Loading...
HomeMy WebLinkAbout06-04 Proffer Statement (2)Greenway Engin Ving Prelimimry Matters Overlay District 155.21 acres of IA, Interstate Area Overlay District A.) Maximum Building Structure Square Feet April 5, 2004 Rutherford, LLC Rezoning RUTHERFORD'S FARM INDUSTRIAL PARK REZONING Tax Parcels 43 -A -96, 43 -A -97, 43 -A -98, 43 -A -99, 43 -A -100 43 -A -101 43 -A -111 Stonewall Magisterial District Pursuant to Section 15.2 -2296 Et. Seq. of the Code of Virginia 1950, as amended, and the provisions of the Frederick County Zoning Ordinance with respect to conditional zoning, the undersigned applicant hereby proffers that in the event the Board of Supervisors of Frederick County, Virginia, shall approve Rezoning Application DC0 for the rezoning of Tax Parcel 43- A -10I, consisting of 0.75 acres, from RA, Rural Areas District to B2, Business General District, and to reconfigure the current Ml, Light Industrial District, B3, Industrial Transition District and B2, Business General District zoning boundaries for the remainder of the acreage to establish the following: Zoning Districts 104.12 acres of Ml, Light Industrial Di aria 22.45 acres of B3, Industrial Transition District 28.64 acres of B2, Business General District Development of the subject property shall be done in conformity with the terms and conditions set forth herein, except to the extent that such terms and conditions may be subsequently amended or revised by the applicant and such be approved by the Frederick County Board of Supervisors in accordance with the said Code and Zoning Ordinance. In the event that such rezoning is not granted, then these proffers shall be deemed withdrawn and have no effect whatsoever. These proffers shall be binding upon this applicant and their legal successors, heirs, or assigns. The subject property is comprised of several Tax Parcels, and is more particularly described as the lands owned by Rutherford, LLC being all or part of Tax Map Parcels 43 -A -96, 43 -A -97, 43 -A -98, 43 -A -99, 43- A -I00, 43 -A -101 and 43 -A -111. The applicants hereby proffer to limit the total buildingstructures to 1,400,000 square feet for the entire 155.21 acres. Greenway Engint. •ring B.) Prohibited Uses The following uses shall not be permitted on the proposed Industrial Park: Description Sic Truck Stop 5541 (Excluding Truck Stops, all other uses within SIC Code 5541 are hereby acceptable and included) C.) Transportation 1.) Traffic Signalization a.) A traffic signal will be installed by the applicants when warranted by the Virginia Department of Transportation at the intersection of the proposed Industrial Park entrance and the unnamed Comprehensive Plan collector road in the configuration and design as approved by VDOT. The applicants shall enter into and execute a signalization agreement prior to the first site plan approval of said Industrial Park. b.) A traffic signal will be install& by the applicants when warranted by VDOT at the southbound ramps of the 317 interchange and U.S. Route 11 in the configuration and design as approved by VDOT. The applicants shall enter into and execute a signalization agreement prior to the first site plan approval of said Industrial Park. 2.) Intersection Improvements April 5, 2004 Rutherford, LLC Rezoning Intersection improvements at the proposed two entrances will be installed and paid for by the applicants. The existing multi-lane system on U.S. Route 11 will be extended north to the intersection of' the proposed County Comprehensive Plan Collector Road. All left and right turn lanes and pavement transitions north and south of proposed County Comprehensive Plan Collector Road on U.S. Route 11 will be install& and paid for by the applicants. The improvements shall be completed within one year of the first site plan approval and prior to the second site plan approval for the Rutherford's Farm Industrial Park. If all or part of the intersection improvements are required for the first site plan of the Rutherford's Farm Industrial Park, they shall be made part of and constructed with this first site plan. 2 Greenway EngiOring 3.) Right of Way Dedication April 5, 2004 Rutherford, LLC Rezoning a.) The applicants hereby agree to dedicate right of way to the Commonwealth of Virginia along U.S. Route 11 adjacent to the property as determined by VDOT. This right of way dedication shall be recorded prior to the approval of the U.S. Route 11 construction plans prepared for the Rutherford's Farm Industrial Park as noted in Proffer C2 (Intersection Improvements) and Proffer C5 (Route 11 and Northbound I -81 Ramp Improvements). b.) The applicants hereby agrees to dedicate right of way to the Commonwealth of Virginia along Interstate 81 as shown on Interstate 81 Improvement Study VDOT Project No. 0081- 968 -F11, PE -100 MP 305 to West Virginia State Line Frederick County, dated November 1998 (specifically noted on Sheet 24 of said study). The right of way dedication shall be recorded prior to the master development plan approval for Rutherford's Farm Industrial Park. 4.) Comprehensive Plan Road Construction The applicants hereby agrees to coordinate, set aside right of way, and construct the portion of the major collector road traversing on the land herein to be rezoned and developed and as outlined in the Frederick County Comprehensive Plan Northeast Land Use Study adopted by the Frederick County Board of Supervisors on September 27, 2000. Said collector road will be incorporated in and constructed with each site plan submission that is adjacent to or part of the site plan. 5.) Route 11 and Northbound I -81 Ramp Improvements The applicants will construct a third southbound lane on US Route 11 from the northern most entrance of the applicants' property to the northbound I -81 ramp of Exit 317. These improvements will include a 12' wide lane of approximately 600 linear feet in length to serve as a continuous right turn lane for the northbound entrance ramp of the Exit 317 interchange. Additionally, the applicants will construct turning radius improvements at the entrance ramp to ensure a smooth transition. The improvements shall be completed within one year of the first site plan approval and prior to the second site plan approval for the Rutherford's Farm Industrial Park. If all or part of the intersection improvements are required for the first site plan of the Rutherford's Farm Industrial Park, they shall be made part of and constructed with this first site plan. 3 Greenway Engineang D.) Historic Resource 1.) Interpretative Signs April 5, 2004 Rutherford, LLC Rezoning The applicants hereby proffer to provide an interpretive area in the location of the old Rutherford's Farm House along U.S. Route 11 and more particularly at the location of the old concrete steps that now remain. An easement of sufficient size will be provided for a pull -off area and viewing. Three interpretative plaques will be provided. They are as follows: The Second Battle of Winchester The Battle of Rutherford's Farm The Rutherford's Farm House The interpretative plaques will contain language and pictures acceptable to the Frederick County Historic Resources Advisory Board. All work performed for the pull -off area will meet the minimum standards of Virginia Department of Transportation and Frederick County Ordinances in respect to Highway pull -off and safety. Ground maintenance of the interpretative area will be performed by the Rutherford's Farm Industrial Park Association under a separate continuous approved permit issued by VDOT. 2.) Landscaping A transitional landscape buffer will be provided along U.S. Route 11 from Interstate 81 traveling north to the Comprehensive Plan collector road and transmission power line easement. This landscape easement will be 15' in width and will consist of a low earthen mound of 2 -3' in height with plantings of ground covers, flowers, and grasses. Indigenous trees such as redbud, oaks, cedars, etc. will be incorporated along said landscape easement in a cluster mass fashion to provide a naturally planted look. The maintenance of said landscape buffer will be the responsibility of the Rutherford's Farm Industrial Park Association and will be installed with the first commercial development adjacent to said easement. 3.) Industrial Park Name The applicant hereby proffers the naming of the Industrial Park to: "Rutherford's Farm Industrial Park" 4 Greenway Engincring E.) Lighting April 5, 2004 Rutherford, LLC Rezoning Building mounted lights and pole- mounted lights will be of a downcast nature and shielded and directed away from adjacent properties surrounding the proposed project. Lighting plans will be submitted as a separate attachment for review and approval by the Frederick County Plannirg Department prior to installation. F.) Signage 1.) Within the M1 (Light Industrial) Zoning District, the applicants hereby proffer that all freestanding business signs shall be monument -style not to exceed 12' in height. 2.) Within the IA (Interstate Area Overlay) Zoning District, the applicants hereby proffer to limit the total numbe of signs to three G.) Recycling Proffer Recyclirg programs will be implemerted with each Industrial Park user to ensure appropriate waste reduction, disposal, and recycling of any waste or byproduct material. This program will be reviewed and approved by the Frederick County Recycling Coordinator prior to final occupancy permit. H.) Monetary Contribution to Offset Impact of Development The undersigned owners of the above described property hereby voluntarily proffer that in the event rezoning application is approved, and the property is subsequently developed within any of the B2, B3, and Mi zones, the undersigned will pay to the Treasurer of Frederick County, Virginia the following amount: 10 000 for Frederick County Fire and Rescue This payment is intended to offset the additional cost to Frederick County due to an increased demand on public services and will be paid at the time of the first site plan submission I.) Signatures The conditions proffered above shall be binding upon the heirs, executors, administrators, assigns and successors in the interest of the applicant and owner. In the event the Frederick County Board of Supervisors grants this rezoning and accepts the conditions, the proffered conditions shall apply to the land rezoned in addition to other requirements set forth in the Frederick County Code. 5 Greenway Engilic ring Respectfully Submitted: therford, LLC Commonwealth of Virginia, City /County of My CommissionExpires April5,2004 To Wit: The foregoing instrument was acknowledged before me this day of l 4) :i?oe' -2004 by Uhn W. 5 C -k at 6 s -0 Date Ntary Public 31 200( Rutherford, LLC Rezoning e$. ;3e File #2795J /EAW Proffer Statement AMENDMENT Action: PLANNING COMMISSION: June 2, 2004 Recommended Approval BOARD OF SUPERVISORS: July 14. 2004 APPROVED DENIED WHEREAS, Rezoning #06 -04 of Rutherford, LLC, submitted by Greenway Engineering, to rezone 13.4 acres from the RA (Rural Areas); B2 (Business General); B3 (Industrial Transition); and, MI (Light Industrial) Districts to the B2 (Business General) and B3 (Industrial Transition) Districts. The subject acreage is located within the northeast quadrant of the Interstate 81 interchange area, which is north and adjacent to Martinsburg Pike (Route 11 North), and east and adjacent to Interstate 81, and is identified by Property Identification Number(s) 43 -A -96, 43 -A -97, 43 -A -98, 43 -A -99, 43 -A -100, 43 -A- 101, and 43-A-111 in the Stonewall Magisterial District; and WHEREAS, the Planning Commission held a public hearing on this rezoning on June 2, 2004; and WHEREAS, the Board of Supervisors held a public hearing on this rezoning on July 14, 2004; and WHEREAS, the Frederick County Board of Supervisors finds the approval of this rezoning to be in the best interest of the public health, safety, welfare, and in conformance with the Comprehensive Policy Plan; NOW, THEREFORE, BE IT ORDAINED by the Frederick County Board of Supervisors that Chapter 165 of the Frederick County Code, Zoning, is amended to revise the Zoning District Map to change 13.4 acres from the RA (Rural Areas); B2 (Business General); B3 (Industrial Transition); and, M1 (Light Industrial) Districts to the B2 (Business General) and B3 (Industrial Transition) Districts, as described by the application and plat submitted, subject to the attached conditions voluntarily proffered in writing by the applicant and the property owner. PDRes #09 -04 AN ORDINANCE AMENDING THE ZONING DISTRICT MAP REZONING #06 -04 OF RUTHERFORD, LLC PDRes. #09 -04 This ordinance shall be in effect on the date of adoption. Passed this 14` day of January, 2004 by the following recorded vote: Richard C. Shickle, Chairman Aye Barbara E. Van Osten Ave Gina A. Forrester Aye Gary Dove Aye W. Harrington Smith, Jr. A y e Bill M. Ewing Aye Lynda J. Tyler A ye A COPY ATTEST AV John iley, Jr. Frederick County Administrator