Loading...
HomeMy WebLinkAbout02-09 Traffic Impact AnalysisA Traffic Impact Analysis of Bishop -Amari Parcels (Route 11 /O1d Charlestown Road) Located in: Frederick County, Virginia Prepared for: Mr. Thomas Amari 285 Baggess Lane, Winchester, VA 22603 Prepared by: Patton Harris Rust Associates End veers. Surveyors. Planners. Landscape Architects. 10212 Governor Lane Boulevard '�-y 1 HR A Suiie 1007 1 1 J Williamsport, Maryland 21795 T 301.223.4010 F 301 .223.6831 October 15, 2008 OVERVIEW Report Summary Patton Harris Rust Associates (PHR +A) has prepared this document to present the traffic impacts' associated with the proposed Bishop -Amari Parcels located along the east side of Route 11 (Martinsburg Pike), north of Old Charlestown Road, in Frederick County, Virginia. The proposed project is comprised of 15,000 square feet of specialty retail, a 16 -pumps gas station with convenience mart and a 5,000 square foot high- turnover restaurant. Access is to be provided via a right in /right out only site driveway located along the east side of Route 11 and a full- access site driveway located along the north side of Old Charlestown Road. The proposed development will be built -out over a single transportation phase by the year 2010. Figure 1 is provided to illustrate the location of the Bishop -Amari Parcels with respect to the surrounding roadway network. Methodology The scope of study provided in this report is based upon a scoping session with Virginia Department of Transportation (VDOT)/Frederick County staff on March 13, 2007. The traffic impacts accompanying Bishop -Amari Parcels development were obtained through a sequence of activities as the narratives that follow document: Assessment of background traffic including other planned projects in the area of impact, Calculation of trip generation for the Bishop -Amari Parcels, Distribution and assignment of the Bishop -Amari Parcels generated trips onto the study area road network, Analysis of capacity and level of service using SYNCHRO for existing and future conditions. A Traffic Impact Analysis of the Bishop -Amari Parcels October 15, 2008 Project Number: 15256 -1 -0 Page 1 No Scale r Figure 1 Vicinity Map: Bishop -Amari Parcels, in Frederick County, VA A Traffic Impact Analysis of the Bishop -Amari Parcels October 15. 2008 Project Number: 15256 -1 -0 Page 2 EXISTING CONDITIONS PHR +A conducted AM and PM peak hour manual turning movement counts at the intersection of US Route 11 /Old Charlestown Road. ADT (Average Daily Traffic) was established along each of the study area roadway links using an assumed "k" factor (the ratio of PM peak hour traffic volumes to 24 -hour traffic volumes) of 10%. Figure 2 shows the existing ADT and AM/PM peak hour traffic volumes at key locations throughout the study area. Figure 3 shows the respective existing lane geometry and AM/PM peak hour levels of service. All traffic count data and SYNCHRO levels of service worksheets are included in the Appendix section of this report. PHR +A has provided Table 1 to show the 95 percentile back of queue and levels of service for each lane group during existing conditions. A Traffic Impact Analysis of the Bishop -Milan Parcels October 15, 2008 Project Number: 15256 -1 -0 Page 3 No Scale -PHI--A r Figure 2 Existing Traffic Conditions AM Peak Hour (PM Peak Hour) A Traffic Impact Analysis of the Bishop-Amari Parcels October 15, 2008 Project Number: 15256 Page 4 No Scale PHA F E gure 3 AM Peak Hour (PM Peak Hour) Denotes Two -way Left turn lane Denotes critical unsignalized movement Existing Lane Geometry and Levels of Service ,4 Traffic hnpact Analysis of the Bishop -An ari Parcels October 15, 2008 Project Number: 15256 -1 -0 Page 5 Intersection Traffic Control Lane Group/ Approach AM Peak Hour PM Peak Hour LOS Back of Queue LOS Back of Queue Route I I Old Charlestown Road Unsignalized WB/LR C 57.0 D 58.0 NB/TR SB/L SB/T A 25.0 A 25.0 Table 1 Bishop -Amari Parcels (Route 11 /O1d Charlestown Road) Levels of Service and Back of Queue (95 Results Exi ting Conditions Assum d 25 feet Vehicle Length EB Eastbound, WB Westbound, NB Northbound, SB Southhound L: Left, T:Thru, R: Right Minimum queue length is assumed to be 25 feet A Traffic Impact Analysis of the Bishop- Antari Parcels October 15, 2008 Project Number: 15256 -1 -0 Page 6 2010 BACKGROUND CONDITIONS PHR +A increased the existing traffic volumes (Figure 2) along Route 11 and Old Charlestown Road using a growth rate of two percent (2 per year through Year 2010. Additionally, all trips relating to specific future "other developments" located within the vicinity of the proposed development were included. Based upon the 7 Edition of the Institute of Transportation Engineers' (ITE) Trip Generation Report PHR +A has provided Table 2 to summarize the calculated trips associated with each of the 2010 "other developments Figure A is provided in the Appendix section of the report to show the location of each of the background developments. Figure 4 shows the 2010 background ADT and AM/PM peak hour traffic volumes at key locations throughout the study area roadway. Figure 5 shows the corresponding 2010 background lane geometry and AM/PM peak hour levels of service. SYNCHRO levels of service worksheets are provided in the Appendix section of this report. PHR +A has provided Table 3 to show the 95 percentile back of queue and levels of service for each lane group during 2010 background conditions. A Traffic Impact Analysis of the Bishop -Amari Parcels October 15. 2008 Project Number: 15256 -1 -0 Page 7 Code Land Use Amount In AM Peak Hour Out Total In PM Peak Hour Out Total ADl' Rutherford Crossing 130 Industrial Park 215,000 SF 152 33 186 44 164 208 1,814 862 Home Impr. Superstore 117,000 SF 76 65 140 135 152 287 3.581 815 Discount Store 127,000 SF 73 34 107 321 321 643 7,115 814 Specialty Retail 187,147 SF 139 89 228 207 264 471 8,044 932 H -T Restaurant 5,000 SF 30 28 58 33 21 55 636 934 Fast Food w/ DT 4,500 SF 122 117 239 81 75 156 2,233 932 H -T Restaurant 4,800 SF 29 27 55 32 20 52 610 932 I-1-T Restaurant 5,500 SF 33 30 63 37 23 60 699 932 H -T Restaurant 7,200 SF 43 40 83 48 31 79 915 912 Drive -in Bank 4,100 SF 28 22 51 94 94 188 1,004 Total 725 485 1,210 1,031 1,165 2,197 26,652 Other Developments 730 FEMA 350 employees 190 24 214 86 191 277 2.713 812 Building /Lumber Store 15,000 SE 26 13 39 33 37 70 639 Total 216 37 253 119 228 347 3,352 Stephenson Village 210 Single Family Detached 429 units 77 232 310 255 144 399 4,290 220 Apartment 240 units 20 103 123 100 49 149 1,573 230 Townhouse /Condo 390 units 26 125 150 127 62 189 3,393 251 Elderly Housing Detach 266 units 29 51 80 78 44 123 1,064 253 Elderly Housing Attach 72 units 3 2 5 4 3 7 251 Total 155 513 667 564 302 866 10,570 Sempeles Property 130 Industrial Park 898,425 SF 459 101 559 154 580 734 5,204 820 Retail 73,500 SF 79 51 130 245 266 511 5,559 Total 538 152 689 399 846 1,245 10,763 North Stephenson (Omps Property) 110 Light Industrial 800,000 SF 752 103 855 118 863 981 5,874 Total 752 103 855 118 863 981 5,874 Adams Commercial 150 Warehousing 120,000 SF 78 17 95 19 57 75 792 151 Self- Service Storage 140,000 SF 12 9 21 18 17 35 334 710 Office 120,000 SF 191 26 217 36 177 213 1,535 812 Building/Lumber Store 25,000 SF 44 21 65 59 67 126 1,024 860 Wholesale Market 150,000 SF 41 34 75 14 17 32 1,010 Total 366 107 473 146 334 481 4,695 Assumed Phase I build -out for Year 2010 Assumed 75% build-out for Year 2010 Table 2 2010 "Other" Developments Trip Generation Summary A Tragic Impact Analysis of the Bishop -Anmri Parcels October 15, 2008 Project Number: 15256 -1 -0 Page 8 _pHRA r Figure 4 No Scale AM Peak Hour(PM Peak Hour) A'vcrage!Uiil3 Tnps P H R 2010 Background Traffic Conditions A Traffic Impact Analysis of the Bishop- Alnari Parcels October 15, 2008 Project Number: 15256 -1 -0 Page 9 r i H Figure 5 `SIgnIi ed' Infeireetlnn IAS =66 Proffered (by others Improvements" Signsliraxon WH. Nil 1 Night "Non- Proffered Suggested Improvement:" Nx -1 Thru AM Peak Hour (PM Peak Hour) Denotes Two -way Left turn lane Denotes critical unsignalized movement 2010 Background Lane Geometry and Levels of Service A Traffic Impact Analysis of the Bishop- Atnarl Parcels October 15, 2008 Project Number: 15256 -1 -0 Page 10 Intersection Traffic Control Lane Group/ Approach AM Peak Hour PM Peak Hour LOS Back of Queue LOS Back of Queue Route I I Old Charlestown Road Signalized WB /L WB /R E A 324.0 71.0 D A 212.0 48.0 WB LOS D C NB/T NB/T NB /R B A 146.0 25.0 C A 521.0 48.0 NB LOS B C SB /L SB/T A D 41.0 957.0 D B 239,0 482.0 SB LOS C C Overall LOS C C Table 3 Bishop -Amari Parcels (Route 11 /Old Charlestown Road) Levels of Service and Back of Queue (95 Results 2010 Background Conditions (w/ suggested improvements) Assum d 25 feet Vehicle Length EB Eastbound, WB Westbound, NB Northbound, SB Southbound L: Left, T:Thru, R: Right Minimum queue length is assumed to be 25 feet A Traffic Impact Analysis of the Bishop -Amari Parcels October 15, 2008 Project Number: 15256 -1 -0 Page 11 Code Land Use Amount In AM Peak Hour Out Total In PM Peak Hour Out Total ADT 814 Specialty Retail 15,000 SF 31 20 50 25 32 57 679 853 Conven. Mart w \pumps 16 pumps 137 137 275 154 154 308 8,682 932 H -T Restaurant 5.000 SF 30 28 58 33 21 55 636 Sub -total 198 185 382 212 207 420 9,997 40% Pass-by (Code 853) 55 55 110 62 62 123 3,473 Total "New" Trips 143 130 273 151 146 297 6,524 TRIP GENERATION The total trips produced by and attracted to the site were established using the 7 Edition of the Institute of Transportation Engineers' (ITE) Trip Generation Report. Table 4 is provided to summarizes the trip generation results for the proposed Bishop -Amari Parcels development. Table 4 Proposed Development: Bishop -Amari Parcels (Route 11 /OId Charlestown Road) Trip Generation Summary TRIP DISTRIBUTION AND TRIP ASSIGNMENT PHR +A utilized the trip distribution percentages shown in Figure 6 to assign the Bishop -Amari Parcels trips (Table 4) throughout the study area roadway network. Figure 7 show the corresponding development- generated AM/PM peak hour trips and ADT assignments. 2010 BUILD -OUT CONDITIONS The Bishop -Amari Parcels assigned trips (Figure 7) were added to the 2010 background traffic volumes (Figure 4) to obtain 2010 build -out conditions. Figure 8 show the 2010 build -out ADT and AM /PM peak hour traffic volumes at key locations throughout the study area roadway network. Figure 9 show the corresponding 2010 build out lane geometry and AM/PM peak hour levels of service. Tables 5a and 5b are provided to show the 95 percentile back of queue and levels of service for each lane group during 2010 build -out conditions to achieve the recommended levels of service "C" and "D respectively. All SYNCHRO levels of service worksheets are included in the Appendix section of this report. A Traffic Impact Analysis of the Bishop- Antari Parcels October 15, 2008 Project Number: 15256 -1 -0 Page 12 P Trip Distribution Percentages A Traffic Impact Analysis of the Hishop-Aniari Parcels October 15, 2008 Project Number: 15256 -1 -0 Page 13 r Figure 7 No Scale AM Peak Hour(PM Peak Hour) Average'!DailykTrips Development- Generated Trip Assignments A Traffic Impact Analysis of the Bishop -Amari Parcels October 15, 2008 Project Number: 15256 -1 -0 Page 14 No Scale pHRA r Figure 8 2010 Build -out Traffic Conditions AM Peak Hour(PM Peak Hour) �`Avtirase I)aly�T�ips, A Traffic Impact Analysis of the Bishop -Anmri Parcels October 15, 2008 Project Number: 15256 -1 -0 Page 15 r Figure 9 No Scale Signalized Intersection yoS�c(cF, "Non- Proffered Suggested Improvements NB -1 Thru WN 1 heft diachie∎re OS't>' d t iN 3 i t Signhliz di:' Inlersectiion LOS )(rh Pro fared (by others Improvements' Signalization VII, Na• 1 Right Signalized:. Inlersecdon LOS=C(U): "Non- Proffered Suggested Improvements" NB -1 Thru o ;achieve _G AESNAZIOW Unsignalized Intersection °0 r SITE y Unsignalized Intersection AM Peak Hour (PM Peak Hour) Denotes Two -way Left turn lane Denotes Turn-lane per VDOT requirement Denotes critical unsignalized movement 2010 Build -out Lane Geometry and Levels of Service A Traffic Impact Analysis of the Bishop -Amari Parcels October 15, 2008 Project Number: 15256 -1 -0 Page 16 Intersection Traffic Control Lane Group/ Approach AM Peak Hour PM Peak Hour LOS Back of Queue LOS Back of Queue Route 11 Old Charlestown Road Signalized (For LOS "C WB /L WB/L WB /R D A 187.0 70.0 D A 146.0 52.0 WB LOS C C NB/T NB/T NB/R A A 133.0 25.0 D A 563.0 71.0 NB LOS A C SB/L SB/T B C 152.0 1172.0 D B 328.0 364.0 SB LOS C C Overall LOS C C Old Charlestown Rd Site- Drive #1 Unsignalized EB/LT A 25.0 A 25.0 WB/TR SB /LR B 25.0 B 25.0 Route 11 Site -Drive #2 Unsignalized Right In/Out WB /R NB/T NB/R SB/T Table 5a Bishop -Amari Parcels (Route 11 /Old Charlestown Road) Level of Service and Back of Queue (95 Results 2010 Build -out Conditions (w/ suggested improvements for recommended LOS 'C') Assumed 25 feet Vehicle Length EB Eastbound, WB Westbound, NB Non bound, SB Southbound L: Left, T:Thru, R: Right Minimum queue length is assumed to be 25 feet A Traffic Impact Analysis of the Bishop- Arnari Parcels October 15, 2008 Project Number: 15256 -1 -0 Page 17 Intersection Traffic Control Lane Group/ Approach AM Peak Hour PM Peak Hour LOS Back of Queue LOS Back of Queue Route I I Old Charlestown Road Signalized (For LOS "D WB /L WB /R F A 500.0 68.0 E B 377.0 92.0 WB LOS D D NB/T NB/T NB/R A A 143.0 25.0 E A 587.0 72.0 NB LOS A D SB /L SB/T B D 169.0 1216.0 E B 351.0 427.0 SB LOS D C Overall LOS C D Old Charlestown Rd Site- Drive 1 Unsignalized EB /LT A 25.0 A 25.0 WB/TR SB /LR B 25.0 B 25.0 Route 11 Site -Drive #2 Unsignalized Right In/Out WB /R NB/T NB/R SB/T Table 5b Bishop -Amari Parcels (Route 11 /Old Charlestown Road) Levels of Service and Back of Queue (95 Results 2010 Build -out Conditions (w/ suggested improvements for recommended LOS 'D') Assumed 25 feet Vehicle Length EB Eastbound, WB Westbound, NB Northbound, SB Southbound L: Left, T:Thru, R: Right Minimum queue length is assumed to be 25 feet A Traffic Impact Analysis of the Bishop- Arnari Parcels October 15, 2008 Project Number: 15256 -1 -0 Page 18 TURN -LANE WARRANT ANALYSIS In order to determine the right -turn lane requirement along Route 11 during future (2010) traffic conditions at the study area intersections, right -turn lane warrant analyses was completed as per "VDOT Road Design Manual: Guideline for Right Turn Treatment". Accordingly, a northbound right -turn lane will be warranted along Route 11 at the intersection of Route I I/Site-Driveway #2 during 2010 build -out conditions. The aforementioned reference is provided in the Appendix section of this report. Existing Proposed Development Traffic Conditions For informational purposes, PHR +A has provided analysis for the existing proposed development generated traffic conditions to observe the traffic impacts of the proposed development on the study area network. Based upon Synchro analysis results, assuming the proffered (by others) improvements, all the study area intersections will maintain overall levels of service "B" or better. Figure B is provided in the Appendix section of the report to show the ADT and AM/PM peak hour traffic volumes. Figure.0 shows the corresponding existing proposed development AM/PM peak hour levels of service in the Appendix section of the report. The following reiterates the off -site roadway improvements recommended for each of the study area intersections: Route 11 /OId Charlestown Road: In order to achieve levels of service "C" or better, this intersection will require traffic signalization, a northbound right -turn lane and a westbound right -turn lane during 2010 build -out conditions. All of the aforementioned improvements are proffered by others at this intersection. A Traffic 6npact Analysis of the Bishop -Amari Parcels October 15, 2008 Project Number: 15256 -1 -0 Page 19 CONCLUSION Based upon Synchro analysis results, assuming the proffered improvements (by others) as well as non proffered improvements (suggested) shown in Figure 9; all the study area intersections will maintain levels of service "C" or better during 2010 build -out conditions. The following describes the off -site roadway improvements recommended for the intersection of Route I 1 /Old Charlestown Road: Proffered Improvements (by others): signalization one westbound right -turn lane one northbound right -turn lane In addition to the aforementioned proffered improvements, the following non proffered improvements are suggested at the intersection of Route 1 1/Old Charlestown Road to maintain levels of service "D" and "C respectively. Non Proffered (Suggested) Improvements (to achieve LOS "D one northbound through lane Non Proffered (Suggested) Improvements (to achieve LOS "C one westbound left -turn lane NOTE: Funding source for the aforementioned non proffered improvements have yet to be identified. The bicycle facility is planned for the west side of Route 11 and will not be accommodated adjacent to the site. However, the Proffer Statement provides a monetary contribution towards improvements associated with the Hopewell Road and Brucetown Road realignment. A Traffic Impact Analysis of the Bishop -Amari Parcels October 15, 2008 Project Number: 15256 -1 -0 Page 20