January 6, 2011
Mr. Ron Mislowsky
Patton Harris Rust & Associates, PC
117 E. Piccadilly Street, Suite 200
Winchester, Virginia 22601
RE: Approval of Site Plan #16 -10; Carmeuse Natural Chemicals Berm `B"
Property Identification Number (PIN): 90 -A -23
Dear Ron:
The above - referenced site plan was approved on January 5, 2011. The site plan is approved for the
construction of Berm B located on the Carmeuse Natural Chemicals Site in the Back Creek Magisterial
District. Berm plantings shall be in conformance with sheet 4 of the site plan.
All requirements of the Frederick County Zoning Ordinance have been met in the approved site plan,
including review agency comments from all relevant review agencies. I am providing you with five (5)
copies of the approved site plan. Please forward these copies to the appropriate representative(s).
Furthermore, advise the owner(s) that a copy should be kept for future reference, and an approved copy
must be kept on the construction site throughout the development process. Once site development is
complete, the owner(s) should contact this office to schedule an on -site inspection. Do not hesitate to
contact me if you have any questions or concerns.
Sincerely,
Candice E. Perkins, A1CP
Senior Planner
Attachments
CEP /bad
cc: Jane Anderson, Real Estate
Gary A. Lofton, Back Creek District Supervisor (e -mail)
Greg Unger and Kevin Crosen, Back Creek District Planning Commissioners
Commissioner of Revenue
Carmeuse Lime and Stone, 1696 Oranda Rd., Strasburg, VA 22657
107 North Kent Street, Suite 202 • Winchester, Virginia 22601 -5000
I have attached seven copies of the Berm B plans for approval. A note regarding the archeological study and the
opportunity for review has been added to the cover sheet. I understand from my conversation from Mr. Cheran
that this is acceptable. The signed POA is also enclosed.
We believe all conditions for approval have been satisfied. Please let me know when we can pick up the signed
plans.
Call if you have any questions.
} l DEC 2 1 2010 _.,.
0 9
Patton Harris Rust
& Associates Memorandum
Engineers. Surveyors. Planners.
Landscape Architects.
117 East Piccadilly Street
P Winchester,
Virginia 22601
540.667.2139
JHRAT
LJL F 540.665.0493
T0:
Candice Perkins
Organization/Company:
Frederick County Planning
From:
Ron Mislowsky, P.E.
Date:
December 21, 2010
Project NamelSubject:
Carmeuse — Berm B
PHR +A Project file Number:
cc:
I have attached seven copies of the Berm B plans for approval. A note regarding the archeological study and the
opportunity for review has been added to the cover sheet. I understand from my conversation from Mr. Cheran
that this is acceptable. The signed POA is also enclosed.
We believe all conditions for approval have been satisfied. Please let me know when we can pick up the signed
plans.
Call if you have any questions.
} l DEC 2 1 2010 _.,.
0
LAWS ®N AND SILEK, P.L.C.
120 EXETER DRIVE. SUITE 200
PO5'F OFF ICE Box, 2740
WINCHESTER,N A 22604
TELEPHONE: (540) 665 -0050
FACSIMILE: (540) 722 -4051
May 3, 2010
Mark R. Cheran, Zoning and Subdivision Administrator
Planning and Development
County of Frederick
107 North Kent Street, 2Rd Floor
Winchester, VA 22601
Dear Mark:
4 2010 f
1
I HONIAS MOORE LAWSON a TLA WdON(/N.WLCCOM
Re: RE" V03 -06 Carmeuse Middletown
This is a follow -up to Carmeuse's correspondence dated May 28, 2009, and our recent
telephone conversation. The archeological survey was conducted and completed by Dr, Gcicr
who is a professor at Jaynes Madison University'. The work that was done exceeded the request
of a Phase 1, including the digging of test pits and retrieving artifacts. To my know!edge. those
artifacts have been removed and are currentiy witfi Dr. Geier at James ma(lisoa i. oiversty.
From here- we understand there will be a further analysis of what- was observed at and rerwv d
from the site. My general understanding of the work is that Dr. Geier was particularly interested
in confirming previous writings which have Mated the events and movements of I-)01's t11at.
Occu:Ted during the Battle of Cedar Creek. It. is my understanding that Dr. Geier's work has, in
fact, confirmed what had previously been written about those movements and activities during
the battle, The historical work that was to be cempieied at the site has been finished As you
know, Dr. Geier is a noted historian and will review the data, artifacts, and information further as
part Cl his onpoing historical analysis of the ar£'a, 1Ne do pi:m tC scheaul- a tm7e whe':n it is
convenient for Dr. Geier to malkc t ur-senta on. of h; ino
3 harn: you for v' ur asslstd ).e, i:! tli-`; I)ICieCt, SitGLl;d y4h` L3',e
any further questions. please do no i'v-S t:arc i.'� give In}e 11 t -all. n1fSS x,9e hear fiAIT!ier, :if
PRU\IR AIORriCt; P(1\l (1VFICf: 141) \802, FPO \TRM:I� \'INGI \IA EER3U .11\.:1 5401635- 941$EACFI \ItR:(540)635- 9.1211: - \1811,; Jti11 M'Afu l.Aq }'(1 \'AiX'11.411. f: F'.Cllll
FAIRE . Allr)ltv,,41: 111894 M AI\ STNk F, I, S1 IITC, 2119, EAIRF.1 \. VIRGI \IA 22030, 1 Y:.'FI,1111. (70.1) 152 - 2(115, F.A(,IIIllI.F: (ifl3) 1524191). E -NIAI I : 1 110 1 \\(11 1N\OVry\ f NI /O\. %E'r
Mark R. Cheran, Zoning and Subdivision Administrator •
May 3, 2010
Page 2
assume this satisfies any questions that remain with regard to the satisfaction of performance of
the proffered items for the rezoning of this property.
TML:atd
0 0
Patton Harris Rust & Associates
Engineers. Surveyors. Planners. Landscape Architects.
117 East Piccadilly Street
RAT Winchester, Virginia 22601
540.667.2139
PH
F 540.665.0493
To: Candice Perkins
OrganizationlCompany:
From:
Date:
Project Name /Subject:
cc:
Frederick County Planning
Ron Mislowsk , P
November 10, 20 Wo
Carmeuse Natural Chemicals Berm `B"
Site Plan #16 -10
Memorandum,,
. NOV 1 4 2010
We have revised the plans per your comments as noted below. I have enclosed two sets of plans for your review
and approval.
1)e ial Limited Power o Attorney Form. Please have the property owner sign the attached Special Is'mited Power ofAttorney
Form prior to further review or approval This form should be notarized and completed to grant the applicant (you) with
authorization to represent them far this site plan.
Carmeuse has asked that this form not be signed until the County is prepared to issue the approved plans.
2) Berm Location. The coversheet indicates that the berm is on parcel 90-A-23; however, the key map has a proposed berm located
on parcel 90 A -2 (appears to be part of Berm A). The detail on sheet 3 is also unclear where Berm B is actually located. On
the key map, the berm location needs to be clarified (bubble the berm area) and the location of Berm A needs to be shown as
well
Sheets one and two have been updated as requested.
3) Prober4 Boundaries. The boundaties jorparrel90A -23 need to beprovided on sheet 2.
Boundary information has been provided for the rezoned parcel. I have attached a copy of the plat for the
rezoned area which shows the entire parcel (90 -A -23) which extends into Shenandoah County.
4) Soil Stockpiles. Indicate if the existing soil stockpile height has been reduced as required by proffer 2.3.
Much of the existing stockpile will be used to construct Berm B. This will be completed prior to the 2013
deadline required in the proffer.
5) Landscgino Notes. On sheet 4, revise the landscaping notes to include the new code references.
Notes have been revised to show the new reference.
6) Phase I Arrheological Surveq. Provide documentation that the Phase I archeological survey has been completed on parcel 90-A-
23.
I have attached a copy of a letter from Carmeuse which was delivered to the County Planning offices on May
28, 2009.
have also included the Department of Forestry, Inspections and Public Works comment sheets. Please let me
know if you have any questions.
1 tlo 4A4D•Qe-ivc2ED
6V J) [ /V\ -i r> t �e
7A0 9
It F(Is�r �t? /i���ttiSO ' May 28, 2009
Mark R. Cheran, Zoning and Subdivision Administrator
Planning and Development
County of Frederick
107 North Kent Street, 2 "d Floor
Winchester, VA 22601
VIA HAND DELIVERY
Dear Mark:
0
THOMAS MOORE LAWSON • T1,AWSOYGdLSPLC.COA1
Re: REZ #03 -06 Carmeuse Middletown
As you are aware, the approved proffers accompanying Rezoning 03 -06 require that a
Phase I Archeological Survey of Parcel 23 be completed within twelve months of the approved
rezoning, and notice to neighboring property owners be provided regarding well and foundation
surveys. This letter is to certify that the required Phase I survey of the property was performed
and completed within the twelve month time period and that the required notices have been sent
to the surrounding property owners.
Thank you for your attention to these matters. If we do not hear from you we will
assume that nothing further is required to remain in compliance with the approved rezoning.
Very truly yours,
James E. Bottom
Area Operations Manager
Carmeuse Lime and Stone
COUNTY of FREDERICK
Department of Planning and Development
540/665 -5651
FAX: 540/665-6395
October 6, 2010
Mr. Ron Mislowsky
Patton Harris Rust & Associates, PC
117 E. Piccadilly Street, Suite 200
Winchester, Virginia 22601
Re: Review Comments for Site Plan #16 -10; Carmeuse Natural Chemicals Berm "B"
Property Identification Number (PIN): 90 -A -23
Dear Ron:
Planning Staff has reviewed the above- referenced site plan to determine if administrative approval can
be granted. At this time, administrative approval cannot be granted. This site plan is denied until the
issues in this letter, as well as all issues of the other review agencies, have been adequately addressed.
Please review Staff s comments listed below and prepare a revised site plan which adequately addresses
each concern.
Review Comments:
1) Special Limited Power of Attorney Form. Please have the property owner sign the attached
Special Limited Power of Attorney Form prior to further review or approval. This form should
be notarized and completed to grant the applicant (you) with authorization to represent them for
this site plan.
2) Berm Location. The coversheet indicates that the berm is on parcel 90 -A -23; however, the key
map has a proposed berm located on parcel 90 -A -2 (appears to be part of Berm A). The detail on
sheet 3 is also unclear where Berm B is actually located. On the key map, the berm location
needs to be clarified (bubble the berm area) and the location of Bern A needs to be shown as
well.
3) Property Boundaries. The boundaries for parcel 90 -A -23 need to be provided on sheet 2.
4) Soil Stockpiles. Indicate if the existing soil stockpile height has been reduced as required by
proffer 2.3.
5) Landscaping Notes. On sheet 4, revise the landscaping notes to include the new code
references.
6) Phase I Archeological Survey. Provide documentation that the Phase I archeological survey
has been completed on parcel 90 -A -23.
107 North Kent Street, Suite 202 • Winchester, Virginia 22601 -5000
0, 41
Mr. Ron Mislowsky
Patton Harris Rust & Associates, PC
Re: Site Plan #16 -10
October 6, 2010
After you have revised the site plan, please resubmit one copy so that I may verify the information
contained on the plan. I will need all approved review agency comment sheets and at least five copies of
the final plan for approval. Comment sheets are required from the following agencies: the Frederick
County Inspections Department, and the Frederick County Engineer.
Do not hesitate to contact me if you have any questions or concerns regarding this letter.
Sincerely,
Candice E. Perkins, AlCP
Senior Planner
Attachment
cc: Carmeuse Lime and Stone, 1696 Oranda Rd., Strasburg, VA 22657
CEP/bad
0
Patton Harris Rust & Associates
Engineers. Surveyors. Planners. Landscape Architects.
/�
117 East Piccadilly Street
PH t / \ Winchester, Virginia 22601
\L i T 540.667.2139
F 540.665.0493
111101
Organization /Company:
From:
Date:
Project Name /Subject:
PHR +A Project file Number:
cc:
Candice Perkins, AICP
Frederick Coumv Planning and Development
Patrick Sowers, AICP
2010
Carmeuse— Middletown Berm B
16408 -1 -2
0
Memorandum
Please Find attached the following for proposed Berm B at the Carmeuse — Middletown quarry operation for
your review and comment:
1. 2 copies of Site Plan
2. Signed Application
3. Checklist
4. Application fee in the amount of $4,750.00
I have also submitted the plan to Inspections, Public Works, and the fire Marshal for comments. If there are
other review agencies that will need to provide comment, please let me know.
If you have anp questions, please feel free to call me at (540) 667 -2139.
SEP 3 2010
i
SEP 3 2010
i
Document Approval Forin
PLEASE REVIEW THE ATTACHED DOCUMENT. IF THIS DOCUMENT MEETS YOUR
APPROVAL PLEASE IAIITIAL AND PROVIDE THE DATE AND T M OF YOUR
APPROVAL.
IF THIS DOCUMENT DOES NOT MEET YOUR APPROVAL PLEASE PROVIDE
COMMENTSAS TO WHAT YOU WOULD LIKE TO HAVE COMPLETED.
Candice
Mark
Dana
Eric
Mike
John
COMMENTS
Received by Clerical Staff (Date &
INITIALS DATE & TIME