HomeMy WebLinkAbout03-12 Commentsr
Rezoning Comments
Virginia Department of Transportation
Mail to:
Virginia Department of Transportation
Attn: Resident Engineer
14031 Old Valley Pike
Edinburg, Virginia 22824
(540) 984 -5600
0
Hand deliver to:
Virginia Department of Transportation
Attn: Resident Engineer
2275 Northwestern Pike
Winchester, Virginia 22603
Applicant: Please fill out the information as accurately as possible in order to assist the Virginia Department
of Transportation with their review. Attach three copies of your application form, location map, proffer
statement, impact analysis, and any other pertinent information.
Applicant's Name:Graystone Corporation of VirainiaTelephone: (540) 667 -7700
Mailing Address: P. 0. Box 2530
Winchester. VA 22604
Location of property: 271.39± acres:
Tax Parcels #43 -(OA))-158,__A4-((A))-25,
and 44- ((A)) -26
Current zoning: Ml
Zoning requested: Amendment to Acreage: _ 271.39±
Proffer Statement
Virginia Department of Transportation Comments:
See attached email from Lloyd In with VDOT to The Shockey Companies
—matt arcaz , 'iZSL2.
VDOT Signature & Date: 03J06J
Notice to VDOT - Please Return Form to Applicant
19
Grav Farland
From: Funkhouser, Rhonda (VDOT) [ Rhonda .Funkhouser @VDOT.Virginia.gov] on behalf of Ingram,
Lloyd (VDOT) [ Lloyd.ingram @VDOT.virginia.gov]
Sent: Tuesday, March 06, 2012 8:36 AM
To: Gray Farland
Cc: John.Bishop; Ingram, Lloyd (VDOT); Smith, Matthew, P.E. (VDOT)
Subject: VDOT Comments to Proposed Graystone Proffer Amendment
Attachments: Scanned from EDNXerox001.pd1
VDOT has reviewed the submittal for an amendment to the existing proffers dated January 25, 2010 and
provides the following comments:
There was no accompanying documentation that supports the need for a change in the existing approved
proffers.
The question of eliminating the medians defies the research by both VDOT and AASHTO that identifies the
medians as a critical part of building a safe 4 -1ane high volume roadway. Urban collector streets with four or
more lanes should include width for an appropriate median treatment, where practical. In addition to
restricting left turn movements, medians provide a recovery area for out -of- control vehicles, provide a
stopping area in case of emergencies, allow space for storage of left- turning and U- turning vehicles, diminish
headlight glare and medians provide separation from opposing traffic which increase driver comfort and
capacity. This criteria was a significant part of the proffers that convinced VDOT to support the original
rezoning. At full build -out of both Graystone and Snowden Bridge, this portion of roadway will be mixing
industrial /commercial traffic with residential traffic when Snowden Bridge Boulevard is completed in its
entirety. The need for the median will become more critical as traffic increases.
In addition to eliminating median, the proposed proffer change appears to eliminate curb and gutter as well.
How will curb & gutter /median proffered (U4D design) in other sections along Snowden Bridge Boulevard tie -
in with non -curb & gutter /median sections? Transitioning from a U4D Section to a non -curb & gutter and non -
median section is unconventional and inconsistent and could affect driver performance and safety. VDOT
advocates maintaining a consistent road section throughout the entire Snowden Bridge Boulevard, as
originally proffered.
Therefore, with the documentation provided with this request, VDOT cannot support the requested
amendment in its current form.
<<Scanned from EDNXerox001.pdf>>
Lloyd A. Ingram, Land Development Engineer
VA Department of Transportation — Land Development
Clarke, Frederick, Shenandoah & Warren Counties
14031 Old Valley Pike
Edinburg, Virginia 22824
Phone #(540) 984 -5611
Fax # (540) 984 -5607
0
Rezoning Comments
Frederick County Department of Public Works
Mail to:
Frederick County Dept. of Public Works
Attn. Director of Engineering
107 North Kent Street
Winchester, Virginia 22601
(540) 665 -5643
1]
Hand deliver to:
Frederick County Dept, of Public Works
Arm. Director of Engineering
County Administration Bldg., Suite 202
107'North•,Kent Street
Winchester, Virginia
Applicant: Please fill out the information as accurately as possible in order to assist the Department. of
Public WorkP with their review Attach a. copy of your application. for_m,, location map, proffer
statdment,�mpact analysis; land' anyaother „',lietiiien'teinformation:° °
'q"_ -y ^'F ort r sruw _ rvgw wwoi , r YJ!
Applicant's Name. Graystone Corporation. of Virginiarelephone: (540) 667 -7700
Mailing Address: P 0 'Box 2530
Winchester, VA 22604
Location of property- 271 ,39t. acres
Tax.Parcels #.43 -R( ))- -158, 44- ((1a)) -25,
aril 44- (;(A)) -26
Current zoning: M1 Zoning requested. AM'-INInent to acreage: 271 39±
Proffer Statement
blic Work's Comme nts:
FDepartmeut
V o ', c +5
S TGl -
Gvcx- s6CO C t u o cli CX vtCL U .art I a
Public Works Signature & Date:. Q I Z
Notice to Dept, of Public Wo - Xlease Return This Form to the Applicant
pill
Mr. Gray Farland - -
The Shockey Companies
P.O. Box 2530
Winchester, Virginia 22604 -1730
F
COUNTY of FREDERICK
Roderick B. Williams
® Q %y7 County Attorney
FED 14 2�i2 L 540/722 -8383
i Fax 540/667 -0370
HOWARD SHOCKEY & SONS, INC. E E -mail:
February 10, 2012
Re: Graystone Corp. Office and Industrial Park — Proposed Proffer Amendments
Dear Mr. Farland: `
You have submitted proposed amendments to paragraphs 4 and 5 of part D
(Transportation Improvements) of the Proffer Statement, dated January 25, 2010, and approved
by the Board of Supervisors on January 27, 2010, for the above - referenced project. The project
encompasses Tax Parcels 43 -A -158, 44 -A -25 & 44 -A -26, comprised of 271.39± acres, located in
the Stonewall Magisterial District (the "Property "). The Property is zoned Ml (Light
Manufacturing), with proffers.
I have now reviewed the proposed amendments and it is my opinion that, subject to just
one comment, the proffer statement containing the proposed amendments would be in a form to
meet the requirements of the Frederick County Zoning Ordinance and the Code of Virginia, and
would be legally sufficient as a proffer statement. My one commends that the proposed
new /revised proffer statement will need to reflect a current revision date and not the final
revision date of January 25, 2010, from the original rezoning.
I have not reviewed the substance of the Proffers as to whether the Proffers are suitable
and appropriate for this specific development, as it is my understanding that that review will be
done by staff and the Planning Commission.
xmcyreiv yours,
Attorney
cc: Michael T. Ruddy, Deputy Director of Planning and Development
107 North Kent Street • Winchester, Virginia 22601