HomeMy WebLinkAbout06-12 Comments & CorrespondenceCOUNTY of FREDERICK
Department of Planning and Development
540/665 -5651
FAX: 540/665.6395
January 2, 2013
Mr. Ben Montgomery
Montgomery Engineering Group, Inc.
132 Saddleback Lane
Winchester, Virginia 22602
RE: Approval of Site Plan #06 -12; Lighthouse Full Gospel Church
Property Identification Number (PIN): 85 -A -4A
Dear Ben:
The above - referenced site plan was approved on January 2, 2013. The site plan is approved for
the construction of a new church. The site is located on Conestoga Lane (off of Valley Pike) in
the Opequon Magisterial District. Required site improvements include the following:
• Construction of a 5,113 square foot church building with a 5,113 square foot basement.
• Construction of a parking lot with 76 spaces _ (including four handicap accessible),
including wheelstops, striping and handicap access.
• One screened dumpster area.
• Landscaping and lighting as shown on the site plan.
All requirements of the Frederick County Zoning Ordinance have been met in the approved site
plan, including review agency comments from all relevant review agencies. I am providing you
with four (4) copies of the approved site plan. Please forward these copies to the appropriate
representative(s). Furthermore, advise the owner(s) that a copy should be kept for future
reference, and an approved copy must be kept on the construction site throughout the
development process. Once site development is complete, the owner(s) should contact this
office to schedule an on -site inspection. Do not hesitate to contact me if you have any questions
or concerns.
Sincerely,
Candice E. Perkins, AICP
Senior Planner
Attachments
CEP /bad
cc: Gary Lofton, Back Creek District Supervisor
Greg Unger and Kevin Crosen, Back Creek District Planning Commissioners
107 North Kent Street, Suite 202 • Winchester, Virginia 22601 -5000
fla COPY
1 COU T of FREDERICK
Department of Planning and Development
540/665 -5651
FAX: 540/665 -6395
January 2, 201
Mr, Ben Montgomery
Montgomery Engineering Group, Inc.
I32 Saddleback Lane
Winchester, Virginia 22602
RE: Approval of Site Plan #06 -12; Lighthouse Full Gospel Church
Property Identification Number (PIN): 85 -A -4A
Dear Ben:
The above - referenced site plan was approved on January 2, 2013. The site plan is approved for
the construction of a new church. The site is located on Conestoga Lane (off of Valley Pike) in
the Opequon Magisterial District. Required site improvements include the following:
• Construction of a 5,113 square foot church building with a 5,113 square foot basement.
• Construction of a parking lot with 76 spaces (including four handicap accessible),
including wheelstops, striping and handicap access.
• One screened dumpster area.
• Landscaping and lighting as shown on the site plan.
All requirements of the Frederick County Zoning Ordinance have been met in the approved site
plan. including review agency comments from all relevant review agencies. I am providing you
with four (4) copies of the approved site plan. Please forward these copies to the appropriate
representative(s). Furthermore, advise the owner(s) that a copy should be kept for future
reference, and an approved copy must be kept on the construction site throughout the
development process. Once site development is complete, the owner(s) should contact this
office to schedule an on -site inspection. Do not hesitate to contact me if you have any questions
or concerns.
Sincerely,
Candice E. Perkins, AICP
Senior Planner
Attachments
CEP /bad
cc: Jane Anderson, Real Estate
Bill Ewing, Opequon District Supervisor
Roger Thomas and Brian Madigan, Opequon District Planning Commissioners
Commissioner of Revenue
Lighthouse Full Gospel Church, 800 Salem Church Road, Stephens City, VA 22655
107 North Kent Street, Suite 202 • Winchester, Virginia 22601 -5000
C$N f' �I ERICK
Department of Planning and Development
540/665 -5651
FAX: 540/665 -6395
June 1, 2012
Mr. Ben Montgomery
Montgomery Engineering Group, Inc.
132 Saddleback Lane
Winchester, Virginia 22602
Re: Second Review Comments for Site Plan 406 -12; Lighthouse Full Gospel Church
Property Identification Number (PIN): 85 -A -4A
Dear Ben:
Planning Staff has reviewed the above - referenced site plan to determine if administrative approval can be
granted. At this time, administrative approval cannot be granted. This site plan is denied until the issues
in this letter, as well as all issues of the other review agencies, have been adequately addressed. Please
review Staffs comments listed below and then prepare a revised site plan which adequately addresses
each concern.
Review Comments
note to state that it will require a separate site plan.
1. Future Parking. Expand the Phase 2
2. Lighting Detail. Remove the lighting detail on sheet 6. Provide a detail for the pole mounted
lighting (base and pole). Specify the height of the pole mounted lighting and the mounting height
of the wall pack.
3. Valley Pike ROW. Clarify with VDOT that additional ROW is not needed for this portion of
Valley Pike.
After you have revised the site plan, please resubmit one copy so that I may verify the information
contained on the plan. I will need all approved review agency comment sheets and at least five copies of
the final plan for approval. Comment sheets are required from the following agencies: the Virginia
Department of Transportation, the Frederick County Inspections Department, the Frederick County
Engineer, the Frederick Counry Fire Marshal, and the Virginia Department of Health.
Sincerely;
f r ft'//
Candice E. Perkins, AICP
Senior Planner
CEP /bad
Attachment
cc: Lighthouse Full Gospel Church, 800Salem Church Road, Stephens City, VA 22655
107 North Kent Street, Suite 202 • Winchester, Virginia 22601 -5000
A`VC1C ` COGS • • ��# COPY
_ COUNTY of FREDERICK
Department of Planning and Development
540/665.5651
FAX: 540 /665 -6395
April 30, 2012
Mr. Ben Montgomery
Montgomery Engineering Group, Inc.
132 Saddleback Lane
Winchester, Virginia 22602
Re: Review Comments for Site Plan #06 -12; Lighthouse Full Gospel Church
Property Identification Number (PIN): 85 -A -4A
Dear Ben:
Planning Staff has reviewed the above - referenced site plan to determine if administrative
approval can be granted. At this time, administrative approval cannot be granted. This site plan
is denied until the issues in this letter, as well as all issues of the other review agencies, have
been adequately addressed. Please review Staff's comments listed below and then prepare a
revised site plan which adequately addresses each concern.
Review Comments
1. Parking Calculation. The parking calculation only accounts for the number of seats,
indicate if there is any office space.
2. Signage. The maximum freestanding signage shown on the coversheet exceeds the
maximum permitted in the RA District. The signage permitted for this site is a 10' tall,
50 square foot monument sign.
3. Entrance Spacing. The entrance located on Conestoga Lane needs to be a minimum of
200' from the intersection of Valley Pike and Conestoga Lane.
4. Photometric Plan and Outdoor Lighting Fixtures. This development is proposing
outdoor lighting and therefore a photometric plan is required. The outdoor lighting
requirements can be found in §165- 201.07 of the Zoning Ordinance. Also, please note
that only full cutoff fixtures (wall mounted and pole mounted) are permitted. The pole
light shown in the parking area on sheet 6 needs to be relocated, light fixtures cannot be
located within the paved /hard surfaced areas.
5. Parking Lot Landscaping. The site plan contains a note that states that parking lot
landscaping is not required because the parking lot is 3' lower than Route 11. Show the
topography at the edge of the parking lot and the property line. A note also needs to be
added that states supplemental landscaping may be required if upon site inspection the 3'
grade differential is not being met.
107 North Kent Street, Suite 202 • Winchester, Virginia 22601 -5000
^ ' 0
Mr. Ben Montgomery
RE: Site Plan #06 -12
April 30, 2012
Page 2
6. Future Parking. There is an area labeled "future parking ", this future parking area
needs to be shown and labeled as Phase 2 or the label removed.
7. Gravel and Pavement. At the rear of the church structure show the transition from
double prime and seal to gravel.
8. Wheelstops. Wheelstops need to be provided as indicated on sheet 2.
9. Landscaping Note. On sheet 6 the Zoning Ordinance reference is incorrect, it needs to
show § 165- 203.01 B.
After you have revised the site plan, please resubmit one copy so that 1 may verify the
information contained on the plan. I will need all approved review agency comment sheets and
at least five copies of the final plan for approval. Comment sheets are required from the
following agencies: the Virginia Department of Transportation, the Frederick County
Inspections Department, the Frederick County Engineer, the Frederick County Fire Marshal,
and the Virginia Department of Health.
Sincerely,
Candice E. Perkins, AICP
Senior Planner
CEP /dlw
Attachment
cc: Lighthouse Full Gospel Church, 800Salem Church Road, Stephens City, VA 22655
Vf
"T 'I
0
Re: #06 -12 Lighthouse Full Gospel Church
County of Frederick
Dept. of Planning & Development
107 N. Kent St.
Winchester, VA 22601 -5000
Dear Ms. Perkins:
VTf-
,'J i. MAY 2 3 2012:.11
FREUEISICK COUNTY
DFVFI OP�gENT
7C.
May 20, 2012
Per your attached comment letter dated April 30, 2012, we have made the following revisions.
1. There are 467 square feet of office included for the church. Added to cover sheet.
2. 1 could not find this in the code before. Change made on cover sheet.
3. Entrance moved 200' from Valley Pike.
4. All lights are to be full cut -off. Note changed on cover sheet. Note marked on Sheet 2 is
for the underground conduit not a light. Photometric Plan added per code.
5. Topography clearly shows the grade difference of 3' minimum both by spot points and
topography lines. Note has been added as directed.
6. Note changed to Phase 2.
7. Gravel at rear has been determined by owner to change to hard surface.
8. Wheel -stops added. There is header curb at HC area except at middle space which a
wheel -stop was provided.
9. Landscaping note changed.
Thank you for your help in this process. If you have any questions, give me a call.
SIFPE
A •Mr. Ben Montgomery
RE: Site Plan #06 -12
April 30, 2012
Page 2
6. Future Parking. There is an area labeled "future parking ", this future parking area
needs to be shown and labeled as Phase 2 or the label removed.
7. Gravel and Pavement. At the rear of the church structure show the transition from
double prime and seal to gravel.
8. Wheelstons. Wheelstops need to be provided as indicated on sheet 2.
9. Landscapine Note. On sheet 6 the Zoning Ordinance reference is incorrect, it needs to
show §165 - 203.0113.
After you have revised the site plan, please resubmit one copy so that I may verify the
information contained on the plan. I will need all approved review agency comment sheets and
at least five copies of the final plan for approval. Comment sheets are required from the
following agencies: the Virginia Department of Transportation, the Frederick County
Inspections Department, the Frederick County Engineer, the Frederick County Fire Marshal,
and the Virginia Department of Health.
Sincerely,
Candice E. Perkins, AICP
Senior Planner
CEP /dlw
Attachment
cc: Lighthouse Full Gospel Church, 800Salem Church Road, Stephens City, VA 22655
_ •
4CKFcm
April 30, 2012
Mr. Ben Montgomery
Montgomery Engineering Group, Inc.
132 Saddleback Lane
Winchester, Virginia 22602
U
COUNTY of FREDERICK
Department of Planning and Development
5401665.5651
FAX: 540/665 -6395
Re: Review Comments for Site Plan #06 -12; Lighthouse Full Gospel Church
Property Identification Number (PIN): 85 -A -4A
Dear Ben:
Planning Staff has reviewed the above - referenced site plan to determine if administrative
approval can be granted. At this time, administrative approval cannot be granted. This site plan
is denied until the issues in this letter, as well as all issues of the other review agencies, have
been adequately addressed. Please review Staffs comments listed below and then prepare a
revised site plan which adequately addresses each concern.
Review Comments
1. Parking Calculation. The parking calculation only accounts for the number of seats,
indicate if there is any office space.
2. Signage. The maximum freestanding signage shown on the coversheet exceeds the
maximum permitted in the RA District. The signage permitted for this site is a 10' tall,
50 square foot monument sign.
3. Entrance Spacing. The entrance located on Conestoga Lane needs to be a minimum of
200' from the intersection of Valley Pike and Conestoga Lane.
4. Photometric Plan and Outdoor Lighting Fixtures. This development is proposing
outdoor lighting and therefore a photometric plan is required. The outdoor lighting
requirements can be found in §165 - 201.07 of the Zoning Ordinance. Also, please note
that only full cutoff fixtures (wall mounted and pole mounted) are permitted. The pole
light shown in the parking area on sheet 6 needs to be relocated, light fixtures cannot be
located within the paved /hard surfaced areas.
5. Parking Lot Landscaping. The site plan contains a note that states that parking lot
landscaping is not required because the parking lot is 3' lower than Route 11. Show the
topography at the edge of the parking lot and the property line. A note also needs to be
added that states supplemental landscaping may be required if upon site inspection the 3'
grade differential is not being met.
107 North Kent Street, Suite 202 • Winchester, Virginia 22601 -5000
Dam
a
Eric
Nuke
John
hffim�
Received by Clerical staff (Date & T=e):