HomeMy WebLinkAbout15-08 Applicationof FREDERICK
Department of Planning and Development
540/665 -5651
FAX: 540 /665 -6395
January 29, 2009
Mr. Evan Wyatt, AICP
Greenway Engineering
151 Windy Hill Lane
Winchester, VA 22602
RE: REZONING 415 -08, ADAMS COMMERCIAL CENTER
Dear Evan:
This letter serves to confirm action taken by the Frederick County Board of Supervisors at their
meeting of January 28, 2009. The above - referenced application was approved to revise proffers
association with Rezoning 402 -05 for 29.10 acres of land zoned B3 (Industrial Transition) District.
This revision is intended to remove the previously proffered uses on the site. The property fronts on
the west side of Martinsburg Pike (Route I I North), opposite the intersection with Stephenson Road
(Route 664), in the Stonewall Magisterial District, and is identified with Property Identification Number
44 -A -75.
The proffer originally dated April 17, 2008, and last revised on. January 8, 2009, that was approved
as a part of this rezoning application is unique to this property and is binding regardless of
ownership. Enclosed is a copy of the adopted proffer statement for your records.
Please do not hesitate to contact this office if you have any questions regarding the approval of this
rezoning application.
Sincerely,
Candice E. Perkins, AICP
Senior Planner
CEP /bad
Attachment
cc: Charles S. DeHaven, Jr., Stonewall District Supervisor
Gary Oates and Richard Ruckman, Stonewall District Planning Commissioners
Jane Anderson, Real Estate
Commissioner of Revenue
Robert Adams, HC 34 Box 30, Bioomery, WV 26817
107 North Kent Street, Suite 202 • Winchester, Virginia 22601 -5000
I •
0
REZONING APPLICATION #15 -08
ADAMS COMMERCIAL CENTER
Staff Report for the Board of Supervisors
Prepared: January 20, 2009
Staff Contact: Candice E. Perkins, AICP, Senior Planner
This report is prepared by the Frederick County Planning Staff to provide information to the
Planning Commission and the Board of Supervisors to assist them in making a decision on this
application. It may also be useful to others interested in this zoning matter. Unresolved issues
concerning this application are noted by staff where relevant throughout this staff report.
Reviewed Action
Planning Commission: 01/07/09 Recommended Approval
Board of Supervisors: 01/28/09 Pending
PROPOSAL To revise proffers associated with Rezoning #02 -05 for 28.10 acres of land zoned B3
(Industrial Transition). This revision is intended to remove the previously proffered uses on the site.
LOCATION The property fronts on the west side of Martinsburg Pike (Route I I North), opposite the
intersection with Stephenson Road (Route 664).
MAGISTERIAL DISTRICT Stonewall
PROPERTY ID NUMBERS 44 -A -75
PROPERTY ZONING 133 (Industrial Transition)
PRESENT USE Undeveloped
ADJOINING PROPERTY ZONING & PRESENT USE
North:
RA (Rural Areas) District
Use:
Residential
South:
MI (Light Industrial) District &
Use:
Residential
RA (Rural Areas) District
Residential
East:
RA (Rural Areas) District &
Use:
Residential
B2 (Business General) District
Industrial
West:
B3 (Industrial Transition) District
Use:
Industrial
1
PROPOSED USES Commercial and Industrial uses as permitted in the B3 District.
Rezoning 411 -08 —Adams Commercial Center
January 20, 2009
Page 2
REVIEW EVALUATIONS:
Virsinia Dept. of Transportation: The documentation within the application to rezone this property
appears to have a measureable impact on Route 11. This route is the VDOT roadway which has been
considered as the access to the property referenced. VDOT is satisfied that the transportation proffers
offered in the Adams Commercial Center Rezoning Application dated August 12, 2008 addresses
transportation concerns associated within this request. Before development, this office will require a
complete set of construction plan detailing entrance designs, drainage features, and traffic flow data
from the I.T.E. Trip Generation Manual. Seventh Edition for review. VDOT reserves the right to
comment on all right -of -way needs, including right -of -way dedications, traffic signalization and off -site
roadway improvements and drainage. Any work performed on the State's right -of -way must be covered
under a land use permit. The permit is issued by this office and requires an inspection fee and surety
bond coverage.
Fire Marshal Plan approval recommended.
Frederick Countv Attornev: Please see attached letter dated December 8, 2008 from Roderick B.
Williams, CounlyAttorney.
Plannine Department: Please see attached letter dated September 11, 2008from Candice E. Perkins,
AICP, Senior Planner.
PlanninE & Zoning:
1) Site History
The original Frederick County Zoning Map (U.S.G.S. Stephenson Quadrangle) depicts the
zoning of the subject parcel as A -2 (Agricultural General) District. The County's agricultural
zoning districts were subsequently combined to form the RA (Rural Areas) District upon
adoption of an amendment to the Frederick County Zoning Ordinance on May 10, 1989.
In 2004, the Board of Supervisors approved Rezoning #11 -04 which rezoned the property to the
B3 (Industrial Transition District) with proffers. On May 13, 2005 the Board of Supervisors
approved Rezoning #02 -05 which revised the proffers for the site to modify the proffered uses
of the site.
2) Proffer Statement - Dated April 17, 2008; Revised January 8, 2009:
Request to Revise Proffered Conditions:
The applicant has submitted the current rezoning petition in an effort to revise the existing
proffered conditions relating to the permitted uses for the property. Specifically this revision
removes the previously proffered uses and building square footage cap on the site and prohibits
certain uses on the site. The revised proffer also accounts for the construction of a ten foot
asphalt path along the Martinsburg Pike frontage of the site.
• •
Rezoning # 11 -08 — Adams Commercial Center
January 20. 2009
Page 3
A) General Development Plan The applicant has proffered to develop the subject property
in substantial conformance with the GDP. The GDP demonstrates a single shared
commercial entrance (Yardmaster Court) and the location of buffers and preservation
areas.
Staff note: Consistent with previously proffered condition. (Please note thatthe GDP
has been revised to remove proposed uses.)
B) Vehicle Per Day (VPD) and Land Use Restrictions
1) Conditional Rezoning application #02 -05 limited traffic generation for permitted
land uses to a maximum of 4,603 VPD based on ITE Trip Generation 7' Edition
volumes. The Applicant hereby proffers to restrict development of the 28.10
acre property to an amount to be determined during Site Plan approval, not to
exceed a maximum of 2,900 VPD. The applicant acknowledges that the
maximum 2,900 VPD may be further reduced for the 28.10 acre property should
additional development occur on the remaining parcels in the Adams
Development not covered by this revised rezoning application.
2) The applicant has proffered to prohibit the following B -3 District land uses on
the site:
• Amusement and recreational services operated indoors
• Automotive dealers and gasoline service stations
• Drive -in motion picture theaters
• Food Stores
• Local and suburban transit and interurban highway passenger
transportation
• Business associations; membership organizations; and labor unions
• Model home sales offices
• Motor freight transportation, excluding warehousing and storage
• Restaurants
• Transportation by air
• Transportation services
• Truck stops
Staff Note: The proffers from Rezoning #01 -05 restricted the uses on the site to
office, building materials and lumber stores, wholesale, warehouse, and self - service
storage facilities. The proffer also limited the site to 555,000 square feet
C) Transportation
1) Direct access to Martinsburg Pike will be provided through a single shared
commercial entrance to provide ingress and egress for the 28.10 acre property.
Staff note: Consistent with previously proffered condition
Rezoning #11 -08 —Adams Commercial Center
January 20, 2009
Page 4
2) Turn lane — Martinsburg Pike. The applicant has constructed a right -turn lane
deceleration lane at the entrance on Martinsburg Pike. The applicant will be
responsible for the relocation of the right -turn deceleration lane should this be
required as a result of the future Martinsburg Pike transportation plan
improvements.
Staff note: Consistent with previously proffered condition
Staff Note: With this revision, the applicant should be implementing the Frederick
County Eastern Road Plan which identifies Martinsburg Pike as an improved minor
arterial road (U4D). With this rezoning application, the applicant should be
constructing the additional lane along the frontage of the site.
3) Additional Right -of -way Dedication
The applicant proffered to dedicate 20 foot of ROW along Martinsburg Pike
with the original rezoning. This ROW has been initiated by the applicant
through a dedication to the County.
Staff note: Consistent with previously proffered condition
4) Corridor Improvements, Signalization
The applicant proffers to contribute a share of the cost of signalization
improvements in the area of Interstate 81 Exit 321. VDOT will determine the
appropriate location for signalization improvements and will determine when
warranted. When determined by VDOT, the applicant will enter into a
signalization agreement with VDOT and provide a one -time contribution to
VDOT based on traffic volume generated by the developed portion of the
subject property.
Staff note: Consistent with previously proffered condition
5) Corridor Improvements, Bicycle and Pedestrian Facility
The applicant has proffered to construct a ten foot asphalt path to be located
within the 20 foot green strip identified in proffer F. The path on the northern
portion of the entrance shall be completed prior to the issuance of an occupancy
permit on the north side and the southern portion shall be completed before any
occupancy permits are issued on the southern portion of the site.
Staffnote: This is a new proffer, Rezoning #02 -05 did not account for a ten foot path.
6) Right -of -Way Reservation
The Applicant proffers to reserve a 50 -foot wide strip of land between
Yardmaster Court and tax parcel 44 -1 -D to allow for the construction of a future
public street connection by others.
Staff note: This is a new proffer added after the Planning Commission Meeting.
D) North Buffer
The applicant has proffered to utilize a 6' high berm opaque screening option along the
north property line.
0 0
Rezoning 411 -08 —Adams Commercial Center
January 20, 2009
Page 5
The applicant has proffered to utilize a 6' high berm opaque screening option along the
north property line.
Staff note: Consistent with previously proffered condition
E) South Buffer
The applicant has proffered to utilize a 6' tall fence as the opaque screening option
along the south property line.
Staff note: Consistent with previously proffered condition
F) Corridor Appearance Enhancements
The applicant has proffered landscape enhancements along Martinsburg Pike (Route 11
N) to include a 20 foot wide green strip, a low -level earth berm, low -lying shrubs and a
single row of deciduous flowering trees. See Corridor Appearance Enhancement Exhibit
Staff note: Consistent with previously proffered condition — includes the addition of
the ten foot asphalt path.
G) Monetary Contributions to Offset Impact of Development
A monetary contribution of $.015 /building square foot.
Staff note: Consistent with previously proffered condition
PLANNING COMMISSION SUMMARY AND ACTION OF THE 01/07/09 MEETING
The applicant said the property owner had different parties express interest in the property that were not
the five specific uses originally proffered, although these uses were still fairly low traffic generators. He
said the solution reached with the Planning Staff was instead of simply removing land bay bubbles, the
applicant should consider proffering out specific B3 uses that were high traffic generators and provide
more flexibility to the site. The applicant said the 4,600 vehicle trips proffered with the original
rezoning remains. In addition, a ten -foot hiker /biker trail has been included along the front of the
property, along with the opportunity for this property to access Yard Master Court, on the M 1 property
immediately to the south, via a 50 -foot right -of -way reservation strip. The applicant read specific
language that would be proffered to guarantee the 50 -foot reservation.
There were no citizen comments during the public comment portion of the hearing.
The Planning Commission believed that even though the revision had opened up the property
somewhat, the applicant still had proffered out quite a few of the high- traffic uses for the site.
Commission members were pleased with the easement to the south for the 50 -foot right -of -way and the
ten -foot bicycle /pedestrian path along the front of the property.
The Planning Commission unanimously recommended approval of the rezoning with the revised
proffers and GDP (generalized development plan) offered by the applicant and with the addition of a
50 -foot reservation strip with the following associated language: "The applicant hereby proffers to
reserve a 50 -foot wide strip of land between Yard Master Court and Tax Parcel 44 -1 -D, the adjoining
property, to allow for the construction of a future public street connection by others. The general
location of this reservation area shall be provided on the GDP, however, it is recognized that the
location can be shifted without the need for conditional zoning approval. All costs associated with
Rezoning #11-08 — Adams Commercial Center
January 20, 2009
Page 6
establishing the future public street shall be bome by the owner of Tax Parcel 44 -1 -D or by others than
the applicant.
STAFF CONCLUSIONS FOR 01/07/09 BOARD OF SUPERVISORS MEETING:
This is an application to revise the proffers associated with Rezoning #02 -05 for 28.10 acres of land
zoned 133 (Industrial Transition). Specifically, this revision removes the previously proffered uses and
building square footage cap on the site and includes uses that have been prohibited on the site. The
revised proffer also accounts for the construction of a ten foot asphalt path along the Martinsburg Pike
frontage of the site.
With this revision, the applicant should be implementing the Frederick County Eastern Road Plan
which identifies Martinsburg Pike as an improved minor arterial road (U413). With this rezoning
application, the applicant should be constructing the additional lane along the frontage of the site.
Following the required public hearing, a decision regarding this rezoning application by the
Board of Supervisors would be appropriate. The applicant should be prepared to adequately
address all concerns raised by the Board of Supervisors.
Adams Commercial Center
ReZoning
REZ #15 -08
PIN: 44-A- 75
n
r 4 llAr, �7
n
f ins. FUtam Rt37 Blame;
Zoning
® M Undustrial, General District)
Applicellan
4r 01 (Business, Neighborhood District)
• MR](MUWle Home Community District)
Buildings
4 B2 (Business General Disvbt)
MS( Medical SupPnrt Wharirt)
Urban Dn mea
rlopt Area B3(BUrinevs, Industrial Transition Dettict) R!(Rnidential Plavvrtl Community District)
0%.#SWSA
- EM(Estractm Menuftcharing District)
qi 5mlysideemi Rttreafional Community Dist
HE (Higher greener. Indian
f\D RA(R..l Arq Dottie[)
• MI (industrial. Light Ratner)
BY (Residential Performance District)
0 75 150 300 Feet
Map bontmenC (F1 l Lo - tO!_MpSCPUUB A': rats Camel r - isl GOnler_RFZI JE 121808 11xdl 11J 13 /940 ° —
0
0
REZONING APPLICATION FORM
FREDERICK COUNTY, VIRGINIA
The following information shall be provided by the applicant:
All parcel identification numbers, deed book and page numbers may be obtained from the
Office of the Commissioner of Revenue, Real Estate Division, 107 North Kent
Street, Winchester.
1. Applicant:
Name: Greenway Engineering
Telephone: 540 -662 -4185
Address: 151 Windy Hill Lane, Winchester, VA 22602
2. Property Owner (if different from above)
Name: Adams Development Group, Inc.
Robert Adams
Telephone: 540 -539 -3599
Address: HC 34 Box 30, Bloomery, WV 26817
3. Contact person if other than above
Name: Evan A. Wyatt, AICP
Telephone: 540- 662 -4185
4. Checklist: Check the following items that have been included with this
application.
Location map
®
Agency Comments
Plat
®
Fees
Deed to Property
®
Impact Analysis Statement
❑
Verification of taxes paid
Proffer Statement
The Code of Virginia allows us to request full disclosure of ownership in relation to
rezoning applications.
Please list below all owners or parties in interest of the land to be rezoned:
Adams Development Group, Inc.
S.
ra
A) Current Use of the Property: Undeveloped
B) Proposed Use of the Property: Industrial Transition Uses
Adjoining Property: Please see attached adjoiner information
8. Location: The property is located at (give exact located based on nearest road
and distance from nearest intersection, using road names and route number):
North of the City of Winchester, fronting on the west side of Martinsburg Pike (US Route
11), opposite the intersections with Stephenson Road (Route 664)
0
hiformation to be Submitted for CaDital Facilities ImDact Model
In order for the Planning Staff to use its capital facilities impact model, it is necessary for
the applicant to provide information concerning the specifics of the proposed use.
Otherwise, the planning staff will use the maximum possible density or intensity scenario
for the proposed Zoning District as described on Page 9 of the application package.
9. Parcel Identification/Location: Parcel Identification Number 44 -A -75
Districts
Magisterial: Stonewall High School: James Wood High
School
Fi;e Service: Clear Brook Middle School: James Wood Middle
School
Rescue Service: Clear Brook Elementary School: Stonewall
Elementary School
10. Zoning Change: List the acreage included in each new zoning category
being requested.
Acres
Current Zoning
Zoning Requested
28.10
B3 (with proffers)
B3 (with revised proffers)
Total Acreage to be rezoned
11.
The following information should be provided according to the type of
rezoning proposed:
Single Family homes:
Non - Residential Lots:
Office:
Self Serve Storage:
Lumber Store:
Number of Units Proposed
Townhome:
Mobile Home:
Multi- Family
Hotel Rooms:
Square Footage of Proposed Uses*
Wholesale:
Warehouse:
Other:
*Structural square footage is limited for the 28.10± acre area based on a maximum
VPD as described in Section B(1) of the proffer statement.
0
Signature:
0
I (we), the undersigned, do hereby respectfully make application and petition the
Frederick County Board of Supervisors to amend the zoning ordinance and to change
the zoning map of Frederick County, Virginia. I (we) authorize Frederick County
officials to enter the property for site inspection purposes.
I (we) understand that the sign issued when this application is submitted must be
placed at the front property line at least seven days prior to the Planning Commission
public hearing and the Board of Supervisors' public hearing and maintained so as to
be visible from the road right -of -way until the hearing.
I (we) hereby certify that this application and its accompanying materials are true and
accurate to the bet of my (our) knowledge.
Applicant(s):
Owner (s):
Date:
Date: / ��
�r
Special Limited Power of Attorney
County of Frederick, Virginia
Frederick Planning Web Site: www.co.frederick.va.us
Department of Planning & Development, County of Frederick, Virginia,
107 North Kent Street, Suite 202 Winchester, Virginia 22601
Phone 540- 665 -5651 Facsimile 540 - 665 -6395
Planning office, County of Frederick, Virginia, 107 Kent Street, Winchester, Virginia 22601
Phone 540-665-5651 Facsimile 540 -665 -6395
Know All Men By These Presents: That I (We)
(Name) Robert C Adams President Adams Development Group (Phone) (540) 539 -3599
(Address) HC 34 Box 30 Bloomerv, WV 26817
the owner(s) of all those tracts or parcels of land ( "Property ") conveyed to me (us), by deed recorded in the
Clerk's Office of the Circuit Court of the County of Frederick. Virginia, by
Instrument No. 030015420 on Page 0670 and is described as
Parcel: 44 Lot: 75 Block: A Section: Subdivision:
do hereby make, constitute and appoint:
(Name) Greenway Eneineering
(Phone) (540) 662 -4185
(Address) 151 Windy Hill Lane, Wincehster, VA 22602
To act as my true and lawful attorney -in -fact for and in my (our) name, place and stead with full power and
authority I (we) would have if acting personally to file planning application for my (our) above described
Property, including:
® Rezoning (Including proffers)
❑ Conditional Use Permits
❑ Master Development Plan (Preliminary and Final)
❑ Subdivision
❑ Site Plan
❑ Comprehensive Policy Plan Amendment
My attorney -in -fact shall have the authority to offer proffered conditions and to make amendments to
previously approved proffered conditions except as follows:
This authorization shall expire one year from the day it is signed, or until it is otherwise rescinded or
modified.
`, ��iiiiiNit
In witness thereof. I (we) have hereto set my (our) hand and seal this }� �" day of F _ .`v O Ell
rcrhr
State of Virginia, City / ount t i ( t wit:
�
I, i/d(1PYa. L� �i5o , a Notary Public in and for the jurisdiction aforesaid, certify that the person(s).w,jtd•.
signed to the foregoing instrument and who I (are) known to me, personally appeared before me and has' '••.....
ac wI dged the same before me in the jurisdiction aforesaid this k day ofl 200 l J I J 0
},I 1 �.p n
�)1..a1= �- �2c; My Commission Expires: 2 2 -q G61;
Notary Public - Rg-,fl'Gf i0r1 1� Zql, I ()-(,
-r V
. r� f
°P O
m
A p W
N 4l
O �O
0 25 r
4 8.888) ACRES W c,N
\ PORTON NORTH COURT
C L YARDMASTER COUR f
YARDMASTER COURT °
VAR14aE WIDTH R/W 19
�% 21 INST. No. 050017512 0 i
Co 41
14 15 16
17 7 cc I
18
12 RESIDUE OF n 60 j g
10 11 TAX PARCEL
44 -A -75 /
1h � y 28.1055 ACRES (TOTAL)
Q ���apti
19.4192 ACRES
o, r PORTION SOUTH OF]
[YARDMASTER COUR 6
T.M. 44_1 -0
StE H .PAYNE, ET UX
0 030024641
L
F = CENTERUNE OF PAVEMENT
R/W = RIGHT OF WAY
O ADJOINING PROPERTY OWNER TAG
REFERS TO KEY ON SHEET 2
CORNER MONUMENT TAG REFERS TD CORDER
DESCRIBED IN METES & BOUNDS DESCRIPRON
I I I
X01E
SEE SHEET 2 FOR NOTES AND KEY
TO ADJOINING PROPERTY OWNERS.
SEE SHEETS J & 4 FOR METES
AND BOUNDS DESCRIPTION.
BOUNDARY SURVEY
OF THE LAND OF
THE ADAMS DEVELOPMENT GROUP, INC.
STONEWALL MAGISTERIAL DISTRICT, FRED(-."RICK COUNTY, VIRGINIA
GREENWAV ENGINEERING, INC.
151 Windy fill Lane
Engineers Winchester, � iq;inia 22602
Surveyors Telephone. (540) 662 -4185
FAX. (540) 722 -9528
Founded in 1971 www.greenwayeng.com
RICHARD A. -DENS
No.002550
J ¢-24-07 n
3949 SHEET 1 OF 4
PAR N \
BU F ER \
20' FCSA EASEMENT I,
-- 1 / —SOUTH
BUFFER-
EX. WETLANDS
i y
F -FCSA PUMP
a ®® I / /I % STATION ` , FCSA
:y �? / 1 EAAEMENT- I
o
I
U
S
<`�
0� 20':FCSA
EASEMENT.
I 20' VD ®T
ROW
DEDICATION
t
I�
20' FCSA
EASEMENT
� GREEN
r SPACE
10' TRAIL
>�3
Y i I
RT. 11 - MARTINSBURG PIKE ;
u,. r VARIABLE RIW I -
55 -MPH
. N
t
5
k�
y b
L i
i
a
w i
_ ° w
W
0
W F
v m
U
Q =z
QWo'
I Z Za 5
d W WO
♦r.W aw
�v °
O Z a w a
VW
DATE: Ol /00 /2GD8
DESIGNED BY: KLB
30 IS O 30 60
FD.E ND. 3848
SCALE, �^ an
Z
z
Q =a gym I
a pY'
Kul s `
S u Qbm
a
-IQPT vo
w3
PAR N
BUF ER
w
m
co
CL F
v m W
Q.Y W ❑_
'# z
Q w
ca
� w
m
w
o
\ 20' FCSA EASEMENT
SOUTH
BUFFER
EX. WETLANDS
[ FCSA PUMP �
i STATION E201EMENT
m
w 4
a `
u m Div
Lu s a €
Q � � W ka a$�
NORTH
BUFFER o g F
Lu
m N
-20' FCSA
EASEMENT 20' FCSA
20'VDOT EASEMENT GREEN
ROW SPACE
DED
= 1 U' I KAIL I
r
moo ,
MNSBURG PI
RIABLE R/W
55 -MPH
W�
v� M
W U
6 N 7
W Lu
�Z zw8
o
44 X
J Q U
0 v��w
c Z
rc a w
z
0
CC
v W
9CdLE ft P 50'
V:
OE9[GNEO ET:
30 15 0 30 60
CORRIDOR APPEARANCE ENHANCEMENT
2®'( OMPLL 6' ME. f'I [8H1P18A£R F'1
ti er
e�
G
T diUllIdJLCI k.UUIL
Location & Zoning Map
i
aria
s
f
L LE
a
L�0 I 1'I A h 0 666
W
s G
Y a
a
eaa
LU
a
W go
cc
664
666 666
�n g
Reab`a
Miles
('PI: TFR / 1 0.5 0 1
Legend
Parcel Boundaries
Q Adams Development Group Property
Frederick County Zoning 2008
® B2 (Business, General District)
- B3 (Business, Industrial Transition District)
- M1 (Industrial, Light District)
- MH1 (Mobile Home Community District)
RA (Rural Areas District)
Map Data Source: Frederick County, Va. GIS Department, 2008 Data
Feet
300 150 0 300 600
w U_ o
a Q z
w (L U) z N
EL w 2 o
> > 0
00z
U Z W
H wNr
W U)af 00
g Q z a U w d
LL
p D J U K °o
J� Q a 0 d w
W } 0 W w 'Q
J Lu
U) O LL v
g
Q N
0 W
a a
O U
V)
N
WE I
S
j
44 1 D
Le end
n Parcel Boundaries
O Adams Development Group Property
Adjoining Properties
Map Data Source: Frederick County, Va. GIS Department, April 2008 Data
44 A 76A
44 A 89
0
Z
LU
m
Z = o
x
LLI
cc k
y S »y
i 5 Y3 P.
/
w
LU
d
Q
U
}
❑
CL
Q
44 A 72 `rfe
A � P �s
O
U)
Z
z
n
a
Of
z
°
K
o
° /) o o�a } >
44 A 64 a 664 /
it
U
0
of
Z
M
44 A 73 //
W
of
rn
=
o
((
w
C O
O
w
Y
LL
w
Q
Q
a
w
W
w
-
z
°
w
LL
Q
w
Feet
w
°
°
m
o
—
Q
Q
U)
N
200 100 0 200 400
a
a
UJ
❑
y
44 A 64
EMMANUEL UNITED METHODIST
2732 MARTINSBURG PIKE
STEPHENSON VA
22656
44 A 70
SOUTH END HOSE CO LC
PO BOX 213
WINCHESTER VA
22604
44 A 72
DEMOREST RICHARD D
PO BOX 233
CLEARBROOK VA
22624
44 A 73
WHITE ELWOOD L & BETTY L
2695 MARTINSBURG PIKE
STEPHENSON VA
22656
44 A 75B
SPIRIT SPE PORTFOLIO 2007 -2 LLC
C/O 84 LUMBER COMPANY
1019 ROUTE 519 ATTN TAX DEPARTMENT BLDG 4
EIGHTY FOUR, PA
15330
44 A 75E
JRE WINCHESTER LLC
11047 LEADBETTER;RD
ASHLAND VA
23005
44 A 75F
EVANLYNN LLC
134 WINDY HILL LN N W2 -1
WINCHESTER VA
22602
44 A 76A
MULLINS DEBORAH A.
PO BOX 243
STEPHENSON VA.
22656
44 A 76B
CONARD FLORENCE H.
C/O FLORENCE SHUSTER
PO BOX 202
STEPHENSON VA.
22656
44 A 76C
WILDER ANN H.
PO BOX 251
STEPHENSON VA.
22656
44 A 76D
MAY EDWARD M
MAY JUANITA A
2851 MARTINSBURG PIKE
STEPHENSON VA
22656
44 A 89
APAC- VIRGINIA INC
C/O W -L CONSTRUCTION & PAVING
PO BOX 339
STEPHENSON VA
22656
44 A 89A
FRANKLIN L F & SONS INC
C/O W -L CONSTRUCTION & PAVING
PO BOX 339
STEPHENSON VA
22656
I
4/17/2008 Source: Frederick County GIS, April 2008 1 of 1
• 1 •
REZONING APPLICATION #15 -08
ADAMS COMMERCIAL CENTER
Staff Report for the Planning Commission
Prepared: December 16, 2008
Staff Contact: Candice E. Perkins, AICP, Senior Planner
This report is prepared by the Frederick County Planning Staff to provide information to the
Planning Commission and the Board of Supervisors to assist them in making a decision on this
application. It may also be useful to others interested in this zoning matter. Unresolved issues
concerning this application are noted by staff where relevant throughout this staff report.
Reviewed Action
Planning Commission: 01/07/09 Pending
Board of Supervisors: 01/28/09 Pending
PROPOSAL To revise proffers associated with Rezoning 902 -05 for 28.10 acres of land zoned B3
(Industrial Transition). This revision is intended to remove the previously proffered uses on the site.
I
LOCATION The property fronts on the west side of Martinsburg Pike (Route I 1 North), opposite the
intersection with Stephenson Road (Route 664).
MAGISTERIAL DISTRICT Stonewall
PROPERTY ID NUMBERS 44 -A -75
PROPERTY ZONING B3 (Industrial Transition)
PRESENT USE Undeveloped
ADJOINING PROPERTY ZONING & PRESENT USE
North:
RA (Rural Areas) District
Use:
Residential
South:
M1 (Light Industrial) District &
Use:
Residential
RA (Rural Areas) District
Residential
East:
RA (Rural Areas) District &
Use:
Residential
B2 (Business General) District
Industrial
West:
B3 (Industrial Transition) District
Use:
Industrial
PROPOSED USES Commercial and Industrial uses as permitted in the B3 District.
0 0
Rezoning #11 -08 — Adams Commercial Center
December 16, 2008
Page 2
REVIEW EVALUATIONS:
Virginia Dept. of Transportation: The documentation within the application to rezone this property
appears to have a measureable impact on Route 11. This route is the VDOT roadway which has been
considered as the access to the property referenced. VDOT is satisfied that the transportation proffers
offered in the Adams Commercial Center Rezoning Application dated August 12, 2008 addresses
transportation concerns associated within this request. Before development, this office will require a
complete set of construction plan detailing entrance designs, drainage features, and traffic flow data
from the I.T.E. Trip Generation Manual. Seventh Edition for review. VDOT reserves the right to
comment on all right -of -way needs, including right -of -way dedications, traffic signalization and off -site
roadway improvements and drainage. Any work performed on the State's right-of-way must be covered
under a land use permit. The permit is issued by this office and requires an inspection fee and surety
bond coverage.
Fire Marshal Plan approval recommended.
Frederick County Attorney: Please see attached letter dated December 8, 2008 from Roderick B.
Williams, County Attorney.
Planning Department: Please see attached letter dated September 11, 2008from Candice L. Perkins,
AICP, Senior Planner.
Planning & Zoning:
1) Site History
The original Frederick County Zoning Map (U.S.G.S. Stephenson Quadrangle) depicts the
zoning of the subject parcel as A -2 (Agricultural General) District. The County's agricultural
zoning districts were subsequently combined to form the RA (Rural Areas) District upon
adoption of an amendment to the Frederick County Zoning Ordinance on May 10, 1989.
In 2004, the Board of Supervisors approved Rezoning 411-04 which rezoned the property to the
B3 (Industrial Transition District) with proffers. On May 13, 2005 the Board of Supervisors
approved Rezoning 402 -05 which revised the proffers for the site to modify the proffered uses
of the site.
2) Proffer Statement - Dated April 17, 2008; Revised December 9, 2008
Request to Revise Proffered Conditions:
The applicant has submitted the current rezoning petition in an effort to revise the existing
proffered conditions relating to the permitted uses for the property. Specifically this revision
removes the previously proffered uses and building square footage cap on the site and prohibits
certain uses on the site. The revised proffer also accounts for the construction of a ten foot
asphalt path along the Martinsburg Pike frontage of the site.
0 0
Rezoning #11 -08 —Adams Commercial Center
December 16, 2008
Page 3
A) General Development Plan The applicant has proffered to develop the subject property
in substantial conformance with the GDP. The GDP demonstrates a single shared
commercial entrance (Yardmaster Court) and the location of buffers and preservation
areas.
Staff note: Consistent with previously proffered condition. (Please note that the GDP
has been revised to remove proposed uses.)
B) Vehicle Per Day (VPD) and Land Use Restrictions
1) Conditional Rezoning application 902 -05 limited traffic generation for permitted
land uses to a maximum of 4,603 VPD based on ITE "Trip Generation 7"' Edition
volumes. The Applicant hereby proffers to restrict development of the 28.10
acre property to an amount to be determined during Site Plan approval, not to
exceed a maximum of 2,900 VPD. The applicant acknowledges that the
maximum 2,900 VPD may be further reduced for the 28.10 acre property should
additional development occur on the remaining parcels in the Adams
Development not covered by this revised rezoning application.
2) The applicant has proffered to prohibit the following B -3 District land uses on
the site:
• Amusement and recreational services operated indoors
• Automotive dealers and gasoline service stations .
• Drive -in motion picture theaters
• Food Stores
• Local and suburban transit and interurban highway passenger
transportation
• Business associations; membership organizations; and labor unions
• Model home sales offices
• Motor freight transportation, excluding warehousing and storage
• Restaurants
e Transportation by air
• Transportation services
e Truck stops
Staff Note: The proffers from Rezoning #02 -05 restricted the uses on the site to
office, building materials and lumber stores, wholesale, warehouse, and self - service
storage facilities. The proffer also limited the site to 555,000 square feet.
C) Transportation
1) Direct access to Martinsburg Pike will be provided through a single shared
commercial entrance to provide ingress and egress for the 28.10 acre property.
Staff note: Consistent with previously proffered condition
Rezoning #11 -08— Adams Commercial Center
December 16, 2008
Page 4
2) Turn lane — Martinsburg Pike. The applicant has constructed a right -turn lane
deceleration lane at the entrance on Martinsburg Pike. The applicant will be
responsible for the relocation of the right -turn deceleration lane should this be
required as a result of the future Martinsburg Pike transportation plan
improvements.
Staff note: Consistent with previously proffered condition
Staff Note: With this revision, the applicant should be implementing the Frederick
County Eastern Road Plan which identifies Martinsburg Pike as an improved minor
arterial road (U4D). With this rezoning application, the applicant should be
constructing the additional lane along the frontage of the site.
3) Additional Right- of-way Dedication
The applicant proffered to dedicate 20 foot of ROW along Martinsburg Pike
with the original rezoning. This ROW has been initiated by the applicant
through a dedication to the County.
Staff note: Consistent with previously proffered condition
4) Corridor Improvements, Signalization
The applicant proffers to contribute a share of the cost of signalization
improvements in the area of Interstate 81 Exit 321. VDOT will determine the
appropriate location for signalization improvements and will determine when
warranted. When determined by VDOT, the applicant will enter into a
signalization agreement with VDOT and provide a one -time contribution to
VDOT based on traffic volume generated by the developed portion of the
subject property.
Staff note: Consistent with previously proffered condition
5) Corridor Improvements, Bicycle and Pedestrian Facility
The applicant has proffered to construct a ten foot asphalt path to be located
within the 20 foot green strip identified in proffer F. The path on the northern
portion of the entrance shall be completed prior to the issuance of an occupancy
permit on the north side and the southern portion shall be completed before any
occupancy permits are issued on the southern portion of the site.
Staff note: This is a new proffer, Rezoning #02 -05 did not account for a ten footpath.
D) North Buffer
The applicant has proffered to utilize a 6' high berm opaque screening option along the
north property line.
Staff note: Consistent with previously proffered condition
E) South Buffer
The applicant has proffered to utilize a 6' tall fence as the opaque screening option
along the south property line.
Staff note: Consistent with previously proffered condition
C
Rezoning #11 -08 — Adams Commercial Center
December 16, 2008
Page 5
F) Corridor Appearance Enhancements
The applicant has proffered landscape enhancements along Martinsburg Pike (Route 11
N) to include a 20 foot wide green strip, a low -level earth berm, low -lying shrubs and a
single row of deciduous flowering trees. See Corridor Appearance Enhancement Exhibit
Staff note: Consistent with previously proffered condition — includes the addition of
the ten foot asphalt path.
G) Monetary Contributions to Offset Impact of Development
A monetary contribution of $.015 /building square foot.
Staff note: Consistent with previously proffered condition
This is an application to revise the proffers associated with Rezoning #02 -05 for 28.10 acres of land
zoned B3 (Industrial Transition). Specifically, this revision removes the previously proffered uses and
building square footage cap on the site and includes uses that have been prohibited on the site. The
revised proffer also accounts for the construction of a ten foot asphalt path along the Martinsburg Pike
frontage of the site.
With this revision, the applicant should be implementing the Frederick County Eastern Road Plan
which identifies Martinsburg Pike as an improved minor arterial road (U4D). With this rezoning
application, the applicant should be constructing the additional lane along the frontage of the site.
address all concerns raised by the Planning Commission.