Loading...
HomeMy WebLinkAbout17-11 Comments & Correspondencea CRI of LAC FREDERICK Department of Planning and Development 540/665 -5651 ALINI FAX: 540/66S-6395 July 13, 2011 Mr. Dennie Dunlap, P.E. Triad Engineering, Inc. 200 Aviation Drive Winchester, VA 22602 RE: Approval of Site Plan 917 -11; Mercury Paper Guardhouse Property Identification Number (PIN): 63 -A -5813 Dear Dennie: The above - referenced site plan was approved on July 13, 2011. The site plan is approved for the construction of a new modular guard booth and security gates at the existing Mercury Paper (Coca Cola Business Park Site Plan #33 -07) site located at 321 Apple Valley Road in the Back Creek Magisterial District. All requirements of the Frederick County Zoning Ordinance have been met in the approved site plan, including review agency comments from all relevant review agencies. I am providing you with five (5) copies of the approved site plan. Please forward these copies to the appropriate representative(s). Furthermore, advise the owner(s) that a copy should be kept for future reference, and an approved copy must be kept on the construction site throughout the development process. Once site development is complete, the owner(s) should contact this office to schedule an on -site inspection. Do not hesitate to contact me if you have any questions or concerns. Sincerely, Candice E. Perkins, AICP Senior Planner Attachment CEP /bad cc: Jane Anderson, Real Estate Gary Lofton, Back Creek District Supervisor Greg Unger and Kevin Crosen, Back Creek District Planning Commissioners Commissioner of Revenue Patrick Barker, EDC NorthMarq Capital, LLC, 9700 Higgins Road, Suite 900, Rosemont IL 60018 107 North Kent Street, Suite 202 • Winchester, Virginia 22601 -5000 TRANSMITTAL AT E R &'77�ROIIAI ;: TRIAD ENGINEERING, INC. Civil Engineering • Geotechnical Engineering Environmental Services • Land Surveying Construction Testing & Monitoring • Drilling Water & Wastewater • Landscape Architecture To: Frederick County Planning Department 107 North Kent Street Winchester, VA 22601 Attn: Candice Perkins WE ARE SENDING YOU THE FOLLOWING ITEMS: • JUL 1 1 201, 200 Aviation Drive Winchester, VA 2Q2•!?,,,, (540) 667 -9300! D= Vi:;C'. (540) 667 -2260 facsimile www.triadeng.com Date: 11 July, 2011 Re: Mercury Paper Guard Booth Site Plan Project No.: 07 -11 -0074 COPIES DATED NUMBER DESCRIPTION 7 06 -02 -11 C -1, C -2 Mercury Paper @ Apple Valley- Guard Booth Site Plan (rev. 07- 11 -11) 1 06 -13 -11 Inspections Dept. Comment Sheet 1 06 -16 -11 VDOT Comment Sheet 1 06 -22 -11 Fire Marshal Comment Sheet THESE ARE TRANSMITTED: ® For Approval ❑ As Requested ❑ Other COPY TO: ❑ For Your Use ❑ For Review and Comment SIGNED: 0 O 0- Dennie D. Dunlap III If attachments are not as noted, kindly notify us at once. TRANSMITTAL LETTER 21CROAD -- TRIAD ENGINEERING, INC. Civil Engineering ' Geotechnical Engineering Environmental Services ' Land Surveying Construction Testing & Monitoring ' Drilling Water & Wastewater' Landscape Architecture To: _ Department of Planning and Development 107 North Kent Street Winchester, VA 22601 Attn: Candice Perkins WE ARE SENDING YOU THE FOLLOWING ITEMS: li 200 Aviation Dri fe Fyi JUN 2 Winchester, VA 22602 (540) 667 -9300 (540) 667 -2260 f csimile www.triadeng.com i 2011 Date: 02 June, 2011 Re: Mercury Paper Guard Booth Site Plan Project No.: 07 -11 -0074 COPIES DATED NUMBER DESCRIPTION 2 06 -02 -11 C -1, C -2 Mercury Paper @ Apple Valley - Guard Booth Site Plan 1 Request for Site Plan Comments 1 Site Plan Application 1 Special Limited Power of Attorney 1 06 -02 -11 21978 Minor Site Plan Review Fee Check THESE ARE TRANSMITTED: ❑ For Approval ❑ As Requested ❑ Other ❑ For Your Use ® For Review and Comment COPY TO: SIGNED: `) z y Dennie D. Dunlap III If attachments are not as noted, kindly notify us at once. i i Ai JUN 2 2011 PLEASE REVIEW THE ATTACHED DOCUMENT. IF THIS DOCUMENT MEETS YOUR APPROVAL PLEASE INITIAL AND PROVIDE THE DATE AND TIME OF YOUR APPROVAL: LF2WSDOC'UJ ENT DOES NOT MEET YOURAPPROVAL PLEASE PRO VIDE COMIYI MNAS TO WHAT YOU WOULD LIIQE TOHAVE COMPLETED ENTTIALS DATE & TM Candice Mark Dana Eric Mae John comm:ENTS- Received by Clerical Staff (Date & Time): 1/ (1(l / i � b1 �