HomeMy WebLinkAbout07-09 Traffic Impact AnalysisA Traffic Impact Analysis of the Burns Valley Mill Road Located in: Frederick County, Virginia Prepared for: David Burns 1675 Fort Braddock Court Winchester, VA 22601 Prepared by: Patton Harris Rust Associates Eng nee Su rveyors. Planners. Landscape Architects. 10212 Governor Lane Blvd, Suite 1007 Williamsport, Maryland 21795 T 301.223.5010 F 301.223.6831 September 4, 2008 OVERVIEW Report Summary Patton Harris Rust Associates (PHR +A) has prepared this document to present the traffic impacts associated with the proposed Bums Valley Mill Road development to be located along the east of Valley Mill Road (VA Route 659), north of Martin Lane, in Frederick County, Virginia. The proposed development is to include a 3,500 foot fast -food restaurant with drive -thru. Access will be provided via Martin Lane located along the east side of the Valley Mill Road. The proposed development will be built -out over a single transportation phase by the year 2010. Analyses are provided for existing, 2010 background and 2010 build -out year conditions. Figure 1 is provided to illustrate the location of the proposed Burns Valley Mill Road development with respect to the surrounding roadway network. Methodology The traffic impacts accompanying the Burns Valley Mill Road development were obtained through a sequence of activities as the narratives that follow document: Assessment of background traffic including other planned projects in the area of impact, Calculation of trip generation for the proposed Burns Valley Mill Road development, Distribution and assignment of the Burns Valley Mill Road development- generated trips onto the completed roadway network, Analysis of capacity and level of service using the latest version of Synchro 7 for existing and future conditions. A Traffic /mpact Analysis of Burns Valley Mill Road Project Number: 15877 -1 -0 September 4, 2008 Page 1 F P HRA Figure 1 Vicinity Map: Burns Valley Mill Road, in Frederick County, VA A Traffic Impact Analysis of Burns Valley Mill Road Project Number: 15877 -1 -0 September 4, 2008 Page 2 EXISTING CONDITIONS PHR +A conducted weekday AM/PM and Saturday mid -day peak hour manual turning movement counts at the intersection of Route 7 (Berryville Pike)/I-81 Route 7 (Berryville Pike) /I -81 NB Rampslvalley Mill Road, Route 7 SB Ramps, (Berryville Pike) /Martin Lane, Route 7 (Berryville Pike) /Gateway Drive, Valley Mill Road /Dairy Corner Place and Valley Mill Road /Martin Lane. In order to determine the ADT (Average Daily Trips) along the study area roadway links, "k" factor (the ratio of PM peak hour traffic volumes to 24 -hour traffic volumes) of 7.7% was utilized based upon the published Virginia Department of Transportation (VDOT) 2006 traffic count data. Figure 2 shows the existing weekday and Saturday ADT as well as weekday AM/PM peak hour and Saturday mid -day peak hour traffic volumes at key locations within the study area. Figure 3 shows the existing lane geometry and weekday AM /PM peak hour and Saturday mid -day peak hour levels of service. Existing condition analysis is based upon VDOT signal dining. PHR +A has provided Table 1 to show the existing weekday AM /PM and Saturday mid -day peak hour levels of service and 95t percentile back of queue for each lane group. All traffic count data and Synchro level of service worksheets are included in the Appendix section of the report. A Traffic Impact Analysis of Burns Valley Mill Road PH Project Number: 15877-1-0 September 4, 4, 200 08 8 Page 3 No Scale 7I741(239)l74■ 114021(1057)645■0. r 1261(17)6 �Ulrtlhl 1229(4011128 4 999(1103)1111951 24(88)f811 1903 X0" ■434(52Al5131 rl I (2S)1421 .L�Ilf>M11 r Figure 2 it I1351(178156■0 181011928)981 ∎0 129X1(3611160■ 1 t( Existing Traffic Conditions Weekdaybuir Saturday ADT AM Peak Hour(PM Peak Hour)[SAT Peak Hour] A Traffic Impact Analysis of Burns Valley Mill Road Projcc1Numbcr: 15877 -1 -0 September 4, 2008 Page 4 1 ICI(B1B•■•0 Signalized J Signalized Intersection E 9 Intersection LOS. D[C11CI L05= 11(D)IDI o J o I'D(A)ICl L_. 0 r A r 4/ Unsigna !iced Intersection 3 Unsignalized Intersection Right In/Out Only dee 4 Signalized Intersection LOS- C(C)IBI Figure 3 Existing Lane Geometry and Levels of Service *1c1(C)C Unsignalized Intersection ).B(B11B1 Denotes Unsignalized Critical Movement AM Peak Hour(PM Peak Hour)[SAT Peak Hour] QChannelized Right turn -lane with 'STOP' condition rChannelized Right turn -lane with 'YIELD' condition NOTE: Analysis is based upon VDOT Signal Timing A Traffic Impact Analysis of Burns Valley Mill Road Project Number: 15877 -1 -0 September 4, 2008 Page 5 Intersection Traffic Control Lane Cr rip/ Approach AM Pm k Hour P31 Peak Hour Saturdav Peak Hour LOS Back of Queue LOS Back of Queue LOS Back of Queue Route 7 &1 -8158 Ramps /Shoney's Entrance Signalized EB /L C 126.0 B 123.0. 8 950! EB/T B 224.0 8 414.0 C 307.0 EB/I'R EB LOS 8 6 C 1 WB /L D 25.0 A 25.0 8 25.01 WB/f -lane 1 E 395.0 A 54.0 C 234.0 WBIT 1 ane2 WB/R A 25.0 A 25.0 A 25.01 WB LOS D A C 1 NB /LT D 28.0 E 75.0 D 63.01 NB /R C 25.0 C 36.0 C 25.01 NB LOS D D D 1 SB/I. F 449.0 E 387.0 E 303.0 SB/LT F 440.0 F 385.0 E 311.0 5B/R A 25.0 A 25.0 A 25.01 SB LOS F F E I Overall LOS D C C 1 Rou[e &I -81 NB RampsNalley Mill Road Signalized EB/L C 59.0 E 188.0 D 109.0 EB/f -Lane 1 D 352.0 C 357.0 C 271.0 EB/f -Ianc2 EB/R A 66.0 A 113.0 A 28.01 EB LOS (2 C C 1 WB/L C 29.0 C 41.0 B 25.01 WB/1'-Lane 1 D 418.0 E 746.0 E 608.0 1 WR/f -Lane 2 WB /R A 25.0 A 25.0 A 25.01 WB LOS C D D 1 NB /L F 464.0 F 540.0 E 371.0 NB/TR D 273.0 E 245.0 D 165.0 NB LOS F E 1 SB /L E 364.0 E 4450 E 298.0 SB /LT E 356.0 E 454.0 0 297.0 SB/R A 25.0 A 25.0 A 25.01 SB LOS D E D 1 Overall LOS D D D 1 Route Maron Lane Unsignalized El3ff EB/TR WB /1' -Lane 1 W B/f -lane 2 NB /R Route 7 Gateway Drive Signalized D 56.0 D 227.0 C 208.01 EB /LlLenc EB/M1Lanel B 671.0 A 213.0 A 33.0 EB/T -lane 2 ED LOS (2 B B 1 W B /LU D 35 0 E 28.0 D 38.01 WB/I' -Lapel B 9130 C 615.0 C 449.0 t WB/r -Larne 2 WB/R A 25.0 A 66.0 A 44.01 WB LOS B C C I SB /L -Lane 1 D 460 D 106.0 D 87.0 SB /I,-Lane. 2 SB/R-Lane 1 A 26.0 A 48.0 A 43.0 SB/R -lanc 2 SB LOS C C B Over 11 I,OS C C B Valley Mill Road Dairy Comer Place Unsignalized EB /LTR C 25.0 C 25.0 C 25.0 WB/LTR B 25.0 8 25.0 B 25.0 NB /L A 250 A 25.0 A 25.11 NB /TR SR/LLB A 25.0 A 25.0 A 25.0 Valley Mill Road &Martin Lane Unsignalized WB/LR B 25.0 B 25.0 B 25.0 NB/fR 58/LT A 25.0 A 25.0 A 25.0. Table 1 Burns Valley Mill Road Levels of Servi e and Back of Queue (95 %u) Results Existing Conditions Assumed 25 feet V hicle Length Minimum queue le gth assumed to be 25 feet 158 Eastbound, WB Westbound, NB Northbound. 813 Southbound L: Left,'Cfhm, k: Right A Traffic Impact Analysis of Burns Valley Mill Road Project Number: 15877 -1 -0 September 4, 2008 Page 6 2010 BACKGROUND CONDITIONS In order to determine the 2010 background traffic conditions, PHR +A grew the existing traffic volumes (shown in Figure 2) using a rate of 6% per year through Year 2010. There are no "planned" background developments located in the vicinitylof the site. Figure 4 shows the 2010 background weekday and Saturday ADT as well as weekday AM/PM peak hour and Saturday mid -day peak hour traffic volumes at key locations throughout the study area. Figure 5 shows the corresponding 2010 background lane geometry and AM /PM peak hour and Saturday mid -day peak hour levels of service. Table 2 is provided to show the 95 percentile back of queue and levels of service for each lane group during 2010 background conditions. Synchro levels of service worksheets are provided in the Appendix section of this report. A Traffic Impact Analysis of Burns Valley Mill Road Project Number: 15877 -1 -0 September 4, 2008 Page 7 No Scale 342110 704 433] 1270 1015 29 o [1967(269)196■ 1914111191)7245 1261(I7)6. g n osry 1 221U13 mmta -PRA r Figure 4 1 1■488(sx8115761 1 r11 (2 0 )2x]91 II(EB)54427 115211100)97 (9101(104IDUUi (312)405)1x0 LIoxu1 2571451)13 4••■ 895(1240012 r f Saturday ADT AM Peak Hour(PM Peak Hour)[SAT Peak Hour] 2010 Background Traffic Conditions A Traffic Impact Analvsis of Burns Valley Mill Road Project Number: 15877 -1 -0 .September 4. 2008 Page 8 No Scale No Improvements Required r HIZA Figure 5 signalized 2 Signalized Intersection Intersection IOS=C(C)I el LOS.D(EJIEI tA(A)IA] O t D( 11E1 2]I' ..Si454 Inters T) C j _C o` "Suggested Impresements" WN 1Ihru NR -1 Left SA -1 Left CICII C(Q(A) Unsignalized Intersection Right In/Out Onl No Improvements Required 4 n G 9 s. 5 A( m lcl t NgNIN vs Signalized Interaction LAS= A(R)IAI No Improvements Required 5 totOc 2010 Background Lane Geometry and Levels of Service Unsignalized Interaction Unsignaliced Interaction ?A(A No Improvements Required I] Denotes Improvements Denotes Unsignalized Cr'tical Movement AM Peak Hour(PM Peak Hour)[SAT Peak Hour] I'Channelized Right turn -lane with 'STOP' condition tChannelized Right turn -lane with 'YIELD' condition A Traffic Impact Analysis of B arns Valley Mill Road Project Number: 15877 -1 -0 September 4, 2008 Page 9 Intersection Traffic Control Lane Group/ Approach ASI Peak Hour PM Peak Hour Saturday Peak Hour LOS Back of Queue LOS Rack of Queue LOS Back or Queue Rome 7 1 -81 SB Runps/Shoney's Entrance Signalized EH /1- E 213.0 E 272.0 1) 157.0 EB/T C 282.0 C 492.0 C 345.0 EB/TR EB LOS C C C WB /L B 25.0 B 25.0 A 25.0 WWI-Lane 1 B 124.0 B 130.0 A 68.0 W B/f -Lanc 2 WB /k A 25.0 A 25.0 A 25.0 \VB LOS A t A NB/131 D 260 D 60.0 D 57.0 NB/R 0 25.0 B 30.0 B 25.0 NB LOS C SB/L E 3760 E 293.0 15 265.0 SB /LT I? 388.0 E 286.0 li 270.0 SB/R A 25.0 A 25.0 A 25. SB LOS D 0vv.111.0S C C C Route 7 1-81 NB Ratnps/Valley Mill Road Signalized EB/L E 109.0 B 199.0 D 1580 EB/RLanc 1 C 566.0 C 512.0 C 336.0 EH/P -Lane 2 EB/R A 25.0 A 25.0 A 25.0 EB LOS C C B WB/L D 37.0 E 107.0 D 780 WB/T -Lanc 1 C 260.0 O 424.0 B 250.0 WB /r -Lane 2 W B/1' -Lanc 3 WB /R A 25.0 A 25.0 A 25.0 WB I.OS C C B NB/L -lane 1 D 165.0 D 161.0 1) 137.0 NR /L Lanc 2 NB/TR E 277.0 D 2160 13 214.0 NB LOS D 1) 1 SB /L -Lane l E 295.0 E 254.0 D 2270 SB/L -lane 2 SH/1' D 76.0 D 1810 D 970 SB /R A 25.0 A 25.0 A 25.0 SR LOS D 1) 11 Oven 11 LOS C C C Route Martin Lane Unsignalized ER/I' EH/1'R WB/T -lane 1 W B/f -Lane 2 NB/R Route 7 Gateway Drive Signalized 1 I C 57.11 C 105.0 C 148.0 ER/I.-Lane 2 EB/T-lane 1 A 30.0 A 25.0 A 25.0 EB/T-Lane 2 Eft LOS r WB/LU D 34.0 D 25.0 D 35.0 WH/I' -Lane 1 A 2200 B 495.0 C 447.0 WR? -Lanc2 WB/R A 25.0 A 30.0 A 32.0 MR LOS A It C SR /L -lane 1 1) 500 D 91.0 1) 84.0 SR/L -Lanc 2 ,tilt /R -lane 1 B 290 B 47.0 A 44.0 .SIi /R -lane 2 Slt LOS C C C Over.11 I.OS A 11 It Valley Mill Road Dairy Comer Place Unsignalivcd GB /LTR C 25.0 C 25.0 C 250 WB /LTR 0 25.0 R 250 B 25.0 NR/L A 25.0 A 25.0 A 25.0 NB/FR A 25.11 A 25.0 A 25.0 SB /LTR A 25.0 A 25.0 A 25.0 Valley Mill Road Munn Laic Unsignaliud WB /LR B 25.0 B 250 C 25.0 NB/FR SB /LT A 25.0 A 25.0 A 25.0 Table 2 B trns Valley Mill Road Le 'els of Servi -e and Back of Queue (95 Results 2010 Background Conditions (w/ assumed Improvements) Assumed 25 tact Vehicle Length Mlnln um queue lc gth assumed to he 25 fm ER BastM>end, W31 Wesibourxl, NR Northbound. 813 Southhnund L: Left. T:Thru, k: Right A Traffic /mpaci Analysis of Burns Valley Mill Road Project Number: 15877- 1 -0 September 4, 2008 Page ID rr! Code Land Use Amount In A511'eak flour Out 'fool In PM Peak flour Out Total AOr In Sal Peak flour Out Total ADT 934 Past Food wt DT 3.500 SF 95 91 186 63 58 121 1.736 106 107 207 2.527 Sub -Tout 95 91 186 63 58 121 13736 106 102 207 2327 Pan -0r Tnpn40R 37 37 74 24 24 48 695 41 41 83 1,011 '1'mul "New'' lop 5fl 54 112 39 34 73 1,1142 64 68 124 1,516 TRIP GENERATION PHR +A determined the number of trips entering and exiting the site using equations and rates provided in the 7 Edition of the Institute of Transportation Engineers' (ITE) Trip Generation Report. Table 3 is provided to summarize the total trip generation associated with the proposed development. 2010 BUILD -OUT CONDITIONS Table Bunts Valley Mill Road Trip Generation Summary' TRIP DISTRIBUTION AND TRIP ASSIGNMENT The distribution of trips was based upon local travel patterns for the roadway network surrounding the proposed site. PHR+A utilized the trip distribution percentages shown in Figure 6 to assign the proposed Burns Valley Avenue development trips (Table 3) throughout the study area roadway network. Figure 7 shows the developmen generated AM/PM peak hour and Saturday mid -day peak hour trips and ADT assignments. The Burns Valley Mill Road assigned trips (Figure 7) were added t0 the 2010 background traffic volumes (Figure 4) to obtain 2010 build -out conditions. Figure 8 shows the 2010 build -out weekday and Saturday ADT as well as weekday AM /PM peak hour and Saturday mid -day peak hour traffic volumes at key locations throughout the study area network. Figure 9 shows the respective 2010 build -out lane geometry and weekday AM/PM peak hour and Saturday mid -day peak hour levels of service. Table 4 shows the 95 percentile back of queue and levels of service for each lane group during 2010 build out conditions. All Synchro levels of service worksheets are included in the Appendix section of this report. A Traffic Impact Analysis of Burns Valley Mill Road Project Number: 15877 -1 -0 September 4, 2008 Page 11 Trip Distribution Percentages A Traffic Impact Analvsis of Burns Valley Mill Road Project Number: 15877 -1 -0 September 4, 2008 Page 12 J 211(-12) -1■ X531(32147 0 1%— +mm.19(12(1.211 1 tits J 'Loant2( J 4■19(1211211 1221(14(29 r 7.511 1 Saturday ADT AM Peak Hour(PM Peak Hour)ISAT Peak Hour] PHA r Figure 7 Development- Generated Trips Assignment A Traffic Impact Analysis of Burns Valley Mill Road Project Number: 15877 -1 -0 September 4, 2008 Page 13 1498(594)158 1ma8951992)190 (11(2811421 0 00 60 1 it.o1u)P No Scale 1PMU249n96■ 1926111 041749 [2611t7) r Figure 8 P 11521(200)97■ 130 I1 1030 1084 1 1■ 25)(4 87(122713MS] 43022111311 ol 3 4e-‘‘ 2010 Build -out Traffic Conditions n'tWeek'diYiAD,TIZ Saturday ADT AM Peak Hour(PM Peak Hour)[SAT Peak Hour] A Traffic Impact Analysis of Burns Valley Mill Road Project Number: 15877 -1 -0 September 4, 2008 Page 14 No Improvements Required No Scale Signalized 2 Intersection LOS= CICIICI A kr li(A)IAI ICIICIC No Improvements Required -P r Figure 9 'JILL EC.-NC), Signalized 3 Intervvtion 1.0S= OIEIIOI ~(1II)II01 r 2 Signalized "Suggested t Intervetti n Imam rots" LOS= CC) CI )VII I TFru N -11.11 oat 1 Unsignalized Intersection }Ugh INOut Only No Improvements Required No Improvements Required n Denotes Improvements Denotes Unsignalized Critical Movement AM Peak Hour(PM Peak Hour)[SAT Peak (lour] frChannelized Right turn -lane with 'STOP' condition FChannelized Right turn -lane with 'YIELD' condition 2010 Build -out Lane Geometry and Levels of Service Unsigsmliud Intersection No Improvements Required A Traffic Impact Analysis of Burns 1 Vailev Mill Road Project Number: 15877 -1 -0 September 4, 2008 t'age 15 Intersection Traffic Control Lane Group/ Approach AM Pe k Hour PM Peak Hour Saturday Peak (lour LOS Back of Queue LOS Back of Queue LOS Back of Queue Route 7 1-81 SB Ramps /Shoncy's Entrance Signalized EB /L D 208.0 D 269.0 D 175.0 EB/r C 293.0 C 492.0 C 345.0 EB/rR EBLOS C C C WB /L 13 25.0 A 25.0 A 25.0 1 WB/P -Lane 1 C 270.0 B 148.0 B 165.0 W B/T -Lane 2 WB/R A 25.0 A 25.0 A 25.0 WB LOS It A A NB /Cr D 26.0 D 59.0 D 55.0 NB/R 8 250 B 31.0 B 25.0 1 NB LOS C 11 C S13/L E 384.0 E 301.0 E 294.0 SB/LT E 395.0 B 296.0 E 301.0 1 SB /R A 25.0 A 25.0 A 25.0 1 SU LOS D 1) D O.er II LOS C C C Rome 7& 1 -81 NB Ramps/Valley NI111 Road Signalized BI13/1, E 115.0 E, 198.0 E 155.0 EB/RLvnc 1 C 5400 C 498.0 C 386.0 EB/r -Lane 2 EB /R A 25.0 A 25.0 A 25.0 EBLOS C C C WB /L E 85.0 P 148.0 1) 111.0 WB/T -Lane 1 13 202.0 C 403.0 C 264.0 WB/T -Lane 2 W B/T -Lane 3 WB/R A 25.0 A 25.0 A 250 1 WB LOS C B NB/L.-Lune 1 C 164.0 D 169.0 D 154.0 NB /L -Lane 2 NB/TR E 340.0 E 254.0 1) 229.0 NB LOS D 1) D SB/L -Lane 1 P 295.0 D 245.0 E 228.0 1 SB/L-Lanc 2 SB/T E 106.0 E 212.0 0 106.0 1 SB/R A 25.0 A 25.0 A 25.0 SB LOS D D D Overall LOS C (3 C Rome 7 Martin Lane Unsignalized EB/T EB/IR WB/T -Innc 1 W B/T -Lane 2 NB/R Route 7 Gateway Drive Signalized EB /L -Lane 1 C 46.0 C 110.0 C 124.0 I EB /L-Lanc 2 EB/T-Lanc 1 A 70.0 A 250 A 25.0 EB/r -Lane 2 EB LOS A A WB/LU D 34.0 0 25.0 0 34.0 WB/I'- I,6. 1 B 32111 C 505.0 C 426.0 1 WB/T-Lane 2 WB/R A 25.0 A 31.0 A 27.0 Mt LOS 1 B 1 SB(L -Wncl D 44.0 D 89.0 D 84.0 SB/L-Lanc 2 58 /R -Lane 1 A 26.0 A 47.0 13 44.0 SB /R -Lane 2 SB LOS C C C Overall LOS B B H Valley Mill Road Dairy Comer Place Unsignalized EB /LTR C 25.0 C 25.0 0 25.0 WB/LTR 13 25.0 B 25.0 C 25.0 NB /L A 25.0 A 25.0 A 25.0 NB /iR A 25.0 A 25.0 A 25.0 SB /LTR A 250 A 25.0 A 25.0 Valley Mill Road &Martin Lane U nsignnlizcd WB/LR B 25.0 B 25.0 B 250 NB/TR SB /LT A 25.0 A 25.0 A 25.0 Table 4 Burns Valley Mill Road Le Ids of Servi e and Back of Queue (95 Results 2010 Build -out Conditions (wl assumed Improvements) Assumed 25 feet V hicle LengthI Minimum queue length assumed to he 25 fed ED Eastbound W 13 =Westbound, NB Northbound. 513 Southbound L Left, T:Thru. R: Right A Traffic Impact Analysis of Burns Valley Mill Road Project Number: 15877 -1 -0 September 4, 2008 Page 16 CONCLUSION Based upon Synchro analysis results, assuming the suggested improvements as shown in Figure 9, all the study area intersections associated with the proposed Burns Valley Mill Road development will maintain acceptable level of service "C" or better during 2010 build -out conditions. The following describes the improvements suggested for each of the study area intersections to maintain acceptable levels of service or better during 2010 build -out conditions: Route 7 (Berryville Pike)/I -81 NB Ramps /Valley Mill Road: This intersection will require a westbound through lane, a northbound left -turn lane and a southbound left turn lane. (Suggested improvements are necessary without the proposed Burns Valley Mill Road development to maintain levels of service "C NOTE: Funding source for the aforementioned improvements have yet to be identified. The applicant will work with VDOT /County to accommodate pedestrian and bicycle facilities adjacent to the site. A Traffic Impact Analysis of Burns Valley Mill Road Project Number: 15877 -1 -0 September 4, 2008 Page 17