Loading...
HomeMy WebLinkAbout01-09 Proffer StatementAMENDMENT Action: PLANNING COMMISSION: March 18, 2009 Recommended Approval BOARD OF SUPERVISORS: April 22, 2009 a APPROVED DENIED PDRES# I4 -09 AN ORDINANCE AMENDING THE ZONINGDISTRICT MAP REZONING #01 -09 OF SILVER LAKE, LLC WHEREAS, Rezoning #01 of Silver Lake, submitted by Greenway Engineering, to rezone 238.96 acres from RA (Rural Areas) District to B2 (General Business) District, and 131.06 acres from RA District to MS (Medical Support) District, with proffers, for Commercial and Continuing Care Retirement Community (CCRC) Uses was considered. The properties are located on the north side of Northwestern Pike. (Route 50 West), west of Retail Boulevard and east of Poor House Road (Route 654), in the Gainesboro Magisterial District, and are identified by Property Identification Numbers 52 -A -C, 52 -A -50, 52- A -50A, 52 -A -52 and 52 -A -63. WHEREAS, the Planning Commission held a public hearing on this rezoning on March 18, 2009; and WHEREAS, the Board of Supervisors held a public hearing on this rezoning.ou April 22; 2009: and WHEREAS, the Frederick County Board of Supervisors finds the approval•ofthisrczoning to be in the best, interest of the public health, safety, welfare,•and in conformance with the Comprehensive Policy Plan; NOW, THEREFORE, BE IT ORDAINED by the Frederick County Board of Supervisors that Chapter 165 of the Frederick County Code, Zoning, is amended to revise the, Zoning District' Map to rezone 238.96 acres from RA (Rural Areas) District to B2 (General Business) District and 131.06 acres from RA District to MS (Medical Support) District, with proffers for Commercial and Continuing Care Retirement Community (CCRC) Uses. The conditions voluntarily proffered in writing by the applicant and the property owner are attached. PDRES414 -09 This ordinance shall be in effect on the date of adoption. Passed this 22nd day of April, 2009 by the following recorded vote: Richard C. Shickle, Chairman Aye Gary W. Dove Gene E. Fisher Philip A. Lemieux Aye Aye Aye Gary A. Lofton Bill M. Ewing Charles S. DeHaven, Jr. A COPY ATTEST John Ril. Jr. Fred rj /k County Administrator Aye Aye Aye Greenway Engineering APPLICANT: PROJECT NAME: ORIGINAL DATE OF PROFFERS: REVISION DATE: Preliminary Matters File #4928S/Silver Lake LLC Rezoning November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009; March 30, 2009 SILVER LAKE, LLC APR 8 2009 PROFFER STATEMENT November 25, 2008 March 30, 2009 REZONING: RZ #01 -09 Rural Areas District (RA) to Business General District (B2) and MS Medical Support District (MS) PROPERTY: 370.02± acres; Tax Parcels #52- ((A)) -C, 52- ((A)) -50, 52- ((A)) -50A, 52-((AD-52, and 52- ((A)) -63 (here -in after the "Property RECORD OWNER: Silver Lake, LLC, James R. Wilkins, III, Manager Silver Lake, LLC (here -in after the "Applicant Round Hill Commercial Center The Village at Orchard Ridge A National Lutheran Home Community Pursuant to Section 15.2 -2296 Et. Seq. of the Code of Virginia, 1950, as amended, and the provisions of the Frederick County Zoning Ordinance with respect to conditional zoning, the undersigned Applicant hereby proffers that in the event the Board of Supervisors of Frederick County, Virginia, shall approve Rezoning Application #01 -09 for the rezoning of 370.02± -acres from the Rural Areas (RA) District to establish 238.96± acres of B -2, Business General District (Tax Map Parcels 52- ((A)) -C, 52- ((A))- 50A, 52- ((A)) -52, 52- ((A)) -63) and 131.06± -acres of MS, Medical Support District (Tax Map Parcel 52- ((A)) -50), development of the subject property shall be done in conformity with the terms and conditions set forth herein, except to the extent that such terms and conditions may be subsequently amended or revised by the Applicant and such be approved by the Frederick County Board of Supervisors in accordance with the said Code and Zoning Ordinance. In the event that such rezoning is not granted, then these proffers shall be deemed withdrawn and have no effect whatsoever. These proffers shall be binding upon this Applicant and their legal successors, heirs, or assigns. The Property, more particularly described as the lands owned by Silver Lake LLC, being all of Tax Map Parcels 52- ((A)) -C, 52- ((A)) -50, 52- ((A)) -50A, 52- ((A)) -52, 52-((AD-63, and further described by Property Deeds including Instrument Number 090001536, Deed Book 872 Page 318 and Deed Book 927 Page 1591. (Please refer to Rezoning Application Deed Information). Grecnway Engineering File i34928S /Silver Lake LLC Rezoning November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009; March 30, 2009 A. Generalized Development Plan 2 1. The Applicant hereby proffers to submit a Generalized Development Plan (the "GDP for the Property. The purpose of the GDP is to identify the general location of the B -2, Business General District and MS, Medical Support District areas, the general location of the proposed future Fire and Rescue Station area, the general location of the proposed future passive open space area, the general location of the 50 -foot green strip enhancement area, the general location of the 10 -foot asphalt trail system, and the general location of the phased transportation improvements areas within and adjacent to the Property. PROFFER STATEMENT 2. The Applicant hereby proffers to develop the Property in substantial conformity with the proffered GDP, prepared by Greenway Engineering dated March 30, 2009. The GDP is recognized to be a conceptual plan and may be adjusted by the Applicant to accommodate final design and engineering constraints without the need of new conditional rezoning approval by the Frederick County Board of Supervisors, provided that the adjustments do not eliminate or substantially relocate the areas described in Section Al of this proffer statement. B. MS, Medical Support District Area 1. The Applicant hereby proffers to develop, or cause for the development of a Continuing Care Retirement Community (the "CCRC on the portion of the Property proposed to be zoned MS, Medical Support District, and to exclude all other MS, Medical Support District land uses not expressly permitted within Section 165- 97B(7) of the Frederick County Zoning Ordinance. 2. The Applicant hereby proffers to limit the maximum residential density within the CCRC to eight units per acre. The maximum residential density total shall include all independent living units, assisted care living units, and skilled nursing care units. The location and totals for the residential units specified in this section shall be provided on the Master Development Plan for the Property. 3. Where buffer areas are required and mature woodlands are in place, the Applicant will request approval of the use of these woodland features to satisfy the buffer requirement during the consideration of the Master Development Plan. 4. The Applicant proffers to provide initial access to the CCRC via Spinning Wheel Lane as described in Section D(2)(f) of the proffer statement, and further proffers to provide a maximum of two commercial entrances on Spinning Wheel Lane to provide access to the CCRC. Grcenway Engineering November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised Febniary 19, 2009; Revised March 2, 2009; March 13, 2009; March 30, 2009 C. B2, Business General District Area Truck Stops Golf Driving Ranges Outdoor Batting Cages Model Home Sales Self- Service Storage Facilities Adult Retail Establishments 3 1. The Applicant hereby proffers to prohibit the following and uses currently allowed within the B2 District: 2. The Applicant hereby proffers to prohibit individual full service commercial entrances to all allowed B2 District land uses that intersect Northwestern Pike (U.S. Route 50 West) and Poorhouse Road (Route 654); however, right -in or right -out only access to B2 District land uses that intersect Northwestern Pike shall be permitted if approved by VDOT and /or Frederick County. 3. The Applicant hereby proffers to establish a green strip along the Property frontage adjacent to the Northwestern Pike corridor that is 50 feet in width. Parking lots and access drives shall be prohibited within the 50 -foot green strip, except for access drives permitted as described in Section C(2) above. The entire Property frontage of the 50 -foot green strip shall be enhanced with street trees that are a minimum of 2 -inch caliper at planting and spaced a maximum of 30 feet on center, ornamental shrubs that are a minimum three gallon container at planting, as well as an asphalt bicycle and pedestrian facility that is 10 feet wide. The installation of the street trees, ornamental shrubs, and bicycle and pedestrian facility located within the 50 -foot green strip shall be required as specified in Section C(8) of the proffer statement. 4. The Applicant hereby proffers to establish street tree plantings along both sides of Spinning Wheel Lane and Silver Lake Road throughout the limits of the B2 District property. All street trees shall be a minimum of two -inch caliper at time of planting and spaced a maximum 40 feet on center. The street trees shall be located between the back of curb and sidewalks and /or the asphalt bicycle and pedestrian facility. 5. The Applicant hereby proffers to establish a linear passive open space area in the general location identified on the proffered GDP, which will be enhanced with a 10 -foot asphalt trail system between Spinning Wheel Lane and Northwestern Pike as specified in Section C(8) of the proffer statement. 6. The Applicant hereby proffers to provide for inter parcel connectors between all adjoining commercial and office land uses. File #4928S/Silver Lake LLC Rezoning Greenway Engineering File #49285 /Silver Lake LLC Rezoning November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009; March 30, 2009 4 7. The Applicant hereby proffers to include an additional row of evergreen trees within all required buffer and screening areas adjacent to land primarily used for residential purposes in the RA District in which accessory uses are proposed within the active portion of the buffer area. 8. The Applicant hereby proffers to design and construct, or cause for the construction of an asphalt bicycle and pedestrian facility that is ten -feet wide. This location of this facility is identified on the proffered GDP and will be located outside of public right -of -way limits. This facility will be developed as follows: The 10 -foot asphalt trail located along the south side of the Phase 1 segment of Spinning Wheel Lane shall be developed during the construction of this road segment as specified in Section D(2)(f) of the proffer statement. The 10 -foot asphalt trail located along the south side of the Phase 2 segment of Spinning Wheel Lane shall be developed during the construction of this road segment as specified in Section D(3)(e) of the proffer statement. The 10 -foot asphalt trail located along the passive open space area shall be developed on or before the completion of the commercial development permitted under the Phase 1Transportation Program as specified in Section D(2)(a) of the proffer statement. The 1 0-foot asphalt trail located along the southern boundary of the Property identified as Area 1 on the GDP shall be developed during the construction of the Phase 1 segment of Spinning Wheel Lane as specified in Section D(2)(f) of the proffer statement. The 10 -foot asphalt trail located along the southern boundary of the Property identified as Area 2 on the GDP shall be developed prior to the issuance of the occupancy permit issued for the first commercial building permit located in the land bay between Spinning Wheel Lane and Silver Lake Road. The 10 -foot asphalt trail located along the southern boundary of the Property identified as Area 3 on the GDP shall be developed prior to the issuance of the occupancy permit issued for the first commercial building permit located in the land bay between Silver Lake Road and the eastern boundary of the Property. 9. The Applicant hereby proffers to establish an Architectural Review Board (ARB) for the purpose of reviewing structural elevations, site landscaping and signage for all commercial sites to ensure compatibility with the restrictive covenant documents for the B2 District property. The restrictive covenant documents shall be provided to Frederick County prior to the subdivision of land within the B2 District, or prior to the approval of any site development plan within the B2 District. The restrictive covenant documents shall include, but not be limited to, the following design elements: Greenway Engineering November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009; March 30, 2009 Building materials for all exterior walls and rooflines. Materials for all monument freestanding business signs. The materials for the base of all monument freestanding business signs shall be consistent throughout the B2 District. Screening of all loading areas from adjoining properties external to the B2 District. Screening of outdoor dumpster pad areas with building materials consistent with the primary structure. Common area maintenance agreements. D. Transportation Enhancements 1. The Applicant has submitted a Traffic Impact Analysis (TIA), prepared by Patton, Harris, Rust and Associates, dated November 25, 2008 for the 370.02± acre Property. The TIA identifies improvements to the regional transportation network to account for background undeveloped projects and the Applicant's proposal through four phases of development. The Applicant hereby proffers to design and construct, or cause for the construction of improvements to the regional transportation network as a phased development program that is described in this section of the proffer statement. Additionally, the phased development program is identified in illustrative form on the proffered GDP. It is recognized that the phased transportation improvements proffered herein will be constructed as described in this section; however, the exact location and limits of these improvements will be determined by VDOT and/or Frederick County during the approval of engineering design plans. It is further recognized that the location of the regional transportation network improvements identified in illustrative form on the proffered GDP are general in nature and may be relocated to accommodate VDOT engineering design plan approval without the need for conditional zoning amendment to the GDP or the proffer statement. 2. The Applicant hereby proffers the following Phase 1 Transportation Program: a. The Applicant shall be entitled to develop the CCRC and a maximum of 180,000 square feet of commercial land use within Phase 1 However, the Applicant can deviate from this land use mix assuming the total trip generation for site plans within this phase of the transportation program (based on the ITE 7 Edition Trip Generation Report) do not exceed the total trip generation specified in the November 25, 2008 Traffic Impact Analysis Report for Phase 1. It is recognized that the Applicant shall complete all Phase 1 transportation improvements prior to the approval of any Site Plan that exceeds 180,000 square feet of commercial land use or equivalent trip generation as noted above on the B2 portion of the Property. File #4928S/Silver Lake LLC Rezoning 5 Greenway Engineering November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009; March 30, 2009 6 b. The Applicant shall dedicate all right -of -way necessary for the Phase 1 improvements that will occur on the Property to VDOT or Frederick County. The Applicant will attempt to design all off -site improvements within public right -of -way; however, if necessary it is recognized that VDOT and /or Frederick County will assist the Applicant with right -of- way necessary to implement proffered off -site transportation improvements. The Applicant agrees to assume all costs associated with right -of -way acquisition if assistance from VDOT and /or Frederick County is required. c. The Applicant shall execute, or cause for the execution of a traffic signalization agreement with VDOT to fully fund new traffic signalization at the intersection of Northwestern Pike (U.S. Route 50) and Poor House Road (Route 654). The traffic signalization agreement shall be executed within six months of final non appealable rezoning approval, or prior to approval of the first Site Plan for the property, whichever occurs first. d. The Applicant shall design and construct, or cause for the execution of a traffic signalization agreement with VDOT to fully fund new traffic signalization with pedestrian actualization at the intersection of Northwestern Pike (U.S. Route 50) and the relocated Spinning Wheel Lane. The traffic signalization agreement shall be executed within one year of final non- appealable rezoning approval, or prior to approval of the first Site Plan for the property, whichever occurs first. The Applicant shall reserve the right to preempt this agreement by initiating a signal warrant study and signal design plans in accordance with VDOT standards for approval to install traffic signalization at this intersection. e. The Applicant shall design and construct, or cause for the construction of improvements to the median crossing including a westbound right turn lane and left turn lane and an eastbound left turn lane on Northwestern Pike at the intersection of the relocated Spinning Wheel Lane. These improvements shall be completed prior to the issuance of the first occupancy permit for the land use utilizing Spinning Wheel Lane for access to Northwestern Pike. f. The Applicant shall design and construct, or cause for the construction of improvements to Spinning Wheel Lane within the Property to provide for a road section that is constructed to a 40 mph geometric design standard and provides right -of -way for a future roundabout at the intersection with Silver Lake Road, and Left tum lanes and right turn lanes at all internal collector street intersections and at commercial entrances as required by VDOT. Additionally, the Applicant shall design and construct, or cause for the construction of separate right and left turn lanes on Spinning Wheel Lane at the intersection of Northwestern Pike. File #49285 /Silver Lake LLC Rezoning Greenway Engineering g. File #4928S/Silver Lake LLC Rezoning November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009; March 30, 2009 7 Spinning Wheel Lane shall be developed as a four -lane divided urban road section between Northwestern Pike and the future roundabout, and as a two -lane road section between the future roundabout and the limits of Phase 1 with dedicated right -of -way to Frederick County to allow for a four -lane urban road section. The construction of the two -lane road section shall include a raised median section necessary to transition from the roundabout into the urban road section design. These improvements shall be completed prior to the issuance of the first occupancy permit for the land use utilizing Spinning Wheel Lane for access to Northwestern Pike. Furthermore, the Applicant agrees to design and construct, or cause for the construction of the four -lane urban section between the future roundabout and the limits of Phase 1 if this improvement is warranted based on future traffic counts as described in Section D(6). The Applicant shall design and construct, or cause for the construction of modifications to, or the elimination of the median crossing on Northwestern Pike identified as Median Crossing A on the proffered GDP. VDOT shall determine the requirements for modification, or elimination and shall advise the Applicant in writing of the requirements associated with this improvement. The Applicant shall complete these improvements in conjunction with construction activities associated with Spinning Wheel Lane as described in Section D(2)(f) of the proffer statement. h. The Applicant shall design and construct, or cause for the construction of improvements to the southbound off ramp at the Route 37 interchange with Northwestern Pike to provide for a free flow right turn lane onto Northwestern Pike. The Applicant shall complete the Route 37 interchange improvements described in this section prior to the approval of any Site Plan that exceeds 180,000 square feet of commercial land use or equivalent trip generations as described in Section D(2)(a) of the proffer statement on the B2 portion of the Property. In the event that VDOT and Frederick County determine that a monetary contribution for regional transportation improvements to the Route 37 corridor between the Northwestern Pike interchange and the North Frederick Pike interchange is desired, the Applicant agrees to provide a monetary contribution in lieu of the improvement described in Section 2(h). This monetary contribution shall be equivalent to the amount associated with the improvement described in that section based upon an engineering estimate agreed upon by VDOT, Frederick County and the Applicant that will be prepared on or before the build out of the Phase 1 transportation improvements. The Applicant agrees to provide this monetary contribution to Frederick County within 30 days of written request by the County, and further agrees to allow for this monetary contribution to be utilized as matching funds by Frederick County for qualifying transportation improvements programs or grants. Greenway Engineering November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised Febniary 19, 2009; Revised March 2, 2009; March 13, 2009: March 30, 2009 3. The Applicant hereby proffers the following Phase 2 Transportation Program: a. The Applicant shall be entitled to develop the CCRC and a maximum of 350,000 square feet of commercial land use and 105,000 square feet of office land use within Phase 2 that is a cumulative total of Phase 1 Phase 2. However, the Applicant can deviate from this land use mix assuming the total trip generation for site plans within this phase of the transportation program (based on the ITE 7` Edition Trip Generation Report) do not exceed the total trip generation specified in the November 25, 2008 Traffic Impact Analysis Report for Phase 2. It is recognized that the Applicant shall complete all Phase 2 transportation improvements prior to the approval of any Site Plan that exceeds 350,000 square feet of commercial land use and 105,000 square feet of office land use or equivalent trip generation as noted above on the B2 portion of the Property. b. The Applicant shall dedicate all right -of -way necessary for the Phase 2 improvements that will occur on the Property to VDOT or Frederick County. The Applicant will attempt to design all off -site improvements within public right -of -way; however, if necessary it is recognized that VDOT and /or Frederick County will assist the Applicant with right -of- way necessary to implement proffered off -site transportation improvements. The Applicant agrees to assume all costs associated with right -of -way acquisition if assistance from VDOT and /or Frederick County is required. c. The Applicant shall design and construct, or cause for the execution of a traffic signalization agreement with VDOT to fully fund new traffic signalization with pedestrian actualization at the intersection of Northwestem Pike (U.S. Route 50) and Silver Lake Road. The traffic signalization agreement shall be executed prior to the issuance of the first occupancy permit for the land use utilizing Silver Lake Road for access to Northwestem Pike. The Applicant shall provide additional funding necessary to provide for pre emption control for this traffic signal if the County requests the land for the new fire and rescue facility provided in Section E(1) of the proffer statement. In the event the County does not request the land for the new fire and rescue facility, the additional funding for traffic signal pre emption control shall be made available for pre- emption control for the traffic signal at the intersection of Northwestern Pike and Poor House Road that is described in Section D(2)(c) of the proffer statement. The Applicant shall reserve the right to preempt this agreement by initiating a signal warrant study and signal design plans in accordance with VDOT standards for approval to install traffic signalization at this intersection. File #4928S/Silver Lake LLC Rezoning 8 Greenway Engineering File #4928S /Silver Lake LLC Rezoning November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009; March 30, 2009 9 d. The Applicant shall design and construct, or cause for the construction of improvements to Silver Lake Road to include a two -lane urban road section with a raised median to the first available commercial entrance that is constructed to a 40 mph geometric design standard and provides for the construction of the roundabout at the intersection with Spinning Wheel Lane, and left turn lanes and right turn lanes at all commercial entrances as required by VDOT. Additionally, the Applicant shall design and construct, or cause for the construction of a median crossing including a westbound right turn lane and left turn lane and an eastbound left turn lane on Northwestern Pike at the intersection of Silver Lake Road. These improvements shall be completed prior to the approval of any Site Plan that exceeds 350,000 square feet of commercial land use and 105,000 square feet of office land use or equivalent trip generation as described in Section D(3)(a) of the proffer statement on the B2 portion of the Property, with the exception of the median crossing and turn lane improvements on Northwestern Pike which shall be completed with the Silver Lake Road intersection improvements on Northwestern Pike. Additionally, the Applicant shall dedicate right -of -way to Frederick County to allow for a four -lane urban road section for Silver Lake Road, and further agrees to design and construct, or cause for the construction of the four -lane urban road section if this improvement is warranted based on future traffic counts as described in Section D(6). e. The Applicant shall design and construct, or cause for the construction of improvements to Spinning Wheel Lane to provide for a two -lane urban road section that is constructed to a 40 mph geometric design standard and provides for left turn lanes and right turn lanes at all internal collector street intersections and at commercial entrances as required by VDOT, which continues from the terminus of Spinning Wheel Lane constructed in Phase 1 to a connection at the intersection of Retail Boulevard. The Applicant shall complete these improvements prior to the approval of any Site Plan that exceeds 350,000 square feet of commercial land use and 105,000 square feet of office land use or equivalent trip generation as described in Section D(3)(a) of the proffer statement on the B2 portion of the Property. Additionally, the Applicant shall dedicate right -of -way to Frederick County to allow for a four -lane urban road section for Spinning Wheel Lane and further agrees to design and construct, or cause for the construction of the four -lane urban section if this improvement is warranted based on future traffic counts as described in Section D(6). f. The Applicant shall design and construct, or cause for the construction of modifications to, or the elimination of the median crossings on Northwestern Pike identified as Median Crossing B and Median Crossing C on the proffered GDP. VDOT shall determine the requirements for modification, or elimination and shall advise the Applicant in writing of Greenway Engineering g. File #49285 /Silver Lake LLC Rezoning November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009; March 30, 2009 1 0 the requirements associated with this improvement. The Applicant shall complete these improvements in conjunction with construction activities associated with Silver Lake Road as described in Section D(3)(d) of the proffer statement. The Applicant shall design and construct, or cause for the construction of improvements to the northbound off ramp at the Route 37 interchange with Northwestern Pike to provide fora second right turn. The Applicant shall complete the Route 37 interchange improvements described in this section prior to the approval of any Site Plan that exceeds 350,000 square feet of commercial land use and 105,000 square feet of office land use or equivalent trip generation as described in Section D(3)(a) of the proffer statement on the B2 portion of the Property. h. The Applicant shall design and construct, or cause for the construction of improvements at the Route 37 interchange with Northwestern Pike to provide for a third westbound thru lane on Northwestern Pike under the Route 37 bridge structure continuing east to the transition for the Route 37 northbound on -ramp, to include the relocation of the existing Route 37 northbound on -ramp. The Applicant shall complete the Route 37 interchange improvements described in this section prior to the approval of any Site Plan that exceeds 350,000 square feet of commercial land use and 105,000 square feet of office land use or equivalent trip generation as described in Section D(3)(a) of the proffer statement on the B2 portion of the Property. i. In the event that VDOT and Frederick County determine that a monetary contribution for regional transportation improvements to the Route 37 corridor between the Northwestern Pike interchange and the North Frederick Pike interchange is desired, the Applicant agrees to provide a monetary contribution in lieu of the improvements described in Section 3(g) and 3(h). This monetary contribution shall be equivalent to the amount associated with the improvement described in those sections based upon an engineering estimate agreed upon by VDOT, Frederick County and the Applicant that will be prepared on or before the build out of the Phase 2 transportation improvements. The Applicant agrees to provide this monetary contribution to Frederick County within 30 days of written request by the County, and further agrees to allow for this monetary contribution to be utilized as matching funds by Frederick County for qualifying transportation improvements programs or grants. In the event that regional transportation improvements to the Route 37 corridor between the Northwestern Pike interchange are constructed prior to the completion of the Phase 2 Transportation Program, the Applicant agrees to provide a monetary contribution equivalent to the amount associated with the improvement described in this section to be utilized Greenway Engineering November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009; March 30, 2009 4. The Applicant hereby proffers the following Phase 3 Transportation Program: File #4928S/Silver Lake LLC Rezoning 11 unconditionally by Frederick County for other transportation improvements. This monetary contribution shall be provided to Frederick County within 60 days of written request by the County. a. The Applicant shall be entitled to develop the CCRC and a maximum of 490,000 square feet of commercial land use and 350,000 square feet of office land use within Phase 3 that is a cumulative total of Phase 1 Phase 3. However, the Applicant can deviate from this land use mix assuming the total trip generation for site plans within this phase of the transportation program (based on the ITE 7` Edition Trip Generation Report) do not exceed the total trip generation specified in the November 25, 2008 Traffic Impact Analysis Report for Phase 3. It is recognized that the Applicant shall complete all Phase 3 transportation improvements prior to the approval of any Site Plan that exceeds 490,000 square feet of commercial land use and 350,000 square feet of office land use or equivalent trip generation as noted above on the B2 portion of the Property. b. The Applicant shall dedicate all right -of -way necessary for the Phase 3 improvements that will occur on the Property to VDOT or Frederick County. The Applicant will attempt to design all off -site improvements within public right -of -way; however, if necessary it is recognized that VDOT and/or Frederick County will assist the Applicant with right -of- way necessary to implement proffered off -site transportation improvements. The Applicant agrees to assume all costs associated with right -of -way acquisition if assistance from VDOT and /or Frederick County is required. c. The Applicant shall design and construct, or cause for the construction of improvements to Spinning Wheel Lane to provide for a second right turn lane on Spinning Wheel Lane at the intersection of Northwestern Pike. These improvements shall be completed prior to the approval of any Site Plan that exceeds 490,000 square feet of commercial land use and 350,000 square feet of office land use or equivalent trip generation as described in Section D(4)(a) of the proffer statement on the B2 portion of the Property. d. The Applicant shall design and construct, or cause for the construction of a two -lane urban road that is constructed to a 40 mph geometric design standard and provides for roundabout design at the intersection with Spinning Wheel Lane, and left turn lanes and right turn lanes at all commercial entrances as required by VDOT, which will provide for a connection between Spinning Wheel Lane and Poor House Road (Route 654). The Applicant will coordinate with the owner of tax parcel 52- Greenway Engineering File #4928S/Silver Lake LLC Rezoning 1 November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009; March 30, 2009 12 ((A)) -47 to obtain right -of -way for this improvement as a first option for development of the two -lane urban road connection. In the event that the first option cannot be achieved, the Applicant shall design and construct, or cause for the construction of the two -lane urban road connection between Spinning Wheel Lane and Poor House Road on the Property. The general location of the two -lane road connection associated with both options will be provided on the proffered GDP; however, it is recognized that this location may shift without the need for conditional rezoning approval. The Applicant shall complete this improvement prior to the approval of any Site Plan that exceeds 490,000 square feet of commercial land use and 350,000 square feet of office land use or equivalent trip generation as described in Section D(4)(a) of the proffer statement on the B2 portion of the Property. 5. The Applicant hereby proffers the following Phase 4 Transportation Program: a. The Applicant shall be entitled to develop the CCRC and a maximum of 583,050 square feet of commercial land use and 494,600 square feet of office land use within Phase 4 that is a cumulative total of Phase 1 Phase 4. However, the Applicant can deviate from this land use mix assuming the total trip generation for site plans within this phase of the transportation program (based on the ITE 7 Edition Trip Generation Report) do not exceed the total trip generation specified in the November 25, 2008 Traffic Impact Analysis Report for Phase 4. It is recognized that the Applicant shall complete all Phase 4 transportation improvements prior to the approval of any Site Plan that exceeds 530,000 square feet of commercial land use and 440,000 square feet of office land use or equivalent trip generation as noted above on the B2 portion of the Property. In the event that the Applicant would desire to develop commercial or office land uses that exceed the maximum square feet or total trip generation specified in this phase of the transportation program, a new traffic impact analysis report shall be prepared with each site plan to determine any additional transportation improvements required to mitigate the impacts created solely by that project, which will be implemented as a condition of site plan approval. b. The Applicant shall dedicate all right -of -way necessary for the Phase 4 improvements that will occur on the Property to VDOT or Frederick County. The Applicant will attempt to design all off -site improvements within public right -of -way; however, if necessary it is recognized that VDOT and/or Frederick County will assist the Applicant with right -of- way necessary to implement proffered off -site transportation improvements. The Applicant agrees to assume all costs associated with right -of -way acquisition if assistance from VDOT and /or Frederick County is required. Green ay Engineering November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009; March 30, 2009 E. Fire and Rescue Enhancements File #4928S/Silver Lake LLC Rezoning 13 c. The Applicant shall design and construct, or cause for the construction of improvements to Silver Lake Road to provide for a second left tum lane on Silver Lake Road at the intersection of Northwestern Pike. These improvements shall be completed prior to the approval of any Site Plan that exceeds 530,000 square feet of commercial land use and 440,000 square feet of office land use or equivalent trip generation as described in Section D(5)(a) of the proffer statement on the B2 portion of the Property. d. The Applicant shall design and construct, or cause for the construction of improvements to provide for a third westbound thru lane on Northwestern Pike from the eastern boundary of the Property to Spinning Wheel Lane. Additionally, the Applicant shall be responsible for the relocation, construction, and right -of -way dedication (if necessary) of the existing right turn lanes on Northwestern Pike at the Spinning Wheel Lane and Silver Lake Road intersections. The Applicant shall complete these improvements prior to the approval of any Site Plan that exceeds 530,000 square feet of commercial land use and 440,000 square feet of office land use or equivalent trip generation as described in Section D(5)(a) of the proffer statement on the B2 portion of the Property. 6. The Applicant hereby proffers to conduct annual traffic counts that will be provided to VDOT and Frederick County to determine if the 8,000 ADT volume is achieved to require the expansion of Spinning Wheel Lane and Silver Lake Road to four -lane urban road sections, as provided for in Sections D(2)(f), D(3)(d), and D(3)(e) of the proffer statement. The annual traffic counts shall begin in the first calendar year that the Phase 2 transportation improvements are completed and shall continue until the warrants are met for widening both street systems. VDOT and Frederick County may allow for annual traffic counts to be delayed in calendar years in which there is no development activity on the Property. When required, traffic counts will be conducted at the Spinning Wheel Lane and Silver Lake Road intersections with Northwestern Pike, on Spinning Wheel Lane at the eastern boundary of the Property, and on the two -lane road connector between Spinning Wheel Lane and Poor House Road at the western boundary of the Property. If warrants are met based on the annual traffic counts, the Applicant shall prepare and submit construction plans for approval by VDOT and Frederick County within six months of written notice that warrants are met. The Applicant shall commence construction of these improvements within six months of final plan approval. 1. The Applicant hereby proffers to provide, or cause for the provision of land to Frederick County for the development of a new fire and rescue station and support facilities within five years from the date of final non appealable rezoning Grecnway Engineering File #49285 /Silver Lake LLC Rezoning November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009; March 30, 2009 14 approval. The Applicant shall dedicate a site fronting on Silver Lake Road that is located near the intersection of Northwestern Pike, which is a minimum of three acres and a maximum of four acres in size, with the final size of this site being determined upon approval of the Site Plan for the new fire and rescue station facility. The Applicant shall prepare and provide Frederick County with the dedication plat for this site and necessary right -of -way along Northwestern Pike and Silver Lake Road within five years from the date of final non appealable rezoning approval provided that a Site Plan has been approved for the new fire and rescue station. Additionally, if Frederick County does not commence construction of a new fire and rescue station within one year following the dedication of the site, this land shall be conveyed back to the Applicant to allow for further economic development. In the event Frederick County elects not to develop this site as a new fire and rescue station, the Applicant shall provide a monetary contribution to Frederick County in the amount of $100,000.00 for the development of a new fire and rescue station or for the expansion of an existing fire and rescue station at another location. 2. The Applicant hereby proffers to provide, or cause for the provision of a monetary contribution to Frederick County in the amount of $1,000,000.00 for the development of a new fire and rescue station or for the expansion of an existing fire and rescue station. This monetary proffer is intended to mitigate impacts to fire and rescue services associated with the development of the CCRC on the MS District portion of the Property. The $1,000,000.00 monetary contribution shall be provided to Frederick County within five years from the date of final non appealable rezoning approval to assist with the development of the new fire and rescue station or for the expansion of an existing fire and rescue station. However, the date for the $1,000,000.00 monetary contribution payment may be extended if a Site Plan for a new fire and rescue station or for the expansion of an existing fire and rescue station has not been approved within five years from the date of final non appealable rezoning approval. If the latter occurs, the $1,000,000.00 monetary contribution shall be provided to Frederick County within 30 days of the date of final Site Plan approval for the new fire and rescue station or for the expansion of an existing fire and rescue station. 3. The Applicant hereby proffers to design and construct, or cause for the construction of all necessary road improvements at the Northwestern Pike intersection with Silver Lake Road and on Silver Lake Road to provide access to the new fire and rescue station, as well as all utilities necessary for the new fire and rescue station located on the Property. These infrastructure improvements shall be provided by the Applicant in advance of the Phase 1 or Phase 2 transportation program improvements to facilitate the construction of the new fire and rescue station should this occur in advance of the commercial development within these transportation phases. The Applicant shall work with Frederick County, upon notice by the County. to ensure that the design, bonding and construction of these infrastructure improvements is coordinated during the preparation of the Site Plan for the new fire and rescue station on the Property. Greenway Engineering F. Signatures The conditions proffered above shall be binding upon the heirs, executors, administrators, assigns and successors in the interest of the Applicants and owners. In the event the Frederick County Board of Supervisors grants this rezoning and accepts the conditions, the proffered conditions shall apply to the land rezoned in addition to other requirements set forth in the Frederick County Code. Respectfully Submitted: By: s Manage`" Date: 7/ 07 v III Commonwealth of Virginia, City ounty .f Er26e_iric 20by The foregoing instrument was acknowledged before me this day of A0vi i My Commission Expires f e to. Lei' 20; Z R e is}vC{i 21(010 (o File #4928S /Silver Lake LLC Rezoning November 25, 2008: Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009; March 30, 2009 To Wit: Notary Public 15 GENERALIZED DEVELOPMENT PLAN SILVER LAKE DEVELOPMENT GAINESBORO MAGISTERIAL DISTRICT FREDERICK COUNTY, VA GREENWAY ENGINEERING 151 Windy Hill Lane Winchester, Virginia 22602 Telephone 540 -682 -4185 FAX 540 722 -9528 www: greenwayeng, com r m n -I -El if ro a z m W m z m r- O N o rn z 0 w I O 11 c 0) z m r m m -1 CD zm ht rn j O �I w O I -413 -1 D I C� z I m c m m N I m� I 000 t t SILVER LAKE RC AD m 0 0 z 0 'A MI 0 m F O m 0 0 z m z a m N m z GENERALIZED DEVELOPMENT PLAN SILVER LAKE DEVELOPMENT GAINESBORO MAGISTERIAL DISTRICT FREDERICK COUNTY, VA cn 0 m z m O z SPINNING WHEEL 0 LANE I• to 0 (4) Qo z m r z Founded in 1971 Engineers Surveyors 151 Windy Hill Lane Winchester, Virginia 22602 Telephone 540 -662 -4185 FAX 540 722 -9528 www. greenwayeng. com 0 50' GREENWAY ENGINEER P 0 0 0 co rn GENERALIZED DEVELOPMENT PLAN SILVER LAKE DEVELOPMENT GAINESBORO MAGISTERIAL DISTRICT FREDERICK COUNTY, VA Founded in 1971 Engineers Surveyors 7 GREENWAY ENGINI 151 Windy Hill Lane Winchester, Virginia 22602 Telephone 540 -662 -4185 FAX 540 722 -9528 www.greenwayeng.com Greenwa APPLICANT: Engineering November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009; March 30, 2009 REZONING: PROPERTY: RECORD OWNER; PROJECT NAME: ORIGINAL DATE OF PROFFERS: REVISION DATE: March 13, 2009 March 30, 2009 Preliminary Matters SILVER LAKE, LLC PROFFER STATEMENT RZ Rural Areas District (RA) to Business General District (B2) and MS Medical Support District (MS) 370.02± acres; Tax Parcels #52- ((A)) -C, 52- ((A)) -50, 52- ((A)) -50A, 52- ((A)) -52, and 52- ((A)) -63 (here -in after the "Property Silver Lake, LLC, James R. Wilkins, III, Manager Silver Lake, LLC (here -in after the "Applicant Round Hill Commercial Center The Village at Orchard Ridge A National Lutheran Home Community November 25, 2008 Pursuant to Section 15.2 -2296 Et. Seq. of the Code of Virginia, 1950, as amended, and the provisions of the Frederick County Zoning Ordinance with respect to conditional zoning, the undersigned Applicant hereby proffers that in the event the Board of Supervisors of Frederick County, Virginia, shall approve Rezoning Application for the rezoning of 370.02± -acres from the Rural Areas (RA) District to establish 238.96± acres of B -2, Business General District (Tax Map Parcels 52- ((A)) -C, 52- ((A)) -50A, 52- ((A))-52, 52- ((A)) -63) and 131.06± -acres of MS, Medical Support District (Tax Map Parcel 524(A)) -50), development of the subject property shall be done in conformity with the terms and conditions set forth herein, except to the extent that such terms and conditions may be subsequently amended or revised by the Applicant and such be approved by the Frederick County Board of Supervisors in accordance with the said Code and Zoning Ordinance. In the event that such rezoning is not granted, then these proffers shall be deemed withdrawn and have no effect whatsoever. These proffers shall be binding upon this Applicant and their legal successors, heirs, or assigns. The Property, more particularly described as the lands owned by Silver Lake LLC, being all of Tax Map Parcels 52- ((A)) -C, 52- ((A)) -50, 52- ((A)) -50A, 52- ((A)) -52, 52- ((A)) -63, and further described by Property Deeds including Instrument Number 090001536, Deed Book 872 Page 318 and Deed Book 927 Page 1591. (Please refer to Rezoning Application Deed information). File #4928S /Silver Lake LLC Rezoning Greenway Engineering 2 File #4928S/Silver Lake LLC Rezoning November 25. 2008; Revised January 6, 2009: Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009: March 30, 2009 A. Generalized Development Plan B. MS, Medical Support District Area PROFFER STATEMENT 1. The Applicant hereby proffers to submit a Generalized Development Plan (the "GDP for the Property. The purpose of the GDP is to identify the general location of the B -2, Business General District and MS, Medical Support District areas, the general location of the proposed future Fire and Rescue Station area, the general location of the proposed future passive open space area, the general location of the 50 -foot green strip enhancement area, the general location of the 10 -foot asphalt trail system, and the general location of the phased transportation improvements areas within and adjacent to the Property. 2. The Applicant hereby proffers to develop the Property in substantial conformity with the proffered GDP, prepared by Greenway Engineering dated March 2, 2009 March 30, 2009. The GDP is recognized to be a conceptual plan and may be adjusted by the Applicant to accommodate final design and engineering constraints without the need of new conditional rezoning approval by the Frederick County Board of Supervisors, provided that the adjustments do not eliminate or substantially relocate the areas described in Section Al of this proffer statement. 1. The Applicant hereby proffers to develop, or cause for the development of a Continuing Care Retirement Community (the "CCRC on the portion of the Property proposed to be zoned MS, Medical Support District, and to exclude all other MS, Medical Support District land uses not expressly permitted within Section 165- 97B(7) of the Frederick County Zoning Ordinance. The Applicant hereby proffers to limit the maximum residential density within the CCRC to eight units per acre. The maximum residential density total shall include all independent living units, assisted care living units, and skilled nursing care units. The location and totals for the residential units specified in this section shall be provided on the Master Development Plan for the Property. 3. Where buffer areas are required and mature woodlands are in place, the Applicant will request approval of the use of these woodland features to satisfy the buffer requirement during the consideration of the Master Development Plan. 4. The Applicant proffers to provide initial access to the CCRC via Spinning Wheel Lane as described in Section D(2)(f) of the proffer statement, and further proffers Grecnway Engineering November 25, 2008; Revised January 6, 2009 Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009; March 30, 2009 to provide a maximum of two commercial entrances on Spinning Wheel Lane to provide access to the CCRC. C. B2, Business General District Area 1. The Applicant hereby proffers to prohibit the following land uses currently allowed within the B2 District: Truck Stops Golf Driving Ranges Outdoor Batting Cages Model Home Sales Self- Service Storage Facilities Adult Retail Establishments 3 2. The Applicant hereby proffers to prohibit individual full service commercial entrances to all allowed B2 District land uses that intersect Northwestern Pike (U.S. Route 50 West) and Poorhouse Road (Route 654); however, right -in or right -out only access to B2 District land uses that intersect Northwestem Pike shall be permitted if approved by VDOT and /or Frederick County. 3. The Applicant hereby proffers to establish a green strip along the Property frontage adjacent to the Northwestern Pike corridor that is 50 feet in width. Parking lots and access drives shall be prohibited within the 50 -foot green strip, unless except for access drives are permitted as described in Section C(2) above. The entire Property frontage of the 50 -foot green strip shall be enhanced with street trees that are a minimum of 2 -inch caliper at planting and spaced a maximum of 30 feet on center, ornamental shrubs that are a minimum three gallon container at planting, as well as an asphalt bicycle and pedestrian facility that is 10 feet wide. The installation of the street trees, ornamental shrubs, and bicycle and pedestrian facility located within the 50 -foot green strip shall be required as specified in Section C(6) Section C(8) of the proffer statement. 4. The Applicant hereby proffers to establish street tree plantings along both sides of Spinning Wheel Lane and Silver Lake Road throughout the limits of the B2 District property. All street trees shall be a minimum of two -inch caliper at time of planting and spaced a maximum 40 feet on center. The street trees shall be located between the back of curb and sidewalks and /or the asphalt bicycle and pedestrian facility. 5. The Applicant hereby proffers to establish a linear passive open space area in the general location identified on the proffered GDP, which will be enhanced with a 10 -foot asphalt trail system between Spinning Wheel Lane and Northwestern Pike as specified in Section C(6) Section C(8) of the proffer statement. File #49285 /Silver Lake LLC Rezoning Greenway Engineering November 25, 2008; Revised January 6, 2009. 6. The Applicant hereby proffers to provide for inter parcel connectors between all adjoining commercial and office land uses. 7. The Applicant hereby proffers to include an additional row of evergreen trees within all required buffer and screening areas adjacent to land primarily used for residential purposes in the RA District in which accessory uses are proposed within the active portion of the buffer area. 8. The Applicant hereby proffers to design and construct, or cause for the construction of an asphalt bicycle and pedestrian facility that is ten -feet wide. This location of this facility is identified on the proffered GDP and will be located outside of public right -of -way limits. This facility will be developed as follows: The 10 -foot asphalt trail located along the south side of the Phase 1 segment of Spinning Wheel Lane shall be developed during the construction of this road segment as specified in Section D(2)(f) of the proffer statement. The 10 -foot asphalt trail located along the south side of the Phase 2 segment of Spinning Wheel Lane shall be developed during the construction of this road segment as specified in Section D(3)(e) of the proffer statement. The 10 -foot asphalt trail located along the passive open space area shall be developed on or before the completion of the commercial development permitted under the Phase 1 Transportation Program as specified in Section D(2)(a) of the proffer statement. The 10 -foot asphalt trail located along the southern boundary of the Property identified as Area 1 on the GDP shall be developed during the construction of the Phase 1 segment of Spinning Wheel Lane as specified in Section D(2)(f) of the proffer statement. The 10 -foot asphalt trail located along the southem boundary of the Property identified as Area 2 on the GDP shall be developed prior to the issuance of the occupancy permit issued for the first commercial building permit located in the land bay between Spinning Wheel Lane and Silver Lake Road The 10 -foot asphalt trail located along the southern boundary of the Property identified as Area 3 on the GDP shall be developed prior to the issuance of the occupancy permit issued for the first commercial building permit located in the land bay between Silver Lake Road and the eastern boundary of the Property. 9. The Applicant hereby proffers to establish an Architectural Review Board (ARB) for the purpose of reviewing structural elevations, site landscaping and signage for all commercial sites to ensure compatibility with the restrictive covenant documents for the B2 District property. The restrictive covenant documents shall be provided to Frederick County prior to the subdivision of land within the B2 File #49285 /Silver Lake LLC Rezoning Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009; March 30, 2009 Greenway Engineering November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009; March 30, 2009 District, or prior to the approval of any site development plan within the B2 District. The restrictive covenant documents shall include, but not be limited to, the following design elements: i Building materials for all exterior walls and rooflines. i Materials for all monument freestanding business signs. The materials for the base of all monument freestanding business signs shall be consistent throughout the B2 District. Screening of all loading areas from adjoining properties external to the B2 District. Screening of outdoor dumpster pad areas with building materials consistent with the primary structure. Common area maintenance agreements. D. Transportation Enhancements 1. The Applicant has submitted a Traffic Impact Analysis (TIA), prepared by Patton, Harris, Rust and Associates, dated November 25, 2008 for the 370.02+ acre Property. The TIA identifies improvements to the regional transportation network to account for background undeveloped projects and the Applicant's proposal through four phases of development. The Applicant hereby proffers to design and construct, or cause for the construction of improvements to the regional transportation network as a phased development program that is described in this section of the proffer statement. Additionally, the phased development program is identified in illustrative form on the proffered GDP. It is recognized that the phased transportation improvements proffered herein will be constructed as described in this section; however, the exact location and limits of these improvements will be determined by VDOT and /or Frederick County during the approval of engineering design plans. It is further recognized that the location of the regional transportation network improvements identified in illustrative form on the proffered GDP are general in nature and may be relocated to accommodate VDOT engineering design plan approval without the need for conditional zoning amendment to the GDP or the proffer statement. 2. The Applicant hereby proffers the following Phase 1 Transportation Program: a. The Applicant shall be entitled to develop the CCRC and a maximum of 180,000 square feet of commercial land use within Phase 1. However, the Applicant can deviate from this land use mix assuming the total trip generation for site plans within this phase of the transportation program (based on the ITE 7 Edition Trip Generation Report) do not exceed the total trip generation specified in the November 25, 2008 Traffic Impact Analysis Report for Phase 1. It is recognized that the Applicant shall complete all Phase 1 transportation improvements prior to the approval of File #49285 /Silver Lake LLC Rezoning Greenway Engineering File #4928SiSilver Lake LLC Rezoning November 25, 2008; Revised January 6, 2009 Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009; March 30, 2009 6 any Site Plan that exceeds 180,000 square feet of commercial land use or equivalent trip generation as noted above on the B2 portion of the Property. b. The Applicant shall dedicate all right -of -way necessary for the Phase 1 improvements that will occur on the Property to VDOT or Frederick County. The Applicant will attempt to design all off -site improvements within public right -of -way; however, if necessary it is recognized that VDOT and /or Frederick County will assist the Applicant with right -of- way necessary to implement proffered off -site transportation improvements. The Applicant agrees to assume all costs associated with right -of -way acquisition if assistance from VDOT and /or Frederick County is required. c. The Applicant shall execute, or cause for the execution of a traffic signalization agreement with VDOT to fully fund new traffic signalization at the intersection of Northwestern Pike (U.S. Route 50) and Poor House Road (Route 654). The traffic signalization agreement shall be executed within six months of final non appealable rezoning approval, or prior to approval of the first Site Plan for the property, whichever occurs first. d. The Applicant shall design and construct. or cause for the execution of a traffic signalization agreement with VDOT to fully fund new traffic signalization with pedestrian actualization at the intersection of Northwestern Pike (U.S. Route 50) and the relocated Spinning Wheel Lane. The traffic signalization agreement shall be executed within one year of final non appealable rezoning approval, or prior to approval of the first Site Plan for the property, whichever occurs first. The Applicant shall reserve the right to preempt this agreement by initiating a signal warrant study and signal design plans in accordance with VDOT standards for approval to install traffic signalization at this intersection. e. The Applicant shall design and construct, or cause for the construction of improvements to the median crossing including a westbound right turn lane and left turn lane and an eastbound left turn lane on Northwestern Pike at the intersection of the relocated Spinning Wheel Lane. These improvements shall be completed prior to the issuance of the first occupancy permit for the land use utilizing Spinning Wheel Lane for access to Northwestern Pike. f. The Applicant shall design and construct, or cause for the construction of improvements to Spinning Wheel Lane within the Property to provide for a road section that is constructed to a 40 mph geometric design standard and provides right -of -way for a future roundabout at the intersection with Silver Lake Road, and left turn lanes and right turn lanes at all internal collector street intersections and at commercial entrances as required by Greenway Engineering g. File #4928SiSilver Lake LLC Rezoning November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009; March 30, 2009 7 VDOT. Additionally, the Applicant shall design and construct, or cause for the construction of separate right and left turn lanes on Spinning Wheel Lane at the intersection of Northwestern Pike. Spinning Wheel Lane shall be developed as a four -lane divided urban road section between Northwestern Pike and the future roundabout, and as a two -lane road section between the future roundabout and the limits of Phase 1 with dedicated right -of -way to Frederick County to allow for a four -lane urban road section. The construction of the two -lane road section shall include a raised median section necessary to transition from the roundabout into the urban road section design. These improvements shall be completed prior to the issuance of the first occupancy permit for the land use utilizing Spinning Wheel Lane for access to Northwestern Pike. Furthermore, the Applicant agrees to design and construct, or cause for the construction of the four -lane urban section between the future roundabout and the limits of Phase 1 if this improvement is warranted based on future traffic counts as described in Section D(6). The Applicant shall design and construct, or cause for the construction of modifications to, or the elimination of the median crossing on Northwestern Pike identified as Median Crossing A on the proffered GDP. VDOT shall determine the requirements for modification, or elimination and shall advise the Applicant in writing of the requirements associated with this improvement. The Applicant shall complete these improvements in conjunction with construction activities associated with Spinning Wheel Lane as described in Section D(2)(f) of the proffer statement. h. The Applicant shall design and construct, or cause for the construction of improvements to the southbound off ramp at the Route 37 interchange with Northwestern Pike to provide for a free flow right turn lane onto Northwestern Pike. The Applicant shall complete the Route 37 interchange improvements described in this section prior to the approval of any Site Plan that exceeds 180,000 square feet of commercial land use or equivalent trip generations as described in Section D(2)(a) of the proffer statement on the B2 portion of the Property. i. In the event that VDOT and Frederick County determine that a monetary contribution for regional transportation improvements to the Route 37 corridor between the Northwestern Pike interchange and the North Frederick Pike interchange is desired, the Applicant agrees to provide a monetary contribution in lieu of the improvement described in Section 2(h). This monetary contribution shall be equivalent to the amount associated with the improvement described in that section based upon an engineering estimate agreed upon by VDOT, Frederick County and the Applicant that will be prepared on or before the build out of the Phase 1 transportation improvements. The Applicant agrees to provide this Greenway Engineering File #4928SiSilver Lake LLC Rezoning November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009; March 30, 2009 monetary contribution to Frederick County within 30 days of written request by the County, and further agrees to allow for this monetary contribution to be utilized as matching funds by Frederick County for qualifying transportation improvements programs or grants. 3. The Applicant hereby proffers the following Phase 2 Transportation Program: 8 a. The Applicant shall be entitled to develop the CCRC and a maximum of 350,000 square feet of commercial land use and 105,000 square feet of office land use within Phase 2 that is a cumulative total of Phase 1 Phase 2. However, the Applicant can deviate from this land use mix assuming the total trip generation for site plans within this phase of the transportation program (based on the ITE 7 Edition Trip Generation Report) do not exceed the total trip generation specified in the November 25, 2008 Traffic Impact Analysis Report for Phase 2. It is recognized that the Applicant shall complete all Phase 2 transportation improvements prior to the approval of any Site Plan that exceeds 350,000 square feet of commercial land use and 105,000 square feet of office land use or equivalent trip generation as noted above on the B2 portion of the Property. b. The Applicant shall dedicate all right -of -way necessary for the Phase 2 improvements that will occur on the Property to VDOT or Frederick County. The Applicant will attempt to design all off -site improvements within public right-of-way; however, if necessary it is recognized that VDOT and /or Frederick County will assist the Applicant with right -of- way necessary to implement proffered off -site transportation improvements. The Applicant agrees to assume all costs associated with right -of -way acquisition if assistance from VDOT and /or Frederick County is required. c. The Applicant shall design and construct, or cause for the execution of a traffic signalization agreement with VDOT to fully fund new traffic signalization with pedestrian actualization at the intersection of Northwestern Pike (U.S. Route 50) and Silver Lake Road. The traffic signalization agreement shall be executed prior to the issuance of the first occupancy permit for the land use utilizing Silver Lake Road for access to Northwestern Pike. The Applicant shall provide additional funding necessary to provide for pre emption control for this traffic signal if the County requests the land for the new fire and rescue facility provided in Section E(1) of the proffer statement. In the event the County does not request the land for the new fire and rescue facility, the additional funding for traffic signal pre emption control shall be made available for pre emption control for the traffic signal at the intersection of Northwestern Pike and Poor House Road that is described in Section Greenway Engineering d. The Applicant shall design and construct, or cause for the construction of improvements to Silver Lake Road to include a two -lane urban road section with a raised median to the first available commercial entrance that is constructed to a 40 mph geometric design standard and provides for the construction of the roundabout at the intersection with Spinning Wheel Lane, and left turn lanes and right turn lanes at all commercial entrances as required by VDOT. Additionally, the Applicant shall design and construct, or cause for the construction of a median crossing including a westbound right turn lane and left turn lane and an eastbound left turn lane on Northwestern Pike at the intersection of Silver Lake Road These improvements shall be completed prior to the approval of any Site Plan that exceeds 350,000 square feet of commercial land use and 105,000 square feet of office land use or equivalent trip generation as described in Section D(3)(a) of the proffer statement on the B2 portion of the Property, with the exception of the median crossing and turn lane improvements on Northwestern Pike which shall be completed with the Silver Lake Road intersection improvements on Northwestern Pike. Additionally, the Applicant shall dedicate right -of -way to Frederick County to allow for a four -lane urban road section for Silver Lake Road, and further agrees to design and construct, or cause for the construction of the four -lane urban road section if this improvement is warranted based on future traffic counts as described in Section D(6). e. The Applicant shall design and construct, or cause for the construction of improvements to Spinning Wheel Lane to provide for a two -lane urban road section that is constructed to a 40 mph geometric design standard and provides for left turn lanes and right turn lanes at all internal collector street intersections and at commercial entrances as required by VDOT, which continues from the terminus of Spinning Wheel Lane constructed in Phase 1 to a connection at the intersection of Retail Boulevard. The Applicant shall complete these improvements prior to the approval of any Site Plan that exceeds 350,000 square feet of commercial land use and 105,000 square feet of office land use or equivalent trip generation as described in Section D(3)(a) of the proffer statement on the B2 portion of the Property. Additionally, the Applicant shall dedicate right -of -way to Frederick County to allow for a four -lane urban road section for Spinning Wheel Lane and further agrees to design and construct, or cause for the construction of the four -lane urban section if this improvement is warranted based on future traffic counts as described in Section D(6). File #4928SiSilver Lake LLC Rezoning November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009; March 30, 2009 9 D(2)(c) of the proffer statement. The Applicant shall reserve the right to preempt this agreement by initiating a signal warrant study and signal design plans in accordance with VDOT standards for approval to install traffic signalization at this intersection. Greenway Engineering November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009; March 30, 2009 g. f. The Applicant shall design and construct, or cause for the construction of modifications to, or the elimination of the median crossings on Northwestern Pike identified as Median Crossing B and Median Crossing C on the proffered GDP. VDOT shall determine the requirements for modification, or elimination and shall advise the Applicant in writing of the requirements associated with this improvement. The Applicant shall complete these improvements in conjunction with construction activities associated with Silver Lake Road as described in Section D(3)(d) of the proffer statement. h. The Applicant shall design and construct, or cause for the construction of improvements at the Route 37 interchange with Northwestern Pike to provide for a third westbound thru lane on Northwestern Pike under the Route 37 bridge structure continuing east to the transition for the Route 37 northbound on -ramp, to include the relocation of the existing Route 37 northbound on -ramp. The Applicant shall complete the Route 37 interchange improvements described in this section prior to the approval of any Site Plan that exceeds 350,000 square feet of commercial land use and 105,000 square feet of office land use or equivalent trip generation as described in Section D(3)(a) of the proffer statement on the B2 portion of the Property. i. In the event that VDOT and Frederick County determine that a monetary contribution for regional transportation improvements to the Route 37 corridor between the Northwestern Pike interchange and the North Frederick Pike interchange is desired, the Applicant agrees to provide a monetary contribution in lieu of the improvements described in Section 3(g) and 3(h). This monetary contribution shall be equivalent to the amount associated with the improvement described in those sections based upon an engineering estimate agreed upon by VDOT, Frederick County and the Applicant that will be prepared on or before the build out of the Phase 2 transportation improvements. The Applicant agrees to provide this monetary contribution to Frederick County within 30 days of written request by the County, and further agrees to allow for this monetary contribution to be utilized as matching funds by Frederick County for qualifying transportation improvements programs or grants. File #4928S/Silver Lake LLC Rezoning 10 The Applicant shall design and construct, or cause for the construction of improvements to the northbound off ramp at the Route 37 interchange with Northwestern Pike to provide for a second right turn. The Applicant shall complete the Route 37 interchange improvements described in this section prior to the approval of any Site Plan that exceeds 350,000 square feet of commercial land use and 105,000 square feet of office land use or equivalent trip generation as described in Section D(3)(a) of the proffer statement on the B2 portion of the Property. Greenway Engineering November 25, 2008; Revised January 6, 2009 Revised January 27, 2009; Revised February 16, 2009: Revised February 19, 2009; Revised March 2, 2009; March 13, 2009: March 30, 2009 4. The Applicant hereby proffers the following Phase 3 Transportation Program: File #4928SiSilver Lake LLC Rezoning In the event that regional transportation improvements to the Route 37 corridor between the Northwestern Pike interchange are constructed prior to the completion of the Phase 2 Transportation Program, the Applicant agrees to provide a monetary contribution equivalent to the amount associated with the improvement described in this section to be utilized unconditionally by Frederick County for other transportation improvements. This monetary contribution shall be provided to Frederick County within 60 days of written request by the County. a. The Applicant shall be entitled to develop the CCRC and a maximum of 490,000 square feet of commercial land use and 350,000 square feet of office land use within Phase 3 that is a cumulative total of Phase 1 Phase 3. However, the Applicant can deviate from this land use mix assuming the total trip generation for site plans within this phase of the transportation program (based on the ITE 7 Edition Trip Generation Report) do not exceed the total trip generation specified in the November 25, 2008 Traffic Impact Analysis Report for Phase 3. It is recognized that the Applicant shall complete all Phase 3 transportation improvements prior to the approval of any Site Plan that exceeds 490,000 square feet of commercial land use and 350,000 square feet of office land use or equivalent trip generation as noted above on the B2 portion of the Property. b. The Applicant shall dedicate all right -of -way necessary for the Phase 3 improvements that will occur on the Property to VDOT or Frederick County. The Applicant will attempt to design all off -site improvements within public right -of -way; however, if necessary it is recognized that VDOT and/or Frederick County will assist the Applicant with right -of- way necessary to implement proffered off -site transportation improvements. The Applicant agrees to assume all costs associated with right -of -way acquisition if assistance from VDOT and /or Frederick County is required. c. The Applicant shall design and construct, or cause for the construction of improvements to Spinning Wheel Lane to provide for a second right turn lane on Spinning Wheel Lane at the intersection of Northwestern Pike. These improvements shall be completed prior to the approval of any Site Plan that exceeds 490,000 square feet of commercial land use and 350,000 square feet of office land use or equivalent trip generation as described in Section D(4)(a) of the proffer statement on the B2 portion of the Property. d. The Applicant shall design and construct, or cause for the construction of a two -lane urban road that is constructed to a 40 mph geometric design Greenway Engineering November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009; March 30, 2009 5. The Applicant hereby proffers the following Phase 4 Transportation Program: File #4928S/Silver Lake LLC Rezoning 12 standard and provides for roundabout design at the intersection with Spinning Wheel Lane, and left turn lanes and right turn lanes at all commercial entrances as required by VDOT, which will provide for a connection between Spinning Wheel Lane and Poor House Road (Route 654). The Applicant will coordinate with the owner of tax parcel 52- ((A)) -47 to obtain right -of -way for this improvement as a first option for development of the two -lane urban road connection. In the event that the first option cannot be achieved, the Applicant shall design and construct, or cause for the construction of the two -lane urban road connection between Spinning Wheel Lane and Poor House Road on the Property. The general location of the two -lane road connection associated with both options will be provided on the proffered GDP; however, it is recognized that this location may shift without the need for conditional rezoning approval. The Applicant shall complete this improvement prior to the approval of any Site Plan that exceeds 490,000 square feet of commercial land use and 350,000 square feet of office land use or equivalent trip generation as described in Section D(4)(a) of the proffer statement on the B2 portion of the Property. a. The Applicant shall be entitled to develop the CCRC and a maximum of 583,050 square feet of commercial land use and 494,600 square feet of office land use within Phase 4 that is a cumulative total of Phase 1 Phase 4. However, the Applicant can deviate from this land use mix assuming the total trip generation for site plans within this phase of the transportation program (based on the ITE 7th Edition Trip Generation Report) do not exceed the total trip generation specified in the November 25, 2008 Traffic Impact Analysis Report for Phase 4. It is recognized that the Applicant shall complete all Phase 4 transportation improvements prior to the approval of any Site Plan that exceeds 530,000 square feet of commercial land use and 440,000 square feet of office land use or equivalent trip generation as noted above on the B2 portion of the Property. In the event that the Applicant would desire to develop commercial or office land uses that exceed the maximum square feet or total trip generation specified in this phase of the transportation program, a new traffic impact analysis report shall be prepared with each site plan to determine any additional transportation improvements required to mitigate the impacts created solely by that project, which will be implemented as a condition of site plan approval. b. The Applicant shall dedicate all right -of -way necessary for the Phase 4 improvements that will occur on the Property to VDOT or Frederick County. The Applicant will attempt to design all off -site improvements within public right -of -way; however, if necessary it is recognized that Greenway Engineering File #4928S/Silver Lake LLC Rezoning November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009; March 30, 2009 13 VDOT and /or Frederick County will assist the Applicant with right -of- way necessary to implement proffered off -site transportation improvements. The Applicant agrees to assume all costs associated with right -of -way acquisition if assistance from VDOT and /or Frederick County is required. c. The Applicant shall design and construct, or cause for the construction of improvements to Silver Lake Road to provide for a second left turn lane on Silver Lake Road at the intersection of Northwestern Pike. These improvements shall be completed prior to the approval of any Site Plan that exceeds 530,000 square feet of commercial land use and 440,000 square feet of office land use or equivalent trip generation as described in Section D(5)(a) of the proffer statement on the B2 portion of the Property. d. The Applicant shall design and construct, or cause for the construction of improvements to provide for a third westbound thru lane on Northwestern Pike from the eastern boundary of the Property to Spinning Wheel Lane. Additionally, the Applicant shall be responsible for the relocation, construction, and right -of -way dedication (if necessary) of the existing right turn lanes on Northwestern Pike at the Spinning Wheel Lane and Silver Lake Road intersections. The Applicant shall complete these improvements prior to the approval of any Site Plan that exceeds 530,000 square feet of commercial land use and 440,000 square feet of office land use or equivalent trip generation as described in Section D(5)(a) of the proffer statement on the B2 portion of the Property. 6. The Applicant hereby proffers to conduct annual traffic counts that will be provided to VDOT and Frederick County to determine if the 8,000 ADT volume is achieved to require the expansion of Spinning Wheel Lane and Silver Lake Road to four -lane urban road sections, as provided for in Sections D(2)(f), D(3)(d), and D(3)(e) of the proffer statement. The annual traffic counts shall begin in the first calendar year that the Phase 2 transportation improvements are completed and shall continue until the warrants are met for widening both street systems. VDOT and Frederick County may allow for annual traffic counts to be delayed in calendar years in which there is no development activity on the Property. When required, traffic counts will be conducted at the Spinning Wheel Lane and Silver Lake Road intersections with Northwestern Pike, on Spinning Wheel Lane at the eastern boundary of the Property, and on the two -lane road connector between Spinning Wheel Lane and Poor House Road at the western boundary of the Property. If warrants are met based on the annual traffic counts, the Applicant shall prepare and submit construction plans for approval by VDOT and Frederick County within six months of written notice that warrants are met. The Applicant shall commence construction of these improvements within six months of final plan approval. Greenway Engineering E. Fire and Rescue Enhancements 1. The Applicant hereby proffers to provide, or cause for the provision of land to Frederick County for the development of a new fire and rescue station and support facilities within five years from the date of final non appealable rezoning approval. The Applicant shall dedicate a site fronting on Silver Lake Road that is located near the intersection of Northwestern Pike, which is a minimum of three acres and a maximum of four acres in size, with the final size of this site being determined upon approval of the Site Plan for the new fire and rescue station facility. The Applicant shall prepare and provide Frederick County with the dedication plat for this site and necessary right -of -way along Northwestern Pike and Silver Lake Road within five years from the date of final non appealable rezoning approval provided that a Site Plan has been approved for the new fire and rescue station. Additionally, if Frederick County does not commence construction of a new fire and rescue station within one year following the dedication of the site, this land shall be conveyed back to the Applicant to allow for further economic development. In the event Frederick County elects not to develop this site as a new fire and rescue station, the Applicant shall provide a monetary contribution to Frederick County in the amount of $100,000.00 for the development of a new fire and rescue station or for the expansion of an existing fire and rescue station at another location. 2. The Applicant hereby proffers to provide, or cause for the provision of a monetary contribution to Frederick County in the amount of $1,000,000.00 for the development of a new fire and rescue station or for the expansion of an existing fire and rescue station. This monetary proffer is intended to mitigate impacts to fire and rescue services associated with the development of the CCRC on the MS District portion of the Property. The $1,000,000.00 monetary contribution shall be provided to Frederick County within five years from the date of final non appealable rezoning approval to assist with the development of the new fire and rescue station or for the expansion of an existing fire and rescue station. However, the date for the $1,000,000.00 monetary contribution payment may be extended if a Site Plan for a new fire and rescue station or for the expansion of an existing fire and rescue station has not been approved within five years from the date of final non appealable rezoning approval. If the latter occurs, the $1,000,000.00 monetary contribution shall be provided to Frederick County within 30 days of the date of final Site Plan approval for the new fire and rescue station or for the expansion of an existing fire and rescue station. 3. The Applicant hereby proffers to design and construct, or cause for the construction of all necessary road improvements at the Northwestern Pike intersection with Silver Lake Road and on Silver Lake Road to provide access to the new fire and rescue station, as well as all utilities necessary for the new fire and rescue station located on the Property. These infrastructure improvements shall be provided by the Applicant in advance of the Phase 1 or Phase 2 transportation program improvements to facilitate the construction of the new fire File #4928S/Silver Lake LLC Rezoning November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009; March 30, 2009 14 Grcenway Engineering F. Signatures Respectfully Submitted: File #4928S/Silver Lake LLC Rezoning November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009; March 30, 2009 15 and rescue station should this occur in advance of the commercial development within these transportation phases. The Applicant shall work with Frederick County, upon notice by the County, to ensure that the design, bonding and construction of these infrastructure improvements is coordinated during the preparation of the Site Plan for the new fire and rescue station on the Property. The conditions proffered above shall be binding upon the heirs, executors, administrators, assigns and successors in the interest of the Applicants and owners. In the event the Frederick County Board of Supervisors grants this rezoning and accepts the conditions, the proffered conditions shall apply to the land rezoned in addition to other requirements set forth in the Frederick County Code. By: Date: Commonwealth of Virginia, City /County of To Wit: The foregoing instrument was acknowledged before me this day of 20 by My Commission Expires Notary Public G'eenway Engineering REZONING: PROPERTY: RECORD OWNER: APPLICANT: PROJECT NAME: ORIGINAL DATE OF PROFFERS: REVISION DATE: Preliminary Matters File #4928S/Silver Lake LLC Rezoning November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 16. 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009 SILVER LAKE, LLC PROFFER STATEMENT RZ #O -o Rural Areas District (RA) to Business General District (B2) and MS Medical Support District (MS) 370.02± acres; Tax Parcels #52- ((A)) -C, 52- ((A)) -50, 52- ((A)) -50A, 52- ((A)) -52, and 52- ((A)) -63 (here -in after the "Property Silver Lake, LLC, James R. Wilkins, III, Manager Silver Lake, LLC (here -in after the "Applicant Round Hill Commercial Center The Village at Orchard Ridge A National Lutheran Home Community November 25, 2008 March 13, 2009 Pursuant to Section 15.2 -2296 Et. Seq. of the Code of Virginia, 1950, as amended, and the provisions of the Frederick County Zoning Ordinance with respect to conditional zoning, the undersigned Applicant hereby proffers that in the event the Board of Supervisors of Frederick County, Virginia, shall approve Rezoning Application 0 1-01 for the rezoning of 370.02± -acres from the Rural Areas (RA) District to establish 238.96± acres of B -2, Business General District (Tax Map Parcels 52- ((A)) -C, 52- ((A)) -50A, 52- ((A))-52, 52- ((A)) -63) and 131.06± -acres of MS, Medical Support District (Tax Map Parcel 52- ((A)) -50), development of the subject property shall be done in conformity with the terms and conditions set forth herein, except to the extent that such terms and conditions may be subsequently amended or revised by the Applicant and such be approved by the Frederick County Board of Supervisors in accordance with the said Code and Zoning Ordinance. In the event that such rezoning is not granted, then these proffers shall be deemed withdrawn and have no effect whatsoever. These proffers shall be binding upon this Applicant and their legal successors, heirs, or assigns. The Property, more particularly described as the lands owned by Silver Lake LLC, being all of Tax Map Parcels 52- ((A)) -C, 52- ((A)) -50, 52- ((A)) -50A, 52- ((A)) -52, 52- ((A)) -63, and further described by Property Deeds including Instrument Number 090001536, Deed Book 872 Page 318 and Deed Book 927 Page 1591. (Please refer to Rezoning Application Deed Information). Greenway Engineering November 25, 2008; Revised January 6, 2009 Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009 A. Generalized Development Plan B. MS, Medical Support District Area File #4928S/Silver Lake LLC Rezoning PROFFER STATEMENT 2 1. The Applicant hereby proffers to submit a Generalized Development Plan (the "GDP for the Property. The purpose of the GDP is to identify the general location of the B -2, Business General District and MS, Medical Support District areas, the general location of the proposed future Fire and Rescue Station area, the general location of the proposed future passive open space area, the general location of the 50 -foot green strip enhancement area, the general location of the 10 -foot asphalt trail system, and the general location of the phased transportation improvements areas within and adjacent to the Property. 2. The Applicant hereby proffers to develop the Property in substantial conformity with the proffered GDP, prepared by Greenway Engineering dated March 2, 2009. The GDP is recognized to be a conceptual plan and may be adjusted by the Applicant to accommodate final design and engineering constraints without the need of new conditional rezoning approval by the Frederick County Board of Supervisors, provided that the adjustments do not eliminate or substantially relocate the areas described in Section Al of this proffer statement. 1. The Applicant hereby proffers to develop, or cause for the development of a Continuing Care Retirement Community (the "CCRC on the portion of the Property proposed to be zoned MS, Medical Support District, and to exclude all other MS, Medical Support District land uses not expressly permitted within Section 165- 97B(7) of the Frederick County Zoning Ordinance. 2. The Applicant hereby proffers to limit the maximum residential density within the CCRC to eight units per acre. The maximum residential density total shall include all independent living units, assisted care living units, and skilled nursing care units. The location and totals for the residential units specified in this section shall be provided on the Master Development Plan for the Property. 3. Where buffer areas are required and mature woodlands are in place, the Applicant will request approval of the use of these woodland features to satisfy the buffer requirement during the consideration of the Master Development Plan. 4. The Applicant proffers to provide initial access to the CCRC via Spinning Wheel Lane as described in Section D(2)(f) of the proffer statement, and further proffers Greenway Engineering November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009 3 to provide a maximum of two commercial entrances on Spinning Wheel Lane to provide access to the CCRC. C. B2, Business General District Area 1. The Applicant hereby proffers to prohibit the following land uses currently allowed within the B2 District: Truck Stops Golf Driving Ranges Outdoor Batting Cages Model Home Sales Self Service Storage Facilities Adult Retail Establishments 2. The Applicant hereby proffers to prohibit individual full service commercial entrances to all allowed B2 District land uses that intersect Northwestern Pike (U.S. Route 50 West) and Poorhouse Road (Route 654); however, right -in or right -out only access to B2 District land uses that intersect Northwestern Pike shall be permitted if approved by VDOT and/or Frederick County. 3. The Applicant hereby proffers to establish a green strip along the Property frontage adjacent to the Northwestem Pike corridor that is 50 feet in width. Parking lots and access drives shall be prohibited within the 50 -foot green strip, unless access drives are permitted as described in Section C(2) above. The entire Property frontage of the 50 -foot green strip shall be enhanced with street trees that are a minimum of 2 -inch caliper at planting and spaced a maximum of 30 feet on center, ornamental shrubs that are a minimum three- gallon container at planting, as well as an asphalt bicycle and pedestrian facility that is 10 feet wide. The installation of the street trees, ornamental shrubs, and bicycle and pedestrian facility located within the 50 -foot green strip shall be required as specified in Section C(6) of the proffer statement. 4. The Applicant hereby proffers to establish street tree plantings along both sides of Spinning Wheel Lane and Silver Lake Road throughout the limits of the B2 District property. All street trees shall be a minimum of two -inch caliper at time of planting and spaced a maximum 40 feet on center. The street trees shall be located between the back of curb and sidewalks and /or the asphalt bicycle and pedestrian facility. 5. The Applicant hereby proffers to establish a linear passive open space area in the general location identified on the proffered GDP, which will be enhanced with a 10 -foot asphalt trail system between Spinning Wheel Lane and Northwestern Pike as specified in Section C(6) of the proffer statement. File #49285 /Silver Lake LLC Rezoning Grecnway Engineering November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009 4 6. The Applicant hereby proffers to provide for inter parcel connectors between all adjoining commercial and office land uses. 7. The Applicant hereby proffers to include an additional row of evergreen trees within all required buffer and screening areas adjacent to land primarily used for residential purposes in the RA District in which accessory uses are proposed within the active portion of the buffer area. 8. The Applicant hereby proffers to design and construct, or cause for the construction of an asphalt bicycle and pedestrian facility that is ten -feet wide. This location of this facility is identified on the proffered GDP and will be located outside of public right -of -way limits. This facility will be developed as follows: The l0 -foot asphalt trail located along the south side of the Phase 1 segment of Spinning Wheel Lane shall be developed during the construction of this road segment as specified in Section D(2)(f) of the proffer statement. The 10 -foot asphalt trail located along the south side of the Phase 2 segment of Spinning Wheel Lane shall be developed during the construction of this road segment as specified in Section D(3)(e) of the proffer statement. The 10 -foot asphalt trail located along the passive open space area shall be developed on or before the completion of the commercial development permitted under the Phase 1Transportation Program as specified in Section D(2)(a) of the proffer statement. The 10 -foot asphalt trail located along the southern boundary of the Property identified as Area 1 on the GDP shall be developed during the construction of the Phase 1 segment of Spinning Wheel Lane as specified in Section D(2)(f) of the proffer statement. The 10 -foot asphalt trail located along the southern boundary of the Property identified as Area 2 on the GDP shall be developed prior to the issuance of the occupancy permit issued for the first commercial building permit located in the land bay between Spinning Wheel Lane and Silver Lake Road. The 10 -foot asphalt trail located along the southern boundary of the Property identified as Area 3 on the GDP shall be developed prior to the issuance of the occupancy permit issued for the first commercial building permit located in the land bay between Silver Lake Road and the eastern boundary of the Property. 9. The Applicant hereby proffers to establish an Architectural Review Board (ARB) for the purpose of reviewing structural elevations, site landscaping and signage for all commercial sites to ensure compatibility with the restrictive covenant documents for the B2 District property. The restrictive covenant documents shall be provided to Frederick County prior to the subdivision of land within the B2 File #4928S /Silver Lake LLC Rezoning Greenway Engineering D. Transportation Enhancements 2. The Applicant hereby proffers the following Phase 1 Transportation Program: File #4928S/Silver Lake LLC Rezoning November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009 5 District, or prior to the approval of any site development plan within the B2 District. The restrictive covenant documents shall include, but not be limited to, the following design elements: Building materials for all exterior walls and rooflines. Materials for all monument freestanding business signs. The materials for the base of all monument freestanding business signs shall be consistent throughout the B2 District. Screening of all loading areas from adjoining properties external to the B2 District. Screening of outdoor dumpster pad areas with building materials consistent with the primary structure. Common area maintenance agreements. 1. The Applicant has submitted a Traffic Impact Analysis (TIA), prepared by Patton, Harris, Rust and Associates, dated November 25, 2008 for the 370.02± acre Property. The TIA identifies improvements to the regional transportation network to account for background undeveloped projects and the Applicant's proposal through four phases of development. The Applicant hereby proffers to design and construct, or cause for the construction of improvements to the regional transportation network as a phased development program that is described in this section of the proffer statement. Additionally, the phased development program is identified in illustrative form on the proffered GDP. It is recognized that the phased transportation improvements proffered herein will be constructed as described in this section; however, the exact location and limits of these improvements will be determined by VDOT and/or Frederick County during the approval of engineering design plans. It is further recognized that the location of the regional transportation network improvements identified in illustrative form on the proffered GDP are general in nature and may be relocated to accommodate VDOT engineering design plan approval without the need for conditional zoning amendment to the GDP or the proffer statement. a. The Applicant shall be entitled to develop the CCRC and a maximum of 180,000 square feet of commercial land use within Phase 1. However, the Applicant can deviate from this land use mix assuming the total trip generation for site plans within this phase of the transportation program (based on the ITE 7 Edition Trip Generation Report) do not exceed the total trip generation specified in the November 25, 2008 Traffic Impact Analysis Report for Phase 1. It is recognized that the Applicant shall complete all Phase 1 transportation improvements prior to the approval of Greenway Engineering November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009 6 any Site Plan that exceeds 180,000 square feet of commercial land use or equivalent trip generation as noted above on the B2 portion of the Property. b. The Applicant shall dedicate all right -of -way necessary for the Phase 1 improvements that will occur on the Property to VDOT or Frederick County. The Applicant will attempt to design all off -site improvements within public right -of -way; however, if necessary it is recognized that VDOT and /or Frederick County will assist the Applicant with right -of- way necessary to implement proffered off -site transportation improvements. The Applicant agrees to assume all costs associated with right -of -way acquisition if assistance from VDOT and /or Frederick County is required. c. The Applicant shall execute, or cause for the execution of a traffic signalization agreement with VDOT to fully fund new traffic signalization at the intersection of Northwestern Pike (U.S. Route 50) and Poor House Road (Route 654). The traffic signalization agreement shall be executed within six months of final non appealable rezoning approval, or prior to approval of the first Site Plan for the property, whichever occurs first. d. The Applicant shall design and construct, or cause for the execution of a traffic signalization agreement with VDOT to fully fund new traffic signalization with pedestrian actualization at the intersection of Northwestern Pike (U.S. Route 50) and the relocated Spinning Wheel Lane. The traffic signalization agreement shall be executed within one year of final non appealable rezoning approval, or prior to approval of the first Site Plan for the property, whichever occurs first. The Applicant shall reserve the right to preempt this agreement by initiating a signal warrant study and signal design plans in accordance with VDOT standards for approval to install traffic signalization at this intersection. e. The Applicant shall design and construct, or cause for the construction of improvements to the median crossing including a westbound right turn lane and left turn lane and an eastbound left turn lane on Northwestern Pike at the intersection of the relocated Spinning Wheel Lane. These improvements shall be completed prior to the issuance of the first occupancy permit for the land use utilizing Spinning Wheel Lane for access to Northwestern Pike. f. The Applicant shall design and construct, or cause for the construction of improvements to Spinning Wheel Lane within the Property to provide for a road section that is constructed to a 40 mph geometric design standard and provides right -of -way for a future roundabout at the intersection with Silver Lake Road, and left tum lanes and right turn lanes at all internal collector street intersections and at commercial entrances as required by File #4928S /Silver Lake LLC Rezoning Green ay Engineering g. File #4928S /Silver Lake LLC Rezoning November 25, 2008; Revised January 6, 2009 Revised January 27. 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009 7 VDOT. Additionally, the Applicant shall design and construct, or cause for the construction of separate right and left turn lanes on Spinning Wheel Lane at the intersection of Northwestern Pike. Spinning Wheel Lane shall be developed as a four -lane divided urban road section between Northwestern Pike and the future roundabout, and as a two -lane road section between the future roundabout and the limits of Phase 1 with dedicated right -of -way to Frederick County to allow for a four -lane urban road section. The construction of the two -lane road section shall include a raised median section necessary to transition from the roundabout into the urban road section design. These improvements shall be completed prior to the issuance of the first occupancy permit for the land use utilizing Spinning Wheel Lane for access to Northwestern Pike. Furthermore, the Applicant agrees to design and construct, or cause for the construction of the four -lane urban section between the future roundabout and the limits of Phase 1 if this improvement is warranted based on future traffic counts as described in Section D(6). The Applicant shall design and construct, or cause for the construction of modifications to, or the elimination of the median crossing on Northwestern Pike identified as Median Crossing A on the proffered GDP. VDOT shall determine the requirements for modification, or elimination and shall advise the Applicant in writing of the requirements associated with this improvement. The Applicant shall complete these improvements in conjunction with construction activities associated with Spinning Wheel Lane as described in Section D(2)(f) of the proffer statement. h. The Applicant shall design and construct, or cause for the construction of improvements to the southbound off ramp at the Route 37 interchange with Northwestern Pike to provide for a free flow right turn lane onto Northwestern Pike. The Applicant shall complete the Route 37 interchange improvements described in this section prior to the approval of any Site Plan that exceeds 180,000 square feet of commercial land use or equivalent trip generations as described in Section D(2)(a) of the proffer statement on the B2 portion of the Property. i. In the event that VDOT and Frederick County determine that a monetary contribution for regional transportation improvements to the Route 37 corridor between the Northwestern Pike interchange and the North Frederick Pike interchange is desired, the Applicant agrees to provide a monetary contribution in lieu of the improvement described in Section 2(h). This monetary contribution shall be equivalent to the amount associated with the improvement described in that section based upon an engineering estimate agreed upon by VDOT, Frederick County and the Applicant that will be prepared on or before the build out of the Phase 1 transportation improvements. The Applicant agrees to provide this Greenway Engineering November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009 8 monetary contribution to Frederick County within 30 days of written request by the County, and further agrees to allow for this monetary contribution to be utilized as matching funds by Frederick County for qualifying transportation improvements programs or grants. 3. The Applicant hereby proffers the following Phase 2 Transportation Program: a. The Applicant shall be entitled to develop the CCRC and a maximum of 350,000 square feet of commercial land use and 105,000 square feet of office land use within Phase 2 that is a cumulative total of Phase 1 Phase 2. However, the Applicant can deviate from this land use mix assuming the total trip generation for site plans within this phase of the transportation program (based on the ITE 7 Edition Trip Generation Report) do not exceed the total trip generation specified in the November 25, 2008 Traffic Impact Analysis Report for Phase 2. It is recognized that the Applicant shall complete all Phase 2 transportation improvements prior to the approval of any Site Plan that exceeds 350,000 square feet of commercial land use and 105,000 square feet of office land use or equivalent trip generation as noted above on the B2 portion of the Property. b. The Applicant shall dedicate all right -of -way necessary for the Phase 2 improvements that will occur on the Property to VDOT or Frederick County. The Applicant will attempt to design all off -site improvements within public right -of -way; however, if necessary it is recognized that VDOT and /or Frederick County will assist the Applicant with right -of- way necessary to implement proffered off -site transportation improvements. The Applicant agrees to assume all costs associated with right -of -way acquisition if assistance from VDOT and /or Frederick County is required. c. The Applicant shall design and construct, or cause for the execution of a traffic signalization agreement with VDOT to fully fund new traffic signalization with pedestrian actualization at the intersection of Northwestern Pike (U.S. Route 50) and Silver Lake Road. The traffic signalization agreement shall be executed prior to the issuance of the first occupancy permit for the land use utilizing Silver Lake Road for access to Northwestern Pike. The Applicant shall provide additional funding necessary to provide for pre emption control for this traffic signal if the County requests the land for the new fire and rescue facility provided in Section E(1) of the proffer statement. The Applicant shall reserve the right to preempt this agreement by initiating a signal warrant study and signal design plans in accordance with VDOT standards for approval to install traffic signalization at this intersection. File #49285 /Silver Lake LLC Rezoning Greenway Engineering d. The Applicant shall design and construct, or cause for the construction of improvements to Silver Lake Road to include a two -lane urban road section with a raised median to the first available commercial entrance that is constructed to a 40 mph geometric design standard and provides for the construction of the roundabout at the intersection with Spinning Wheel Lane, and left turn lanes and right turn lanes at all commercial entrances as required by VDOT. Additionally, the Applicant shall design and construct, or cause for the construction of a median crossing including a westbound right turn lane and left turn lane and an eastbound left turn lane on Northwestern Pike at the intersection of Silver Lake Road. These improvements shall be completed prior to the approval of any Site Plan that exceeds 350,000 square feet of commercial land use and 105,000 square feet of office land use or equivalent trip generation as described in Section D(3)(a) of the proffer statement on the B2 portion of the Property, with the exception of the median crossing and turn lane improvements on Northwestern Pike which shall be completed with the Silver Lake Road intersection improvements on Northwestern Pike. Additionally, the Applicant shall dedicate right -of -way to Frederick County to allow for a four -lane urban road section for Silver Lake Road, and further agrees to design and construct, or cause for the construction of the four -lane urban road section if this improvement is warranted based on future traffic counts as described in Section D(6). e. The Applicant shall design and construct, or cause for the construction of improvements to Spinning Wheel Lane to provide for a two -lane urban road section that is constructed to a 40 mph geometric design standard and provides for left turn lanes and right turn lanes at all internal collector street intersections and at commercial entrances as required by VDOT, which continues from the terminus of Spinning Wheel Lane constructed in Phase 1 to a connection at the intersection of Retail Boulevard. The Applicant shall complete these improvements prior to the approval of any Site Plan that exceeds 350,000 square feet of commercial land use and 105,000 square feet of office land use or equivalent trip generation as described in Section D(3)(a) of the proffer statement on the B2 portion of the Property. Additionally, the Applicant shall dedicate right -of -way to Frederick County to allow for a four -lane urban road section for Spinning Wheel Lane and further agrees to design and construct, or cause for the construction of the four -lane urban section if this improvement is warranted based on future traffic counts as described in Section D(6). f. The Applicant shall design and construct, or cause for the construction of modifications to, or the elimination of the median crossings on Northwestern Pike identified as Median Crossing B and Median Crossing C on the proffered GDP. VDOT shall determine the requirements for modification, or elimination and shall advise the Applicant in writing of the requirements associated with this improvement. The Applicant shall File #4928S/Silver Lake LLC Rezoning November 25, 2008; Revised January 6, 2009 Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009 9 Greenway Engineering g. File #49285 /Silver Lake LLC Rezoning November 25, 2008; Revised January 6, 2009 Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009 10 complete these improvements in conjunction with construction activities associated with Silver Lake Road as described in Section D(3)(d) of the proffer statement. The Applicant shall design and construct, or cause for the construction of improvements to the northbound off ramp at the Route 37 interchange with Northwestern Pike to provide for a second right turn. The Applicant shall complete the Route 37 interchange improvements described in this section prior to the approval of any Site Plan that exceeds 350,000 square feet of commercial land use and 105,000 square feet of office land use or equivalent trip generation as described in Section D(3)(a) of the proffer statement on the B2 portion of the Property. h. The Applicant shall design and construct, or cause for the construction of improvements at the Route 37 interchange with Northwestern Pike to provide for a third westbound thru lane on Northwestern Pike under the Route 37 bridge structure. The Applicant shall complete the Route 37 interchange improvements described in this section prior to the approval of any Site Plan that exceeds 350,000 square feet of commercial land use and 105,000 square feet of office land use or equivalent trip generation as described in Section D(3)(a) of the proffer statement on the B2 portion of the Property. i. In the event that VDOT and Frederick County determine that a monetary contribution for regional transportation improvements to the Route 37 corridor between the Northwestern Pike interchange and the North Frederick Pike interchange is desired, the Applicant agrees to provide a monetary contribution in lieu of the improvements described in Section 3(g) and 3(h). This monetary contribution shall be equivalent to the amount associated with the improvement described in those sections based upon an engineering estimate agreed upon by VDOT, Frederick County and the Applicant that will be prepared on or before the build out of the Phase 2 transportation improvements. The Applicant agrees to provide this monetary contribution to Frederick County within 30 days of written request by the County, and further agrees to allow for this monetary contribution to be utilized as matching funds by Frederick County for qualifying transportation improvements programs or grants. In the event that regional transportation improvements to the Route 37 corridor between the Northwestern Pike interchange are constructed prior to the completion of the Phase 2 Transportation Program, the Applicant agrees to provide a monetary contribution equivalent to the amount associated with the improvement described in this section to be utilized unconditionally by Frederick County for other transportation improvements. This monetary contribution shall be provided to Frederick County within 60 days of written request by the County. Greenway Engineering November 25, 2008; Revised January 6, 200 Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009 4. The Applicant hereby proffers the following Phase 3 Transportation Program: File #4928S /Silver Lake LLC Rezoning a. The Applicant shall be entitled to develop the CCRC and a maximum of 490,000 square feet of commercial land use and 350,000 square feet of office land use within Phase 3 that is a cumulative total of Phase 1 Phase 3. However, the Applicant can deviate from this land use mix assuming the total trip generation for site plans within this phase of the transportation program (based on the ITE 7' Edition Trip Generation Report) do not exceed the total trip generation specified in the November 25, 2008 Traffic Impact Analysis Report for Phase 3. It is recognized that the Applicant shall complete all Phase 3 transportation improvements prior to the approval of any Site Plan that exceeds 490,000 square feet of commercial land use and 350,000 square feet of office land use or equivalent trip generation as noted above on the B2 portion of the Property. b. The Applicant shall dedicate all right -of -way necessary for the Phase 3 improvements that will occur on the Property to VDOT or Frederick County. The Applicant will attempt to design all off -site improvements within public right -of -way; however, if necessary it is recognized that VDOT and/or Frederick County will assist the Applicant with right -of- way necessary to implement proffered off -site transportation improvements. The Applicant agrees to assume all costs associated with right -of -way acquisition if assistance from VDOT and /or Frederick County is required. c. The Applicant shall design and construct, or cause for the construction of improvements to Spinning Wheel Lane to provide for a second right turn lane on Spinning Wheel Lane at the intersection of Northwestern Pike. These improvements shall be completed prior to the approval of any Site Plan that exceeds 490,000 square feet of commercial land use and 350,000 square feet of office land use or equivalent trip generation as described in Section D(4)(a) of the proffer statement on the B2 portion of the Property. d. The Applicant shall design and construct, or cause for the construction of a two -lane urban road that is constructed to a 40 mph geometric design standard and provides for roundabout design at the intersection with Spinning Wheel Lane, and left turn lanes and right turn lanes at all commercial entrances as required by VDOT, which will provide for a connection between Spinning Wheel Lane and Poor House Road (Route 654). The Applicant will coordinate with the owner of tax parcel 52- ((A))-47 to obtain right -of -way for this improvement as a first option for development of the two -lane urban road connection. In the event that the first option cannot be achieved, the Applicant shall design and construct, Greenway Engineering November 25, 2008; Revised January 6. 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009 or cause for the construction of the two -lane urban road connection between Spinning Wheel Lane and Poor House Road on the Property. The general location of the two -lane road connection associated with both options will be provided on the proffered GDP; however, it is recognized that this location may shift without the need for conditional rezoning approval. The Applicant shall complete this improvement prior to the approval of any Site Plan that exceeds 490,000 square feet of commercial land use and 350,000 square feet of office land use or equivalent trip generation as described in Section D(4)(a) of the proffer statement on the B2 portion of the Property. 5. The Applicant hereby proffers the following Phase 4 Transportation Program: a. The Applicant shall be entitled to develop the CCRC and a maximum of 583,050 square feet of commercial land use and 494,600 square feet of office land use within Phase 4 that is a cumulative total of Phase 1 Phase 4. However, the Applicant can deviate from this land use mix assuming the total trip generation for site plans within this phase of the transportation program (based on the ITE 7 Edition Trip Generation Report) do not exceed the total trip generation specified in the November 25, 2008 Traffic Impact Analysis Report for Phase 4. It is recognized that the Applicant shall complete all Phase 4 transportation improvements prior to the approval of any Site Plan that exceeds 530,000 square feet of commercial land use and 440,000 square feet of office land use or equivalent trip generation as noted above on the B2 portion of the Property. In the event that the Applicant would desire to develop commercial or office land uses that exceed the maximum square feet or total trip generation specified in this phase of the transportation program, a new traffic impact analysis report shall be prepared with each site plan to determine any additional transportation improvements required to mitigate the impacts created solely by that project, which will be implemented as a condition of site plan approval. b. The Applicant shall dedicate all right -of -way necessary for the Phase 4 improvements that will occur on the Property to VDOT or Frederick County. The Applicant will attempt to design all off -site improvements within public right -of -way; however, if necessary it is recognized that VDOT and/or Frederick County will assist the Applicant with right -of- way necessary to implement proffered off -site transportation improvements. The Applicant agrees to assume all costs associated with right -of -way acquisition if assistance from VDOT and/or Frederick County is required. c. The Applicant shall design and construct, or cause for the construction of improvements to Silver Lake Road to provide for a second left turn lane File #4928S/Silver Lake LLC Rezoning 12 Greenway Engineering File #4928S/Silver Lake LLC Rezoning November 25, 2008: Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009 13 on Silver Lake Road at the intersection of Northwestern Pike. These improvements shall be completed prior to the approval of any Site Plan that exceeds 530,000 square feet of commercial land use and 440,000 square feet of office land use or equivalent trip generation as described in Section D(5)(a) of the proffer statement on the B2 portion of the Property. d. The Applicant shall design and construct, or cause for the construction of improvements to provide for a third westbound thru lane on Northwestern Pike from the eastern boundary of the Property to Spinning Wheel Lane. Additionally, the Applicant shall be responsible for the relocation, construction, and right -of -way dedication (if necessary) of the existing right turn lanes on Northwestern Pike at the Spinning Wheel Lane and Silver Lake Road intersections. The Applicant shall complete these improvements prior to the approval of any Site Plan that exceeds 530,000 square feet of commercial land use and 440,000 square feet of office land use or equivalent trip generation as described in Section D(5)(a) of the proffer statement on the B2 portion of the Property. 6. The Applicant hereby proffers to conduct annual traffic counts that will be provided to VDOT and Frederick County to determine if the 8,000 ADT volume is achieved to require the expansion of Spinning Wheel Lane and Silver Lake Road to four -lane urban road sections, as provided for in Sections D(2)(f), D(3)(d), and D(3)(e) of the proffer statement. The annual traffic counts shall begin in the first calendar year that the Phase 2 transportation improvements are completed and shall continue until the warrants are met for widening both street systems. VDOT and Frederick County may allow for annual traffic counts to be delayed in calendar years in which there is no development activity on the Property. When required, traffic counts will be conducted at the Spinning Wheel Lane and Silver Lake Road intersections with Northwestern Pike, on Spinning Wheel Lane at the eastern boundary of the Property, and on the two -lane road connector between Spinning Wheel Lane and Poor House Road at the western boundary of the Property. If warrants are met based on the annual traffic counts, the Applicant shall prepare and submit construction plans for approval by VDOT and Frederick County within six months of written notice that warrants are met. The Applicant shall commence construction of these improvements within six months of final plan approval. E. Fire and Rescue Enhancements 1. The Applicant hereby proffers to provide, or cause for the provision of land to Frederick County for the development of a new fire and rescue station and support facilities within five years from the date of final non appealable rezoning approval. The Applicant shall dedicate a site fronting on Silver Lake Road that is located near the intersection of Northwestern Pike, which is a minimum of three acres and a maximum of four acres in size, with the final size of this site being Greenway Engineering determined upon approval of the Site Plan for the new fire and rescue station facility. The Applicant shall prepare and provide Frederick County with the dedication plat for this site and necessary right -of -way along Northwestem Pike and Silver Lake Road within five years from the date of final non appealable rezoning approval provided that a Site Plan has been approved for the new fire and rescue station. Additionally, if Frederick County does not commence construction of a new fire and rescue station within one year following the dedication of the site, this land shall be conveyed back to the Applicant to allow for further economic development. In the event Frederick County elects not to develop this site as a new fire and rescue station, the Applicant shall provide a monetary contribution to Frederick County in the amount of $100,000.00 for the development of a new fire and rescue station or for the expansion of an existing fire and rescue station at another location. 2. The Applicant hereby proffers to provide, or cause for the provision of a monetary contribution to Frederick County in the amount of $1,000,000.00 for the development of a new fire and rescue station or for the expansion of an existing fire and rescue station. This monetary proffer is intended to mitigate impacts to fire and rescue services associated with the development of the CCRC on the MS District portion of the Property. The $1,000,000.00 monetary contribution shall be provided to Frederick County within five years from the date of final non- appealable rezoning approval to assist with the development of the new fire and rescue station or for the expansion of an existing fire and rescue station. However, the date for the $1,000,000.00 monetary contribution payment may be extended if a Site Plan for a new fire and rescue station or for the expansion of an existing fire and rescue station has not been approved within five years from the date of final non appealable rezoning approval. If the latter occurs, the $1,000,000.00 monetary contribution shall be provided to Frederick County within 30 days of the date of final Site flan approval for the new fire and rescue station or for the expansion of an existing fire and rescue station. 3. The Applicant hereby proffers to design and construct, or cause for the construction of all necessary road improvements at the Northwestern Pike intersection with Silver Lake Road and on Silver Lake Road to provide access to the new fire and rescue station, as well as all utilities necessary for the new fire and rescue station located on the Property. These infrastructure improvements shall be provided by the Applicant in advance of the Phase 1 or Phase 2 transportation program improvements to facilitate the construction of the new fire and rescue station should this occur in advance of the commercial development within these transportation phases. The Applicant shall work with Frederick County, upon notice by the County, to ensure that the design, bonding and construction of these infrastructure improvements is coordinated during the preparation of the Site Plan for the new fire and rescue station on the Property. File #4928S /Silver Lake LLC Rezoning November 25, 2008; Revised January 6, 2009 Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009 14 Greenway Engineering F. Signatures The conditions proffered above shall be binding upon the heirs, executors, administrators, assigns and successors in the interest of the Applicants and owners. In the event the Frederick County Board of Supervisors grants this rezoning and accepts the conditions, the proffered conditions shall apply to the land rezoned in addition to other requirements set forth in the Frederick County Code. Respectfully Submitted: By: Commonwealth of Virginia, C The foregoing instrument was acknowledged before me this 13 of 20051 by J R. W i I Lies nT My Commission Expires 2 251 IZ01Z IRegisF1uu 1 4* 2 l0 (o File #4928S /Silver Lake LLC Rezoning November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; March 13, 2009 Date: 3//'3/() °l f (Pr{e.vcL To Wit: Nit ar Notary Public 15 -Li 2L g 0 0 Co 4/ o 0 8 ‘Z> m Z 0 Z 8. In 0 5 E. 44 )1, GENERALIZED DEVELOPMENT PLAN SILVER LAKE DEVELOPMENT GAINESBORO MAGISTERIAL DISTRICT FREDERICK COUNTY, VA LT2 A Z' s'N L 4 Pounded in 1971 Engineers Surveyors GREENWAY ENGINEEI 151 Windy Hill Lane ifinchester, Virginia 22602 Telephone 540-662-4185 FAX 540-722-9526 wvnvgreenwayeng.com r P7 Ca zm n r m 0 GENERALIZED DEVELOPMENT PLAN SILVER LAKE DEVELOPMENT GARS90RO MAGISTERIAL DtsTR1cz FREDERICK CouN'et, NA 2 y H 0 Z 0 1 SPINNING WHEEL 0 Cif c 0 Z a 0 m m LANE GREENWAY ENGINEERING 151 Windy Hill Lane Winchester, ir,:ai:,;x, 'za0uz Telephone 540 662 -4185 FAX 540 -722 -9528 www.greenwayeng.com Greenway Engineering REZONING: PROPERTY: RECORD OWNER: APPLICANT: PROJECT NAME: ORIGINAL DATE OF PROFFERS: REVISION DATE: Preliminary Matters File H492RS /Silver Lake LLC Rezoning November 25, 2008: Revised January 6, 2009: 'Revised January 27, 2009; Revised February l6, 2009; Revised February 19,2009; Revised March 2, 2009 SILVER LAKE, LLC PROFFER STATEMENT RZ Rural Areas District CAA) to Business General District (B2) and MS Medical Support District (MS) 370.02± acres; Tax Parcels #52- ((A)) -C, 52- ((A)) -50, 52- ((A)) -50A, 52- ((A)) -52, and 524(AD -63 (here -in after the "Property") Silver Lake, LLC, James R. Wilkins, Ill, Manager Silver Lake, LLC (here -in after the "Applicant Round Hill Commercial Center The Village at Orchard Ridge A National Lutheran Home Community_ November 25, 2008 March 2, 2009 Pursuant to Section 15.2 -2296 Et. Seq. of the Code of Virginia, 1950, as amended, and the provisions of the Frederick County Zoning Ordinance with respect to conditional zoning, the undersigned Applicant hereby proffers that in the event the Boa o f Supervisors of Frederick County, Virginia, shall approve Rezoning Application for the rezoning of 370.02± -acres from the* Rural Areas (RA) District to establish 238.96± acres of B -2, Business General District (Tax Map Parcels 52- ((A)) -C, 52- ((A)) -50A, 52- ((A))-52, 52- ((A)) -63) and 131.06± -acres of MS, Medical Support District (Tax Map Parcel 524(_A)) -50), development of the subject property shall be done in conformity with the terms and conditions set forth herein except to the extent that such terms and conditions may be subsequently amended or revised by the Applicant and such be approved by the Frederick County Board of Supervisors in accordance with the said Code and Zoning Ordinance. In the event that such rezoning is not granted, then these proffers shall be deemed withdrawn and have no effect whatsoever. These proffers shall be binding upon.this Applicant and their legal successors, heirs, or assigns. The Property, more particularly described as the lands owned by Silver Lake LLC, being all of Tax Map Parcels 52- ((A)) -C, 52- ((A)) -50, 52- ((A)) -50A, 52- ((A)) -52, 52- ((A)) -63, and further described by Property Deeds including Instrument Number 090001536, Deed Book 872 Page 318 and Deed Book 927 Page 1591. (Please refer to Rezoning Application Deed Information). Greenway Engineering A. Generalized Development Pian November 25, 2008; Revised January 6, 2009 Revised January 27, 2009; Revised February' 16, 2009; Revised February 19, 2009; Revised March 2, 2009 1. The Applicant hereby proffers to submit a Generalized Development Plan (the "GDP for the Property. The purpose of the GDP is to identify the general location of the B -2, Business General District and MS, Medical Support District areas, the general location of the proposed future Fire and Rescue Station area, the general location of the proposed future passive open space area, the general location of the 50 -foot green strip enhancement area, the general location of the 10 -foot asphalt trail system, and the general location of the phased transportation improvements areas within and adjacent to the Property. 2. The Applicant hereby proffers to develop the Property in substantial conformity with the proffered GDP, prepared by Greenway Engineering dated March 2, 2009. The GDP is recognized to be a conceptual plan and may be adjusted by the Applicant to accommodate final design and engineering constraints without the need of new conditional rezoning approval by the Frederick County Board of Supervisors, provided that the adjustments do not eliminate or substantially relocate the areas described in Section Al of this proffer statement. B. MS, Medical Support District Area PROFFER STATEM ENT 1. The Applicant hereby proffers to develop, or cause for the development of a Continuing Care Retirement Community (the "CCRC on the portion of the Property proposed to be zoned MS, Medical Support District, and to exclude all other MS, Medical Support District land uses not expressly permitted within Section 165- 97B(7) of the Frederick County Zoning Ordinance. 2. The Applicant hereby proffcrs to limit the maximum residential density within the CCRC to eight units per acre. The maximum residential density total shall include all independent living units, assisted care living units, and skilled nursing care units. The location and totals for the residential units specified in this section shall be provided on the Master Development Plan for the Property. 3. Where buffer areas are required and mature woodlands are in place, the Applicant will request approval of the use of these woodland features to satisfy the buffer requirement during the consideration of the Master Development Plan. 4. The Applicant proffers to provide initial access to the CCRC via Spinning Wheel Lane as described in Section D(2)(f) of the proffer statement, and fiirther proffers File N4928S /Silver Lake LLC Rezoning 2 Greenway Engineering to provide a maximum of two commercial entrances on Spinning Wheel Lane to provide access to the CCRC. C. B2, Business General District Area 1. The Applicant hereby proffers to prohibit the following land uses currently allowed within the B2 District: Truck Stops Golf Driving Ranges Outdoor Batting Cages Model Home Sales Self Service Storage Facilities Adult Retail Establishments November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009 2. The Applicant hereby proffers to prohibit individual full service commercial entrances to all allowed B2 District land uses that intersect Northwestern Pike (U.S. Route 50 West) and Poorhouse Road (Route 654); however, right -in or right -out only access to B2 District land uses that intersect Northwestem Pike shall be permitted if approved by VDOT and /or Frederick County. 3. The Applicant hereby proffers to establish a green strip along the Property frontage adjacent to the Northwestern Pike corridor that is 50 feet in width. Parking lots and access drives shall be prohibited within the 50 -foot green strip, unless access drives arc permitted as described in Section C(2) above. The entire Property frontage of the 50 -foot green strip shall be enhanced with street trees that are a minimum of 2 -inch caliper at planting and spaced a maximum of 30 feet on center, ornamental shrubs that are a minimum three- gallon container at planting, as well as an asphalt bicycle and pedestrian facility that is 10 feet wide. The installation of the street trees, ornamental shrubs, and bicycle and pedestrian facility located within the 50 -foot green strip shall be required as specified in Section C(6) of the proffer statement. 4. The Applicant hereby proffers to establish street tree plantings along both sides of Spinning Wheel Lane and Silver Lake Road throughout the limits of the B2 District property. All street trees shall be a minimum of two -inch caliper at time of planting and spaced a maximum 40 feet on center. "f he street trees shall be located between the back of curb and sidewalks and/or the asphalt bicycle and pedestrian facility. 5. The Applicant hereby proffers to establish a linear passive open space area in the general location identified on the proffered GDP, which will be enhanced with a 10 -foot asphalt trail system between Spinning Wheel Lane and Northwestern Pike as specified in Section C(6) of the proffer statement. File #49285 /Silver lake LLC Rezoning Greenway Engineering November 25, 2008; Revised January 6.2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009 6. The Applicant hereby proffers to provide for inter parcel connectors between all adjoining commercial and office land uses. 7. The Applicant hereby proffers to include an additional row of evergreen trees within all required buffer and screening areas adjacent to land primarily used for residential purposes in the RA District in which accessory uses are proposed within the active portion of the buffer area. 8. The Applicant hereby proffers to design and construct, or cause for the construction of an asphalt bicycle and pedestrian facility that is ten -feet wide. This location of this facility is identified on the proffered GDP and will be located outside of public right -of -way limits. This facility will be developed as follows: The 10 -foot asphalt trail located along the south side of the Phase 1 segment of Spinning Wheel Lane shall be developed during the construction of this road segment as specified in Section D(2)(f) of the proffer statement. The 10 -foot asphalt trail located along the south side of the Phase 2 segment of Spinning Wheel Lane shall be developed during the construction of this road segment as specified in Section D(3)(e) of the proffer statement. The 10 -foot asphalt trail located along the passive open space area shall be developed on or before the completion of the commercial development permitted under the Phase 1 Transportation Program as specified in Section D(2)(a) of the proffer statement. The 10 -foot asphalt trail located along the southern boundary of the Property identified as Area 1 on the GDP shall be developed during the construction of the Phase 1 segment of Spinning Wheel Lane as specified in Section D(2)(f) of the proffer statement. The 10 -foot asphalt trail located along the southern boundary of the Property identified as Area 2 on the GDP shall be developed prior to the issuance of the occupancy permit issued for the first commercial building permit located in the land bay between Spinning Wheel Lane and Silver Lake Road. The 10 -foot asphalt trail located along the southern boundary of the Property identified as Area 3 on the GDP shall be developed prior to the issuance of the occupancy permit issued for the first commercial building permit located in the land bay between Silver Lake Road and the eastern boundary of the Property. 9. The Applicant hereby proffers to establish an Architectural Review Board (ARB) for the purpose of reviewing structural elevations, site landscaping and signage for all commercial sites to ensure compatibility with the restrictive covenant documents for the B2 District property. The restrictive covenant documents shall be provided to Frederick County prior to the subdivision of land within the B2 File #49285 /Silver Lake LLC Rezoning Greenway Engineering District, or prior to the approval of any site development plan within the B2 District. The restrictive covenant documents shall include, but not be limited to, the following design elements: Building materials for all exterior walls and rooflines. Materials for all monument freestanding business signs. The materials for the base of all monument freestanding business signs shall be consistent throughout the B2 District. Screening of all loading areas from adjoining properties external to the B2 District. Screening of outdoor dumpster pad areas with building materials consistent with the primary structure. Common area maintenance agreements. D. Transportation Enhancements 1. The Applicant has submitted a Traffic Impact Analysis (TIA), prepared by Patton, Harris, Rust and Associates, dated November 25, 2008 for the 370.02± acre Property. The TIA identifies improvements to the regional transportation network to account for background undeveloped projects and the Applicant's proposal through four phases of development. The Applicant hereby proffers to design and construct, or cause for the construction of improvements to the regional transportation network as a phased development program that is described in this section of the proffer statement. Additionally, the phased development program is identified in illustrative form on the proffered GDP. It is recognized that the phased transportation improvements proffered herein will be constructed as described in this section; however, the exact location and limits of these improvements will be determined by VDOT and /or Frederick County during the approval of engineering design plans. It is further recognized that the location of the regional transportation network improvements identified in illustrative form on the proffered GDP are general in nature and may be relocated to accommodate VDOT engineering design plan approval without the need for conditional zoning amendment to the GDP or the proffer statement. 2. The Applicant hereby proffers the following Phase 1 Transportation Program: a. The Applicant shall be entitled to develop the CCRC and a maximum of 180,000 square feet of commercial land use within Phase 1. However, the Applicant can deviate from this land use mix assuming the total trip generation for site plans within this phase of the transportation program (based on the 1TE 7 Edition Trip Generation Report) do not exceed the total trip generation specified in the November 25, 2008 Traffic Impact Analysis Report for Phase 1. It is recognized that the Applicant shall complete all Phase 1 transportation improvements prior to the approval of File #49285 /Silver Lake LLC Rezoning November 25. 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009 5 Greenway Engineering P 6, November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February. 16, 2009; Revised February 19, 2009; Revised March 2, 2009 6 any Site Plan that exceeds 180,000 square feet of commercial land use or equivalent trip generation as noted above on the 132 portion of the Property. b. The Applicant shall dedicate all right -of -way necessary for the Phase 1 improvements that will occur on the Property to VDOT or Frederick County. The Applicant will attempt to design all off -site improvements within public right -of -way; however, if necessary it is recognized that VDOT and/or Frederick County will assist the Applicant with right -of- way necessary to implement proffered off -site transportation improvements. The Applicant agrees to assume all costs associated with right -of -way acquisition if assistance from VDOT and /or Frederick County is required. c. The Applicant shall execute, or cause for the execution of a traffic signalization agreement with VDOT to fully fund new traffic signalization at the intersection of Northwestern Pike (U.S. Route 50) and Poor 1 -louse Road (Route 654). The traffic signalization agreement shall be executed within six months of final non appealable rezoning approval, or prior to approval of the first Site Plan for the property, whichever occurs first. d. The Applicant shall design and construct, or cause for the execution of a traffic signalization agreement with VDOT to fully fund new traffic signalization with pedestrian actualization at the intersection of Northwestern Pike (U.S. Route 50) and the relocated Spinning Wheel Lane. The traffic signalization agreement shall be executed within one year of final non appealable rezoning approval, or prior to approval of thc first Site Plan for the property, whichever occurs first. The Applicant shall reserve the right to preempt this agreement by initiating a signal warrant study and signal design plans in accordance with VDOT standards for approval to install traffic signalization at this intersection. e. The Applicant shall design and construct, or cause for the construction of improvements to the median crossing including a westbound right turn lane and left turn lane and an eastbound left turn lane on Northwestern Pike at the intersection of the relocated Spinning Wheel Lane. These improvements shall be completed prior to the issuance of thc first occupancy permit for the land use utilizing Spinning Wheel Lane for access to Northwestern Pike. f. The Applicant shall design and construct, or cause for the construction of improvements to Spinning Wheel Lane within the Property to provide for a road section that is constructed to a 40 mph geometric design standard and provides right -of -way for a future roundabout at the intersection with Silver Lake Road and left turn lanes and right turn lanes at all internal collector street intersections and at commercial entrances as required by File #49285 /Silver Lake LLC Rezoning Greenway Engineering g. File #4928S/Silver Lake LLC Rezoning November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009 7 VDOT. Additionally, the Applicant shall design and construct, or cause for the construction of separate right and left turn lanes on Spinning Wheel Lane at the intersection of Northwestern Pike. Spinning Wheel Lane shall be developed as a four -lane divided urban road section between Northwestern Pike and the future roundabout. and as a two-lane road section between the future roundabout and the limits of Phase 1 with dedicated right -of -way to Frederick County to allow for a four -lane urban road section. The construction of the two -lane road section shall include a raised median section necessary to transition from the roundabout into the urban road section design. These improvements shall be completed prior to the issuance of the first occupancy permit for the land use utilizing Spinning Wheel Lane for access to Northwestern Pike. Furthermore, the Applicant agrees to design and construct, or cause for the construction of the four -lane urban section between the future roundabout and the limits of Phase 1 if this improvement is warranted based on future traffic counts as described in Section D(6). The Applicant shall design and construct, or cause for the construction of modifications to, or the elimination of the median crossing on Northwestern Pike identified as Median Crossing A on the proffered GDP. VDOT shall determine the requirements for modification, or elimination and shall advise the Applicant in writing of the requirements associated with this improvement. The Applicant shall complete these improvements in conjunction with construction activities associated with Spinning Wheel Lane as described in Section D(2)(f) of the proffer statement. h. The Applicant shall design and construct, or cause for the construction of improvements to the southbound off ramp at the Route 37 interchange with Northwestern Pike to provide for a free flow right turn lane onto Northwestern Pike. The Applicant shall complete the Route 37 interchange improvements described in this section prior to the approval of any Site Plan that exceeds 180,000 square feet of commercial land use or equivalent trip generations as described in Section D(2)(a) of the proffer statement on the B2 portion of the Property. i. In the event that VDOT and Frederick County determine that a monetary contribution for regional transportation improvements to the Route 37 corridor between the Northwestern Pike interchange and the North Frederick Pike interchange is desired, the Applicant agrees to provide a monetary contribution in lieu of the improvement described in Section 2(h). This monetary contribution shall be equivalent to the amount associated with the improvement described in that section based upon an engineering estimate agreed upon by VDOT, Frederick County and the Applicant that will be prepared on or before the build out of the Phase 1 transportation improvements. The Applicant agrees to provide this Greenway Engineering File #49285 /Silver Lake LLC Rezoning November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009 monetary contribution to Frederick County within 30 days of written request by the County, and further agrees to allow for this monetary contribution to be utilized as matching funds by Frederick County for qualifying transportation improvements programs or grants. 3. The Applicant hereby proffers the following Phase 2 Transportation Program: 8 a. The Applicant shall be entitled to develop the CCRC and a maximum of 350,000 square feet of commercial land use and 105,000 square feet of office land use within Phase 2 that is a cumulative total of Phase 1— Phase 2. However, the Applicant can deviate from this land use mix assuming the total trip generation for site plans within this phase of the transportation program (based on the ITE 7 Edition Trip Generation Report) do not exceed the total trip generation specified in the November 25, 2008 Traffic Impact Analysis Report for Phase 2. It is recognized that the Applicant shall complete all Phase 2 transportation improvements prior to the approval of any Site Plan that exceeds 350,000 square feet of commercial land use and 105,000 square feet of office land use or equivalent trip generation as noted above on the B2 portion of the Property. b. The Applicant shall dedicate all right -of -way necessary for the Phase 2 improvements that will occur on the Property to VDOT or Frederick County. The Applicant will attempt to design all off -site improvements within public right -of -way; however, if necessary it is recognized that VDOT and/or Frederick County will assist the Applicant with right -of- way necessary to implement proffered off -site transportation improvements. The Applicant agrees to assume all costs associated with right -of -way acquisition if assistance from VDOT and /or Frederick County is required. c. The Applicant shall design and construct, or cause for the execution of a traffic signalization agreement with VDOT to fully fund new traffic signalization with pedestrian actualization at the intersection of Northwestern Pike (U.S. Route 50) and Silver Lake Road. The traffic signalization agreement shall be executed prior to the issuance of the first occupancy permit for the land use utilizing Silver Lake Road for access to Northwestern Pike. The Applicant shall provide additional funding necessary to provide for pre emption control for this traffic signal if the County requests the land for the new fire and rescue facility provided in Section E(1) of the proffer statement. The Applicant shall reserve the right to preempt this agreement by initiating a signal warrant study and signal design plans in accordance with VDOT standards for approval to install traffic signalization at this intersection. Greenway Engineering November 25, 2008; Revised January 6, 2009 Revised January 27, 2009; Revised February 16, 2009; Revised February' 19, 2009; Revised March 2, 2009 9 d. The Applicant shall design and construct, or cause for the construction of improvements to Silver Lake Road to include a two -lane urban road section with a raised median to the first available commercial entrance that is constructed to a 40 mph geometric design standard and provides for the construction of the roundabout at the intersection with Spinning Wheel Lane, and left turn lanes and right turn lanes at all commercial entrances as required by VDOT. Additionally, the Applicant shall design and construct, or cause for the construction of a median crossing including a westbound right turn lane and left turn lane and an eastbound left turn lane on Northwestern Pike at the intersection of Silver Lake Road. These improvements shall be completed prior to the approval of any Site Plan that exceeds 350,000 square feet of commercial land use and 105,000 square feet of office land use or equivalent trip generation as described in Section D(3)(a) of the proffer statement on the B2 portion of the Property, with the exception of the median crossing and turn lane improvements on Northwestern Pike which shall be completed with the Silver Lake Road intersection improvements on Northwestern Pike. Additionally, the Applicant shall dedicate right -of -way to Frederick County to allow for a four -lane urban road section for Silver Lake Road, and further agrees to design and construct, or cause for the construction of the four -lane urban road section if this improvement is warranted based on future traffic counts as described in Section D(6). e. The Applicant shall design and construct, or cause for the construction of improvements to Spinning Wheel Lane to provide for a two -lane urban road section that is constructed to a 40 mph geometric design standard and provides for left turn lanes and right turn lanes at all internal collector street intersections and at commercial entrances as required by VDOT, which continues from the terminus of Spinning Wheel Lane constructed in Phase 1 to a connection at the intersection of Retail Boulevard. The Applicant shall complete these improvements prior to the approval of any Site Plan that exceeds 350,000 square feet of commercial land use and 105,000 square feet of office land use or equivalent trip generation as described in Section D(3)(a) of the proffer statement on the B2 portion of the Property. Additionally, the Applicant shall dedicate right -of -way to Frederick County to allow for a four -lane urban road section for Spinning Wheel Lane and further agrees to design and construct, or cause for the construction of the four -lane urban section if this improvement is warranted based on future traffic counts as described in Section D(6). E The Applicant shall design and construct, or cause for the construction of modifications to, or the elimination of the median crossings on Northwestern Pike identified as Median Crossing B and Median Crossing C on the proffered GDP. VDOT shall determine the requirements for modification, or elimination and shall advise the Applicant in writing of the requirements associated with this improvement. The Applicant shall File #49285 /Silver Lake LLC Rezoning Greenway Engineering g. File #49285 /Silver Lakc LLC Rezoning November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009 10 complete these improvements in conjunction with construction activities associated with Silver Lake Road as described in Section D(3)(d) of the proffer statement. The Applicant shall design and construct, or cause for the construction of improvements to the northbound off ramp at the Route 37 interchange with Northwestern Pike to provide for a second right turn. The Applicant shall complete the Route 37 interchange improvements described in this section prior to the approval of any Site Plan that exceeds 350,000 square feet of commercial land use and 105,000 square feet of office land use or equivalent trip generation as described in Section D(3)(a) of the proffer statement on the 132 portion of the Property. h. The Applicant shall design and construct, or cause for the construction of improvements at the Route 37 interchange with Northwestern Pike to provide for a third westbound thru lane on Northwestern Pike under the Route 37 bridge structure. The Applicant shall complete the Route 37 interchange improvements described in this section prior to the approval of any Site Plan that exceeds 350,000 square feet of commercial land use and 105,000 square feet of office land use or equivalent trip generation as described in Section D(3)(a) of the proffer statement on the B2 portion of the Property. i. In the event that VDOT and Frederick County determine that a monetary contribution for regional transportation improvements to the Route 37 corridor between the Northwestern Pike interchange and the North Frederick Pike interchange is desired, the Applicant agrees to provide a monetary contribution in lieu of the improvements described in Section 3(g) and 3(h). This monetary contribution shall be equivalent to the amount associated with the improvement described in those sections based upon an engineering estimate agreed upon by VDOT, Frederick County and the Applicant that will be prepared on or before the build out of the Phase 2 transportation improvements. The Applicant agrees to provide this monetary contribution to Frederick County within 30 days of written request by the County, and further agrees to allow for this monetary contribution to be utilized as matching funds by Frederick County for qualifying transportation improvements programs or grants. In the event that regional transportation improvements to the Route 37 corridor between the Northwestern Pike interchange are constructed prior to the completion of the Phase 2 Transportation Program, the Applicant agrees to provide a monetary contribution equivalent to the amount associated with the improvement described in this section to be utilized unconditionally by Frederick County for other transportation improvements. This monetary contribution shall be provided to Frederick County within 60 days of written request by the County. Grecnway Engineering File #4928S/Silver Lake LLC Rezoning f November 25, 2008 Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009 4. The Applicant hereby proffers the following Phase 3 Transportation Program: 11 a. The Applicant shall be entitled to develop the CCRC and a maximum of 490,000 square feet of commercial land use and 350,000 square feet of office land use within Phase 3 that is a Cumulative total of Phase 1 Phase 3. However, the Applicant can deviate from this land use mix assuming the total trip generation for site plans within this phase of the transportation program (based on the ITE 7 Edition Trip Generation Report) do not exceed the total trip generation specified in the November 25, 2008 Traffic impact Analysis Report for Phase 3. It is recognized that the Applicant shall complete all Phase 3 transportation improvements prior to the approval of any Site Plan that exceeds 490,000 square feet of commercial land use and 350,000 square feet of office land use or equivalent trip generation as noted above on the B2 portion of the Property. b. The Applicant shall dedicate all right- of-way necessary for the Phase 3 improvements that will occur on the Property to VDOT or Frederick County. The Applicant will attempt to design all off -site improvements within public right-of-way; however, if necessary it is recognized that VDOT and/or Frederick County will assist the Applicant with right -of- way necessary to implement proffered off -site transportation improvements. The Applicant agrees to assume all costs associated with right -of -way acquisition if assistance from VDOT and /or Frederick County is required. c. The Applicant shall design and construct, or cause for the construction of improvements to Spinning Wheel Lane to provide for a second right turn lane on Spinning Wheel Lane at the intersection of Northwestern Pike. These improvements shall be completed prior to the approval of any Site Plan that exceeds 490,000 square feet of commercial land use and 350,000 square feet of office land use or equivalent trip generation as described in Section D(4)(a) of the proffer statement on the B2 portion of the Property. d The Applicant shall design and construct, or cause for the construction of a two -lane urban road that is constructed to a 40 mph geometric design standard and provides for roundabout design at the intersection with Spinning Wheel Lane, and left turn lanes and right turn lanes at all commercial entrances as required by VDOT, which will provide for a connection between Spinning Wheel Lane and Poor House Road (Route 654). The Applicant will coordinate with the owner of tax parcel 52- ((A))-47 to obtain right -of -way for this improvement as a first option for development of the two -lane urban road connection. In the event that the first option cannot be achieved, the Applicant shall design and construct, Greenway Engineering File #49285 /Silver Lake LLC Rezoning November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009 12 or cause for the construction of the two -lane urban road connection between Spinning Wheel Lane and Poor louse Road on the Property. The general location of the two -lane road connection associated with both options will be provided on the proffered GDP; however, it is recognized that this location may shift without the need for conditional rezoning approval. The Applicant shall complete this improvement prior to the approval of any Site Plan that exceeds 490,000 square feet of commercial land use and 350,000 square feet of office land use or equivalent trip generation as described in Section D(4)(a) of the proffer statement on the B2 portion of the Property. 5. The Applicant hereby proffers the following Phase 4 Transportation Program: a. The Applicant shall be entitled to develop the CCRC and a maximum of 583,050 square feet of commercial land use and 494,600 square feet of office land use within Phase 4 that is a cumulative total of Phase 1 Phase 4. However, the Applicant can deviate from this land use mix assuming the total trip generation for site plans within this phase of the transportation program (based on the ITE 7` Edition Trip Generation Report) do not exceed the total trip generation specified in the November 25, 2008 Traffic Impact Analysis Report for Phase 4. It is recognized that the Applicant shall complete all Phase 4 transportation improvements prior to the approval of any Site Plan that exceeds 530,000 square feet of commercial land use and 440,000 square feet of office land use or equivalent trip generation as noted above on the B2 portion of the Property. In the event that the Applicant would desire to develop commercial or office land uses that exceed the maximum square feet or total trip generation specified in this phase of the transportation program, a new traffic impact analysis report shall be prepared with each site plan to determine any additional transportation improvements required to mitigate the impacts created solely by that project, which will be implemented as a condition of site plan approval. b. The Applicant shall dedicate all right -of -way necessary for the Phase 4 improvements that will occur on the Property to VDOT or Frederick County. The Applicant will attempt to design all off-site improvements within public right -of -way; however, if necessary it is recognized that VDOT and/or Frederick County will assist the Applicant with right -ot- way necessary to implement proffered off -site transportation improvements. The Applicant agrees to assume all costs associated with right -of -way acquisition if assistance from VDOT and /or Frederick County is required. c. The Applicant shall design and construct, or cause for the construction of improvements to Silver Lake Road to provide for a second left turn lane Greenway Engineering E. Fire and Rescue Enhancements File 849285 /Silver Lake LLC Rezoning November 25, 2008; Revised January 6, 2009 Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009 13 on Silver Lake Road at the intersection of Northwestern Pike. These improvements shall be completed prior to the approval of any Site Plan that exceeds 530,000 square feet of commercial land use and 440,000 square feet of office land use or equivalent trip generation as described in Section D(5)(a) of the proffer statement on the B2 portion of the Property. d. The Applicant shall design and construct, or cause for the construction of improvements to provide for a third westbound thru lane on Northwestern Pike from the eastern boundary of the Property to Spinning Wheel Lane. Additionally, the Applicant shall be responsible for the relocation, construction, and right -of -way dedication (if necessary) of the existing right turn lanes on Northwestern Pike at the Spinning Wheel Lane and Silver Lake Road intersections. The Applicant shall complete these improvements prior to the approval of any Site Plan that exceeds 530,000 square feet of commercial land use and 440,000 square feet of office land use or equivalent trip generation as described in Section D(5)(a) of the proffer statement on the B2 portion of the Property. 6. The Applicant hereby proffers to conduct annual traffic counts that will be provided to VDOT and Frederick County to determine if the 8,000 ADT volume is achieved to require the expansion of Spinning Wheel Lane and Silver Lake Road to four -lane urban road sections, as provided for in Sections D(2)(0, D(3)(d), and D(3)(e) of the proffer statement. The annual traffic counts shall begin in the tirst calendar year that the Phase 2 transportation improvements are completed and shall continue until the warrants are met for widening both street systems. VDOT and Frederick County may allow for annual traffic counts to be delayed in calendar years in which there is no development activity on the Property. When required, traffic counts will be conducted at the Spinning Wheel Lane and Silver Lake Road intersections with Northwestern Pike, on Spinning Wheel Lane at the eastern boundary of the Property, and on the two -lane road connector between Spinning Wheel Lane and Poor House Road at the western boundary of the Property. If warrants are met based on the annual traffic counts, the Applicant shall prepare and submit construction plans for approval by VDOT and Frederick County within six months of written notice that warrants are met. The Applicant shall commence construction of these improvements within six months of final plan approval. 1. The Applicant hereby proffers to provide, or cause for the provision of land to Frederick County for the development of a new( fire and rescue .station and support facilities serving the Round Hill community within five years from the date of final non appealable rezoning approval. The Applicant shall dedicate a site fronting on Silver Lake Road that is locates} near the intersection of Northwestern Pike, which is a minimum of three acres and a maximum of four acres in size, 1 Greenway Engineering November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 1b, 2009; Revised February 19, 2009; Revised March 2, 2009 14 with the final size of this site being determined upon approval of the Site Plan for the new fire and rescue station facility. The Applicant shall prepare and provide Frederick County with the dedication plat for this site and necessary right -of -way along Northwestern Pike and Silver Lake Road within five years from the date of final non appealable rezoning approval provided that a Site Plan has been approved for the new fire and rescue station. Additionally, if Frederick County does not commence construction of a new fire and rescue station within one year following the dedication of the site, this land shall be conveyed back to the Applicant to allow for further economic development. In the event Frederick County elects not to develop this site as a new fire and rescue station, the Applicant shall provide a monetary contribution to Frederick County in the amount of $100,000.00 for the development of a new fire and rescue station serving the Round Hill community at another location. 2. The Applicant hereby proffers to provide, or cause for the provision of a monetary contribution to Frederick County in the amount of $1,000,000.00 for the development of a new fire and rescue station serving the Round Hill community. This monetary proffer is intended to mitigate impacts to fire and rescue services associated with the development of the CCRC on the MS District portion of the Property. The $1,000,000.00 monetary contribution shall be provided to Frederick County within five years from the date of final non- appealable rezoning approval to assist with the development of the new fire and rescue station. However, the date for the $1,000,000.00 monetary contribution payment may be extended if a Site Plan for a new tire and rescue station serving the Round Hill community has not been approved within five years from the date of final non- appealable rezoning approval. If the latter occurs, the $1,000,000.00 monetary contribution shall be provided to Frederick County within 30 days of the date of final Site Plan approval for the new fire and rescue station serving the Round Hill community. 3. The Applicant hereby proffers to design and construct, or cause for the construction of all necessary road improvements at the Northwestern Pike intersection with Silver Lake Road and on Silver Lake Road to provide access to the new fire and rescue station, as well as all utilities necessary for the new lire and rescue station located on the Property. These infrastructure improvements shall be provided by the Applicant in advance of the Phase 1 or Phase 2 transportation program improvements to facilitate the construction of the new fire and rescue station should this occur in advance of the commercial development within these transportation phases. The Applicant shall work with Frederick County, upon notice by the County, to ensure that the design, bonding and construction of these infrastructure improvements is coordinated during the preparation of the Site Plan for the new fire and rescue station on the Property. File #49285 /Silver Lake LLC Rezoning Greenway Engineering November 25, 2008; Revised January 6, 2009 Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009 F. Signatures The conditions proffered above shall be binding upon the heirs, executors, administrators, assigns and successors in the interest of the Applicants and owners. In the event the Frederick County Board of Supervisors grants this rezoning and accepts the conditions, the proffered conditions shall apply to the land rezoned in addition to other requirements set forth in the Frederick County Code. Respectfully Submitted: By: Commonwealth of Virginia. City /Gaily of The foregoing instrument was acknowledged before me this 441c.day of 20 09 by My Commission Expires 8 o20 /D CINDY GROVE NOTARY PUBLIC Commonwealth of Virginia Reg. #184054 File #49285 /Silver Lake LLC Rezoning To VVit. Date: 3 1 01 N ary Public 15 Greenway Engineering APPLICANT: PROJECT NAME: File #49285 /Silver Lake LLC Rezoning November 25, 2008 Revised January 6, 2009; Revised January 27, 2009 Revised February 16, 2009; Revised February 19, 2009 SILVER LAKE, LLC PROFFER STATEMENT REZONING: RZ Rural Areas District (RA) to Business General District (B2) and MS Medical Support District (MS) PROPERTY: 370.02± acres; Tax Parcels #52- ((A)) -C, 52- ((A)) -50, 52- ((A)) -50A, 52- ((A)) -52, and 52- ((A)) -63 (here -in after the "Property RECORD OWNER: Silver Lake, LLC, James R. Wilkins, II1, Manager Silver Lake, LLC (here -in after the "Applicant Round Hill Commercial Center The Village at Orchard Ridge A National Lutheran Home Community ORIGINAL DATE OF PROFFERS: November 25, 2008 REVISION DATE: February 19, 2009 Preliminary Matters Pursuant to Section 15.2 -2296 Et. Seq. of the Code of Virginia, 1950, as amended, and the provisions of the Frederick County Zoning Ordinance with respect to conditional zoning, the undersigned Applicant hereby proffers that in the event the Board of Supervisors of Frederick County, Virginia, shall approve Rezoning Application for the rezoning of 370.02± -acres from the Rural Areas (RA) District to establish 238.96± acres of B -2, Business General District (Tax Map Parcels 52- ((A)) -C, 52- ((A)) -50A, 52- ((A))-52, 52- ((A)) -63) and 131.06± -acres of MS, Medical Support District (Tax Map Parcel 52- ((A)) -50), development of the subject property shall be done in conformity with the terms and conditions set forth herein, except to the extent that such terms and conditions may be subsequently amended or revised by the Applicant and such be approved by the Frederick County Board of Supervisors in accordance with the said Code and Zoning Ordinance. In the event that such rezoning is not granted, then these proffers shall be deemed withdrawn and have no effect whatsoever. These proffers shall be binding upon this Applicant and their legal successors, heirs, or assigns. The Property, more particularly described as the lands owned by Silver Lake LLC, being all of Tax Map Parcels 52- ((A)) -C, 52- ((A)) -50, 52- ((A)) -50A, 52- ((A)) -52, 52- ((A)) -63, and further described by Property Deeds including Instrument Number 090001536, Deed Book 872 Page 318 and Deed Book 927 Page 1591. (Please refer to Rezoning Application Deed Information). Greenway Engineering A. Generalized Development Plan 1. The Applicant hereby proffers to submit a Generalized Development Plan (the "GDP for the Property. The purpose of the GDP is to identify the general location of the B -2, Business General District and MS, Medical Support District areas, the general location of the proposed future Fire and Rescue Station area, the general location of the proposed future passive open space area, the general location of the 50 -foot green strip enhancement area, the general location of the 10 -foot asphalt trail system, and the general location of the phased transportation improvements areas within and adjacent to the Property. 2. The Applicant hereby proffers to develop the Property in substantial conformity with the proffered GDP, prepared by Greenway Engineering dated February 16, 2889 February 19, 2009. The GDP is recognized to be a conceptual plan and may be adjusted by the Applicant to accommodate final design and engineering constraints without the need of new conditional rezoning approval by the Frederick County Board of Supervisors, provided that the adjustments do not eliminate or substantially relocate the areas described in Section Al of this proffer statement. B. MS, Medical Support District Area 1. The Applicant hereby proffers to develop, or cause for the development of a Continuing Care Retirement Community (the "CCRC on the portion of the Property proposed to be zoned MS, Medical Support District, and to exclude all other MS, Medical Support District land uses not expressly permitted within Section 165- 97B(7) of the Frederick County Zoning Ordinance. 2. The Applicant hereby proffers to limit the maximum residential density within the CCRC to eight units per acre. The maximum residential density total shall include all independent living units, assisted care living units, and skilled nursing care units. The location and totals for the residential units specified in this section shall be provided on the Master Development Plan for the Property. 3. Where buffer areas are required and mature woodlands are in place, the Applicant will request approval of the use of these woodland features to satisfy the buffer requirement during the consideration of the Master Development Plan. 4. The Applicant proffers to provide initial access to the CCRC via Spinning Wheel Lane as described in Section D(2)(1) of the proffer statement, and further File #149285 /Silver Lake 111 Rezoning November 25, 2008 Revised January 6, 2009; Revised January 27, 2009 Revised February 16, 2009; Revised February 19, 2009 PROFFER STATEMENT 2 November 25, 2008 3 Revised January 6, 2009; Revised January 27, 2009 Revised February 16, 2009; Revised February 19, 2009 proffers to provide a maximum of two commercial entrances on Spinning Wheel Lane to provide access to the CCRC. Greenway Engineering C. B2, Business General District Area 1. The Applicant hereby proffers to prohibit the following land uses currently allowed within the B2 District: Truck Stops Golf Driving Ranges Outdoor Batting Cages Model Home Sales Self- Service Storage Facilities Adult Retail Establishments File #4928S/Silver Lake LLC Rezoning 2. The Applicant hereby proffers to prohibit individual full service commercial entrances to all allowed B2 District land uses that intersect Northwestern Pike (U.S. Route 50 West; however, right -in or right -out only access to B2 District land uses shall be permitted if approved by VDOT and /or Frederick County. 3. The Applicant hereby proffers to establish a green strip along the Property frontage adjacent to the Northwestern Pike corridor that is 50 feet in width. Parking lots and access drives shall be prohibited within the 50 -foot green strip, unless access drives are permitted as described in Section C(2) above. The entire Property frontage of the 50 -foot green strip shall be enhanced with street trees that are a minimum of 2 -inch caliper at planting and spaced a maximum of 30 feet on center, ornamental shrubs that are a mininzum three gallon container at planting, as well as an asphalt bicycle and pedestrian facility that is 10 feet wide. The installation of the street trees, ornamental shrubs, and bicycle and pedestrian facility located within the 50 foot green strip shall be required as specified in Section C(6) of the proffer statement. in conjunction with the development f the portion of the street trees and bicycle and pcdestri issuance of the occupancy permit for the first building permit issued for that pareel. 4. The Applicant hereby proffers to establish a linear passive open space area in the general location identified on the proffered GDP, which will be enhanced with a 1D -foot asphalt trail system between Spinning Wheel Lane and Northwestern Pike as specified in Section C(6) of the proffer statement. construct, or cause for the c nstruction of this trail system on or before the build Greenway Engineering File #4928S/Silver Lake LLC Rezoning November 25, 2008 Revised January 6, 2009; Revised January 27, 2009 Revised February 16, 2009: Revised February 19, 2009 4 5. The Applicant hereby proffers to provide for inter parcel connectors between all adjoining commercial and office land uses. 6. The Applicant hereby proffers to design and construct, or cause for the construction of an asphalt bicycle and pedestrian facility that is ten feel wide. This location of this facility is identified on the proffered GDP and will be located outside of public right -of -way limits. This facility will be developed as follows: The 10 foot asphalt trail located along the south side of the Phase 1 segment of Spinning Wheel Lane shall be developed during the construction of this road segment as specified in Section D(2)(f) of the proffer statement. i The 10 foot asphalt trail located along the south side of the Phase 2 segment of Spinning Wheel Lane shall be developed during the construction of this road segment as specified in Section D(3)(e) of the proffer statement. i The 10 foot asphalt trail located along the passive open space area shall be developed on or before the completion of the commercial development permitted under the Phase 1Transportation Program as specified in Section D(2)(a) of the proffer statement. The l0 foot asphalt trail located along the southern boundary of the Property identified as Area 1 on the GDP shall be developed during the construction of the Phase 1 segment of Spinning Wheel Lane as specified in Section D(2)(f) of the proffer statement. i The 10 foot asphalt trail located along the southern boundary of the Property identified as Area 2 on the GDP shall be developed prior to the issuance of the occupancy permit issued for the first commercial building permit located in the land bay between Spinning Wheel Lane and Silver Lake Road. i The 10 foot asphalt trail located along the southern boundary of the Property identified as Area 3 on the GDP shall be developed prior to the issuance of the occupancy permit issued for the first commercial building permit located in the land bay between Silver Lake Road and the eastern boundary of the Property. D. Transportation Enhancements I. The Applicant has submitted a Traffic Impact Analysis (TIA), prepared by Patton, Harris, Rust and Associates, dated November 25, 2008 for the 370.02± acre Property. The TIA identifies improvements to the regional transportation network to account for background undeveloped projects and the Applicant's proposal through four phases of development. The Applicant hereby proffers to design and construct, or cause for the construction of improvements to the regional Greenway Engineering November 25, 2008 Revised January 6, 2009; Revised January 27, 2009 Revised February 16, 2009; Revised February 19, 2009 2. The Applicant hereby proffers the following Phase 1 Transportation Program: File #4928S/Silver Lake LLC Rezoning 5 transportation network as a phased development program that is described in this section of the proffer statement. Additionally, the phased development program is identified in illustrative form on the proffered GDP. It is recognized that the phased transportation improvements proffered herein will be constructed as described in this section; however, the exact location and limits of these improvements will be determined by VDOT and /or Frederick County during the approval of engineering design plans. It is further recognized that the location of the regional transportation network improvements identified in illustrative form on the proffered GDP are general in nature and may be relocated to accommodate VDOT engineering design plan approval without the need for conditional zoning amendment to the GDP or the proffer statement. a. The Applicant shall be entitled to develop the CCRC and a maximum of 180,000 square feet of commercial land use within Phase 1. However, the Applicant can deviate from this land use mix assuming the total trip generation for site plans within this phase of the transportation program (based on the ITE 7` Edition Trip Generation Report) do not exceed the total trip generation specified in the November 25, 2008 Traffic impact Analysis Report for Phase 1. It is recognized that the Applicant shall complete all Phase 1 transportation improvements prior to the approval of any Site Plan that exceeds 180,000 square feet of commercial land use or equivalent trip generation as noted above on the B2 portion of the Property. b. The Applicant shall dedicate all right -of -way necessary for the Phase 1 improvements that will occur on the Property to VDOT or Frederick County. The Applicant will attempt to design all off -site improvements within public right -of -way; however, if necessary it is recognized that VDOT and /or Frederick County will assist the Applicant with right -of- way necessary to implement proffered off -site transportation improvements. The Applicant agrees to assume all costs associated with right -of -way acquisition if assistance from VDOT and /or Frederick County is required. c. The Applicant shall execute, or cause for the execution of a traffic signalization agreement with VDOT to fully fund new traffic signalization with pre cmption control at the intersection of Northwestern Pike (U.S. Route 50) and Poor House Road (Route 654). The traffic signalization agreement shall be executed within six months of final non appealable rezoning approval, or prior to approval of the first Site Plan for the property, whichever occurs first. d. The Applicant shall design and construct, or cause for the execution of a traffic signalization agreement with VDOT to fully fund new traffic Greenway Engineering November 25, 2008 Revised January 6, 2009; Revised January 27, 2009 Revised February 16, 2009; Revised February 19, 2009 6 signalization with pedestrian actualization at the intersection of Northwestern Pike (U.S. Route 50) and the relocated Spinning Wheel Lane. The traffic signalization agreement shall be executed within one year of final non appealable rezoning approval, or prior to approval of the first Site Plan for the property, whichever occurs first. The Applicant shall reserve the right to preempt this agreement by initiating a signal warrant study and signal design plans in accordance with VDOT standards for approval to install traffic signalization at this intersection. e. The Applicant shall design and construct, or cause for the construction of improvements to the median crossing including a westbound right turn lane and left turn lane and an eastbound left turn lane on Northwestern Pike at the intersection of the relocated Spinning Wheel Lane. These improvements shall be completed prior to the issuance of the first occupancy permit for the land use utilizing Spinning Wheel Lane for access to Northwestern Pike. f. The Applicant shall design and construct, or cause for the construction of improvements to Spinning Wheel Lane within the Property to provide for a road section that is constructed to a 40 mph geometric design standard and provides right -of -way for a future roundabout at the intersection with Silver Lake Road, and left turn lanes and right turn lanes at all internal collector street intersections and at commercial entrances as required by VDOT. Additionally, the Applicant shall design and construct, or cause for the construction of separate right and left turn lanes on Spinning Wheel Lane at the intersection of Northwestern Pike. File #49285 /Silver Lake LLC Rezoning Spinning Wheel Lane shall be developed as a four -lane divided urban road section between Northwestern Pike and the future roundabout, and as a two -lane road section between the future roundabout and the limits of Phase 1 with dedicated right -of -way to Frederick County to allow for a four -lane urban road section. The construction of the two -lane road section shall include a raised median section necessary to transition from the roundabout into the urban road section design. Additionally, a way paralleling Spinning Wheel Lane on the south side. These improvements shall be completed prior to the issuance of the first occupancy permit for the land use utilizing Spinning Wheel Lane for access to Northwestern Pike. Furthermore, the Applicant agrees to design and construct, or cause for the construction of the four -lane urban section between the future roundabout and the limits of Phase 1 if this improvement is warranted based on future traffic counts as described in Section D(6). The Applicant shall design and construct, or cause for the construction of modifications to, or the elimination of the median crossing on Greenway Engineering File #4928S/Silver Lake LLC Rezoning November 25, 2008 Revised January 6, 2009; Revised January 27, 2009 Revised February 16, 2009; Revised February 19, 2009 7 Northwestern Pike identified as Median Crossing A on the proffered GDP. VDOT shall determine the requirements for modification, or elimination and shall advise the Applicant in writing of the requirements associated with this improvement. The Applicant shall complete these improvements in conjunction with construction activities associated with Spinning Wheel Lane as described in Section D(2)(f) of the proffer statement. h. The Applicant shall design and construct, or cause for the construction of improvements to the southbound off ramp at the Route 37 interchange with Northwestern Pike to provide for a free flow right turn lane onto Northwestern Pike. The Applicant shall complete the Route 37 interchange improvements described in this section prior to the approval of any Site Plan that exceeds 180,000 square feet of commercial land use or equivalent trip generations as described in Section D(2)(a) of the proffer statement on the B2 portion of the Property. i. In the event that VDOT and Frederick County determine that a monetary contribution for regional transportation improvements to the Route 37 corridor between the Northwestern Pike interchange and the North Frederick Pike interchange is desired, the Applicant agrees to provide a monetary contribution in Lieu of the improvement described in Section 2(h). This monetary contribution shall be equivalent to the amount associated with the improvement described in that section based upon an engineering estimate agreed upon by VDOT, Frederick County and the Applicant that will be prepared on or before the build out of the Phase 1 transportation improvements. The Applicant agrees to provide this monetary contribution to Frederick County within 30 days of written request by the County, and further agrees to allow for this monetary contribution to be utilized as matching funds by Frederick County for qualifying transportation improvements programs or grants. 3. The Applicant hereby proffers the following Phase 2 Transportation Program: a. The Applicant shall be entitled to develop the CCRC and a maximum of 350,000 square feet of commercial land use and 105,000 square feet of office land use within Phase 2 that is a cumulative total of Phase 1 Phase 2. However, the Applicant can deviate from this land use mix assuming the total trip generation for site plans within this phase of the transportation program (based on the ITE 7 Edition Trip Generation Report) do not exceed the total trip generation specified in the November 25, 2008 Traffic Impact Analysis Report for Phase 2. It is recognized that the Applicant shall complete all Phase 2 transportation improvements prior to the approval of any Site Plan that exceeds 350,000 square feet of commercial land use and 105,000 square feet of office land use or Greenway Engineering 8 File #49285 /Silver Lake LLC Rezoning November 25, 2008 Revised January 6, 2009; Revised January 27, 2009 Revised February 16, 2009; Revised February 19, 2009 equivalent trip generation as noted above on the B2 portion of the Property. b. The Applicant shall dedicate all right -of -way necessary for the Phase 2 improvements that will occur on the Property to VDOT or Frederick County. The Applicant will attempt to design all off -site improvements within public right -of -way; however, if necessary it is recognized that VDOT and /or Frederick County will assist the Applicant with right -of- way necessary to implement proffered off -site transportation improvements. The Applicant agrees to assume all costs associated with right -of -way acquisition if assistance from VDOT and /or Frederick County is required. c. The Applicant shall design and construct, or cause for the execution of a traffic signalization agreement with VDOT to fully fund new traffic signalization with pedestrian actualization at the intersection of Northwestern Pike (U.S. Route 50) and Silver Lake Road. The traffic signalization agreement shall be executed prior to the issuance of the first occupancy permit for the land use utilizing Silver Lake Road for access to Northwestern Pike. The Applicant shall provide additional funding necessary to provide for pre eruption control for this traffic signal if the County requests the land for the new fire and rescue facility provided in Section E(1) of the proffer statement. The Applicant shall reserve the right to preempt this agreement by initiating a signal warrant study and signal design plans in accordance with VDOT standards for approval to install traffic signalization at this intersection. d. The Applicant shall design and construct, or cause for the construction of improvements to Silver Lake Road to include a two -lane urban road section with a raised median to the first available commercial entrance that is constructed to a 40 mph geometric design standard and provides for the construction of the roundabout at the intersection with Spinning Wheel Lane, and left turn lanes and right turn lanes at all commercial entrances as required by VDOT. Additionally, the Applicant shall design and construct, or cause for the construction of a median crossing including a westbound right turn lane and left turn lane and an eastbound left turn lane on Northwestern Pike at the intersection of Silver Lake Road. These improvements shall be completed prior to the approval of any Site Plan that exceeds 350,000 square feet of commercial land use and 105,000 square feet of office land use or equivalent trip generation as described in Section D(3)(a) of the proffer statement on the B2 portion of the Property, with the exception of the median crossing and turn lane improvements on Northwestern Pike which shall be completed with the Silver Lake Road intersection improvements on Northwestern Pike. Additionally, the Applicant shall dedicate right -of -way to Frederick County to allow for a four -lane urban road section for Silver Lake Road, Greenway Engineering November 25, 2008 9 Revised January 6, 2009; Revised January 27, 2009 Revised February 16, 2009; Revised February 19, 2009 and further agrees to design and construct, or cause for the construction of the four -lane urban road section if this improvement is warranted based on future traffic counts as described in Section D(6). e. The Applicant shall design and construct, or cause for the construction of improvements to Spinning Wheel Lane to provide for a two -lane urban road section that is constructed to a 40 mph geometric design standard and provides for ]eft turn lanes and right turn lanes at all internal collector street intersections and at commercial entrances as required by VDOT, which continues from the terminus of Spinning Wheel Lane constructed in Phase 1 to a connection at the intersection of Retail Boulevard. The Applicant shall complete these improvements prior to the approval of any Site Plan that exceeds 350,000 square feet of commercial land use and 105,000 square feet of office land use or equivalent trip generation as described in Section D(3)(a) of the proffer statement on the B2 portion of the Property. Additionally, the Applicant shall dedicate right -of -way to Frederick County to allow for a four -lane urban road section for Spinning Wheel Lane and further agrees to design and construct, or cause for the construction of the four -lane urban section if this improvement is warranted based on future traffic counts as described in Section D(6). f. The Applicant shall design and construct, or cause for the construction of modifications to, or the elimination of the median crossings on Northwestern Pike identified as Median Crossing B and Median Crossing C on the proffered GDP. VDOT shall determine the requirements for modification, or elimination and shall advise the Applicant in writing of the requirements associated with this improvement. The Applicant shall complete these improvements in conjunction with construction activities associated with Silver Lake Road as described in Section D(3)(d) of the proffer statement. The Applicant shall design and construct, or cause for the construction of improvements to the northbound off ramp at the Route 37 interchange with Northwestern Pike to provide for a second right turn. The Applicant shall complete the Route 37 interchange improvements described in this section prior to the approval of any Site Plan that exceeds 350,000 square feet of commercial land use and 105,000 square feet of office land use or equivalent trip generation as described in Section D(3)(a) of the proffer statement on the B2 portion of the Property. g• h. The Applicant shall design and construct, or cause for the construction of improvements at the Route 37 interchange with Northwestern Pike to provide for a third westbound thru lane on Northwestern Pike under the Route 37 bridge structure. The Applicant shall complete the Route 37 interchange improvements described in this section prior to the approval of any Site Plan that exceeds 350,000 square feet of commercial land use File 1149285 /Silver Lake LLC Rezoning Greenway Engineering November 25, 2008 10 Revised January 6, 2009; Revised January 27, 2009 Revised February 16, 2009; Revised February 19, 2009 and 105,000 square feet of office land use or equivalent trip generation as described in Section D(3)(a) of the proffer statement on the B2 portion of the Property. i. In the event that VDOT and Frederick County determine that a monetary contribution for regional transportation improvements to the Route 37 corridor between the Northwestern Pike interchange and the North Frederick Pike interchange is desired, the Applicant agrees to provide a monetary contribution in lieu of the improvements described in Section 3(g) and 3(h). This monetary contribution shall be equivalent to the amount associated with the improvement described in those sections based upon an engineering estimate agreed upon by VDOT, Frederick County and the Applicant that will be prepared on or before the build out of the Phase 2 transportation improvements. The Applicant agrees to provide this monetary contribution to Frederick County within 30 days of written request by the County, and further agrees to allow for this monetary contribution to be utilized as matching funds by Frederick County for qualifying transportation improvements programs or grants. In the event that regional transportation improvements to the Route 37 corridor between the Northwestern Pike interchange are constructed prior to the completion of the Phase 2 Transportation Program, the Applicant agrees to provide a monetary contribution equivalent to the amount associated with the improvement described in this section to be utilized unconditionally by Frederick County for other transportation improvements. This monetary contribution shall be provided to Frederick County within 60 days of written request by the County. 4. The Applicant hereby proffers the following Phase 3 Transportation Program: a. The Applicant shall be entitled to develop the CCRC and a maximum of 490,000 square feet of commercial land use and 350,000 square feet of office land use within Phase 3 that is a cumulative total of Phase 1 Phase 3. However, the Applicant can deviate from this land use mix assuming the total trip generation for site plans within this phase of the transportation program (based on the ITE 7 Edition Trip Generation Report) do not exceed the total trip generation specified in the November 25, 2008 Traffic Impact Analysis Report for Phase 3. It is recognized that the Applicant shall complete all Phase 3 transportation improvements prior to the approval of any Site Plan that exceeds 490,000 square feet of commercial land use and 350,000 square feet of office land use or equivalent trip generation as noted above on the B2 portion of the Property. File 1t49285/Silver Lake LLC Rezoning Greenway Engineering File #49285 /Silver Lake LLC Rezoning November 25, 2008 Revised January 6, 2009; Revised January 27, 2009 Revised February 16, 2009; Revised February 19, 2009 b. The Applicant shall dedicate all right -of -way necessary for the Phase 3 improvements that will occur on the Property to VDOT or Frederick County. The Applicant will attempt to design all off -site improvements within public right -of -way; however, if necessary it is recognized that VDOT and /or Frederick County will assist the Applicant with right -of- way necessary to implement proffered off -site transportation improvements. The Applicant agrees to assume all costs associated with right -of -way acquisition if assistance from VDOT and /or Frederick County is required. c. The Applicant shall design and construct, or cause for the construction of improvements to Spinning Wheel Lane to provide for a second right turn lane on Spinning Wheel Lane at the intersection of Northwestern Pike. These improvements shall be completed prior to the approval of any Site Plan that exceeds 490,000 square feet of commercial land use and 350,000 square feet of office land use or equivalent trip generation as described in Section D(4)(a) of the proffer statement on the B2 portion of the Property. d. The Applicant shall design and construct, or cause for the construction of a two -lane urban road that is constructed to a 40 mph geometric design standard and provides for roundabout design at the intersection with Spinning Wheel Lane, and left turn lanes and right turn lanes at all commercial entrances as required by VDOT, which will provide for a connection between Spinning Wheel Lane and Poor House Road (Route 654). The Applicant will coordinate with the owner of tax parcel 52- ((A))-47 to obtain right -of -way for this improvement as a first option for development of the two -lane urban road connection. In the event that the first option cannot be achieved, the Applicant shall design and construct, or cause for the construction of the two -lane urban road connection between Spinning Wheel Lane and Poor House Road on the Property. The general location of the two -lane road connection associated with both options will be provided on the proffered GDP; however, it is recognized that this location may shift without the need for conditional rezoning approval. The Applicant shall complete this improvement prior to the approval of any Site Plan that exceeds 490,000 square feet of commercial land use and 350,000 square feet of office land use or equivalent trip generation as described in Section D(4)(a) of the proffer statement on the B2 portion of the Property. 5. The Applicant hereby proffers the following Phase 4 Transportation Program: a. The Applicant shall be entitled to develop the CCRC and a maximum of 583,050 square feet of commercial land use and 494,600 square feet of office land use within Phase 4 that is a cumulative total of Phase 1 Phase Greenway Engineering November 25, 2008 Revised January 6, 2009; Revised January 27, 2009 Revised February 16, 2009; Revised February 19, 2009 12 4. However, the Applicant can deviate from this land use mix assuming the total trip generation for site plans within this phase of the transportation program (based on the ITE 7 Edition Trip Generation Report) do not exceed the total trip generation specified in the November 25, 2008 Traffic Impact Analysis Report for Phase 4. It is recognized that the Applicant shall complete all Phase 4 transportation improvements prior to the approval of any Site Plan that exceeds 530,000 square feet of commercial land use and 440,000 square feet of office land use or equivalent trip generation as noted above on the B2 portion of the Property. In the event that the Applicant would desire to develop commercial or office land uses that exceed the maximum square feet or total trip generation specified in this phase of the transportation program, a new traffic impact analysis report shall be prepared with each site plan to determine any additional transportation improvements required to mitigate the impacts of that development created solely by that project, which will be implemented as a condition of site plan approval. b. The Applicant shall dedicate all right -of -way necessary for the Phase 4 improvements that will occur on the Property to VDOT or Frederick County. The Applicant will attempt to design all off -site improvements within public right -of -way; however, if necessary it is recognized that VDOT and /or Frederick County will assist the Applicant with right -of- way necessary to implement proffered off -site transportation improvements. The Applicant agrees to assume all costs associated with right -of -way acquisition if assistance from VDOT and /or Frederick County is required. c. The Applicant shall design and construct, or cause for the construction of improvements to Silver Lake Road to provide for a second left turn lane on Silver Lake Road at the intersection of Northwestern Pike. These improvements shall be completed prior to the approval of any Site Plan that exceeds 530,000 square feet of commercial land use and 440,000 square feet of office land use or equivalent trip generation as described in Section D(5)(a) of the proffer statement on the B2 portion of the Property. d. The Applicant shall design and construct, or cause for the construction of improvements to provide for a third westbound thru lane on Northwestern Pike from the eastern boundary of the Property to Spinning Wheel Lane. Additionally, the Applicant shall be responsible for the relocation, construction, and right -of -way dedication (if necessary) of the existing right turn lanes on Northwestern Pike at the Spinning Wheel Lane and Silver Lake Road intersections. The Applicant shall complete these improvements prior to the approval of any Site Plan that exceeds 530,000 square feet of commercial land use and 440,000 square feet of office land File 4149285 /Silver Lake LLC Rezoning Greenway Engineering November 25, 2008 13 Revised January 6, 2009; Revised January 27, 2009 Revised February 16, 2009; Revised February 19, 2009 use or equivalent trip generation as described in Section D(5)(a) of the proffer statement on the B2 portion of the Property. 6. The Applicant hereby proffers to conduct annual traffic counts that will be provided to VDOT and Frederick County to determine if the 8,000 ADT volume is achieved to require the expansion of Spinning Wheel Lane and Silver Lake Road to four -lane urban road sections, as provided for in Sections D(2)(f), D(3)(d), and D(3)(e) of the proffer statement. The annual traffic counts shall begin in the first calendar year that the Phase 2 transportation improvements are completed and shall continue until the warrants are met for widening both street systems. VDOT and Frederick County may allow for annual traffic counts to be delayed in calendar years in which there is no development activity on the Property. When required, traffic counts will be conducted at the Spinning Wheel Lane and Silver Lake Road intersections with Northwestern Pike, on Spinning Wheel Lane at the eastern boundary of the Property, and on the two -lane road connector between Spinning Wheel Lane and Poor House Road at the western boundary of the Property. If warrants are met based on the annual traffic counts, the Applicant shall prepare and submit construction plans for approval by VDOT and Frederick County within six months of written notice that warrants are met. The Applicant shall commence construction of these improvements within six months of final plan approval. E. Fire and Rescue Enhancements 1. The Applicant hereby proffers to provide, or cause for the provision of land to Frederick County for the development of a new fire and rescue station and support facilities serving the Round Hill community within five years from the date of final non appealable rezoning approval. The Applicant shall dedicate a site fronting on Silver Lake Road that is located near the intersection of Northwestern Pike, which is a minimum of three acres and a maximum of four acres in size, with the The final size of this site shall be being determined upon approval of the Site Plan for the new fire and rescue station facility. The Applicant shall prepare and provide Frederick County with the dedication plat for this site and necessary right -of -way along Northwestem Pike and Silver Lake Road within five years from the date of final non- appealable rezoning approval; 90 days of written notice of the County's in however, the date for dedication of this land may be extended beyond five years if the County has not approved a Site Plan for the new fire and rescue station, or if the County has not programmed funding necessary for the new fire and rescue station In the event Frederick County elects not to develop this site as a new fire and rescue station, the Applicant shall provide a monetary contribution to Frederick County in the amount of $100,000.00 for the development of a new fire and rescue station serving the Round Hill community at another location. Additionally, if Frederick County elects not to develop this site as a new fire and File #4928S /Silver Lake LLC Rezoning Greenway Engineering November 25, 2008 Revised January 6, 2009; Revised January 27, 2009 Revised February 16, 2009; Revised February 19, 2009 14 rescue station following dedication of the site, this land shall be conveyed to the Applicant to allow for further economic development. 2. The Applicant hereby proffers to provide, or cause for the provision of a monetary contribution to Frederick County in the amount of $1,000,000.00 for the development of a new fire and rescue station serving the Round Hill community. This monetary proffer is intended to mitigate impacts to fire and rescue services associated with the development of the CCRC on the MS District portion of the Property. The $1,000,000.00 monetary contribution shall be provided to Frederick County within five years from the date of final non appealable rezoning approval to assist with the development of the new fire and rescue station. However, the date for the $1,000,000.00 monetary contribution payment may be extended if a Site Plan for a new fire and rescue station serving the Round Hill community has not been approved within five years from the date of final non appealable rezoning approval. if the latter occurs, the $1,000,000.00 monetary contribution shall be provided to Frederick County within 30 days of the date of final Site Plan approval for the new fire and rescue station serving the Round Hill community. 3. The Applicant hereby proffers to design and construct, or cause for the construction of all necessary road improvements at the Northwestern Pike intersection with Silver Lake Road and on Silver Lake Road to provide access to the new fire and rescue station, as well as all utilities necessary for the new fire and rescue station located on the Property. These infrastructure improvements shall be provided by the Applicant in advance of the Phase 1 or Phase 2 transportation program improvements to facilitate the construction of the new fire and rescue station should this occur in advance of the commercial development within these transportation phases. The Applicant shall work with Frederick County, upon notice by the County, to ensure that the design, bonding and construction of these infrastructure improvements is coordinated during the preparation of the Site Plan for the new fire and rescue station on the Property. File 444928S /Silver Lake LLC Rezoning Greenway Engineering F. Signatures The conditions proffered above shall be binding upon the heirs, executors, administrators, assigns and successors in the interest of the Applicants and owners. In the event the Frederick County Board of Supervisors grants this rezoning and accepts the conditions, the proffered conditions shall apply to the land rezoned in addition to other requirements set forth in the Frederick County Code. Respectfully Submitted: B Date: Commonwealth of Virginia, City /County of To Wit: The foregoing instrument was acknowledged before me this day of 20 by My Commission Expires File #4928S /Silver Lake LLC Rezoning November 25, 2008 Revised January 6, 2009; Revised January 27, 2009 Revised February 16, 2009; Revised February 19, 2009 Notary Public 15