Loading...
HomeMy WebLinkAbout09-11 Comments & Correspondence1 July 14, 2011 Mr. Jeremy Tweed ie Greenway Engineering, Inc. 151 Windy Hill Lane Winchester. VA 22602 Department of Planning and Development 540/665 -5651 FAX: 540/665-6395 RE: Approval of Site Plan 909 -11; Monoflow Parking Lot Expansion Property Identification Number (PIN): 54 -A -97B Dear .leremy The above - referenced site plan was approved on July 14, 2011. The site plan is approved for the construction of a parking lot expansion at the existing Monoflow site located at 882 Baker Lane in the Stonewall Magisterial District. Required site improvements include the following: • Expansion of the existing parking area to accommodate 41 new parking spaces (to provide for a total of 160 parking spaces - including four handicap accessible), including striping, and a sidewalk along the existing building. All requirements of the Frederick County Zoning Ordinance have been met in the approved site plan, including review agency comments from all relevant review agencies. I am providing you with eight (8) copies of the approved site plan. Please forward these copies to the appropriate representative(s). Furthermore, advise the owner(s) that a copy should be kept for future reference, and an approved copy must be kept on the construction site throughout the development process. Once site development is complete, the owner(s) should contact this office to schedule an on -site inspection. Do not hesitate to contact me if you have any questions or concerns. Sincerely, rr C 1Azi-_ Candice E. Perkins, AICP Senior Planner Attachment CEP /bad cc: Jane Anderson- Real Estate Charles DeHaven, Jr., Stonewall District Supervisor Gary Oates and Stan Crockett, Stonewall District Planning Commissioners Commissioner of Revenue Patrick Barker, EDC Radar Investment Group, 882 Baker Lane, Winchester VA 22602 107 North Kent Street, Suite 202 • Winchester, Virginia 22601 -5000 • • 18� GREENWAY ENGINEERING 151 Windy Hill Lane Founded in 1971 Winchester, Virginia 22602 Project Name: Monoflo -North Front Parking Lot Expansion Site Plan File No: 2241M Date: Wed, Jul 6, 2011 To: FC Planning Attn: Candice Perkins Copied Delivery: 0 Fed Ex Other_ U.S. Mail From: Jeremy Tweedie /dlm GREENWAY ENGINEERING Phone: 540- 662 -4185 Fax: 540- 722 -9528 R Courier F71 Pick Up E] Urgent F-/-1 For Your Review R As You Requested ❑,► Please Comment Message Candice, Per your request, attached is the following for final approval signature: -10 copies of the North Front Parking Lot Expansion site plan As always, thank you for your assistance. (`7 IS � V E !i JUL 6 2011 "I Hand Delivery and Pick Ups Only: I Received by: Date: Please Print Name: 0 Ag_� GREENWAY ENGINEERING 151 Windy Hill Lane Founded in 1971 Winchester, Virginia 22602 � � a i � �, i k 1 A % Project Name: Monoflo -North Front Parking Lot Expansion Site Plan File No: 2241M Date: Tue, Apr 5, 2011 To: FC Planning Attn: Candice Perkins Copied Delivery: 0 Fed Ex 0 U.S. Mail EJ Other From: Jeremy Tweedie /dlm GREENWAY ENGINEERING Phone: 540- 662 -4185 Fax: 540- 722 -9528 0 Courier F, I Pick Up Urgent n For Your Review 0 As You Requested 0 Please Comment Message Candice, Attached is the following for your review: -Site Plan Application - Application fee check for $2,615.00 - Signed /notarized Special Limited Power of Attorney form -2 copies of the site plan - Planning comment sheet NOTE: We are in the process of obtaining approval letters from appropriate review agencies and will submit to your office once we receive. Thank you for your assistance. Contact us with any questions. Hand Delivery and Pick Ups Only: Received by: Date: i Please Print Name: APR - 5 2011' L i i Document Approval Form rg 2011 APR ill 1 APR PLEASE REVIEW THE ATTACHED DOCUMENT. IF THIS DOCUMENT MEETS YOUR APPROVAL PLEASE IldTTIAL AND PROVIDE THE DATE AND TAME OF YOUR APPROVAL. LFTHISDOCUBIEff DOES NOT MEET YOUR APPROVAL PLEASE PROVIDE COb WM3ASTOWHATYOUWOULDT TOHAVECOMPLETED. I I IALS DATE & THE 1� Eric Mike John COMMENTS. Received by Clerical Staff (Date & Time):