HomeMy WebLinkAbout08-11 Comments & Correspondence� •d��l'llh.�V.\ Y '
November 18, 2011
Mr. Randy Kepler, PE
Greenway Engineering, Inc.
151 Windy Hill Lane
Winchester, VA 22602
COUNTY of FREDERICK
Department of Planning and Development
540/665 -5651
FAX: 540 /665 -6395
RE: Approval of Site Plan #08 -11; Safford Chrysler
Property Identification Number (PIN): 54-A -106
Dear Randy:
The above - referenced site plan was approved on November 18, 2011. The site plan is
approved for additions and renovations to the Safford Chrysler (former Clarke Motors)
site located at 1659 Berryville Pike in the Stonewall Magisterial District. Required
improvements include the following:
• Building additions to include a 4,828 square foot showroom addition and a 1,500
square foot service addition.
• Designated parking areas (existing and new) with a total of 358 spaces (total for
customer, employee, vehicle storage and handicap accessible spaces), including
curb and gutter, wheelstops for certain areas, striping, handicap access and
landscaping.
• Closure of one entrance on Route 7 (Berryville Pike) and construction of a_
sidewalk along Route 7.
• Removal of the existing outdoor site lighting and addition of new outdoor
lighting.
• Removal of one freestanding sign on the property as shown on the site plan.
• One screened dumpster area.
• New landscaping as shown on the site plan.
All requirements of the Frederick County Zoning Ordinance have been met in the
approved site plan, including review agency comments from all relevant review agencies.
I am providing you with six (6) copies of the approved site plan. Please forward these
copies to the appropriate representative(s). Furthermore, advise the owner(s) that a copy
should be kept for future reference, and an approved copy must be kept on the
construction site throughout the development process. Once site development is
107 North Kent Street, Suite 202 • Winchester, Virginia 22601 -5000
r Mr. Randy Kepler, PE�
RE: Site Plan #08 -11
November 18, 2011
Page 2
complete, the owner(s) should contact this office to schedule an on -site inspection. Do
not hesitate to contact me if you have any questions.
Sincerely,
r
Candice E. Perkins, AICP
Senior Planner
CEP /dlw
cc: Charles S. DeHaven, Jr., Stonewall District Supervisor
Gary Oates & Stan Crockett, Stonewall District Planning Commissioners
Commissioner of the Revenue
Jane Anderson, Real Estate
Gramm Holdings, LLC, 1659 Berryville Pike, Winchester, VA 22603
0 0
Dana Johnston
From: Dana Johnston
Sent: Wednesday, March 30, 2011 10:06 AM
To: rj @signdoctor.biz
Subject: RE: Safford Dodge Winchester
Good Morning Jennifer,
Per our conversation yesterday 3/29/2011 a permit is not needed to reface existing sign at
the dodge dealership on route 7. However, if sign face changes in square footage a sign
permit would be require. If you have any other questions or concerns please do not hesitate
to contact me.
Thanks
Dana
- - - -- Original Message---- -
From: riOsiendoctor.biz rmailto:ri(@siendoctor.biz1
Sent: Wednesday, March 30, 2011 10:00 AM
To: Dana Johnston
Cc: ri(@signdoctor.biz
Subject: Safford Dodge Winchester
* *This message was sent via the website email form. **
Sender: Jennifer Judd
Email: ri(@signdoctor.biz
IP address: 173.163.203.29
Date: 3/30/2011 10:00:15 AM
CC: ri(@signdoctor.biz
Message:
Dana,
Good Morning. I just wanted to do a follow up with you on getting a confirmation e -mail for
no permit needed to reface this location's freestanding sign. Thank you for your help.
Sincerely,
Jennifer Judd
Office Manager
Sign Doctor
E
ENGINEERING, INC.
151 Windy Hill lane
Winchester, Virginia 22602
August 24, 2011
County of Frederick
Department of Planning and Development
107 North Kent Street, Suite 202
Winchester, VA 22601
Attn: Candice Perkins. AICP. Senior Planner
Re: Safford Chrysler Site Plan— File SP #08-11
Comment Response Letter
Dear Ms. Perkins:
0
We are in receipt of the comments dated August 12, 2011 and offer the following responses:
Comments from Frederick County Planning
Comment 1: Covetsheet. On the coversheet the previously approved site plans section should be removed as
all previously approved site plans are expired.
Response: All references to previously approved plans have been removed from coversheet.
Comment 2: BLA. Indicate if the BLA has been completed, if not it must be completed before this site plan can
be approved.
Response: The BLA is being processed.
Comment 3: Parking of Displav Vehicles. There are currently vehicles being displayed in the grass area
between the pat-king lot and Route 7 which is VDOT ROW. These vehicles cannot be parked in this area. The
Plan needs to include a note that states that vehicles cannot be parked within the VDOT ROW.
Response: A note has been added to sheet C3 -01 of the site plan.
Comment 4: Islands. Landscaped islands need to be provided as indicated on sheet C3 -01.
Response: Landscape islands have been added as indicated.
Comment 5: Parking Spaces. The two parking spaces shown near the body shop need to be removed or the
layout revised so that the .spaces meet the requirements of the Zoning Ordinance. Also, wheelstops need to be
Provided along the parking spaces that face the office trailer as indicated on sheet C3 -01.
Response: The two parking spaces shown near the body shop have been removed from the plan. Wheelstops
have been provided as indicated.
Engineers Surveyors Planners Environmental Scientists
Telephone 540- 662 -4185 FAX 540- 722 -9528
www.greenwayeng.rom
File #0370SGRIX/int/dlm
E
E
Comment 6: Directional Arrows. Provide painted directional arrows throughout the .rite.
Response: Direction arrows have been provided in customer parking areas.
Comment 7: Lighting Fixtures. The wall pack fixtures are .shown ar cutoff, the Zoning Ordinance requires a
.full cutoff fixture. Also, the pole mounted lighting does not provide a cutoff classif cation; indicate jf this,fixture
is full cutoff.
Response: Full cutoff fixtures have been provided on the plans for the wall pack fixtures and the pole mounted
fixtures.
Comment 8: Pole Height. Ensure that the pole height for the light fixtures encloses the height of the bare.
Response: Pole heights have been adjusted to ensure total pole height with base and fixtures does not exceed
25' in height.
Comment 9: Photometric Plan. Sheet CI I -01 needs to be revised to show the footcandles at all properh. lines
(Route 7 and property to the west). The lighting levels along roads cannot exceed 5.0 footcandles.
Response: Revised lighting plan is attached.
General Comment: After you have revised the site plan, please resubmit two copies so that I Wray verifi' the
information contained on the plan. I will need all approved review agency comment .sheets and at least five
copies of the.final plan for approval. Comment sheets are reguired.from the following agencies: the Virginia
Department of Transportation, the Frederick Couniv Inspections Department, the Frederick Countly Engineer,
the Frederick County Fire Marshal, and the Frederick County Sanitation AuthoritY.
Response: Attached are the approval letters from Inspections. Engineer, Fire Marshal, and FCSA. We are still
waiting on VDOT approval and will submit once we receive.
Thank you for your assistance with this project. Contact us with any questions or need for additional
information.
Sincerely,
TZT'
Enclosures
Idle #0370SGR1.Klm/dlm
0
August 12, 2011
Mr. Randy Kepler, PE
Greenway Engineering, Inc.
151 Windy Hill Lane
Winchester, VA 22602
FILE
COUNTY of FREDERICK
Department of Planning and Development
540/665 -5651
FAX: 540/665-6395
Re: Second Review Comments for Site Plan #08 -11; Safford Chrysler
Property Identification Number (PIN): 54 -A -106
Dear Randy:
Planning Staff has reviewed the above - referenced site plan to determine if administrative
approval can be granted. At this time, administrative approval cannot be granted. This site plan
is denied until the issues in this letter, as well as all issues of the other review agencies, have
been adequately addressed. Please review Staffs comments listed below and then prepare a
revised site plan which adequately addresses each concern.
Review Comments
1. Coversheet. On the coversheet the previously approved site plans section should be
removed as all previously approved site plans are expired.
2. BLA. Indicate if the BLA has been completed, if not it must be completed before the site
plan can be approved.
3. Parking of Display Vehicles. There are currently vehicles being displayed in the grass
area between the parking lot and Route 7 which is VDOT ROW. These vehicles cannot
be parked in this area. The plan needs to include a note that states that vehicles cannot be
parked within the VDOT ROW.
4. Islands. Landscaped islands need to be provided as indicated on sheet 0-01.
5. Parking Spaces. The two parking spaces shown near the body shop need to be removed
or the layout revised so that the spaces meet the requirements of the Zoning Ordinance.
Also, wheelstops need to be provided along the parking spaces that face the office trailer
as indicated on sheet 0-01.
6. Directional Arrows. Provide painted directional arrows throughout the site.
7. Lighting Fixtures. The wall pack fixtures are shown as cutoff, the Zoning Ordinance
requires a full cutoff fixture. Also, the pole mounted lighting does not provide a cutoff
classification; indicate if this fixture is full cutoff.
8. Pole Height. Ensure that the pole height for the light fixtures encloses the height of the
base.
107 North Kent Street, Suite 202 • Winchester, Virginia 22601 -5000
Mr. Randy Kepler, PE
RE: Site Plan 908 -11
August 12, 2011
Page 2
0
u
9. Photometric Plan. Sheet C11 -01 needs to be revised to show the footcandles at all
property lines (Route 7 and the property to the west). The lighting levels along roads
cannot exceed 5.0 footcandles.
After you have revised the site plan, please resubmit two copies so that I may verify the
information contained on the plan. I will need all approved review agency comment sheets and
at least five copies of the final plan for approval. Comment sheets are required from the
following agencies: the Virginia Department of Transportation, the Frederick County
Inspections Department, the Frederick County Engineer, the Frederick County Fire Marshal,
and the Frederick County Sanitation Authority.
Sincerely,
i
Candice E. Perkins, AICP
Senior Planner
cc: Gramm Holdings, LLC, 1659 Berryville Pike, Winchester, VA 22603
CEP /dlw
Attachment
Department of Planning and Development
540/665 -5651
FAX: 540/665 -6395
April 13, 2011
Mr. Randy Kepler, PE
Greenway Engineering, Inc.
151 Windy Hill Lane
Winchester, VA 22602
Re: Review Comments for Site Plan #08 -11; Safford Chrysler
Property Identification Number (PIN): 54 -A -106
Dear Randy:
Planning Staff has reviewed the above - referenced site plan to determine if administrative
approval can be granted. At this time, administrative approval cannot be granted. This site plan
is denied until the issues in this letter, as well as all issues of the other review agencies, have
been adequately addressed. Please review Staffs comments listed below and then prepare a
revised site plan which adequately addresses each concern.
Review Comments
1. Project Information. On the coversheet under project information, the proposed
building requirements need to be provided. Also, the parking calculations need to be
revised as follows: the office space needs to be parked at 1 /250sf and the showroom
needs to be parked at 1 /400sf.
2. Photometric Plan. A photometric plan needs to be provided with this submission.
Please note that all outdoor lighting for this site needs to conform with § 165 - 201.07.
3. Sidewalk. A five foot wide sidewalk is required along the site's frontage with Route 7.
4. Parking Lot Setback. The parking spaces along the front of the property need to be ten
feet off the ROW.
5. Signage. The existing freestanding signage must be removed from the site as it does not
conform to the Zoning Ordinance. The site is permitted to have one freestanding
monument sign (150sf in size, 25 feet in height).
6. Curb and Gutter. Curb and gutter is required for the following parking areas: 1) The
new parking area at the northern portion of the site needs to have curb and gutter along
the entire perimeter, 2) along the new parking areas that face the showroom addition, and
3) along all parking space that face the two existing buildings.
7. Islands. The parking lot islands located in areas where new /used vehicle storage is
proposed needs to be striped. All other islands (employee parking, customer parking)
need to be landscaped islands.
107 North Kent Street, Suite 202 • Winchester, Virginia 22601 -5000
Mr. Randy Kepler, PE • •
RE: Site Plan 408-11
April 13, 2011
Page 2
8. Aisle Width. The minimum travel aisle width is 22 feet (for parking spaces 10'x18'),
areas less than 22 feet must be one way only or modified to increase the aisle width.
9. Existing Buildings. The two existing buildings (shop /maintenance) need to be clearly
delineated along with all parking that faces the structures (see sheet 0-01). The use of
the structures also needs to be shown.
10. Easements. Provide the legal references for all existing easements.
11. Shared Access. The site plan states that curb and gutter within the easements will be "by
others ". Provide documentation that Sheetz has agreed to construct these improvements;
otherwise, this site will be responsible for the improvements. The edge of pavement for
the access road needs to be shown as well.
12. Directional Arrows. Provide painted directional arrows throughout the site.
I3. Interior Landscaping. All parking spaces are counted towards the interior landscaping
requirement. This site needs to provide 36 interior landscaping trees, not seven.
After you have revised the site plan, please resubmit two copies so that I may verify the
information contained on the plan. 1 will need all approved review agency comment sheets and
at least five copies of the final plan for approval. Comment sheets are required from the
following agencies: the Virginia Department of Transportation, the Frederick County
Inspections Department, the Frederick County Engineer, the Frederick County Fire Marshal,
and the Frederick County Sanitation Authority.
Sincerely,
Candice E. Perkins, AICP
Senior Planner
cc: Gramm Holdings, LLC, 1659 Berryville Pike, Winchester, VA 2260'
Attachment
! NOV 1 5 2011 11 GREENWAY ENGINEERING
151 Windy Hill Lane
{fit;;l Funded in 1971 Winchester, Virginia 22602
q
K A
Project Name: Safford Chrysler -Site Plan
File No: 0370SC
Date: Tue, Nov 15, 2011
To: FC Planning
Attn: Candice Perkins
Copied
Delivery: ❑ Fed Ex
❑ Other_
❑ U.S. Mail
From: Randy Kepler /dlm
GREENWAY ENGINEERING
Phone: 540- 662 -4185
Fax: 540- 722 -9528
❑] Courier ❑ Pick Up
❑ Urgent R For Your Review R As You Requested 2] Please Comment
Message
Candice,
Per your request, attached is the following for final approval signature:
-8 copies of the revised site plan to include the new Boundary Line Adjustment
Thank you. Contact us with any questions.
Hand Delivery and Pick Ups Only:
Received by: Date:
Please Print Name:
0
Ag� GREENWAY ENGINEERING
151 Windy Hill Lane
Founded in 1971 Winchester, Virginia 22602
Project Name: Safford Chrysler -Site Plan
File No: 0370SC
Date: Tue, Apr 5, 201 1
To: FC Planning
Attn: Candice Perkins
Copied
Delivery: ❑ Fed Ex
❑ Other_
❑ U.S. Mail
From: Randy Kepler /dlm
GREENWAY ENGINEERING
Phone: 540- 662 -4185
Fax: 540- 722 -9528
R Courier ❑ Pick Up
❑ Urgent ❑v For Your Review ❑ As You Requested ❑ Please Comment
Message
Candice,
Attached is the following to be included in our original site plan submittal package:
- Signed /notarized Special Limited Power of Attorney
- Application fee check for $3,642.00
As always, thank you for your assistance. Contact us with any questions.
Hand Delivery and Pick Ups Only:
Received by: Date:
Please Print Name:
(fir
5 2011 1 "
APR
r ..
0
GREENWAY ENGINEERING
151 Windy Hill Lane
Founded in 1971 Winchester, Virginia 22602
�s a
Project Name: Safford Chrysler -Site Plan (Revised)
File No: 0370SC
Date: Thu, Mar 31, 201 1
To: FC Planning
Attn: Candice Perkins
Copied Jim Gramm- Safford
Delivery: ❑ Fed Ex
❑ Other_
U.S. Mail
From: Randy Kepler /dim
GREENWAY ENGINEERING
Phone: 540- 662 -4185
Fax: 540- 722 -9528
R Courier ❑ Pick Up
❑ Urgent ❑v For Your Review ❑ As You Requested F-/1 Please Comment
Message
Candice,
Attached is the following for your review and comments:
-Site Plan Application
-2 copies of the site plan (revised)
- Planning comment sheet
Thank you for your assistance. Contact us with any questions or need for additional information.
Hand Delivery and Pick Ups Only:
Received by: Date:
Please Print Name:
0 0
18� GREENWAY ENGINEERING
151 Windy Hill Lane
Founded in 1971 Winchester, Virginia 22602
Project Name: Safford Chrysler -Site Plan
File No: 0370SC
Date: Wed, Aug 24, 201 1
To: FC Planning
Ann: Candice Perkins
Copied
Delivery: ❑ Fed Ex
❑ Other_
❑ U.S. Mail
+i
AUG 2 4 2011
f
From: Randy Kepler /dlm
GREENWAY ENGINEERING
Phone: 540- 662 -4185
Fax: 540- 722 -9528
❑r Courier ❑ Pick Up
❑ Urgent ❑v For Your Review 0 As You Requested ❑� Please Comment
Message
Candice,
Per your request, attached is the following for your review:
- Comment response letter
-2 copies of the revised site plan per Planning comments dated August 12, 2011
-Site plan approval letters from Inspections, Engineer, Fire Marshal, and FCSA
As always, thank you for your assistance. Contact us with any questions.
Hand Delivery and Pick Ups Only: I
Received by: Date:
Please Print Name:
Document App ov�i Forrii
GL
PLEASE REVIEW THE ATTA= DOCUMENT. IF THIS DOCUMENT MEETS YOUR
APPROVAL PLEASE INITIAL AND PROVIDE THE DATE AND TRvIE OF YOUR
APPROVAL.
LFTHISDOCpME'NTDOESNOTMEET YOVRAPPROVAL PLEASEPROMDE
COMMMAS TO WHAT YOU WOULD r TO HAVE COMPLETED.
INITIALS DATE & ITHE
Candice � I
Mark
Dana
t
Eric
Mike
John
COMMENTS:
Received by Clerical Staff (Date & Time):
... ... .... • ... -.. .• • I .... ..