Loading...
HomeMy WebLinkAbout24-11 Application11 2. SITE PLAN APPLICATION - Office Use Only ,/ Date Application Received: Application #: 2 y Jz / c9 � Fees Received: � > O�d�— Receipt #: D b Y4 Initials: Project Title: Site Plan Addition - Greenwood Baptist Church Location of Property 779 Greenwood Road (Street address) Winchester Virginia 22602 3. Applicant/Designer: Name: H. Bruce Edens,L.S. Address: P.O. Box 473 Capon Springs, WV 26823 4. Property Owner (if different than above): Name: Greenwood Baptist Church Address: 779 Greenwood Road Winchester, Virginia 22602 5. Property Information: a. Property Identification Number: b. Total acreage of the parcel to be developed C. Total disturbed area of the parcel: d_ Present Use: e. Proposed Use: f. Magisterial District(s) AUG 3 1 2011 f. ! ;C-0- Y 9 Telephone: 304-856-2521 Telephone: 540- 665 -0368 5S -A -17-,k Ace 55000A 0000 - 0000 - 0001920 3.57 ac 768 S.F. Church Church Shawnee 6. Site Plan Type 7 0 0 a. Is this an original or new site plan? Yes % No b. Is this a revised site plan? Yes No If yes provide all previous site plan numbers: C. Is this a minor site plan? Yes X No If yes provide all previous site plan numbers: 009 -92 Zoning Information a. Current Zoning: RA b. Was this property Rezoned? Yes C. If yes provide the rezoning number for this property: d- Are there any nrnffa_re fnr thic property? ve.c e. Has a MDP been approved for this property? Yes % f. If yes provide the MDP number for this property: Adjoining property zoning and use: ZONING RA M. No X Nn X No I have read the material included in this package and understand what is required by the Frederick County Planning Department. I also understand that all required material will be complete prior to the submission of my site plan. Signature: ;g C. r6 � Date: August 29, 2011 9 USE North access strip East Cementary South Fireball West Highway ZONING RA M. No X Nn X No I have read the material included in this package and understand what is required by the Frederick County Planning Department. I also understand that all required material will be complete prior to the submission of my site plan. Signature: ;g C. r6 � Date: August 29, 2011 9