HomeMy WebLinkAbout09-11 Comments & Correspondence1
July 14, 2011
Mr. Jeremy Tweed ie
Greenway Engineering, Inc.
151 Windy Hill Lane
Winchester. VA 22602
Department of Planning and Development
540/665 -5651
FAX: 540/665-6395
RE: Approval of Site Plan 909 -11; Monoflow Parking Lot Expansion
Property Identification Number (PIN): 54 -A -97B
Dear .leremy
The above - referenced site plan was approved on July 14, 2011. The site plan is approved for the
construction of a parking lot expansion at the existing Monoflow site located at 882 Baker Lane in the
Stonewall Magisterial District. Required site improvements include the following:
• Expansion of the existing parking area to accommodate 41 new parking spaces (to provide for a
total of 160 parking spaces - including four handicap accessible), including striping, and a
sidewalk along the existing building.
All requirements of the Frederick County Zoning Ordinance have been met in the approved site plan,
including review agency comments from all relevant review agencies. I am providing you with eight (8)
copies of the approved site plan. Please forward these copies to the appropriate representative(s).
Furthermore, advise the owner(s) that a copy should be kept for future reference, and an approved copy
must be kept on the construction site throughout the development process. Once site development is
complete, the owner(s) should contact this office to schedule an on -site inspection. Do not hesitate to
contact me if you have any questions or concerns.
Sincerely, rr
C 1Azi-_
Candice E. Perkins, AICP
Senior Planner
Attachment
CEP /bad
cc: Jane Anderson- Real Estate
Charles DeHaven, Jr., Stonewall District Supervisor
Gary Oates and Stan Crockett, Stonewall District Planning Commissioners
Commissioner of Revenue
Patrick Barker, EDC
Radar Investment Group, 882 Baker Lane, Winchester VA 22602
107 North Kent Street, Suite 202 • Winchester, Virginia 22601 -5000
• •
18� GREENWAY ENGINEERING
151 Windy Hill Lane
Founded in 1971 Winchester, Virginia 22602
Project Name: Monoflo -North Front Parking Lot Expansion Site Plan
File No: 2241M
Date: Wed, Jul 6, 2011
To: FC Planning
Attn: Candice Perkins
Copied
Delivery: 0 Fed Ex
Other_
U.S. Mail
From: Jeremy Tweedie /dlm
GREENWAY ENGINEERING
Phone: 540- 662 -4185
Fax: 540- 722 -9528
R Courier F71 Pick Up
E] Urgent F-/-1 For Your Review R As You Requested ❑,► Please Comment
Message
Candice,
Per your request, attached is the following for final approval signature:
-10 copies of the North Front Parking Lot Expansion site plan
As always, thank you for your assistance.
(`7 IS � V E
!i
JUL 6 2011 "I
Hand Delivery and Pick Ups Only: I
Received by: Date:
Please Print Name:
0
Ag_� GREENWAY ENGINEERING
151 Windy Hill Lane
Founded in 1971 Winchester, Virginia 22602
� � a i � �, i
k 1 A %
Project Name: Monoflo -North Front Parking Lot Expansion Site Plan
File No: 2241M
Date: Tue, Apr 5, 2011
To: FC Planning
Attn: Candice Perkins
Copied
Delivery: 0 Fed Ex 0 U.S. Mail
EJ Other
From: Jeremy Tweedie /dlm
GREENWAY ENGINEERING
Phone: 540- 662 -4185
Fax: 540- 722 -9528
0 Courier F, I Pick Up
Urgent n For Your Review 0 As You Requested 0 Please Comment
Message
Candice,
Attached is the following for your review:
-Site Plan Application
- Application fee check for $2,615.00
- Signed /notarized Special Limited Power of Attorney form
-2 copies of the site plan
- Planning comment sheet
NOTE: We are in the process of obtaining approval letters from appropriate review agencies and
will submit to your office once we receive.
Thank you for your assistance. Contact us with any questions.
Hand Delivery and Pick Ups Only:
Received by: Date:
i
Please Print Name: APR - 5 2011' L
i i
Document Approval Form
rg
2011
APR
ill
1 APR
PLEASE REVIEW THE ATTACHED DOCUMENT. IF THIS DOCUMENT MEETS YOUR
APPROVAL PLEASE IldTTIAL AND PROVIDE THE DATE AND TAME OF YOUR
APPROVAL.
LFTHISDOCUBIEff DOES NOT MEET YOUR APPROVAL PLEASE PROVIDE
COb WM3ASTOWHATYOUWOULDT TOHAVECOMPLETED.
I I IALS DATE & THE
1�
Eric
Mike
John
COMMENTS.
Received by Clerical Staff (Date & Time):