HomeMy WebLinkAbout24-11 Application11
2.
SITE PLAN APPLICATION
- Office Use Only ,/
Date Application Received: Application #: 2 y Jz /
c9 �
Fees Received: � > O�d�— Receipt #: D b Y4 Initials:
Project Title: Site Plan Addition - Greenwood Baptist Church
Location of Property 779 Greenwood Road
(Street address) Winchester Virginia 22602
3. Applicant/Designer:
Name: H. Bruce Edens,L.S.
Address: P.O. Box 473
Capon Springs, WV 26823
4. Property Owner (if different than above):
Name: Greenwood Baptist Church
Address: 779 Greenwood Road
Winchester, Virginia 22602
5. Property Information:
a. Property Identification Number:
b. Total acreage of the parcel to be developed
C. Total disturbed area of the parcel:
d_ Present Use:
e. Proposed Use:
f. Magisterial District(s)
AUG 3 1 2011 f. !
;C-0- Y
9
Telephone: 304-856-2521
Telephone: 540- 665 -0368
5S -A -17-,k
Ace 55000A 0000 - 0000 - 0001920
3.57 ac
768 S.F.
Church
Church
Shawnee
6. Site Plan Type
7
0 0
a. Is this an original or new site plan? Yes % No
b. Is this a revised site plan? Yes No
If yes provide all previous site plan numbers:
C. Is this a minor site plan? Yes X No
If yes provide all previous site plan numbers: 009 -92
Zoning Information
a. Current Zoning: RA
b. Was this property Rezoned? Yes
C. If yes provide the rezoning number for this property:
d- Are there any nrnffa_re fnr thic property? ve.c
e. Has a MDP been approved for this property? Yes %
f. If yes provide the MDP number for this property:
Adjoining property zoning and use:
ZONING
RA
M.
No X
Nn X
No
I have read the material included in this package and understand what is required by the Frederick County Planning
Department. I also understand that all required material will be complete prior to the submission of my site plan.
Signature: ;g C. r6 �
Date: August 29, 2011
9
USE
North
access strip
East
Cementary
South
Fireball
West
Highway
ZONING
RA
M.
No X
Nn X
No
I have read the material included in this package and understand what is required by the Frederick County Planning
Department. I also understand that all required material will be complete prior to the submission of my site plan.
Signature: ;g C. r6 �
Date: August 29, 2011
9