Loading...
HomeMy WebLinkAbout09-09 Proffer StatementGreenway Engineering X O nn i August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12, 2010 Revised January 25, 2010 RECORD OWNER: Graystone Corporation of Virginia APPLICANT: Graystone Corporation of Virginia (here -in after the "Applicant ORIGINAL DATE OF PROFFERS: August 24, 2009 REVISION DATE: January 25, 2010 Preliminary Matters GRAYSTONE CORPORATION OF VIRGINIA PROFFER STATEMENT REZONING: RZ oq -01 7 Rural Areas District (RA) to Light Manufacturing District (MI) PROPERTY: 271.39± acres; Tax Parcels #43 -((A)) -158, 44- ((A)) -25, and 44- ((A)) -26, (here -in after the "Property PROJECT NAME: Graystone Corporation Office and Industrial Park Pursuant to Section 15.2 -2296 Et. Seq. of the Code of Virginia, 1950, as amended, and the provisions of the Frederick County Zoning Ordinance with respect to conditional zoning, the undersigned Applicant hereby proffers that in the event the Board of Supervisors of Frederick County, Virginia, shall approve Rezoning Application o q -o7 for the rezoning of 271.39± -acres from the Rural Areas (RA) District to 271.39± -acres to the Light Industrial (MI) District, development of the subject property shall be done in conformity with the terms and conditions set forth herein, except to the extent that such terms and conditions may be subsequently amended or revised by the Applicant and such be approved by the Frederick County Board of Supervisors and their legal successors, heirs, or assigns in accordance with the said Code and Zoning Ordinance. In the event that such rezoning is not granted, then these proffers shall be deemed withdrawn and have no effect whatsoever. These proffers shall be binding upon this Applicant and their legal successors, heirs, or assigns. The Property, more particularly described as the lands owned by Graystone Corporation of Virginia (formerly Crider Shockey, Inc. of West Virginia), being all of Tax Map Parcels 43 -((A)) -158, 44- ((A)) -25, and 44- ((A)) -26, and further described by Instrument Number 030025588. (Please refer to Rezoning Application Deed Information). Proffer Statement Greenway Engineering A. Generalized Development Plan August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12, 2010 Revised January 25, 2010 PROFFER STATEMENT B. Ml, Light Industrial District Land Uses C. Ml, Light Industrial District Design Standards 2 1. The Applicant hereby proffers to submit a Generalized Development Plan (the "GDP for the Property. The purpose of the GDP is to identify the general location of the M1 District office and industrial land bays, the general location of the future Route 37 corridor study area, the general location of the Snowden Bridge Boulevard urban four -lane divided collector road system with signalized intersection or roundabout design and limited entrance locations, the general location of on -site and off -site green space buffer areas, and the general location of the adjoining parcels that are within permanent protective easements. 2. The Applicant hereby proffers to develop the Property in substantial conformity with the proffered GDP, prepared by Greenway Engineering dated January 25, 2010. The GDP is recognized to be a conceptual plan and may be adjusted by the Applicant to accommodate final design and engineering constraints without the need of new conditional rezoning approval by the Frederick County Board of Supervisors, provided that the adjustments do not eliminate or substantially relocate the areas indicated on the proffered GDP. 1. The Applicant intends to develop the Property to implement industrial and office land uses that are designed to coexist in an office park setting. 2. The Frederick County Board of Supervisors agrees to allow future office and industrial land uses that are included within future amendments to the M1, Light Industrial District to be developed on the Property without the need for conditional zoning amendments. 1. The Applicant hereby proffers to establish an Architectural Review Board (ARB) to oversee and approve all structural design exterior treatments for new construction and structural additions to ensure high quality development throughout the project. Additionally, the ARB will oversee and approve all Proffer Statement Greenway Engineering D. Transportation Enhancements August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12, 2010 Revised January 25, 2010 3 monument signage and building mounted signage, to ensure consistency in the design of signage throughout the project. Notwithstanding what is stated herein, the ARB is intended to be in addition to and not intended to override or conflict with any provisions of the Frederick County Code. 2. The Applicant hereby proffers to establish requirements for outdoor green areas and/or outdoor plaza areas for the benefit of employees of the office and industrial park. These outdoor green areas and outdoor plaza areas will be located within each of the M1 District land bay areas identified in the proffered GDP. 3. The Applicant hereby proffers to establish internal asphalt trails for the benefit of employees of the office and industrial park. These asphalt trails will be a minimum of eight feet in width and will be designed to connect land uses throughout the M1 District land bay areas identified in the proffered GDP wherever possible. For each lot or parcel associated with the construction of a building, the Applicant agrees to identify the location on said lot or parcel for trails (if applicable, to said lot or parcel) and to have the trail constructed (if applicable) prior to the issuance of the Certificate of Occupancy for the structure or building on said lot or parcel. 4. The Applicant hereby proffers to establish a 100 -foot green space buffer area along the northern boundary of the Property as depicted on the proffered GDP. This green space buffer area will be left in its natural state to provide viewshed mitigation for the Milburn Cemetery and the Helm- McCann springhouse. Said buffer is in addition to the requirements of the Frederick County Code. 5. The Applicant hereby proffers to provide for evergreen landscaping along the Redbud Road frontage of the Property identified as a green space buffer area on the proffered GDP. The provision of this evergreen landscaping is to provide viewshed mitigation between the Property and the Shenandoah Valley Battlefield Foundation property. Said buffer is in addition to the requirements of the Frederick County Code. 1. The Applicant hereby proffers to provide a corridor study area within the Property as depicted on the proffered GDP that is a minimum of 350 feet in width. The purpose of this corridor study area is to provide Frederick County with an opportunity to determine a final alignment for Route 37 throughout the limits of the Property through the completion of engineering design sufficient for this purpose. The design within the corridor study area depicted on the proffered GDP will provide access to the Property to the proposed interchange and Snowden Proffer Statement 03 J Grecnway Engineering August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12, 2010 Revised January 25, 2010 Proffer Statement 4 Bridge Boulevard. The corridor study area shall be available to Frederick County for a period of eight years from the date of rezoning approval to complete engineering design necessary to determine the appropriate alignment and right -of- way width for Route 37 within the Property. The Applicant agrees to cooperate with VDOT and Frederick County to provide engineering information and reports within the Applicant's possession if needed to assist with this design effort. The Board of Supervisors may allow encroachment into and or the definition of the corridor study area if necessary to accommodate site development proposals through the Site Plan approval process. 2. The Applicant hereby proffers to provide for a maximum 350 -foot wide right -of- way dedication for the Route 37 mainline section within the Property. The mainline section is intended to include through travel lanes and collector distributor lanes if necessary. It is agreed that any portion of the maximum 350 foot right -of -way that is not required for the Route 37 mainline section within the Property will not be requested from the Applicant. The Applicant shall provide the required right of-way dedication to Frederick County within 90 days from the date of written notice by Frederick County, which shall occur after an official decision has been made by Frederick County and VDOT for the alignment and right -of -way width for the Route 37 mainline section within the Property. In the event the aforesaid official decision has not been made for the Route 37 mainline section within the time period specified in Section D(1), the Applicant may either extend the time period for this decision, or may provide Frederick County with a 225 -foot wide right -of -way dedication for Route 37 within the corridor study area depicted on the proffered GDP. The Applicant shall be allowed to install utilities or other elements necessary for site development within the dedicated right -of- way area, provided that this does not restrict use of the right -of -way. 3. The Applicant hereby proffers to provide for right -of -way dedication sufficient for the development of up to an 800 -foot wide diamond interchange or a single point urban interchange (SPUI) in the general location depicted on the proffered GDP. It is agreed that any portion of the right -of -way that is not required for the new interchange within the Property will not be requested from the Applicant. it is further agreed that the engineering design sufficient to determine the location, type and right -of -way needs for the new interchange will provide direct access to Snowden Bridge Boulevard. The Applicant shall provide the required right -of- way dedication to Frederick County within 90 days from the date of written notice by Frederick County, which shall occur after an official decision has been made by Frederick County and VDOT for the alignment and right -of -way width for the new Route 37 interchange within the Property. In the event the aforesaid official decision has not been made for the new Route 37 interchange within the time period specified in Section D(1), the Applicant may either extend the time period for this decision, or may provide Frederick County with a 225 -foot wide right -of- way dedication for Route 37 within the corridor study area depicted on the 0 0 Greenway Engineering August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12, 2010 Revised January 25, 2010 5 proffered GDP. The Applicant shall be allowed to install utilities or other elements necessary for site development within the dedicated right -of -way area, provided that this does not restrict use of the right -of -way. 4. The Applicant hereby proffers to construct Snowden Bridge Boulevard between the Property and Martinsburg Pike (U.S. Route 11 North), including the CSX bridge crossing, prior to the issuance of an occupancy permit for the first office or industrial site plan approved on the Property. The Applicant shall design and construct Snowden Bridge Boulevard as an urban four -lane divided collector road section (U4D) throughout the limits of the Property, and shall develop the off -site segment of Snowden Bridge Boulevard consistent with the approved public improvement plan. Snowden Bridge Boulevard shall be initially constructed as a two -lane road section, and shall be constructed as the ultimate four -lane divided road section prior to the issuance of the occupancy permit for the site plan that exceeds 8,000 VPD or in the event that Snowden Bridge Boulevard is developed to allow access for additional traffic from outside the Property, the construction of the ultimate four -lane divided road section shall be required when the total trip volume exceeds 8,000 VPD on the Property, which ever first occurs. 5. The Applicant hereby proffers to limit full commercial intersection access on Snowden Bridge Boulevard to establish up to three commercial intersections in the general location of intersections identified on the proffered GDP. An intersection has been identified on the proffered GDP that could potentially be developed as either a roundabout or as a signalized intersection if warranted by VDOT. All full commercial intersections identified on the proffered GDP will be developed with raised medians to provide for controlled left turn movement access to the Property. 6. The Applicant hereby proffers to allow for the full commercial intersection located on the east side of the Route 37 corridor study area to be dosed entirely if necessary when Route 37 is developed by others throughout the limits of the Property. The closure of the full commercial intersection is conditioned upon the provision of street access to this portion of the Property that will be developed by others during the construction of Route 37. The Applicant agrees to cooperate with Frederick County to provide easements on the Property if necessary to facilitate new street access to this portion of the Property if this becomes necessary due to the construction of Route 37. 7. The Applicant hereby proffers to prohibit direct commercial access from the Property to existing Milburn Road (Route 662). The County may determine that emergency access from to the Property from existing Milburn Road is acceptable provided that it is designed to prohibit access for regular vehicular traffic. Proffer Statement CD Grecnway Engineering August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12, 2010 Revised January 25, 2010 6 8. The Applicant hereby proffers to prohibit direct commercial access from the Property to existing Redbud Road (Route 661). Frederick County may determine that emergency access from to the Property from existing Redbud Road is acceptable provided that it is designed to prohibit access for regular vehicular traffic. 9. The Applicant hereby proffers to prohibit direct commercial access from the Property to McCann's Road (Route 838). Emergency access to the Property from McCann's Road is prohibited as well to protect the integrity of the buffer identified along this road. 10. The Applicant shall develop Snowden Bridge Boulevard as a public street; however, the Applicant shall have the ability to develop all internal streets as private street systems. All private streets shall be constructed to meet or exceed VDOT vertical base section standards. 11. The Applicant hereby proffers to provide for inter parcel connections where possible to mitigate transportation impacts to the full commercial intersections identified on the proffered GDP. 12. The Applicant submits that it will apply for all such public assistance mechanisms that are available at the time of development to facilitate the installation of the aforementioned transportation/infrastructure improvements. Those mechanisms include, but are not limited to, matching funds, industrial access funds and /or any other transportation /infrastructure funding vehicles, such as CDAs. Without binding any future legislative act, the Applicant and the Frederick County Board of Supervisors agree that the use of said mechanisms are advantageous to the development of the Property and the use of same should be encouraged and that both parties should make all reasonable efforts to cooperate with one another to implement the appropriate mechanism or combination of mechanisms to ensure rapid installation of the aforementioned improvements. 13. The Applicant hereby proffers to provide for a maximum 60 -foot right -of -way dedication to Frederick County to provide for the development of a street connection by others between the planned portion of Snowden Bridge Boulevard on the Property and existing Redbud Road (Route 661) immediately south of the Property. The general location of this 60 -foot right -of -way shall be delineated on the final Master Development Plan, which shall connect to one of the proposed new full commercial intersections that are located to the west of the Route 37 corridor study area as depicted on the proffered GDP. It is agreed that the 60 -foot right -of -way dedication can be located within buffer areas provided that the landscape screening and opaque elements are located between the adjoining properties owned by Applicant and the right -of -way dedication area. The Applicant shall provide the required right -of -way dedication to Frederick County Proffer Statement O 0 Greenway Engineering August 24. 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12. 2010 Revised January 25, 2010 7 within 90 days from the date of written notice by Frederick County, which shall occur after an official decision has been made by Frederick County and VDOT to construct this street connection. It is agreed that the Applicant can construct street access with entrances to land bays within the delineated 60-foot right -of -way area provided that the proposed street access meets or exceeds VDOT vertical base section standards. The Applicant shall be allowed to install utilities or other elements necessary for site development within the dedicated right -of -way area, provided that this does not restrict use of the right -of -way. 14. The Applicant has agreed to provide Frederick County with right -of -way dedications within the Property for the Route 37 mainline, the new Route 37 interchange, and the connecting street between Redbud Road and Snowden Bridge Boulevard as described in Sections D(2), D(3), and D(13) of the Proffer Statement. In the event that Frederick County or VDOT decides to not construct these road systems in whole or in part subsequent to right -of -way dedication, the recipient of the dedication agrees to convey the right -of -way dedication to the Applicant within 90 days from the date of this determination. E. Fire and Rescue Monetary Contribution 1. The Graystone Office and Industrial Park has been demonstrated to provide a positive economic impact to Frederick County services by the Frederick County Development Impact Model. However, the Applicant intends to further support fire and rescue services through the provision of a monetary contribution in the amount of $0.05 per square foot of structural development for all land uses within the Property. This monetary contribution shall be provided to Frederick County for fire and rescue purposes prior to the issuance of a certificate of occupancy permit for each building permit issued within the Property. [Signatures on next page] Proffer Statement O� Greenway Engineering Respectfully Submitted: August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12, 2010 Revised January 25, 2010 F. Signatures Graystone Corporation of Virginia The conditions proffered above shall be binding upon the heirs, executors, administrators, assigns and successors in the interest of the Applicants and owners. In the event the Frederick County Board of Supervisors grants this rezoning and accepts the conditions, the proffered conditions shall apply to the land rezoned in addition to other requirements set forth in the Frederick County Code. By: n /7-/ let ,ra{ 5 G ✓il •�l iezt ,f'f Commonwealth of°r 6443VCounty of A:e .ear. t' To Wit: Date:1AN 2" The foregoing instrument was acknowledged before me this✓° day of_. .4".. 7 20 /a by \4o eta dee vvv My Commission Expire:: P ere Registration No.: �24+blit At uut t. Proffer Statement 1 JOB NO. 2(.( DESIGNED BY: WRS SIM :TWOS GENERALIZED DEVELOPMENT PLAN GRAYSTONE CORPORATION OF VIRGINIA STONEWALL MAGISTERIAL DISTRICT FREDERICK COUNTY, VA GREENWAY ENGINEERING, INI 151 Windy Hill Lane Winchester, Virginia 22602 Telephone: (540) 662 -4185 X (540) 722 -9528 FAX.- www.greenwayeng.com Engineers, Surveyors Environmental Services Founded in 1971 L.8 3 �visa alto IA v c x c� m O n\\ to n7 I r -i i t r 0 C O Cam II II c os 7j O c c H m m X O H O m 0 U' O z 7° 0 CD o z p co 0 0 m m D m a z H m z z 0 m 7 0 0 m 0 N 0 z m r 0 m z 0 0 URBAN 4 LANE DIVIDED COLLECTOR ROAD PARCELS WITH PERMANENT EASEMENTS OFFICE MANUFACTURING LAND BAYS PDRES446 -09 Action: PLANNING COMMISSION: January 6, 2010 Recommended Approval BOARD OF SUPERVISORS: January 27, 2010 a APPROVED DENIED 0 0 AN ORDINANCE AMENDING THE ZONING DISTRICT MAP REZONING #09 -09 OF GRAYSTONE CORPORATION OF VIRGINIA WHEREAS, Rezoning #09 -09 of Graystone Corporation of Virginia, submitted by Greenway Engineering, to rezone 271.39 acres from RA (Rural Areas) District to M1 (Light Industrial) District, with proffers dated August 24, 2009, last revised on January 25, 2010, for Office and Manufacturing Uses, was considered. The properties are located on the north side of Redbud Road (Route 661), the east side of CSX Railroad, the west side of Milburn Road (Route 662), and south of McCanns Road (Route 838), in the Stonewall Magisterial District, and are identified by Property Identification Numbers 43 -A -158, 44 -A -25 and 44 -A -26. WHEREAS, the Planning Commission held a public hearing on this rezoning on November 4, 2009 and a public meeting on January 6, 2010; and WHEREAS, the Board of Supervisors held a public hearing on this rezoning on January 27, 2010; and WHEREAS, the Frederick County Board of Supervisors finds the approval of this rezoning to be in the best interest of the public health, safety, welfare, and in conformance with the Comprehensive Policy Plan; NOW, THEREFORE, BE IT ORDAINED by the Frederick County Board of Supervisors that Chapter 165 of the Frederick County Code, Zoning, is amended to revise the Zoning District Map to rezone 271.39 acres from RA (Rural Areas) District to M1 (Light Industrial) District, for Office and Manufacturing Uses. The conditions voluntarily proffered in writing by the applicant and the property owner are attached. This ordinance shall be in effect on the date of adoption. Passed this 27th day of January, 2010 by the following recorded vote: Richard C. Shickle, Chairman Gary W. Dove Gene E. Fisher Christopher E. Collins PDRES446 -09 Aye Aye Aye Aye Gary A. Lofton Bill M. Ewing Charles S. DeHaven, Jr. A COPY ATTEST Aye Aye Aye iia iley, Jr. �erick County Administrator ,Iq1 *ll 379W 21130 0!34'!6' 01'2129 I .91, ,21,9020 1076'59 Po'IIOO 17 r 5101 w' 14' wa2u' fro II It,9f00 52,51.60 I .00,,00.50 I I,91S0_'j 14'45'47 01'37'49' 1 5. IL,IS.PJ �tf,ff. 9 11.00 00 Po.LI.Po M '9CU.If 5 9 090143 5 25992' W 5 22'0559' w M .05V* 51 5 1 M,S(O9.fz 5 f 175439 W 5 22'5706 W 5 31'1113 W 5234632 W N 6753 W N 16'01 9 W J�L0,9S.CS N 5090.91 N 3 ,51 IJ.LI N 3,9E21.25 N 3 .22,14.95 N 5 2433'29' 1'1 5 12'11' W 5 63'3!'16' E I 5 69'1210 5 S(Sl. 5_ M Ct,*5.95 5 ht ,55,99.N5 5 ,60•691 11I0N31 060743 I ,66591 ,16501 ,21 .56 ,95605 99101 ,16Tt1 ,91•105 40'056 ,51611 ,61 915 ,LO 05 ,11'105 1 ,651( _.1,,L0 Ka 5 ,3,5512.95 13 ,699(1 ,56665 ,61 ,00 051 *6 er A1 1 4131531 aaY 65 6 01 X 966 01 I 9'5611 96611 ,02905 ,5•551 ,0S'SLI ,0l ,W'OK ,19•(1 ,11615 ,10'a ,91'[29 ;16!01 ,91"1(9 517 NUEI ,95'511 ,556n ,99•511 *091 ,1p 65. 1 to 51[ 511101171 11 E2E9 ,951191 (5'199 ,(5001* 10(9 SP 415 .99219 9•16949 ,62391 ,993 *95 ,1'65196 ,905151 1 5745.65' 5754.65' .1-9•405 0( 19(0? ,09269 91'I[NI ,91 3165 'C3 «e IIJ 013 63 93 (3 93 *63 053 653 153 153 E 1(56 3!62154 21•901 .1 995 JP 1 FAA 901 t 191( f 91 dL 511 1 ,0 9 5L 0 *961 6•60( ,00'1 1('915 ,I {'OL5 I 95'111 10'51 1 IFffii ,0( 90 95644145 25'20'50' W M ,51,0I2t 5 M ,51,95.15 5 5 2433'29' 1'1 5 12'11' W 5 23'09'OJ'WJ 5 12"1605'8' N '1546 I6 WI 50YJ'40' W N 1749'49_ E N 52•1011 W 5 52'10 I N 3319'19' E 3 10 rf?1 2 ,65.1l. N N 50•3951' W N 59'30'05 E M 1,5*.9C N S 3 I *t,LG9f I N J6'25 N 391f25'E _.1,,L0 Ka 5 ,3,5512.95 13 62'49'28'E s_71•7517 5 57'30 60' 8' 5 2.002'21' 8' I1 MOM I G I *1 111 I 011 517 NUEI 117 I 1 511 151 1 05 CLl ttI 951 I 1•37 127 957 at- cc" be 0 a 0 CC la h 8..,` 4 0 VIRGINIA: FREDERICK COUNTY.SCT. This instrument of writing was produced to me on ra, 20 tD at la and with certificate acknov:led :mm,nt thereto annexed was admitted to record. Tax imposcc by See. 58.1 -802 of I A` t and 58.1 -801 have been paid, if assessable. Clerk E i 8 .1 11 IHI lj I 'COMMONWEALTH OF VIRGINIA q a TIME: ACCOUNT: 69C R rl 01- t Ff i iIA" DATE: 02/12/10 TIM_: 12:30:43 ACCOUNT: L"_LL000124. P,__EIF1: 10000002340 I;, CASHIER: RPH REG: WE17 TYPE: OTHER PAYMENT: FULL PAYMENT INSTRUMENT 10000124E BOOK: PAGE: RECORDED: 02;1 AT 12:20 1' GRANTOR: GRAYSTONE CORPORATION OF VIRGINIA EY: N LOC: CO GRANTEE: FREDERICK COUNTY VIRSINIA EX: N PET: i00% ANO ADDREES RECEIVED OF ROD WILLIAMS 3.00 DESCRIPTION 1: PROFFER STATEMENT PAGES: 0 0/P 0 b NAMES: 0 CONSIDERATION: .00 A /VAL: .00 MAP: MISC t PIN: 000 ZERO PAYMENT .00 TENDERED .00 AMOUNT PAID: .00 CHANGE AMT .00 rt i .l CLERK OF COURT: REBECCA P. HOGAN OFFICIAL RECEIPT FREDERICK CIRCUIT COURT DEED RECEIPT 1A DPi9 (150) Action: PLANNING COMMISSION: January 6, 2010 Recommended Approval BOARD OF SUPERVISORS: January 27, 2010 gi APPROVED DENIED PURES#46 -09 AN ORDINANCE AMENDING THE ZONING DISTRICT MAP REZONING #09 -09 OF GRAYSTONE CORPORATION OF VIRGINIA WHEREAS, Rezoning #09 -09 of Graystone Corporation of Virginia, submitted by Greenway Engineering, to rezone 271.39 acres from RA (Rural Areas) District to M1 (Light Industrial) District, with proffers dated August 24, 2009, last revised on January 25, 2010, for Office and Manufacturing Uses, was considered. The properties are located on the north side of Redbud Road (Route 661), the east side of CSX Railroad, the west side of Milburn Road (Route 662), and south of McCanns Road (Route 838). in the Stonewall Magisterial District, and are identified by Property Identification Numbers 43 -A -158, 44 -A -25 and 44 -A -26. WHEREAS, the Planning Commission held a public hearing on this rezoning on November 4, 2009 and a public meeting on January 6, 2010; and WHEREAS, the Board of Supervisors held a public hearing on this rezoning on January 27, 2010; and WHEREAS, the Frederick County Board of Supervisors finds the approval of this rezoning to be in the best interest of the public health, safety, welfare, and in conformance with the Comprehensive Policy Plan; NOW, THEREFORE, BE IT ORDAINED by the Frederick County Board of Supervisors that Chapter 165 of the Frederick County Code, Zoning, is amended to revise the Zoning District Map to rezone 271.39 acres from RA (Rural Areas) District to M1 (Light Industrial) District, for Office and Manufacturing Uses. The conditions voluntarily proffered in writing by the applicant and the property owner are attached. PDRES446 -09 This ordinance shall be in effect on the date of adoption. Passed this 27th day of January, 2010 by the following recorded vote: Richard C. Shickle, Chairman Gary W. Dove Gene E. Fisher Christopher E. Collins Aye Aye Aye Aye Gary A. Lofton Bill M. Ewing Charles S. Del laven, Jr. A COPY ATTEST •i d i Ir iley,Jr. de rick County Administrator Aye Aye Aye Greenway Engineering all REZONING: PROPERTY: RECORD OWNER: APPLICANT: PROJECT NAME: ORIGINAL DATE OF PROFFERS: REVISION DATE: Preliminary Matters August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12, 2010 Revised January 25, 2010 GRAYSTONE CORPORATION OF VIRGINIA PROFFER STATEMENT RZ# 01-07 Rural Areas District (RA) to Light Manufacturing District (Ml) 271.39± acres; Tax Parcels #43 -((A)) -158, 44- ((A)) -25, and 44- ((A)) -26, (here -in after the "Property Graystone Corporation of Virginia Graystone Corporation of Virginia (here -in after the "Applicant August 24, 2009 January 25, 2010 Graystone Corporation Office and Industrial Park Pursuant to Section 15.2 -2296 Et. Seq. of the Code of Virginia, 1950, as amended, and the provisions of the Frederick County Zoning Ordinance with respect to conditional zoning, the undersigned Applicant hereby proffers that in the event the Board of Supervisors of Frederick County, Virginia, shall approve Rezoning Application bq _o'7 for the rezoning of 271.39± -acres from the Rural Areas (RA) District to 271.39± -acres to the Light Industrial (M1) District, development of the subject property shall be done in conformity with the terms and conditions set forth herein, except to the extent that such terms and conditions may be subsequently amended or revised by the Applicant and such be approved by the Frederick County Board of Supervisors and their legal successors, heirs, or assigns in accordance with the said Code and Zoning Ordinance. In the event that such rezoning is not granted, then these proffers shall be deemed withdrawn and have no effect whatsoever. These proffers shall be binding upon this Applicant and their legal successors, heirs, or assigns. The Property, more particularly described as the lands owned by Graystone Corporation of Virginia (formerly Crider Shockey. Inc. of West Virginia), being all of Tax Map Parcels 43 -((A)) -158, 44- ((A)) -25, and 44- ((A)) -26, and further described by Instrument Number 030025588. (Please refer to Rezoning Application Deed Information). Proffer Statement Greenway Engineering A. Generalized Development Plan August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12, 2010 Revised January 25, 2010 PROFFER STATEMENT 2 1. The Applicant hereby proffers to submit a Generalized Development Plan (the "GDP for the Property. The purpose of the GDP is to identify the general location of the M1 District office and industrial land bays, the general location of the future Route 37 corridor study area, the general location of the Snowden Bridge Boulevard urban four -lane divided collector road system with signalized intersection or roundabout design and limited entrance locations, the general location of on -site and off -site green space buffer areas, and the general location of the adjoining parcels that are within permanent protective easements. 2. The Applicant hereby proffers to develop the Property in substantial conformity with the proffered GDP, prepared by Greenway Engineering dated January 25, 2010. The GDP is recognized to be a conceptual plan and may be adjusted by the Applicant to accommodate final design and engineering constraints without the need of new conditional rezoning approval by the Frederick County Board of Supervisors, provided that the adjustments do not eliminate or substantially relocate the areas indicated on the proffered GDP. B. Ml, Light Industrial District Land Uses 1. The Applicant intends to develop the Property to implement industrial and office land uses that are designed to coexist in an office park setting. 2. The Frederick County Board of Supervisors agrees to allow future office and industrial land uses that are included within future amendments to the M1, Light Industrial District to be developed on the Property without the need for conditional zoning amendments. C. Ml, Light Industrial District Design Standards 1. The Applicant hereby proffers to establish an Architectural Review Board (ARB) to oversee and approve all structural design exterior treatments for new construction and structural additions to ensure high quality development throughout the project. Additionally, the ARB will oversee and approve all Proffer Statement Greenway Engineering D. Transportation Enhancements August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12, 2010 Revised January 25, 2010 3 monument signage and building mounted signage, to ensure consistency in the design of signage throughout the project. Notwithstanding what is stated herein, the ARB is intended to be in addition to and not intended to override or conflict with any provisions of the Frederick County Code. 2. The Applicant hereby proffers to establish requirements for outdoor green areas and /or outdoor plaza areas for the benefit of employees of the office and industrial park. These outdoor green areas and outdoor plaza areas will be located within each of the MI District land bay areas identified in the proffered GDP. 3. The Applicant hereby proffers to establish internal asphalt trails for the benefit of employees of the office and industrial park. These asphalt trails will be a minimum of eight feet in width and will be designed to connect land uses throughout the M1 District land bay areas identified in the proffered GDP wherever possible. For each lot or parcel associated with the construction of a building, the Applicant agrees to identify the location on said lot or parcel for trails (if applicable, to said lot or parcel) and to have the trail constructed (if applicable) prior to the issuance of the Certificate of Occupancy for the structure or building on said lot or parcel. 4. The Applicant hereby proffers to establish a 100 -foot green space buffer area along the northern boundary of the Property as depicted on the proffered GDP. This green space buffer area will be left in its natural state to provide viewshed mitigation for the Milburn Cemetery and the Helm- McCann springhouse. Said buffer is in addition to the requirements of the Frederick County Code. 5. The Applicant hereby proffers to provide for evergreen landscaping along the Redbud Road frontage of the Property identified as a green space buffer area on the proffered GDP. The provision of this evergreen landscaping is to provide viewshed mitigation between the Property and the Shenandoah Valley Battlefield Foundation property. Said buffer is in addition to the requirements of the Frederick County Code. 1. The Applicant hereby proffers to provide a corridor study area within the Property as depicted on the proffered GDP that is a minimum of 350 feet in width. The purpose of this corridor study area is to provide Frederick County with an opportunity to determine a final alignment for Route 37 throughout the limits of the Property through the completion of engineering design sufficient for this purpose. The design within the corridor study area depicted on the proffered GDP will provide access to the Property to the proposed interchange and Snowden Proffer Statement Greenway Engineering August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12. 2010 Revised January 25. 2010 Proffer Statement 4 Bridge Boulevard. The corridor study area shall be available to Frederick County for a period of eight years from the date of rezoning approval to complete engineering design necessary to determine the appropriate alignment and right -of- way width for Route 37 within the Property. The Applicant agrees to cooperate with VDOT and Frederick County to provide engineering information and reports within the Applicant's possession if needed to assist with this design effort. The Board of Supervisors may allow encroachment into and or the definition of the corridor study area if necessary to accommodate site development proposals through the Site Plan approval process. 2. The Applicant hereby proffers to provide for a maximum 350 -foot wide right -of- way dedication for the Route 37 mainline section within the Property. The mainline section is intended to include through travel lanes and collector distributor lanes if necessary. It is agreed that any portion of the maximum 350 foot right -of -way that is not required for the Route 37 mainline section within the Property will not be requested from the Applicant. The Applicant shall provide the required right -of -way dedication to Frederick County within 90 days from the date of written notice by Frederick County, which shall occur after an official decision has been made by Frederick County and VDOT for the alignment and right -of -way width for the Route 37 mainline section within the Property. In the event the aforesaid official decision has not been made for the Route 37 mainline section within the time period specified in Section D(1), the Applicant may either extend the time period for this decision, or may provide Frederick County with a 225 -foot wide right -of -way dedication for Route 37 within the corridor study area depicted on the proffered GDP. The Applicant shall be allowed to install utilities or other elements necessary for site development within the dedicated right -of- way area, provided that this does not restrict use of the right -of -way. 3. The Applicant hereby proffers to provide for right -of -way dedication sufficient for the development of up to an 800 -foot wide diamond interchange or a single point urban interchange (SPUI) in the general location depicted on the proffered GDP. It is agreed that any portion of the right-of-way that is not required for the new interchange within the Property will not be requested from the Applicant. It is further agreed that the engineering design sufficient to determine the location, type and right -of -way needs for the new interchange will provide direct access to Snowden Bridge Boulevard. The Applicant shall provide the required right-of- way dedication to Frederick County within 90 days from the date of written notice by Frederick County, which shall occur after an official decision has been made by Frederick County and VDOT for the alignment and right -of -way width for the new Route 37 interchange within the Property. In the event the aforesaid official decision has not been made for the new Route 37 interchange within the time period specified in Section D(1), the Applicant may either extend the time period for this decision, or may provide Frederick County with a 225 -foot wide right -of- way dedication for Route 37 within the corridor study area depicted on the Greenway Engineering August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12, 2010 Revised January 25, 2010 5 proffered GDP. The Applicant shall be allowed to install utilities or other elements necessary for site development within the dedicated right -of -way area, provided that this does not restrict use of the right -of -way. 4. The Applicant hereby proffers to construct Snowden Bridge Boulevard between the Property and Martinsburg Pike (U.S. Route 11 North), including the CSX bridge crossing, prior to the issuance of an occupancy permit for the first office or industrial site plan approved on the Property. The Applicant shall design and construct Snowden Bridge Boulevard as an urban four -lane divided collector road section (U4D) throughout the limits of the Property, and shall develop the off -site segment of Snowden Bridge Boulevard consistent with the approved public improvement plan. Snowden Bridge Boulevard shall be initially constructed as a two -lane road section, and shall be constructed as the ultimate four -lane divided road section prior to the issuance of the occupancy permit for the site plan that exceeds 8,000 VPD or in the event that Snowden Bridge Boulevard is developed to allow access for additional traffic from outside the Property, the construction of the ultimate four -lane divided road section shall be required when the total trip volume exceeds 8,000 VPD on the Property, which ever first occurs. 5. The Applicant hereby proffers to limit full commercial intersection access on Snowden Bridge Boulevard to establish up to three commercial intersections in the general location of intersections identified on the proffered GDP. An intersection has been identified on the proffered GDP that could potentially be developed as either a roundabout or as a signalized intersection if warranted by VDOT. All full commercial intersections identified on the proffered GDP will be developed with raised medians to provide for controlled left turn movement access to the Property. 6. The Applicant hereby proffers to allow for the full commercial intersection located on the east side of the Route 37 corridor study area to be closed entirely if necessary when Route 37 is developed by others throughout the limits of the Property. The closure of the full commercial intersection is conditioned upon the provision of street access to this portion of the Property that will be developed by others during the construction of Route 37. The Applicant agrees to cooperate with Frederick County to provide easements on the Property if necessary to facilitate new street access to this portion of the Property if this becomes necessary due to the construction of Route 37. 7. The Applicant hereby proffers to prohibit direct commercial access from the Property to existing Milburn Road (Route 662). The County may determine that emergency access from to the Property from existing Milburn Road is acceptable provided that it is designed to prohibit access for regular vehicular traffic. Proffer Statement Greenway Engineering August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12, 2010 Revised January 25, 2010 6 8. The Applicant hereby proffers to prohibit direct commercial access from the Property to existing Redbud Road (Route 661). Frederick County may determine that emergency access from to the Property from existing Redbud Road is acceptable provided that it is designed to prohibit access for regular vehicular traffic. 9. The Applicant hereby proffers to prohibit direct commercial access from the Property to McCann's Road (Route 838). Emergency access to the Property from McCann's Road is prohibited as well to protect the integrity of the buffer identified along this road. 10. The Applicant shall develop Snowden Bridge Boulevard as a public street; however, the Applicant shall have the ability to develop all internal streets as private street systems. All private streets shall be constructed to meet or exceed VDOT vertical base section standards. 11. The Applicant hereby proffers to provide for inter parcel connections where possible to mitigate transportation impacts to the full commercial intersections identified on the proffered GDP. 12. The Applicant submits that it will apply for all such public assistance mechanisms that are available at the time of development to facilitate the installation of the aforementioned transportation/infrastructure improvements. Those mechanisms include, but are not limited to, matching funds, industrial access funds and /or any other transportation /infrastructure funding vehicles, such as CDAs. Without binding any future legislative act, the Applicant and the Frederick County Board of Supervisors agree that the use of said mechanisms are advantageous to the development of the Property and the use of same should be encouraged and that both parties should make all reasonable efforts to cooperate with one another to implement the appropriate mechanism or combination of mechanisms to ensure rapid installation of the aforementioned improvements. 13. The Applicant hereby proffers to provide for a maximum 60 -foot right -of -way dedication to Frederick County to provide for the development of a street connection by others between the planned portion of Snowden Bridge Boulevard on the Property and existing Redbud Road (Route 661) immediately south of the Property. The general location of this 60 -foot right -of -way shall be delineated on the final Master Development Plan, which shall connect to one of the proposed new full commercial intersections that are located to the west of the Route 37 corridor study area as depicted on the proffered GDP. It is agreed that the 60 -foot right -of -way dedication can be located within buffer areas provided that the landscape screening and opaque elements are located between the adjoining properties owned by Applicant and the right-of-way dedication area. The Applicant shall provide the required right -of -way dedication to Frederick County Proffer Statement Greenway Engineering August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12, 2010 Revised January 25, 2010 7 within 90 days from the date of written notice by Frederick County, which shall occur after an official decision has been made by Frederick County and VDOT to construct this street connection. It is agreed that the Applicant can construct street access with entrances to land hays within the delineated 60 -foot right-of-way area provided that the proposed street access meets or exceeds VDOT vertical base section standards. The Applicant shall be allowed to install utilities or other elements necessary for site development within the dedicated right -of -way area, provided that this does not restrict use of the right -of -way. 14. The Applicant has agreed to provide Frederick County with right -of -way dedications within the Property for the Route 37 mainline, the new Route 37 interchange, and the connecting street between Redbud Road and Snowden Bridge Boulevard as described in Sections D(2), D(3), and D(13) of the Proffer Statement. In the event that Frederick County or VDOT decides to not construct these road systems in whole or in part subsequent to right -of -way dedication, the recipient of the dedication agrees to convey the right -of -way dedication to the Applicant within 90 days from the date of this determination. E. Fire and Rescue Monetary Contribution 1. The Graystone Office and Industrial Park has been demonstrated to provide a positive economic impact to Frederick County services by the Frederick County Development Impact Model. I-lowever, the Applicant intends to further support fire and rescue services through the provision of a monetary contribution in the amount of $0.05 per square foot of structural development for all land uses within the Property. This monetary contribution shall be provided to Frederick County for fire and rescue purposes prior to the issuance of a certificate of occupancy permit for each building permit issued within the Property. [Signatures on next page] Proffer Statement Greenway Engineering F. Signatures Graystone Corporation of Virginia The conditions proffered above shall be binding upon the heirs, executors, administrators, assigns and successors in the interest of the Applicants and owners. In the event the Frederick County Board of Supervisors grants this rezoning and accepts the conditions, the proffered conditions shall apply to the land rezoned in addition to other requirements set forth in the Frederick County Code. Respectfully Submitted: By: A CQ Common 'alth of Virginia, €ityr /County of A;e et" August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12, 2010 Revised January 25, 2010 The foregoing instrument was acknowledged before me thisVtdav of —✓.o or.d.1 20, by \elsn'w.t \—C.s"• COPP W pvA .R �OC1h\SSk0t My Commission Exp `IRE i3 Registration No.: �Ory 7 NOk rrrnn ol` To Wit: 8 Date: 71 1-6 1.- 2 j c >/o Proffer Statement i L2 atv taboos ti- J ‘z. -n 71 c OC m O O M co -n 0) 0 0 CD rn C z o m m 1 A 0 -O o O r- cn m 0 m N 0 z m r m m z 0 el tJ ca g ts GENERALIZED DEVELOPMENT PLAN GRAYSTONE CORPORATION OF VIRGINIA STONEWALL MAGISTERIAL DISTRICT FREDERICK COUNTY, VA Engineers, Surveyors Environmental Services Founded in 1971 GREENWAY ENGINEERING, INC. 151 Windy Hill Lane Winchester, Virginia 22602 Telephone: (540) 662 -4185 FAX: (540) 722 -9528 www.greenwayeng. com LAWSON AND SILEK, P.L.C. 120 EXETER DRIVE, SUITE 200 POST OFFICE Box 2740 WINCHESTER, VA 22604 TELEPHONE: (540) 665 -0050 FACSIMILE: (540) 722 -4051 John Riley, County Administrator County of Frederick 107 North Kent Street Winchester, VA 22601 Roderick B. Williams, Esquire County Attorney 107 North Kent Street Winchester, VA 22601 VIA HAND DELIVERY Dear Gentlemen: January 25, 2010 THOMAS MOORE LAWSON TLAWSON(aiLSPLC.COM Michael T. Ruddy, Deputy Director Planning and Development County of Frederick 107 North Kent Street, 2 Floor Winchester, VA 22601 John A. Bishop, AICP, Deputy Director Transportation County of Frederick 107 North Kent Street Winchester, VA 22601 Re: Graystone Corporation Office and Industrial Park Our File No. 546.001 Enclosed please find fully executed and revised proffers and revised Generalized Development Plan, along with a cover letter to the members of the Board of Supervisors, for the above- referenced Graystone project. Based on your comments, we have made revisions which better define the proffers. We have sent the enclosed via email this morning to the Board members and we are hand delivering this to you at the same time. We would ask that the proffers dated today be considered as part of the rezoning application to be heard at the Board of Supervisors' meeting on Wednesday night. Thank you for your assistance and cooperation. If you have any questions, please do not hesitate to give me a call. FRO] 1 RO AI ADIWIKSS: POST OI110E RAO :602, FRUSI ROTA.. VIRGO:IA 22630. TV.L KPNON 8: (540) 635 -9415. FACSId111.8: (540) 635-9421. E. MAIL: 3611.FA01.AMSONANOSILFA.0 OM FA, A ADDRESS: 10805 AI ON 6 rRErr, SUITE 2110, FAIRFA'. VIRGINIA 2211311,TE I. IPIIOV I:: (703) 352 -2615. FAC \1\111.8: (703) 352 -4190, E-MAIL: TIIORISO LANSOV'y ■'f.N1 /.ON.NET John Riley, County Adnilstrator January 25, 2010 Page 2 TML:atd Enclosures cc: Graystone Corporation of Virginia Mr. Evan A. Wyatt 1 Greenway Engineering REZONING: PROPERTY: RECORD OWNER: APPLICANT: PROJECT NAME: ORIGINAL DATE OF PROFFERS: REVISION DATE: File #2760GC Rezoning GRAYSTONE CORPORATION OF VIRGINIA PROFFER STATEMENT RZ Rural Areas District (RA) to Light Manufacturing District (M1) 271.39+ acres; Tax Parcels #43 -((A)) -158, 44- ((A)) -25, and 44- ((A)) -26, (here -in after the "Property") Graystone Corporation of Virginia Graystone Corporation of Virginia (here -in after the "Applicant Graystone Corporation Office and Industrial Park August 24, 2009 January 25, 2010 August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12, 2010 Revised January 25, 2010 Preliminary Matters Pursuant to Section 15.2 -2296 Et. Seq. of the Code of Virginia, 1950, as amended, and the provisions of the Frederick County Zoning Ordinance with respect to conditional zoning, the undersigned Applicant hereby proffers that in the event the Board of Supervisors of Frederick County, Virginia, shall approve Rezoning Application for the rezoning of 271.39± -acres from the Rural Areas (RA) District to 271.39± -acres to the Light Industrial (M1) District, development of the subject property shall be done in conformity with the terms and conditions set forth herein, except to the extent that such terms and conditions may be subsequently amended or revised by the Applicant and such be approved by the Frederick County Board of Supervisors and their legal successors, heirs, or assigns in accordance with the said Code and Zoning Ordinance. In the event that such rezoning is not granted; then these proffers shall be deemed withdrawn and have no effect whatsoever. These proffers shall be binding upon this Applicant and their legal successors, heirs, or assigns. The Property, more particularly described as the lands owned by Graystone Corporation of Virginia (formerly Crider Shockey, Inc. of West Virginia), being all of Tax Map Parcels 43 -((A)) -158, 44- ((A)) -25, and 44- ((A)) -26, and further described by Instrument Number 030025588. (Please refer to Rezoning Application Deed Information). Proffer Statement Greenway Engineering A. Generalized Development Plan August 24, 20D9 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12, 2010 Revised January 25, 2010 PROFFER STATEMENT 2 1. The Applicant hereby proffers to submit a Generalized Development Plan (the "GDP for the Property. The purpose of the GDP is to identify the general location of the M1 District office and industrial land bays, the general location of the future Route 37 corridor study area, the general location of the Snowden Bridge Boulevard urban four -lane divided collector road system with signalized intersection or roundabout design and limited entrance locations, the general location of on -site and off -site green space buffer areas, and the general location of the adjoining parcels that are within permanent protective easements. 2. The Applicant hereby proffers to develop the Property in substantial conformity with the proffered GDP, prepared by Greenway Engineering dated January 25, 2010. The GDP is recognized to be a conceptual plan and may be adjusted by the Applicant to accommodate final design and engineering constraints without the need of new conditional rezoning approval by the Frederick County Board of Supervisors, provided that the adjustments do not eliminate or substantially relocate the areas indicated on the proffered GDP. B. Ml, Light Industrial District Land Uses 1. The Applicant intends to develop the Property to implement industrial and office land uses that are designed to coexist in an office park setting. 2. The Frederick County Board of Supervisors agrees to allow future office and industrial land uses that are included within future amendments to the M1, Light Industrial District to be developed on the Property without the need for conditional zoning amendments. C. Ml, Light Industrial District Design Standards 1. The Applicant hereby proffers to establish an Architectural Review Board (ARB) to oversee and approve all structural design exterior treatments for new construction and structural additions to ensure high quality development throughout the project. Additionally, the ARB will oversee and approve all File #2760GC Rezoning Proffer Statement August 24, 2009 3 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12, 2010 Revised January 25, 2010 monument signage and building mounted signage, to ensure consistency in the design of signage throughout the project. Notwithstanding what is stated herein, the ARB is intended to be in addition to and not intended to override or conflict with any provisions of the Frederick County Code. 2. The Applicant hereby proffers to establish requirements for outdoor green areas and /or outdoor plaza areas for the benefit of employees of the office and industrial park. These outdoor green areas and outdoor plaza areas will be located within each of the M1 District land bay areas identified in the proffered GDP. 3. The Applicant hereby proffers to establish internal asphalt trails for the benefit of employees of the office and industrial park. These asphalt trails will be a minimum of eight feet in width and will be designed to connect land uses throughout the MI District land bay areas identified in the proffered GDP wherever possible. For each lot or parcel associated with the construction of a building, the Applicant agrees to identify the location on said lot or parcel for trails (if applicable, to said lot or parcel) and to have the trail constructed (if applicable) prior to the issuance of the Certificate of Occupancy for the structure or building on said lot or parcel. 4. The Applicant hereby proffers to establish a 100 -foot green space buffer area along the northern boundary of the Property as depicted on the proffered GDP. This green space buffer area will be left in its natural state to provide viewshed mitigation for the Milburn Cemetery and the Helm- McCann springhouse. Said buffer is in addition to the requirements of the Frederick County Code. 5. The Applicant hereby proffers to provide for evergreen landscaping along the Redbud Road frontage of the Property property identified as a green space buffer area on the proffered GDP. The provision of this evergreen landscaping is to provide viewshed mitigation betel een the Property and the for this property an Shenandoah Valley Battlefield Foundation property owner. Said buffer is in addition to the requirements of the Frederick County Code. Greenway Engineering D. Transportation Enhancements 1. The Applicant hereby proffers to provide a corridor study area within the Property as depicted on the proffered GDP that is a minimum of 350 feet in width. The purpose of this corridor study area is to provide Frederick County with an opportunity to determine a final alignment for Route 37 throughout the limits of the Property through the completion of engineering design sufficient for this File #2760GC Rezoning Proffer Statement August 24, 2009 4 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12, 2010 Revised January 25, 2010 purpose. The design within the corridor study area depicted on the proffered GDP will provide access to the Property to the proposed interchange and Snowden Bridge Boulevard. The corridor study area shall be available to Frederick County for a period of eight years from the date of rezoning approval to complete engineering design necessary to determine the appropriate alignment and right -of- way width for Route 37 within the Property. The Applicant agrees to cooperate with VDOT and Frederick County to provide engineering information and reports within the Applicant's possession if needed to assist with this design effort. The Board of Supervisors may allow encroachment into and or the definition of the corridor study area if necessary to accommodate site development proposals through the Site Plan approval process. 2. The Applicant hereby proffers to provide for a maximum 350 -foot wide right -of- way dedication for the Route 37 mainline section within the Property. The mainline section is intended to include through travel lanes and collector distributor lanes if necessary. It is agreed that any portion of the maximum 350 foot right -of -way that is not required for the Route 37 mainline section within the Property will not be requested from the Applicant. The Applicant shall provide the required right -of -way dedication to Frederick County within 90 days from the date of written notice by Frederick County, which shall occur after an official decision has been made by Frederick County and VDOT all applicable governmental authorities for the alignment and right -of -way width for the Route 37 mainline section within the Property. In the event the aforesaid official decision has not been made for the Route 37 mainline section within the time period specified in Section D(1), the Applicant may either extend the time period for this decision, or may provide Frederick County with a 225 -foot wide right -of- way dedication for Route 37 within the corridor study area depicted on the proffered GDP. The Applicant shall be allowed to install utilities or other elements necessary for site development within the dedicated right -of -way area, provided that this does not restrict use of the right- of- 14'ay. 3. The Applicant hereby proffers to provide for right -of -way dedication sufficient for the development of up to an 800 -foot wide diamond interchange or a single point urban interchange (SPUI) in the general location depicted on the proffered GDP. It is agreed that any portion of the right -of -way that is not required for the new interchange within the Property will not be requested from the Applicant. It is further agreed that the engineering design sufficient to determine the location, type and right -of -way needs for the new interchange will provide direct access to vi-411 Snowden Bridge Boulevard. The Applicant shall provide the required right -of -way dedication to Frederick County within 90 days from the date of written notice by Frederick County, which shall occur after an official decision has been made by Frederick County and VDOT all for the alignment and right -of -way width for the new Route 37 interchange within the Property. In the event the aforesaid Greenway Engineering File #27600C Rezoning Proffer Statement August 24, 2009 5 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12, 2010 Revised January 25, 2010 official decision has not been made for the new Route 37 interchange within the time period specified in Section D(1), the Applicant may either extend the time period for this decision, or may provide Frederick County with a 225 -foot wide right -of -way dedication for Route 37 within the corridor study area depicted on the proffered GDP. The Applicant shall be allowed to install utilities or other elements necessary for site development within the dedicated right -of -way area, provided that this does not restrict use of the right -of -wary. 4. The Applicant hereby proffers to construct Snowden Bridge Boulevard between the Property and Martinsburg Pike (U.S. Route 11 North), including the CSX bridge crossing, prior to the issuance of an occupancy permit for the first office or industrial site plan approved on the Property. The Applicant shall design and construct Snowden Bridge Boulevard as an urban four -lane divided collector road section (U4D) throughout the limits of the Property, and shall develop the off -site segment of Snowden Bridge Boulevard consistent with the approved public improvement plan Snowden Bridge Boulevard shall be initially constructed as a two -lane road section, and shall be constructed as the ultimate four -lane divided road section prior to the issuance of the occupancy permit for the site plan that exceeds 8,000 VPD or in the event that Snowden Bridge Boulevard is developed to allow access for additional traffic from outside the Property, the construction of the ultimate four -lane divided road section shall be required when the total trip volume exceeds 8,000 VPD on the Property, which ever first occurs. 5. The Applicant hereby proffers to limit full commercial intersection access on Snowden Bridge Boulevard to establish up to three commercial intersections in the general location of intersections identified on the proffered GDP. An intersection has been identified on the proffered GDP that could potentially be developed as either a roundabout or as a signalized intersection if warranted by VDOT. All full commercial intersections identified on the proffered GDP will be developed with raised medians to provide for controlled left turn movement access to the Property. 6. The Applicant hereby proffers to allow for the full commercial intersection located on the east side of the Route 37 corridor study area to be closed entirely if necessary when Route 37 is developed by others throughout the limits of the Property. The closure of the full commercial intersection is conditioned upon the provision of street access to this portion of the Property that will be developed by others during the construction of Route 37. The Applicant agrees to cooperate with Frederick County to provide easements on the Property if necessary the extent possible to facilitate new street access to this portion of the Property if this becomes necessary due to the construction of Route 37. 7. The Applicant hereby proffers to prohibit direct commercial access from the Property to existing Milburn Road (Route 662). The County may determine that Greenway Engineering File #2760GC Rezoning Proffer Statement Greenway Engineering File #27600C Rezoning August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12, 2010 Revised January 25, 2010 6 emergency access from to the Property from existing Milburn Road is acceptable provided that it is designed to prohibit access for regular vehicular traffic. 8. The Applicant hereby proffers to prohibit direct commercial access from the Property to existing Redbud Road (Route 661). Frederick County may determine that emergency access from to the Property from existing Redbud Road is acceptable provided that it is designed to prohibit access for regular vehicular traffic. 9. The Applicant hereby proffers to prohibit direct commercial access from the Property to McCann's Road (Route 838). Emergency access to the Property from McCann's Road is prohibited as well to protect the integrity of the buffer identified along this road 10. The Applicant shall develop Snowden Bridge Boulevard as a public street; however, the Applicant shall have the ability to develop all internal streets as private street systems. All private streets shall be constructed to meet or exceed VDOT vertical base section standards. 11. The Applicant hereby proffers to provide for inter parcel connections where possible to mitigate transportation impacts to the full commercial intersections identified on the proffered GDP. 12. The Applicant submits that it will apply for all such public assistance mechanisms that are available at the time of development to facilitate the installation of the aforementioned transportation/infrastructure improvements. Those mechanisms include, but are not limited to, matching funds, industrial access funds and /or any other transportation /infrastructure funding vehicles, such as CDAs. Without binding any future legislative act, the Applicant and the Frederick County Board of Supervisors agree that the use of said mechanisms are advantageous to the development of the Property and the use of same should be encouraged and that both parties should make all reasonable efforts to cooperate with one another to implement the appropriate mechanism or combination of mechanisms to ensure rapid installation of the aforementioned improvements. 13. The Applicant hereby proffers to provide for a maximum 60 -foot right -of -way dedication to Frederick County to provide for the development of a street connection by others between the planned portion of Snowden Bridge Boulevard on the Property and existing Redbud Road (Route 661) immediately south of the Property. The general location of this 60 -foot right -of -way shall be delineated on the final Master Development Plan, which shall connect to one of the proposed new full commercial intersections that are located to the west of the Route 37 corridor study area as depicted on the proffered GDP. It is agreed that the 60 -foot right -of -way dedication can be located within buffer areas provided that the Proffer Statement August 24, 2009 7 Revised September23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12, 2010 Revised January 25, 2010 landscape screening and opaque elements are located between the adjoining properties owned by Applicant and the right -of -way dedication area. The Applicant shall provide the required right -of -way dedication to Frederick County within 90 days from the date of written notice by Frederick County, which shall occur after an official decision has been made by Frederick County and VDOT to construct this street connection. It is agreed that the Applicant can construct street access with entrances to land bays within the delineated 60 -foot right -of -way area provided that the proposed street access meets or exceeds VDOT vertical base section standards. The Applicant shall be allowed to install utilities or other elements necessary for site development within the dedicated right -of -way area, provided that this does not restrict use of the right 14. The Applicant has agreed to provide Frederick County with right -of -way dedications within the Property for the Route 37 mainline, the new Route 37 interchange, and the connecting street between Redbud Road and Snowden Bridge Boulevard as described in Sections D(2), D(3), and D(13) of the Proffer Statement. In the event that Frederick County or VDOTr governmental authority decides to not construct these road systems in whole or in part subsequent to right -of -way dedication, the recipient of the dedication agrees to convey the right -of -way dedication to the Applicant within 90 days from the date of this determination. Greenway Engineering E. Fire and Rescue Monetary Contribution 1. The Graystone Office and Industrial Park has been demonstrated to provide a positive economic impact to Frederick County services by the Frederick County Development Impact Model. However, the Applicant intends to further support fire and rescue services through the provision of a monetary contribution in the amount of $0.05 per square foot of structural development for all land uses within the Property. This monetary contribution shall be provided to Frederick County for fire and rescue purposes prior to the issuance of a certificate of occupancy permit for each building permit issued within the Property. F. Signatures Graystone Corporation of Virginia The conditions proffered above shall be binding upon the heirs, executors, administrators, assigns and successors in the interest of the Applicants and owners. In the event the Frederick County Board of Supervisors grants this rezoning and accepts the conditions, File #2760GC Rezoning Proffer Statement Greenway Engineering the proffered conditions shall apply to the land rezoned in addition to other requirements set forth in the Frederick County Code. File #27600C Rezoning August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12, 2010 Revised January 25, 2010 [Signatures on next page] 8 Proffer Statement Greenway Engineering Respectfully Submitted: File #27600C Rezoning August24,2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12, 2010 Revised January 25, 2010 9 By: Date: Commonwealth of Virginia, City /County of To Wit: The foregoing instrument was acknowledged before me this day of 20 by My Commission Expires Registration No.: Notary Public Proffer Statement Greenway Engineering August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12, 2010 Revised January 25, 2010 GRAYSTONE CORPORATION OF VIRGINIA PROFFER STATEMENT REZONING: RZ Rural Areas District (RA) to Light Manufacturing District (MI) PROPERTY: 271.39± acres; Tax Parcels #43 -((A)) -158, 44- ((A)) -25, and 44- ((A)) -26, (here -in after the "Property RECORD OWNER: Graystone Corporation of Virginia APPLICANT: Graystone Corporation of Virginia (here -in after the "Applicant PROJECT NAME: Graystone Corporation Office and Industrial Park ORIGINAL DATE OF PROFFERS: August 24, 2009 REVISION DATE: January 25, 2010 Preliminary Matters Pursuant to Section 15.2 -2296 Et. Seq. of the Code of Virginia, 1950, as amended, and the provisions of the Frederick County Zoning Ordinance with respect to conditional zoning, the undersigned Applicant hereby proffers that in the event the Board of Supervisors of Frederick County, Virginia, shall approve Rezoning Application for the rezoning of 271.39± -acres from the Rural Areas (RA) District to 271.39± -acres to the Light Industrial (M1) District, development of the subject property shall be done in conformity with the terms and conditions set forth herein, except to the extent that such terms and conditions may be subsequently amended or revised by the Applicant and such be approved by the Frederick County Board of Supervisors and their legal successors, heirs, or assigns in accordance with the said Code and Zoning Ordinance. In the event that such rezoning is not granted, then these proffers shall be deemed withdrawn and have no effect whatsoever. These proffers shall be binding upon this Applicant and their legal successors, heirs, or assigns. The Property, more particularly described as the lands owned by Graystone Corporation of Virginia (formerly Crider Shockey, Inc. of West Virginia), being all of Tax Map Parcels 43 -((A)) -158, 44- ((A)) -25, and 44- ((A)) -26, and further described by Instrument Number 030025588. (Please refer to Rezoning Application Deed Information). Proffer Statement Greenway Engineering A. Generalized Development Plan August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12, 2010 Revised January 25, 2010 PROFFER STATEMENT 2 1. The Applicant hereby proffers to submit a Generalized Development Plan (the "GDP for the Property. The purpose of the GDP is to identify the general location of the M1 District office and industrial land bays, the general location of the future Route 37 corridor study area, the general location of the Snowden Bridge Boulevard urban four -lane divided collector road system with signalized intersection or roundabout design and limited entrance locations, the general location of on -site and off -site green space buffer areas, and the general location of the adjoining parcels that are within permanent protective easements. 2. The Applicant hereby proffers to develop the Property in substantial conformity with the proffered GDP, prepared by Greenway Engineering dated January 25, 2010. The GDP is recognized to be a conceptual plan and may be adjusted by the Applicant to accommodate final design and engineering constraints without the need of new conditional rezoning approval by the Frederick County Board of Supervisors, provided that the adjustments do not eliminate or substantially relocate the areas indicated on the proffered GDP. B. Ml, Light Industrial District Land Uses 1. The Applicant intends to develop the Property to implement industrial and office land uses that are designed to coexist in an office park setting. 2. The Frederick County Board of Supervisors agrees to allow future office and industrial land uses that are included within future amendments to the M1, Light Industrial District to be developed on the Property without the need for conditional zoning amendments. C. Ml, Light Industrial District Design Standards 1. The Applicant hereby proffers to establish an Architectural Review Board (ARB) to oversee and approve all structural design exterior treatments for new construction and structural additions to ensure high quality development throughout the project. Additionally, the ARB will oversee and approve all Proffer Statement Greenway Engineering August 24, 2009 3 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12, 2010 Revised January 25, 2010 monument signage and building mounted signage, to ensure consistency in the design of signage throughout the project. Notwithstanding what is stated herein, the ARB is intended to be in addition to and not intended to override or conflict with any provisions of the Frederick County Code. 2. The Applicant hereby proffers to establish requirements for outdoor green areas and/or outdoor plaza areas for the benefit of employees of the office and industrial park. These outdoor green areas and outdoor plaza areas will be located within each of the M1 District land bay areas identified in the proffered GDP. 3. The Applicant hereby proffers to establish internal asphalt trails for the benefit of employees of the office and industrial park. These asphalt trails will be a minimum of eight feet in width and will be designed to connect land uses throughout the MI District land bay areas identified in the proffered GDP wherever possible. For each lot or parcel associated with the construction of a building, the Applicant agrees to identify the location on said lot or parcel for trails (if applicable, to said lot or parcel) and to have the trail constructed (if applicable) prior to the issuance of the Certificate of Occupancy for the structure or building on said lot or parcel. 4. The Applicant hereby proffers to establish a 100 -foot green space buffer area along the northern boundary of the Property as depicted on the proffered GDP. This green space buffer area will be left in its natural state to provide viewshed mitigation for the Milburn Cemetery and the Helm- McCann springhouse. Said buffer is in addition to the requirements of the Frederick County Code. 5. The Applicant hereby proffers to provide for evergreen landscaping along the Redbud Road frontage of the Property identified as a green space buffer area on the proffered GDP. The provision of this evergreen landscaping is to provide viewshed mitigation between the Property and the Shenandoah Valley Battlefield Foundation property. Said buffer is in addition to the requirements of the Frederick County Code. D. Transportation Enhancements 1. The Applicant hereby proffers to provide a corridor study area within the Property as depicted on the proffered GDP that is a minimum of 350 feet in width. The purpose of this corridor study area is to provide Frederick County with an opportunity to determine a final alignment for Route 37 throughout the limits of the Property through the completion of engineering design sufficient for this purpose. The design within the corridor study area depicted on the proffered GDP will provide access to the Property to the proposed interchange and Snowden Proffer Statement Greenway Engineering August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12,2010 Revised January 25, 2010 4 Bridge Boulevard. The corridor study area shall be available to Frederick County for a period of eight years from the date of rezoning approval to complete engineering design necessary to determine the appropriate alignment and right -of- way width for Route 37 within the Property. The Applicant agrees to cooperate with VDOT and Frederick County to provide engineering information and reports within the Applicant's possession if needed to assist with this design effort. The Board of Supervisors may allow encroachment into and or the definition of the corridor study area if necessary to accommodate site development proposals through the Site Plan approval process. 2. The Applicant hereby proffers to provide for a maximum 350 -foot wide right -of- way dedication for the Route 37 mainline section within the Property. The mainline section is intended to include through travel lanes and collector distributor lanes if necessary. It is agreed that any portion of the maximum 350 foot right -of -way that is not required for the Route 37 mainline section within the Property will not be requested from the Applicant. The Applicant shall provide the required right -of -way dedication to Frederick County within 90 days from the date of written notice by Frederick County, which shall occur after an official decision has been made by Frederick County and VDOT for the alignment and right -of -way width for the Route 37 mainline section within the Property. In the event the aforesaid official decision has not been made for the Route 37 mainline section within the time period specified in Section D(1), the Applicant may either extend the time period for this decision, or may provide Frederick County with a 225 -foot wide right -of -way dedication for Route 37 within the corridor study area depicted on the proffered GDP. The Applicant shall be allowed to install utilities or other elements necessary for site development within the dedicated right -of- way area, provided that this does not restrict use of the right -of -way. 3. The Applicant hereby proffers to provide for right -of -way dedication sufficient for the development of up to an 800 -foot wide diamond interchange or a single point urban interchange (SPUI) in the general location depicted on the proffered GDP. It is agreed that any portion of the right -of -way that is not required for the new interchange within the Property will not be requested from the Applicant. It is further agreed that the engineering design sufficient to determine the location, type and right -of -way needs for the new interchange will provide direct access to Snowden Bridge Boulevard. The Applicant shall provide the required right -of- way dedication to Frederick County within 90 days from the date of written notice by Frederick County, which shall occur after an official decision has been made by Frederick County and VDOT for the alignment and right -of -way width for the new Route 37 interchange within the Property. In the event the aforesaid official decision has not been made for the new Route 37 interchange within the time period specified in Section D(1), the Applicant may either extend the time period for this decision, or may provide Frederick County with a 225 -foot wide right -of- way dedication for Route 37 within the corridor study area depicted on the Proffer Statement Greenway Engineering August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12, 2010 Revised January 25, 2010 5 proffered GDP. The Applicant shall be allowed to install utilities or other elements necessary for site development within the dedicated right -of -way area, provided that this does not restrict use of the right -of -way. 4. The Applicant hereby proffers to construct Snowden Bridge Boulevard between the Property and Martinsburg Pike (U.S. Route 11 North), including the CSX bridge crossing, prior to the issuance of an occupancy permit for the first office or industrial site plan approved on the Property. The Applicant shall design and construct Snowden Bridge Boulevard as an urban four -lane divided collector road section (U4D) throughout the limits of the Property, and shall develop the off -site segment of Snowden Bridge Boulevard consistent with the approved public improvement plan. Snowden Bridge Boulevard shall be initially constructed as a two -lane road section, and shall be constructed as the ultimate four -lane divided road section prior to the issuance of the occupancy permit for the site plan that exceeds 8,000 VPD or in the event that Snowden Bridge Boulevard is developed to allow access for additional traffic from outside the Property, the construction of the ultimate four -lane divided road section shall be required when the total trip volume exceeds 8,000 VPD on the Property, which ever first occurs. 5. The Applicant hereby proffers to limit full commercial intersection access on Snowden Bridge Boulevard to establish up to three commercial intersections in the general location of intersections identified on the proffered GDP. An intersection has been identified on the proffered GDP that could potentially be developed as either a roundabout or as a signalized intersection if warranted by VDOT. All full commercial intersections identified on the proffered GDP will be developed with raised medians to provide for controlled left turn movement access to the Property. 6. The Applicant hereby proffers to allow for the full commercial intersection located on the east side of the Route 37 corridor study area to be closed entirely if necessary when Route 37 is developed by others throughout the limits of the Property. The closure of the full commercial intersection is conditioned upon the provision of street access to this portion of the Property that will be developed by others during the construction of Route 37. The Applicant agrees to cooperate with Frederick County to provide easements on the Property if necessary to facilitate new street access to this portion of the Property if this becomes necessary due to the construction of Route 37. 7. The Applicant hereby proffers to prohibit direct commercial access from the Property to existing Milburn Road (Route 662). The County may determine that emergency access from to the Property from existing Milburn Road is acceptable provided that it is designed to prohibit access for regular vehicular traffic Proffer Statement August 24, 2009 6 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12, 2010 Revised January 25, 2010 8. The Applicant hereby proffers to prohibit direct commercial access from the Property to existing Redbud Road (Route 661). Frederick County may determine that emergency access from to the Property from existing Redbud Road is acceptable provided that it i designed to prohibit access for regular vehicular traffic. Greenway Engineering 9. The Applicant hereby proffers to prohibit direct commercial access from the Property to McCann's Road (Route 838) Emergency access to the Property from McCann's Road is prohibited as well to protect the integrity of the buffer identified along this road. 10. The Applicant shall develop Snowden Bridge Boulevard as a public street; however, the Applicant shall have the ability to develop all internal streets as private street systems. All private streets shall be constructed to meet or exceed VDOT vertical base section standards. 11. The Applicant hereby proffers to provide for inter parcel connections where possible to mitigate transportation impacts to the full commercial intersections identified on the proffered GDP. 12. The Applicant submits that it will apply for all such public assistance mechanisms that are available at the time of development to facilitate the installation of the aforementioned transportation /infrastructure improvements. Those mechanisms include, but are not limited to, matching funds, industrial access funds and /or any other transportation /infrastructure funding vehicles, such as CDAs. Without binding any future legislative act, the Applicant and the Frederick County Board of Supervisors agree that the use of said mechanisms are advantageous to the development of the Property and the use of same should be encouraged and that both parties should make all reasonable efforts to cooperate with one another to implement the appropriate mechanism or combination of mechanisms to ensure rapid installation of the aforementioned improvements. 13. The Applicant hereby proffers to provide for a maximum 60 -foot right -of -way dedication to Frederick County to provide for the development of a street connection by others between the planned portion of Snowden Bridge Boulevard on the Property and existing Redbud Road (Route 661) immediately south of the Property. The general location of this 60 -foot right -of -way shall be delineated on the final Master Development Plan, which shall connect to one of the proposed new full commercial intersections that are located to the west of the Route 37 corridor study area as depicted on the proffered GDP. It is agreed that the 60 -foot right -of -way dedication can be located within buffer areas provided that the landscape screening and opaque elements are located between the adjoining properties owned by Applicant and the right -of -way dedication area. The Applicant shall provide the required right -of -way dedication to Frederick County Proffer Statement August 24, 2009 7 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12, 2010 Revised January 25, 2010 within 90 days from the date of written notice by Frederick County, which shall occur after an official decision has been made by Frederick County and VDOT to construct this street connection. It is agreed that the Applicant can construct street access with entrances to land bays within the delineated 60 -foot right -of -way area provided that the proposed street access meets or exceeds VDOT vertical base section standards. The Applicant shall be allowed to install utilities or other elements necessary for site development within the dedicated right -of -way area, provided that this does not restrict use of the right -of -way. 14. The Applicant has agreed to provide Frederick County with right -of -way dedications within the Property for the Route 37 mainline, the new Route 37 interchange, and the connecting street between Redbud Road and Snowden Bridge Boulevard as described in Sections D(2), D(3), and D(13) of the Proffer Statement. In the event that Frederick County or VDOT decides to not construct these road systems in whole or in part subsequent to right -of -way dedication, the recipient of the dedication agrees to convey the right -of -way dedication to the Applicant within 90 days from the date of this determination. Greenway Engineering E. Fire and Rescue Monetary Contribution 1. The Graystone Office and Industrial Park has been demonstrated to provide a positive economic impact to Frederick County services by the Frederick County Development Impact Model. However, the Applicant intends to further support fire and rescue services through the provision of a monetary contribution in the amount of $0.05 per square foot of structural development for all land uses within the Property. This monetary contribution shall be provided to Frederick County for fire and rescue purposes prior to the issuance of a certificate of occupancy permit for each building permit issued within the Property. [Signatures on next page] Proffer Statement Greenway Engineering Respectfully Submitted: By: August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12, 2010 Revised January 25, 2010 F. Signatures Graystone Corporation of Virginia The conditions proffered above shall be binding upon the heirs, executors, administrators, assigns and successors in the interest of the Applicants and owners. In the event the Frederick County Board of Supervisors grants this rezoning and accepts the conditions, the proffered conditions shall apply to the land rezoned in addition to other requirements set forth in the Frederick County Code. Dor Commonwe. of Virginia, Cry /County of f.P•o.rr.i. To Wit: 8 Date: /3&/-2)--- 20/0 The foregoing instrument was acknowledged before me thist■day of .•in.• 4 nV 20,o by w.e,., \J. -oe,rt 4.. Registration No.: GOPPg My Commission Expire •tG 35 \55\O P''• 510 k iiMC A`-\?‘` Proffer Statement 0 0 GENERALIZED DEVELOPMENT PLAN GRAYSTONE CORPORATION OF VIRGINIA STONEWALL MAGISTERIAL DISTRICT FREDERICK COUNTY, VA Engineers, Surveyors Environmental Services Founded in 1971 GREE?IWAY ENGINEERING, IN 151 Windy Hill Lane Winchester, Virginia 22602 Telephone: (540) 662 -4185 FAX: (540) 722 -9528 www.greenwayeng.com Greenway Engineering IP August 24, 2009 Revised September 23, 2009 1 ®A T CURRENT o- Revised October 9, 2009 Revised November 17, 2009 Revised January [2, 2010 GRAYSTONE CORPORATION OF VIRGINIA PROFFER STATEMENT REZONING: RZ Rural Areas District (RA) to Light Manufacturing District (M1) PROPERTY: 271.39± acres; Tax Parcels #43 -((A)) -158, 44 ((A)) -25, and 44- ((A)) -26, (here -in after the "Property RECORD OWNER: Graystone Corporation of Virginia APPLICANT: Graystone Corporation of Virginia (here -in after the "Applicant PROJECT NAME: Graystone Corporation Office and Industrial Park ORIGINAL DATE OF PROFFERS: August 24, 2009 REVISION DATE: January 12, 2010 Preliminary Matters Pursuant to Section 15.2 -2296 Et. Seq. of the Code of Virginia, 1950, as amended, and the provisions of the Frederick County Zoning Ordinance with respect to conditional zoning, the undersigned Applicant hereby proffers that in the event the Board of Supervisors of Frederick County, Virginia, shall approve Rezoning Application for the rezoning of 271.39± -acres from the Rural Areas (RA) District to 271.39± -acres to the Light Industrial (M1) District, development of the subject property shall be done in conformity with the terms and conditions set forth herein, except to the extent that such terms and conditions may be subsequently amended or revised by the Applicant and such be approved by the Frederick County Board of Supervisors and their legal successors, heirs, or assigns in accordance with the said Code and Zoning Ordinance. In the event that such rezoning is not granted, then these proffers shall be deemed withdrawn and have no effect whatsoever. These proffers shall be binding upon this Applicant and their legal successors, heirs, or assigns. The Property, more particularly described as the lands owned by Graystone Corporation of Virginia (formerly Crider Shockey, Inc. of West Virginia), being all of Tax Map Parcels 43 -((A)) -158, 44- ((A)) -25, and 44- ((A)) -26, and further described by Instrument Number 030025588. (Please refer to Rezoning Application Deed Information). File #276000 Rezoning Proffer Statement Greenway Engineering A. Generalized Development Plan August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12, 2010 PROFFER STATEMENT 1. The Applicant hereby proffers to submit a Generalized Development Plan (the "GDP for the Property. The purpose of the GDP is to identify the general location of the M1 District office and industrial land bays, the general location of the future Route 37 corridor study area, the general location of the Snowden Bridge Boulevard urban four -lane divided collector road system with signalized intersection or roundabout design and limited entrance locations, the general location of on -site and off -site green space buffer areas, and the general location of the adjoining parcels that are within permanent protective easements. 2. The Applicant hereby proffers to develop the Property in substantial conformity with the proffered GDP, prepared by Greenway Engineering dated January 12, 2010. The GDP is recognized to be a conceptual plan and may be adjusted by the Applicant to accommodate final design and engineering constraints without the need of new conditional rezoning approval by the Frederick County Board of Supervisors, provided that the adjustments do not eliminate or substantially relocate the areas indicated on the proffered GDP. B. Ml, Light Industrial District Land Uses 2 1. The Applicant intends to develop the Property to implement industrial and office land uses that are designed to coexist in an office park setting. 2. The Frederick County Board of Supervisors agrees to allow future office and industrial land uses that are included within future amendments to the Ml, Light Industrial District to be developed on the Property without the need for conditional zoning amendments. C. Ml, Light Industrial District Design Standards 1. The Applicant hereby proffers to establish an Architectural Review Board (ARB) to oversee and approve all structural design exterior treatments for new construction and structural additions to ensure high quality development throughout the project. Additionally, the ARB will oversee and approve all monument signage and building mounted signage, to ensure consistency in the File #2760GC Rezoning Proffer Statement Greenway Engineering design of signage throughout the project. Notwithstanding what is stated herein, the ARB is intended to be in addition to and not intended to override or conflict with any provisions of the Frederick County Code. 2. The Applicant hereby proffers to establish requirements for outdoor green areas and/or outdoor plaza areas for the benefit of employees of the office and industrial park. These outdoor green areas and outdoor plaza areas will be located within each of the M1 District land bay areas identified in the proffered GDP. 3. The Applicant hereby proffers to establish internal asphalt trails for the benefit of employees of the office and industrial park. These asphalt trails will be a minimum of eight feet in width and will be designed to connect land uses throughout the Ml District land bay areas identified in the proffered GDP wherever possible. For each lot or parcel associated with the construction of a building, the Applicant agrees to identify the location on said lot or parcel for trails (if applicable, to said lot or parcel) and to have the trail constructed (if applicable) prior to the issuance of the Certificate of Occupancy for the structure or building on said lot or parcel. 4. The Applicant hereby proffers to establish a 100 -foot green space buffer area along the northern boundary of the Property as depicted on the proffered GDP. This green space buffer area will be left in its natural state to provide viewshed mitigation for the Milburn Cemetery and the Helm- McCann springhouse. Said buffer is in addition to the requirements of the Frederick County Code. 5. The Applicant hereby proffers to provide for evergreen landscaping along the Redbud Road frontage of the Shenandoah Valley Battlefield Foundation property identified as a green space buffer area on the proffered GDP. The provision of this evergreen landscaping is to provide viewshed mitigation for this property and is conditioned upon a landscape easement being furnished by Shenandoah Valley Battlefield Foundation property owner. Said buffer is in addition to the requirements of the Frederick County Code. D. Transportation Enhancements August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12. 2010 3 1. The Applicant hereby proffers to provide a corridor study area within the Property as depicted on the proffered GDP that is a minimum of 350 feet in width. The purpose of this corridor study area is to provide Frederick County with an opportunity to determine a final alignment for Route 37 throughout the limits of the Property through the completion of engineering design sufficient for this purpose. The design within the corridor study area depicted on the proffered GDP will provide access to the Property to the proposed interchange and Snowden Bridge Boulevard. The corridor study area shall be available to Frederick County File #2760GC Rezoning Proffer Statement Greenway Engineering August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12, 2010 4 for a period of eight years from the date of rezoning approval to complete engineering design necessary to determine the appropriate alignment and right -of- way width for Route 37 within the Property. The Applicant agrees to cooperate with VDOT and Frederick County to provide engineering information and reports within the Applicant's possession if needed to assist with this design effort. The Board of Supervisors may allow encroachment into and or the definition of the corridor study area if necessary to accommodate site development proposals through the Site Plan approval process. 2. The Applicant hereby proffers to provide for a maximum 350 -foot wide right -of- way dedication for the Route 37 mainline section within the Property. It is agreed that any portion of the maximum 350 -foot right -of -way that is not required for the Route 37 mainline section within the Property will not be requested from the Applicant. The Applicant shall provide the required right -of -way dedication to Frederick County within 90 days from the date of written notice by Frederick County, which shall occur after an official decision has been made by all applicable governmental authorities for the alignment and right -of -way width for the Route 37 mainline section within the Property. In the event the aforesaid official decision has not been made for the Route 37 mainline section within the time period specified in Section D(1), the Applicant may either extend the time period for this decision, or may provide Frederick County with a 225 -foot wide right -of -way dedication for Route 37 within the corridor study area depicted on the proffered GDP. The Applicant shall be allowed to install utilities or other elements necessary for site development within the dedicated right -of -way area. 3. The Applicant hereby proffers to provide for right -of -way dedication sufficient for the development of up to an 800 -foot wide diamond interchange or a single point urban interchange (SPUI) in the general location depicted on the proffered GDP. It is agreed that any portion of the right -of -way that is not required for the new interchange within the Property will not be requested from the Applicant. It is further agreed that the engineering design sufficient to determine the location, type and right -of -way needs for the new interchange will provide direct access to the Property through its intersection with Snowden Bridge Boulevard. The Applicant shall provide the required right -of -way dedication to Frederick County within 90 days from the date of written notice by Frederick County, which shall occur after an official decision has been made by all applicable governmental authorities for the alignment and right -of -way width for the new Route 37 interchange within the Property. In the event the aforesaid official decision has not been made for the new Route 37 interchange within the time period specified in Section D(1), the Applicant may either extend the time period for this decision, or may provide Frederick County with a 225 -foot wide right -of -way dedication for Route 37 within the corridor study area depicted on the proffered GDP. The Applicant shall be allowed to install utilities or other elements necessary for site development within the dedicated right -of -way area. File #2760GC Rezoning Proffer Statement Greenway Engineering August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12, 2010 5 4. The Applicant hereby proffers to construct Snowden Bridge Boulevard between the Property and Martinsburg Pike (U.S. Route 11 North), including the CSX bridge crossing, prior to the issuance of an occupancy permit for the first office or industrial site plan approved on the Property. The Applicant shall design and construct Snowden Bridge Boulevard as an urban four -lane divided collector road section (U4D) throughout the limits of the Property, and shall develop the off -site segment of Snowden Bridge Boulevard consistent with the approved public improvement plan. Snowden Bridge Boulevard shall be initially constructed as a two -lane road section, and shall be constructed as the ultimate four -lane divided road section prior to the issuance of the occupancy permit for the site plan that exceeds 8,000 VPD or in the event that Snowden Bridge Boulevard is developed to allow access for additional traffic from outside the Property, the construction of the ultimate four -lane divided road section shall be required when the total trip volume exceeds 8,000 VPD on the Property, which ever first occurs. 5. The Applicant hereby proffers to limit full commercial intersection access on Snowden Bridge Boulevard to establish up to three commercial intersections in the general location of intersections identified on the proffered GDP. An intersection has been identified on the proffered GDP that could potentially be developed as either a roundabout or as a signalized intersection if warranted by VDOT. All full commercial intersections identified on the proffered GDP will be developed with raised medians to provide for controlled left turn movement access to the Property. 6. The Applicant hereby proffers to allow for the full commercial intersection located on the east side of the Route 37 corridor study area to be closed entirely if necessary when Route 37 is developed by others throughout the limits of the Property. The closure of the full commercial intersection is conditioned upon the provision of street access to this portion of the Property that will be developed by others during the construction of Route 37. The Applicant agrees to cooperate with Frederick County to the extent possible to facilitate new street access to this portion of the Property if this becomes necessary due to the construction of Route 37. 7. The Applicant hereby proffers to prohibit direct commercial access from the Property to existing Milburn Road (Route 662). The County may determine that emergency access from to the Property from existing Milburn Road is acceptable provided that it is designed to prohibit access for regular vehicular traffic. 8. The Applicant hereby proffers to prohibit direct commercial access from the Property to existing Redbud Road (Route 661). Frederick County may determine that emergency access from to the Property from existing Redbud Road is acceptable provided that it is designed to prohibit access for regular vehicular traffic. File #2760GC Rezoning Proffer Statement Greenway Engineering August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12, 2010 6 9. The Applicant hereby proffers to prohibit direct commercial access from the Property to McCann's Road (Route 838). Emergency access to the Property from McCann's Road is prohibited as well to protect the integrity of the buffer identified along this road. 10. The Applicant shall develop Snowden Bridge Boulevard as a public street; however, the Applicant shall have the ability to develop all internal streets as private street systems. All private streets shall be constructed to meet or exceed VDOT vertical base section standards. 11. The Applicant hereby proffers to provide for inter parcel connections where possible to mitigate transportation impacts to the full commercial intersections identified on the proffered GDP. 12. The Applicant submits that it will apply for all such public assistance mechanisms that are available at the time of development to facilitate the installation of the aforementioned transportation/infrastructure improvements. Those mechanisms include, but are not limited to, matching funds, industrial access funds and/or any other transportation/infrastructure funding vehicles, such as CDAs. Without binding any future legislative act, the Applicant and the Frederick County Board of Supervisors agree that the use of said mechanisms are advantageous to the development of the Property and the use of same should be encouraged and that both parties should make all reasonable efforts to cooperate with one another to implement the appropriate mechanism or combination of mechanisms to ensure rapid installation of the aforementioned improvements. 13. The Applicant hereby proffers to provide for a maximum 60 -foot right -of -way dedication to Frederick County to provide for the development of a street connection by others between the planned portion of Snowden Bridge Boulevard on the Property and existing Redbud Road (Route 661) immediately south of the Property. The general location of this 60 -foot right -of -way shall be delineated on the final Master Development Plan, which shall connect to one of the proposed new full commercial intersections that are located to the west of the Route 37 corridor study area as depicted on the proffered GDP. It is agreed that the 60 -foot right -of -way dedication can be located within buffer areas provided that the landscape screening and opaque elements are located between the adjoining property and the right -of -way dedication area. The Applicant shall provide the required right -of -way dedication to Frederick County within 90 days from the date of written notice by Frederick County, which shall occur after an official decision has been made by all applicable governmental authorities to construct this street connection. It is agreed that the Applicant can construct street access with entrances to land bays within the delineated 60 -foot right -of -way area provided that the proposed street access meets or exceeds VDOT vertical base section standards. The Applicant shall be allowed to install utilities or other elements necessary for site development within the dedicated right -of -way area. File #2760GC Rezoning Proffer Statement Greenway Engineering August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 Revised January 12, 2010 E. Fire and Rescue Monetary Contribution F. Signatures Graystone Corporation of Virginia [Signatures on next page] 7 14. The Applicant has agreed to provide Frederick County with right -of -way dedications within the Property for the Route 37 mainline, the new Route 37 interchange, and the connecting street between Redbud Road and Snowden Bridge Boulevard as described in Sections D(2), D(3), and D(13) of the Proffer Statement. In the event that Frederick County or any other governmental authority decides to not construct these road systems in whole or in part subsequent to right -of -way dedication, the recipient of the dedication agrees to convey the right -of -way dedication to the Applicant within 90 days from the date of this determination. 1. The Graystone Office and Industrial Park has been demonstrated to provide a positive economic impact to Frederick County services by the Frederick County Development Impact Model. However, the Applicant intends to further support fire and rescue services through the provision of a monetary contribution in the amount of $0.05 per square foot of structural development for all land uses within the Property. This monetary contribution shall be provided to Frederick County for fire and rescue purposes prior to the issuance of a certificate of occupancy permit for each building permit issued within the Property. The conditions proffered above shall be binding upon the heirs, executors, administrators, assigns and successors in the interest of the Applicants and owners. In the event the Frederick County Board of Supervisors grants this rezoning and accepts the conditions, the proffered conditions shall apply to the land rezoned in addition to other requirements set forth in the Frederick County Code. File #2760GC Rezoning Proffer Statement Greenway Engineering Respectfully Submitted: t• ,c Commorfralth of Virginia, By: City /County of August 24, 2009 frid Revised September 23, 2009 Revised October 9,2009 Revised November 17, 2009 Revisal January 12, 20 I0 The foregoing instrument was acknowledged before me this 2 day of .JO/JL 2C7/ 20P by aid )ockio .1P My Commission Expires Registration No.: pao To Wit: SUSAN D. STAHL NOTARY PUBLIC Commonwealth of Virginia Reg. #290374 My Commission Expires April 30, 2012 Date: 8 1 -2o\o 'Notary Public File #2760GC Rezoning Proffer Statement 7 9 9 0 qo� 1 if 0 f Y NN r k i(i N„, e'' I A n'-r7----7---------7',,,,, 1 t I 1 1' Trr1 _1 1 L e _i_ _Cs' 87:itti �t 1 f 411141, i 94 '0 065 4497,, '91). ,x, So, 47 r r J U -H X O O t3 O n m o m 0 z m 0 C a r m m z 0 FUTURE ROUTE 37 SNOWDEN BRIDGE BLVD. INTERCHANGE PARCELS WITH PERMANENT EASEMENTS DATE: 01/12/10 GENERALIZED DEVELOPMENT PLAN GREENWAY ENGINEERING 151 Windy Hill Lane 2 BY GRAYSTONE CORPORATION OF VIRGINIA Winchester, Virginia 22602 Engineers, Surveyors Envi Telephone: (540) 662 -4185 STONEWALL MAGISTERIAL DISTRICT Services Founded in 1971 FAX. 540 722 9528 FREDERICK COUNTY, VA www.greenwayeng.com 7 9 9 0 qo� 1 if 0 f Y NN r k i(i N„, e'' I A n'-r7----7---------7',,,,, 1 t I 1 1' Trr1 _1 1 L e _i_ _Cs' 87:itti �t 1 f 411141, i 94 '0 065 4497,, '91). ,x, So, 47 r r J U -H X O O t3 O n m o m 0 z m 0 C a r m m z 0 FUTURE ROUTE 37 SNOWDEN BRIDGE BLVD. INTERCHANGE PARCELS WITH PERMANENT EASEMENTS 4 8 cri D co m 0 C D ei M ,b4 g 2 0 17) ..c.. co GENERALIZED DEVELOPMENT PLAN GRAYSTONE CORPORATION OF VIRGINIA STONEWALL MAGISTERIAL DISTRICT FREDERICK COUNTY, VA GREENWAY ENGINEERING, 151 Windy Hill Lane Winchester, Virginia 22602 Telephone: (540) 662-4185 FAX. (540) 722-9528 www.greenwayeng.com Engineers, Surveyors Environmental Services Founded in 1971 4 1 -o- ,o to. 17 o' --4 1 1'/ i i i i 1. —.N." s sivi-skisi" ----AA to y r I 4 -T, i i 4 9,0 i Air i r I -1 11•Wit■—_ 'of 1 c c m 0 c —1 m w z 0 0 ni 0 CO 0 m 03 0 z 0 0 m 0 0 0 0) c 1 r— m ni z CJ December 2, 2009 Mr. Mike Ruddy Deputy Planning Director Frederick County 107 North Kent Street, 2 Floor Winchester, VA 22601 RE: Graystone Rezoning Revised Proffers Dear Mike: Enclosed please find our revised proffers. This revision results from Ty Lawson's consultation with Rod Williams. Please let me know if you have any questions. Sincerely, John P. Goo Treasurer Enclosure d, Jr. GRAYSTONE CORPORATION of Virginia P. O. Box 2530 Winchester, VA 22604 -1730 POT NT Greenway Engineering REZONING: PROPERTY: RECORD OWNER: APPLICANT: PROJECT NAME: ORIGINAL DATE OF PROFFERS: REVISION DATE: File #2760GC Rezoning August 24, 2009 November 17, 2009 August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 GRAYSTONE CORPORATION OF VIRGINIA PROFFER STATEMENT RZ a e t raq Rural Areas District (RA) to Light Manufacturing District (Ml) 271.39± acres; Tax Parcels #43 -((A))- 158, 44- ((A)) -25, and 44- ((A)) -26, (here -in after the "Property Graystone Corporation of Virginia Graystone Corporation of Virginia (here -in after the "Applicant Graystone Corporation Office and Industrial Park Preliminary Matters Pursuant to Section 15.2 -2296 Et. Seq. of the Code of Virginia, 1950, as amended, and the provisions of the Frederick County Zoning Ordinance with respect to conditional zoning, the undersigned Applicant hereby proffers that in the event the Board of Supervisors of Frederick County, Virginia, shall approve Rezoning Application t'7 -Oq for the rezoning of 271.39± -acres from the Rural Areas (RA) District to 271.39±-acres to the Light Industrial (M1) District, development of the subject property shall be done in conformity with the terms and conditions set forth herein, except to the extent that such terms and conditions may be subsequently amended or revised by the Applicant and such be approved by the Frederick County Board of Supervisors in accordance with the said Code and Zoning Ordinance. In the event that such rezoning is not granted, then these proffers shall be deemed withdrawn and have no effect whatsoever. These proffers shall be binding upon this Applicant and their legal successors, heirs, or assigns. The Property, more particularly described as the lands owned by Graystone Corporation of Virginia (formerly Crider Shockey, Inc. of West Virginia), being all of Tax Map Parcels 43 -((A)) -158, 44- ((A)) -25, and 44- ((A)) -26, and further described by Instrument Number 030025588. (Please refer to Rezoning Application Deed Information). Proffer Statement Greenway Engineering A. Generalized Development Plan August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November I7, 2009 PROFFER STATEMENT 2 1. The Applicant hereby proffers to submit a Generalized Development Plan (the "GDP") for the Property. The purpose of the GDP is to identify the general location of the MI District office and industrial land bays, the general location of the future Route 37 corridor study area, the general location of the Snowden Bridge Boulevard urban four -lane divided collector road system with signalized intersection or roundabout design and limited entrance locations, the general location of on -site and off -site green space buffer areas, and the general location of the adjoining parcels that are within permanent protective easements. 2. The Applicant hereby proffers to develop the Property in substantial conformity with the proffered GDP, prepared by Greenway Engineering dated October 9, 2009. The GDP is recognized to be a conceptual plan and may be adjusted by the Applicant to accommodate final design and engineering constraints without the need of new conditional rezoning approval by the Frederick County Board of Supervisors, provided that the adjustments do not eliminate or substantially relocate the areas indicated on the proffered GDP. B. Ml, Licht Industrial District Land Uses 1. The Applicant intends to develop the Property to implement industrial and office land uses that are designed to coexist in an office park setting. 2. The Frederick County Board of Supervisors agrees to allow future office and industrial land uses that are included within future amendments to the MI, Light Industrial District to be developed on the Property without the need for conditional zoning amendments. C. Ml, Licht Industrial District Design Standards 1. The Applicant hereby proffers to establish an Architectural Review Board (ARB) to oversee and approve all structural design exterior treatments for new File #2760GC Rezoning Proffer Statement Greenway Engineering D. Transportation Enhancements File 427600C Rezoning August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 3 construction and structural additions to ensure high quality development throughout the project. Additionally, the ARB will oversee and approve all monument signage and building mounted signage, to ensure consistency in the design of signage throughout the project. Notwithstanding what is stated herein, the ARB is intended to be in addition to and not intended to override or conflict with any provisions of the Frederick County Code. 2. The Applicant hereby proffers to establish requirements for outdoor green areas and/or outdoor plaza areas for the benefit of employees of the office and industrial park. These outdoor green areas and outdoor plaza areas will be located within each of the Ml. District land bay areas identified in the proffered GDP. 3. The Applicant hereby proffers to establish internal asphalt trails for the benefit of employees of the office and industrial park. These asphalt trails will be a minimum of eight feet in width and will be designed to connect land uses throughout the M1 District land bay areas identified in the proffered GDP wherever possible. For each lot or parcel associated with the construction of a building, the Applicant agrees to identify the location on said lot or parcel for trails (if applicable, to said lot or parcel) and to have the trail constructed (if applicable) prior to the issuance of the Certificate of Occupancy for the structure or building on said lot or parcel. 4. The Applicant hereby proffers to establish a 100 -foot green space buffer area along the northern boundary of the Property as depicted on the proffered GDP. This green space buffer area will be left in its natural state to provide viewshed mitigation for the Milburn Cemetery and the Helm- McCann springhouse. Said buffer is in addition to the requirements of the Frederick County Code. 5. The Applicant hereby proffers to provide for evergreen landscaping along the Redbud Road frontage of the Shenandoah Valley Battlefield Foundation property identified as a green space buffer area on the proffered GDP. The provision of this evergreen landscaping is to provide viewshed mitigation for this property and is conditioned upon a landscape easement being furnished by Shenandoah Valley Batllefield Foundation property owner. Said buffer is in addition to the requirements of the Frederick County Code. 1. The Applicant hereby proffers to provide a corridor study area within the Property as depicted on the proffered GDP that is a minimum of 350 feet in width. The purpose of this corridor study area is to provide Frederick County with an opportunity to determine a final alignment for Route 37 through the completion of final engineering design throughout the limits of the Property. The corridor study Proffer Statement Greenway Engineering File #2760GC Rezoning August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 4 area depicted on the proffered GDP shall be available to Frederick County for a period of five years from the date of final non appealable rezoning approval. 2. The Applicant hereby proffers to provide for a 225 -foot wide right -of -way dedication for the Route 37 corridor that is consistent with the Route 37 western bypass typical section on the Property. The Applicant shall provide this right -of- way dedication to Frederick County within 90 days from the date of written notice by Frederick County of final engineering design approval for the section of Route 37 within the Property. In the event that final engineering design approval for Route 37 is not obtained within the time period specified in Section D(1), the Applicant may either extend the time period or shall determine the location of the 225 -foot wide right -of -way dedication area for Route 37 within the corridor study area depicted on the proffered GDP. In the event that Route 37 is not developed, or if an alternative design is approved for Route 37 that is not on the Property subsequent to the right -of -way dedication, Frederick County agrees to have the right -of -way transferred back to the Applicant within 90 days from the date of this determination. 3. The Applicant hereby proffers to provide for right -of -way dedication sufficient for the development of up to an 800 -foot wide diamond interchange or a single point urban interchange (SPUI) in the general location depicted on the proffered GDP. The 800 -foot wide diamond interchange or SPU1 interchange design is intended to provide direct access to the Property through its intersection with Snowden Bridge Boulevard. The Applicant shall provide the right -of -way dedication to Frederick County within 90 days from the date of written notice by Frederick County of final engineering design approval for the 800 -foot wide diamond interchange or SPUI interchange design serving Route 37 within the Property. In the event that Route 37 is not developed, or if an alternative design is approved for Route 37 that is not on the Property subsequent to the right -of -way dedication, Frederick County agrees to have the right -of -way transferred back to the Applicant within 90 days from the date of this determination. 4. The Applicant hereby proffers to construct Snowden Bridge Boulevard between the Property and Martinsburg Pike (U.S. Route 11 North), including the CSX bridge crossing, prior to the issuance of an occupancy permit for the first office or industrial site plan approved on the Property. The Applicant shall design and construct Snowden Bridge Boulevard as an urban four -lane divided collector road section (U4D) throughout the limits of the Property, and shall develop the off -site segment of Snowden Bridge Boulevard consistent with the approved public improvement plan. Snowden Bridge Boulevard shall be initially constructed as a two -lane road section, and shall be constructed as the ultimate four -lane divided road section prior to the issuance of the occupancy permit for the site plan that exceeds 8,000 VPD or in the event that Snowden Bridge Boulevard is developed to allow access for additional traffic from outside the Property, the construction of the ultimate four -lane divided road section shall be required when the total trip volume exceeds 8,000 VPD on the Property, which ever first occurs. Proffer Statement Greenway Engineering File #27600C Rezoning August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 5. The Applicant hereby proffers to limit full commercial intersection access on Snowden Bridge Boulevard to establish up to three commercial intersections in the general location of intersections identified on the proffered GDP. An intersection has been identified on the proffered GDP that could potentially be developed as either a roundabout or as a signalized intersection if warranted by VDOT. All full commercial intersections identified on the proffered GDP will be developed with raised medians to provide for controlled left turn movement access to the Property. 6. The Applicant hereby proffers to allow for the full commercial intersection located on the east side of the Route 37 corridor study area to be closed entirely if necessary when Route 37 is developed by others throughout the limits of the Property. The closure of the full commercial intersection is conditioned upon the provision of street access to this portion of the Property from a new full commercial intersection on Snowden Bridge Boulevard located east of Milburn Road, which will traverse Milburn Road and will be developed by others during the construction of Route 37 throughout the limits of the Property. 7. The Applicant hereby proffers to prohibit direct commercial access from the Property to existing Milburn Road (Route 662). The County may determine that emergency access from to the Property from existing Milburn Road is acceptable provided that it is designed to prohibit access for regular vehicular traffic. 8. The Applicant hereby proffers to prohibit direct commercial access from the Property to existing Redbud Road (Route 661). Frederick County may determine that emergency access from to the Property from existing Redbud Road is acceptable provided that it is designed to prohibit access for regular vehicular traffic. 9. The Applicant hereby proffers to prohibit direct commercial access from the Property to McCann's Road (Route 838). Emergency access to the Property from McCann's Road is prohibited as well to protect the integrity of the buffer identified along this road. 10. The Applicant shall develop Snowden Bridge Boulevard as a public street; however, the Applicant shall have the ability to develop all internal streets as private street systems. All private streets shall be constructed to meet or exceed VDOT vertical base section standards. 11. The Applicant hereby proffers to provide for inter parcel connections where possible to mitigate transportation impacts to the full commercial intersections identified on the proffered GDP. 12. The Applicant submits that it will apply for all such public assistance mechanisms that are available at the time of development to facilitate the installation of the Proffer Statement Greenway Engineering August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 aforementioned transportation /infrastructure improvements. Those mechanisms include, but are not limited to, matching funds, industrial access funds and /or any other transportation/infrastructure funding vehicles, such as CDAs. Without binding any future legislative act, the Applicant and the Frederick County Board of Supervisors agree that the use of said mechanisms are advantageous to the development of the Property and the use of same should be encouraged and that both parties should make all reasonable .efforts to cooperate with one another to implement the appropriate mechanism or combination of mechanisms to ensure rapid installation of the aforementioned improvements. E. Fire and Rescue Monetary Contribution 1. The Graystone Office and Industrial Park has been demonstrated to provide a positive economic impact to Frederick County services by the Frederick County Development Impact Model. However, the Applicant intends to further support fife and rescue services through the provision of a monetary contribution in the amount of $0.05 per square foot of structural development for all land uses within the Property. This monetary contribution shall be provided to Frederick County for fire and rescue purposes prior to the issuance of a certificate of occupancy permit for each building permit issued within the Property. F. Signatures Graystone Corporation of Virginia File #27600C Rezoning [Signatures on next page) 6 The conditions proffered above shall be binding upon the heirs, executors, administrators, assigns and successors in the interest of the Applicants and owners. In the event the Frederick County Board of Supervisors grants this rezoning and accepts the conditions, the proffered conditions shall apply to the land rezoned in addition to other requirements set forth in the Frederick County Code. Proffer Statement Grecnway Engineering Respectfully Submitted: By: August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 1 OS Commonwealt of Vir grfiia, SUSAN D. STA L NOTARY PUBLIC Commonwealth of Virginia Reg. #290874 My Commission Expires April 30, 2012 My Commission Expires Registration No.: Notary Public/ 7 Date: (I -oj City /County of /'/7ri k ek To Wit: �r ep The foregoing instrument was acknowledged before me this day of (i /e/I/ 2007 by .L a /O File #276000 Rezoning Proffer Statement November 25, 2009 GRAYSTONE CORPORATION of Virginia P. O. Box 2530 Winchester, VA 22604 -1730 Frederick County Planning Commission 107 North Kent Street Winchester, VA 22601 RE: Graystone Corporation of Virginia Rezoning Application Honorable Members of the Frederick County Planning Commission: Please find enclosed the latest revision of our Proffer Statement with the changes highlighted. You will see that many of the concerns expressed during the November 4 meeting have been addressed. All of the benefits to Frederick County enumerated in the original have been retained. We introduced this project to many of you in the Fall of 2008. Prior to filing our application, Frederick County encouraged us to move through the process in an expeditious manner due to an industrial prospect considering our area with a potential investment of $200 million. The County has offered the prospect an incentive package. Our site might be a fit and could enhance the County's prospects of landing the client. It is a long shot, however, in the current economic environment all of us need to take every good shot we can get. We now understand that the Planning Commission was unaware of this opportunity. We remain prepared to address your questions whenever you decide to take up this rezoning. Our rezoning offers many benefits to Frederick County that will be outlined in one or more e-mails you can expect to receive early next week. Please watch for them. Don Shockey Copies to: Enclosure You do not need to wait until a formal meeting for your questions to be addressed. We would be happy to address them at your convenience. Please e-mail the questions or comments to igood(a)shockevcompanies.com or call him at 540- 665 -3212. We appreciate your efforts to plan the future of Frederick County and we hope that you will agree that our project can be a positive part of that future. Hon. Richard C. Shickle, Chairman, Frederick County Board of Supervisors Hon. Charles S. DeHaven, Jr., Frederick County Board of Supervisors John R. Riley, Frederick County Administrator Michael Ruddy, Deputy Planning Director, Frederick County December 2, 2009 Mr. Mike Ruddy Deputy Planning Director Frederick County 107 North Kent Street, 2 Floor Winchester, VA 22601 RE: Graystone Rezoning Revised Proffers Dear Mike: Enclosed please find our revised proffers. This revision results from Ty Lawson's consultation with Rod Williams. Please let me know if you have any questions. Sincerely, Wear John P. Goo.. Jr. •reasurer Enclosure GRAYSTONE CORPORATION of Virginia P. 0. Box 2530 Winchester, VA 22604 -1730 Greenway Engineering August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 GRAYSTONE CORPORATION OF VIRGINIA PROFFER STATEMENT REZONING: RZ Rural Areas District (RA) to Light Manufacturing District (M 1) PROPERTY: 271.39± acres; Tax Parcels #43 -((A)) -158, 44- ((A)) -25, and 44- ((A)) -26, (here -in after the "Property RECORD OWNER: Graystone Corporation of Virginia APPLICANT: Graystone Corporation of Virginia (here -in after the "Applicant PROJECT NAME: Graystone Corporation Office and Industrial Park ORIGINAL DATE OF PROFFERS: August 24, 2009 REVISION DATE: November 17, 2009 Preliminary Matters Pursuant to Section 15.2 -2296 Et. Seq. of the Code of Virginia, 1950, as amended, and the provisions of the Frederick County Zoning Ordinance with respect to conditional zoning, the undersigned Applicant hereby proffers that in the event the Board of Supervisors of Frederick County, Virginia, shall approve Rezoning Application for the rezoning of 271.39± -acres from the Rural Areas (RA) District to 271.39±-acres to the Light Industrial (M1) District, development of the subject property shall be done in conformity with the terms and conditions set forth herein, except to the extent that such terms and conditions may be subsequently amended or revised by the Applicant and such be approved by the Frederick County Board of Supervisors in accordance with the said Code and Zoning Ordinance. In the event that such rezoning is not granted, then these proffers shall be deemed withdrawn and have no effect whatsoever. These proffers shall be binding upon this Applicant and their legal successors, heirs, or assigns. The Property, more particularly described as the lands owned by Graystone Corporation of Virginia (formerly Crider Shockey, Inc. of West Virginia), being all of Tax Map Parcels 43 -((A)) -158, 44- ((A)) -25, and 44- ((A)) -26, and further described by Instrument Number 030025588. (Please refer to Rezoning Application Deed Information). File #2760GC Rezoning Proffer Statement Greenway Engineering A. Generalized Development Plan August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 PROFFER STATEMENT 1. The Applicant hereby proffers to submit a Generalized Development Plan (the "GDP for the Property. The purpose of the GDP is to identify the general location of the M1 District office and industrial land bays, the general location of the future Route 37 corridor study area, the general location of the Snowden Bridge Boulevard urban four -lane divided collector road system with signalized intersection or roundabout design and limited entrance locations, the general location of on -site and off -site green space buffer areas, and the general location of the adjoining parcels that are within permanent protective easements. 2. The Applicant hereby proffers to develop the Property in substantial conformity with the proffered GDP, prepared by Greenway Engineering dated October 9, 2009. The GDP is recognized to be a conceptual plan and may be adjusted by the Applicant to accommodate final design and engineering constraints without the need of new conditional rezoning approval by the Frederick County Board of Supervisors, provided that the adjustments do not eliminate or substantially relocate the areas indicated on the proffered GDP. B. Ml, Light Industrial District Land Uses 2 1. The Applicant intends to develop the Property to implement industrial and office land uses that are designed to coexist in an office park setting. 2. The Frederick County Board of Supervisors agrees to allow future office and industrial land uses that are included within future amendments to the M1, Light Industrial District to be developed on the Property without the need for conditional zoning amendments. C. Ml, Light Industrial District Design Standards 1. The Applicant hereby proffers to establish an Architectural Review Board (ARB) to oversee and approve all structural design exterior treatments for new File #2760GC Rezoning Proffer Statement Greenway Engineering construction and structural additions to ensure high quality development throughout the project. Additionally, the ARB will oversee and approve all monument signage and building mounted signage, to ensure consistency in the design of signage throughout the project. Notwithstanding what is stated herein, the ARB is intended to be in addition to and not intended to override or conflict with any provisions of the Frederick County Code. 2. The Applicant hereby proffers to establish requirements for outdoor green areas and /or outdoor plaza areas for the benefit of employees of the office and industrial park. These outdoor green areas and outdoor plaza areas will be located within each of the M1 District land bay areas identified in the proffered GDP. 3. The Applicant hereby proffers to establish internal asphalt trails for the benefit of employees of the office and industrial park. These asphalt trails will be a minimum of eight feet in width and will be designed to connect land uses throughout the Ml District land hay areas identified in the proffered GDP wherever possible. For each lot or parcel associated with the construction of a building, the Applicant agrees to identify the location on said lot or parcel for trails (if applicable, to said lot or parcel) and to have the trail constructed (if applicable) prior to the issuance of the Certificate of Occupancy for the structure or building on said lot or parcel. 4. The Applicant hereby proffers to establish a 100 -foot green space buffer area along the northern boundary of the Property as depicted on the proffered GDP. This green space buffer area will be Left in its natural state to provide viewshed mitigation for the Milburn Cemetery and the Helm- McCann springhouse. Said buffer is in addition to the requirements of the Frederick County Code. 5. The Applicant hereby proffers to provide for evergreen landscaping along the Redbud Road frontage of the Shenandoah Valley Battlefield Foundation property identified as a green space buffer area on the proffered GDP. The provision of this evergreen landscaping is to provide viewshed mitigation for this property and is conditioned upon a landscape easement being furnished by Shenandoah Valley Battlefield Foundation property owner. Said buffer is in addition to the requirements of the Frederick County Code. D. Transportation Enhancements August 24, 2009 Revised September 23, 2009 Revised October 9,2009 Revised November 17, 2009 3 1. The Applicant hereby proffers to provide a corridor study area within the Property as depicted on the proffered GDP that is a minimum of 350 feet in width. The purpose of this corridor study area is to provide Frederick County with an opportunity to determine a final alignment for Route 37 through the completion of final engineering design throughout the limits of the Property. The corridor study Fite #2760GC Rezoning Proffer Statement Greenway Engineering File #2760GC Rezoning August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 4 area depicted on the proffered GDP shall be available to Frederick County for a period of five years from the date of final non appealable rezoning approval. 2. The Applicant hereby proffers to provide for a 225 -foot wide right -of -way dedication for the Route 37 corridor that is consistent with the Route 37 western bypass typical section on the Property. The Applicant shall provide this right -of- way dedication to Frederick County within 90 days from the date of written notice by Frederick County of final engineering design approval for the section of Route 37 within the Property. In the event that final engineering design approval for Route 37 is not obtained within the time period specified in Section D(1), the Applicant may either extend the time period or shall determine the location of the 225 -foot wide right -of -way dedication area for Route 37 within the corridor study area depicted on the proffered GDP. In the event that Route 37 is not developed, or if an alternative design is approved for Route 37 that is not on the Property subsequent to the right -of -way dedication, Frederick County agrees to have the right -of -way transferred back to the Applicant within 90 days from the date of this determination. 3. The Applicant hereby proffers to provide for right -of -way dedication sufficient for the development of up to an 800 -foot wide diamond interchange or a single point urban interchange (SPUI) in the general location depicted on the proffered GDP. The 800 -foot wide diamond interchange or SPUI interchange design is intended to provide direct access to the Property through its intersection with Snowden Bridge Boulevard. The Applicant shall provide the right -of -way dedication to Frederick County within 90 days from the date of written notice by Frederick County of final engineering design approval for the 800 -foot wide diamond interchange or SPUI interchange design serving Route 37 within the Property. In the event that Route 37 is not developed, or if an alternative design is approved for Route 37 that is not on the Property subsequent to the right -of -way dedication, Frederick County agrees to have the right -of -way transferred back to the Applicant within 90 days from the date of this determination. 4. The Applicant hereby proffers to construct Snowden Bridge Boulevard between the Property and Martinsburg Pike (U.S. Route 11 North), including the CSX bridge crossing, prior to the issuance of an occupancy permit for the first office or industrial site plan approved on the Property. The Applicant shall design and construct Snowden Bridge Boulevard as an urban four -lane divided collector road section (U4D) throughout the limits of the Property, and shall develop the off -sitc segment of Snowden Bridge Boulevard consistent with the approved public improvement plan. Snowden Bridge Boulevard shall be initially constructed as a two -lane road section, and shall be constructed as the ultimate four -lane divided road section prior to the issuance of the occupancy permit for the site plan that exceeds 8,000 VPD or in the event that Snowden Bridge Boulevard is developed to allow access for additional traffic from outside the Property, the construction of the ultimate four -lane divided road section shall be required when the total trip volume exceeds 8,000 VPD on the Property, which ever first occurs. Proffer Statement Greenway Engineering August 24, 2 009 Revised Septemter 23, 2009 Revised October 9, 2009 Revised November 17. 2009 5. The Applicant hereby proffers to limit full commercial intersection access on Snowden Bridge Boulevard to establish up to three commercial intersections in the general location of intersections identified on the proffered GDP. An intersection has been identified on the proffered GDP that could potentially be developed as either a roundabout or as a signalized intersection if warranted by VDOT. All full commercial intersections identified on the proffered GDP will be developed with raised medians to provide for controlled left turn movement access to the Property. 6. The Applicant hereby proffers to allow for the full commercial intersection located on the east side of the Route 37 corridor study area to be closed entirely if necessary when Route 37 is developed by others throughout the limits of the Property. The closure of the full commercial intersection is conditioned upon the provision of street access to this portion of the Property from a new full commercial intersection on Snowden Bridge Boulevard located east of Milburn Road, which will traverse Milburn Road and will be developed by others during the construction of Route 37 throughout the limits of the Property. 7. The Applicant hereby proffcrs to prohibit direct commercial access from the Property to existing Milburn Road (Route 662). The County may determine that emergency access from to the Property from existing Milburn Road is acceptable provided that it is designed to prohibit access for regular vehicular traffic. 8. The Applicant hereby proffers to prohibit direct commercial access from the Property to existing Redbud Road (Route 661). Frederick County may determine that emergency access from to the Property from existing Redbud Road is acceptable provided that it is designed to prohibit access for regular vehicular traffic. 9. The Applicant hereby proffers to prohibit direct commercial access from the Property to McCann's Road (Route 838). Emergency access to the Property from McCann's Road is prohibited as well to protect the integrity of the buffer identified along this road. 10. The Applicant shall develop Snowden Bridge Boulevard as a public street; however, the Applicant shall have the ability to develop all internal streets as private street systems. All private streets shall he constructed to meet or exceed VDOT vertical base section standards. 11. The Applicant hereby proffers to provide for inter parcel connections where possible to mitigate transportation impacts to the full commercial intersections identified on the proffered GDP. 12. The Applicant submits that it will apply for all such public assistance mechanisms that are available at the time of development to facilitate the installation of the File #276000 Rezoning Proffer Statement Greenway Engineering aforementioned transportation /infrastructure improvements. Those mechanisms include, but are not limited to, matching funds, industrial access funds and /or any other transportation/infrastructure funding vehicles, such as CDAs. Without binding any future legislative act, the Applicant and the Frederick County Board of Supervisors agree that the use of said mechanisms are advantageous to the development of the Property and the use of same should be encouraged and that both parties should make all reasonable efforts to cooperate with one another to implement the appropriate mechanism or combination of mechanisms to ensure rapid installation of the aforementioned improvements. E. Fire and Rescue Monetary Contribution 1. The Graystone Office and Industrial Park has been demonstrated to provide a positive economic impact to Frederick County services by the Frederick County Development Impact Model. However, the Applicant intends to further support fire and rescue services through the provision of a monetary contribution in the amount of $0.05 per square foot of structural development for all land uses within the Property. This monetary contribution shall be provided to Frederick County for fire and rescue purposes prior to the issuance of a certificate of occupancy permit for each building permit issued within the Property. F. Signatures Graystone Corporation of Virginia The conditions proffered above shall be binding upon the heirs, executors, administrators, assigns and successors in the interest of the Applicants and owners. In the event the Frederick County Board of Supervisors grants this rezoning and accepts the conditions, the proffered conditions shall apply to the land rezoned in addition to other requirements set forth in the Frederick County Code. File #27600C Rezoning August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 [Signatures on next page] Proffer Statement Greenway Engineering Respectfully Submitted: File #27600C Rezoning August 24,2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 By: T rvit a 5. r dr, Commonwealt of Vir /p i a City /County of /�/If(l� /I p /ek p The foregoing instrument was acknowledged before me this27 day of ii;0 1 //7150e-- L. 2007 by e,/ Ofili(Q3/o(/'I�� X1)6# SUSAN D. STAWL NOTARY PUBLIC Commonwealth of Virginia Reg. #290874 My Commission Expires April 30, 2012 My Commission Expires Registration No.: To Wit: Notary Public 7 Date: ti —25 -0q Proffer Statement November 25, 2009 GRAYSTONE CORPORATION of Virginia P. O. Box 2530 Winchester, VA 22604 -1730 Frederick County Planning Commission 107 North Kent Street Winchester, VA 22601 RE: Graystone Corporation of Virginia Rezoning Application Honorable Members of the Frederick County Planning Commission: Please find enclosed the latest revision of our Proffer Statement with the changes highlighted. You will see that many of the concerns expressed during the November 4 meeting have been addressed. All of the benefits to Frederick County enumerated in the original have been retained. We introduced this project to many of you in the Fall of 2008. Prior to filing our application, Frederick County encouraged us to move through the process in an expeditious manner due to an industrial prospect considering our area with a potential investment of $200 million. The County has offered the prospect an incentive package. Our site might be a fit and could enhance the County's prospects of landing the client. It is a long shot, however, in the current economic environment all of us need to take every good shot we can get. We now understand that the Planning Commission was unaware of this opportunity. We remain prepared to address your questions whenever you decide to take up this rezoning. Our rezoning offers many benefits to Frederick County that will be outlined in one or more e-mails you can expect to receive early next week. Please watch for them. You do not need to wait until a formal meeting for your questions to be addressed. We would be happy to address them at your convenience. Please e-mail the questions or comments to jgood anshockevcompanies.com or call him at 540 665 -3212. We appreciate your efforts to plan the future of Frederick County and we hope that you will agree that our project can be a positive part of that future. Sin erely, Lt 161 Don Shockey Copies to: Hon. Richard C. Shickle, Chairman, Frederick County Board of Supervisors Hon. Charles S. DeHaven, Jr., Frederick County Board of Supervisors John R. Riley, Frederick County Administrator Michael Ruddy, Deputy Planning Director, Frederick County Enclosure Greenway Engineering August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 GRAYSTONE CORPORATION OF VIRGINIA PROFFER STATEMENT REZONING: RZ Rural Areas District (RA) to Light Manufacturing District (M1) PROPERTY: 271.39± acres; Tax Parcels #43 -((A)) -158, 44- ((A)) -25, and 44- ((A)) -26, (here -in after the "Property RECORD OWNER: Graystone Corporation of Virginia APPLICANT: Graystone Corporation of Virginia (here -in after the "Applicant PROJECT NAME: Graystone Corporation Office and Industrial Park ORIGINAL DATE OF PROFFERS: August 24, 2009 REVISION DATE: 1 November 17, 2009 (.JS TEST RE— JtSlo4 DATE Preliminary Matters Pursuant to Section 15.2 -2296 Et. Seq. of the Code of Virginia, 1950, as amended, and the provisions of the Frederick County Zoning Ordinance with respect to conditional zoning, the undersigned Applicant hereby proffers that in the event the Board of Supervisors of Frederick County, Virginia, shall approve Rezoning Application for the rezoning of 271.39± -acres from the Rural Areas (RA) District to 271.39± -acres to the Light Industrial (M1) District, development of the subject property shall be done in conformity with the terms and conditions set forth herein, except to the extent that such terms and conditions may be subsequently amended or revised by the Applicant and such be approved by the Frederick County Board of Supervisors in accordance with the said Code and Zoning Ordinance. In the event that such rezoning is not granted, then these proffers shall be deemed withdrawn and have no effect whatsoever. These proffers shall be binding upon this Applicant and their legal successors, heirs, or assigns. The Property, more particularly described as the lands owned by Graystone Corporation of Virginia (formerly Crider Shockey, Inc. of West Virginia), being all of Tax Map Parcels 43 -((A)) -158, 44- ((A)) -25, and 44- ((A)) -26, and further described by Instrument Number 030025588. (Please refer to Rezoning Application Deed Information). Fitc #2760GC Rezoning Proffer Statement Greenway Engineering A. Generalized Development Plan File #2700GC Rezoning August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 PROFFER STATEMENT 1. The Applicant hereby proffers to submit a Generalized Development Plan (the "GDP for the Property. The purpose of the GDP is to identify the general location of the M1 District office and industrial land bays, the general location of the future Route 37 corridor study area, the general location of the Snowden Bridge Boulevard urban four -lane divided collector road system with signalized intersection or roundabout design and limited entrance locations, the general location of on -site and off -site green space buffer areas, and the general location of the adjoining parcels that are within permanent protective easements. 2.. The Applicant hereby proffers to develop the Property in substantial conformity with the proffered GDP, prepared by Greenway Engineering dated October 9, 2009. The GDP is recognized to be a conceptual plan and may be adjusted by the Applicant to accommodate final design and engineering constraints without the need of new conditional rezoning approval by the Frederick County Board of Supervisors, provided that the adjustments do not eliminate or substantially relocate the areas indicated on the proffered GDP. C. Ml, Light Industrial District Design Standards B. Ml, Light Industrial District Land Uses IN rcRA E A-1i •1 of USES EL-A4,4a CO 1. The Applicant intends to develop the Property to implement industrial and office land uses that are designed to coexist in an office park setting. 2. The Frederick County Board of Supervisors agrees to allow future office and industrial land uses that are included within future amendments to the M1, Light Industrial District to be developed on the Property without the need for conditional zoning amendments. coa &MrcA RAM41.126946Si Gli vt Nl I h&r#'(oF So' Cat c 1cGS Et. uW4ft) MkXfm -ei I4GtGW of r7o ¶A 012Ki+ t sate -c EmAmi4A'tla 1. The Applicant hereby proffers to establish an Architectural Review Board (ARB) to oversee and approve all structural design exterior treatments for new Proffer Statement Greenway Engineering construction and structural additions to ensure high quality development throughout the project. Additionally, the ARB will oversee and approve all monument signage and building mounted signage, to ensure consistency in the desir of si• age throu hog ut the project�Notwithstanding what is stated herein the ARB is intended to be in addition to and not intended to override or conflic with any provisions of the Frederick County Code. cuM tFtCA r 4cA 2. The Applicant hereby proffers to establish requirements for outdoor green areas and /or outdoor plaza areas for the benefit of employees of the office and industrial park. These outdoor green areas and outdoor plaza areas will be located within each of the M1 District land bay areas identified in the proffered GDP. 3. The Applicant hereby proffers to establish internal asphalt trails for the benefit of employees of the office and industrial park. These asphalt trails will be a minimum of eight feet in width and will be designed to connect land uses throughout the M1 District land bay areas identified in the proffered GDP wherever possible or each lot or parcel associated with the construction of a /building, the Applicant agrees to identify the location on said lot or parcel for trails (if applicable, to said lot or parcel) and to have the trail constructed (if applicable) prior to the issuance of the Certificate of Occupancy for the structur or building on said lot or parcel CLeie\FtCATlo D. Transportation Enhancements August 24, 2009 Revised September 23, 2009 Revised October9, 2009 Revised November 17, 2009 3 4. The Applicant hereby proffers to establish a 100 -foot green space buffer area along the northern boundary of the Property as depicted on the proffered GDP. This green space buffer area will be left in its natural state to provide viewshed miti ation for the Milburn Cemeter and the Helm- McCann springhouse a buffer is in addition to the requirements of the Frederick County Code. C&ARAVICATtot 5. The Applicant hereby proffers to provide for evergreen landscaping along the Redbud Road frontage of the Shenandoah Valley Battlefield Foundation property identified as a green space buffer area on the proffered GDP. The provision of this evergreen landscaping is to provide viewshed mitigation for this property and is conditioned upon a landscape easement being furnished by Shenandoah Valley Battlefield Foundation property owner. Said buffer is in addition to the requirements of the Frederick County Code. 1. The Applicant hereby proffers to provide a corridor study area within the Property as depicted on the proffered GDP that is a minimum of 350 feet in width. The purpose of this corridor study area is to provide Frederick County with an opportunity to determine a final alignment for Route 37 through the completion of final engineering design throughout the limits of the Property. The corridor study File #2760GC Rezoning Proffer Statement Greenway Engineering August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 File #2760GC Rezoning Proffer Statement 4. The Applicant hereby proffers to construct Snowden Bridge Boulevard between the Property and Martinsburg Pike (U.S. Route 11 North), including the CSX bridge crossing, prior to the issuance of an occupancy permit for the first office or industrial site plan approved on the Property. The Applicant shall design and construct Snowden Bridge Boulevard as an urban four lane divided collector road section (U4D) throughout the limits of the Property, and shall develop the off -site segment of Snowden Bridge Boulevard consistent with the approved public improvement plan. Snowden Bridge Boulevard shall be initially constructed as a two -lane road section, and shall be constructed as the ultimate four -lane divided road section prior to the issuance of the occupancy permit for the site plan that exceeds 8,000 VP of in the event that Snowden Bridge Boulevard is developed to allow access for additional traffic from outside the Property, the construction of the ultimate four -lane divided road section shall be required when the total trip volume exceeds 8,000 VPD on the Property(which ever first occurs?) G t.,4CkVt CA-to n) POOCO 3. The Applicant hereby proffers to provide for right -of -way dedication sufficient for the development of up to an 800 -foot wide diamond interchange or a single point urban interchange (SPUI) in the general location depicted on the proffered GDP. The 800 -foot wide diamond interchange or SPUI interchange design is intended to provide direct access to the Property through its intersection with Snowden Bridge Boulevard. The Applicant shall provide the right -of -way dedication to Frederick County within 90 days from the date of written notice by Frederick County of final engineering design approval for the 800 -foot wide diamond interchange or SPUI interchange design serving Route 37 within the Property. In the event that Route 37 is not developed, or if an alternative design is approved for Route 37 that is not on the Property subsequent to the right -of -way dedication, Frederick County agrees to have the right -of -way transferred back to the Applicant within 90 days from the date of this determination. 4 area depicted on the proffered GDP shall be available to Frederick County for a period of five years from the date of final non- appealable rezoning approval. 2. The Applicant hereby proffers to provide for a 225 -foot wide right -of -way dedication for the Route 37 corridor that is consistent with the Route 37 western bypass typical section on the Property. The Applicant shall provide this right -of- way dedication to Frederick County within 90 days from the date of written notice by Frederick County of final engineering design approval for the section of Route 37 within the Property. In the event that final engineering design approval for Route 37 is not obtained within the time period specified in Section D(1), the Applicant may either extend the time period or shall determine the location of the 225 -foot wide right -of -way dedication area for Route 37 within the corridor study area depicted on the proffered GDP. In the event that Route 37 is not developed, or if an alternative design is approved for Route 37 that is not on the Property subsequent to the right -of -way dedication, Frederick County agrees to have the right -of -way transferred back to the Applicant within 90 days from the date of this determination. Greenway Engineering August 24,2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 5. The Applicant hereby proffers to limit full commercial intersection access on Snowden Bridge Boulevard to establish up to three commercial intersections in the general location of intersections identified on the proffered GDP. An intersection has been identified on the proffered GDP that could potentially be developed as either a roundabout or as a signalized intersection if warranted by VDOT. All full commercial intersections identified on the proffered GDP will be developed with raised medians to provide for controlled left turn movement access to the Property. 6. The Applicant hereby proffers to allow for the full commercial intersection located on the east side of the Route 37 corridor study area to be closed entirely if necessary when Route 37 is developed by others throughout the limits of the Property. The closure of the full commercial intersection is conditioned upon the provision of street access to this portion of the Property from a new full commercial intersection on Snowden Bridge Boulevard located east of Milburn Road, which will traverse Milburn Road and will be developed by others during the construction of Route 37 throughout the limits of the Property. 7. The Applicant hereby proffers to prohibit direct commercial access from the Property to existing Milburn Road (Route 662). The County may determine that emergency access from to the Property from existing Milburn Road is acceptable provided that it is designed to prohibit access for regular vehicular traffic. 8. The Applicant hereby proffers to prohibit direct commercial access from the Property to existing Redbud Road (Route 661). Frederick County may determine that emergency access from to the Property from existing Redbud Road is acceptable provided that it is designed to prohibit access for regular vehicular traffic. 9. The Applicant hereby proffers to prohibit direct commercial access from the Property to McCann's Road (Route 838). Emergency access to the Property from McCann's Road is prohibited as well to protect the integrity of the buffer identified along this road. 10. The Applicant shall develop Snowden Bridge Boulevard as a public street; however, the Applicant shall have the ability to develop all internal streets as private street systems. All private streets shall be constructed to meet or exceed VDOT vertical base section standards. 11. The Applicant hereby proffers to provide for inter parcel connections where possible to mitigate transportation impacts to the full commercial intersections identified on the proffered GDP. 12. The Applicant submits that it will apply for all such public assistance mechanisms that are available at the time of development to facilitate the installation of the File #276000 Rezoning Proffer Statement Greenway Engineering August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 aforementioned transportation /infrastructure improvements. Those mechanisms include, but are not limited to, matching funds, industrial access funds and /or any other transportation /infrastructure funding vehicles, such as CDAs. Without binding any future legislative act, the Applicant and the Frederick County Board of Supervisors agree that the use of said mechanisms are advantageous to the development of the Property and the use of same should be encouraged and that both parties Could make all reasonable efforts to cooperate with one another to implement the appropriate mechanism or combination of mechanisms to ensure rapid installation of the afor entioned improvements. CL-PA C4c47)4 AOo (5 E. Fire and Rescue Monetary Contribution 1. The Graystone Office and Industrial Park has been demonstrated to provide a positive economic impact to Frederick County services by the Frederick County Development Impact Model. However, the Applicant intends to further support fire and rescue services through the provision of a monetary contribution in the amount of $0.05 per square foot of structural development for all land uses within the Property. This monetary contribution shall be provided to Frederick County for fire and rescue purposes prior to the issuance of a certificate of occupancy permit for each building permit issued within the Property. F. Signatures Graystone Corporation of Virginia The conditions proffered above shall be binding upon the heirs, executors, administrators, assigns and successors in the interest of the Applicants and owners. In the event the Frederick County Board of Supervisors grants this rezoning and accepts the conditions, the proffered conditions shall apply to the land rezoned in addition to other requirements set forth in the Frederick County Code. File #27600C Rezoning [Signatures on next page] Proffer Statement 6 Greenway Engineering Respectfully Submitted: File #2760GC Rezoning August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 Revised November 17, 2009 By: Do(V S14ocv Date: 2S Commonwealth of Virginia, City /County of To Wit: The foregoing instrument was acknowledged before me this day of 20 by My Commission Expires Registration No.: Notary Public Proffer Statement Greenway Engineering August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 GRAYSTONE CORPORATION OF VIRGINIA PROFFER STATEMENT REZONING: RZ# oq -o' Rural Areas District (RA) to Light Manufacturing District (M1) PROPERTY: 271.39± acres; Tax Parcels #43 -((A)) -158, 44- ((A)) -25, and 44- ((A)) -26, (here -in after the "Property RECORD OWNER: Graystone Corporation of Virginia APPLICANT: Graystone Corporation of Virginia (here -in after the "Applicant PROJECT NAME: Graystone Corporation Office and Industrial Park ORIGINAL DATE OF PROFFERS: August 24, 2009 REVISION DATE: October 9, 2009 Preliminary Matters Pursuant to Section 15.2 -2296 Et. Seq. of the Code of Virginia, 1950, as amended, and the provisions of the Frederick County Zoning Ordinance with respect to conditional zoning, the undersigned Applicant hereby proffers that in the event the Board of Supervisors of Frederick County, Virginia, shall approve Rezoning Application 0l -09 for the rezoning of 271.39± -acres from the Rural Areas (RA) District to 271.39± -acres to the Light Industrial (MI) District, development of the subject property shall be done in conformity with the terms and conditions set forth herein, except to the extent that such terms and conditions may be subsequently amended or revised by the Applicant and such be approved by the Frederick County Board of Supervisors in accordance with the said Code and Zoning Ordinance. In the event that such rezoning is not granted, then these proffers shall be deemed withdrawn and have no effect whatsoever. These proffers shall be binding upon this Applicant and their legal successors, heirs, or assigns. The Property, more particularly described as the lands owned by Graystone Corporation of Virginia (formerly Crider Shockey, Inc. of West Virginia), being all of Tax Map Parcels 43 -((A)) -158, 44- ((A)) -25, and 44- ((A)) -26, and further described by Instrument Number 030025588. (Please refer to Rezoning Application Deed Information). File #2760GC Rezoning Proffer Statement o CURRENT Greenway Engineering A. Generalized Development Plan August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 PROFFER STATEMENT 1. The Applicant hereby proffers to submit a Generalized Development Plan (the "GDP for the Property. The purpose of the GDP is to identify the general location of the M1 District office and industrial land bays, the general location of the future Route 37 corridor study area, the general location of the Snowden Bridge Boulevard urban four -lane divided collector road system with signalized intersection or roundabout design and limited entrance locations, the general location of on -site and off -site green space buffer areas, and the general location of the adjoining parcels that are within permanent protective easements. 2. The Applicant hereby proffers to develop the Property in substantial conformity with the proffered GDP, prepared by Greenway Engineering dated October 9, 2009. The GDP is recognized to be a conceptual plan and may be adjusted by the Applicant to accommodate final design and engineering constraints without the need of new conditional rezoning approval by the Frederick County Board of Supervisors, provided that the adjustments do not eliminate or substantially relocate the areas indicated on the proffered GDP. B. MI, Light Industrial District Land Uses Financial Institution Offices Medical Offices Research and Development Offices 2 1. The Applicant intends to develop the Property to implement industrial and office land uses that are designed to coexist in an office park setting. In order to ensure that the Property is developed to its maximum potential under the M1, Light Industrial District, the Applicant requests the Frederick County Board of Supervisors, by accepting this proffer, agrees that the M1 District is to be interpreted to include the following land uses: 2. The Frederick County Board of Supervisors agrees to allow future office and industrial land uses that are included within future amendments to the M1, Light Industrial District to be developed on the Property without the need for conditional zoning amendments. File #2760GC Rezoning Proffer Statement Greenway Engineering August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 C. Ml, Light Industrial District Design Standards 3 1. In order to ensure that the Property is developed to its maximum potential under the Ml, Light Industrial District, the Applicant requests the Frederick County Board of Supervisors, by accepting this proffer, agrees to allow a floor area to lot area ratio (FAR) of 2.0 for office building development. This FAR allowance will provide consistency with office building development currently permitted in the MS, Medical Support District as identified in §165 -98D of the Frederick County Code. 2. In order to ensure that the Property is developed to its maximum potential under the M1, Light Industrial District, the Applicant requests the Frederick County Board of Supervisors, by accepting this proffer, agrees to allow a maximum structural height of 90 feet for office buildings within the project. This structural height allowance will provide consistency with office building development currently permitted in the MS, Medical Support District as identified in §165 101A of the Frederick County Code. 3. In order to ensure that the Property is developed to its maximum potential under the M1, Light Industrial District, the Applicant requests the Frederick County Board of Supervisors, by accepting this proffer, agrees to allow a maximum structural height of 70 feet for automobile parking structures within the project. This structural height allowance will provide consistency with automobile parking structures currently permitted in the MS, Medical Support District as identified in §165-101B of the Frederick County Code. 4. The Applicant hereby proffers to establish an Architectural Review Board (ARB) to oversee and approve all structural design exterior treatments for new construction and structural additions to ensure high quality development throughout the project. Additionally, the ARB will oversee and approve all monument signage and building mounted signage, to ensure consistency in the design of signage throughout the project. 5. The Applicant hereby proffers to establish requirements for outdoor green areas and/or outdoor plaza areas for the benefit of employees of the office and industrial park. These outdoor green areas and outdoor plaza areas will be located within each of the M1 District land bay areas identified in the proffered GDP. 6. The Applicant hereby proffers to establish internal asphalt trails for the benefit of employees of the office and industrial park. These asphalt trails will be a minimum of eight feet in width and will be designed to connect land uses throughout the M1 District land bay areas identified in the proffered GDP wherever possible. File #2760GC Rezoning Proffer Statement Greenway Engineering August 24,2009 Revised September 23, 2009 Revised October 9, 2009 7. The Applicant hereby proffers to establish a 100 -foot green space buffer area along the northern boundary of the Property as depicted on the proffered GDP. This green space buffer area will be left in its natural state to provide viewshed mitigation for the Milburn Cemetery and the Helm- McCann springhouse. 8. The Applicant hereby proffers to provide for evergreen landscaping along the Redbud Road frontage of the Shenandoah Valley Battlefield Foundation property identified as a green space buffer area on the proffered GDP. The provision of this evergreen landscaping is to provide viewshed mitigation for this property and is conditioned upon a landscape easement being furnished by Shenandoah Valley Battlefield Foundation property owner. D. Transportation Enhancements 4 1. The Applicant hereby proffers to provide a corridor study area within the Property as depicted on the proffered GDP that is a minimum of 350 feet in width. The purpose of this corridor study area is to provide Frederick County with an opportunity to determine a final alignment for Route 37 through the completion of final engineering design throughout the limits of the Property. The corridor study area depicted on the proffered GDP shall be available to Frederick County for a period of five years from the date of final non- appealable rezoning approval. 2. The Applicant hereby proffers to provide for a 225 -foot wide right -of -way dedication for the Route 37 corridor that is consistent with the Route 37 western bypass typical section on the Property. The Applicant shall provide this right -of- way dedication to Frederick County within 90 days from the date of written notice by Frederick County of final engineering design approval for the section of Route 37 within the Property. In the event that final engineering design approval for Route 37 is not obtained within the time period specified in Section D(1), the Applicant may either extend the time period or shall determine the location of the 225 -foot wide right -of -way dedication area for Route 37 within the corridor study area depicted on the proffered GDP. In the event that Route 37 is not developed, or if an alternative design is approved for Route 37 that is not on the Property subsequent to the right -of -way dedication, Frederick County agrees to have the right -of -way transferred back to the Applicant within 90 days from the date of this determination. 3. The Applicant hereby proffers to provide for right -of -way dedication sufficient for the development of up to an 800 -foot wide diamond interchange or a single point urban interchange (SPUI) in the general location depicted on the proffered GDP. The 800 -foot wide diamond interchange or SPUI interchange design is intended to provide direct access to the Property through its intersection with Snowden Bridge Boulevard. The Applicant shall provide the right -of -way File #2760GC Rezoning Proffer Statement Greenway Engineering August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 5 dedication to Frederick County within 90 days from the date of written notice by Frederick County of final engineering design approval for the 800 -foot wide diamond interchange or SPUI interchange design serving Route 37 within the Property. In the event that Route 37 is not developed, or if an alternative design is approved for Route 37 that is not on the Property subsequent to the right -of -way dedication, Frederick County agrees to have the right -of -way transferred back to the Applicant within 90 days from the date of this determination. 4. The Applicant hereby proffers to construct Snowden Bridge Boulevard between the Property and Martinsburg Pike (U.S. Route 11 North), including the CSX bridge crossing, prior to the issuance of an occupancy permit for the first office or industrial site plan approved on the Property. The Applicant shall design and construct Snowden Bridge Boulevard as an urban four -lane divided collector road section (U4D) throughout the limits of the Property, and shall develop the off -site segment of Snowden Bridge Boulevard consistent with the approved public improvement plan. Snowden Bridge Boulevard shall be initially constructed as a two -lane road section, and shall be constructed as the ultimate four -lane divided road section prior to the issuance of the occupancy permit for the site plan that exceeds 8,000 VPD. In the event that Snowden Bridge Boulevard is developed to allow access for additional traffic from outside the Property, the construction of the ultimate four -lane divided road section shall be required when the total trip volume exceeds 8,000 VPD on the Property. 5. The Applicant hereby proffers to limit full commercial intersection access on Snowden Bridge Boulevard to establish up to three commercial intersections in the general location of intersections identified on the proffered GDP. An intersection has been identified on the proffered GDP that could potentially be developed as either a roundabout or as a signalized intersection if warranted by VDOT. All full commercial intersections identified on the proffered GDP will be developed with raised medians to provide for controlled left turn movement access to the Property. 6. The Applicant hereby proffers to allow for the full commercial intersection located on the east side of the Route 37 corridor study area to be closed entirely if necessary when Route 37 is developed by others throughout the limits of the Property. The closure of the full commercial intersection is conditioned upon the provision of street access to this portion of the Property from a new full commercial intersection on Snowden Bridge Boulevard located east of Milburn Road, which will traverse Milburn Road and will be developed by others during the construction of Route 37 throughout the limits of the Property. 7. The Applicant hereby proffers to prohibit direct commercial access from the Property to existing Milburn Road (Route 662). The County may determine that emergency access from to the Property from existing Milburn Road is acceptable provided that it is designed to prohibit access for regular vehicular traffic. File #2760GC Rezoning Proffer Statement Greenway Engineering August 24, 2009 Revised September 23, 2009 Revised October 9, 2009 6 8. The Applicant hereby proffers to prohibit direct commercial access from the Property to existing Redbud Road (Route 661). Frederick County may determine that emergency access from to the Property from existing Redbud Road is acceptable provided that it is designed to prohibit access for regular vehicular traffic. 9. The Applicant hereby proffers to prohibit direct commercial access from the Property to McCann's Road (Route 838). Emergency access to the Property from McCann's Road is prohibited as well to protect the integrity of the buffer identified along this road. 10. The Applicant shall develop Snowden Bridge Boulevard as a public street; however, the Applicant shall have the ability to develop all internal streets as private street systems. All private streets shall be constructed to meet or exceed VDOT vertical base section standards. 11. The Applicant hereby proffers to provide for inter parcel connections where possible to mitigate transportation impacts to the full commercial intersections identified on the proffered GDP. 12. The Applicant submits that it will apply for all such public assistance mechanisms that are available at the time of development to facilitate the installation of the aforementioned transportation/infrastructure improvements. Those mechanisms include, but are not limited to, matching funds, industrial access funds and/or any other transportation/infrastructure funding vehicles, such as CDAs. Without binding any future legislative act, the Applicant and the Frederick County Board of Supervisors agree that the use of said mechanisms are advantageous to the development of the Property and the use of same should be encouraged and that both parties will cooperate with one another to implement the appropriate mechanism or combination of mechanisms to ensure rapid installation of the aforementioned improvements. E. Fire and Rescue Monetary Contribution 1. The Graystone Office and Industrial Park has been demonstrated to provide a positive economic impact to Frederick County services by the Frederick County Development Impact Model. However, the Applicant intends to further support fire and rescue services through the provision of a monetary contribution in the amount of $0.05 per square foot of structural development for all land uses within the Property. This monetary contribution shall be provided to Frederick County for fire and rescue purposes prior to the issuance of a certificate of occupancy permit for each building permit issued within the Property. File #2760GC Rezoning Proffer Statement Greenway Engineering 1 August 24, 2009 1 Revised September 23, 2009 Revised October 9, 2009 F. Signatures Graystone Corporation of Virginia The conditions proffered above shall be binding upon the heirs, executors, administrators, assigns and successors in the interest of the Applicants and owners. In the event the Frederick County Board of Supervisors grants this rezoning and accepts the conditions, the proffered conditions shall apply to the land rezoned in addition to other requirements set forth in the Frederick County Code. Respectfully Submitted: By: onaco S7rncke PfQS;igt -I Commonwealth of Virginia, .city /County "/9��Itd /County of e To Wit: The foregoing instrument was ac k nowledged before me this G� day of 0e /Mot 2069 by I Lo/oa /c/SioA� lie My Commission Expires /39 207,2— Date: D(,f Cy Nota SUSAN D. STAHL NOTARY PUBLIC Commonwealth of Virginia Reg. #290874 My Commission Expires April 30 File #2760GC Rezoning Proffer Statement 7 JOB NO. 2760GC DESIGNED BY: WRS SCALE: 1" 900' DATE: 10/09/09 GENERALIZED DEVELOPMENT PLAN GRAYSTONE CORPORATION OF VIRGINIA STONEWALL MAGISTERIAL DISTRICT FREDERICK COUNTY, VA GREENWAY ENGINEERING, 151 Windy Hill Lane Winchester, Virginia 22602 Telephone: (540) 662 -4185 FAX: (540) 722 9528 www.greenwayeng.com Engineers, Surveyors En Services Fooununddeed d in n Environmental 1971 r 1 1 s r —.r 1�_�. o_. o q 830 f ��c' T X1 I 0 N: Ne w4s, 17 f err f re f r r r E` ,t\f/11,4 7/. Bo a c 21 m O c H m W z 0 0 m z W 0 m m C 6 2 H m 0 z m 30 0 c m CA.) V 0 0 30 30 0 .0 G7 c m O -b O ff. l 0 O D r O O) m. o 0 z m �i r G) m z 101a1SIC1 1.1A1