HomeMy WebLinkAbout10-08 ApplicationFebruary 2, 2009
Dear Patrick:
Mr. Patrick Sowers
Patton Harris Rust Associates
117 E. Piccadilly St.
Winchester, VA 22601
RE: REZONING #10 -08 AND MASTER DEVELOPMENT PLAN #08-08 FOR
GOVERNORS HILL
M&
Department of Planning and Development
540/665-5651
FAX: 540/665 -6395
This letter serves to confirm action taken by the Frederick County Board of Supervisors at their meeting of
January 28, 2009. The above referenced application was approved to rezone 39.7 acres from the RA (Rural
Areas) District to the R4 (Residential Planned Community) District, with proffers, and 238.3 acres from the R4
District to the R4 District to revise the proffers associated with Rezoning #11 -05. The proffer originally dated
March 24, 2008, and last revised on January 9, 2009, that was approved as a part of this rezoning application is
unique to this property and is binding regardless of ownership. Enclosed is a copy of the adopted proffer
statement for your records.
Furthermore, Frederick County administrativelyapproved the above referenced master development plan on
January 30, 2009. All requirements of the Frederick County Zoning and Subdivision Ordinance have been
addressed in the plan. Please note that a site plan is required prior to the development of these parcels. 1 am
providing you with four copies of the approved final master development plan. Please ensure that these plans
are distributed accordingly.
The subject properties are located approximatelyone mile east of Interstate 81 on the south side of Millwood
Pike (Route 50 E), across from Sulphur Spring Road (Route 655) and The Ravens Subdivision, in the Shawnee
Magisterial District, and are identified with Property Identification Numbers 64 -A -83, 64- A -83A, 64 -A -84, 64-
A- 85,64 -A -86 and 64 -A -87.
Please do not hesitate to contact this office if you have any questions regarding the approval of this rezoning
application.
Sincerely,
1,
Candice E. Perkins, AICP
Senior Planner
CEP bad
Attachment
cc: Gene Fisher, Shawnee Magisterial District Supervisor
Lawrence Ambrogi and H. Paige Minuet, Shawnee Magisterial District Commissioners
Jane Anderson, Real Estate
Commissioner of Revenue
Carpers Valley Development, LLC, 480 Jubal Early Dr., Ste. 330, Winchester, VA 22601
Governors Hill, LLC, 480 Jubal Early Di Ste. 330, Winchester,VA 22601
107 North Kent Street, Suite 202 Winchester, Virginia 22601 -5000
REZONING APPLICATION #10 -08
MASTER DEVELOPMENT PLAN #08 -08
GOVERNORS HILL
Staff Report for the Board of Supervisors
Prepared: January 20, 2009
Staff Contact: Candice E. Perkins, AICP, Senior Planner
John A. Bishop, AICP, Deputy Director Transportation
This report is prepared by the Frederick County Planning Staff to provide information to the Planning
Commission and the Board of Supervisors to assist them in making a decision on this application. 11 may
also be useful to others interested in this zoning matter. Unresolved issues concerning this application are
noted by staff where relevant throughout this staff report.
Reviewed Action
Planning Commission: 01/07/09 Recommended Approval
Board of Supervisors: 01/28/09 Pending
PROPOSAL: To rezone 39.7 acres from the RA (Rural Areas) District to the R4 (Residential
Planned Community) District, with proffers, and 238.3 acres from the R4 District to the R4 District,
to revise the proffers associated with Rezoning #11 -05.
LOCATION: The properties are located approximately one mile east of Interstate 81 on the south
side of Millwood Pike (Route 50 E), across from Sulphur Spring Road (Route 655) and The Ravens
Subdivision.
MAGISTERIAL DISTRICT: Shawnee
PROPERTY ID NUMBERS: 64 -A -83, 64- A -83A, 64 -A -84, 64 -A -85, 64 -A -86 and 64 -A -87
PROPERTY ZONING USE:
Zoned: R4 (Residential Planned Community) District Use: Undeveloped
RA (Rural Areas) Use: Residential/Undeveloped
ADJOINING PROPERTY ZONING PRESENT USE:
North: RP (Residential Performance) Use: Single Family Residential
South: RA (Rural Areas) Use: Regional Airport
East: Ml (Light Industrial) Use: Industrial and Residential
MH1 (Mobile Home Community)
West: RA (Rural Areas) Use: Regional Airport and Office
B2 (Business General)
PROPOSED USES: 278 acres of mixed use (161.1 acres of commercial and 550 residential units)
Rezoning #10-08 Governors Hill
Master Development Plan #08 -08
January 20, 2009
Page 2
REVIEW EVALUATIONS:
Virginia Department of Transportation: The documentation within the application to rezone this
property appears to have significant measurable impact on Routes 50, 1538 and 781. These routes
are the VDOT roadways which have been considered as the access to the property. VDOT is not
satisfied that the transportation proffers offered in the Governors Hill Development rezoning
application dated September 2, 2008 address transportation concerns associated with this request.
We have reviewed the proffers, preliminary drawings, as well as the associated traffic impact
analysis (TIA) report. There have been two primary questions asked of the Department with
respect to this application. First, would a single point of access for the development function, and
second, to offer our opinion regarding the proposed removal of the development's connection to
Route 655 at Route 50. From our review of the TIA, it is our opinion that a single point of access to
the proposed development offers certain failing or under- performing conditions that are not
desirable. Furthermore, as also evidenced in the applicant's TIA, the existing proffered connection
from the development to Route 655 at Route 50 offers good regional connectivity. Revising the
development's road connection proffers as requested by the applicant, would remove a logical and
effective future road connection that has been a part of the County's planning activities for many
years. We offer the following detailed review comments:
Regional Planning
The planned proffer modification that will remove a previously- agreed -to connection to Sulphur
Spring Road (Route 655) is inconsistent with the County's Eastern Road Plan, updated as recently
as August 2007. As depicted, both the connection to Route 655 and Inverlee Way thru the
development are planned Major Collectors. The approval of this rezoning request as presented
would arguably eliminate the County's ability to see the connection to Route 655 move forward in
the foreseeable future. Additionally, it is important to note that a Six Year Improvement Plan
project northwest of Route 50 along Route 655 is currently designed to provide typical section (land
arrangement) that would be inconsistent with the amended proffer /rezoning currently being
considered with this application. It may be warranted for the County to re- evaluate the scope of the
project should the connection be removed. As part of the TIA that was prepared for this request,
three scenarios have been presented (at different stages of development). The first with one
connection which is made at Inverlee via Coverstone Drive. The second a single connection made
opposite Route 655; and the third, a combination of connections at Route 655 and Inverlee Way via
Coverstone Drive. From a regional planning perspective, VDOT's opinion is that Scenario 3 is the
preferred option for the following reasons:
Consistency with the 2007 adopted Comprehensive Plan.
Connection opposite Route 655 offers enhanced access from the eastem part of the
County to the planned future realignment of Route 522 and destination development west
of the I -81 area. Connection (as approximated in the TIA) would divert a minimum of
30 of the planned development traffic (and background traffic) away from Route 50 as
it approaches a land use setting that is increasingly more residential in nature. Allowing a
single point of access for a large scale retail planned development opposite Inverlee could
arguably be disruptive to neighboring residential uses.
Connection opposite Inverlee offers direct access to planned development north of Route
50.
As can be construed in the TIA, a connection opposite Route 655 could very well satisfy
an existing significant latent demand for the connection.
Rezoning #1 0-08 Governors Hill
Master Development Plan #08 -08
January 20, 2009
Page 3
Proffers
•I• From an access management perspective, the Route 50 Corridor is identified as a
Principal Arterial which requires certain access goals be recognized during the
development process. The distance between Inverlee and Route 655 is nearly 1/2 mile,
which is reasonably consistent with the recently adopted VDOT Access Management
Regulations.
It is important to understand that the connection to Inverlee Way via Coverstone Drive
was never an "either /or" option as evidenced in the 10/12/2005 rezoning and related
approved proffers which state:
Picture (Metafile)
The future connection to Inverlee Way has been contemplated for some time so as to supplement
access to the proposed development at Route 655 and Route 50. What is now being considered is
the elimination of the Route 655 connection, at the same time that the applicant is requesting the
addition of hundreds of thousands of additional square feet of retail space. While the subject TIA
has demonstrated that significant Large scale improvements to Inverlee Way at Coverstone Drive
can result in an overall LOS of C, it is critical that the County understand that 6 out of 11 of the
movements at this intersections fail /under perform at build -out (LOS D, E and F).
We disagree with Section 15.6 of the current proffer as it relates to the monetary
contribution for the signalization of Costello and Prince Frederick Drive. At current
VDOT costs, the offered amount of $150,000 would cover only 75% of the cost of a
signal.
We disagree with the terms of Section 15.2: Phase 4 of the proposed proffers which
establishes a deadline of June 30, 2018 for the County or VDOT to secure right -of -way
for the extension of Coverstone Drive Extended. This terminology was not included in
prior agreements, and we feel that a deadline should not be established now.
Revised Section 3.1 to read as follows: The applicant shall design and construct a two
lane public roadway from Arbor Court to Tazewell /Coverstone Drive.
Similar to VDOT comments at the time of the 10/2005 application, we are concerned
about proffer Language included in Section 15.12 Which states "The applicant shall make
good faith efforts to obtain any off -site ROW needed to complete any proffered off -site
transportation improvements. In the event that the Applicant is not able to obtain the
ROW and, further, the County and/or State of Virginia do not obtain the necessary ROW,
the Applicant shall not be responsible for constructing those improvements where
sufficient ROW is not available We would suggest that those specific off -site
improvements where ROW may be problematic for the Applicant be identified and
reviewed prior to the approval of the current rezoning application.
We disagree with Section 15.13 of the proposed proffer which states that the TIA that has
been provided for this application be valid for a period of 6 years from the date of final
rezoning. Given that no specific tenants have been identified that will utilize a new
public road Coverstone) from Prince Frederick to Route 50, the evolving nature of the
neighboring parcels, and historic regional growth patterns, we do not support this
proffered condition.
Rezoning #10 -08 Governors Hill
Master Development Plan #08 -08
January 20, 2009
Page 4
Fire Marshall: Plan approval recommended.
TIA Technical Observations
Please use separate figures for site generated and pass -by trips in the future.
For 2025 Build -out scenarios 1, 2, and 3 with Imp the intersections have an acceptable
intersection overall LOS, but many movements operate at LOS F. As an example, please
refer to the following sub bullets:
The approach to Route 50 from Inverlee Way currently enjoys a LOS of B, and is projected
to maintain a LOS C during the 2025 background conditions. That said, the proposed
development would create a new signalized intersection at Inverlee and Route 50 resulting
in a LOS D for this approach.
At the Prince Frederick Drive and Route 50 intersection during year 2025, Saturday peak
hour background (no- build), the LOS at the intersection is B, with all individual movements
operating at acceptable /good LOS (A,B,C). Also, the roadway between Route 50 and
Costello Drive yields 250+ vehicles in the peak hour. By contrast, at build -out, a peak hour
volume of 1,850+ along the roadway from Route 50 to Costello Drive. This with no
planned improvements to Prince Frederick Drive other than turn lanes at intersections.
We disagree with the spacing of the proposed driveway entrances and signalized
intersections along Coverstone Drive. The arterial LOS from Tazewell Drive to Route 50 is
LOS D for NB, and LOS E for SB during the 2025 build -out, Saturday conditions as an
example. When considering the volumes and traffic operations depicted in the TIA, we feel
that the following additional improvements are necessary at the intersection of Coverstone
and Tazewell:
EB Dual lefts
SB Dual lefts
Before development, this office will require a complete set of construction plans detailing entrance
designs, drainage features and traffic flow data from the I.T.E. Trip Generation Manual, Seventh
Edition for review. VDOT reserves the right to comment on all right -of -way needs, including right
of -way dedications, traffic signalization and off -site roadway improvements and drainage. Any
work performed on the State's right -of -way must be covered under a land use permit. This permit
is issued by this office and requires an inspection fee and surety bond coverage.
Public Works: Refer to our previous review comments, 1 and 3, dated to June 27, 2005, related to
the Carpers Valley Rezoning. These comments need to be incorporated in the proposed MDP.
Indicate the contour intervals shown on the applicable topographic sheets. Existing ponds are
shown on sheet 4 of 6 in conjunction with proposed stormwater management ponds. Indicate if the
existing ponds will be used in the development of a stormwater management plan for the
commercial area. If so, the site design should reflect what measures will be taken to ensure the
integrity and long -term stability of the dams associated with these ponds. Off -site easements may
be required to accommodate point source discharges. The area in the vicinity of the existing rubble
fill is shown as steep slopes rather than uncompacted fill. This discrepancy needs to be resolved in
conjunction with addressing the previous rezoning comment related to this fill. Indicate if
consideration has been given to construction one or two large stormwater detention facilities in the
Rezoning #10-08 Governors Hill
Master Development Plan #08 -08
January 20, 2009
Page 5
residential development areas rather than the ten small facilities shown on sheet 4 of 6. This
approach would greatly reduce the maintenance responsibilities assigned to the Homeowners'
Associations.
Inspections Department: No comments at this time. Comments shall be made at site plan
submittal.
Sanitation Authority: There should be sufficient sewer and water capacity to serve this project.
Service Authority: No comments.
Health Department: Health Department has no objection if public water and sewer is to be
utilized. Permits for restaurants and motels/hotels are required if applicable.
Parks Recreation: The proposed monetary proffer for Parks and Recreation does not appear to
be adequate to compensate for the impact the residents of this development will have on the capital
needs of the Parks and Recreation Department. Plan appears to offer the equivalent to the required
number of recreational units; however, detailed information regarding the proposed recreational
units will be needed for review during the subdivision review phase of this project. The
pedestrian/bicycle trail appears to meet County standards and should be constructed to the 2007
MPO Bicycle /Pedestrian Plan specifications. The proposed Dog Park would not be considered a
recreational unit. The net useable open space to be provided in the commercial areas should be
included in the project summary. It appears this project is required to provide 30% open space
throughout the entire development. The proffered neighborhood swimming pools should have
adequate decking, dressing rooms and support amenities. Completion of the 3,000 square foot
Community Center and the 3,500 square foot swimming pools by the issuance of the 281 building
permit should be reviewed and approved by the Planning Department as deemed appropriate.
Historic Resources Advisory Board: It appears that the proposal does not significantly impact
historic resources and it is not necessary to schedule a formal review of the rezoning application by
the HRAB. According to the Rural Landmarks Survey, there are no significant historic structures
located on the property nor are there any possible historic districts in the vicinity. It was also noted
that the National Park Service Study of Civil War Sites in the Shenandoah Valley does not identify
a core battlefield within this area.
Winchester Regional Airport: After review by legal counsel, we feel that the proffer referring to
an avigation easement be reworded in order to clearly define the Airport Authority's request for an
avigation easement and the applicant's concurrence to that request. On behalf of the Winchester
Regional Airport Authority, I respectfully request the following change in the Proffer Statement
under Section 14.Environment, Subsection 14.3: The Applicant shall convey to the Winchester
Regional Airport Authority an avigation easement to provide further protection for Airport
operations in the form as attached to this document. The Applicant shall provide noise attenuation
treatment for all residential units. I have enclosed a copy of the Deed of Easement for your use.
This is the same easement form recorded in the County of Frederick between the applicant and the
Airport Authority on prior land transactions. Provided the above language is used to replace
Subsection 14.3, the Airport Authority has no further comments or objections to the proposed
Rezoning 10 -08 Governors Hill
Master Development Plan #08 -08
December 19, 2008
Page 6
rezoning.
Frederick County Public Schools: The cumulative impact of this project and other projects in
varying stages of development in eastern Frederick County will necessitate future construction of
new schools and support facilities to accommodate increased student enrollment. We estimate that
the 422 single- family attached units and 128 multifamily units in the development will house 46
high school students, 45 middle school students and 94 elementary school students. In order to
properly serve these 185 students, Frederick County Public Schools will outlay $6,409,000 in
capital expenditures and $1,890,000 annually in operating costs. We note the case proffers for
public schools of $1,714 per dwelling unit, which totals $942,700. This would defray only 15% of
the $6,409,000 in capital costs mentioned above. We will be sending four school buses (two
elementary, one middle school and one high school) into a subdivision that has only one access
point to the road network. With roughly 75% of the 550 proposed households on Tazewell Road,
there are a lot of vehicles concentrated on that one road that can slow travel along it, or even close
the road in the event of an accident. We therefore recommend the addition of a signalized access
point onto Route 50 to facilitate the movement of traffic, including our buses, to and from the
broader road network. Frederick County Public Schools is concerned about all land development
applications. Both capital expenditures and annual operating costs are significantly increased by
each approved residential development, as is illustrated above.
Frederick County Attorney: Please see attached letter dated December 30, 2008 from Roderick
B. Williams, County Attorney.
Planning Department: Please see attached letters dated April 28, 2008 and October29, 2008
from Candice E. Perkins, Senior Planner and letters dated April 28, 2008 and October29, 2008
from John A. Bishop, AICP, Deputy Director Transportation.
Planning Zoning:
1) Site History
The original Frederick County zoning map (U.S.G.S. Winchester Quadrangle) identifies the
subject parcels as being zoned R -1 (Residential Limited). The parcels were re- mapped from
R -1 to A -2 (Agricultural General) pursuant to the County's comprehensive downzoning
initiative (Zoning Amendment Petition #011 -80), which was adopted on October 8, 1980.
The County's agricultural zoning districts were subsequently combined to form the RA
(Rural Areas) District upon adoption of an amendment to the Frederick County Zoning
Ordinance on May 10, 1989. The corresponding revision of the zoning map resulted in the
re- mapping of the subject properties and all other A -1 and A -2 zoned land to the RA
District. On October 12, 2005 the Board of Supervisors approved Rezoning #11 -05 which
rezoned parcels 64 -A -82, 64 -A -83, 64- A -83A, 64 -A -86, 64 -A -87, 64 -A -87A to the R4
District with proffers.
2) Comprehensive Policy Plan
The Frederick County Comprehensive Policy Plan is an official public document that serves
as the community's guide for making decisions regarding development, preservation, public
facilities and other key components of community life. The primary goal of this plan is to
Rezoning #10 -08 Governors Hill
Master Development Plan #08 -08
January 20, 2009
Page 7
protect and improve the living environment within Frederick County. It is in essence a
composition of policies used to plan for the future physical development of Frederick
County. [Comprehensive Policy Plan, p. 1 -1]
Land Use
The six properties included with this rezoning request are all located within the boundaries
of the Route 50 East Corridor Land Use Plan. A portion of the site is located within the
Urban Development Area (UDA), specifically the residential portion of the development
(Land Bay 1) is within the UDA. The Route 50 East Corridor Land Use Plan envisions the
area comprised by the subject parcels as developing with business /office land use. The
existing and proposed R4 zoning is generally consistent with this plan as it relates to this
area. (Comprehensive Policy Plan, p. 6 -87, 6 -88, 6 -89)
The subject parcels are also located within the boundaries of the Airport Support Area that
surrounds the Winchester Regional Airport. Business and industrial uses should be the
primary uses in the airport support area. (Comprehensive Policy Plan, p. 6 -169)
Transportation
The Eastern Road Plan was adopted by the Board of Supervisors on November 8, 2006 and
is a component of the Comprehensive Policy Plan. The planned road network included in
Eastern Road Plan identifies a collector road network through this area. This network
includes the extension of a major collector road (Coverstone Drive) from Prince Frederick
Drive (extended to the relocated Route 522 when constructed) through the property and
connecting to Route 50 at two separate intersections. The Eastern Road Plan calls for
connections with both Inverlee Way and Sulphur Springs Road.
Staff Note: On the version of the Eastern Road Plan prior to this rezoning there were no
roads planned on this property due to the Golf Course use at that time. This
development's proposals led to an update of the Eastern Road Plan in this area as the
Board of Supervisors strived to work with the applicant.
3) Master Development Plan #08 -08)
A master development plan is required prior to development of this property. Before a
master development plan can be approved, it must be reviewed by the Planning
Commission, Board of Supervisors and all relevant review agencies. Approval may only be
granted if the master development plan conforms to all requirements of the Frederick
County Zoning and Subdivision Ordinances. The purpose of the master development plan is
to promote orderly and planned development of property within Frederick County that suits
the characteristics of the land, is harmonious with adjoining property and is in the best
interest of the general public. The R4 District requires that Master Development Plans be
proffered as part of the rezoning application.
A revised MDP has been proffered with the new rezoning application. It is noted that the
revised layout for the residential area now creates an area of units that are completely
separated from the remaining units. These units as depicted would access Coverstone Drive
through the commercial area. The residential layout should be re- evaluated to ensure that it
Rezoning #l0 -08 Governors Hill
Master Development Plan #08 -08
January 20, 2009
Page 8
is internally connected.
4) Site Suitability /Environment
Staff Note: If the rezoning for Governors Hill is approved, this Master Development Plan
is consistent with the proffers and would be in a form that is administratively approvable.
Flood Plains: Flood plain data for the subject parcels is delineated on the Flood Insurance
Study Map for Frederick County prepared by the U.S. Department of Housing and Urban
Development, Community Panel #510063-0115B, effective date July 17, 1978. The
majority of the site is Located in Flood Zone C, which denotes areas of minimal flooding
outside of the 100 -year flood plain. As reported by the applicants, 100 -year flood plain,
Flood Zone A, exists coincident with Sulfur Spring Run, which traverses the frontage of the
site, roughly parallel to Route 50. The applicant indicated that disturbance will be limited to
entrance and utility improvements. Any disturbance within the designated flood plain area
will be subject to the requirements of the Floodplain District (FP) provisions of the Zoning
Ordinance.
Soils and Steep Slopes: The General Soil Map of the Soil Survey of Frederick County,
Virginia indicates that the soils comprising the subject parcels fall under the Weikert- Berks-
Blairton soil association, which is the predominant association on land located east of
Interstate 81. As reported by the applicant, map sheet #36 of the Soil Survey reveals that the
site is comprised of nine distinct soil types. With the exception of a pit area containing fill
materials, all of the soil types identified on the site are suitable for development. It is noted
that the Weikert- Berks Blairton soil association presents some limitations to site
development due to a seasonal high water table, depth to bedrock, and slope. The
management of such characteristics must be demonstrated through the site engineering
process associated with subsequent development applications for the proposed project.
Wetlands: The site includes some areas of wetlands which are mainly confined to the man-
made ponds located on the commercial land bay which were created as part of the golf
course, as well as areas within the ravines located within the residential land bay. Pursuant
to the environmental standards of the Zoning Ordinance, disturbance of wetland areas is not
permitted. Exceptions to this prohibition may be granted by the zoning administrator to
allow disturbance of small portions of wetland areas to facilitate conservation, recreation,
and/or the placement of utilities and roads.
5) Proffer Statement Dated March 24, 2008; Revised September 2, 2008, October 31,
2008, December 8, 2008 and January 9, 2009:
1. Land Use (1.1 -1.6)
The project shall be designed to establish interconnected mixed -use
residential and commercial /employment Land Bays in general conformance
with the Master Development Plan, subject to minor modifications necessary
upon final engineering including but not limited to intersection alignments.
Rezoning #10 -08 Governors Hill
Master Development Plan #08 -08
January 20, 2009
Page 9
Development shall be in conformance with the "Design and Development
Standards (See Modifications below)
o Residential Uses shall be prohibited in Land Bay 2. Land Bay 2 shall be
restricted to uses permitted in the B2 (Business General) Zoning District.
Residential development on the property shall not exceed 550 dwellings.
Prior to the Property exceeding 1,285,000 square feet of commercial building
floor area, the Applicant shall submit to the County a revised TIA for the
Property. The total permitted commercial building floor area may increase
provided that the applicant completes a revised traffic impact analysis which
identifies the impacts of trips for commercial development in excess of
45,815 Average Daily Trips and mitigation for said impacts is provided by
the applicant in a form that is acceptable to the County and VDOT.
Modifications Request included within the Design and Development Standards
proffered with proffer 1.2 (see booklet included in the agenda package).
Per Section 165 -72.0, of the County Code, an applicant may request modifications to
provisions of the Code. Such modifications may be sought to enable implementation of a
design and/or land use concept beneficial to the community that would not otherwise be
permitted by the existing ordinance. The applicant has requested two modifications to
certain provisions of the Frederick County Code. With the original rezoning, the applicant
requested three modifications, the two currently being requested as well as a modification to
separate the rezoning from the MDP. The Board of Supervisors approved the three
modifications with the original rezoning. With the revised rezoning application, the
applicant has proffered an MDP but is required to seek approval of the other two
modifications. Those modifications are outlined as follows:
Modification #1 165 -71. Mixture of Housing Types Required
The R4 District requirements stipulate that no more than 40% of the residential land area in
a planned residential community shall consist of duplexes, multiplexes, atrium houses,
weak -link townhouses, townhouses, or garden apartments or any combination of said
housing types. The Zoning Ordinance promotes a residential mix dominated by single
family detached housing types.
The applicant is requesting that this standard be modified to allow housing types identified
by the zoning ordinance and the proffer statement (Design and Development Standards).
The residentially designated areas of the project would be able to develop without limitation
to the percentage or ratio of any given housing type. The development of single family
attached (Townhouses) and multi family dwellings would be the predominant housing type
in Carpers Valley.
Modification #2 165 -72.D. Commercial and Industrial Areas
Rezoning #10-08 Governors Hill
Master Development Plan #08 -08
January 20, 2009
Page 10
The R4 District requirements stipulate that a minimum of 10% of the gross area of a planned
residential community shall be used for business and industrial land uses, and that such uses
shall not exceed 50% of the gross and area. Moreover, the Zoning Ordinance requires that
each phase of a planned community development shall include a reasonable amount of non-
residential land uses. These requirements provide the necessary regulations to facilitate a
development with residential and employment which coexist, enabling not only a walkable
community, but also offer opportunities to place residential uses and commercial uses within
the same structure.
The applicant is requesting that these standards be modified to allow a maximum of 60% of
the total gross area to be used for business and commercial purposes. This area has been
identified as Land Bay 2 on the GDP.
2. Construction ofa Unified Development
The Property shall be developed as one single and unified development.
3. Access to Armory Parcel
The applicant shall design and construct a two lane public roadway,
identified on the MDP as Pendleton Drive, from Arbor Court to the entrance
of the Armory Site to coincide with the completion of the Armory. At such
time that Tazwell Road is constructed adjacent to Pendleton Drive as
depicted on the MDP, the Applicant shall extend Pendleton Drive to connect
with Tazwell.
4. Phasing of Residential Development
Provides for limitation on the issuance of residential building permits.
Year 1 140 permits
Year 2 140 permits
Year 3 140 permits
Year 4 130 permits
Improvements including a 3,000 square foot community center, 3,500 square
feet of neighborhood swimming pools, and a dog park shall be constructed in
conjunction with residential development in Land Bay 1 and shall be
dedicated upon completion of the improvements to the homeowners
association. The improvements shall be completed prior to the issuance of
the 281" residential building permit.
Staff Note: This rezoning application does not tie the residential permits to the
commercial development; therefore, there is the potential for the residential portion of the
development to be built without the commercial, thereby creating impact to the County.
Rezoning #1 0-08 Governors Hill
Master Development Plan #08 -08
January 20, 2009
Page 11
5. Architecture, Signage and Landscaping
All buildings on the property shall be constructed using compatible
architectural styles. The applicant shall establish an Architectural Review
Board through the HOA to enforce and administer the Design and
Development Standards.
All signage within the Property shall be in substantial conformity with a
comprehensive sign plan that meets the requirements of the Zoning
Ordinance, which shall be submitted in conjunction with the first final site or
subdivision plan for the Property.
6. Pedestrian Trail System and Recreation Areas
The applicant shall design and build a public pedestrian bicycle trail system
to VDOT standards that links the residential and commercial areas within the
development. Said trails shall be in the locations generally depicted on the
MDP.
Monetary Proffers (7 -11)
7. Fire and Rescue
$422 per dwelling unit
Following the final rezoning, the Master HOA shall contribute annually $100
per constructed residential unit, and $100 per 1,000 square feet of constructed
commercial use to the fire and rescue company providing the first response to
the Property. Said monetary contribution shall cease at such time that the fire
and rescue company is no longer a volunteer operation or should the County
adopt a fee for service plan.
Staff Note: The original proffer contained a clause that stated: Commencing January 1,
2010 the contribution shall increase at the rate calve dollars per residential unit or per
1,000 square feet of commercial development each calendar year.
8. Schools
$1,714 per dwelling unit
9. Parks and Open Space
$343 per dwelling unit
10. Libraries
$79 per dwelling unit
11. Administration Building
$79 per dwelling unit
Staff Note: The monetary proffers provided in this revised rezoning application are
consistent with the proffers approved with Rezoning #11 -05. It should be noted that since
Rezoning #10-08 Governors Hill
Master Development Plan #08 -08
January 20, 2009
Page 12
the residential portion of this development is not tied to the commercial development,
there is the potential for the 550 residential units to be constructed without any
commercial development. Therefore the entire impact for each residential unit should
generally be addressed and mitigated If the non- residential phase of the project does not
materialize and the project is built solely as a 550 residential unit development, the per
unit capital facilities fiscal impact is projected to be $16,965 for townhouses and $8,975
per multi family unit
12. Creation of Property Owners Association (12.1 -12.7)
Provides for the creation and responsibilities of the Master Property Owners
Association and the residential and commercial associations.
13. Water and Sewer
Provides for the connection of the development to public water /sewer.
14. Environment (14.1 -14.3)
Stormwater management and BMP's shall be provided.
The applicant shall provide notice in all sales literature, covenants, conditions
and restrictions for any POA of the adjacency of the Winchester Regional
Airport.
The applicant shall consult with the Executive Director of the Airport with
respect to the granting of a reasonable avigation easement to provide further
protection for Airport operations, and shall dedicate such easement, as the
Airport and the applicant shall mutually agree. Said avigation easement shall
be dedicated prior to the issuance of the 1st building permit for the Property.
The applicant shall provide noise attenuation treatment for all residential
units.
15. Transportation (15.1- 15.13)
15.1 Major roadways to be constructed as shown on the MPD.
15.2 Excluding 200,000sf of office uses which may be developed at any time utilizing
access to the existing completed portion of Coverstone Drive, the applicant shall
design and construct Coverstone Drive as a full section with raised medians on a
minimum 90 foot ROW, utilizing the following phasing schedule:
Phase 1 Full four lane section with trail from Millwood Pike to the first
intersection on Coverstone Drive (Points A -B on the MDP). Phase I shall also
consist of all necessary improvements, including signalization when warranted by
VDOT to create a four way intersection at Route 50 and Inverlee Way.
Phase 2 Construction of a two lane section of Coverstone Drive from Point B to
Point C as depicted on the MDP to be completed prior to the issuance of a
certificate of occupancy for any use that would cause the property to exceed
400,000sf of commercial building area.
Phase-3= Construction ofthe- remaining two lane section of Coverstone Drive from
Point B to Point C as depicted on the MDP to be completed prior to the issuance of
a certificate of occupancy for any use that would cause the property to exceed
Rezoning #10-08 Governors Hill
Master Development Plan #08 -08
January 20, 2009
Page 13
800,000sf of commercial building area.
Phase 4 Design Coverstone Drive Extended as a four lane section from Prince
Frederick To Relocated Route 522 as depicted from Point D to Point E on the MDP
for a maximum distance of 800 feet when the alignment of Relocated 522 has been
determined by VDOT and the ROW for this segment of Coverstone has been
acquired by VDOT or Frederick County.
o In the event that this ROW is not secured by June 30, 2018 the applicant shall
pay to the County $20,000 for transportation improvements within the
vicinity of the Property in lieu of designing said portion of Coverstone Drive.
o $1,000 per residential unit shall be paid towards the future construction of
Coverstone Extended after June 30, 2018, funds to be utilized toward
projects in the vicinity of the property if ROW not secured for the extension.
15.3 The applicant shall construct Coverstone Drive as a full four -lane section from
Millwood Pike to Prince Frederick Drive prior to November 1, 2015.
Staff Note: The original proffers stated that Coverstone Drive would be completed from
Millwood Pike to Prince Frederick Drive by June 1, 2012. The revised proffers have
pushed this deadline back to 2015.
15.4 Tazwell Road shall be designed and constructed as a minimum two lane roadway as
shown on the MDP to provide access to residential uses in Land Bay 1 and
commercial uses in Land Bay 2.
15.5 The applicant shall pay to the County the amount of $75,000 for signalization or
other road improvements at the intersection of Millwood Pike and Victory Road
15.6 The applicant shall pay to the County the amount of 5175,000 for signalization of the
intersection of Costello Drive and Prince Frederick Drive.
15.7 Access to Millwood Pike shall be limited to Coverstone Drive as shown on the MDP
with the exception of the private driveway currently serving parcel 64- A -83B, which
shall be- closed.once the internal residential street network has been constructed and
provides access to the parcel. Additionally, the existing crossover previously used
for the golf course shall be closed.
15.8 All public ROW'S shall be dedicated to Frederick County.
15.9 All public streets /roads shall be designed in accordance with VDOT standards.
15.10 All private streets /roads shall be constructed to VDOT standards and owned by the
HOA.
15.11 The design of off -site road improvements shall be in general conformance with the
plan entitled "Governors Hill Road Improvements" dated October 30, 2008.
Excluding 200,000sf of office uses which may be developed at any time utilizing
Rezoning #10-08 Governors Hill
Master Development Plan #08 -08
January 20, 2009
Page 14
17. Escalator Clause
access to the existing completed Coverstone Drive, off -site improvements shall be
constructed in three phases
Phase A: Improvements at the intersection of Millwood Pike /Inverlee
Way /Coverstone Drive and shall be completed coincident with Phase 1
Coverstone Drive construction per proffer 15.2.
Phase B: Improvements at the intersection of Millwood Pike /Prince
Frederick Drive and Prince Frederick Drive /Costello Drive. Phase B
improvements shall be completed coincident with Phase 2 Coverstone Drive
construction per proffer 15.2.
Phase C: Improvements at the intersection of Millwood Pike /Sulphur
Springs Road. Phase C improvements shall be completed coincident with
Phase 3 Coverstone Drive construction per proffer 15.2.
15.12 The applicant shall make good faith efforts to obtain any off -site right of way needed
to complete any proffered off -site transportation improvements. In the event that the
applicant is not able to obtain the right of way and, further, the County and /or VDOT
is not able to obtain the necessary right of way, in lieu of constructing the road
improvement, the applicant shall provide a monetary contribution to Frederick
County equivalent to the estimated construction cost of those road improvements
that could not be implemented. The construction cost estimate shall be subject to
review and approval by VDOT.
15.13 Any future transportation analysis which may be required for the Property shall
utilize Code 820 "Retail" per the ITE Trip Generation Manuel for any commercial
use other than office use.
15.14 In the event any proffered off -site road improvements are constructed by others, the
Applicant shall provide a monetary contrition to Frederick County that is equivalent
to the estimated construction costs of those proffered road improvements not
installed by the Applicant. The construction cost estimate shall be subject to review
and approval by VDOT. The monetary contribution shall coincide with the
commercial area threshold that triggers the off -site road improvements as indentified
in Proffer15.11.
16. Cultural Resources Investigation and Preservation
The applicant shall conduct or cause to be conducted a Phase I
Archaeological Investigation of the Property, prior to the approval of the first
final site or subdivision plan for the Property, and shall complete Phase II
and III investigations thereof as may be demonstrated to be necessary by the
Phase I study.
Rezoning #10-08 Governors Hill
Master Development Plan #08 -08
January 20, 2009
Page 15
In the event any monetary contributions set forth in the Proffer Statement are
paid to Frederick County within 30 months of October 12, 2005, said
contributions shall be in the amounts as stated in the proffer statement. Any
monetary contributions paid after 30 months following October 12, 2005
shall be adjusted in accordance with the Urban Consumer Price Index, such
that at the time contributions are paid, they shall be adjusted by the
percentage change in the CPI -U from that date 30 months after October 12,
2005 to the most recently available CPI -U to the date contributions are paid,
subject to a cap of 5% per year, non compounded.
Staff Note: As thirty months have already passed since this rezoning was approved
(October 12, 2005), and this new proffer statement if approved would take the place of the
October 12, 2005 proffer, it would be appropriate to update the fiscal impact contributions
reflective of the Development Impact Model, and continue to apply the escalator clause in
the future.
PLANNING COMMISSION SUMMARY AND ACTION OF THE 01/07/09 MEETING:
Staff reviewed the applicant's two R4 District modification requests. Staff also discussed how the
project proposal implements the Board of Supervisors' requested change involving the Eastern
Road Plan and the extension of Coverstone Drive to Inverlee Way and how the project allows for
scaling back VDOT funded improvements and possibly allows the reallocation of revenue sharing
funds to other county projects. Staff also reviewed several areas of concern regarding
transportation which included: 1) the scaling back of commitment on the design of relocated Route
522 by placing a time deadline that did not exist in the original proffers without a value
compensation; 2) the lack of access management on the proffered section of Coverstone Drive; the
graphics depict entrance spacing of approximately 800 feet which is insufficient for the long -range
purpose of this roadway; 3) the expansion of developable square footage should be tied to roadway
function and not just trip counts; 4) the lack of full funding for improvements at the intersection of
Costello and Prince Frederick; 5) the absence of a trigger for participation in the Victory
intersection; the proffer could be improved by adding flexibility; and 6) coordination at Sulphur
Springs Road.
One citizen spoke during the public comment portion of the hearing. Ms. Serena (Renny) R.
Manuel, the Executive Director of Winchester Regional Airport stated that as part of the 2005
zoning approval by the Board of Supervisors, the applicant had proffered to include mutually
agreed upon language to establish an avigation easement over the entire property in order to protect
current and future operations and growth of the Winchester Regional Airport. Ms. Manuel said the
two parties have still not arrived at a mutual agreement on the language for the avigation easement
and she requested the Commission include the Airport's comment letter into the application as a
condition for approval.
The applicant provided responses on each of the issues raised by the staff. In response to staff's
comments about the expansion of developable square footage being tied to roadway function and
not simply trip counts, the applicant suggested the issue be handled with a 527 application
adjustment where a TIA is done and provided as information to the County and VDOT for planning
Rezoning #10 -08 Govemors Hill
Master Development Plan #08 -08
January 20, 2009
Page 16
purposes. Regarding the avigation easement, the applicant believed the current language was too
convoluted for lenders and future homeowners; however, he believed an agreement on revisions to
the language could be reached.
Members of the Planning Commission believed the transportation plan was improved over the
previous version and they were satisfied with the proffer revisions. They supported the
lnverlee /Coverstone connectivity because it provided a much safer alternative to the Sulphur
Springs connection. It appeared to members of the Commission that the concessions made by the
applicant dealt with most of the issues raised by the staff. However, they wanted to make sure the
airport was protected and thought the remaining concerns could be worked out.
Commission members unanimously voted to recommend approval of Rezoning Application #10 -08
together with Master Development Plan #08 -08 for mixed use commercial /residential with revised
proffers and two waivers, Section 165 -71, Mixture of Housing Types, and Section 165 -72.D,
Commercial and Industrial Areas. and also including: the applicant's proffer that an amount equal
to the cost of designing the 800 feet of Coverstone Road will be turned over to the County if not
used by 2018; the acceptance of the applicant's proffer to concede changes to Proffer 15 -12; the
acceptance of the applicant's proffer to do a 527 application adjustment, and the completion of the
avigation easement prior to the first building permit.
STAFF CONCLUSIONS FOR 01/28/09 BOARD OF SUPERVISORS MEETING:
This application is a request to rezone approximately 39.7 acres from the RA (Rural Areas) District
to the R4 (Residential Planned Community) District, with proffers, and 238.3 acres from the R4
District to the R4 District, to revise the proffers associated with Rezoning #11 -05 to facilitate
development of a mixed use development consisting of 550 dwelling units and approximately
161 acres of commercial uses.
The Eastern Road Plan of the Comprehensive Policy Plan addresses the planned road network for
this site and calls for connections with Inverlee Way and Sulphur Springs Road The previous
rezoning recognized both of these connections. However, it is important to note that this version of
the Eastern Road Plan exists due to Board cooperation with this applicant upon the previous
rezoning. At the request of the Board of Supervisors, this application modifies the previously
approved road system to one requested by the Board. This action has a number of positive impacts
as follows;
1. Addresses the concerns about the road system previously raised by the
Board.
2. Creates a situation that will allow for the scaling back of certain
improvements to Sulphur Springs road, which will potentially free up funds
for use in other areas.
3. Frees up revenue sharing funds at the intersection of Route 50 and Inverlee
Drive for potential use elsewhere.
A number of smaller transportation issues were raised at the Planning Commission meeting on this
item, but the current proffer package appears to address all of those issues leaving no outstanding
Rezoning 10 -08 Governors Hill
Master Development Plan #08 -08
January 20, 2009
Page 17
transportation concerns.
Following the required public hearing, a number of decisions regarding this rezoning
application by the Board of Supervisors would be appropriate. Decisions needed by the Board of
Supervisors for the Governors Hill Rezoning Application:
Modification #1 165 -71. Mixture of Housing Types Required
Modification #2 165 -72.D. Commercial and Industrial Areas
Rezoning #10 -08 with proffered MDP #08 -08
Waiver of §144 -24C to allow commercial lots to be subdivided on private streets.
The applicant should be prepared to adequately address all concerns raised by the Board of
Supervisors.
OYEAM
-61 k 111114 1,11_11Ap *ft 4,11
0
1,250
64 A 9
WINCHESTER EGIONAL
2,500
5,000 Feet
Governors Hill
ReZoning Ft Master Development
REZ 10 08 a MDP 08 08
PIN: 64 A 83, 64 A 83A, 64
64 A 86, 64 A 87
A 4'
4 Future Rt37 Bypass
Q Applicction BI (Business, Neighborhood District)
Buildings 0 B2 (Business, General Distrst)
133 (Business, Industrial Transition District)
4141 6011 SWSA is EM (Extractive Manufacturing District)
HE (Higher Education District)
MI (industrial, Light District)
Urban Development Area
Zoning
Plan
A 84, 64 A 65
tr�taa,� o s, s.
5 f`,
tli
1
Case Planne
M2 (Industrial, General District)
Mill (Mobile Home Community Disti
MS (Medical Support District)
AD R4 (Residential Planned Community 1
R5 (Residential Recreational Commm
t RA (Rural Area District)
RP (Residential Performance District)
Map Document (P Locator_ Mps120081CovernorsHill _REZ1008_MDP0808_110708.nud) 11/1812008 9• -0715
The following information shall be provided by the applicant:
All parcel identification numbers, deed book and page numbers may be obtained from the Office of
the Commissioner of Revenue, Real Estate Division, 107 North Kent Street, Winchester.
1. Applicants:
REZONING APPLICATION FORM
FREDERICK COUNTY, VIRGINIA
Name: Carpers Valley Development, LLC Telephone: (540) 722 -9566
c/o Miller and Smith Land, Inc.
Address: 480 Jubal Early Drive, Suite 330
Location Map
Plat
Deed of property
Verification of taxes paid
Winchester, VA 22611
Name: Governors Hill LLC
c/o Miller and Smith Land, Inc.
Address: 480 Jubal Early Drive, Suite 330
Winchester VA 22611
2. Property Owner (if different than above)
3. Contact person(s) if other than above
Name: Patrick R. Sowers
Patton Harris Rust Associates
Address: 117 E. Piccadilly Street, Suite 200
Winchester, Virginia 22601
4. Checklist: Check the following items that have been included with this application.
Agency Comments
Fees
Impact Analysis Statement
Proffer Statement
Telephone: (540) 722 -9566
Telephone: (540) 667 -2139
(Rt. 655) and The Ravens Subdivision.
7. Adjoining Property: SEE ATTACHED.
5. The Code of Virginia allows us to request full disclosure of ownership in relation to
rezoning applications.
Please list below all owners or parties in interest of the land to be rezoned:
Carpers Valley Development, LLC
Miller and Smith at Coverstone, LLC
6. A) Current Use of the Property: Undeveloped/Vacant
B) Proposed Use of the Property: Mixed Use Employment/Residential
8. Location: The property is located at (give exact location based on nearest road and distance
from nearest intersection, using road names and route numbers).
The properties are located approximately one mile east of Interstate 81 on the
south side of Millwood Pike (Route 50 East), across from Sulphur Springs Road
2
Acres
Current Zoning
Zoning Requested
39.7
RA
R4
238.3
R4
R4
278.0
Total acreage to be rezoned
Information to be Submitted for Capital Facilities Impact Model
In order for the Planning Staff to use its capital facilities impact model, it is necessary for the
applicant to provide information concerning the specifics of the proposed use. Otherwise, the
planning staff will use the maximum possible density of intensity scenario for the proposed Zoning
District as described on page 9 of the application package.
9. Parcel Identification/Location: Parcel Identification Number: 64 -A -83; 64- A -83A; 64 -A -84;
64-A-85; 64-A-86; 64-A-8T
Districts
Square Footage of Proposed Uses
Magisterial: Shawnee High School: Sherando
Fire Service: Millwood Middle School: James Wood
Rescue Service: Millwood Elementary School: Armel
10. Zoning Change: List the acreage included in each new zoning category being requested.
11. The following information should be provided according to the type of rezoning proposed:
Number of Units Proposed
Single Family Home N/A Townhome 128 Multi- Family 422
Non Residential Lots NA Mobile Home NA Hotel Rooms NA
Office 385,000 Service Station NA
Retail 900,000 Manufacturing NA
Restaurant NA Flex Warehouse N/A
Other N/A
12. Signature:
I (we), the undersigned, do hereby respectfully make application and petition the Frederick County
Board of Supervisors to amend the zoning ordinance and to change the zoning map of Frederick
County, Virginia. I (we) authorize Frederick County officials to enter the property for site
inspection purposes.
I (we) understand that the sign issued when this application is submitted must be placed at the front
property line at least seven days prior to the Planning Commission public hearing and the Board of
Supervisors' public hearing and maintained so as to be visible from the road right -of -way until the
hearing.
I (we) hereby certify that this application and its accompanying materials are true and accurate to
the best of my (our) knowledge.
Applicant(s)
Date !e /a 4 /o&
4
Name
Property Identification Number (PIN)
Address
Name:
Property
Winchester Regional Airport
64 -A -79
491 Airport Rd
Winchester, VA 22602
Name:
Property
Winchester Regional Airport
64 -A -88
491 Airport Rd
Winchester, VA 22602
Name:
Property
Glaize Bro, LC
64 -A -80J
P.O. Box 2598
Winchester, VA 22604
Name:
Property
Blue Ridge Industries
64 -A -80Q
P.O. Box 1847
Winchester, VA 22604
Name:
Property
Main of Winchester, LLC
64 -A -80K
1936 Millwood Pike
Winchester, VA 22602
Name:
Property
R G Warehouse, LLC
64 -A -80L
119 Arbor Ct
Winchester, VA 22602
Name:
Property
Winchester Industrial Park, LLC
64 -A -81A
1936 Millwood Pike
Winchester, VA 22602
Name:
Property
Winchester Industrial Park, LLC
64 -A -81
1936 Millwood Pike
Winchester, VA 22602
Name:
Property
Raymond Tanya Long
64 -A -134
718 Chelsea Dr
Winchester, VA 22601
Name:
Property
Raymond Tanya Long
64 -A -133
718 Chelsea Dr
Winchester, VA 22601
Name:
Property
Terry W. Lois J. Ruffner
64 -A -132
112 Sulphur Spring Rd
Winchester, VA 22602
Name:
Property
Perry Engineering Co., Inc.
64 -A -124
1945 Millwood Pike
Winchester, VA 22602
Name:
Property
Perry Engineering Co., Inc.
64- A -123A
1945 Millwood Pike
Winchester, VA 22602
Name:
Property
Perry Engineering Co., Inc.
64 -A -123
1945 Millwood Pike
Winchester, VA 22602
Adjoining Property Owners
Rezoning
Owners of property adjoining the land will be notified of the Planning Commission and the Board
of Supervisors meetings. For the purpose of this application, adjoining property is any property
abutting the requested property on the side or rear or any property directly across a public
right -of -way, a private right -of -way, or a watercourse from the requested property. The
applicant is required to obtain the following information on each adjoining property including the
parcel identification number which may be obtained from the office of the Commissioner of
Revenue. The Commissioner of the Revenue is located on the 2 floor of the Frederick County
Administrative Building, 107 North Kent Street.
5
Name:
Property
Potomac Edison Company
64- A -124A
10435 Downsville Pike
Hagerstown, MD 21740
Name:
Property
Trustees of the James Peyton Darlington Trust
64 -A -122
1543 Millwood Pike
Winchester, VA 22602
Name:
Property
Lloyd Fisher c/o Mary E. Washington
64 -A -116
813 N 18th St
Harrisburg, PA 17103
Name:
Property
Raven Wing Homeowners Association
64G- 2 -1 -52A
P.O. Box 888
Winchester, VA 22604
Name:
Property
David W. Loy
64A- 7 -1 -15
1441 Millwood Pike
Winchester, VA 22602
Name:
Property
Robert A. Frazier
64A- 7 -1 -14
1427 Millwood Pike
Winchester, VA 22602
Name:
Property
Robert A. Frazier
64A- 7 -1 -13
1427 Millwood Pike
Winchester, VA 22602
Name:
Property
George G. Kelsa R. Lambert
64A- 7 -1 -12A
1411 Millwood Pike
Winchester, VA 22602
Name:
Property
George G. Kelsa R. Lambert
64A-7-1-11A
1411 Millwood Pike
Winchester, VA 22602
Name:
Property
George G. Kelsa R. Lambert
64A- 7 -1 -10A
1411 Millwood Pike
Winchester, VA 22602
Name:
Property
Raven Wing Homeowners Association
64G- 2 -1 -63A
P.O. Box 888
Winchester, VA 22604
Name:
Property
Judy Belle Cook c/o Judy B. Rodgers
64A -7 -1 -8
178 Grand View Ln
Clearbrook, VA 22624
Name:
Property
Judy Belle Cook c/o Judy B. Rodgers
64A -7 -1 -7
178 Grand View Ln
Clearbrook, VA 22624
Name:
Property
Judy Belle Cook c/o Judy B. Rodgers
64A -7 -1 -6
178 Grand View Ln
Clearbrook, VA 22624
Name:
Property
Judy Belle Cook c/o Judy B. Rodgers
64A -7 -1 -5
178 Grand View Ln
Clearbrook, VA 22624
Name:
Property
Douglas A. Hartley
64A -7 -1 -4
100 Stanley Dr
Winchester, VA 22602
Name:
Property
Douglas A. Hartley
64A -7 -1 -3
100 Stanley Dr
Winchester, VA 22602
Name:
Property
John H. Kaknis Christopher Brooks c/o John G. Kaknis
64A 7 1 2
730 N Hayfield Rd
Winchester, VA 22603
Name:
Property
John H. Kaknis Christopher Brooks c/o John G. Kaknis
64A -7 -1 -1
730 N Hayfield Rd
Winchester, VA 22603
Name:
Property
Helen J. Sempeles Trustee
64A -A -12
107 Roszel Rd
Winchester, VA 22601
Name:
Property
Winchester Outdoor
64A -A -13
355 S Potomac St
Hagerstown, MD 21740
6
Name:
Property
Marlow Investments, LC
64 -A -89A
707 N Commerce Ave
Front Royal, VA 22630
Name:
Property
Fredericktowne Group, LC c/o Richard Dick
64 -10 -2
1400 Millwood Pike
Winchester, VA 22602
Name:
Property
Karen B. Barrett -Perry, et als
64 -10 -3
P.O. Box 807
Stephens City, VA 22655
Name:
Property
Prince Frederick Group, LC c/o James L. Mcilvaine, Jr.
64 -A -89B
6231 Leesburg Pike, Ste 600
Falls Church, VA 22044
7
Know All Men By Those Present: That I (We)
(Name) Careers Valley Development, LLC
Tax Map Parcel 64 -A -84, 64 -A -85, 64 -A -86, 64 -A -87 Subdivision:
do hereby make, constitute and appoint:
Special Limited Power of Attorney
County of Frederick, Virginia
Frederick Planning Web Site: www.co.frederick.va.us
Department of Planning Development, County of Frederick, Virginia,
107 North Kent Street, Winchester, Virginia 22601
Phone 540 -665 -5651 Facsimile 540 -665 -6395
(Phone) 540.722.9566
(Address) 480 Jubal Early Dr, Suite 330 Winchester, Virginia 22601
the owner(s) of all those tracts or parcels of land "Property") conveyed to me (us), by deed recorded in the
Clerk's Office of the Circuit Court of the County of Frederick, Virginia, by
Instrument Number: 070004129, 060003761 and is described as
(Name) Patton Harris Rust Associates (Phone) 540.667.2139
ifil ddress) 117 E. Piccadilly Street, Suite 200, Winchester, Virginia 22601
act as my true and lawful attorney -in -fact for and in my (our) name, place, and stead with full power and
authority I (we) would have if acting personally to file planning applications for my (our) above described
Property, including
X Rezoning (including proffers)
Conditional Use Permits
X Master Development Plan (Preliminary and Final)
X Subdivision
X Site Plan
My attorney -in -fact shall have the authority to offer proffered conditions and to make amendments to previously approved proffered
conditions except as follows:
This authorization shall expire one year from the day it is signed, or until it is otherwise rescinded or
modified.
In witness thereof, 1 (we) have hereto set my ((o J (our hand and seal this day of
Signatur(s)� 7 2', Ci
State of Virginia, City /County of U)1 n/r S't't /L ,To -wit:
a, t I j4 1\ Mm 1 2 a Notary Public in and for the jurisdiction
afnresaid, certirythat the person(s) who signed to the foregoing instrument personally appeared before me
add,iias acknowledged the same before me in the jurisdiction aforesaid this 3R d day of RpR I 200 8_.
CC.tl' /4
nary Public
Fig-
T)11 s.) Co
My Commission Expires: FE/7RoA2y/ oZ old 12.
Special Limited Power of Attorney
County of Frederick, Virginia
Frederick Planning Web Site: www.co.frederick.va.us
Department of Planning Development, County of Frederick, Virginia,
107 North Kent Street, Winchester, Virginia 22601
Phone 540 -665 -5651 Facsimile 540-665 -6395
Know All Men By Those Present: That I (We)
(Name) Governors Hill LLC (Phone) 540.722.9566
(Address) 480 Jubal Early Dr, Suite 330 Winchester Virginia 22601
the owner(s) of all those tracts or parcels of land "Property") conveyed to me (us), by deed recorded in the
Clerk's Office of the Circuit Court of the County of Frederick, Virginia, by
Instrument Number: 060007880 050027203 and is described as
Tax Map Parcel 64 -A -83, 64 -A -83A Subdivision:
do hereby make, constitute and appoint:
(Name) Patton Harris Rust Associates
ddress) 117 E. Piccadilly Street, Suite 200, Winchester, Virginia 22601
act as my true and lawful attorney -in -fact for and in my (our) name, place, and stead with full power and
authority I (we) would have if acting personally to file planning applications for my (our) above described
Property, including
Signature(s
lira Public
ley. f5eqri
X Rezoning (including proffers)
Conditional Use Permits
X Master Development Plan (Preliminary and Final)
X Subdivision
X Site Plan
(Phone) 540.667.2139
My attorney -in -fact shall have the authority to offer proffered conditions and to make amendments to previously approved proffered
conditions except as follows:
This authorization shall expire one year from the day it is signed, or until it is otherwise rescinded or
2
Jor
modified.J
2 j2 ti 2adit,< A
In witness thereof, I (we) have hereto set my (our) hand and seal this 3 day o
,To -wit: i o ho b ��,a�/ -R /9_,
State of Virginia, .city/County of W i N FGtra_
1, V e. C I 1 w.: i u a Notary Public in and for the jurisdiction
aforesaid, certify that the person(s) who signed to the foregoing instrument personally appeared before me
and has acknowledged the sane before me in the jurisdiction aforesaid this ,3 R d day ofj p/Z i 200S
My Commission Expires: Fe bzu rO_ nn
s
2
at
T
O
m
N
C)
z
w
0
9)
N
A
w N
O C 0
v3 g
pzi
Po r
trl
tri
5 o z
l"
RP
b b
�z
d
0
d
/7J
n
cn C
D
m m --1
rn
m 73
m 0
m
F5
o� r
I T O
T V
z m
D Z
Go
0
CD
A m
Y Y
Y
W A
W 2
1 30
31
N M
V A
N N
23
24
25
N N
it
16
14
15
f2
L
11
cO W
.1 W.
P
W N
64AAl2
64A 71 1
84A 88
64 10 3
64A 898
84 A 87A
64A 89
64A 82
64A79
00 mm
gg A A
64 A 80L
64 A 80K
64A81
64A81A
64 A 132
64 A 133
64A 134
64 A 124A
64 A 123
64Al22
84A85
84A 116
64A 71 15
64G 2152A
1 64A 71 13
64A 71 14
I64A 71 11A
64A 71 12
1 64G2163A 1
64A 71 1
1 64A 7 1 7 :1
64A718_ 1
1 64A 71 5
64A716 I
I 64A 712
64A713
64A 714
HELEN J. SEMPELES
JOHN H. KALENIS 8 CHRISTOPHER BROOKS
WINCHESTER REGIONAL AIRPORT
KAREN BARRETT- PERRY ET ALS
PRINCE FREDERICKTOWNE GROUP LC
GO JAMES L MCILVAINE JR.
COUNTY OF FREDERICK
FREDERICKTOWNE GROUP LC GO RICHARD DIELE
COUNTY OF FREDERICK
WINCHESTER REGIONAL AIRPORT
BLUE RIDGE INDUSTRIES
CAMPFIELD, LLC.
RGR,LLC
MAIN OF WINCHESTER, LLC
WINCHESTER INDUSTRIAL PARK, LLC
WINCHESTER INDUSTRIAL PARK, LLC
RUFFNER, TERRY W 8 LOIS J
LONG, RAYMOND TANYA C
LONG, RAYMOND TANYA C
POTOMAC EDISON COMPANY
PERRY ENGINEERING CO INC
,FISHER, LLOYD EST. C/O MARY E. WASHINGTON
(RICHARD DICK
(FISHER, LLOYD EST. C/0 MARY E. WASHINGTON
ILOY, DAVID W
IRAVENWING HOMEOWNERS ASSOCIATION
FRAZIER, ROBERT A
FRAZIER, ROBERT A
LAMBERT, GEORGE G KELSA R
LAMBERT, GEORGE G KELSA R
RAVENWING HOMEOWNERS ASSOCIATION
LAMBERT, GEORGE G KELSA R
COOK, JUDY BELLE 0/0 RODGERS, JUDY B
COOK, JUDY BELLE 040 RODGERS, JUDY B
COOK, JUDY BELLE GO RODGERS, JUDY B I
COOK, JUDY BELLE G0 RODGERS, JUDY 6 1
KAKNIS, JOHN H CHRISTOPHER BROOKS
HARTLEY, DOUGLAS ALLEN
HARTLEY, DOUGLAS ALLEN
vv
R4 92
82
R4
82
�a3
MH1
M1
3`ter
b� °b
`0
S�b�
RP
RP
RP
RP
vv
RP
RP
RP
RP
RP
RP
vvv
VAC
VAC
I AIRPORT J I
VAC
GOV
GOV I VAC
ARMORY
AIRPORT
P O
IND I IND
IND I
RES
RES
IND
VAC I
RES
RES I RES
OS I RES
RES I RES
RES I RES
RES I RES
RES I OS
RES I RES
RES
RES
RES
tz
cn
x
0
F
D
0
z
z
D
1
9
C7
ro
a,
9
1
NVid 1111113A0
m A
N
v
0
0
0
0
3
N
v
v
0
0
0
0
5
A
N
0
F
0)
z
my
5 m
c
N
n
A
0
co
A O
D
D
m
m
N
�l
z
n
4 t i
fHfii 'a' lgi e�' l ga Il" 1 11 1 ,.g t i $te 6 1 as rkp g4 P ilyt P
1 e ED i QEii 1 E 4 6 aF 3 a o S Sb g q
LIO a x a p N F- Fik R. 1:14 E g` 2 g 9 t..;.
lit i
sac 1 e V;
V g g E FFF ff .d a ;.t ss E.
0
C a v. a 7 g H
IV I! 1 I €ga 5 l g R g C m li pp pp
g ��gg p E
9 g 1 �a �td.nR r p ii S RR 3. g
�g 2 K 11s1 3E c�.� B i ags`
I, is@ Eel S s' a 2,, L ,�.s s 0
•Y 66 g' e'�ai� y� fi �k�'
i ii i 4110 "1-- B_S °eau g5e 1 a� aa ge
gg s n t7. °u
nts .aC laa gl. ?&1epec@ 5 s
ggg Ila k P i
eBa g $a IU ors OW
W gee 6 IQ o,q. ggff��ge�
8 g'� as g ae g I l igHi I! go fg g
FF 3 Il €ate§ §sac
g TO. RI V E f eo g gs'� jt
�i 3 'IF g g
k= a �sa'� II esgYa 06S }Aa
e p g
ss L 3 3” i g�
a y�� 1:406 q S g q 1 6 g o� F y 'Y as �.a 5
�g s 5 g s "z 10 Org.Rs Pr A a
p 2 ni 3 4
s 888$ }L
°g�B :igi Wig/ @.e
as @a5,r,' a S E �a `�a' R VETS @s
a a gE 4; a� o IIw a ti z g a Ili
a^ 3
a s s �g ^'b OR T 4 A Ile a
T P
gao gild s a c 1.61 e� A§
W' g �I 'all °°So, RE
gg
0
s
Y1420.0600•E 109&86'—
PIN
A -B7
14.7
4.7 AC
52549'1 N2008
230.32 j p96 B9 __,...--4.----
szros '7"
E m n
;Mal g@p S� �'I Wig! WNW
p33 �g R
t WW 3 5 IF .�R:fgs 4 ;t' 1 gg$c
HUN gad @5 ti; 111 g g i 91 g E. Iad.sR p i !I wi g
s .S$[$[•• Eg6Q y �pSEg °g 14 a �s2 s' pa aq$
N d °x 9 5 1 B A 6. s u F p i $i 3 e
gi p a 3 g01 IB g g ii 01111 ag'1 ^6
g§ s S EE
-la
O 'O 0
D D D
(l) C/) C/) CC)
mmrrim
-P t- N
°7070
Cn
C,7
O O O
O O
C C
C7 O 0
O D
C Z Z
P1 C) C7
7O -C
Cf)
—I 0 0
O m m
23
m
p —I —I
—I -1
C O O
O r r
O
n 00
0 0
m m
z)
oo
C D O
CD CD
O 0
o m rl
C Q Q
m "'f1
rri
Cr O O
N
N
m
70 70
rn co co
Q r
Q co co
co r r-
G J co
Z 1 1
0 0 0
C) T O TT
N N
C.sl
CD D
Fri D
m
N
0
00
WOO
D D D
m rn Li)
C7 CO D
1 1 1
O
-n
U)
0
-n
-n
m
70
m
CD
C7
O
C
C7
0
rn
CD
T 6=
N
m
m
J
I
J
J
1
sfo
mongi
R.$2
Oft
2 2
IgT
m S z
O P�1 AA
ADni Ogfn
a pp €T
6g 8m
gRR
i!J I gt o 1
f A
Q@ Il As
gg
mE
2°E
g
202
8
V
NC
INVERLEE WAY
q
Ri
Fi�
RCM PER O91ER CaIORS
10/70/08
CST
CST
I R1515W TO COW RE 50 00 LT TURN IME 0 IBER EE
9/0S/08
CSC
CST
D. DESCRIPTION
DATE
RENO
REWD
MIND
DATE
REVISION
SIGN
CSK
SURVEY
GREENWAY ENG.
PROJECT
GOVERNORS HILL
ROAD IMPROVEMENTS
SHAWNEE IMGISTERIAL DISTRICTS
FREDERICK COUNTY. VIRGINIA
TITLE
OVERALL PLAN
Patton Harris Rust Associates
Engineers. Surveyors. Planners. Landscape Architects.
Chantilly, VA 20151 -1679
P
H T 7D3.449.6700
F 703.449.671
PROFESSION
P
a�
4
SR.n A. Mi
AWN
CSK
DATE
AUGUST 29, 2008
I ECKED
RAM
SCALE
1' =200
CERTIFICATE
RTIFICATE
rROF C12067.
R OF5IEE
rssu
ENCINE1
.E ND.
5413 -1 -B
CAT. No.
C400SIT
SHEET
1 OF 2
O 'O 0
D D D
(l) C/) C/) CC)
mmrrim
-P t- N
°7070
Cn
C,7
O O O
O O
C C
C7 O 0
O D
C Z Z
P1 C) C7
7O -C
Cf)
—I 0 0
O m m
23
m
p —I —I
—I -1
C O O
O r r
O
n 00
0 0
m m
z)
oo
C D O
CD CD
O 0
o m rl
C Q Q
m "'f1
rri
Cr O O
N
N
m
70 70
rn co co
Q r
Q co co
co r r-
G J co
Z 1 1
0 0 0
C) T O TT
N N
C.sl
CD D
Fri D
m
N
0
00
WOO
D D D
m rn Li)
C7 CO D
1 1 1
O
-n
U)
0
-n
-n
m
70
m
CD
C7
O
C
C7
0
rn
CD
T 6=
N
m
m
J
I
J
J
1
sfo
mongi
R.$2
Oft
2 2
IgT
m S z
O P�1 AA
ADni Ogfn
a pp €T
6g 8m
gRR
i!J I gt o 1
f A
Q@ Il As
gg
mE
2°E
g
202
8
V
NC
INVERLEE WAY
q
Ri
Fi�
7
CI
m
C)
190
CJ)
C!')
m
CCI
70a' TAPFR
350' OSIAL LT TIIRN AMPS
102 LT TURN LANE
MISER PER OMRDt canons
10/30/08
CSC
CSK
CEASED TO Dams RL 50 D1 LT UN IAE 0 M E MIE
9/03/09
csc
CSC
DESCRIPTION
GATE
REVS'D
mots
APRVO
DATE
REVISION
CSK
SURVEY
GREENWAY ENG.
PROJECT
GOVERNORS HILL
ROAD IMPROVEMENTS
SHAWNEE MAGISTERIAL DISTRICTS
FREDERICK COUNTY, VIRGINIA
TITLE
INTERSECTIONS
Patton
Engineers.
Harris Rust Associates
Surveyors. Planners. Landscape Architects.
14532 Lee Road
Chantilly, VA 20151 -1679
T 703.449.6700
F 703.449.6714
PROFESSIONAL
N e
oflom A lE M
CERTIFICATE NO.
020614
REGISTERED
PROFESSIONAL
ENGINEER
CSK
DATE
AUGUST 29, 2 008
:ED
RAM
SCALE
1 =10O
20.
5 -1-5
CAT. NO.
C400SIT
SHEET
2 OF 2
7
CI
m
C)
190
CJ)
C!')
m
CCI
70a' TAPFR
350' OSIAL LT TIIRN AMPS
102 LT TURN LANE
REZONING APPLICATION #10 -08
MASTER DEVELOPMENT PLAN #08 -08
GOVERNORS HILL
Staff Report for the Planning Commission
Prepared: December 19, 2008
Staff Contact: Candice E. Perkins, AICP, Senior Planner
John A. Bishop, AICP, Deputy Director Transportation
This report is prepared by the Frederick County Planning Staff to provide information to the Planning
Commission and the Board of Supervisors to assist them in making a decision on this application. It may
also be useful to others interested in this zoning matter. Unresolved issues concerning this application are
noted by staff where relevant throughout this staff report.
Reviewed Action
Planning Commission: 01/07/09 Pending
Board of Supervisors: 01/28/09 Pending
PROPOSAL: To rezone 39.7 acres from the RA (Rural Areas) District to the R4 (Residential
Planned Community) District; with proffers, and 238.3 acres frofn the R4 District to the R4 District,
to revise the proffers associated with Rezoning #11 -05.
LOCATION: The properties are located approximately one mile east of Interstate 81 on the south
side of Millwood Pike (Route 50 E), across from Sulphur Spring Road (Route 655) and The Ravens
Subdivision.
MAGISTERIAL DISTRICT: Shawnee
PROPERTY ID NUMBERS: 64 -A -83, 64- A -83A, 64 -A -84, 64 -A -85, 64 -A -86 and 64 -A -87
PROPERTY ZONING USE:
Zoned: R4 (Residential Planned Community) District Use: Undeveloped
RA (Rural Areas) Use: Residential /Undeveloped
ADJOINING PROPERTY ZONING PRESENT USE:
North: RP (Residential Performance) Use: Single Family Residential
South: RA (Rural Areas) Use: Regional Airport
East: M1 (Light Industrial) Use: Industrial and Residential
MI-11 (Mobile Home Community)
West: RA (Rural Areas) Use: Regional Airport and Office
B2 (Business General)
PROPOSED USES: 278 acres of mixed use (161.1 acres of commercial and 550 residential units)
Rezoning #10 -08 Governors Hill
Master Development Plan #08 -08
December 19, 2008
Page 2
REVIEW EVALUATIONS:
Virginia Department of Transportation: The documentation within the application to rezone this
property appears to have significant measurable impact on Routes 50, 1538 and 781. These routes
are the VDOT roadways which have been considered as the access to the property. VDOT is not
satisfied that the transportation proffers offered in the Governors Hill Development rezoning
application dated September 2, 2008 address transportation concerns associated with this request.
We have reviewed the proffers, preliminary drawings, as well as the associated traffic impact
analysis (TIA) report. There have been two primary questions asked of the Department with
respect to this application. First, would a single point of access for the development function, and
second, to offer our opinion regarding the proposed removal of the development's connection to
Route 655 at Route 50. From our review of the TIA, it is our opinion that a single point of access to
the proposed development offers certain failing or under performing conditions that are not
desirable. Furthermore, as also evidenced in the applicant's TIA, the existing proffered connection
from the development to Route 655 at Route 50 offers good regional connectivity. Revising the
development's road connection proffers as requested by the applicant, would remove a logical and
effective future road connection that has been a part of the County's planning activities for many
years. We offer the following detailed review comments:
Regional Planning
The planned proffer modification that will remove a previously- agreed -to connection to Sulphur
Spring Road (Route 655) is inconsistent with the County's Eastern Road Plan, updated as recently
as August 2007. As depicted, both the connection to Route 655 and Inverlee Way thru the
development are planned Major Collectors. The approval of this rezoning request as presented
would arguably eliminate the County's ability to see the connection to Route 655 move forward in
the foreseeable future. Additionally, it is important to note that a Six Year Improvement Plan
project northwest of Route 50 along Route 655 is currently designed to provide typical section (land
arrangement) that would be inconsistent with the amended proffer /rezoning currently being
considered with this application. It may be warranted for the County to re- evaluate the scope of the
project should the connection be removed. As part of the TIA that was prepared for this request,
three scenarios have been presented (at different stages of development). The first with one
connection which is made at Inverlee via Coverstone Drive. The second a single connection made
opposite Route 655; and the third, a combination of connections at Route 655 and Inverlee Way via
Coverstone Drive. From a regional planning perspective, VDOT's opinion is that Scenario 3 is the
preferred option for the following reasons:
Consistency with the 2007 adopted Comprehensive Plan.
Connection opposite Route 655 offers enhanced access from the eastern part of the
County to the planned future realignment of Route 522 and destination development west
of the I -81 area. Connection (as approximated in the TIA) would divert a minimum of
30 of the planned development traffic (and background traffic) away from Route 50 as
it approaches a land use setting that is increasingly more residential in nature. Allowing a
single point of access for a large scale retail planned development opposite Inverlee could
arguably be disruptive to neighboring residential uses.
•A Connection opposite Inverlee offers direct access to planned development north of Route
50.
As can be construed in the TIA, a connection opposite Route 655 could very well satisfy
an existing significant latent demand for the connection.
Rezoning 10 -08 Governors Hill
Master Development Plan #08 -08
December 19, 2008
Page 3
Proffers
•I• From an access management perspective, the Route 50 Corridor is identified as a
Principal Arterial which requires certain access goals be recognized during the
development process. The distance between Inverlee and Route 655 is nearly Y� mile,
which is reasonably consistent with the recently adopted VDOT Access Management
Regulations.
C. It is important to understand that the connection to Inverlee Way via Coverstone Drive
was never an "either /or" option as evidenced in the 10/12/2005 rezoning and related
approved proffers which state:
Picture (Metafile)
The future connection to Inverlee Way has been contemplated for some time so as to supplement
access to the proposed development at Route 655 and Route 50. What is now being considered is
the elimination of the Route 655 connection, at the same time that the applicant is requesting the
addition of hundreds of thousands of additional square feet of retail space. While the subject TIA
has demonstrated that significant large scale improvements to Inverlee Way at Coverstone Drive
can result in an overall LOS of C, it is critical that the County understand that 6 out of 11 of the
movements at this intersections fail /under perform at build -out (LOS D, E and F).
We disagree with Section 15.6 of the current proffer as it relates to the monetary
contribution for the signalization of Costello and Prince Frederick Drive. At current
VDOT costs, the offered amount of $150,000 would cover only 75% of the cost of a
signal.
C. We disagree with the terms of Section 15.2: Phase 4 of the proposed proffers which
establishes a deadline of June 30, 2018 for the County or VDOT to secure right -of -way
for the extension of Coverstone Drive Extended. This terminology was not included in
prior agreements, and we feel that a deadline should not be established now.
Revised Section 3.1 to read as follows: The applicant shall design and construct a two
lane public roadway from Arbor Court to Tazewell /Coverstone Drive.
C. Similar to VDOT comments at the time of the 10/2005 application, we are concerned
about proffer language included in Section 15.12 Which states "The applicant shall make
good faith efforts to obtain any off -site ROW needed to complete any proffered off -site
transportation improvements. In the event that the Applicant is not able to obtain the
ROW and, further, the County and /or State of Virginia do not obtain the necessary ROW,
the Applicant shall not be responsible for constructing those improvements where
sufficient ROW is not available We would suggest that those specific off -site
improvements where ROW may be problematic for the Applicant be identified and
reviewed prior to the approval of the current rezoning application.
C. We disagree with Section 15.13 of the proposed proffer which states that the TIA that has
been provided for this application be valid for a period of 6 years from the date of final
rezoning. Given that no specific tenants have been identified that will utilize a new
public road (Coverstone) from Prince Frederick to Route 50, the evolving nature of the
neighboring parcels, and historic regional growth patterns, we do not support this
proffered condition.
Rezoning #10 -08 Governors Hill
Master Development Plan #08 -08
December 19, 2008
Page 4
TIA TechnicaI Observations
C. Please use separate figures for site generated and pass -by trips in the future.
For 2025 Build -out scenarios 1, 2, and 3 with Imp the intersections have an acceptable
intersection overall LOS, but many movements operate at LOS F. As an example, please
refer to the following sub bullets:
The approach to Route 50 from Inverlee Way currently enjoys a LOS of B, and is projected
to maintain a LOS C during the 2025 background conditions. That said, the proposed
development would create a new signalized intersection at Inverlee and Route 50 resulting
in a LOS D for this approach.
At the Prince Frederick Drive and Route 50 intersection during year 2025, Saturday peak
hour background (no- build), the LOS at the intersection is B, with all individual movements
operating at acceptable /good LOS (A,B,C). Also, the roadway between Route 50 and
Costello Drive yields 250+ vehicles in the peak hour. By contrast, at build -out, a peak hour
volume of 1,850+ along the roadway from Route 50 to Costello Drive. This with no
planned improvements to Prince Frederick Drive other than turn lanes at intersections.
We disagree with the spacing of the proposed driveway entrances and signalized
intersections along Coverstone Drive. The arterial LOS from Tazewell Drive to Route 50 is
LOS D for NB, and LOS E for SB during the 2025 build -out, Saturday conditions as an
example. When considering the volumes and traffic operations depicted in the TIA, we feel
that the following additional improvements are necessary at the intersection of Coverstone
and Tazewell:
EB Dual lefts
SB Dual lefts
Before development, this office will require a complete set of construction plans detailing entrance
designs, drainage features and traffic flow data from the I.T.E. Trip Generation Manual, Seventh
Edition for review. VDOT reserves the right to comment on all right -of -way needs, including right
of -way dedications, traffic signalization and off -site roadway improvements and drainage. Any
work performed on the State's right -of -way must be covered under a land use permit. This permit
is issued by this office and requires an inspection fee and surety bond coverage.
Fire Marshall: Plan approval recommended.
Public Works: Refer to our previous review comments, 1 and 3, dated to June 27, 2005, related to
the Carpers Valley Rezoning. These comments need to be incorporated in the proposed MDP.
Indicate the contour intervals shown on the applicable topographic sheets. Existing ponds are
shown on sheet 4 of 6 in conjunction with proposed stormwater management ponds. Indicate if the
existing ponds will be used in the development of a stormwater management plan for the
commercial area. If so, the site design should reflect what measures will be taken to ensure the
integrity and long -term stability of the dams associated with these ponds. Off -site easements may
be required to accommodate point source discharges. The area in the vicinity of the existing rubble
fill is shown as steep slopes rather than uncompacted fill. This discrepancy needs to be resolved in
conjunction with addressing the previous rezoning comment related to this fill. Indicate if
consideration has been given to construction one or two large stormwater detention facilities in the
Rezoning #10-08 Governors Hill
Master Development Plan #08 -08
December 19, 2008
Page 5
residential development areas rather than the ten small facilities shown on sheet 4 of 6. This
approach would greatly reduce the maintenance responsibilities assigned to the I- Iomeowners'
Associations.
Inspections Department: No comments at this time. Comments shall be made at site plan
submittal.
Sanitation Authority: There should be sufficient sewer and water capacity to serve this project.
Service Authority: No comments.
Health Department: Health Department has no objection if public water and sewer is to be
utilized. Permits for restaurants and motels /hotels are required if applicable.
Parks Recreation: The proposed monetary proffer for Parks and Recreation does not appear to
be adequate to compensate for the impact the residents of this development will have on the capital
needs of the Parks and Recreation Department. Plan appears to offer the equivalent to the required
number of recreational units; however, detailed information regarding the proposed recreational
units will be needed for review during the subdivision review phase of this project. The
pedestrian/bicycle trail appears to meet County standards and should be constructed to the 2007
MPO Bicycle /Pedestrian Plan specifications. The proposed Dog Park would not be considered a
recreational unit. The net useable open space to be provided in the commercial areas should be
included in the project summary. It appears this project is required to provide 30% open space
throughout the entire development. The proffered neighborhood swimming pools should have
adequate decking, dressing rooms and support amenities. Completion of the 3,000 square foot
Community Center and the 3,500 square foot swimming pools by the issuance of the 281 building
permit should be reviewed and approved by the Planning Department as deemed appropriate.
Historic Resources Advisory Board: It appears that the proposal does not significantly impact
historic resources and it is not necessary to schedule a formal review of the rezoning application by
the HRAB. According to the Rural Landmarks Survey, there are no significant historic structures
located on the property nor are there any possible historic districts in the vicinity. It was also noted
that the National Park Service Study of Civil War Sites in the Shenandoah Valley does not identify
a core battlefield within this area.
Winchester Regional Airport: After review by legal counsel, we feel that the proffer referring to
an avigation easement be reworded in order to clearly define the Airport Authority's request for an
avigation easement and the applicant's concurrence to that request. On behalf of the Winchester
Regional Airport Authority, I respectfully request the following change in the Proffer Statement
under Section 14.Environment, Subsection 14.3: The Applicant shall convey to the Winchester
Regional Airport Authority an avigation easement to provide further protection for Airport
operations in the form as attached to this document. The Applicant shall provide noise attenuation
treatment for all residential units. I have enclosed a copy of the Deed of Easement for your use.
This is the same easement form recorded in the County of Frederick between the applicant and the
Airport Authority on prior land transactions. Provided the above language is used to replace
Subsection 14.3, the Airport Authority has no further comments or objections to the proposed
Rezoning #10-08 Governors Hill
Master Development Plan #08 -08
December 19, 2008
Page 6
rezoning.
1
Frederick County Public Schools: The cumulative impact of this project and other projects in
varying stages of development in eastern Frederick County will necessitate future construction of
new schools and support facilities to accommodate increased student enrollment. We estimate that
the 422 single family attached units and 128 multifamily units in the development will house 46
high school students, 45 middle school students and 94 elementary school students. In order to
properly serve these 185 students, Frederick County Public Schools will outlay $6,409,000 in
capital expenditures and $1,890,000 annually in operating costs. We note the case proffers for
public schools of $1,714 per dwelling unit, which totals $942,700. This would defray only 15% of
the $6,409,000 in capital costs mentioned above. We will be sending four school buses (two
elementary, one middle school and one high school) into a subdivision that has only one access
point to the road network. With roughly 75% of the 550 proposed households on Tazewell Road,
there are a lot of vehicles concentrated on that one road that can slow travel along it, or even close
the road in the event of an accident. We therefore recommend the addition of a signalized access
point onto Route 50 to facilitate the movement of traffic, including our buses, to and from the
broader road network. Frederick County Public Schools is concerned about all land development
applications. Both capital expenditures and annual operating costs are significantly increased by
each approved residential development, as is illustrated above.
Frederick County Attorney: Please see attached letter dated April 22, 2008 from Roderick B.
Williams, County Attorney.
Planning Department: Please see attached letters dated April 28, 2008 and October29, 2008
from Candice E. Perkins, Senior Planner and letters dated April 28, 2008 and October29, 2008
from John A. Bishop, ALCP, Deputy Director Transportation.
Planning Zoning:
1) Site History
The original Frederick County zoning map (U.S.G.S. Winchester Quadrangle) identifies the
subject parcels as being zoned R -1 (Residential Limited). The parcels were re- mapped from
R -1 to A -2 (Agricultural General) pursuant to the County's comprehensive downzoning
initiative (Zoning Amendment Petition #011 -80), which was adopted on October 8, 1980.
The County's agricultural zoning districts were subsequently combined to form the RA
(Rural Areas) District upon adoption of an amendment to the Frederick County Zoning
Ordinance on May 10, 1989. The corresponding revision of the zoning map resulted in the
re- mapping of the subject properties and all other A -1 and A -2 zoned land to the RA
District. On October 12, 2005 the Board of Supervisors approved Rezoning #11 -05 which
rezoned parcels 64 -A -82, 64 -A -83, 64- A -83A, 64 -A -86, 64 -A -87, 64 -A -87A to the R4
District with proffers.
2) Comprehensive Policy Plan
The Frederick County Comprehensive Policy Plan is an official public document that serves
as the community's guide for making decisions regarding development, preservation, public
facilities and other key components of community life. The primary goal of this plan is to
Rezoning #10-08 Governors Bill
Master Development Plan #08 -08
December 19, 2008
Page 7
protect and improve the living environment within Frederick County. It is in essence a
composition of policies used to plan for the future physical development of Frederick
County. [Comprehensive Policy Plan, p. 1 -1]
Land Use
The six properties included with this rezoning request are all located within the boundaries
of the Route 50 East Corridor Land Use Plan. A portion of the site is located within the
Urban Development Area (UDA), specifically the residential portion of the development
(Land Bay 1) is within the UDA. The Route 50 East Corridor Land Use Plan envisions the
area comprised by the subject parcels as developing with business /office land use. The
existing and proposed R4 zoning is generally consistent with this plan as it relates to this
area. (Comprehensive Policy Plan, p. 6 -87, 6 -88, 6 -89)
The subject parcels are also located within the boundaries of the Airport Support Area that
surrounds the Winchester Regional Airport. Business and industrial uses should be the
primary uses in the airport support area. (Comprehensive Policy Plan, p. 6 -169)
Transportation
The Eastern Road Plan was adopted by the Board of Supervisors on November 8, 2006 and
is a component of the Comprehensive Policy Plan. The planned road network included in
Eastern Road Plan identifies a collector road network through this area. This network
includes the extension of a major collector road (Coverstone Drive) from Prince Frederick
Drive (extended to the relocated Route 522 when constructed) through the property and
connecting to Route 50 at two separate intersections. The Eastern Road Plan calls for
connections with both Inverlee Way and Sulphur Springs Road.
Staff Note: The previous rezoning #I1 -05) recognized both of these connections.
However, this new application and associated proffers renders the connection to Sulphur
Springs impossible in the future. It is the opinion of staff that with slight modification,
the potential for the Sulphur Springs connection could be preserved for the future, thus
preserving the compliance of this application with the adopted comprehensive plan. The
applicant has noted that the Sulphur Springs intersection would result in a less safe
transportation network; however, the accident data does not support this. In addition, the
actual construction of 4 lane collector roadways within the development has been reduced
by over mile.
3) Master Development Plan #08 -08)
A master development plan is required prior to development of this property. Before a
master development plan can be approved, it must be reviewed by the Planning
Commission, Board of Supervisors and all relevant review agencies. Approval may only be
granted if the master development plan conforms to all requirements of the Frederick
County Zoning and Subdivision Ordinances. The purpose of the master development plan is
to promote orderly and planned development of property within Frederick County that suits
the characteristics of the land, is harmonious with adjoining property and is in the best
interest of the general public. The R4 District requires that Master Development Plans be
proffered as part of the rezoning application.
Rezoning #10 -08 Governors Hill
Master Development Plan #08 -08
December 19, 2008
Page 8
A revised MDP has been proffered with the new rezoning application. It is noted that the
revised layout for the residential area now creates an area of units that are completely
separated from the remaining units. These units as depicted would access Coverstone Drive
through the commercial area. The residential layout should be re- evaluated to ensure that it
is internally connected.
Staff Note: If the rezoning for Governors Hill is approved this Master Development Plan
is consistent with the proffers and would be in a form that is administratively approvable.
4) Site Suitability/Environment
Flood Plains: Flood plain data for the subject parcels is delineated on the Flood Insurance
Study Map for Frederick County prepared by the U.S. Department of Housing and Urban
Development, Community Panel #510063-0115B, effective date July 17, 1978. The
majority of the site is located in Flood Zone C, which denotes areas of minimal flooding
outside of the 100 -year flood plain. As reported by the applicants, 100 -year flood plain,
Flood Zone A, exists coincident with Sulfur Spring Run, which traverses the frontage of the
site, roughly parallel to Route 50. The applicant indicated that disturbance will be limited to
entrance and utility improvements. Any disturbance within the designated flood plain area
will be subject to the requirements of the Floodplain District (FP) provisions of the Zoning
Ordinance.
Soils and Steep Slopes: The General Soil Map of the Soil Survey of Frederick County,
Virginia indicates that the soils comprising the subject parcels fall under the Weikert- Berks-
Blairton soil association, which is the predominant association on land located east of
Interstate 81. As reported by the applicant, map sheet #36 of the Soil Survey reveals that the
site is comprised of nine distinct soil types. With the exception of a pit area containing fill
materials, all of the soil types identified on the site are suitable for development. It is noted
that the Weikert- Berks Blairton soil association presents some limitations to site
development due to a seasonal high water table, depth to bedrock, and slope. The
management of such characteristics must be demonstrated through the site engineering
process associated with subsequent development applications for the proposed project.
Wetlands: The site includes some areas of wetlands which are mainly confined to the man-
made ponds located on the commercial land bay which were created as part of the golf
course, as well as areas within the ravines located within the residential land bay. Pursuant
to the environmental standards of the Zoning Ordinance, disturbance of wetland areas is not
permitted. Exceptions to this prohibition may be granted by the zoning administrator to
allow disturbance of small portions of wetland areas to facilitate conservation, recreation,
and /or the placement of utilities and roads.
5) Proffer Statement Dated March 24, 2008; Revised September 2, 2008, October 31,
2008 and December 8, 2008
Rezoning #10-08 Governors Hill
Master Development Plan #08 -08
December 19, 2008
Page 9
1. Land Use (1.1 -1.6)
The project shall be designed to establish interconnected mixed -use
residential and commercial/employment Land Bays in general conformance
with the Master Development Plan, subject to minor modifications necessary
upon final engineering including but not limited to intersection alignments.
Staff Note: All entrance alignments need to mirror the MDP and modifications would not
be permitted without a revised MDP. Proffer 1.1 should be revised to eliminate the
statement about intersection alignments.
Development shall be in conformance with the "Design and Development
Standards (See Modifications below)
Residential Uses shall be prohibited in Land Bay 2. Land Bay 2 shall be
restricted to uses permitted in the B2 (Business General) Zoning District.
Residential development on the property shall not exceed 550 dwellings.
Commercial development on the Property shall not exceed a total building
floor area of 1,285,000 square feet without completion of additional traffic
studies. The total permitted commercial building floor area may increase
provided that the applicant completes a revised traffic impact analysis which
identifies the impacts of trips for commercial development in excess of
45,815 Average Daily Trips and mitigation for said impacts is provided by
the applicant in a form that is acceptable to the County and VDOT.
Staff Note: The original proffers did not include this final bullet and staff feels it is
inappropriate to include it now. It is important to note that the TIA does not include
analysis of the function of the individual entrances along proposed Coverstone Drive.
This is important because, as noted in VDOT's comments, the proposed entrances are
closely spaced. That, combined with the amount of development and traffic generation
proposed to be allowed here, could have significant impact to the function of Coverstone
Drive through the development. Since Coverstone Drive is intended to function as a
major collector for the County, this is a concern. Should this issue concern become
reality, the development should be prepared to address it and not leave the County and
VDOT with the responsibility.
Modifications Request included within the Design and Development Standards
proffered with proffer 1.2 (see booklet included in the agenda package).
Per Section 165 -72.0, of the County Code, an applicant may request modifications to
provisions of the Code. Such modifications may be sought to enable implementation of a
design and /or land use concept beneficial to the community that would not otherwise be
permitted by the existing ordinance. The applicant has requested two modifications to
certain provisions of the Frederick County Code. With the original rezoning, the applicant
requested three modifications, the two currently being requested as well as a modification to
separate the rezoning from the MDP. The Board of Supervisors approved the three
Rezoning #10 -08 Governors Hill
Master Development Plan #08 -08
December 19, 2008
Page 10
1
modifications with the original rezoning. With the revised rezoning application, the
applicant has proffered an MDP but is required to seek approval of the other two
modifications. Those modifications are outlined as follows:
Modification #1 165 -71. Mixture of Housing Types Required
The R4 District requirements stipulate that no more than 40% of the residential land area in
a planned residential community shall consist of duplexes, multiplexes, atrium houses,
weak -link townhouses, townhouses, or garden apartments or any combination of said
housing types. The Zoning Ordinance promotes a residential mix dominated by single
family detached housing types.
The applicant is requesting that this standard be modified to allow housing types identified
by the zoning ordinance and the proffer statement (Design and Development Standards).
The residentially designated areas of the project would be able to develop without limitation
to the percentage or ratio of any given housing type. The development of single family
attached (Townhouses) and multi family dwellings would be the predominant housing type
in Carpers Valley.
Modification #2 165 -72.D. Commercial and Industrial Areas
The R4 District requirements stipulate that a minimum of 10% of the gross area of a planned
residential community shall be used for business and industrial land uses, and that such uses
shall not exceed 50% of the gross land area. Moreover, the Zoning Ordinance requires that
each phase of a planned community development shall include a reasonable amount of non-
residential land uses. These requirements provide the necessary regulations to facilitate a
development with residential and employment which coexist, enabling not only a walkable
community, but also offer opportunities to place residential uses and commercial uses within
the same structure.
The applicant is requesting that these standards be modified to allow a maximum of 60% of
the total gross area to be used for business and commercial purposes. This area has been
identified as Land Bay 2 on the GDP.
2. Construction of a Unified Development
The Property shall be developed as one single and unified development.
3. Access to Armory Parcel
The applicant shall design and construct a two lane public roadway,
identified on the MDP as Pendleton Drive, from Arbor Court to the entrance
of the Armory Site to coincide with the completion of the Armory. At such
time that Tazwell Road is constructed adjacent to Pendleton Drive as
depicted on the MDP, the Applicant shall extend Pendleton Drive to connect
with Tazwell.
Staff Note: The original proffers stated that the Armory site would be provided access to
Route 50 via Coverstone Drive. The proffers have been modified to eliminate the main
access route to the armory and provide an access point through an industrial park
Rezoning #10 -08— Governors Hill
Master Development Plan #08 -08
December 19, 2008
Page 11
instead.
4. Phasing of Residential Development
Provides for limitation on the issuance of residential building permits.
Year 1 140 permits
Year 2 140 permits
Year 3 140 permits
Year 4 130 permits
Improvements including a 3,000 square foot community center, 3,500 square
feet of neighborhood swimming pools, and a dog park shall be constructed in
conjunction with residential development in Land Bay 1 and shall be
dedicated upon completion of the improvements to the homeowners
association. The improvements shall be completed prior to the issuance of
the 281 residential building permit.
Staff Note: This rezoning application does not tie the residential permits to the
commercial development; therefore there is the potential for the residential portion of the
development to be built without the commercial, thereby creating impact to the County.
Consideration should be given tying the residential permits to the commercial
development or providing a monetary offset.
5. Architecture, Signage and Landscaping
All buildings on the property shall be constructed using compatible
architectural styles. The applicant shall establish an Architectural Review
Board through the HOA to enforce and administer the Design and
Development Standards.
All signage within the Property shall be in substantial conformity with a
comprehensive sign plan that meets the requirements of the Zoning
Ordinance, which shall be submitted in conjunction with the first final site or
subdivision plan for the Property.
6. Pedestrian Trail System and Recreation Areas
The applicant shall design and build a public pedestrian bicycle trail system
to VDOT standards that links the residential and commercial areas within the
development. Said trails shall be in the locations generally depicted on the
MDP.
Monetary Proffers (7 -11)
7. Fire and Rescue
$422 per dwelling unit
Following the final rezoning, the Master HOA shall contribute annually $100
per constructed residential unit, and $100 per 1,000 square feet of constructed
commercial use to the fire and rescue company providing the first response to
Rezoning #10- 08— Governors Hill
Master Development Plan #08 -08
December 19, 2008
Page 12
the Property. Said monetary contribution shall cease at such time that the fire
and rescue company is no longer a volunteer operation or should the County
adopt a fee for service plan.
Staff Note: The original proffer contained a clause that stated: Commencing January 1,
2010 the contribution shall increase at the rate of five dollars per residential unit or per
1,000 square feet of commercial development each calendar year. It is unclear why this
increase has been removed from the revised proffer statement.
8. Schools
$1,714 per dwelling unit
9. Parks and Open Space
$343 per dwelling unit
10. Libraries
$79 per dwelling unit
11. Administration Building
$79 per dwelling unit
Staff Note: The monetary proffers provided in this revised rezoning application are
consistent with the proffers approved with Rezoning #11 -05. It should be noted that since
the residential portion of this development is not tied to the commercial development,
there is the potential for the 550 residential units to be constructed without any
commercial development. Therefore the entire impact for each residential unit should
generally be addressed and mitigated. If the non residential phase of the project does not
materialize and the project is built solely as a 550 residential unit development, the per
unit capital facilities fiscal impact is projected to be $16,965 for townhouses and $8,975
per multi family unit.
12. Creation of Homeowners and Property Owners Association (12.1 -12.7)
Provides for the creation and responsibilities of the Master Property Owners
Association and the residential and commercial associations.
13. Water and Sewer
Provides for the connection of the development to public water /sewer.
14. Environment (14.1 -14.3)
Stormwater management and BMP's shall be provided.
The applicant shall provide notice in all sales literature, covenants, conditions
and restrictions for any HOA or POA of the adjacency of the Winchester
Regional Airport.
The applicant shall consult with the Executive Director of the Airport with
respect to the granting of a reasonable avigation easement to provide further
Rezoning #10-08 Governors Hill
Master Development Plan #08 -08
December 19, 2008
Page 13
protection for Airport operations, and shall dedicate such easement, as the
Airport and the applicant shall mutually agree. The applicant shall provide
noise attenuation treatment for all residential units.
Staff Note: Proffer 14.3 does not provide an assurance that an avigation easement will be
agreed to between the Airport Authority and the applicant and does not satisfy the Airport
Authority's comment. If the Airport and the applicant do not agree to a "reasonable"
avigation easement it is unclear how this proffer will be implemented.
15. Transportation (15.1 15.13)
15.1 Major roadways to be constructed as shown on the MPD.
15.2 Excluding 200,000sf of office uses which may be developed at any time utilizing
access to the existing completed portion of Coverstone Drive, the applicant shall
design and construct Coverstone Drive as a full section with raised medians on a
minimum 90 foot ROW, utilizing the following phasing schedule:
e Phase 1 Full four lane section with trail from Millwood Pike to the first
intersection on Coverstone Drive (Points A -B on the MDP). Phase I shall also
consist of all necessary improvements, including signalization when warranted by
VDOT to create a four way intersection at Route 50 and Inverlee Way.
o Phase 2 Construction of a two lane section of Coverstone Drive from Point B to
Point C as depicted on the MDP to be completed prior to the issuance of a
certificate of occupancy for any use that would cause the property to exceed
400,000sf of commercial building area.
o
Phase 3 Construction of the remaining two lane section of Coverstone Drive from
Point B to Point C as depicted on the MDP to be completed prior to the issuance of
a certificate of occupancy for any use that would cause the property to exceed
800,000sf of commercial building area.
e Phase 4 Design Coverstone Drive Extended as a four lane section from Prince
Frederick To Relocated Route 522 as depicted from Point D to Point E on the MDP
for a maximum distance of 800 feet when the alignment of Relocated 522 has been
determined by VDOT and the ROW for this segment of Coverstone has been
acquired by VDOT or Frederick County.
o In the event that this ROW is not secured by June 30, 2018 the applicant shall
not be responsible for the design of Coverstone Extended.
o $1,000 per residential unit shall be paid towards the future construction of
Coverstone Extended after June 30, 2018, funds to be utilized toward
projects in the vicinity of the property if ROW not secured for the extension.
Staff Note: The phase 4 proffer previously did not require purchase of right -of way -by
the County and VDOT, did not have a time deadline, and did not limit the length of the
design area to 800 feet which would not cover the length of the current adopted alignment
from Prince Frederick to Route 522. Staff feels it is inappropriate to detract from the
value of the previously approved proffer in this manner.
Rezoning #10-08 Governors Hill
Master Development Plan #08 -08
December 19, 2008
Page 14
15.3 The applicant shall construct Coverstone Drive as a full four -lane section from
Millwood Pike to Prince Frederick Drive prior to November 1, 2015.
Staff Note: The original proffers stated that Coverstone Drive would be completed from
Millwood Pike to Prince Frederick Drive by June 1, 2012. The revised proffers have
pushed this deadline back to 2015.
15.4 Tazwell Road shall be designed and constructed as a minimum two lane roadway as
shown on the MDP to provide access to residential uses in Land Bay 1 and
commercial uses in Land Bay 2.
15.5 The applicant shall pay to the County the amount of $75,000 for signalization of the
intersection of Millwood Pike and Victory Road.
Staff Note: While the language of this proffer has not been modified from the currently
approved rezoning, staff feels it would be appropriate to modify the language from
`signalization' to `intersection improvements' and to add language that gives the Board
some idea of when this proffer would be realized since it does not appear to be addressed
in the proffer phasing in proffer 15.11.
15.6 The applicant shall pay to the County the amount of $175,000 for signalization of the
intersection of Costello Drive and Prince Frederick Drive.
Staff Note: While this proffer has been increased from $150,000 to $175,000, it will not
fully fund the signalization of Costello Drive and Prince Frederick Drive as noted in
VDOT and County staff comments to the applicant
15.7 Access to Millwood Pike shall be limited to Coverstone Drive as shown on the MDP
with the exception of the private driveway currently serving parcel 64- A -83B, which shall
be closed once the internal residential street network has been constructed and provides
access to the parcel. Additionally, the existing crossover previously used for the golf
course shall be closed.
15.8 All public ROW's shall be dedicated to Frederick County.
15.9 All public streets /roads shall be designed in accordance with VDOT standards.
15.10 All private streets /roads shall be constructed to VDOT standards and owned by the
HOA.
15.11 The design of off -site road improvements shall be in general conformance with the
plan entitled "Governors Hill Road Improvements" dated October 30, 2008.
Excluding 200,000sf of office uses which may be developed at any time utilizing
access to the existing completed Coverstone Drive, off -site improvements shall be
constructed in three phases:
Phase A: Improvements at the intersection of Millwood Pike /Inverlee
Way /Coverstone Drive and shall be completed coincident with Phase 1
Coverstone Drive construction per proffer 15.2.
Phase B: Improvements at the intersection of Millwood Pike /Prince
Rezoning 10 -08 Governors Hill
Master Development Plan #08 -08
December 19, 2008
Page 15
Frederick Drive and Prince Frederick Drive /Costello Drive. Phase B
improvements shall be completed coincident with Phase 2 Coverstone Drive
construction per proffer 15.2.
Phase C: Improvements at the intersection of Millwood Pike /Sulphur
Springs Road. Phase C improvements shall be completed coincident with
Phase 3 Coverstone Drive construction per proffer 15.2.
Staff Note: Language should be included in the Phase C proffer that should VDOT
commence construction of intersection improvements at the intersection of Millwood
Pike /Sulphur Springs Road, that the development would participate to the extent of their
proffered improvements.
15.12 The applicant shall make good faith efforts to obtain any off -site right of way needed
to complete any proffered off -site transportation improvements. In the event that the
applicant is not able to obtain the right of way and, further, the County and /or VDOT
is not able to obtain the necessary right of way, in lieu of constructing the road
improvement, the applicant shall provide a monetary contribution to Frederick
County equivalent to the estimated construction cost of the improvement.
Staff Note: It would be appropriate for VDOT to approve or provide the cost estimates
noted in 15.12.
15.13 Any future transportation analysis which may be required for the Property shall
utilize Code 820 "Retail" per the ITE Trip Generation Manuel for any commercial
use other than office use.
Staff Note: If the transportation analysis is required by VDOT standards, the County
would not have the authority to dictate which code from the ITE Trip Generation Report
would be used.
16. Cultural Resources Investigation and Preservation
The applicant shall conduct or cause to be conducted a Phase I
Archaeological Investigation of the Property, prior to the approval of the first
final site or subdivision plan for the Property, and shall complete Phase II
and III investigations thereof as may be demonstrated to be necessary by the
Phase I study.
17. Escalator Clause
In the event any monetary contributions set forth in the Proffer Statement are
paid to Frederick County within 30 months of October 12, 2005, said
contributions shall be in the amounts as stated in the proffer statement. Any
monetary contributions paid after 30 months following October 12, 2005
shall be adjusted in accordance with the Urban Consumer Price Index, such
that at the time contributions are paid, they shall be adjusted by the
percentage change in the CPI -U from that date 30 months after October 12,
Rezoning #10-08 Governors Hill
Master Development Plan #08 -08
December 19, 2008
Page 16
2005 to the most recently available CPI -U to the date contributions are paid,
subject to a cap of 5% per year, non compounded.
Staff Note: As thirty months have already passed since this rezoning was approved
(October 12, 2005), and this new proffer statement if approved would take the place of the
October 12, 2005 proffer, it would be appropriate to update the fiscal impact contributions
reflective of the Development Impact Model, and continue to apply the escalator clause in
the future.
STAFF CONCLUSIONS FOR 12/03/08 PLANNING COMMISSION MEETING:
This application is a request to rezone approximately 39.7 acres from the RA (Rural Areas) District
to the R4 (Residential Planned Community) District, with proffers, and 238.3 acres from the R4
District to the R4 District, to revise the proffers associated with Rezoning #11 -05 to facilitate
development of a mixed use development consisting of 550 dwelling units and approximately
161 acres of commercial uses.
The Eastern Road Plan of the Comprehensive Policy Plan specifically addresses the planned road
network for this site and calls for connections with Inverlee Way and Sulphur Springs Road. The
previous rezoning recognized both of these connections. However, this revised application renders
the connection to Sulphur Springs impossible in the future. This package could, with minor
modification, address the issue of future Sulphur Spring connectivity. The applicant has noted that
the Sulphur Springs intersection would result in a less safe transportation network; however, the
accident data does not support this. In addition, the actual construction of 4 lane collector roadways
within the development has been reduced by over 1/4 mile.
There is a scaling back of the timing of the proffered construction and little regard for entrance
spacing along the portion of Coverstone Drive. If the entrances are developed as proposed, it would
significantly impact the functionality of this planned major collector roadway in spite of what the
TIA states for the existing intersections that were studied and which have their own issues as
detailed in the VDOT comment. The package also scales back the design obligations for this
development compared to what they have currently committed to the relocation of Route 522
between Prince Frederick Drive and existing Route 522.
Following the required public hearing, recommendations by the Planning Commission to the
Board of Supervisors are necessary on the following: The two requested R4 District
modifications, and the rezoning application which includes the proffered MDP. The applicant
should be prepared to adequately address all concerns raised by the Planning Commission.
Frederick County, Virginia
FOR
REVIEW AND APPROVAL
OF
GOVERNORS HILL
Shawnee Magisterial District
March 2008
Prepared by:
Patton Harris Rust Associates
117 E. Piccadilly Street
Suite 200
Winchester, Virginia 22601
Phone: 540- 667 -2139 Fax: 540- 665 -0493
REZONING APPLICATION MATERIALS
3 2008
i•
I. Application
II. Impact Analysis Statement
III. Proposed Proffer Statement
IV. Agency Comments
V. Survey Plat and Deed
VI. Tax Ticket
TABLE OF CONTENTS