RE: Approval of Site Plan 416 -11; Melnor, Inc.
Property Identification Number (PIN): 43 -A -63F
Dear Jeremy:
The above- referenced site plan was approved on August 25, 2011. The site plan is approved for
the construction of a new 128,000 square foot industrial /warehouse facility located on Tyson
Drive in the Stonewall Industrial Park in the Stonewall Magisterial District. Required site
improvements include the following:
Construction of a parking lot with 73 spaces (including four handicap accessible),
including curb, wheelstops, striping and handicap access.
Twenty two loading spaces.
Buffers and landscaping as shown on the site plan.
Lighting as shown on the "New Warehouse Facility for Melnor" prepared by Design
Concepts.
All requirements of the Frederick County Zoning Ordinance have been met in the approved site
plan, including review agency comments from all relevant review agencies. I am providing you
with four (4) copies of the approved site plan. Please forward these copies to the appropriate
representative(s). Furthermore, advise the owner(s) that a copy should be kept for future
reference, and an approved copy must be kept on the construction site throughout the
development process. Once site development is complete, the owner(s) should contact this office
to schedule an on -site inspection. Do not hesitate to contact me if you have any questions.
Sincerely,
( � e�W4
Candice E. Perkins, AICP
Senior Planner
CEP /bad
cc: Charles S. DeHaven, Jr., Stonewall District Supervisor
Gary Oates & Stan Crockett, Stonewall District Planning Commissioners
Commissioner of the Revenue
Jane Anderson, Real Estate
Melnor Inc., 260 West Brook Road, Winchester, VA 22603
107 North Kent Street, Suite 202 • Winchester, Virginia 22601 -5000
• 0
GREENWAY ENGINEERING
` 151 Windy Hill Lane
Founded in 1971 Winchester, Virginia 22602
Project Name: Melnor -Site Plan
File No: 0231D
Date: Tue, Aug 23, 2011
To: FC Planning
Attn: Candice Perkins
Copied
Delivery: "Q Fed Ex 0 U.S. Mail
0 Other
—
From: Jeremy Tweedie /dlm
GREENWAY ENGINEERING
Phone: 540 -662 -4185
Fax: 540 - 722 -9528
R] Courier E] Pick Up
R Urgent F For Your Review 0 As You Requested w Please Comment
Candice,
Attached is the following for final approval signature:
-10 copies of the site plan
Thank you for your assistance. Contact us with any questions.
pier
2 3
., t
Hand Delivery and Pick Ups Only:
Received by: Date:
Please Print Name:
0 0
.: GREENWAY ENGINEERING
151 Windy Hill Lane
Founded in 1971 Winchester, Virginia 22602
Project Name: Stonewall Industrial Park- Melnor
File No: 0231D
Date: Wed, Jun 15, 2011
To: Frederick County Planning Dept
Winchester, VA 22601
Attn: Candice Perkins
Copied
Delivery: R Fed Ex
Other-
F-1 U.S. Mail
From: Jeremy Tweedie
GREENWAY ENGINEERING
Phone: 540- 662 -4185
Fax: 540 -722 -9528
0 Courier E] Pick Up
Q Urgent 7 For Your Review 0 As You Requested 0 Please Comment
t
GREENWAY ENGINEERING, mc.
151 windy Hill lane
Winchester, Virginia 22602
Founded in 1971
June 15, 2011
County of Frederick
Department of Planning and Development
107 North Kent Street, Suite 202
Winchester, VA 22601
Attn: Candice Perkins, AICP, Senior Planner
Re: Stonewall Industrial Park— Melnor Inc.
Comment Response Letter
Dear Ms. Perkins:
We are in receipt of the comments dated June 14th, 2011 and offer the following responses:
Comments from Frederick County Planning
Comment 1: Special Limited Power of Attorney Form. Please have the property owner sign the
attached Special Limited Power of Attorney Form prior to further review or approval. This form
should be notarized and completed to grant the applicant (you) with authorization to represent
them for this site plan.
Response: SLPOA is forthcoming, will forward once received.
Comment 2: Project Information. On the coversheet under project information, the front
parking setback is ten feet, the landscaping plan is on sheet 11, the required parking is 50 and
show the total number of loading spaces.
Response: Revised as noted.
Comment 3: Site Plan Scale. Increase the site plan scale to 1 " =40' as the current site plan is
difficult to read.
Response: Scaled remained the same, we just increased the font for libibility.
Comment 4: Office Space. On sheet 5, revise the office to show 12,554sf.
Response: Revised as noted.
Comment 5: Parking Areas. Label all curbed areas and show the type.
Response: Revised as noted.
Engineers Surveyors Planners Environmental Scientists
Telephone 540- 662 -4185 FAX 540- 722 -9528
File #0231 D/J NT /cls www.greenwayeng.com
0
0
Comment 6: Gravel Fire Lane. Provide barriers (gate%hain, etc.) at Both ends of the gravel fire
lane to ensure that it will not be used by vehicles.
Response: Revised as noted.
Comment 7: Additional Improvements. Indicate if this site will have any dumpsters or will
require a guard house.
Response: Trash compactor location delineated within the loading dock area..
Comment 8: Interior Parking Lot Trees. Revise the parking space total to show 73 spaces and
semen interior trees.
Response: Revised as noted.
Comment 9: Hedge Row. The planting called for the evergreen hedge row is not permitted;
revise to a plant type permitted on the landscape list. Also, the hedge row must be 36 inches at
time of planting, not 18 inches.
Response: Revised as noted.
Comment I0: Photometric Plan. The following needs to be addressed on the photometric plan:
• Details show drop lens for some of the pole lights; drop lens are not permitted.
• The wallpack lighting is shown as a cutoff fixture; full cutoff fixtures are required.
• Provide clarification that the 25 foot pole lights include the height of the base.
• Lighting levels need to be shown to all property lines.
• The five fixtures at the rear of the property must be affixed with supplemental shielding
because the site adjoins residential property.
• The photometric plan must he certified by the National Council on Qualifications for the
Lighting Professions (NCQLP), or a Virginia licensed professional engineer, architect,
landscape architect or land surveyor.
Response: Revised lighting plan is forthcoming, will forward once received
Thank you for your assistance with this project. Contact us with any questions or need for
additional information.
Sincerely,
Greenway Engineering, Inc.
Jeremy Tweedie, Project Manager
Enclosures
File #0231 Dt1NT /els
0 •
June 24, 2011
Mr. Jeremy Tweedie
Greenway Engineering
151 Windy Hill Lane
Winchester, Virginia 22602
RE: Melnor, Inc. — Revised Site Plan
Frederick County, Virginia
Dear Jeremy:
COUNTY of FREDERICK
Department of Public Works
5401665.5643
FAX: 540/678 -0682
We have completed our review of the revised site plan dated May 27, 2011 and received on June
23, 2011. All of our previous comments have been addressed; therefore, we recommend approval
of the subject site plan.
Sincerely,
Aif tL
Joe C. Wilder
Deputy Director of Public Works
JCW /rls
cc: Planning and Development
file
T:\Rhu ndavrr,Nn`C0M M E N'1'S \M ELNOR,1 NCRE\'S l'CODt.due
COUNTY of FREDERICK
Department of Planning and Development
540/665 -5651
FAX: 540 /665 -6395
June 9, 2011
Mr. Jeremy Tweedie
Greenway Engineering, Inc.
151 Windy Hill Lane
Winchester- VA 22602
Re: Review Comments for Site Plan #16 -11; Melnor, Inc.
Property Identification Number (PIN): 43 -A -63F
Dear Jeremy:
Planning Staff has reviewed the above - referenced site plan to determine if administrative
approval can be granted. At this time, administrative approval cannot be granted. This site plan
is denied until the issues in this letter, as well as all issues of the other review agencies, have
been adequately addressed. Please review Staff's comments listed below and then prepare a
revised site plan which adequately addresses each concern.
Review Comments
1. Special Limited Power of Attornev Form. Please have the property owner sign the
attached Special Limited Power of Attorney Form prior to further review or approval.
This form should be notarized and completed to grant the applicant (you) with
authorization to represent them for this site plan.
2. Proieet Information. On the coversheet under project information, the front parking
setback is ten feet, the landscaping plan is on sheet 11, the required parking is 50 and
show the total number of loading spaces.
3. Site Plan Scale. Increase the site plan scale to 1'�40' as the current site plan is difficult
to read.
4. Office Space. On sheet 5, revise the office to show 12,554sf.
5. Parking Areas. Label all curbed areas and show the type.
6. Gravel Fire Lane. Provide barriers (gate /chain, etc.) at both ends of the gravel fire lane
to ensure that it will not be used by vehicles.
7. Additional Improvements. Indicate if this site will have any dumpsters or will require a
guard house.
8. Interior Parking Lot Trees. Revise the parking space total to show 73 spaces and seven
interior trees.
9. Hedge Row. The planting called for the evergreen hedge row is not permitted; revise to
a plant type permitted on the landscape list. Also, the hedge row must be 36 inches at
time of planting, not 18 inches.
107 North Kent Street, Suite 202 • Winchester, Virginia 22601 -5000
Mr. Jeremy Tweedie
RE: Site Plan 415-11
June 9, 2011
Page 2
10. Photometric Plan. The following needs to be addressed on the photometric plan:
• Details show drop lens for some of the pole lights; drop lens are not permitted.
• The wallpack lighting is shown as a cutoff fixture; full cutoff fixtures are
required.
• Provide clarification that the 25 foot pole lights include the height of the base.
• Lighting levels need to be shown to all property lines.
• The five fixtures at the rear of the property must be affixed with supplemental
shielding because the site adjoins residential property.
• The photometric plan must be certified by the National Council on Qualifications
for the Lighting Professions (NCQLP), or a Virginia licensed professional
engineer, architect, landscape architect or land surveyor.
After you have revised the site plan, please resubmit two copies so that I may verify the
information contained on the plan. I will need all approved review agency comment sheets and
at least five copies of the final plan for approval. Comment sheets are required from the
following agencies: the Virginia Department of Transportation, the Frederick County
Inspections Department, the Frederick County Engineer, the Frederick County Fire Marshal,
and the Frederick County Sanitation Authority.
Sincerely,
Candice E. Perkins. AICP
Senior Planner
cc: Mehror Inc., 260 West Brook Road, Winchester, VA 22603
CEP/bad
Attachment
• 0
I ) GREENWAY ENGINEERING
151 Windy Hill Lane
Founded in 1971 Winchester, Virginia 22602
Project Name: Stonewall Industrial Park - Melnor Site Plan
File No: 0231D
Date: Wed, Jun 1, 2011
To: FC Planning
Attn:
Copied
Candice Perkins
Delivery: Q Fed Ex
0 Other-
From: Jeremy Tweedie /dlm
GREENWAY ENGINEERING
Phone: 540- 662 -4185
Fax: 540- 722 -9528
0 U.S. Mail R Courier F_� Pick Up
0 Urgent❑ For Your Review [:] As You Requested 0 Please Comment
Message
Candice,
Attached is the following for your review:
-2 copies of the site plan
-Site Plan Application
- Application fee check for $4,020.00
- Planning comment sheet
NOTE: We are in the process of obtaining approvals from all appropriate agencies and will forward
to your office once we receive.
Thank you for your assistance. Contact us with any questions
Hand Delivery and Pick Ups Only:
Received by:,
Please Print Name:
Date.
'} E C IF, V E 'r'j
!' JUN 1 2011
PLEASE REVIEW THE ATTACHED DOCUMENT. IF THIS DOCUMENT MEETS YOUR
APPROVAL PLEASE INITIAL AND PROVIDE THE DATE AND TIME OF YOUR
APPROVAL.
L nUSDOCUMEIVT DOES NOT MEET YOZ7RAPPROVAL PLEASE PR0KDE
CoAodENTSAS TO WHAT YOU WOULD LSE TO HAVE COBSPLETEA
INTITALS DATE & TIME
Candice � ( �
Mark
Eric
Mike
John
COMMEN PS:
Received by Clerical Staff (Date & Time):
iin