HomeMy WebLinkAbout01-09 Impact AnalysisIMPACT ANALYSIS STATEMENT SILVER LAKE, LLC REZONING Tax Map Parcels# 52- ((A)) -C, 52- ((A)) -50, 52- ((A)) -50A, 52- ((A)) -52, and 52- ((A)) -63 Aggregate Area of 370.02± acres Gainesboro Magisterial District Frederick County, Virginia Current Owners: Contact Person: Silver Lake, LLC James R. Wilkins, Jr. James R. Wilkins, III Evan A. Wyatt, AICP Greenway Engineering 151 Windy Hill Lane Winchester, VA 22602 540- 662 -4185 November 25, 2008 Revised February 19, 2009 Greenway Engineering General Information Location: North side of Northwestern Pike (U.S. Route 50 West); West of Retail Boulevard; and East of Poor House Road (Route 654) Magisterial District: Gainesboro Magisterial District Tax Map Parcel Numbers: 52- ((A)) -C, 52- ((A)) -50, 52- ((A)) -50A, 52- ((A)) -52, and 52- ((A)) -63 Current Zoning: RA, Rural Areas District Current Use: Residential, Radio Station Agricultural, and Unimproved Proposed Zoning: Proposed Use: Continuing Care Retirement Community Retail, Commercial and Office Total Area: 370.02± acres COMPREHENSIVE POLICY PLAN Silver Lake, LLC Rezoning MS, Medical Support District TM 52- ((A)) -50 B2, Business General District TM 52- ((A)) -C; 52- ((A)) -50A; 52- ((A)) -52 52- ((A)) -63 The Frederick County Board of Supervisors adopted revisions to the Round Hill Community Land Use Plan on November 17, 2007. This Comprehensive Policy Plan amendment incorporated approximately 481 acres of land within the Sewer and Water Service Area (SWSA) and established guiding principles for land use development within the rural community center and developing commercial areas. The 370.02± acres owned by Silver Lake, LLC were incorporated into the SWSA during the Comprehensive Policy Plan amendment process. The Applicants have submitted a rezoning application request that will allow for the development of a Continuing Care Retirement Community (CCRC) and the development of commercial retail and office land uses on the subject properties. The Applicants have proffered a Generalized Development Plan (GDP), which identifies the locations of these land use areas, as well as the comprehensive road network envisioned to facilitate traffic movement within this portion of the Round Hill Community. Additionally, the development of the subject properties will facilitate the extension of public water and sewer service further into the Round Hill Community and will provide an opportunity for the relocation of the Round Hill Volunteer Fire and File #4928S 2 Greenway Engineering SUITABILITY OF THE SITE Existing Conditions Floodplains Silver Lake, LLC Rezoning Rescue Company. The proposed rezoning application for the 370.02± acre subject properties has been designed to implement the land use, transportation, public utilities and public facilities needs identified in the Round Hill Community Land Use Plan. Therefore, the Applicants rezoning application is in conformance with the Comprehensive Policy Plan. The subject properties consist primarily of open fields and woodlands with rolling and moderately sloped terrain. These properties are not in active agricultural land use and are primarily unimproved with the exception of two residential structures that are utilized as rental units, a small commercial structure that was previously utilized as a radio station, and the foundation and some side walls of a large residential structure that appears to have been constructed prior to 1937 and has been dilapidated since 1950. All of these structures will be removed over the course of development of the subject properties to accommodate the construction of internal road systems and commercial and office land bays. All existing structures will be permitted with the Frederick County Building Inspections Department to ensure that asbestos inspections and removal occurs and that all necessary measures are accomplished prior to demolition. The subject properties are identified on FEMA NFIP Maps 510063- 0105 -B and 510063 0115-B. FEMA NFIP Map 510063 -0115B indicates that floodplain areas exist on tax parcels 52- ((A)) -C and 52- ((A)) -50, totaling approximately 30.67 acres. These floodplain areas are located in the central portion of the overall site development area and are associated with a large drainage area, which goes under Northwestern Pike to Abram's Creek. The conceptual land plan directs land bay development away from the floodplain areas; however, some impacts to this environmental feature will be realized through the construction of the east -west collector road identified within the Comprehensive Policy Plan Round Hill Land Use Plan. Additionally, minor impacts will occur within the identified floodplain area necessary to implement regional stormwater management, as well as a recreational trail system proposed within the park area identified around the pond near Northwestern Pike. The projected impacted floodplain areas will be provided on the Master Development Plan to ensure compliance with County ordinance requirements. File #49285 3 Greenway Engineering Wetlands The National Wetlands Inventory Map identifies wetland areas in the western, central, and southern portions of the subject properties. The Applicants have conducted a detailed Wetlands Delineation Study prepared by Greenway Engineering, dated November 6, 2007 for the entire project site. The Applicants have received a Jurisdiction Determination Letter from the U.S. Army Corp of Engineers, which identifies the approved wetland areas on the subject properties. These areas are delineated on the Silver Lake, LLC Property Environmental Features Map Exhibit that is included with this analysis. Additionally, a copy of the Wetlands Delineation Study and the Jurisdiction Determination Letter has been included with this analysis. The projected impacted wetlands areas will be provided on the Master Development Plan to ensure compliance with all Federal, State, and local requirements. Steep Slopes The subject properties contain minor areas of steep slope as defined, which are located primarily along the defined floodplain areas located within the central portion of the site. It is anticipated that there will be minor impacts within the defined steep slope areas primarily due to the construction of public utilities. The projected impacted steep slope areas will be provided on the Master Development Plan to ensure compliance with County ordinance requirements. The subject properties have pronounced slopes located primarily is the northern portion of the site in the area that will be developed as a Continuing Care Retirement Community (CCRC). These areas do not meet the County definition of steep slopes; however, substantial filling will need to occur within the disturbed portions of these slopes to accommodate the CCRC. All areas of compacted fill will be certified through geotechnical analysis during the site development process and all reports will be furnished to the County for verification of this work. Mature Woodlands Silver Lake, LLC Rezoning The subject properties are predominately covered with mature woodlands located within the northern, central, and eastern portions of the 370.02+ acre site. The conceptual land plan for the subject properties identifies areas in which mature woodlands can be preserved, which include buffer areas, floodplain areas, and substantial areas within the proposed Continuing Care Retirement Community (CCRC) area. The Frederick County Zoning Ordinance allows for disturbance of mature woodland areas to implement planned development areas within the Sewer and Water Service Area (SWSA) and establishes replanting requirements to mitigate this impact. Therefore, the Applicants will be able to address these requirements and will identify the location of mature tree preservation areas on the Master Development Plan. File #4928S 4 Greenway Engineering Soil Types The Soil Survey of Fredrick County, published by the USDA Soil Conservation Service and the Frederick County GIS Database was consulted to determine soil types contained in this tract. The 370.02+ acre properties contain the following soil types: 7C Carbo- Oaklet -Rock Outcrop Complex, 2 -15% slopes 14B Frederick Poplimento Loams, 2 -7% slope 14C Frederick Poplimento Loams, 7 -15% slope 16C Frederick- Poplimento Loams, very rocky, 7 -15% slope 17C Frederick- Poplimento -Rock Outcrop Complex, 2 -15% slope 17E Frederick Poplimento -Rock Outcrop Complex, 15 -45% slope 20B Guernsey Silt Loams, 2 -7% slope 29 Massanetta Loams 32B Oaklet Silt Loams, 2 -7% slope 33C Opequon- Chilhowies Silty Clays, very rocky, 3 -15% slope 34 Pagebrook Silt Loams 35 Pagebrook Silty Clay Loams Table 5 of the Soil Survey identifies soil types 14B, 20B, and 32B as prime farmland soils. These soil types exist primarily in the northern and western portions of the subject site. The proposed development plan identifies these areas for commercial land use and the CCRC land use. Table 10 of the Soil Survey identifies all soil types as moderate to severe for the development of roads and commercial structures due to shrink -swell potential and soil strength. Soils testing and compaction testing are standard practice for development projects and road construction; therefore, reports verifying soils suitability will be conducted throughout the development of the subject site. The soil types are associated with limestone geology, which underlies the subject properties. Limestone geology needs to be treated with care during site development to ensure that solution channels and sinkholes are identified prior to site disturbance and are designed to prevent infiltration of pollutants. The Applicant will incorporate narratives on the Master Development Plan that commit to geotechnical analysis during the site plan process to determine the location of sink holes, solution channels and other karst features and submit reports to the County Engineer for review and approval of the proposed treatment of these features as a condition of land disturbance. File #49285 Silver Lake, LLC Rezoning Greenway Engineering Silver lake, LLC Rezoning SURROUNDING PROPERTIES The zoning and land uses for adjoining parcels are as follows: North: Zoned RA, Rural Area District Use: Orchard; Agricultural; Unimproved South: Zoned RA, Rural Area District Use: Residential; Church Academy Unimproved Zoned B2, Business General District Use: Convenience Store; Motel; Residential East: Zoned RA, Rural Areas District Use: Orchard; Agricultural Unimproved Zoned B2, Business General District Use: Orchard Unimproved West: Zoned RA, Rural Area District Use: Residential Agricultural The subject properties adjoin several properties to the north and east that are primarily utilized for orchard and other agricultural land use, while adjoining properties to the south and west are primarily utilized for residential and small commercial land use. The majority of the active orchards in proximity to this site are owned and operated by Fruit Hill Orchard who operates an existing wastewater pond immediately north of the subject properties. The development of the proposed Continuing Care Retirement Community (CCRC) will occur near this wastewater facility; therefore, development plans will include the preservation of perimeter mature woodlands and established grading limits to ensure that there is no impact to this facility as a result of the development of this site. TRANSPORTATION The 370.02+ acre subject site has approximately 2,400 linear feet of frontage along Northwestern Pike (U.S. Route 50) and approximately 1200 linear feet of frontage along Poor House Road (Route 654). The Round Hill Land Use Plan recommends regional transportation improvements along the Northwestern Pike corridor, as well as on the north side of this corridor that traverse the subject site. The Round Hill Land Use Plan recommends travel lane and signalization needs associated with development in the study area; however, this has not been quantified through traffic modeling based on various land use assumptions. Therefore, the Applicants have prepared a detailed traffic impact analysis statement in order to determine the projected impacts associated with the proposed development of a CCRC and commercial retail and office land use on the subject site. File 1149285 6 Greenway Engineering Silver Lake, LLC Rezoning A Traffic Impact Analysis (TIA) has been prepared for the Silver Lake, LLC properties by Patton Harris Rust Associates, dated November 25, 2008, which is included as a component of the Impact Analysis Statement. The TIA assumes the total build -out of the Continuing Care Retirement Community (CCRC); 583,050 square feet of commercial retail; and 494,600 square feet of office land use that is developed over a four -phase study. The TIA studies turning movements and capacities at five intersections along the Northwestern Pike (U.S. Route 50 West) corridor, as well as the northbound and southbound on and off ramps at the Route 37 interchange. The TIA provides for a Level of Service (LOS) analysis for AM and PM peak hour weekday and Saturday traffic volumes. as well as Average Daily Trip (ADT) volumes for existing, background, and build -o`uf` conditions for each transportation phase. Additionally, the TIA provides recommended improvements to the regional transportation network that will mitigate the impacts associated with the build -out of the 370.02± acre properties and improve the LOS at all studies intersections, which are the result of background traffic impacts. Phase 1 of the TIA accounts for background projects agreed upon during the project scoping with VDOT and Frederick County, and includes the development of 570 units within the CCRC and 180,000 square feet of commercial retail on the 370.02± subject site. The TIA modeling demonstrates that deficiencies occur at several of the intersections due primarily to existing traffic and projected background traffic conditions. The TIA provides for suggested improvements to the regional transportation network during the Phase 1 development of the subject site to create acceptable LOS at these intersections. These improvements include new traffic signalization at the intersection of Northwestern Pike and Poor House Road, new traffic signalization and turn lane improvements at the intersection of Northwestern Pike and Spinning Wheel Lane, and improvements to the Route 37 southbound off ramp to establish a free flow right turn condition onto Northwestern Pike. Phase 2 of the TIA builds on the assumptions utilized in Phase 1 through a 2% annualized increase in traffic volumes within the study area through the year 2018. Additionally, Phase 2 increases development on the 370.02± acre subject site to account for an additional 170,000 square feet of commercial retail and 105,000 square feet of office land use. The TIA modeling demonstrates that deficiencies occur at two of the intersections not impacted during the Phase 1 analysis. The TIA provides for suggested improvements to the regional transportation network during the Phase 2 development of the subject site to create acceptable LOS at these intersections. These improvements include new signalization and turn lane improvements at the intersection of Northwestern Pike and Silver Lake Road, the development of a two -lane east -west road system that connects Spinning Wheel Lane to Retail Boulevard, improvements to the Route 37 northbound off ramp to provide for a second right turn lane, and the development of a third westbound travel lane on Northwestem Pike under the Route 37 bridge structure. Phase 3 of the TIA builds on the assumptions utilized in Phase 2 through a 2% annualized increase in traffic volumes within the study area through the year 2020. Additionally, Phase 3 increases development on the 370.02± acre subject site to account for an File #4928S 7 Greenway Engineering additional 140,000 square feet of commercial retail and 245,000 square feet of office land use. The TIA does not demonstrate additional deficiencies at any of the intersections within the study area. The TIA provides for two suggested improvements to the regional transportation network during the Phase 3 development of the subject site. These improvements include the provision of a second right turn lane on Spinning Wheel Lane at the intersection of Northwestern Pike, and the extension of the east -west road system to connect with Poor House Road (Route 654). Phase 4 of the TIA builds on the assumptions utilized in Phase 3 through the build -out of background projects agreed upon during the project scoping with VDOT and Frederick County, a 2% annualized increase in traffic volumes within the study area through the year 2022, and includes the complete build -out of the CCRC and the complete build -out of the commercial and office center, accounting for an additional 93,050 square feet of commercial retail and 144,600 square feet of office land use on the 370.02± subject site. The TIA does not demonstrate additional deficiencies at any of the intersections within the study area. The TIA provides for four suggested improvements to the regional transportation network during the Phase 4 development of the subject site. These improvements include the provision of a second left turn lane on Silver Lake Road at the intersection of Northwestern Pike, the provision of a second left turn lane on Botanical Boulevard at the intersection of Northwestern Pike, the development of a third westbound travel lane on Northwestem Pike between Silver Lake Road and Poor House Road, and the development of a third eastbound travel lane on Northwestern Pike from Retail Boulevard through the Route 37 overpass bridge. .SEWAGE CONVEYANCE AND TREATMENT The 370.02* acre subject property is located within the Round Hill Community Sewer and Water Service Area (SWSA). A public sewer system including a sewer pump station and 8" sanitary sewer force main exists to the east of the subject property, which serves the existing commercial development on the north side of Northwestern Pike (U.S. Route 50 West). Analysis of this system indicates that there is sufficient capacity to serve the CCRC and commercial land uses identified in the Phase 1 portion of the traffic impact analysis statement. The Applicant has worked with the Director of the Frederick County Sanitation Authority (FCSA) to determine the projected needs and collection system requirements for the remaining phases of development identified in the traffic study for the subject property, as well as the needs for the Round Hill Community. Based on comparable discharge patterns, the Frederick County Sanitation Authority (FCSA) has determined that 700 gallons /day per acre is a reasonable guide for estimating the sewer impact for the commercial, office and CCRC land uses. Q 700 gallons /day /acre Q 700 GPD x 370.02± acres Q 259,014 GPD projected at project build -out Silver Lake, LLC Rezoning File *49285 8 Greenway Engineering Silver Lake, LLC Rezoning The proposed build -out of the 370.02+ subject property is estimated to add 259,014 gallons per day to the public sewage conveyance system. The development of land uses in the first phase will direct effluent to the Opequon Water Reclamation Facility (OWRF) through the existing pump station and sewer force main system. The design capacity of the treatment plant is 8.4 million gallons per day (MGD) during summer months and 16.0 MGD during winter months, of which approximately 6.8 MGD of capacity is currently being utilized. The Applicant will work with the FCSA on all agreements necessary to implement the regional infrastructure sufficient in size and capacity to serve the 370.02+ acre site and the Round Hill Community. This regional infrastructure will include on -site collection systems that transfer sewer through gravity, pump stations, and force mains routed along the Abram's Creek drainage area that provide conveyance to the Parkins Mill Wastewater Treatment Facility. The Parkins Mill Wastewater Treatment Facility is currently under expansion to create a 5- million gallons per day (MGD) facility. The 5 MGD expansion of the Parkins Mill Wastewater Treatment Facility is projected to be complete in 2009, which will provide adequate capacity for sewage treatment. The Applicant will direct all effluent from the 370.02+ acre site to the Parkins Mill Wastewater Treatment Facility upon completion of the regional infrastructure improvements described above. WATER SUPPLY The 370.02+ acre subject property is located within the Round Hill Community Sewer and Water Service Area (SWSA). A public water system including a 20" water transmission line and a 4 MGD water storage tank exist to the north and east of the subject property, which serves the existing commercial development on the north side of Northwestern Pike (U.S. Route 50 West). Analysis of this system indicates that there is sufficient capacity to serve the CCRC and commercial land uses identified in the Phase 1 portion of the traffic impact analysis statement. The Applicant has worked with the Director of the Frederick County Sanitation Authority (FCSA) to determine the projected water capacity and fire flow needs for the remaining phases of development identified in the traffic study for the subject property, as well as the needs for the Round Hill Community. Based on comparable consumption estimates, the Frederick County Sanitation Authority (FCSA) has determined that 1,000 gallons /day per acre is a reasonable guide for estimating the water impact for the commercial, office and CCRC land uses. The figures below represent the impact that the total build -out of the proposed land uses will have on the water supply and treatment systems. Q 1,000 gallons /day /acre Q 1,000 GPD x 370.02+ acres Q 370,020 GPD projected at project build -out File #4928S 9 Greenway Engineering The proposed build -out of the 370.021 subject property is estimated to require 370,020 GPD of public water service for the commercial, office and CCRC land uses. The FCSA water transmission system provides water service to this area of the community via the Stephens City quarry system from the James H. Diehl Water Filtration Plant and the Clearbrook quarry system from the North Water Filtration Plant. These systems currently provide 6.0 MGD and can be increased to 10 MGD. The Applicant will work with the FCSA on all agreements necessary to implement the regional infrastructure sufficient in size and capacity to serve the 370.02± acre site and the Round Hill Community. This regional infrastructure will include water transmission lines and elevated water storage that will accommodate the needs of the FCSA to service the portions of the Round 11111 Community. The on -site water infrastructure required to convey potable water to the proposed commercial, office, and CCRC land uses will be developed by the Applicant to standards acceptable to the FCSA for future operation and maintenance. DRAINGE The 370.02± acre subject site is naturally divided into 3 distinctive drainage areas, which direct drainage from the north, east, and west towards the central portion of the site. The site directs drainage from the central portion of the site to the southeast to a large pond that is visible from Northwestern Pike (U.S. Route 50 West). The developed portions of the site for both the CCRC and the commercial retail and office land uses are proposed to be designed as a regional stormwater management system. This system will include a series of smaller drainage structures and the large pond, which are designed to promote stormwater quality and quantity to meet State and local regulations. The general location of the structures that will be utilized for this regional system will be provided on the Master Development Plan for the subject site. The underlying limestone geology may require the design of impervious liners for the proposed regional stormwater management system to ensure that infiltration of stormwater and pollutants is avoided. The Applicant will incorporate narratives on the Master Development Plan that commit to geotechnical analysis during the site plan process to determine the appropriate design measures for stormwater management facilities that will be submitted to the County Engineer for review and approval prior to land disturbance activities. SOLID WASTE DISPOSAL Silver Lake, LLC Rezoning The impact on solid waste disposal facilities can be projected from an average annual business consumption of landfill volume of 5.4 cubic yards per 1,000 square feet of structural floor area and an average annual residential consumption of 5.4 cubic yards per household (Civil Engineering Reference Manual, 4 edition). The following figures File 449285 10 Greenway Engineering Silver Lake, LLC Rezoning show the increase in average annual volume based on the 1,077,650 square feet of commercial and office land use, and the CCRC independent living, assisted care and skilled care residential units that are projected to develop over a 14 -year period: AV 5.4 Cu. Yd. per 1,000 square feet AV 5.4 Cu. Yd. x 1,077 (1,000 square feet) AV 5,815 Cu. Yd. at commercial build- out/yr, or 4,070 tons /yr at build -out AV 5.4 Cu. Yd. per household AV 5.4 Cu. Yd. x 1,048 CCRC residential units AV 5,659 Cu. Yd. at CCRC build -out, or 3,961 tons /yr at build -out TOTAL AV 8,031 tons /yr 14 -yr build -out 573 ton annual increase at build out The Municipal Solid Waste area of the Regional Landfill has a current remaining capacity of 13,100,000 cubic yards of air space. The projected 14 -year build -out of the subject site will generate on average 573 tons of solid waste annually. This represents a 0.28% increase in the annual solid waste received by the Municipal Solid Waste area of the Regional Landfill, which currently averages 200,000 tons per year. The complete build -out of the commercial retail, office, and CCRC is projected to increase the solid waste received by the Municipal Solid Waste area of the Regional Landfill by 4.0% annually. The commercial retail, office, and CCRC land uses will utilize commercial waste haulers for trash pickup service; therefore, transportation and increased volume impacts at the citizen convenience centers will be mitigated and tipping fees will be generated that will create a continuous revenue source for the Regional Landfill by the proposed project. HISTORICAL SITES AND STRUCTURES The Frederick County Rural Landmarks Survey does not identify structures on the 370.02± -acre site that are deemed potentially significant. Three sites within close proximity are identified as potentially significant, which include the I- Iodgson House #34 -93), the Hodgson -Abner House #34 -94), and Walnut Grove #34 -98); however, none of these sites are identified as properties that are potentially eligible for the state and national register of historic places. Additionally, the National Park Service Study of Civil War Sites in the Shenandoah Valley identifies the southwestern portion of the 2nd Winchester Core Battlefield area (Phase 6) located adjacent to the subject site. The three sites identified above are all utilized as private residences. The Hodgson House is the only structure that is visible from the project site; however, it should be noted that this structure has been modified to accommodate the residential land use. The portion of the subject site near the Hodgson House is proposed as commercial land use; File H4928S I I Greenway Engineering IMPACT ON COMMUNITY FACILITIES Fire and Rescue Parks and Recreation Silver Lake, LLC Rezoning therefore, the County Zoning Ordinance will require buffering and screening between the proposed land use and the existing residential land uses to mitigate visual impacts. The southwestern portion of the 2 °d Winchester Core Battlefield area (Phase 6) is located on adjacent properties that have been incorporated into the County's Sewer and Water Service Area (SWSA); therefore, it is anticipated that these adjoining properties will develop in the future. The identified core battlefield adjoins the portion of the 370.02± acre site that is proposed as a CCRC. The development of a CCRC will require buffering and screening against the adjoining property due to the current agricultural land uses. The Master Development Plan for the CCRC will utilize the existing mature woodland areas to provide for buffering and screening; therefore, this will mitigate visual impacts to the southwestern portion of the core battlefield area on the adjoining properties. The development of commercial retail and office and a Continuing Care Retirement Community will create an impact to fire and rescue services in this area of the community. The Applicant has provided for this impact through a proffer that provides land to Frederick County for the development of a new fire and rescue station and support facilities serving the Round Hill Community. The Applicant's proffer calls for the dedication of land fronting on Silver Lake Road that is located near the intersection of Northwestern Pike (U.S. Route 50 west), which is a minimum of three acres and a maximum of four acres in size. Additionally, the Applicant has proffered to provide a monetary contribution to Frederick County in the amount of $1,000,000.00 for the development of a new fire and rescue station providing service to the Round Hill Community, to develop the necessary access and infrastructure to the new facility if it is located on the project site, and to design proffered traffic signalization with preemption technology. Should the new fire and rescue station providing service to the Round Hill Community be developed at another location, the Applicant has proffered to provide an additional $100,000.00 for the development of this facility. Therefore, the Applicant's proffer statement more than adequately addresses impacts to fire and rescue services. The Applicant proffered land to Frederick County to provide a 10 -acre site located along Northwestern Pike around an including the existing pond feature to provide for public recreational opportunities consistent with the Comprehensive Policy Plan. The Frederick County Parks and Recreation Board considered this request during their January 2009 meeting and decided not to accept this proffered site. The Applicant has incorporated a complete network of trail systems and sidewalks that will link all commercial and office land uses and the Continuing Care Retirement Community (CCRC) to create a walkable File #4928S 12 Greenway Engineering Educational Facilities General Government Silver Lake, LLC Rezoning campus design for the subject properties. Additionally, the CCRC will be developed with a wellness center and other on -site services to meet the recreational needs of their community. Therefore, the development of this project will not have a negative impact to parks and recreation services. The development of commercial retail and office and a Continuing Care Retirement Community will not impact public school facilities or operations. The County will receive revenues from the commercial and office development, which will assist in the annual budget necessary to fund public schools. The development of commercial retail and office and a Continuing Care Retirement Community will not impact general government facilities or operations. The County will receive revenues from the commercial and office development, which will assist in the annual budget necessary to fund general government services. File 449285 13 Silver Lake, LLC Property -Ac s Management Regulations Exception J? quest Approval Page 1 of 1 Evan Wyatt From: Funkhouser, Rhonda [Rhonda.Funkhouser @VDOT.Virginia.gov] on behalf of Smith, Matthew, P.E. [Matthew.Sm ith vdot.virgin ia.gov] Sent: Friday, February 13, 2009 1:54 PM To: Evan Wyatt Cc: John Bishop; Smith, Matthew, P.E.; Hoffman, Gregory; Copp, Jerry; Eric Lawrence Subject: Silver Lake, LLC Property Access Management Regulations Exception Request Approval Evan, A VDOT review has been conducted on the subject project's Access Management Regulations Exception Request. The proposed signalized intersection spacings for the Silver Lake Development along Route 50 West have been approved. The approved spacings are approximately 2,070' between Retail Boulevard and proposed Silver Lake Road and approximately 2,350' between proposed Spinning Wheel Lane and proposed Silver Lake Road. Should you have any questions, please feel free to contact me. Matthew B. Smith, P.E. Residency Staff Engineer VDOT Edinburg Residency 14031 Old Valley Pike Edinburg, VA 22824 Phone (540) 984 -5615 Fax (540) 984 -5607 2/16/2009 U.S. RTE. 50 WEST (NORTHWESTERN PIKE) SIGNALIZED INTERSECTION EXCEPTION Silver Lake, LLC Property Frederick County, Virginia Tax Parcels 52- ((A)) -C; 52- ((A)) -50A; 52- ((A)) -52; 52- ((A)) -63 53- ((A)) -69 Prepared For: Virginia Department of' Transportation County of Frederick, Virginia Contact Person: Evan Wyatt, AICP Founded in 1871 Engineers Surveyors November 25, 2008 GRIMM AV E CO IE I BWIG 151 Windy Hill Lane Winchester, Virginia 22602 Telephone 540- 662 -4185 FAX 540- 722 -9528 www.gree nwaye n g.com Summary The 2007 General Assembly approved legislation that implemented access management regulations and standards to improve the performance of existing road networks and enhance safety while maintaining the ability of private properties to have reasonable access to state maintained highways. These new access management regulations and standards were implemented by the Virginia Department of Transportation on July 1, 2008. Chapter 72 Access Management Regulations: Principal Arterials provides for an appeal and exception procedure as specified in Section 24VAC30 -72 -50 of this chapter. The information and exhibits in this report have been prepared for consideration of an exception to signalized intersection spacing standards along Northwestern Pike (U.S. Route 50 West) in Frederick County, Virginia. Justification Comprehensive Policy Plan The Frederick County Board of Supervisors adopted amendments to the Comprehensive Policy Plan Round Hill Community Land Use Plan on November 14, 2007. The amended land use plan incorporated approximately 481 acres on land into the County's development area, which recommends commercial, medical support, medical office, educational, and public land use development on the north and south sides of the Northwestern Pike (Route 50 West) corridor. Additionally, the amended Round Hill Community Land Use Plan establishes recommendations for access management along the Northwestern Pike (U.S. Route 50 West) corridor. Specifically, the County's access management language states the following; "Vehicular management access is recommended throughout the Round Hill Community center, particularly along Route 50. A six -lane arterial road should not include multiple access points. Ideally, primary vehicular access should be limited to four signalized intersections along Route 50W with additional commercial entrances planned at appropriate intervals to facilitate safe and efficient traffic movement." The Silver Lake, LLC conceptual land use plan provides for commercial and office land use, as well as a continuing care retirement community (CCRC) that will be developed by the National Lutheran Home. The conceptual land plan provides for signalized intersection locations that are consistent with the County's Comprehensive Policy Plan. (Please refer to the Round Hill Community Land Use Plan Exhibit and the Silver Lake, LLC Development TIA Suggested Site Improvements Exhibit) Signalized Intersection 1 November 25, 2008 Spacing Exception Signalized Intersection Spacing Exception Information Intersection VDOT Spacing Requirement Approximate Spacing Between Intersections Spacing Distance Exception Poorhouse Road 2,640 LF 1,970 LF 670 LF Spinning Wheel Lane 2,640 LF 2,350 LF 290 LF Silver Lake Road 2,640 LF 2,070 LF 570 LF Traffic Impact Analysis Report PHR +A has prepared a detailed traffic impact analysis (TIA) dated November 25, 2008 for the Silver Lake, LLC conceptual land use plan. This TIA- includes traffic count conditions at project build out, as well as land geometry and level of service information including weekday and Saturday peak hour ADT and link level of service analysis for the Northwestern Pike (U.S. Route 50 West) mainline. The detailed signalization analysis tables for all identified signalized intersections have also been provided as a separate report for review by VDOT. The results of this analysis concur with the signalized intersection locations specified in the County's Comprehensive Policy Plan and also identify an additional signalized intersection location necessary to maintain acceptable levels of service of the Northwestern Pike mainline and north and south side streets at these intersection locations. The TIA also identifies the need for a new east -west collector road on the north side of Northwestern Pike, which is also recommended by the County's Comprehensive Policy Plan. This parallel collector mad syst' m will connect Retail Boulevard and Spinning Wheel Lane behind the Wal -Mart Center, which will redistribute traffic patterns in the area, thus creating increased capacity for the Northwester Pike corridor. (Please refer to the Round Hill Center Traffic Conditions Figure 1 Exhibit and the Round Hill Center Lane Geometry and Level of Service Figure 2 Exhibit) Silver Lake, LLC Property Site Constraints The Silver Lake properties have frontage along Northwestern Pike (U.S. Route 50 West) at three separate locations. The Silver Lake conceptual land use plan has been prepared to locate necessary signalized intersections that maximize spacing between intersections and account for topographic and environmental constraints, such as flood plain and wetlands avoidance. The location of the proposed signalized intersections provides for superior sight distance lines that exceed VDOT standards for the posted speed limits along Northwestern Pike. The following table provides for the, proposed signalized intersection locations and distances, including the necessary distance exceptions. Signalized Intersection Spacing Exception 2 November 25, 2008 Please refer to the Silver Lake, LLC Development TIA Suggested Site Improvements Exhibit for signalized intersection locations and topographic and environmental constraints information. Conclusion The Silver Lake, LLC properties signalized intersection spacing exception request is consistent with the Frederick County Comprehensive Policy Plan recommendations for future land use development along the Northwestern Pike (U.S. Route 50 West) corridor. The information provided in the detailed traffic impact analysis (TIA) demonstrates that the proposed signalized intersection spacing maintains acceptable levels of service on the Northwestern Pike mainline and does not create unsafe condi :ions to the traveling public. The Silver Lake, LLC conceptual land use plan provides for appropriate locations for the proposed signalized intersections and maximizes spacing between intersections to the best of its ability. Additionally, the development of the east -west collector road paralleling Northwestern Pike will create additional capacity for the Northwestern Pike corridor. Therefore, the proposed signalized intersection spacing exception is justified and is requested to be approved by the VDOT Staunton District Administrator as submitted. Signalized Intersection Spacing Exception Accepted Signalized Intersection Spacing Exception Denied Garrett W. Moore, P.E., District Administrator Date Disclaimer: Acceptance of the signalized intersection spacing exception does not guarantee the installation of traffic signalization at these locations. Future engineering studies and traffic signal warrant analysis approval by VDOT will dictate final traffic signalization improvements at the locations identified in this report. Signalized Intersection 3 November 25, 2008 Spacing Exception No Scale "Suggested Improvements" Signalizalion BB -1 Left WB 1 'Ihn, I Right SO -1 Left, 1 Plight Intersection" "Suggested Improvements" SignSLrrfion WB 1 Thin Improvements" WB• 1 Thor 1 Unsignalized Intersection 4 Signalized Intersection 1 LOS= D(F)[D1 V O m C(CIID] DIICID 1 4 —P F Figure 2 MIME' iiciL'OS Denotes Unsignalized Critical Movement AM Peak Hour(PM Peak Hour)[SAT Peak Hour] Round Hill Center: Lane Geometry and Level of Service (Per Round Hill Center Traffic Impact Analysis Report, dated November 25, 2008) "Suggested Improvements" SignaBaden WB -1 Theo J LSlgnaIizM Interseclwn; {fl "Suggested Improvement" Signaleanan HI 1 Left B 1 Thro,l High B -1 Len, 1 (tight -P Eink1LOS' Denotes Unsignalized Critical Movement AM Peak Hour(PM Peak Hour)[SAT Peak Hour] Round Hill Center: Lane Geometry and Level of Service F igure 2 Round Hill Center Traffic Impact Analysis Report, dated November 25, 2008) i c v x D ni m TIA SUGGESTED SITE WPROVEMENTS PHASES 1 -4 SILVER LAKE DEVELOPMENT VDOT 527 EVALUATION GAINESBORO MAGISTERIAL DISTRICT FREDERICK COUNTY, VA DATE 6 /u /oe 7/18/08 9/03/08 12/04/06 REVISION ROAD REVISIONS VDOT 527 SUBMITTAL TIA MOD, CARPENTER COST ROAD REVISIONS PER UPDATED TIA ?modal /971 Engineers Surveyors 151 windy hill Lam Winchester. Virginia 22802 Telephone 540-882-4185 PAX 640- 722 -9628 www.greenwsyeng.00m GREENWAY ENGINEER moo'Dvo6vrvooan•LUw 9898- 88L -01 XY3 99It- 899 -01 0110 80988 vl 'a 011, i x 6 PUM I9I a33NION3 AVMN33UIJ &zois Lwow 11u3 LL[l M PTMJ TAL119998 L89 LOQA 3S03 11V3113d8Y.3 'QOM VLL YLL aaLYQdn 23d SNOISIA38 QYO11 G41OI91188 ,YOB 101SIA321 90 /fo /Z[ 90 /so /0 90 /91 /L 90 /It /9 3.1103 VA '.UNfOO xoniaasad LORILSIa 'IVI2ixLSIOVIR 02IOHSHNIVO NOILVfl1YA3 LZ9 ±OOA 1N311dO13A3a t— T SESVHd s,LNSMAO2I0II xlds Q1 S300ns VIZ 3>e1 1:13A1IS 'Ia.LDIHf1S 4Z9 1OUA MOD =mama 'von vu VII 03YYOdf1 2134 SNOISIA3l UCH SNOISIAaa Qwou NOISIAZ23 go/i0 /at eo /so /ao a0 /K/1. 20/11/9 aLvU t -1 S3SVHd S,LslaYiaAOIdWWI 3ONVHO2i3,LNI a3,LS300AS 'trIJ, VA '1LLNflO )IOI2i3a32I3 LOI2LLSIa o2ioaSaNIVO NOLLVIIIIIA3 Z39 lOGA 1N311dO13A30 3>Ib1 83A7IS f- y C O O U a Z c a_ cu m o z N w y J Z y 0 fY 0 c) co. 1 0 w w 0 a ci I33NION3 AVMN33N0 moa•Bvakmaeaalluut 9ZS6 636 -0►9 XY3 991t Z99 an auogdaley ZOOM aw}41,1 'aa7aagoWl aavl MH LPaft 191 sao6aeans weabl3o3 1661 w papaw r L l r Y r i 1 3 1 3 r 1 f f���� J i r C I I I I i !1 1! I. 1 111 1 I 1 r n 1 w i 0 -I 1 J L 1 I fl 11 1 1 1 f z g I i 7 c‹ I 71 I 1 C Z al O r J W I I i 11 I I 7 r e\\�\ z a 7 r 7 1'/ l c 7 7 7J 'IVLLIA6116 as ,Loan iSOO 733.L10d21V0 'CON YLL YLL aaLY0df1 Had 614O1SIn321 IiV08 9HOISinai1 avO3I Noisinau 90 /roo /z 90/60/0 g VA '1LNf100 HORI3a32I3 J,OI LISIa 'IVIg3,LSI)VNI 02aossaNIVO NOI1Yfl1VA3 L29 1OOA 1N311dO13A30 3)IV1 1:13AhIS 'v t S3SVHd SJ,N3I'z3402IdNII aiIS GaLsao0ns VIZ moo 8voLeraaaa arr 9zSO—zZA.a 0 XVJ 99iro- z99 -oro9 Zo9ZZ na e M11 mH ,6 Pu1A1 S 33NION3 AVMN33H0 N 0) 0 0 r K a W Z a E a0 co 0 0 O Z W W J z 0) a x a 0 0 c csi 0 N x a 3NV1 133WONINNIdS 4- eio6anms 'maam8u3 I461 9 Pw.o 133H9 4I111 3N11 I1'1VW 0, n to 69 06 0, 00 rliT5* Y1 J L J O ONIU33NIJN3 AVMN33H0 mozPaaLaraaai9'rrr 9096 00l 049 %V3 gett-ze9-ots aaoydalal 00900 a7.1 sa1c 2 9 3 .111. aa71 IIILI 6 P.1* 1ST z 0 m w C) i 1' f I r Jw r avotl 3)IY1 aJA118 1 z LmAauns /L61 1 114 0 e 1- 0 cc iliwwwwsimomommisi i■1 133N6 3Nl H71VW 7YJ.L1149fIS 120 lOQA 1S00 '93J.143a VO 'a0A VLL VII, aaLVadf1 92d SNOISIO2N aY09 SNOISIA38 0900 NOISIAEH tt I I I I I II I II I II I 0 I II I II I I I J Cn 0 z 0 1- w cn 0) CC w z 90/10/01 90/S0/6 80 /9I /L 90 /I/9 aLVa 133H6 336 31 h1�1VW 1 '0A18 1IV131:I 111 Ul co 1 1 IN3WdO13A30 3NV1 1:13A1IS T SISVHd S,LN3Yi3A02TdNI SJIS Qd,LSa00fS VI.L 1 4 4 4 4 VA '2UNf103 Nomaumm L�I2ILSIQ 1VI2ISJSIOVNI 0210HS3NIVO NOLLVf11VA3 LZ9 lOOA o to a- rrr 1 to I 1� 1 I L O VOld TIN whoa .1. 133H6 61H1 31111 Ha1VW 0 M r7 N N a) t on N N O f� V aJ Lo v 4 ri N M V W W W W 2 S 2 Z C a a a ONIa33NIJN3 AVMN33U0 L r 0 i r r r 0 w 2 BOH 301AEOS I too o"Puell raawl /UM BZ96- ZSL -0f9 XY3 999- Z99 -Of9 auogdale& 20929 oT1.XIA waaca9oaut auvl 1104 dpuiy 1ST I I I I I 1 I 1 i 11 i 11 1 L scot oozn www/has 1481 4 P.P.m1 1 133119 91M1 3N11 H iVW 11 0 a trt J 133M6 339 3N11 1iJ1VW WJ.LIN9fIS LZ9 sou IS 03 VaL149d1W3 '0011 VLL VLL 03dV0df1 83d SNOISLIZH OV08 SH01SI1A81I QV 021 x01STA313 J 9o/i0 /al 90/90/80 00/91//. 90/11/9 3SV0 VA 'A,LNfOO NOI2I3UR'2I3 .LoiaLsia 'IVIHRLSIOVYI olio saNIVO NO11Vf11VA3 LZ9 100A 1N311dO13A3a 3>Id1 1:13A1IS t —I SHSVHd SLNN}N AOHdY(I SONVHOUI3,LNI aaisaDOnS VI,L 1 N 0 N a w co 02 W N M C w w W w CO 1/) 1n 1A 1 x x x a a a 0_ I 1 1 1 —.1-1 1 II N 1 1 1 i w I 1 1 a c 1 F. I III 1El1 I 1 1 o Q I 11 j/ 1 1 1 I 1 I i1 133NS 91111 3W Ii71V14 mi z I III c� L i 1 F a 0 W 2 I ce` 0 U r .n x x X m X '4 m 01 o m 11 o a 7 c'6, PRELIMINARY LAND BAYS SILVER LAKE DEVELOPMENT GAINESBORO MAGISTERIAL DISTRICT FREDERICK COUNTY, VA GREENWAY ENGINE 151 Windy Hill Lane 151 Winchester, Virginia 22802 Telephone 540 -882 FAX 540 722 -9528 www.greenweyeng.com r In tart Engineers Engineers m m m m z 2 m m 0 1 0 z N 0 0 0 N 0 0 0 0 t17 Asr�i nF: :1A 44 40 r �i- v r 01 no (Li 0 1 0 z \C -o 0 0 1 c „7 A LP(.' Zz f 1 ‘1\ „(c rL:� I 1 \W_ -it_ i- 1-1:-,..--- te uTrig d mall 11 C L L 11 z r m 0 O m z z 0 r c m D z O m n 4- 12 L 0 m 1 V) m 0 m m m 01 D m 01 0