HomeMy WebLinkAbout02-04 ApplicationMay 5, 2004 Mr. Charles E. Maddox, Jr. Gilbert W. Clifford Associates, Inc. 117 E. Piccadilly St. Winchester, VA 22601 RE: REZONING #02 -04, SEMPELES PROPERTY Dear Chuck: This letter serves to confirm action taken by the Frederick County Board of Supervisors at their meeting of April 27, 2004. The above referenced application was approved to rezone 10.35 acres from RA (Rural Areas) to B2 (Business General) and 101.92 acres from RA (Rural Areas) to M1 (Industrial Light) District. The subject properties are located east and adjacent to Martinsburg Pike (Route 11 North) and north and adjacent to Woodbine Road (Route 669). The properties are identified with Property Identification Numbers 34 -A -2 and 34 -A -4, in the Stonewall Magisterial District. The proffers that were approved as a part of this rezoning application are unique to these properties and are binding regardless of ownership. Enclosed is a copy of the adopted proffer statement for your records. Please do not hesitate to contact this office if you have any questions regarding the approval of this rezoning application. Sincerely, Christopher M. Mohn, AICP Deputy Planning Director CMM/bad cc: /George and Carol Sempeles, 331 Woodbine Road, Clearbrook, VA 22624 Ada Tyler, Stonewall District Supervisor /J�rry Copp, VDOT Resident Engineer e Anderson, Real Estate ,_Alex Gray, Planning Development /John Light, Stonewall Planning Commissioner em: DeHaven, Jr., Stonewall Planning Commissioners 107 North Kent Street Winchester. Virginia 22601 -5000 COUNTY of FREDERICK Department of Planning and Development 540/665 -5651 FAX: 540/665 -6395 0 REZONING APPLICATION #02 -04 SEMPELES PROPERTY Staff Report for the Board of Supervisors Public Hearing Prepared: April 20, 2004 Staff Contact: Christopher M. Mohn, AICP, Deputy Planning Director This report is prepared by the Frederick County Planning Staff to provide information to the Planning Commission and the Board of Supervisors to assist them in making a decision on this application. It may also be useful to others interested in this zoning matter. Unresolved issues concerning this application are noted by staff where relevant throughout this staff report. Reviewed Action Planning Commission: 04/07/04 Recommended Approval Board of Supervisors: 04/27/04 in PROPOSAL: To rezone 10.35 acres from RA (Rural Areas) District to B2 (Business General) District and 101.92 acres from RA (Rural Areas) District to M1 (Industrial Light) District. The total area subject to this rezoning request is 112.27 acres. LOCATION: The property is located east and adjacent to Martinsburg Pike (Route 11 North) and north and adjacent to Woodbine Road (Route 669). MAGISTERIAL DISTRICT: Stonewall PROPERTY ID NUMBER(S): 34 -A -2 and 34 -A -4 PROPERTY ZONING PRESENT USE: Rural Areas (RA) District Vacant ADJOINING PROPERTY ZONING PRESENT USE: North: Berkeley County, WV Residential, Vacant South: Rural Areas (RA) District Residential, Vacant Light Industrial (M1) District Industrial (Butler Manufacturing) East: Rural Areas (RA) District Residential, Vacant West: Rural Areas (RA) District Residential, Institutional Business General (B2) District Commercial PROPOSED USE: Industrial /Commercial REZ #02 -04, Sempeles Property Page 2 April 20, 2004 REVIEW EVALUATIONS: Virginia Dept. of Transportation: The addendum you have submitted for review provides a significant improved flow of traffic and a reduction of congestion (projected LOS of at all intersections) at the intersection of Route 669 and the north bound ramps of Interstate 81. This change, along with a partial signalization agreement at the Route 11 and Woodbine Road intersection, will provide a plan that VDOT can support. Fire Marshal: Plan approval recommended. Frederick- Winchester Service Authority: No technical comments. County Engineer: Please see attached letter from HarveyE. Strawsnyder, Jr., P.E., Director ofPublic Works, dated 04/01/03. Sanitation Authority: The construction contract for the project to serve this property with water and sewer has been awarded. All easements have been provided and construction will begin within a month. Completion of the project is expected in October 2004. Historic Resources Advisory Board: Please see attached letter from Rebecca A. Ragsdale, Planner 1, dated 03/03/03. County Attorney: Proffers appear to be in proper form. Frederick County Inspections: No comment required at this time. Shall comment at the time of site plan review. Winchester Regional Airport: The above referenced proposal has been reviewed and it appears that the proposed site plan will not have an impact on operations at the Winchester Regional Airport. While the proposed development lies within the airport's airspace, it does fall outside of the airport's Part 77 surfaces. Planning Zoning: 1) Site History The original Frederick County zoning map (U.S.G.S. Inwood Quadrangle) identifies the subject parcels as being zoned A -2 (Agricultural General). The County's agricultural zoning districts were combined to form the RA (Rural Areas) District upon adoption of an amendment to the Frederick County Zoning Ordinance on May 10, 1989. The corresponding revision of the zoning map resulted in the re- mapping of the subject properties and all other A -1 and A -2 zoned land to the RA District. The Northeast Land Use Plan (NELUP) was amended by the Board of Supervisors on November 12, 2003 to modify land use and transportation provisions applicable to the subject site. Specifically, the path of a planned major collector road was relocated to follow existing Woodbine Road (Route 669), as opposed to bisecting the site as originally envisioned. 39) REZ #02 -04, Sempeles Property Page 3 April 20, 2004 Additionally, the business land use designation was added in the vicinity of the intersection of Martinsburg Pike (Route 11 North) and Rest Church Road (Route 669), which coincides with the frontage of the subject site. 2) Comprehensive Policy Plan Land Use The two parcels comprising this rezoning request are located within the boundaries of the Northeast Land Use Plan (NELUP), and are located wholly within the Sewer and Water Service Area (SWSA). The NELUP envisions the majority of the area comprised by the subject parcels as developing with industrial land uses, with the frontage of the site along Martinsburg Pike (Route 11 North) designated for business land use. (Comprehensive Policy Plan, p. 6 -36, p. 6- Transportation Consistent with the general transportation policies of the Comprehensive Policy Plan, the NELUP specifies that proposed development should only occur if impacted road systems will function at Level of Service (LOS) "C" or better. The NELUP indicates that improvement of roads to maintain this level of service objective is the responsibility of the private property owner or developer. Moreover, the transportation policies of the NELUP encourage the development of connector roadways within industrial areas and the implementation of measures that will facilitate the improvement of Martinsburg Pike (Route 11 North) to a four lane highway. (Comprehensive Policy Plan, p. 6 -36.2, 6 -36.3, 7 -5) Planning Staff Comment The rezoning proposal offered by the applicant is generally consistent with the applicable land use and transportation policies of the Comprehensive Policy Plan, and, in particular, the Northeast Land Use Plan (NELUP). Specifically, conformance with adopted policy is achieved as follows: Land Use: The configuration of zoning districts proposed by the applicant correctly corresponds with the multiple planned land use designations applicable to the site, with the M1 (Light Industrial) District and B2 (Business General) District applied to the areas designated for industrial and business land uses, respectively. The land use objectives articulated for the site by policy may be effectively achieved through these zoning designations. Transportation: The transportation program proffered by the applicant includes elements encouraged by the NELUP, such as an internal connector roadway linking Martinsburg Pike and Woodbine Road (Route 669), improvements and right -of -way dedication on Martinsburg Pike, and a commitment to enter a signalization agreement for the intersection of Martinsburg Pike and Woodbine Road. REZ #02 -04, Sempeles Property Page 4 April 20, 2004 Moreover, the proffered transportation program achieves the functional objectives established by policy, as the road network serving the proposed project is projected to maintain Level of Service (LOS) "C" conditions or better. 3) Site Suitability The subject properties do not contain any environmental features or constraints that would either hinder or preclude site development. In particular, the site does not include any areas of steep slopes, flood plain, or wetlands /hydrologic soils. The General Soil Map of the Soil Survey of Frederick County, Virginia indicates that the soils comprising the subject parcels fall under the Oaklet Carbo Chilhowie soil association. The predominant soil type on the site is Oaklet silt loam, 2 to 7 percent slopes (map symbol 32B), which is identified by the survey as prime farmland. The applicant has proffered that a geotechnical analysis will be completed prior to site plan approval for any commercial or industrial development on the site. Effective management of unique geological characteristics or conditions identified through such analysis will be required to secure site plan approval. 4) Potential Impacts. a) Transportation Impact Analysis Statement: The traffic impact analysis (TIA) prepared for this application calculated transportation impacts based upon the following development assumptions: Industrial Park: 1,197,900 square feet Retail: 98,000 square feet Using traffic generation figures from the I.T.E. Trip Generation Manual, 6`h Edition, the applicant projects traffic impacts for the development in terms of project build -out, which is expected to occur by 2012. The TIA indicates that at project build out, the planned uses will result in the generation of 13,422 new average daily trips (ADT). (See "A Traffic Impact Analysis of the Sempeles Property," p. 4) The new trips generated by the development will be absorbed by an external road network consisting of Martinsburg Pike (Route 11), Woodbine Road (Route 669) and the Exit 323 interchange of Interstate 81 at Rest Church Road (Route 669). This external network will be linked to the development via a proffered internal connector road, which will align with Rest Church Road at its intersection with Martinsburg Pike and extend through the site to link withWoodbine Road. REZ #02 -04, Sempeles Property Page 5 April 20, 2004 Access management is critical to the build out projections of the TIA. Indeed, the TIA assumes that site access for all truck traffic will be restricted to the Woodbine Road entrance. Outbound truck traffic will exit the site via the connector road at either the Woodbine Road or Martinsburg Pike site entrances. To facilitate this access arrangement, the applicant has proffered to participate in a signalization agreement for the intersection of Martinsburg Pike and Woodbine Road. The TIA does not account for any restrictions on car access. The TIA concludes that the improvements proffered by the applicant will ensure Level of Service (LOS) Category "C" conditions or better on study area roads during peak traffic periods at project build -out (2012). (See "An Addendum To: A Traffic Impact Analysis of the Sempeles Property"). VDOT Comment: The addendum you have submitted for review provides a significant improved flow of traffic and a reduction of congestion (projected LOS of "C" at all intersections) at the intersection of Route 669 and the north bound ramps of Interstate 81. This change, along with a partial signalization agreement at the Route 11 and Woodbine Road intersection will provide a plan that VDOT can support. b) Historic Resources c) Water Sewer The Frederick County Rural Landmarks Survey does not identify any potentially significant historic resources on the site of the proposed rezoning. Moreover, according to the National Park Service's Study of Civil War Sites in the Shenandoah Valley of Virginia, the subject site is not included in any battlefield study area and does not contain any core battlefield resources. It is noted that several structures included in the Frederick County Rural Landmarks Survey are located on properties adjacent to the subject site. Of these resources, only Saspirilla Springs #156) is identified as potentially significant, which is located immediately east of the site and is occupied by the applicant as a single family residence. The Historic Resources Advisory Board (HRAB) considered this rezoning proposal at its February 25, 2003 meeting. The HRAB offered no adverse comments concerning the proposal. The applicant indicates that public sewer and water service will be provided to the site pursuant to the concept plan prepared by the Frederick County Sanitation Authority (FCSA) for the extension of such facilities to the Rest Church Road interchange area. The water consumption /wastewater generation for the uses envisioned on the site is projected to be approximately 35,000 gallons per day (GPD). REZ #02 -04, Sempeles Property Page 6 April 20, 2004 FCSA Comment: The construction contract for the project to serve this property with water and sewer has been awarded. All easements have been provided and construction will begin within a month. Completion of the project is expected in October 2004. 5) Proffer Statement Revised Through March 2004 General Development Plan (Proposed Proffer Statement, p. 1) The applicant has proffered that development of the site will occur in conformance with the General Development Plan (GDP) submitted with the proposed proffer statement (dated March 8, 2004). The GDP references the location of certain proffered improvements (i.e., transportation features) and further delineates the proposed commercial and industrial components of the site. Street Improvements (Proposed Proffer Statement, p. 1 2) a. Martinsburg Pike Frontage: The applicant has proffered to complete the following improvements along the site's Martinsburg Pike frontage: (1) Construction of a 12 -foot wide lane on the northbound side of Martinsburg Pike; (2) Dedication of 14 feet of additional right -of -way for Martinsburg Pike; and (3) Installation of two commercial entrances on the north and south sides of the connector road intersection with Martinsburg Pike. The proffered commercial entrances will be at least 36 feet in width, and the south entrance will be limited to right in/out movements. b. Industrial Access /Internal Connector Road: The applicant has proffered to construct an industrial access road that will align with Rest Church Road at its intersection with Martinsburg Pike. This internal connector road will traverse through the site and link with Woodbine Road. The right -of -way for the road is proffered to consist of 80 feet. c. Signal Modification: The applicant has proffered to modify the VDOT proposed three (3) way traffic signal at the Rest Church Road/Martinsburg Pike intersection to accommodate a four (4) way intersection. d. Signalization Agreement: The applicant has proffered to enter into a signalization agreement involving partial cost sharing for the Woodbine Road/Martinsburg Pike intersection. The establishment of this agreement is proffered to occur prior to approval of the first site plan for the Ml zoned portion of the site. e. Traffic Impact Analysis: The applicant has proffered to provide a traffic impact analysis (TIA) with each site plan for an industrial use on the site. Any additional road improvements deemed necessary by the TIA to maintain acceptable level of service conditions will be negotiated between the applicant, VDOT and Frederick County prior to site plan approval. REZ #02 -04, Sempeles Property Page 7 April 20, 2004 Landscape Design Features (Proposed Proffer Statement, p. 2) a. The applicant has proffered to provide a twenty (20) foot wide landscaped green strip along the site's frontage on Martinsburg Pike. Included within this landscaped area will be a low berm complemented by suitable low profile landscaping. Planning Staff Comment: It is noted that the Generalized Development Plan (GDP) does not include a design detail of the proffered landscaped green strip. Indeed, with the exception of the low berm, the planned composition and appearance of this important corridor design feature has not been defined. On Site Development (Proposed Proffer Statement, p. 2 3) The applicant has proffered to include language governing construction standards in the deed covenants and restrictions for the individual industrial sites within the project. These standards will be privately administered and enforced during the site development process. Additional Site Proffers (Proposed Proffer Statement, p. 3) The applicant has proffered to employ the following site design standards, which will be administered and enforced by county staff during review of subsequent development applications: a. All utilities will be installed underground. b. Street trees will be planted along both sides of the proffered industrial access /internal connector road The street trees will be installed on 50 foot centers and will consist of a minimum caliper of 2 inches at time of planting. c. Stormwater management pond facilities will be lined with impervious liner materials to protect against groundwater impacts. d. A geoteclmical analysis and study will be prepared for all proposed commercial and industrial structures prior to site plan approval. e. Retail sale of diesel fuel for trucks will be prohibited on the site. Monetary Contribution to Offset Impact of Development (Proposed Proffer Statement, p. 3) The applicant has proffered to contribute a total of $20,000 to Frederick County to aid mitigation of fiscal impacts associated with the proposed development. This contribution will be submitted by the applicant at the time of issuance of the first building permit for the site. The applicant has proffered that this contribution be disbursed as follows: REZ #02 -04, Sempeles Property Page 8 April 20, 2004 Fire and Rescue Services $15,000 Sheriff 3,000 Administration Building 2,000 PLANNING COMMISSION SUMMARY ACTION OF 04/07/04 MEETING: The primary area of discussion among Commissioners was the anticipated truck traffic that would be generated by this site. In particular, the applicant and VDOT were questioned regarding the extent to which the proposed transportation plan accounted for the coordinated flow and stacking of truck traffic associated with the Sempeles site and the Flying J facility located on the opposite side of the interchange. Although some Commissioners believed gridlock would result from the close proximity of Route 11 to Interstate 81, coupled with the traffic generated by the Flying J site and existing vehicular traffic, the majority of members believed the traffic issues were solvable. A request was made for the applicant to present specific methods for traffic coordination at the master development plan stage. Concern was also raised for impacts to the existing residential uses fronting on Route 11 and the applicant assured the Commission that noise and light infiltration would be addressed. During the public comment portion of the meeting, a member from the Board of Trustees of Rest United Methodist Church came before the Commission to express the board's concem with traffic conditions in the area. In particular, it was noted that access to the church site had been significantly constrained due to the recent improvement project involving the Rest Church Road bridge. The Rest United Methodist Church representative clarified that the board was concerned primarily with the VDOT response to the reported site access problems, and that it had no objection to the subject rezoning application. A copy of a letter submitted by the Rest United Methodist Church Board of Trustees to Senator Russell Pots concerning the access issue and the VDOT response to date was included with the official record of this application. A representative from VDOT was available to answer questions at the meeting. He believed the transportation problems had been substantially addressed, especially in light of the improvements that were made at the Rest Church bridge and the intersection of Rest Church Road (Rt. 669) and Martinsburg Pike (Rt. 11). It was further noted that Woodbine Road had been improved as an industrial access roadway. VDOT did not foresee any potential future problems arising from this site. By a majority vote, the Planning Commission recommended approval of the rezoning as follows: YES (TO APPROVE): Unger, Thomas, Ours, Fisher, Rosenberry, DeHaven NO: Gouchenour, Morris, ABSTAIN: Light (Please note: Commissioners Straub, Watt, Kriz, and Triplett were absent from the meeting.) REZ #02 -04, Sempeles Property Page 9 April 20, 2004 STAFF CONCLUSIONS FOR THE 04/27/04 BOARD OF SUPERVISORS MEETING: This application is a request to rezone 112.27 acres of land to the B2 and M1 Districts. Specifically, the applicant is seeking to rezone 10.35 acres to the B2 District and 101.92 acres to the Ml District The Comprehensive Policy Plan articulates the planned land uses applicable to the subject parcels through the policies of the Northeast Land Use Plan (NELUP). The NELUP designates the subject parcels for industrial and business development, respectively. Moreover, the site is located within the Sewer and Water Service Area (SWSA). As described in this staff report, the development program proposed through the requested rezoning is consistent with the adopted policies of the Comprehensive Policy Plan. Following the requisite public hearing, a decision to either approve or deny this application would be appropriate. R V NI TE0 i i 0 0 end Nancy Compher, Pastor The Honorable Russell Potts Senate of Virginia PO Box 396 Richmond, VA 23218 Dear Senator Potts orttj freberi! QCjjarge Pest United Methodist Church February 9, 2004 1233 Ite5t Chuck Jkoab Ctearbrook, in 22624 (540) 665 -2926 White United Methodist Church As you are aware, the recent Virginia Department of Transportation (VDOT) construction project involving the new six -lane bridge over Interstate 81 on Va. Rt. 669 has caused considerable controversy within the local community and with local property owners in northern Frederick County. One of the controversies remaining unresolved involves the unsafe entrance /exit to and from US Rt. 11 to the parking lot of the Rest United Methodist Church, which is immediately adjacent to Rt. 669. During the course of the construction the church's access to Rt. 669 was permanently closed, leaving only one entrance /exit to and from the parking lot. To further compound the single entrance situation, the entrance /exit to the parking lot is within 100 feet of the Rt. 669 US Rt. 11 intersection. This, by VDOT's own admission, creates an unsafe traffic condition. To date (covering about 2 years of dialogue), Rest United Methodist Church (through the Winchester district of the Virginia Methodist Conference and through the law office of Mr. Thomas M. Dickinson Jr.) has attempted to reach a fair and equitable settlement with VDOT regarding the loss of the second entrance /exit, and more importantly the unsafe traffic condition created by the construction project. However, it now appears to the members of Rest United Methodist Church that VDOT continually attempts to delay and/or prolong bringing this issue to acceptable closure. Rest Church has provided a gathering place for worship for many northern Frederick County residents over the years, and has been a landmark in the local community for over 100 years. However, many members of the congregation are now gravely concerned over the unsafe entrance /exit created by the construction project. The existing traffic hazard not only threatens the safety of the present congregation (the majority of whom are your constituents), but also reduces the viability of the church due to a limited and unsafe facility to support the present and future needs of the church. Due to space limitations herein, I have not provided any details relative to the issue; however, I am confident that the Reverend Jay Hanke, District Superintendent of the Winchester District of the United Methodist Church, and/or Mr. Tom Dickinson, Esq., would welcome the opportunity to speak with you and discuss the details surrounding the situation. Page 2 of 2 As Rest United Methodist Church has stated many times over the past two years, the congregation is not seeking to capitalize on the Commonwealth of Virginia regarding any perceived damages to this church created with the widening of Rt. 669. However, the members of Rest United Methodist Church do believe VDOT should bear the burden of restoring a safe access to its property. Therefore, the Trustees are seeking any help you and/or your staff can provide in resolving and bringing this matter to closure in a timely manner. Sincerely, Robert D. Van Metre Chairman, Board of the Trustees Rest United Methodist Church 1233 Rest Church Road Clearbrook, VA 22624 Copies to: The Honorable Beverly herwood House of Delegates General Assembly Building PO Box 406 Richmond, VA 23218 The Reverend Dr. Jay Hanke Superintendent, Winchester District The United Methodist Church 21 South Kent Street Winchester, VA 22601 Tom Dickinson, Esq. 102 -2 South Kent Street Winchester, VA 22601 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Mr. Charles E. Maddox, Jr., P.E. Vice President Gilbert W. Clifford and Associates, Inc. 117 East Piccadilly Street, Suite 200 Winchester, Virginia 22601 RE: Semples Rezoning Frederick County, Virginia Dear Chuck: April 1, 2003 We have completed our review of the proposed rezoning and offer the following comments: COUNTY of FREDERICK Department of Public Works 540/665 -5643 FAX: 540/678 -0682 1) Refer to Section II, Summary. The discussion indicates that all site traffic will use the direct connection at Route 11 and Rest Church Road thereby minimizing the impact of the development on the existing transportation system. We recommend that the planned commercial site traffic also be funneled to this direct connect rather than allowing entrances off of Route 11. 2) Refer to Section III, Impact Analysis "A" Site Background and History. The discussion references the probable extension of water and sewer facilities to this area. Discussions with the sanitation authority staff indicate that these extensions could occur within the next fiscal year. 3) Refer to Section III, Impact Analysis "C" Site Suitability. We recommend that a geological study be performed at the master development phase to delineate any pertinent karst features (i.e., sinkholes, rock ledges, etc.) that may exist on the site. This study will aid in locating drainage structures, detention ponds and roads. 4) We strongly support your offer to line stormwater management ponds in the karst terrain as outlined under Section "F" Site Drainage. 107 North Kent Street Winchester, Virginia 22601 -5000 1 I Semples Rezoning Page 2 1 April 1, 2003 5) Under Section "G" Solid Waste Disposal Facilities, the estimated solid waste generation of 14.9 tons per day at build -out will result in a waste flow increase of approximately three (3) percent at the existing landfill. 1 1 1 It t HES /rls I can be reached at 665 -5643 if you have any questions concerning the above comments. cc: Frederick County Planning and Development file 1' 1 1 1 1 1 1 1 1 1 Sincerely, Harvey I Jr., P.E. Director of Public Works 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 March 3, 2003 Mr. C. E. Maddox, Jr., P. E., Vice President Gilbert W. Clifford Associates, Inc. 117 East Piccadilly Street, Suite 200 Winchester, Virginia 22601 RE: Historic Resources Advisory Board (HRAB) Comments Sempeles Rezoning -Rest Church Area Dear Chuck: The Frederick County Historic Resources Advisory Board (HRAB) considered the referenced proposal during their meeting of February 25, 2003. The HRAB reviewed information information associated with the Frederick County Rural Landmarks Survey Report, National Park Service Study of Civil War Sites in the Shenandoah Valley and information provided by the applicant. Historic Resources Advisory Board Comment The 103 -acre parcel proposed for rezoning from the RA (Rural Areas) District to the M -1 (Light Industrial) and B -2 (Business General) Zoning Districts is not located within any battlefield study areas as identified by the National Park Service Study of Civil War Sites in the Shenandoah Valley. There are several historic properties identified in the Frederick County Rural Landmarks Survey Report located proximate to the property proposed for rezoning. Directly adjacent properties include the Brining -Adams House, the Rest United Methodist Church, the Schlack House (located on the subject site), and Sasparilla Springs. Sasparilla Springs is listed as potentially significant in the Rural Landmarks Survey Report. There were no adverse comments by the HRAB regarding this rezoning request. The HRAB agrees with the applicant's suggested buffers and screening along the perimeter of the site. Please contact me if you have questions regarding this comment from the HRAB. Sincerely, attaira Rebecca A. Ragsdale Planner I RAR/bah cc: George Sempeles, 331 Woodbine Road, Clearbrook, VA 22624 U:\ COMMnTEES\ HRAB \Comments\2oo3 \SempelesRZ.wpd 107 North Kent Street Winchester, Virginia 22601 -5000 COUNTY of FREDERICK Department of Planning and Development 540/665 -5651 FAX: 540/665-6395 The following information shall be provided by the applicant: All parcel identification numbers, deed book and page numbers may be obtarnedfrom'thep Office of the Commissioner of Revenue, Real Estate Division, 107 North Kent' Street, Winchester. 1. Applicant: Name: Gilbert W. Clifford Associates, Inc. Telephone: 667 -2139 Address: c/o C. E. Maddox, Jr., P.E., VP 117 E. Piccadilly Street, Suite 200, Winchester, Virginia 22601 2. Property Owner (if different than above) Name: George M. Carol T. Sempeles Telephone: 662 -5802 Address: 331 Woodbine Road Clearbrook, Virginia 22624 3. Contact person if other than above Name: C.E. Maddox, Jr. 4. Checklist: Check the following items that have been included with this application. Location Map Plat Deed of property Verification of taxes paid REZONING APPLICATION FORM FREDERICK COUNTY, VIRGINIA Agency Comments Fees Impact Analysis Statement Proffer Statement Telephone: 667 -2139 FEB 0 6 2004 r LANNItia cb7S.ik "rtr 1 5. The Code of Virginia allows us to request full disclosure of ownership in relation to rezoning applications. Please list below all owners or parties in interest of the land to be rezoned: George M. Sempeles Carol T. Sempeles 6. A) Current Use of the Property: Vacant B) Proposed Use of the Property: Industrial/Commercial 7. Adjoining Property: See attached PARCEL ID NUMBER USE ZONING 8. Location: The property is located at (give exact location based on nearest road and distance from nearest intersection, using road names and route numbers). East and adjacent to intersection of U.S. Route 11 and Route 669 (Woodbine Road) Information to be Submitted for Capital Facilities Impact Model 2 Acres Current Zonin Zonin Re s uested nal RA B-2 n! RA M -1 n Total acreage to be rezoned In order for the Planning Staff to use its capital facilities impact model, it is necessary for the applicant to provide information concerning the specifics of the proposed use Otherwise, the planning staff will use the maximum possible density of intensity scenario for the proposed Zoning District as described on page 9 of the application package. 9. Parcel Identification/Location: Parcel Identification Number 34 -A -2, 34 -A -4 Districts Magisterial: Stonewall High School: James Wood Fire Service: Clearbrook Middle School: James Wood Rescue Service: Clearbrook Elementary School: Stonewall 10. Zoning Change: List the acreage included in each new zoning category being requested. 11. The Yalv4ving information should be provided according to the type of rezoning proposed: Number of Units Proposed Single Family Home 0 Townhome 0 Multi- Family 0 Non Residential Lots 0 Mobile Home 0 Hotel Rooms 0 Square Footage of Proposed Uses Office 200,000 SF Service Station 8,000 SF Retail 65,000 SF Manufacturing 500,000 SF Restaurant 25,000 SF Warehouse 500,000 SF Other 3 12. Signature: Applicant(s) Owner(s) I (we), the undersigned, do hereby respectfully make application and petition the Frederick County Board of Supervisors to amend the zoning ordinance and to change the zoning map of Frederick County, Virginia. I (we) authorize Frederick County officials to enter the property for site inspection purposes I (we) understand that the sign issued when this application is submitted must be placed at the front property line at least seven days prior to the Planning Commission public hearing and the Board of Supervisors' public hearing and maintained so as to be visible from the road right -of -way until the hearing. I (we) hereby certify that this application and its accompanying materials are true and accurate to the best of my (our) knowledge. Carol T. Sempeles Date Date Date Date 3 /Lso /C 4 ID# Name Address Zoned Use 24 -A -1 Virgil Ruth D Fiddler 4836 Martinsburg Pike, Clearbrook, VA 22624 RA Residential 24 -A -2 Marvin 0 Elizabeth S Renner 4822 Martinsburg Pike, Clearbrook, VA 22624 RA Residential 24 -A -3 Otis E Margie K Golliday 4810 Martinsburg Pike, Clearbrook, VA 22624 RA Residential 24 -A -4 Otis E Margie K Golliday 4810 Martinsburg Pike, Clearbrook, VA 22624 RA Vacant 24 -A -5 Otis E Margie K Golliday 4810 Martinsburg Pike, Clearbrook, VA 22624 RA Vacant 24 -A -6 Otis E Margie K Golliday 4810 Martinsburg Pike, Clearbrook, VA 22624 RA Vacant 24 -A -7 Sanford L Silver 4804 Martinsburg Pike, Clearbrook, VA 22624 RA Residential 24 -A -9 Boyd L Bloomer 4784 Martinsburg Pike, Clearbrook, VA 22624 RA Residential 24 -A -11 Rhonda Coe Lynch 4754 Marti nsburg Pike, Clearbrook, VA 22624 RA Residential 24 -A -10 John Francis Rhonda Coe Lynch 4754 Martinsburg Pike, Clearbrook, VA 22624 RA Residential 34 -A -5A George M. Semples 331 Woodside Road, Clearbrook, VA 22624 RA Agricultural 34 -A -6A Butler Manufacturing Co. P.O. Box 25, Clearbrook, VA 22624 MI Industrial 34 -A -6B John Huyett Light 2973 Woodside Road, Clearbrook, VA 22624 RA Vacant 34 -A -1 Rest Methodist Church 1233 Rest Church Road, Clearbrook, VA 22624 RA Religious 33A -A -25 George M Carol T Semples 331 Woodbine Road, Clearbrook, VA 22624 RA Residential 33A -A -26 Leslie Osborne Pope 136 Jordan Drive, Winchester, VA 22602 RA Vacant 33A -A -27 Delores Esther Ellis 4568 Martinsburg Pike, Clearbrook, VA 22624 RA Residential 33A -A -27A Molden Real Estate 2400 Valley Avenue, Winchester, VA 22601 RA Residential 33A -A -28 Roger L Phyllis A Helsley 497 Front Royal Pike, Winchester, VA 22601 RA Residential 33A -A -29 Thelma M Curry Robin A Light 4592 Martinsburg Pike, Clearbrook, VA 22624 RA Residential 33A -A -30 Fred Milton Rebecca A Kitts 4600 Martinsburg Pike, Clearbrook, VA 22624 RA Residential 33A -A -31 Donald V Barbara N Smallwood 108 Juliet Lane, Bunker Hill, WV 25413 RA Vacant 4 33A -A -33 Delmar B Cynthia K Larrick 4622 Martinsburg Pike, Clearbrook, VA 22624 RA Residential 33A -A -11 H. M. Funkhouser Co. 2150 S. Loudoun Street, Winchester, VA 22601 B2 Commercial 33A -A -12 Manuel C DeHaven 4273 Martinsburg Pike, Clearbrook, VA 22624 M2 Vacant 33 -A -104 Manuel C DeHaven 4273 Martinsburg Pike, Clearbrook, VA 22624 RA Agricultural 33A -A -24 Allen J Linda L Paugh 208 Woodbine Road, Clearbrook, VA 22624 RA Residential 33A -A -16 Betty L Stine Cooke, etals 4481 Martinsburg Pike, Clearbrook, VA 22624 RA Residential 33A -A -17 Mary C Kerns 146 Woodbine Road, Clearbrook, VA 22624 RA Vacant 33A -A -18 Molden Real Estate 2400 Valley Avenue, Winchester, VA 22601 RA Residential 33A -A -19 Betty M Shillingburg 160 Woodbine Road, Clearbrook, VA 22624 RA Residential 33A -A -20 Benjamin D Fitzwater, Jr 166 Woodbine Road, Clearbrook, VA 22624 RA Residential Sempeles 33A -A -21 John W Harden Katherine T., Eiland 174 Woodbine Road, Clearbrook, VA 22624 RA Residential 33A -A -22 Maynard L Virginia S DeHaven 184 Woodbine Road, Clearbrook, VA 22624 RA Residential 33A -A -23 Lester B McDonald P.O. Box 4435, Leesburg, VA 20177 RA Residential 33A -A -24 Sharon A Shanholtz 3733 Dort Place, Columbus, OH 43227 RA Commercial 34 -A -6C Frederick County School Board P.O. Box 3508, Winchester, VA 22604 M1 Educational /Tax Exempt 33A -A -34 The Rainbow Group 1908 S. Loudoun Street, Winchester, VA 22601 RA Vacant