HomeMy WebLinkAbout15-08 Proffer Statement0
-AMENDMENT
Action:
PLANNING COMMISSION: January i 7, 2009 - Recx)mrnended Approval
BOARD OF SUPERVISORS: January 28, 2009 U APPROVED J DENIED
AN ORDiNAIN`C:E AMENDEI ' �
THE Z ONING DISTRICT MAP
REZONING 415 -08 OF ADIANIS CC)MVERCIAL, CENTER
WHEREAS Rezoning #15 -08 of Adams: omrnercialCetate.r, submit (edbyGreenwavEngineering.to
revise proffers dated April 17 2008 with final revision date of Jangarv 2009, associated with Rezoning
902 -05 for 28.10 acres of land zoned B3 (Industrial Transition) was considered. This revision is intended
to remove the previously proffered uses on the site. The properly fronts on the west side of Martinsburg
Pike (Route 11 'North), opposite the intersection with Stephenson Rod (Rome 664). in the Stonewall
Magisterial District. and is identified by Property Identi INmber 44- A -75.
WHEREAS. the Planning C:-lmnLss!on hrrdo a p'Jbke 7ec Gl 'r' -::.C?'t't[_SGfl rlg On.7allU L ' 2 and
WHE CdEAS, Lhe BCiur Jt Si:peivnV 'S he.f a rrui ilt e u O r � � � l i'Or tllg: TiJanuar 28 ai.
WHEREAS, n F1'ederre E: County Boar'J 1in x .. appt3 al of this rez to be :;
the best interest of the public health srifety. welfare, and In c:,;tarirsnce with the Comprehensive
Policv Plan;
NOW, THEREFORE, BE IT ORDAINED by the F:ederi -k County Board ofSL!tw ,;sors th :a1
Chapter 165 of the Frederick County Code, Z.;nin,,.. is amcnc io r vi e the rro *;ors cenr,ernin
Rezoning 102 This revision is interde" to rzincr.e the nrvinusl'; proffered u r;: the site, as
described'by the application and attached co.ditiors in writing tY'hc applicant
and the p,opertl owner.
I'D7ts ri0l -29
This ordinance shall be in effect on the date of adoption.
Passed this 28th day of January, 2009 by the following recorded vote:.
Richard C. Shickle, Chairman Aye Gary A. Lcfton �yz
Gary W. Dove A ye Bill M. Ewing Aye
Gene E. Fisher Aye Charles S. DeIaven, Jr. Aye
Philip A. Lemieux Aye
A COPY ATTEST
D to
John
Frederick. County Administrator
PDkes. 40 1 -09
Greenway Engineering April 17, 2008; Its Development Group, Inc. Rezoning
Revised July 29,2008; Revised August 12, 2008;
Revised October 1, 2008; Revised December 9, 2008;
Revised January 8, 2009
PROPOSED PROFFER STATEMENT
REZONING: RZ #15 -08
Industrial Transition District (133) with Proffers to Industrial
Transition District (113) with Revised Proffers
PROPERTY: 2 8. 10 acres + / -;
Tax Parcel #44- ((A)) -75
RECORD OWNER: Adams Development Group, Inc., Robert C. Adams, President
APPLICANT: Adams Development Group (here -in after "the Applicant ")
PROJECT NAME: Adams Commercial Center
ORIGINAL DATE
OF PROFFERS: April 17, 2008
REVISION DATE: January 8, 2009
Preliminary Matters
Pursuant to Section 15.2 -2296 Et. Seq. of the Code of Virginia, 1950, as amended, and
the provisions of the Frederick County Zoning Ordinance with respect to conditional
zoning, the undersigned Applicant hereby proffers that in the event the Board of
Supervisors of Frederick County, Virginia, shall approve Rezoning Application #15 -08
for the rezoning of 28.10± acres from the Industrial Transition (133) District with Proffers
to the Industrial Transition (B3) District with Revised Proffers, development of the
subject property shall be done in conformity with the terms and conditions set forth
herein, except to the extent that such terms and conditions may be subsequently amended
or revised by the Applicant and such be approved by the Frederick County Board of
Supervisors in accordance with the said Code and Zoning Ordinance. In the event that
such rezoning is not granted, then these proffers shall be deemed withdrawn and have no
effect whatsoever. These proffers shall be binding upon this Applicant and their legal
successors, heirs, or assigns. Approval of this proffer statement does not eliminate
previously approved proffers associated with current Tax Map Parcels 44- ((A)) -75B, 44-
((A))-75C, 44- ((A)) -75D, 44- ((A)) -75E and 44- ((A)) -75F; which were approved under
the conditions set forth in RZ #02 -05 approved by the Frederick County Board of
Supervisors on April 13, 2005.
The subject property, more particularly described as the lands owned by Adams
Development Group, Inc. being all of Tax Map Parcel 44- ((A)) -75 and further described
by Boundary Survey Plat prepared by Richard A. Edens, L.S., dated April 24, 2007 and
recorded as Instrument No. 070007323 (see attached Boundary Survey Plat).
File #3949/EAW
Greenway Engineering April 17,2008; O's Development Group, Inc. Rezoning
Revised July 29,2008; Revised August 12, 2008;
Revised October 1, 2008; Revised December 9, 2008;
Revised January 8, 2009
A.) Generalized Development Plan
The Applicant hereby proffers to develop the 28.10± acre property in substantial
conformance with the attached Generalized Development Plan — Adams Rezoning
28.10± Acre property, dated January 8, 2009 and approved as part of the rezoning
application.
B.) Vehicle Per Day (VPD) and Land Use Restrictions
1.) Conditional Rezoning Application #02 -05 limited traffic generation for permitted
land uses to a maximum of 4,603 VPD based on ITE Trip Generation 7 th Edition
volumes. The Applicant hereby proffers to restrict development of the 28.10±
acre property to an amount to be determined during Site Plan approval, not to
exceed a maximum of 2,N0 VPD. The Applicant acknowledges that the
maximum 2,900 VPD may be further reduced for the 28.10± acre property should
additional development occur on tax parcels 44- ((A)) -75B, 44- ((A)) -75C, 44-
((A))-75D, 44- ((A)) -75E and 44- ((A)) -75F.
2.) The Applicant hereby proffers to prohibit the following B -3 District land uses
within 28.10± acre property:
➢ Amusement and recreational services operated indoors
➢ Automotive dealers and gasoline service stations
➢ Drive -in motion picture theaters
➢ Food stores
➢ Local and suburban transit and interurban highway passenger
transportation.
➢ Business associations; membership organizations; and labor unions
➢ Model home sales offices
➢ Motor freight transportation, excluding warehousing and storage
➢ Restaurants
➢ Transportation by air
➢ Transportation services
➢ Truck stops
C.) Transportation
1.) Access to Martinsburg Pike (US Route 11)
Direct access to Martinsburg Pike (US Route 11) will be provided through a single
shared commercial entrance to provide ingress and egress for the 28.10± acre
property and all parcels previously subdivided from tax parcel 44- ((A)) -75. This
shared commercial entrance has been constructed to align with the existing
File 53949/EAW 2
Greenway Engineering • April 17,2008; 0m, Development Group, Inc. Rezoning
Revised July 29,2008; Revised August 12, 2008;
Revised October I, 2008; Revised December 9, 2008;
Revised January 8, 2009
commercial entrance to the APAC site located on the opposite side of Martinsburg
Pike.
2.) Turn lane — Martinsburg Pike (US Route 11)
The Applicant has constructed a right -turn deceleration lane at the entrance on
Martinsburg Pike (US Route 11). The Applicant will be responsible for the relocation
of the right -turn deceleration lane should this be required as a result of the future
Martinsburg Pike transportation plan improvements.
3.) Additional Right -of -way Dedication
In the interest of future area transportation plan improvements, the applicant hereby
proffers to dedicate to the Commonwealth of Virginia twenty (20) feet of additional
right -of -way. cn the Martinsburg Pike (US Route 11) frontage of the property. This
right -of -way commitment has been initiated by the Applicant through dedication to
Frederick County as evident in Deed Instrument No. 050017512.
4.) Corridor Improvements, Signalization
In recognition of offsite transportation impacts, the Applicant hereby proffers to
contribute a share of the cost of signalization improvements in the area of Interstate -
81 Exit 321. The Virginia Department of Transportation (VDOT) will determine the
appropriate location for signalization improvements and will determine when this
improvement is warranted. When determined by VDOT, the Applicant will enter into
a signalization agreement with VDOT that will provide a one -time contribution
towards the cost of signalization in an amount to be determined by VDOT based upon
the traffic volume generated by the developed portion of the subject property.
5.) Corridor Improvements, Bicycle and Pedestrian Facility
The Applicant hereby proffers to construct an asphalt bicycle and pedestrian facility
that is 10 feet in width and located within the 20 -foot green strip identified in Section
F of this proffer statement. The Applicant shall construct this bicycle and pedestrian
facility on the north side of the single shared commercial entrance prior to the
issuance of a building occupancy permit for the first site plan on the north side of that
entrance, and shall construct this bicycle and pedestrian facility on the south side of
the single shared commercial entrance prior to the issuance of a building occupancy
permit for the first site plan on the south side of that entrance. No portion of the
asphalt bicycle and pedestrian facility will be constructed with the 20 -foot right -of-
way dedication area identified in Section C(3) of this proffer statement.
6.) Right -of -Way Reservation
The Applicant hereby proffers to reserve a 50 -foot wide strip of land between
Yardmaster Court and tax parcel 44 -1 -D to allow for the construction of a future
File #3949/EA W 3
Greenway Engineering • April 17,2008; Oms Development Group, Inc. Rezoning
Revises) July 29,2008; Revised August 12,2008;
Revised October I, 2008; Revised December 9, 2008;
Revised January 8, 2009
public street connection by others. The general location of this reservation area shall
be provided on the Generalized Development Plan; however, it is recognized that this
location can be shifted without the need of conditional zoning approval. All costs
associated with establishing this future public street shall be borne by the owner of
tax parcel 44 -1 -D, or by others than the Applicant.
D.) North Buffer
The applicant hereby proffers to utilize a minimum six foot high earthen berm, rather
than a fence, as the opaque element within the one - hundred foot wide Category "C" full
screen adjacent to tax parcels 44- ((A)) -76A, 44- ((A)) -76B, 44- ((A)) -76C and 44- ((A))-
76D as depicted on the proffered GDP.
E.) South Buffer
The applicant hereby proffers to utilize a minimum six foot high fence, rather than
earthen berm, as the opaque element within the one - hundred foot wide Category "C" full
screen adjacent to tax parcels 44- ((A)) -70, 44- ((A)) -72, 44- ((A)) -73, and 44- ((1)) -D as
depicted on the proffered GDP.
F.) Corridor Appearance Enhancements
The Applicant hereby proffers to enhance the appearance of the Martinsburg Pike (U.S.
Route 11) corridor through the implementation of a low -level earth berm and landscaping
along the frontage of the subject property. This enhancement will be located within a 20-
foot wide green strip that is located immediately adjacent to and on the west side of the
dedicated 20 -foot right -of -way strip, which will contain an earth berm that is 2 -feet in
height with staggered low -lying shrubs and a single row of deciduous flowering trees that
are a minimum of 1 J/2 caliper and planted on 30 -foot centers. This corridor appearance
enhancement will be designed to ensure that sight distance is not negatively impacted at
the commercial entrance to the subject property, will be developed in substantial
conformance with the Corridor Appearance Enhancement Exhibit dated January 8, 2009,
and will be installed by the Applicant consistent with the construction of the bicycle and
pedestrian facility as described in Section C5 of the proffer statement.
G.) Monetary Contribution to Offset Impact of Development
The undersigned owner of the above- described property hereby voluntarily proffers
that in the event rezoning application #15 -08 is approved, the undersigned will pay to
the Treasurer of Frederick County, Virginia the following amount:
$ .0151 building square foot
File #3949/EA W 4
Greenway Engineering April 17,2008; Quis Development Group, Inc. Rezoning
Revised July 29,2008; Revised August 12, 2008;
Revised October I, 2008; Revised December 9, 2008;
Revised January 8, 2009
This payment is intended to offset the additional cost to Frederick County, and more
specifically Frederick County Fire and Rescue, due to an increased demand on public
services. The proffer increments will be paid prior to issuance of the building
occupancy permits.
H.) Signatures
The conditions proffered above shall be binding upon the heirs, executors, administrators,
assigns and successors in the interest of the Applicant and owner. In the event the
Frederick County Board of Supervisors grants this rezoning and accepts the conditions,
the proffered conditions shall apply to the land rezoned in addition to other requirements
set forth in the Frederick County Code.
Respectfully Submitted:
ADAMS DEVELOPENINNT GROUP, INC.
By: Z � " / //9 /of
Robert C. Adams, President Date
Commonwealth of Virginia,
City /County of rY C al C d To Wit:
The foregoing instrument was acknowledged before me this I9 day of
20 09 by Z � E- C- � (\S QQ
� 3(s7la �9
\ otary Public
My Commission Expires, } $1 ZUO Y
File Jt3949 /EAW
73 ®:
W AL�
5
LL \r l
N \
o z I
m
0
r~( m >!
r
i
`� SrRia
\ \ y�,
J/ 1
z
v
s
A Z
A rri
A
REVISION
A
m
C)
D D
3
z
E5 ZT1ZN
v T 4
cn
N 0
L1
v
q
o
m
b ;
v
s
-
GENERALIZED DEVELOPMENT PLAN
ADAMS REZONING a 28.10 ACRE PROPERTY
±
B3 INDUSTRIAL TRANSITION
STONEWALL MAGISTERIAL DISTRICT
FREDERICK COUNTY, VA
y o� �
o
n
m -,�„
r^
"Jyy ��
f R "
DATE
REVISION
�
'eiei°i '°'
i
S. ' �°
GREENWlAV ENIGIN
51 n.a, „w � ,
l mheste Virglvie 22502
Tele 540- 882 -4185
FA% 540— gmen 2 engx
� eree �� JOe eem
Greenway Engineering
April 17, 2008
Revised July 29,2008
Revised August 12, 2008
October 1, 2008
December 9, 2008
0
Adams Development Group, Inc, Rezoning
PROPOSED PROFFER STATEMENT
REZONING: RZ# /5 S ag
Industrial Transition District (B3) with Proffers to Industrial
Transition District (B3) with Revised Proffers
PROPERTY: 28.10 acres + / -;
Tax Parcel #44- ((A)) -75
RECORD OWNER: Adams Development Group, Inc., Robert C. Adams, President
APPLICANT: Adams Development Group (here -in after "the Applicant ")
PF+,JECT NAME: Ad--Ms Commercial Center
ORIGINAL DATE
OF PROFFERS:
REVISION DATE:
Preliminary Matters
April 17, 2008
December 9, 2008
Pursuant to Section 15.2 -2296 Et. Seq. of the Code of Virginia, 1950, as amended, and
the provisions of the Frederick County Zoning Ordinance with respect to conditional
zoning, the undersigned Applicant hereby proffers that in the event the Board of
Supervisors of Frederick County, Virginia, shall approve Rezoning Application #/5
for the rezoning of 28.10± acres from the Industrial Transition (133) District with Proffers
to the Industrial Transition (B3) District with Revised Proffers, development of the
subject property shall be done in conformity with the terms and conditions set forth
herein, except to the extent that such terms and conditions may be subsequently amended
or revised by the Applicant and such be approved by the Frederick County Board of
Supervisors in accordance with the said Code and Zoning Ordinance. In the event that
such rezoning is not granted, then these proffers shall be deemed withdrawn and have no
effect whatsoever. These proffers shall be binding upon this Applicant and their legal
successors, heirs, or assigns. Approval of this proffer statement does not eliminate
previously approved proffers associated with current Tax Map Parcels 44- ((A)) -75B, 44-
((A))-75C, 44- ((A)) -75D, 44- ((A)) -75E and 44- ((A)) -75F; which were approved under
the conditions set forth in RZ #02 -05 approved by the Frederick County Board of
Supervisors on April 13, 2005.
The subject property, more particularly described as the lands owned by Adams
Development Group, Inc. being all of Tax Map Parcel 44- ((A)) -75 and further described
by Boundary Survey Plat prepared by Richard A. Edens, L.S., dated April 24, 2007 and
recorded as Instrument No. 070007323 (see attached Boundary Survey Plat).
File #39491EAW
0 0
Greenway Engineering April 17, 2008 Adams Development Group, Inc. Rezoning
Revised July 29,2008
Revised August 12, 2008
October I, 2008
December 9, 2008
A.) Generalized Development Plan
The Applicant hereby proffers to develop the 28.10± acre property in substantial
conformance with the attached Generalized Development Plan — Adams Rezoning
28.10± Acre property, dated October 1, 2008 and approved as part of the rezoning
application.
B.) Vehicle Per Day (VPD) and Land Use Restrictions
1.) Conditional Rezoning Application #02 -05 limited traffic generation for permitted
land uses to a maximum of 4,603 VPD based on ITE Trip Generation 7 Edition
volumes. The Applicant hereby proffers to restrict developmer:. of the 28.10±
acre property to an amount to be determined during Site Plan approval, not to
exceed a maximum of 2,900 VPD. The Applicant acknowledges that the
maximum 2,900 VPD may be further reduced for the 28.10± acre property should
additional development occur on tax parcels 44- ((A)) -75B, 44- ((A)) -75C, 44-
((A))-75D, 44- ((A)) -75E and 44- ((A)) -75F.
2.) The Applicant hereby proffers to prohibit the following B -3 District land uses
within 28.10± acre property:
➢ Amusement and recreational services operated indoors
➢ Automotive dealers and gasoline service stations
➢ Drive -in motion picture theaters
➢ Food stores
➢ Local and suburban transit and interurban highway passenger
transportation.
➢ Business associations; membership organizations; and labor unions
➢ Model home sales offices
➢ Motor freight transportation, excluding warehousing and storage
➢ Restaurants
➢ Transportation by air
➢ Transportation services
➢ Truck stops
C.) Transportation
1.) Access to Martinsburg Pike (US Route 11)
Direct access to Martinsburg Pike (US Route 11) will be provided through a single
shared commercial entrance to provide ingress and egress for the 28.10± acre
property and all parcels previously subdivided from tax parcel 44- ((A)) -75. This
File #3949/EAW 2
0 0
Greenway Engineering April 17, 2008 Adams Development Group, Inc. Rezoning
Revised July 29,2008
Revised August 12, 2008
October I, 2008
December 9, 2008
shared commercial entrance has been constructed to align with the existing
commercial entrance to the APAC site located on the opposite side of Martinsburg
Pike.
2.) Turn lane — Martinsburg Pike (US Route 11)
The Applicant has constructed a right -tum deceleration lane at the entrance on
Martinsburg Pike (US Route 11). The Applicant will be responsible for the relocation
of the right -turn deceleration lane should this be required as a result of the future
Martinsburg Pike transportation plan improvements.
3.) Additional Right -of -way Dedication
In the interest of future area transportation plan improvements, the ap _icant hereby
proffers to dedicate to the Commonwealth of Virginia twenty (20) feet of additional
right -of -way on the Martinsburg Pike (US Route 11) frontage of the property. This
right -of -way commitment has been initiated by the Applicant through dedication to
Frederick County as evident in Deed Instrument No. 050017512.
4.) Corridor Improvements, Signalization
In recognition of offsite transportation impacts, the Applicant hereby proffers to
contribute a share of the cost of signalization improvements in the area of Interstate -
81 Exit 321. The Virginia Department of Transportation (VDOT) will determine the
appropriate location for signalization improvements and will determine when this
improvement is warranted. When determined by VDOT, the Applicant will enter into
a signalization agreement with VDOT that will provide a one -time contribution
towards the cost of signalization in an amount to be determined by VDOT based upon
the traffic volume generated by the developed portion of the subject property.
5.) Corridor Improvements, Bicycle and Pedestrian Facility
The Applicant hereby proffers to construct an asphalt bicycle and pedestrian facility
that is 10 feet in width and located within the 20 -foot green strip identified in Section
F of this proffer statement. The Applicant shall construct this bicycle and pedestrian
facility on the north side of the single shared commercial entrance prior to the
issuance of a building occupancy permit for the first site plan on the north side of that
entrance, and shall construct this bicycle and pedestrian facility on the south side of
the single shared commercial entrance prior to the issuance of a building occupancy
permit for the first site plan on the south side of that entrance. No portion of the
asphalt bicycle and pedestrian facility will be constructed with the 20 -foot right -of-
way dedication area identified in Section C(3) of this proffer statement.
File #3949/EAW 3
Greenway Engineering April 17, 2008 Adams Development Group, Inc. Rezoning
Revised July 29,2008
Revised August 12, 2008
October I, 2008
December 9, 2008
D.) North Buffer
The applicant hereby proffers to utilize a minimum six foot high earthen berm, rather
than a fence, as the opaque element within the one- hundred foot wide Category "C" full
screen adjacent to tax parcels 44- ((A)) -76A, 44- ((A)) -76B, 44- ((A)) -76C and 44- ((A))-
76D as depicted on the proffered GDP.
E.) South Buffer
The applicant hereby proffers to utilize a minimum six foot high fence, rather than
earthen berm, as the opaque element within the one - hundred foot wide Category "C" full
screen adjacent to tax parcels 14 - ((A') /0, 44- ((A)) -77, 44- ((A)) -73, and 44- ((])) -D as
depicted on the proffered GDP.
F.) Corridor Appearance Enhancements
The Applicant hereby proffers to enhance the appearance of the Martinsburg Pike (U.S.
Route 11) corridor through the implementation of a low -level earth berm and landscaping
along the frontage of the subject property. This enhancement will be located within a 20-
foot wide green strip that is located immediately adjacent to and on the west side of the
dedicated 20 -foot right -of -way strip, which will contain an earth berm that is 2 -feet in
height with staggered low -lying shrubs and a single row of deciduous flowering trees that
are a minimum of 1 '/2 caliper and planted on 30 -foot centers. This corridor appearance
enhancement will be designed to ensure that sight distance is not negatively impacted at
the commercial entrance to the subject property, will be developed in substantial
conformance with the Corridor Appearance Enhancement Exhibit dated October 1, 2008,
and will be installed by the Applicant consistent with the construction of the bicycle and
pedestrian facility as described in Section C5 of the proffer statement.
G.) Monetary Contribution to Offset Impact of Development
The undersigned owner of the above - described property hereby voluntarily proffers
that in the event rezoning application J!L!R � is approved, the undersigned will pay to
the Treasurer of Frederick County, Virginia the following amount:
$ .015/ building square foot
This payment is intended to offset the additional cost to Frederick County, and more
specifically Frederick County Fire and Rescue, due to an increased demand on public
services. The proffer increments will be paid prior to issuance of the building
occupancy permits.
File It3949 /EAW 4
Greenway Engineering
H.) Signatures
0
April 17, 2008
Revised July 29,2008
Revised August 12, 2008
October I, 2008
December 9, 2008
0
Adams Development Group, Inc. Rezoning
The conditions proffered above shall be binding upon the heirs, executors, administrators,
assigns and successors in the interest of the Applicant and owner. In the event the
Frederick County Board of Supervisors grants this rezoning and accepts the conditions,
the proffered conditions shall apply to the land rezoned in addition to other requirements
set forth in the Frederick County Code.
Respectfully Submitted:
ADAMS DEVELOPEMNT GROUP, INC
A CA darns, By. President Date
Commonwealth of Virginia,
Cit ounty Frei ev''c�- To Wit:
The foregoing instrument was acknowledged before me this�� day of 71)fC e Ver
20008 by tPAer+ C, AdavvlS, 9 1eSIdPv1}
Notary Public
My Commission Expires Z ICI .2-6
�egisfra(ivn # ZG(tou
.•P LiQ,,AlF,
p`O � 0
T gfiY
'"nrtt, „ t .
File #39491EA W
Greenway Engineering April 17, 2008 It Development Group, Inc. Rezoning
Revised July 29,2008
Revised August 12, 2008
October 1, 2008
PROPOSED PROFFER STATEMENT
REZONING: RZ# /S_ 0 9
Industrial Transition District (B3) with Proffers to Industrial
Transition District (133) with Revised Proffers
PROPERTY: 28.10 acres + / -;
Tax Parcel #44- ((A)) -75
RECORD OWNER: Adams Development Group, Inc., Robert C. Adams, President
APPLICANT
PROJECT NAME:
ORIGINAL DATE
OF PROFFERS:
REVISION DATE:
Preliminary Matters
Adams Development Group (here -in after "the Applicant')
Adams Commercial Center
April 17, 2008
August 12,20 09 October 1, 2008
Pursuant to Section 15.2 -2296 Et. Seq. of the Code of Virginia, 1950, as amended, and
the provisions of the Frederick County Zoning Ordinance with respect to conditional
zoning, the undersigned Applicant hereby proffers that in the event the Board of
Supervisors of Frederick County, Virginia, shall approve Rezoning Application # / o 0
for the rezoning of 28.10± acres from the Industrial Transition (133) District with Proffers
to the Industrial Transition (133) District with Revised Proffers, development of the
subject property shall be done in conformity with the terms and conditions set forth
herein, except to the extent that such terms and conditions may be subsequently amended
or revised by the Applicant and such be approved by the Frederick County Board of
Supervisors in accordance with the said Code and Zoning Ordinance. In the event that
such rezoning is not granted, then these proffers shall be deemed withdrawn and have no
effect whatsoever. These proffers shall be binding upon this Applicant and their legal
successors, heirs, or assigns. Approval of this proffer statement does not eliminate
previously approved proffers associated with current Tax Map Parcels 44- ((A)) -75B, 44-
((A))-75C, 44- ((A)) -75D, 44- ((A)) -75E and 44- ((A)) -75F; which were approved under
the conditions set forth in RZ #02 -05 approved by the Frederick County Board of
Supervisors on April 13, 2005.
The subject property, more particularly described as the lands owned by Adams
Development Group, Inc. being all of Tax Map Parcel 44- ((A)) -75 and further described
by Boundary Survey Plat prepared by Ea .a W Deve, r c d r..l 29 2003
Richard A. Edens, L.S., dated April 24, 2007 and recorded as Instrument No.
070007323 (see attached Boundary Survey Plat).
File 413949/EAW
0
Greenway Engineering April 17, 2008
Revised July 29,2008
Revised August 12, 2008
October 1, 2008
A.) Generalized Development Plan
Adams Development Group, Inc. Rezoning
The Applicant hereby proffers to develop the 28.10± acre property in substantial
conformance with the attached Generalized Development Plan — Adams Rezoning
28.10± Acre property, dated August 22008 October 1, 2008 and approved as part
of the rezoning application.
B.) Vehicle Per Day (VPD) and Land Use Restrictions
1.) Conditional Rezoning Application #02 -05 limited traffic generation for permitted
land uses to a maximum of 4,603 VPD based on ITE Trip Generation 7 1h Edition
volumes. Th Applicant he proffers t restrict development Of the 29.10!_i!
acre property to a fflaximurn of 3 VPD to he dete...l:..ed during Site Dl ari
,appFeval. The Applicant hereby proffers to restrict development of the 28.10±
acre property to an amount to be determined during Site Plan approval, not to
exceed a maximum of 2,900 VPD. The 607 vDTI Fe „et,. the remaining traffic
eta d er i ve d fre the a TI calculations \'D.l cu l a ti ons of a Site
b
Dl parce 44 / / A \\ 15 M ((A)) 75C M / /A \ \'7CTI 4 4 _ ( 1 A)) '7CG'.....1
44 / /)T5F- The Applicant acknowledges that the maximum 3{07 2,900 VPD
wig may be further reduced for the 28.10± acre property should additional
development occur on tax parcels 44- ((A)) -75B, 44- ((A)) -75C, 44- ((A)) -75D, 44-
((A))-75E and 44- ((A)) -75F.
2.) The Applicant hereby proffers to prohibit the following B -3 District land uses
within 28.10± acre property:
Amusement and recreational services operated indoors
➢ Automotive dealers and gasoline service stations
➢ Drive -in motion picture theaters
➢ Food stores
➢ Local and suburban transit and interurban highway passenger
transportation.
➢ Membership organizations
➢ Model home sales offices
➢ Motor freight transportation
➢ Restaurants
➢ Transportation by air
➢ Transportation services
➢ Truck stops
File #3949/EAW 2
r
Greenway Engineering April 17. 2008 Adams Development Group, Inc. Rezoning
Revised July 29 2008
Revised August 12, 2008
October 1, 2008
C.) Transportation
1.) Access to Martinsburg Pike (US Route 11)
Direct access to Martinsburg Pike (US Route 11) will be provided through a single
shared commercial entrance to provide ingress and egress for a uses wi thi ° «°
for the 28.10± acre property and all parcels previously subdivided from tax parcel
44- ((A)) -75. This shared commercial entrance , °i he lRe ed se °° has been
constructed to align with the existing commercial entrance to the APAC site located
on the opposite side of Martinsburg Pike.
2.) Turn lane — Martinsburg Pike (US Route 11)
The Applicant hereby pFaffe inq ;all has constructed a right -turn deceleration lane
at the entrance on Martinsburg Pike (US Route 11). A�'a =��itiefially, the The Applicant
will be responsible for the relocation of the right -turn deceleration lane should this be
required as a result of the future Martinsburg Pike transportation plan improvements.
3.) Additional Right -of -way Dedication
In the interest of future area transportation plan improvements, the applicant hereby
proffers to dedicate to the Commonwealth of Virginia twenty (20) feet of additional
right -of -way on the Martinsburg Pike (US Route 11) frontage of the property. This
right -of -way commitment has been initiated by the Applicant through dedication to
Frederick County as evident in Deed Instrument No. 050017512.
4.) Corridor Improvements, Signalization
In recognition of offsite transportation impacts, the Applicant hereby proffers to
contribute a share of the cost of signalization improvements in the area of Interstate -
81 Exit 321. The Virginia Department of Transportation (VDOT) will determine the
appropriate location for signalization improvements and will determine when this
improvement is warranted. When determined by VDOT, the 44e Applicant will
enter into a signalization agreement with VDOT that will provide a one -time
contribution towards the cost of signalization in an amount to be determined by
VDOT based upon the traffic volume generated by the developed portion of the
subject property.
5.) Corridor Improvements, Bicycle and Pedestrian Facility
The Applicant hereby proffers to construct an asphalt bicycle and pedestrian facility
that is 10 feet in width and located within the 20 -foot green strip identified in Seeder[
Fr Section F of this proffer statement. The Applicant shall construct this bicycle and
pedestrian facility on the north side of the single shared commercial entrance in
eenjun ction wi approval ^r prior to the issuance of a building occupancy permit
for the first site plan on the north side of that entrance, and shall construct this bicycle
File #3949 /EAW 3
r
Greenway Engineering April 17, 2008 urns Development Group, Inc. Rezoning
Revised July 29, 2008
Revised August 12, 2008
October 1, 2008
and pedestrian facility on the south side of the single shared commercial entrance in
^ ^^ ^`h ° •'•'royal ^r prior to the issuance of a building occupancy permit
for the first site plan on the south side of that entrance. No portion of the asphalt
bicycle and pedestrian facility will be constructed with the 20 -foot right -of -way
dedication area identified in Section C(3) of this proffer statement.
D.) North Buffer
The applicant hereby proffers to utilize a minimum six foot high earthen berm, rather
than a fence, as the opaque element within the one - hundred foot wide Category "C" full
screen adjacent to prop t o the northeast. tax parcels 44- ((A)) -76A, 44- ((A)) -76B,
44- ((A)) -76C and 44- ((A)) -76D as depicted on the proffered GDP.
E.) South Buffer
The applicant hereby proffers to utilize a minimum six foot high fence, rather than
earthen berm, as the opaque element within the one - hundred foot wide Category "C" full
screen adjacent to prop ert i es t the s '' . tax parcels 44- ((A)) -70, 44- ((A)) -72, 44- ((A))-
73, and 44- ((])) -D as depicted on the proffered GDP.
F.) Corridor Appearance Enhancements
The Applicant hereby proffers to enhance the appearance of the Martinsburg Pike (U.S.
Route 11) corridor through the implementation of a low -level earth berm and landscaping
along the frontage of the subject property. This enhancement will be located within a 20-
foot wide green strip that is located immediately adjacent to and on the west side of the
dedicated 20 -foot right -of -way strip, which will contain an earth berm that is 2 -feet in
height with staggered low -lying shrubs and a single row of deciduous flowering trees that
are a minimum of 1 '/2 caliper and planted on 30 -foot centers. This corridor appearance
enhancement will be designed to ensure that sight distance is not negatively impacted at
the commercial entrance to the subject property, arrd will be developed in substantial
conformance with the Corridor Appearance Enhancement Exhibit dated Augu
October 1, 2008, and will be installed by the Applicant consistent with the construction
of the bicycle and pedestrian facility as described in Section C5 of the proffer
statement.
G.) Monetary Contribution to Offset Impact of Development
The undersigned owner of the above- described property hereby voluntarily proffers
that in the event rezoning application # /5 , � s approved, the undersigned will pay to
the Treasurer of Frederick County, Virginia the following amount:
File #3949/EAW 4
Greenway Engineering • April 17, 2008 Puts Development Group, Inc. Rezoning
Revised July 29,2008
Revised August 12, 2008
October 1, 2008
$ .015/ building square foot
This payment petentiall totaling $8,3-25 is intended to offset the additional cost to
Frederick County, and more specifically Frederick County Fire and Rescue, due to an
increased demand on public services. The proffer increments will be paid at the he tine
prior to issuance of the building occupancy permits.
H.) Signatures
The conditions proffered above shall be binding upon the heirs, executors, administrators,
assigns and successors in the interest of the Applicant and owner. In the event the
Frederick County Board of Supervisors grants this rezoning and accepts the conditions,
the proffered conditions shall apply to the land rezoned in addition to other requirements
set forth in the Frederick County Code.
Respectfully Submitted:
ADAMS DEVELOPEMNT GROUP, INC.
UA
Robert C. Adams, President
Commonwealth of Virginia,
City /County of
To Wit:
Date
The foregoing instrument was acknowledged before me this _day of
20_ by
Notary Public
My Commission Expires
File ri3949 /EAW 5
z 2
��� ���
IN
Lu
V EIC*A%M
NUDDA
IL
-J
COORD FLORDEO:E IR ANN H
411 RD
rRED BOOK X`
MULIJNS�FFORA A
DEED"" 0
DE�1)800NEMD ZONE. .E. Z,.
OEM. -- w � ,
USE, RESIDENTI RESIDEMTM�
- swill
USE
SPIRIT SPR POTFOUFO D.7a I.I.0
JNSTR.. Tll 01919
ZO DB3
FO
USE OFFICE I WHOLESA-E I
WAREKMOSEILUMBERSTORE— IN
EDICAT IO 20'
R
i FUTURE RT. 11
� W 11 WIDENING
INSTR. 050017512
USE
MARK ➢ M H
1
A$ lH
LANDIB AREA REMAININd Y AREA -
DEVELOPMEN T C3 ONAL / qw. DEVEIL PENT
— Al
G
4
/ ROUI
/W '0-
W
4v f Z IL
L CC
JREWINCHESTEF.LLC IL
INSTR. 0!R-ZDaT
I iow u
ZONED B3 SOUTH END HOSE CO LC
USE UNIMPROVED S ZONED RA 1
Lu z C I E
IFICE I US 2
.q ZONED B3 ERENDENTIA�
ANUTHU" 0 +1
j
a
>
ED LL,
VS(t NO L
/.e— -4 4 'iN
/ J ( �
/ // S 6
I
/U
------ SWM CHANNEL USE U.E C4
& WETLANDS A
PRESERVATION AREA
<
oci
----- -- W 0' N z
yde '\ m z
PA OL
A RUTH B
�EHNTE EL.00D L
D soo", FOUS J I
zqMEOMI DEED UK 23�
I.FNTIJU, _U
R,SUENTAL
E RE Lill 44 0 0
ZONED �l z M
/—RATWEOL&RUTH. V)
DEED SOON 351 PG 225
DATE. 10101108
SCAIE: NTS
DESIGNED BY. TEAM
NO. 3949
SHEET I OF I
VINICINTY MA
SCAC I" = 2000'
NORTH BUFFER AREA
SOUTH BUFFER AREA
CORRIDOR ENHANCEMENT
20' GREEN STRIP
z 2
��� ���
IN
Lu
V EIC*A%M
NUDDA
IL
-J
COORD FLORDEO:E IR ANN H
411 RD
rRED BOOK X`
MULIJNS�FFORA A
DEED"" 0
DE�1)800NEMD ZONE. .E. Z,.
OEM. -- w � ,
USE, RESIDENTI RESIDEMTM�
- swill
USE
SPIRIT SPR POTFOUFO D.7a I.I.0
JNSTR.. Tll 01919
ZO DB3
FO
USE OFFICE I WHOLESA-E I
WAREKMOSEILUMBERSTORE— IN
EDICAT IO 20'
R
i FUTURE RT. 11
� W 11 WIDENING
INSTR. 050017512
USE
MARK ➢ M H
1
A$ lH
LANDIB AREA REMAININd Y AREA -
DEVELOPMEN T C3 ONAL / qw. DEVEIL PENT
— Al
G
4
/ ROUI
/W '0-
W
4v f Z IL
L CC
JREWINCHESTEF.LLC IL
INSTR. 0!R-ZDaT
I iow u
ZONED B3 SOUTH END HOSE CO LC
USE UNIMPROVED S ZONED RA 1
Lu z C I E
IFICE I US 2
.q ZONED B3 ERENDENTIA�
ANUTHU" 0 +1
j
a
>
ED LL,
VS(t NO L
/.e— -4 4 'iN
/ J ( �
/ // S 6
I
/U
------ SWM CHANNEL USE U.E C4
& WETLANDS A
PRESERVATION AREA
<
oci
----- -- W 0' N z
yde '\ m z
PA OL
A RUTH B
�EHNTE EL.00D L
D soo", FOUS J I
zqMEOMI DEED UK 23�
I.FNTIJU, _U
R,SUENTAL
E RE Lill 44 0 0
ZONED �l z M
/—RATWEOL&RUTH. V)
DEED SOON 351 PG 225
DATE. 10101108
SCAIE: NTS
DESIGNED BY. TEAM
NO. 3949
SHEET I OF I
z
W
of
W ° o 0
z x
LLI
LLI
us
LU
�o
v a'
�g'zw
J 6 U
W — w
®u 6 &
®Z Q W W
F
CC
®Z
Us
DAM 10/01/2008
SCALE a 1
061CNE0 BY: 10E
FdE N0. OBIB
SHEET 1 OF L
Y
So 15 o so Bo
SCAU: 1' 30'
r uYYRI ® .LW LrM bPCC