HomeMy WebLinkAbout06-08 Traffic Impact AnalysisTraffic Impact Analysis
01 HUr T assisted Living
Prepared For:
February 1, 2008
Frederick County, Virginia
Bowman Consulting Group
124 East Cork Street
Winchester, VA 22601
Prepared By:
Gorove /Slade
Associates, Inc
1140 Connecticut Avenue
Suite 700
Washington, DC 20036
Tel: 202.296.8625
Fax: 202.785.1276
GOROVE /SLADE ASSOCIATES. INC.
Transportation, Traffic and Parking
PREPARED BY:
Gorove /Slade Associates, Inc.
3914 Centreville Road
Suite 330
Chantilly, VA 20151
Tel: 703.787.9595
Fax: 703.787.9905
ADDITIONAL OFFICES:
651 Holiday Drive
Suite 300
Pittsburgh, PA 15220
Tel: 412- 928 -1730
Fax: 412. 928.1731
www.goroveslade.com
825 Chicago Avenue
Suite D
Chicago, IL 60202
Tel: 847.733.1390
Fax: 847.733.1391
This document, together with the concepts and designs presented herein, as an instrument of services, is
intended for the specific purpose and client for which is was prepared. Reuse of and improper reliance on this
document without written authorization by Gorove /Slade Associates, Inc., shall be without liability to
Gorove /Slade Associates, Inc.
HH Hunt Assisted LiviOraffic Impact Analysis
TABLE OF CONTENTS
List of Figures
List of Tables
Executive Summary
Introduction
Scope of Study
Existing Conditions (2008)
Existing Roadway Network
Existing Traffic Volumes
Existing Conditions Capacity Analysis
February 1, 2008
2
3
1
3
4
4
4
5
Future Conditions Without Development (Future Background 2010) 7
Planned Roadway Improvements 7
Future Conditions without Development Traffic Volumes 7
Future Conditions without Development Capacity Analysis 8
Future Conditions With Development (Total Future 2010) 10
Site Description 10
Site Access 10
Site Generated Volumes 10
Directional Distribution, Trip Assignment, and Total Future Traffic Volumes 11
Total Future Capacity Analysis 13
Warrant Analyses- Right Turn Lane 15
Pedestrian and Bike Facilities on Site 16
Queuing analysis (2010) 16
Conclusions 17
i
HH Hunt Assisted Livin`raffic Impact Analysis
LIST OF FIGURES
Figure 1: Regional Map and Site Location 2
Figure 2: Existing (2008) Conditions 6
Figure 3: Future Conditions without Development (2010) 9
Figure 4: Site Generated PM /SAT Peak Hour Traffic Volumes 12
Figure 5: Future Conditions with Development (2010) 14
LIST OF TABLES
Table 1: Existing (2008) Intersection Capacity Analysis 5
Table 2: Future Conditions without Development (2010) Intersec
Table 3: Proposed Site Trip Generation (2010)
Table 4: Future Conditions with Development (2010) Intersection
Table 5: Warrant Analysis for Right Turn Lanes
February 1, 2008
on Capacity Analysis 8
10
Capacity Analysis 13
15
HH Hunt Assisted Liu' raffle Impact Analysis
EXECUTIVE SUMMARY
The following report presents the findings of a traffic impact analysis for the proposed HH Hunt
Assisted Living development in Frederick County, Virginia. The site is located just outside the city of
Winchester along the south side of Route 50 (Northwestern Pike) bounded by Echo Lane to the west
and Ward Avenue /Botanical Boulevard to the east.
The proposed HH Hunt development plan consists of approximately 84 beds for assisted living
housing. The development will have primary access from Ward Avenue and a secondary limited access
from Route 50 (Northwestern Pike). The project is scheduled to be built -out by the year 2010.
The analysis presented in this report supports the following major conclusions:
Existing Conditions (2008)
No mitigations are required at the study intersections under the existing conditions based on
the criteria set forth by the Virginia Department of Transportation (VDOT) (LOS D or better
per lane group).
Future Conditions without Development (Future Background 2010):
Future Conditions with Development (Total Future 2010):
The HH Hunt development during the peak traffic hours will generate:
February 1, 2008
No mitigations are required at the study intersections under the future conditions without
development scenario based on the criteria set forth by the Virginia Department of
Transportation (VDOT) (LOS D or better per lane group).
The projected site trips for the assisted living development will have a negligible impact on the
roadway network within the vicinity of the site.
Approximately 25 trips during the PM peak Hour (13 in and 12 out) and 34 Saturday peak
hour trips (18 in and 16 out).
Approximately 1 trip every 2 minutes will travel along Route 50 (Northwestern Pike) in
the PM and Saturday peak hours.
All intersections operate at an acceptable level of service based on the criteria set forth by the
Virginia Department of Transportation (VDOT) (LOS D or better per lane group).
iii
HH Hunt Assisted Lisp Traffic Impact Analysis
INTRODUCTION
This report presents the findings of a traffic impact analysis for the proposed HH Hunt Assisted Living
development in Frederick County, Virginia. The site is located just outside the City of Winchester
along the south side of Route 50 (Northwestern Pike) bounded by Echo Lane in the west and Ward
Avenue /Botanical Boulevard to the east. The general location of the site is indicated in the regional
map found in Figure 1.
The proposed assisted living development plan consists of approximately 84 beds for assisted living
housing. Two (2) access points to the proposed site will be provided. The primary site drive is along
Ward Avenue, just south of the intersection of Route 50 (Northwestern Pike) with Ward Avenue. The
secondary site drive is located along Route 50 (Northwestern Pike) along Echo Lane (Limited Access).
The development site is currently zoned as a Rural Area (RA). A rezoning of the property to B2 is
being proposed for the assisted living residential development.
The following tasks were undertaken as part of this study in accordance with direction received from
VDOT staff in a scoping meeting held on January 17, 2008:
Field reconnaissance in the vicinity of the site was performed to collect information related to
existing traffic controls, roadway geometry, and traffic flow characteristics;
Traffic counts were conducted on Thursday, January 10, 2008 and Saturday, January 12,2008
during the afternoon and Saturday peak hours at the intersections located within the study area;
o Future traffic conditions were projected based on inherent traffic growth of two percent
compounded annually over a two -year period to account for regional development along the
roadway network along with the trips generated from the background development within the
vicinity of the study area and the proposed site plan.
Site traffic volumes were generated based on the methodology outlined in the Institute of
Transportation Engineers' (ITE) Trip Generation 7` Edition. The ITE Trip generation rate for
assisted living developments is approximately 4 trips per day per bed. Intersection capacity
analyses were performed using Synchro, version 6.0 based on the Highway Capacity Manual
methodology. Traffic analyses were performed for the existing conditions (2008), future
conditions without development (Future Background 2010), and future conditions with
development (Total Future 2010) at the intersections and roadway segments contained within
the study area. Sources of data for this study include Frederick County, VDOT, and the office
files and field reconnaissance efforts of Gorove /Slade Associates, Inc.
February 1, 2008
1
HH Hunt Assisted LiviTraffic Impact Analysis
Figure 1: Regional Map and Site Location
February 1, 2008
f�'c•R h v .'e ti e rn 1 =iks
`all Dr
SITE
Rnttr,d Hm
4111 F;.
4.111t CrA=G
Rain Hi$ ft9
.7?
C..uT t;.gs94 -_y2r
0 Fa+'t Mart)
522'
50
Winchester
Alt
;11
W 'd to H E 7 T E
17:
Barmett
'6'tY EJUfl, J al Park
S1 y Nstr_:.k L o Y
o.
R G I N A A
8uerii2g
Frederick Knells
Burnt F
P
447
Q 4 y
1' fX
S Itk xxst:er' 6
meter .�C
tad alCmt r -fr
.�w
'thy C.t
HH Hunt Assisted Liv Traffic Impact Analysis
Scope of Study
The following intersections were identified for inclusion in this study:
Route 50 (Northwestern Pike) and Echo Lane;
Route SO (Northwestern Pike) and Ward Avenue /Botanical Boulevard;
All site driveways associated with the proposed site.
This report presents the findings of analyses performed for the following conditions:
Existing Conditions (2008): Consider existing traffic volumes and existing roadway
configurations during the weekday evening and Saturday peak hours.
Future Conditions without Development (Future Background 2010): Consider
future traffic conditions resulting from inherent traffic growth, but do not include volumes
generated by the proposed HH Hunt Assisted Living development.
Future Conditions with Development (Total Future 2010): Consider future traffic
volumes with the background growth and traffic generated by the proposed site.
The results of the analysis and the traffic impacts associated with the proposed development plan are
presented in the Conclusion section of this report.
February 1, 2008
3
HH Hunt Assisted Liviil>/fraffic Impact Analysis
Egi
EXISTING CONDITIONS (2008)
Existing Roadway Network
A description of the major roadways within the immediate vicinity of the site is presented below:
Route 50 (Northwestern Pike} is a four -lane, divided roadway with posted speed limit of
35 mph in the vicinity of the site.
Echo Lane is a two -lane, undivided roadway. There is no median break at the intersection of
Echo Lane. Hence, the northern and southern approaches have a right -in right -out access.
Ward Avenue is a two -lane, undivided roadway. There was no posted speed limit sign in the
vicinity of the site.
Botanical Boulevard is a four -lane, undivided roadway with a posted speed limit of 35 mph
in the vicinity of the site.
Figure 2 illustrates the local roadway network with the existing intersection lane uses and traffic
control devices.
Existing Traffic Volumes
In order to determine the peak hour turning movement traffic volumes, traffic counts were conducted
on Thursday, January 10, 2008 from 4:00 PM to 7:00 PM and on Saturday, January 12, 2008 from
11:00 AM to 2:00 PM. Analysis of the existing traffic data determined that the weekday afternoon
peak hour occurred from 4:45 PM to 5:45 PM and the Saturday peak hour occurred from 12:45 PM to
1:45 PM.
The existing peak hour traffic volumes for the intersections contained within the study area are shown
in Figure 2. The existing turning movement counts are included in the Technical Appendix.
February 1, 2008
4
HH Hunt Assisted LivTraffic Impact Analysis
Table 1: Existing (2008) Intersection Capacity Analysis
Intersection (Lane Group)
February 1, 2008
Existing Conditions Capacity Analysis
Intersection and roadway capacity analyses were performed for the existing conditions at the
intersections and roadway segments contained within the study area during the afternoon and Saturday
peak hours. Synchro, version 6.0 was used to analyze the study intersections based on the Highway
Capacity Manual methodology.
The results of the intersection capacity analyses are presented in Table 1, and are expressed in level of
service (LOS) and delay (seconds per vehicle) per lane group. Figure 2 illustrates the results
graphically.
Existing Conditions
PM Peak Hour SAT Peak Hour
Level of Delay Level of Delay
Service (sec /veh) Service (sec /veh)
Route 50 and Echo Lane Drive (Unsignalized
Northbound Right A 0.0 A 0.0
Southbound Right A 9.1 A 9.7
Route 50 and Ward Avenue /Botanical Boulevard (Signalized)
Overall A 8.6 A 8.8
Eastbound Left D 45.5 D 51.9
Eastbound Through A 7.6 A 8.2
Eastbound Right A 6.0 A 5.6
Westbound Left D 45.6 D 50.7
Westbound Through A 6.2 A 6.6
Westbound Right A 4.9 A 5.0
Northbound Left /Through D 43.2 D 49.5
Northbound Right D 42.2 D 48.1
Southbound Left A 0.0 D 49.0
Southbound Left /Through A 0.0 D 49.1
Southbound Right D 44.4 D 48.5
There is no median break at the intersection of Echo Lane with Route 50. Hence, the northern and southern approaches have
a right.in right-out access
According to VDOT guidelines on traffic operations performance, it is desirable to achieve a LOS D or
better per lane group. The results presented in the Table 1 conclude that:
No mitigations are required at the study intersections under the existing conditions based on
the criteria set forth by the Virginia Department of Transportation (VDOT) (LOS D or better
per lane group).
5
HH Hunt Assited Livin lopment
Existing Lane Configuration and Traffic Control
LEGEND
Existing ConditIom
Lane Configuration
Traffic Signal
-a- Stop Sign
Existing PM /SAT Peak Hour Traffic Volumes
LEGEND
-00000 Peak HourTraffic
x00/00 Volumes
JAL
0/0
768/966-
15
Route 50 (Northwestern Pike)
t-0/0
851/1069
Route 50 (Northwestern Pike)
J
aoa
JIB
2/7 J
2]519
39/40
E
I1 r
3
r 40/17
t 1r
Existing PM /SAT Peak Hour Levels of Service
LEGEND
`NA Peak Hour Level of
Service
r
Route 50 (Northwestern Pike)
0/0
NA�
NAB
g
A NA
A NA co
( 0/0
NA
1 r
on
on
Figure 2
Existing (2008) Conditions
February 1, 2008
6
HH Hunt Assisted LivTraffic Impact Analysis
February 1. 2008
FUTURE CONDITIONS WITHOUT DEVELOPMENT (FUTURE BACKGROUND 2010)
Planned Roadway Improvements
There are no planned roadway improvements in the area.
Future Conditions without Development Traffic Volumes
The construction of the proposed assisted living development is anticipated to be complete in 2010.
Typically, future traffic volumes are projected by increasing existing traffic volumes to the build -out
year using a growth rate based on historical traffic growth. Based on historical data obtained from
VDOT, an inherent growth rate of two (2) percent per year over a two -year period, or a total increase
of 4.04% was applied to the existing traffic volumes along Route 50.
The Valley Health Systems, Degrange Property and WWW Property sites were the approved
developments identified at the scoping meeting with VDOT and the County. These approved
developments are located in close proximity of the proposed Assisted Living Facility, north of Route 50
(Northwestern Pike). The traffic studies for these approved developments were prepared by PHR +A,
and were utilized in order to calculate the trip generation and distribution. The trip generation tables
and distribution for the approved developments is attached in the appendix section of the report.
The trips generated by the background approved developments along with the inherent growth were
added to the existing volumes to estimate the future volumes without development as illustrated in
Figure 3.
7
HH Hunt Assisted Livi raffic Impact Analysis
Future Conditions without Development Capacity Analysis
Intersection capacity analyses were performed for the future background conditions at the intersections
and roadway segments contained within the study area during the afternoon and Saturday peak hours.
Synchro, version 6.0 was used to analyze the study intersections based on the Highway Capacity Manual
methodology.
The results of the intersection capacity analyses are presented in Table 2 and Figure 3. The detailed
analysis worksheets are contained in the Technical Appendix.
Table 2: Future Conditions without Development (2010) Intersection Capacity Analysis
Intersection (Lane Group)
Future Conditions Without Development
PM Peak Hour SAT Peak Hour
Level of Delay Level of Delay
Service (sec /veh) Service (sec /veh)
Route 50 and Echo Lane (Unsignalized
Northbound Right A 0.0 A 0.0
Southbound Right A 9.1 A 9.5
Route 50 and Ward Avenue /Botanical Boulevard (Signalized)
•Overall B 17.5 C 28.8
Eastbound Left D 46.2 D 41.9
Eastbound Through 9 15.9 D 36.6
Eastbound Right A 9.3 B 14.2
Westbound Left D 47.7 D 42.3
Westbound Through B 13.3 C 20.6
Westbound Right B 11.2 B 13.5
Northbound Left /Through D 45.7 D 37.8
Northbound Right D 44.8 D 37.0
Southbound Left D 44.0 C 33.2
Southbound Left /Through D 44.0 C 33.3
Southbound Right D 41.4 C 25.2
There is no median break at the intersection of Echo Lane with Route 50. Hence, the northern and southern approaches have
a right-in right-out access
As mentioned earlier in the report, it is desirable to achieve a LOS D or better per lane group. The
results in Table 2 conclude that:
All study intersections operate at an acceptable level of service under the future conditions
without development scenario.
February 1, 2008
8
HH Hunt Assisted Livinselopment
Future Background Lane Configuration and Traffic Control
LEGEND
Ex sting Conditions
Lane Configuration
Traffic Signal
Stop Sign
Future Background PM /SAT Peak Hour Traffic Volumes
LEGEND
00/00 Peak HourTraff c
00/00 Volumes
4- 00/00
rvoo
J l L
0/0
1312/1512
1/0 n
Route 50 (Northwestern Pike)
t 0/0
1104/1608
Route 50 (Northwestern Pike)
62/116il
1209/1354-
41/42- 1
207/97
1053/1487
n 42(18
;ate
Future Background PM /SAT Peak Hour Levels of Service
LEGEND
L Peak Hour Level of
—A/A Service
Route 50 Northwestern Pi
Figure 3
Future Conditions without Development (2010)
February 1, 2008
9
HH Hunt Assisted Livi raffic Impact Analysis
FUTURE CONDITIONS WITH DEVELOPMENT (TOTAL FUTURE 2010)
Site Description
The proposed HH Hunt Assisted Living development is located just outside the city of Winchester
along the south side of Route 50 (Northwestern Pike) bounded by Echo Lane to the west and Ward
Avenue /Botanical Boulevard to the east. The proposed development plan consists of approximately 84
beds for assisted living housing. The development will have primary access from Ward Avenue and a
secondary limited access from Route 50 (Northwestern Pike). The project is scheduled to he built -out
by the year 2010.
Site Access
Two access points to the proposed site will be provided. The primary site drive will be along Ward
Avenue (Full Access), whereas the existing right -in right -out access (Echo Lane South) along Route 50
(Northwestern Pike) will form the secondary site drive (limited access).
Site Generated Volumes
In order to calculate the trip generation for the proposed development, the ITE's Trip Generation, 7
Edition publication was used to determine the trips into and out of the proposed site for the weekday
afternoon and Saturday peak hours as well as for the entire day. Table 3 presents the new trips
generated by the proposed site.
Table 3: Proposed Site Trip Generation (2010)
Land Use
Assisted Living
Total Future Trip Generation
ITE Size PM Peak Hour SAT Peak Hour Daily
Code
In Out Total In Out Total Total
254 84 Beds 13 12 25 18 16 34 231
Total Site Trips 13 12 25 18 16 34 231
February 1, 2008
1 0
HH Hunt Assisted Livi O raffic Impact Analysis
Directional Distribution, Trip Assignment, and Total Future Traffic Volumes
The distribution of the proposed site trips was based on existing volumes and anticipated traffic
patterns. Based on the location of the proposed site and the existing traffic data, the inbound and
outbound trips calculated for the weekday morning and afternoon peak hours were routed in the
roadway network to the site based on the direction of approach assumptions presented below:
Direction of Approach:
Route 50 (west of Echo Lane) 10%
Route 50 (east of Ward Avenue) 90%
Number of vehicles entering and exiting the site entrances:
Inbound (PMPH /SATPH)
Primary site drive (Ward Avenue) 12 /16 (90
Secondary site drive (Echo Lane) 1/2 (10
Outbound (PMPH /SATPH)
The site traffic assignment for the weekday morning and afternoon peak hours is illustrated in
Figure 4. The proposed site trips were added to the future background volumes in order to establish
the total future 2010 traffic volumes, and are shown in Figure 5.
February 1, 2008
Primary site drive 5/6 (40
Secondary site drive 7/10 (60
11
HH Hunt Assited Livintlopment
Figure 4
Site Generated PM /SAT Peak Hour Traffic Volumes
February 1, 2008
12
Total Future Lane Configuration
J
and Traffic Control
m
J kL
r_ Route 50 (Northwestern Pike)
LEGEND
E Conditions
i t-
Lane Configuration
w
Traffic Signal
1
Stop sign
2
Route 50 (Northwestern Pike)
90 /0
10%
LEGEND
-00/00 Peak HourTraffc
—00/00 Volumes
__mix E
Background Site Generated
0 00
o
J I L
Traffic Volumes
000
i_ 0/0 1/2 Route 50 (Northwestern Pike) J
m L 0
I L
/0
—0/0 0/0
x 12/16
0/0 J
0 /2n A
w
LEGEND
0/0 J
2 o o�
0
aQ
J
'I I r
m
00
00/ Site Traffic Volumes 516
0/0-
r 00 /00
HH Hunt Assited Livintlopment
Figure 4
Site Generated PM /SAT Peak Hour Traffic Volumes
February 1, 2008
12
HH Hunt Assisted Livirraffic Impact Analysis
Intersection (Lane Group)
Route 50 and Echo Lane (Unsignalized
Northbound Right
Southbound Right
February 1, 2008
B
A
Site Drive (Full Access) and Ward Avenue (Unsignalized)
Eastbound Left /Right A
Northbound Through A
Total Future Capacity Analysis
Intersection capacity analyses were performed for the total future 2010 traffic conditions at the
intersections and roadway segments contained within the study area during the morning and afternoon
peak hours. Synchro, version 6.0 was used to analyze the study intersections based on the Highway
Capacity Manual methodology.
The results of the intersection capacity analyses for the total future conditions are presented in
Table 4. The detailed analysis worksheets are contained in the Technical Appendix.
Table 4: Future Conditions with Development (2010) Intersection Capacity Analysis
Future Conditions With Development
PM Peak Hour SAT Peak Hour
Level of Delay Level of Delay
Service (sec /veh) Service (sec /veh)
14.8 C 16.8
9.1 A 9.6
Route 50 and Ward Avenue /Botanical Boulevard (Signalized)
Overall 8 18.1 C 34.0
Eastbound Left D 44.8 D 50.4
Eastbound Through B 16.7 D 39.5
Eastbound Right A 9.7 B 15.4
Westbound Left D 47.0 D 44.1
Westbound Through B 13.7 C 28.3
Westbound Right B 11.5 B 18.0
Northbound Left /Through D 45.2 D 41.8
Northbound Right D 44.2 D 40.8
Southbound Left D 43.5 D 36.8
Southbound Left /Through D 43.4 D 37.0
Southbound Right D 40.9 C 27.9
9.2 A 9.0
0.0 A 0.0
There is no median break at the intersection of Echo Lane with Route 50. Hence, the northern and southern approaches have
a right-in right-out access
All the study intersections would operate at acceptable levels of service.
As mentioned before, it is desirable to achieve a LOS D or better per lane group. The results in
Table 4 conclude that:
The proposed HH Hunt Assisted Living development will generate approximately 1 trip/ 2
minutes along Route 50 (Northwestern Pike) in the PM and Saturday peak period respectively.
Figure 5 shows the results graphically.
13
HH Hunt Assisted Livin lopment
Total Future Lane Configuration and Traffic Control
LEGEND
Ex Conditions
t—
Lane configuration
Traffic Signal
1 Stop Sign
Site Improvements
Total Future PM /SAT Peak Hour Traffic Volumes
LEGEND
00 /00 Peak HaurTraffc
rw Volumes
Jl_
0/0
1312/1512--
2/2—i 6
0/0
--11 05/1609
0
r
Route 50 (Northwestern Pike)
Route 50 (Northwestern Pike)
J
L
62/116—
1216/1354-
41/42-,
mr
am
J
5/6 J-1 1
�2 oC
r
L 207/97
1053,/1487
c 54/3c
-r
Total Future PM /SAT Peak Hour Levels of Service
LEGEND
NA Peak Hour Level of
Service
m
Route 50 (Northwestern Pike)
000
JkL-
000
A/A
1
0
00
Figure 5
Future Conditions with Development (2010)
February 1,2008
14
HH Hunt Assisted Liviliraffic Impact Analysis
WARRANT ANALYSES- RIGHT TURN LANE
Right turn warrant analyses were reviewed for the right -in right -out site entrance along Route 50
(Northwestern Pike). Based on Virginia Department of Transportation (VDOT) Road Design Manual,
warrant analysis for right turn lane was performed at the proposed driveways to determine if a right
turn lane is required. It should be noted that the VDOT Road Design Manual provides a guideline for
left -turn and right -turn facilities to be considered on four -lane highways. Table 5 presents the results
of this analysis.
Table 5: Warrant Analysis for Right Turn Lanes
Intersection
Route 50 and Secondary Site Drive
(BIRO)
February 1, 2008
Approach Right Turn Right Turn Warrant Analysis
Volume Volume
PM SAT PM SAT PM Right Turns SAT Right Turns
1314 1514 2 2
Notes:
1. Source: VDOT Road Design Manual (Table C-1-9).
2. Warrant Analysis is based on the future with development (2010) volumes
Right turn lane
not required
Right turn lane
not required
As shown in Table 5, right turn lane or taper is not required at the intersection of Route 50
(Northwestern Pike) with Secondary Site Drive (RIRO).
The VDOT Subdivision and Commercial Entrance Spreadsheet for the Edinburg District for four lane
divided highways was also used in order to check the requirement for a right turn lane. The spreadsheet
revealed that a right turn lane is required at the entrance. The Subdivision and Commercial Entrance
Worksheet recommends turn lanes based on a combination of factors such as Posted Speed Limit,
Highway Traffic Volume etc. The factors taken into consideration are translated into points, which are
tallied in order to come up with the recommendations. The traffic volume data i.e. existing as well as
site generated (VPD's) is also converted into points based on the range in which they fit in. The ranges
in which traffic volumes are evaluated is depicted in increments of 500 VPD's, starting from 0 working
up to 6,000. The Subdivision and Commercial Entrance Worksheet is therefore very generic in
structure as compared to the VDOT Road Design Manual Guidelines. The VDOT Road Design Manual
guidelines are very specific, especially for right turn bay analysis. The recommendations are based on
the specific peak hour volumes for approaches and especially right turns.
Based on the above information coupled with the fact that the Secondary Site Drive (RIRO) has a
projected peak hour volume of approximately 2 vehicles turning right in the peak hour, a right turn bay
is not recommended at this Site Entrance. The detailed analysis worksheets are provided in the
technical appendix.
15
HH Hunt Assisted Liviikraffic Impact Analysis
PEDESTRIAN AND BIKE FACILITIES ON SITE
For non vehicular transportation features on the site, please refer to the concept plan prepared by
Bowman Consultants that will accompany this report.
QUEUING ANALYSIS (2010)
February 1, 2008
Queuing analyses were performed at the existing and proposed intersections contained within the
vicinity of the proposed development to determine any queuing issues under future traffic conditions
(2010). The queuing analyses were performed using Synchro, version 6.0. The queuing analyses results
are expressed in terms of the 95 percentile and 50` percentile queue Length (in feet). The 50t
percentile queue length is the average queue length observed during the peak hour. The 95` percentile
queuing results show the worst -case scenario and has the probability of occurring approximately once
in the peak hour. Hence, for design purposes, the 50` percentile queue results are representative of the
actual conditions. The queuing analysis results table and worksheets are included in the Technical
Appendix.
16
HH Hunt Assisted Livin Impact Analysis
CONCLUSIONS
This report presents the findings of a traffic impact analysis for the proposed HH Hunt Assisted Living
development in Frederick County, Virginia. The site is located just outside the city of Winchester
along the south side of Route 50 (Northwestern Pike) bounded by Echo Lane to the west and Ward
Avenue /Botanical Boulevard to the east.
The proposed HH Hunt development plan consists of approximately 84 beds for assisted living
housing. The development will have primary access from Ward Avenue and a secondary limited access
from Route 50 (Northwestern Pike). The project is scheduled to be built -out by the year 2010.
The analysis presented in this report supports the following major conclusions:
Existing Conditions (2008)
No mitigations are required at the study intersections under the existing conditions based on
the criteria set forth by the Virginia Department of Transportation (VDOT) (LOS D or better
per lane group).
Future Conditions without Development (Future Background 2010):
No mitigations are required at the study intersections under the future conditions without
development scenario based on the criteria set forth by the Virginia Department of
Transportation (VDOT) (LOS D or better per lane group).
Future Conditions with Development (Total Future 2010):
The projected site trips for the assisted living development will have a negligible impact on the
roadway network within the vicinity of the site.
The HH Hunt development during the peak traffic hours will generate:
Approximately 25 trips during the PM peak Hour (13 in and 12 out) and 34 Saturday peak
hour trips (18 in and 16 out).
Approximately 1 trip every 2 minutes will travel along Route 50 (Northwestern Pike) in
the PM and Saturday peak hours.
All intersections operate at an acceptable level of service based on the criteria set forth by the
Virginia Department of Transportation (VDOT) (LOS D or better per lane group).
February 1, 2008
17
gl 100 R 0 alc TI
DATE JAN. 2008
I JOB No. 5132 -01 -0031.
0TO
DESIGN
DATE
1ii
i
o,, LTH
1 .COOP CESai0
❑c. No. 3,001 g
•3
,$3
REVISIONS
GENERALIZED DEVELOPMENT PLAN
HHHUNT CORPORATION
ROUTE 50 ASSISTED LIVING FACILITY
BACK CREEK MAGISTERIAL DISTRICT FREDERICK COUNTY, VIRGINIA
Batman Consarg Camp. La
Wbcnetsterkete
rsa;auw+�,a
Witcher.. °�°M
Hla0),
rm.=
Bo s 1
C O N S U L
1
OESCFPPON _F�
f
0
Cl
i F ii
jam! gM
1 V rl I
_k i v
4
/Kir WARD Ak
i
1
4 0 RI ra- 7 3 1 /O' L1iY
f v v ,ca.
-i _I I r N i
l r' v. r
I t r f I r I,
L I r �2 r I f 1
m� I 1 A v r y l
I
i .Y r
T il._ O g <T: �1- 'g�;
Jti y co •ri ..H
j" %r `r
Uzi
-s
F '4I
titt
ti 0 r
,0I,�
i x N.
y I
fir+ 8
fi i t I kV
=1 /111. m's /r fir- 1
i f
C n
c
N
Z
A
I I.
I
I
li
I
II
I, I
blI Jk,lu
I ✓I {IJ:
SCALE: 3/32" =1 I
ELEVATION
AMSHRECiS
11
SCALE: 3 /32 =1' -0"
ELEVATION
SCALE: 3/32" P -0"
ELEVATION
CA W WiP
L
SCALE: 3132' =1' -0'
ELEVATION
1*7 EIDPESFO
"p4
IC C ERT ND
SRm
4t� r"
SS T a o
&ct
1 1 ,IlyrE,
11 lUidill
I lit
III I I,.
116
II
I III
ii
I I
il II
IL
1 IL
\IY AU 'Yp -YYl 11
iii siaaia :Al ai.
I IA
IS
II
il
I IE
11111
11
i
III
VIII
lir
i ii
rI
.LlulI
i
I I
iii
'Fl bi
j
11 i
l
.1 I
1
\vans
}I ff
1
T
II
Id II�
I
1
1p11
IIII�IiI I
�i ll.l
I ii
U f
I
II
Ifl II
h i ll
li
i {II
i f
d
ihiNVIII'
i
i
EEEEB
i E II I
li
E41
El I E..
�66 i
i r
nil
l
1 1 1
IIi VIII
IIII If
11
IIIf
rrrri
IIII
tr III 1
�III
I' 1�
'1
n'Iu
11f
Oi(' IIII
ti
I �i1'4..
it
i
1
rl
i t
it
�I.
I
'll
1'11'I'i'i
Ilf I ll l
I11
Ili
I1 f I I
I I I II
rill' Ilfln
II l
i1
iII
h l, I
II
tmf
I ,4
I
1110
VIII
iII
LluI
i l l
wit!
L I
qmli
III
v s
i�
G t
iiij
l.
fN
ESE
It
ll
Ee
G am`
II'II
IIiII.
il
I
i,;
IJIIUI'Ill
��flL
1;II�IILi(
I
10 BE ASSMnFC 10 Nrt MFtl PEASE 4.107017
II I III 11
i ii ll lj i
l l
Mt PPE THEY
I'
�I
p I1�1111
�1
�f
Il it 91
�lup,,
III
it
t
i:
`4
II
I
II
11/
'1,
IIII''
i
f
iI111I
f; 1 i
�I IIi
hill
1
I�
a(
li
1 1 1
1iI
y
10,I l ll!'I
I
II
1
II, I111
'111'
1
if 11
1,• hf,
11 I
,j
I I
f
I
1. —Il
1W7T1 7E0.
1MFSE PPx9 1NESE MANS
ARE Fql iO flF PFfliMRC. Mfl770 CN CCPF
f I
EXPRESSLY RESERVE S RS COMMON LAW FATI161R N9 OTKR PROPERTY
C) MMSMl,S
RICKS N
FIPSi (Niuuwf.
NWilp *7llaSS 1
➢;x ;;M' idlM
rrl
w
Z
0
0
cn
r
m
Ww Nlv :mx ILSOOX
HH Hunt
Spring Arbor of Winchester
Winchester, Virginia
co
0
0
i
ISSUE'
REVISERS
"p4
IC C ERT ND
SRm
4t� r"
SS T a o
&ct
M1E
rrl
w
Z
0
0
cn
r
m
Ww Nlv :mx ILSOOX
HH Hunt
Spring Arbor of Winchester
Winchester, Virginia
co
0
0
i
SCALE: 1/4" 1' -0"
SCALE: 3/4" =1 -0
MAINTANCE BUILDING WALL SECTION
n m o P E z
1 0 a i s! a s
4
6 B
ill
T
(ISSUE
I•
µcmre
CEl NOi
SIAP
au4uN
<Fpµ X
I
i
i
Cc 0
I
1
j
i
1I 1.L
1
I
1
1 1
III
II
11 11
=11 OCT
i l
n
x I
-E i
II
I
h 0
I�
1
r
_Ili II I
N jr
II
Lt..
t
tY YYi Ark
1
I
v
Wz
c
I A
I
i
it
1
1
1
.A
C
pp
5
SCALE: 1/4 =1' -0"
MAINTANCE BUILDING ELEVATION
1
1
IJ
11
2
SCALE: 1/4 =1-0"
MAINTANCE BUILDING PLAN
E
NVMBFNCH
(flan FAI RG1pX)
g g
_n
E
I
I4
m
a
o
SCALE: 1/4" =1' -0"
C
D
O
MAINTANCE BUILDING ELEVATION
u F,
i o
6' -1 1/2" 4 -6 1/2' u
la
ETE�
:D FINISH)
F.
Ti
�1
m
y
I
j
I
I j
m
4
ARCHITECTS EMPFFSSY PE! rtS FMIN(w LAW COPYRIGHT Am MHFP PPMFan arrMS lu MF.SF Pi ixFSP PL APF uni TO SF PFMn [xaursn nn nroun ltt ONY
mo
S? 6r
As
m N
os
px
o�m
is
u
r. Ab JDPN
w
OP na
uwu[a wut5[F uco u:W xPG iuw in aG naelnum in euv man cxary 1555x515 rum mrawiun vc cvvoccccn unmcx ocxueeu
m
X
Eo
Z
0
1
1
0
0)
D
r
HH Hunt
Spring Arbor of Winchester
Winchester, Virginia
0
0
ISSUE
REVISIONS:
4
ill
(ISSUE
I•
µcmre
CEl NOi
SIAP
au4uN
<Fpµ X
Cc 0
rArE
m
X
Eo
Z
0
1
1
0
0)
D
r
HH Hunt
Spring Arbor of Winchester
Winchester, Virginia
0
0
,x o�
A
J i�
A
\z4 \`fi >N"?
7 s rte,
2 v „77..(2 an488� 1
A-12 cv;D m
amp tcmcioc5
g o Q t a i n'� ni p om a V] v 0
DAR9E d 1 I ="J
s
0
m
0
4
1
5132-C- MP-001
Z
c
A
0 N
N
0
CO
tg
9 a T A N 4 g 0
v(0
T x
M n H oo
o m m "I. no tZJr oA
A(1 Z A C Z Z O
0 A< V) 1- 0 mmcnro -u x
n m oCsJn O> sX L mm
gm(n rn 5 z Nro Z (o A°
Z O p O O O O U O O W fr, K 2' n N H sr z 'T O mN 0
5z rn2 mw Gn'00 UI t p z
ny Ox 02 E0 mm• OZ O
Z m N:.TO'�
n 4 0 O c 0
o z C
tt
A
0
MED
R�gQ;amoa
y 2 o z m G m m 0 A
W g o Qi <i
1 m m m D P Z O G p G O
y f•1 Z
g Z
P 8 m
"WA kD AV "-LS
—oe z02
Tht
XIOd90e OS 9a
01
2
5
O
N
swm
2 Saz
F.61 mE2F.
�U1 00 ,os
VCS 83.
°odzo §o 0 >S D coF m'
v
W5
>ZO
00>
20 mAgs s E 5 2 6 m
�8 g r oga 'Sm
M-A.L'� A xsE
3
L
2
rn
0
c
rn
m
711
7
0
z
0
CO
(ot
13
rn
rn
P1 C C)
Z 01
2
p1 0
m -o
(O 7
r
r
-0 2
1
c 0 z
-4 0
2 0
6 r
c7)
Z -4
(1)
7. Ni ul PI
o CA 7
Z CU
m m I 0 Z
U) CA
I r
m Ti No
Z
m
rT1
z
C7
-n
CL
.,----ti. 1
t n
1—-1
L. 1
i ..t.'
t '‘i.. L........ x
1 i i t 1 3 tt
U
0
L4
r
0
0 xi
NJ
0
z
0 m
o
6
Ul
m
WAR
A Vt. RTE
71 NI 0 c 0 z
9
rn m 03 Z 0 PI di 7 1
c
x I c
19 rn f_,4 12 I+ Z
2 c C
u)
2 xi i R o N 1
r9 ri c
1— NJ
p
0 n,
d z
cv
t.) mzrricAz
2 M
P1 Q
0 I
7' LT)
CD
1317
0)
L
I C c
2
1 m rr
r 5
e_
7 N 'Ivo- 0,
(,..1
a) 1—
N.... N I
0 m
rn°
rn o
N ern
0 73
rn c
v
F r"
r-
0
ctR
TY ®R /C
C
F i °A NT
yF s�
R
'II 11
i I I 0 1 i 1
m Z Z x X X
m m C UJ
m 2 m- --I D m
-n O 0 0 0 0 0
m z
73 wz Fr) z
K c C ::-1
m
D n n r co
Z —I
O O
z z
co D m
z --1
-1 m
D 77
70
0
Z
M4 R
M,g N S
0
0
r
j-i A
J N.17-1
x IS s
0
N
0
I DX
Z
-I
N Z 3 m e
S .2 4 .7i.
D O
4
t
N
O
�r-
L aimmum.
to
tr
d
�mc
p'rn
m O
a
zz r�*
0 23
m
r- (t
Z Z
0
4
HH Hunt Assisted Livinleraffic Impact Analysis
TECHNICAL APPENDIX TABLE OF CONTENTS
APPENDIX A
EX /STING (2008) TRAFFIC VOLUMES COUNT SHEETS
APPENDIX B
LEVEL OF SERVICE DEFINITIONS
APPENDIX C
SCOPING DOCUMENT
APPENDIX D
INTERSECTION CAPACITY ANALYSIS RESULTS EXISTING CONDITION
APPENDIX E
INTERSECT /ON CAPACITY ANAL YSIS RESULTS FUTURE CONDITIONS WITHOUT DEVELOPMENT
APPENDIX F -1
TR /PS GENERATION FOR BACKGROUND DEVELOPMENTS
APPENDIX F -2
TR /PS DISTR /BUT /ON FOR BACKGROUND DEVELOPMENTS
APPENDIX G
INTERSECTION CAPACITY ANALYSIS RESULTS FUTURE CONDITIONS WITH DEVELOPMENT
APPENDIX H
QUEUING ANALYSIS (2010)
HH Hunt Assisted Liviirattic Impact Analysis
APPENDIX A
EXISTING (2008) TRAFFIC VOLUMES COUNT SHEETS
Intersection:
NORTHWESTERN AVENUE (RTE. 50) AT ECHO LANE
AM PEAK
Direction:
Roadway:
Movement:
Right
Southbound
ECHO LANE
Thru Lett
Peds
Right
Westbound
RTE. 50
Thru Left
Peds
Right
Northbound
ECHO LANE
Thru Lett
Ped:
c Eastbound
RTE. 50
Right Thru I eft
Peds
6:00 AM t0 6:15 AM
6:15 AM to 6:30 AM
6:30 AM to 6:45 AM
6:45 AM to 7:00 AM
7:00 AM to 7:]5 AM
7:15 AM to. 7:30 AM
7:30 AM to 7:45 AM
7:45 AM to 8:00 AM
8:00 AM to 8:15 AM
8:15 AM to 8:30 AM
8:30 AM to 8:45 AM
8:45 AM to 9:00 AM
PM PEAK
Direction:
Roadway:
Movement:
Right
Southbot.ind
ECHO LANE
Thru Lett
Peds
Right
Westbound
RTE. 50
Thru Lelt
Peds
Right
Northbound
ECHO LANE
Thru Left
Pods
Right
Eastbound
RTE. 50
Thru Left
Peds
4:00 PM Ito 4:15 PM
0
1
1
0
0
0
0
1
0
1
0
1
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 1
0 0
2 2
0 1
0 0
0 0
0 1
0 3
0 0
0 0
0 0
0 D
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
2 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 1
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
227 0
201 0
186 0
177 0
214 0
186 0
178 0
175 0
184 0
163 0
158 0
114 0
0
0
0
0
0
0
0
3
0
0
0
0
4:15 PM to 4:30 PM
4:30 PM to 4:45 PM
4:45 PM to 5:00 PM
5:00 PM to 5:15 PM
5:15 PM to 5:30 PM
5:30 PM to 5:45 PM
5:45 PM to 6:00 PM
6:00 PM to 6:15 PM
6:15 PM to 6:30 PM
6:30 PM to 6:45 PM'
6:45 PM to 7:00 PM
PEAK HOURS
Direction:
Roadway:
Movement
AM INTERSECT /ON PEAK HOUR
6:00 AM to 7:00 AM
PM INTERSECTION PEAK HOUR
4:00 PM to 5:00 PM
AM SYSTEM PEAK HOUR
6:00 AM to 7:00 AM
PM SYSTEM PEAK HOUR
4:45 PM to 5:45 PM
Right
0
2
0
0
Southbound
ECHO LANE
Thru Lett
0 0
0 0
0 0
0 0
Peds
0
2
0
0
Right
0
4
0
2
Westbound
RTE. 50
Thru Lett
0 0
0 0
0 0
0 0
Peds
0
2
0
0
Right
0
0
0
0
Northbound
ECHO LANE
Thru Left
0 0
0 0
0 0
0 0
Peds
0
0
0
0
Right
0
1
0
0
Eastbound
RTE. 50
Thru Left
0 0
791 0
0 0
755 0
'Peds
0
0
0
0
PEAK HOUR
FACTORS
AM PEAK HOUR
PM PEAK HOUR
Overall
AM Period Intersection Voloine:
Southbound
Westbound
Northbound
Eastbound
ECHO LANE
Right Thru Lelt
0.00 0,00 0.00
0.00 0.00 0.00
AM PEAK HOUR FACTOR
0
Peds Right
N/A 0.00
N/A 0.50
3010/01
RTE. 50 ECHO LANE
Thru Lett Peds Right Thru Lelt I'eds Right
0.00 0.00 N/A 0.00 0.00 0.00 N/A 0.00
0.00 0.00 WA 0.00 0.00 0.00 N/A 0.00
Overall PM PEAK HOUR FACTOR
PM Period Intersection Volume:
RTE. 50
Thru Lett
0.00 0.00
0.88 0.00
0.88
Peds
-N /A
N/A
Gorove /Slade Associates
Project Name
Project 6
Location
Data Source:
HHHUNT ASSITED LIV NG
2151 -001
WINCHESTER, VA
Gorov
0
0
2
792
Date of Counts:
AM Weather Conditions:
AM INTERSECTION PEAK VOLUMES
J
J l 1. w
79
0
0
0
RTE, 50
0
RTE. 50
Th
0
f O
l 4 W
z
It 1
1 i
z i 5
O p
w
0
Z
0
i
Thursday, January 10, 2008
RTE. 0
RTE. 50
Mild, Clear 1 PM Weather Conditions:I
0
0
0
4
0
r
PM INTERSECTION PEAK VOLUMES
0
0
0
4
791
AM SYSTEM PEAK VOLUI
0
0
0
0
0
J j L
0
z
4
0
V
0
RTE. 50
0 0
RTE.
PM SYSTEM PEAK VOLUI1
l i
0
755
0
755
0
0
0
J jL
RTE. 50
J
i
z
2
w
cm
0 0
z1 5
o
W
RTE.
5
Intersection:
NORTHWESTERN AVENUE (RTE.50) AT WARD AVE.
AM PEAK
Direction:
Southbound
Westbound
Northbound
Eastbound
Roadway:
BDTANICAL
RTE. 50
WARD AVE.
RTE. 50
Movement:
Right
Thru Left
Peds
Right
Thru Left
Right
Thru .Left
.Peds
.Right
Thru Lett
Peds
6:00 ,AM to 6:15 AIM
6:15 AM to 6:30 AM
6:30 AM to 6:45 AM
6:45 AM to 7:00 AM
7:00 AM to 7:15 AM
7:15-AM to 7:30 AM
7:30 AM to 7:45 4M
7:45 AM to 8:00.4M
8:00 AM to 8:15 .4M
8:05 AM to 8:30.4M
8:30 AM to 8.45 AM
8:45 AM to 9:00 AM
PM PEAK
Direction:
Southbound
Wostbounrl
Northbound
Eastbound
Roadway:
BOTANICAL
RTE. 50
WARD AVE.
RTE. 50
Movement:
Right
Thru Left
Peds
Right
Thru Left
Peds
Right.
Thru Left
Peds
Right
Thru Left
Peds
4:00 PM to 4:15 PM
0
0 1
0 0
392 11
0 2
1 8
0 5
184 0
0
4:15 PM to 4:30 PM
0
0 1
0 1
383 9
0 3
0 14
0 12
180 0
0
4:30 PM to 4:45 PM
0
0 0
0 3
381 10
0 0
0 7
0 2
165 0
0
4:45 PM to 5:00 PM
1
0 0
0 0
411 12
0 2
0 11
0 10
177 0
0
5:00 PM to 5:15 PM
0
0 0
0 0
409 9
0 3
0 5
0 16
184 0
0
5:15 PM to 5:30 PM
2
0 0
0 1
446 11
0 7
0 14
0 4
177 1
0
5:30 PM to 5:45. PM
0
0 0
0 1
393 8
3 4
0 6
0 8
167 1
0
5:45 PM to 6:00 PM
2
0 2
0 1
338 15
0 7
0 11
0 9
161 0
0
6:00 PM to 6:15 PM.
0
0 0
0 2
287 8
0 2
1 8
0 8
175 1
0
6:15 PM to 6:30 PM
0
0 1
0 2
299 9
0 2
0 6
0 7
163 2
0
6:30 PM to 6:45 PM
2
0 1
0 0
230 9
0 3
1 4
0 10
144 0
0
6:45 PM.' to 7:00 PM
1
0 2
0 1
200 3
0 3
1 5
0 8
114 0
0
PEAK HOURS
Direction:
Southbound
Westbound
Northbound
Eastbound
Roadway;
BOTANICAL
RTE. 50
WARD AVE.
RTE. 50
Movement:
Right
Thru Left
Peds
Right
Thru Left
Peds
Right
Thru Lett
Peds
Right
Thru Left
Pods
AM INTERSECTION PEAK HOUR
6:00 AM to 7:00 AM 0
0 0
0
0
0 0
0
0
0 0
0
0
0 0
0
PM INTERSECTION PEAK HOUR
4:45 PM to 5:45 PM 3
0 0
0
2
1659 40
3
16
0 36
0
38
705 2
0
AM SYSTEM PEAK HOUR
6:00 AM to 7:00 AM 0
0 0
0
0
0 0
0
0
0 0
0
0
0 0
0
PM SYSTEM PEAK HOUR
4:45 PM to 5:45 PM
3
0 0
0
2
1659 40
16
0 36
0
38
705 2
0
PEAK HOUR
Southbound
Westbound
Northbound
Eastbound
FACTORS
BOTANICAL
RTE. 50
WARD AVE.
RTE. 50
Right
Thru Left
Peds Right
Thru Leff
Peds Right
Thru Left
Peds. Right
Thru Left
Pods
AM PEAK HOUR
0.00 0.00.
N/A 2.00
0.00 0.00
NiA 0.00
0.00 0,00,
N/A 0.00
0.00 :0.00.
N/A
PM PEAK HOUR 0,38
0.00 0.00
N/A 0.50
0.93 0.83
N/A 0.57
0.00 0.64
111,4 -059
0.96 0.50
N/A
Overall AM PEAK HOUR FACTOR
5500#
Overall PM PEAK HOUR FACTOR
0.94
AM Period Intersection Volume: 0
PM Period intersection Volume:
Gerove /Slade Associates
Project Name
Project
Location
Data Source
HHHUNT ASSITED LIVING
2151 001
WINCHESTER, VA
Gorove /Slad
y
0
Date of Counts:
AM Weather Conditions:
1698
745
AM INTERSECTION PEAK VOLUMES AM SYSTEM PEAK VOLUMES
0
m
705
8
0
L
RTE. 50
RTE. 50
0
1
Y 0
m
n
1
a
3
Lid
Thursday, January 10, 2008
RTE. 50
0
PM INTERSECTION PEAK VOLUMES
0
L
RTE. 50
2
ri
1659
40
10
0
721
0
1701
4-
PM Weather Conditions:
0
0
0
0
0
I z
A L
m
0
0
RTE. 50
J
0
0 0
o
00
RIO.
0
t 11
PM SYSTEM PEAK VOLUMES
1 4
i 1t
0
0
0
2
0
1698
745
2
705
38
l 4
RTE. 50
Th
0
m
a
00 CV
RTE. 50
)i
0
16.
40
Intersection:
NORTHWESTERN AVENUE (RTE. 50) AT ECHO LANE
AM PEAK
Direction:
Roadway:
Movement:
Right
Southbound
ECHO LANE
Thru Left.
Peds
Right
Westbound
RTE. 50
Thre Left
Peds:-
Right l
Northbound
ECHO LANE
Thru Left
Peds
Right
Eastbound
RTE. 50
Thru. Lett;: -Peds
11:00 AM to 1 1:15 AM
0
0
0
0
0
1
0
0
1
1
1
1
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 3
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
223 0
220 0
273 0
246 0
225 0
250 0
260 0
266 0
268 0
264 0
271 0
259 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
251 0 0
219 0 0
229 0 0
281 0 0
263 0 0
238 0 0
244 0 0
228 0 0
265 0 0
225 0 0
254 0 0
225 0 0
11:15 AM to 11:30 AM
1 AM to 11:45 AM
11:45 AM to 1200 PM
12:00 PM to 12:15 PM
12:15 PM to 12:30 PM
12:30 PM to 32.45 PM
12:45 PM to 1:00 PM
1:00 PM to 1:15 PM
1:15 PM to 1:30 PM
1:30 PM to 1:45 PM
1 :45 PM to 2:00 PM
PM PEAK
Direction:
Roadway:
Movement:
Right
Southbound
ECHO LANE
Thru Left
Pads
-Right
Westbound
RTE. 50
Thru Lett
Peds
Right
Nod hbouncl
ECHO LANE
Thru Left
Peril
Right
Eastbound
RTE. 50
Thru Left
Peds.
4:00 PM Ito 4:15 PM
4:15 PM to 4:30 PM
4:30 PM to 4:45 PIA
4:45 PM to 5:00 -PM
5:00 PM to 5:15 PM
5:15 PM to 5:30 PM
5:30 PM to 5:45 PM
5:45 PM to 6 :00 PM
6:00 PM to 6:15 PM
6:15 PM to 6:30 PM
6:30 PM to 6:45 PM
6:45 PM to 7:00 Prvt
PEAK HOURS
Direction:
Roadway:
Movement:
AM INTERSECTION PEAK HOUR
12:45 014 to 1:45 PM
PM INTERSECTION PEAK HOUR
4:00 PM to 5:00 PM
AM SYSTEM PEAK HOUR
12:45 PM to 1:45 PM
PM SYST£M PEAK HOUR
4:00 PM to 5:00 PM-
Right
3
0
3
0
Southbound
ECHO LANE
Thru Left
0 0
0 0
0 0
0 0
Peds
0
0
0
0
Right
0
G
0
0
Westbound
RTE. 50
Thru Left
1099 0
0 0
1059 0
0 0
Peds Right
0 0
I
0 0
0 0
0 0
Northbound
ECHO LANE
Thru Left.
0 0
0 0
0 0
0 0
Peck
0
0
0
0
Right
0
0
0
0
Faelbnund
RTE. 50
That Left
972 0
0. 0
972 0
0 0
Peds
0
0
0
0
PEAK HOUR
FACTORS
AM PEAK HOUR
PM PEAK. HOUR
Overall
AM Period Intersection Volume:
Southbound
Westbound
Northbound
Eastbound
ECHO LANE
Right Thru Left
0.75 0.00 0.00
0,00 0 00 0.00
AM PEAK HOUR FACTOR
Pegs Right
N/A 0.00
N/A 0.00
0.96
RTE. 50 ECHO LANE
1hru Left Peds Right Thru Left Peds Right
0.99 0.00 N/A 0.00 0.00 0.00 N/A 0.00
0.00 0.00 N/A 0.00 0.00 0.00 N/A 0.00
Overall PM PEAK HOUR FACTOR
PM Period Intersection Volume: 0
RTE. 50
Thru Lett
0.92 0.00
0.00 0.00
599419
Peds
N/A
N/A
Gorove /S lade Associates
Project Name
Project
Location
Data Source:
Hl ASSISTED LIVING
2151.001
WINCHESTER, VA
4-- 0
Date of Counts:
AM Weather Conditions:
1072
972
AM INTERSECTION PEAK VOLUMES AM SYSTEM PEAK VOLUI
J
0
972
0
RTE. 50
I L.
RTE. 50
1
1 2
0
w
1t
O 0
0
z
g
O
0
Saturday, January 12. 2008
0
L
RTE. 50
Mild, Clear
O
RTE. 50
0
0
1069
t t
PM INTERSECTION PEAK VOLUMES PM SYSTEM PEAK VOLUI
1t 11
0
0
r
0
1069
972
0
0
y
PM Weather Conditions:I
1072
972
m
0
972
0
0
JjL
z
5
0
2
RTE.
RTE. 50
O s o'
w
0 0
0
0
0
0
0
J j�.
RTE. 50
0
Z t�
0
O
x
RTE
0 0
O
1 1t
Intersection:
NORTHWESTERN AVENUE (RTE.50) AT WARD AVE.
AM PEAK
Direction:
Southbound
Westbound
Northbound
:Eastbound
Roadway:
BOTANICAL
RTE. 50
WARD AVE.
RTE. 50
Movement:
Right.
Thru Left
Peds
Right
Thru Left
Peds:
Right
Thru 'Lett
Peds
Right
Thru Left
Peds
11:00 AM to 11:15AM
0
0 0
0 0
211 6
0 3
0 4
0 10
227 0
0
11:15 AM to 11:30 AM
0
0 0
0 1
228 11
0 7
0 6
1 10
213 1
0
11:30 AM to 11:45 AM
0
0 3
0 0
267 4
0 2
1 6
0 12
204 2
0
11:45 AM to 12:00 PM
2
0 5
0 1
234 4
0 1
0 6
0 14
268 1
0
12:00 PM to 12:15 PM
1
0 2
0 1
227 6
0 6
0 3
0 13
238 1
0
12:15 PM to 12 :30 PM
1
0 1
0 0
237 5
0 2
0 9
0 8
233 0
0
12:30 -P64 to 12:45 PM
0
0 1
0 0
258 5
0 4
0 9
0 6
233 0
0
12:45 Pbt to 1:00 PM
5
1 12
0 0
254 4
0 0
0 2
0 12
217 0
0
1:00 PM to 1:15 PM.
0
0 1
0 5
258 5
0 3
0 6
2 13
241 2
0
1:15 PM to 1:30 PM
0
0 1
0 7
274 4
0 3
1 6
0 5
211 2
0
1:30 PM to 1:45 PM
0
1 0
0 1
259 4
0 2
0 4
0 10
243 3
0
1:45 PM to 2:00 PM
2
0 2
0 2
241 10
0 2
1 6
0 8
201 0
0
PM PEAK
Direction:
Southbound
Westbound
Northbound
Eastbound
Roadway:
BOTANICAL
RTE. 50
WARD AVE.
RTE. 50
Movement:
Right
Thru. Left
Peds
Right
Thre Lett
Peds
Right
Thru Leff
Peds
Right
Thru Left
Pods
4:00 PM to 4:15 PM
4:15 PM to 4:30 PM
4:30 PM to 4:45 PM
r 4:45 PM to 5:00 PM
5:00 PM to 5:15 PM
5:15 PM to 5:30 PM
5:30 PM to 5:45 PM
5:45 PM to 6:00 PM
6:00 PM to 6:15 PM
6:15 PM to 6:30 704
6:30 PM to 6:45 PM
6:45 PM to 7:00 PM
PEAK HOURS
Direction:
Southbound
Westbound
Northbound
Eastbound
Roadway:
BOTANICAL
RTE. 50
WARD AVE.
RTE. 50
Movement:
Right
Thru Lett
Pods
Right
Thru Left
Peril
Right
Thru Let,
Peds
Right
Thru Loft
Peds
AM INTERSECT /ON PEAK HOUR
12:45 PM to 1:45 PM 5
2 14
0
13
1045 17
0
5
18
40
912 7
0
PM INTERSECTION PEAK HOUR
4:00 PM to 5:00 PM 0
0 0
G
0
7 0
0
0
0 0
0
0
0 0
0
AM SYSTEM PEAK HOUR
12:45 PM to 1:45 PM
2 14
0
13
1045 17
0
6
1 18
2
40
912 7
0
PM SYSTEM PEAK HOUR
4:00 PM to 5:00 PM
0
0 0
0
0
0 0
0
0
0 0
0
0
_0 0
0
PEAK HOUR
Southbound
Westbound
Northbound
Eastbound
FACTORS
Right
BOTANICAL
Thru Lett
Pods Right
RTE. 50
Thru Left
Peds Right
WARD AVE,
Thru Lett
RTE. 50
Peds Right Thru Left
Peds
AM PEAK HOUR 0.25
0.50 0.29
N/A 0.46
.0.95 0.85
N/A 0.67
0.25 0.75
N/A 0.77
0.94 0.56
N/A
PM PEAK HOUR 0.00
0.00 0.00
NiA 0.00
0.00 0.00
N/A 0.00
0.00 0.00
N /.4 0.00
0.00 0.00
N/A
Overall AM PEAK HOUR. FACTOR
0.97
Overall PM PEAK HOUR FACTOR
5659
AM Period Intersection Volume: ■Ayoz
PM Period Intersection Volume:
0
Gorove /Slade Assoriales
Project Name
Project 5
Location
Data Source
HHHUNT ASSITED LIVING
2151.001
WI NCHESTER, VA
Gorove /Slade ASSoc
0
1068
959
0
Date of Counts:
AM Weather Conditions:
AM (NTERSECTION PEAK VOLUMES AM SYSTEM PEAK VOLUMES
7
912
40
0
N
RTE. 50
RTE. 50
N
0
J
11 It
PM INTERSECTION PEAK VOLUMES PM SYSTEM PEAK VOLUMES
Saturday, January 12, 2008
PM Weather Conditions:I
RTE. 50
RTE. 50
0
L
0
13
1045
17
0
0
075
934
0
0
t 1068
959
4)
7
912
40
RTE. 50
—i
U
Y 0
0
I
N I
2
N
1T
RTE. 50
13
10.
17
0
0
0
0
0
0
0
1 4
RTE. 50
Th
O
C
0
0 0
°J
0
0
0
RTE. 50
o o C
3
HH Hunt Assisted Livia/Traffic Impact Analysis
APPENDIX B
LEVEL OF SERVICE DEFINITIONS
HH Hunt Assisted. Livi Traffic Impact Analysis
APPENDIX B: LEVEL OF SERVICE DEFINITIONS
All capacity analyses are based on the procedures specified by the Transportation Research Board,
Special Report 209: Highway Capacity Manual (HCM), 2000. Levels of service (LOS) range from A to
F. A brief description of each level of service for signalized and unsignalized intersections is provided
below.
Signalized Intersections: Level of service is based upon the traffic volume present in each lane on
the roadway, the capacity of each lane at the intersection and the delay associated with each directional
movement. The levels of' service for signalized intersections are defined below:
Level of Service A describes operations with very low average delay per vehicle, i.e., less than
10.0 seconds. This occurs when progression is extremely favorable, and most vehicles arrive
during the green phase. Most vehicles do not stop. Short signal cycle Lengths may also
contribute to low delay.
Level of Service B describes, operations with average delay in the range of 10.1 to 20.0 seconds
per vehicle. This generally occurs with good progression and /or short cycle lengths. More
vehicles stop than for LOS A, causing higher levels of average delay.
Level of Service C describes operations with delay in the range of 20.1 to 35.0 seconds per
vehicle. These higher delays may result from fair progression and /or longer cycle lengths.
Individual cycle failures may begin to appear at this level. The number of vehicles stopping is
significant at this level although many still pass through the intersection without stopping. This is
generally considered the lower end of the range of the acceptable level of service in rural areas.
Level of Service D describes operations with delay in the range of 35.1 to 55.0 seconds per
vehicle. At LOS D, the influence of congestion becomes more noticeable. Longer delays may
result from some combination of unfavorable progression, long cycle lengths, and /or high traffic
volumes as compared to the roadway capacity. Many vehicles are required to stop and the
number of vehicles that do not have to stop declines. Individual signal cycle failures, where all
waiting vehicles do not clear the intersection during a single green time, are noticeable. This is
generally considered the lower end of the range of the acceptable level of service in urban areas.
Level of Service E describes operations with delay in the range of 55.1 to 80.0 seconds per
vehicle. These higher delay values generally indicate poor progression, long cycle lengths, and
high traffic volumes. Individual cycle failures are frequent occurrences. LOS E has been set as
the limit of acceptable conditions.
e Level of Service F describes operations with average delay in excess of 80.0 seconds per vehicle.
This is considered to be unacceptable to most drivers. This condition often occurs with over
saturation, i.e., when traffic arrives at a flow rate that exceeds the capacity of the intersection. It
may also occur at high volumes with many individual cycle failures. Poor progression and long
cycle lengths may also contribute to such delays.
HH Hunt Assisted Livillikraffic Impact Analysis
Unsignalized Intersections: At an unsignalized intersection, the major street through traffic and
right turns are assumed to operate unimpeded and therefore receive no level of service rating. The
level of service for the minor street and the major street left turn traffic is dependent on the volume
and capacity of the available lanes, and, the number and frequency of acceptable gaps in the major
street traffic to make a conflicting turn. The level of service grade is provided for each conflicting
movement at an unsignalized intersection and is based on the total average delay experienced by each
vehicle. The delay includes the time it takes a vehicle to move from the back of a queue through the
intersection.
The unsignalized intersection level of service analysis does not account for variations in driver behavior
or the effects of nearby traffic signals. Therefore, the results from this analysis usually indicates worse
levels of service than may be experienced in the field. The unsignalized intersection level of service
descriptions are provided below:
Level of Service A. Describes operations where there is very little to no conflicting traffic for a
minor side street movement, i.e., an average total delay of less than 10.0 seconds per vehicle.
Level of Service B. Describes operations with average total delay in the range of 10.1 to 15.0
seconds per vehicle.
Level of Service C. Describes operations with average total delay in the range of 15.1 to 25.0
second per vehicle.
Level of Service D. Describes operations with average total delay in the range of 25.1 to 35.0
seconds per vehicle
Level of Service E. Describes operations with average total delay in the range of 35.1 to 50.0
seconds per vehicle
Level of Service F. Describes operations with average total delay of 50 seconds per vehicle.
LOS F exists when there are insufficient gaps of suitable size to allow a side street demand to
cross safely through or enter a major street traffic stream. This level of service is generally
evident from extremely long total delays experienced by side street traffic and by queuing on
the minor approaches. It is important to note that LOS F may not always result in long queues
but may result in adjustments to normal driver behavior.
HH Hunt Assisted Livileraffic Impact Analysis
APPENDIX C
TRAFFIC IMPACT ANALYSIS SCOPING DOCUMENT
Contact Information
Consultant Name:
Tele:
E -mail:
Chad A. Baird, Gorove /Slade Associates, Inc.
703- 787 -9595
cab @goroveslade.com
Developer /Owner Name:
Tele:
E -mail:
HHHunt, Bo Cook Jr.
919- 461 -0587
wrcook @hhhunt.com
Project Information
Project Name:
HH Hunt Assisted Living
Project Location:
(Attach regional and site
specific location map)
Frederick County, VA. Regional and site specific location map attached.
Please see Figures 1 and 2.
g
Project Description:
Including type of application
(rezoning, su site
plan) acreage, business square
ft; number of dwelling units,
access location, etc. Attach
additional sheet if necessary)
The property is currently zoned as RA. The size of the property is approx.
9.9 acres. A rezoning of this being proposed to allow for an
9 property p e ttY is 9 P ro P
assisted living development, comprising of up to approx. 84 beds. Access
points along Northwestern Pike and Ward Avenue will serve the proposed
development.
Locality/County:
Frederick County, VA
Proposed Use:
(Check all that apply; attach
additional pages as necessary)
Residential
Commercial
Mixed Use
Other
TRIP GENERATION
TABLE ATTACHED.
I
Residential:
Assisted Living: 84 Beds
ITE LU Code: 254
Commercial Use Sq Ft:
i NvD
Virginia Department
of Transportation
PRE -SCOPE OF WORK MEETING FORM
Information on the Project
Traffic Impact Analysis Base Assumptions
The applicant is responsible for having this form completed and returned to VDOT and the locality no
less than three (3) business days prior to the meeting. If a completed form is not received by this
deadline, the scope of work meeting may be postponed.
r 4
,Traffic Impact'Analysis Assumptions
Nor
Study Period
Existing Year: 2008
Build -out Year: 2010
Design Year: NA
Study Area Boundaries
(Attach map)
North: Route 50
South:
East: Ward Avenue
West: Echo Lane
External Factors That
Could Affect Project
(Planned road improvements,
other nearby developments)
Winchester Medical Center
Retail Center along Crock Wells Mill Drive
Consistency With
Comprehensive Plan
Yes
Available Traffic Data
(Historical, forecasts)
VDOT MDT Data, Existing Traffic Counts (2008)
Trip Distribution
(Attach sketch)
Road Name: Route 50
N
S
E 90%
W 10 Wo
PLEASE SEE
ATTACHED FIGURE 3.
Road Name:
N
S
E
W
Road Name:
N
S
E
W
Road Name:
N
S
E
W
Wo
2% on Route 50
Peak Period for Study
(circle all that app y)
AM PM SA
Annual Vehicle Trip
Growth Rate:
Study Intersections
and /or Road Segments
(Attach additional sheets as
necessary)
1. Route 50 Echo Ln
6.
2. Route 50 Ward Ave.
7.
3. All future access points
8.
4.
9.
5.
10.
Trip Adjustment
Factors
Internal allowance: Yes Ai No
Reduction: trips
Pass -by allowance: Yes 41 No
Reduction: trips
Synchro HCS (v.2000 aaSIDRA CORSIM Other
Software Methodology
Traffic Signal Proposed
or Affected
(Analysis software to be used,
progression speed; cycle
length)
1. Northwestern Pike Ward Ave.
HH Hunt Assisted Living Facility •rick County, VA
January 17, 2008
Page 2
Improvement(s)
Assumed or to be
Considered
N/A
Background Traffic
Studies Considered
N/A
Plan Submission
Master Development Plan (MOP) Generalized Development Plan (GDP)
Preliminary/Sketch Plan Other Plan type (Final Site, Subd. Plan)
Additional Issues to be
addressed
Al Queuing analysis Actuation /Coordination Weaving analysis
Merge analysis Bike /Ped Accommodations Intersection(s)
TDM Measures Other
HH Hunt Assisted Living Facility F•rick County, VA
January 17, 2008
Page 3
NOTES on ASSUMPTIONS:
1. Will analyze PM and Saturday peak period. AM peak period will not be analyzed.
2. TIA will include text regarding Ped and Bike accommodations.
AGREED: DATE: 01/17/2008
Applicant or Consultant
PRINT NAME: Chad A. Baird, Gorove /Slade Associates, Inc.
Applicant or Consultant
SIGNED: DATE:
VDOT Representative
PRINT NAME:
VDOT Representative
SIGNED: DATE:
Local Government Representative
PRINT NAME:
IP Local Government Representative
HH Hunt Assisted Living Facility Trip Generation Table (Peak Hour of Adjacent Street Traffic)
HH Hunt Assisted Living Facility .rick County, VA
January 17, 2008
Page 4
Land Use
Assisted Living
TOTAL
ITE Weekday
Code Size SAT Peak Hour PM Peak Hour Daily
In 0ut Total In Out Total Total
254 84 Bed 27 7 34 13 12 25 231
HH Hunt Assisted Trip Generation Table (Peak Hour of Generator)
27 7 34 13 12 25 231
ITE Weekday
Land Use Code Size SAT Peak Hour PM Peak Hour Daily
In Out Total In Out Total Total
Assisted Living 254 84 Beds 27 7 34 13 23 26 231
TOTAL 27 7 34 13 23 26 231
HH Hunt Assisted Living Facility
January 17, 2008
Page 5
Figure 1: Regional Map
rick County, VA
HH Hunt Assisted Living Facility —.rick County, VA
January 17, 2008
Page 6
cc* Harbor
;nfl res,rse
Figure 2: Area Map and Site Location
HH Hunt Assisted Living Facility
January 17, 2008
Page 7
Figure 3: DOA
rick County, VA
APPENDIX D
HH Hunt Assisted Livitraffic Impact Analysis
INTERSECT /ON CAPACITY ''ANALYSIS RESULTS EXISTING CONDITION
HCM Unsignalized Intilection Capacity Analysis Exis. PM Peak Hour Traffic Volumes
3: Route 50 Echo Lane
Movement
Lane Configurations
Sign Control
Grade
Volume (veh /h)
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free
cM capacity (veh /h)
Intersection Summary
-M' .-0,, 4- t 4 /4° C i 4/
EBL EBT EBR WBL WBT WBR NEL NET NER SWL SWT SWR
Hit r r rf
Free Free Stop Stop
0% 0% 0% 0%
0 768 1 0 851 0 0 0 0 0 0 2
0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
0 835 1 0 925 0 0 0 0 0 0 2
None
588 ..s.13 °k z golquiPtv
0.96 0.96 0.96 0.96 0.96 0.96
925 836 1146 1760 418 1342 1761 308
840 836 1070 1710 418 1275 1710 198
4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9
2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
100 100 100 100 100 100 100 100
760 794 168 86 584 119 86 778
Direction, Lane EB 1 EB 2 WB 1 WB 2 WB 3 WB 4 NE 1 SW 1
Volume Total 557 279 308 308 308 0 0 2
Volume Left 0 0 0 0 0 0 0 0
Volume Right 0 1 0 0 0 0 0 2
cSH 1700 1700 1700 1700 1700 1700 1700 778
Volume to Capacity 0.33 0.16 0.18 0.18 0.18 0.00 0.00 0.00
Queue Length 95th (ft) 0 0 0 0 0 0 0 0
Control Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 9.6
Lane LOS A A
Approach Delay (s) 0.0 0.0 0.0 9.6
Approach LOS A A
Average Delay 0.0
Intersection Capacity Utilization 26.4% ICU Level of Service A
Analysis Period (min) 15
2/1/2008
HH Hunt Assited Living Synchro 6 Report
Gorove /Slade Associates, Inc. Page 1
HCM Signalized Intertion Capacity Analysis Exi. PM Peak Hour Traffic Volumes
5: Route 50 Botanical Boulevard
Movement
Lane Configurations
Ideal Flow (vphpl)
Total Lost time (s)
Lane Util. Factor
Frt
Fit Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Volume (vph)
Peak -hour factor, PHF
Adj. Flow (vph)
RTOR Reduction (vph)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Actuated Green, G (s)
Effective Green, g (s)
Actuated g/C Ratio
Clearance Time (s)
Vehicle Extension (s)
Lane Grp Cap (vph)
v/s Ratio Prot
v/s Ratio Perm
v/c Ratio
Uniform Delay, d1
Progression Factor
Incremental Delay, d2
Delay (s)
Level of Service
Approach Delay (s)
Approach LOS
Intersection Summary
HCM Average Control Delay
HCM Volume to Capacity ratio
Actuated Cycle Length (s)
Intersection Capacity Utilization
Analysis Period (min)
c Critical Lane Group
HH Hunt Assited Living
Gorove /Slade Associates, Inc.
0.03 0.34
45.3 7.5
1.00 1.00
0.2 0.1
45.5 7.6
D A
7.6
A
8.6
0.32
97.5
36.8%
15
0.26
6.0
1.00
0.2
6.2
A
8.0
A
0.00
0.00
4.9
1.00
0.0
4.9
A
HCM Level of Service
Sum of lost time (s)
ICU Level of Service
t
1900
4.0
1.00
0.85
1.00
1583
1.00
1583
16
0.92
17
16
1
Perm
20.0
A
Split
4 4
42.7 44.4
D D
2/1/2008
4,
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
tt +ft r 4
1900 1900 1900 1900 1900 1900 1900 1900
4.0 4.0 4.0 4.0 4.0 4.0 4.0
1.00 0.95 1.00 1.00 0.91 1.00 1.00
1.00 1.00 0.85 1.00 1.00 0.85 1.00
0.95 1.00 1.00 0.95 1.00 1.00 0.95
1770 3539 1583 1770 5085 1583 1770
0.95 1.00 1.00 0.95 1.00 1.00 0.95
1770 3539 1583 1770 5085 1583 1770
2 727 39 40 831 2 18 0
0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
2 790 42 43 903 2 20 0
0 0 15 0 0 1 0 0
2 790 27 43 903 1 0 20
Prot Perm Prot Perm Split
5 2 1 6 8 8
2 6 8
1.1 60.2 60.2 3.9 63.0 63.0 Y„ 3.4 3.4
3.6 63.7 63.7 6.4 66.5 66.5 6.9 6.9
0.04 0.65 0.65 0.07 0.68 0.68 0.07 0.07
6.5 7.5 7.5 6.5 7.5 7.5 7.5 7.5
3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
65 2312 1034 116 3468 1080 125 112
0.00 c0.22 c0.02 c0.18 c0.01
0.02 0.00
0.03 0.37 0.16 0.01
6.0 43.6 42.6 42.1
1.00 1.00 1.00 1.00
0.0 2.0 0.6 0.0
6.0 45.6 43.2 42.2
A D D D
f
1900 1900 1900
4.0
1.00
0.85
1.00
1583
1.00
1583
0 0 2
0.92 0.92 0.92
0 0 2
0 0 2
0 0 0
Perm
4
1.0
4.5
0.05
7.5
3.0
73
c0.00
0.00
44.4
1.00
0.0
44.4
D
Synchro 6 Report
Page 2
HCM Unsignalized Intitection Capacity Analysis ExistiSAT Peak Hour Traffic Volumes
3: Route 50 Echo Lane 2/1/2008
41- 14' 4/
Movement EBL EBT EBR WBL WBT WBR NEL NET NER SWL SWT SWR
Lane Configurations 1414 r r
Sign Control Free Free Stop Stop
Grade 0% 0% 0% 0%
Volume (veh /h) 0 966 1 0 1069 0 0 0 0 0 0 3
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 0 1050 1 0 1162 0 0 0 0 0 0 3
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh) 1 x k
Median type None None
Median storage veh)
Upstream signal (ft) 588
pX, platoon unblocked 0.93 0.93 0.93 0.93 0.93 0.93
vC, conflicting volume 1162 1051 1441 2212 526 1687 2213 387
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 1022 1051 1322 2152 526 1587 2153 188
tC, single (s) 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free 100 100 100 100 100 100 100 100
cM capacity (veh /h) 627 658 106 44 497 67 44 764
Direction, Lane EB 1 EB 2 WB 1 WB 2 WB 3 WB 4 NE 1 SW 1
Volume Total 700 351 387 387 387 0 0 3
Volume Left 0 0 0 0 0 0 0 0
Volume Right 0 1 0 0 0 0 0 3
cSH 1700 1700 1700 1700 1700 1700 1700 764
Volume to Capacity 0.41 0.21 0.23 0.23 0.23 0.00 0.00 0.00
Queue Length 95th (ft) 0 0 0 0 0 0 0 0
Control Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 9.7
Lane LOS A A
Approach Delay (s) 0.0 0.0 0.0 9.7
Approach LOS A A
Intersection Summary
Average Delay 0.0
Intersection Capacity Utilization 30.7% ICU Level of Service A
Analysis Period (min) 15
HH Hunt Assited Living Synchro 6 Report
Gorove /Slade Associates, Inc. Page 1
HCM Signalized InteriPtion Capacity Analysis Exist SAT Peak Hour Traffic Volumes
5: Route 50 Botanical Boulevard 2/1/2008
Movement
Lane Configurations
Ideal Flow (vphpi)
Total Lost time (s)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Volume (vph)
Peak -hour factor, PHF
Adj. Flow (vph)
RTOR Reduction (vph)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Actuated Green, G (s)
Effective Green, g (s)
Actuated g/C Ratio
Clearance Time (s)
Vehicle Extension (s)
Lane Grp Cap (vph)
v/s Ratio Prot
v/s Ratio Perm
v/c Ratio
Uniform Delay, di
Progression Factor
Incremental Delay, d2
Delay (s)
Level of Service
Approach Delay (s)
Approach LOS
EBL EBT EBR WBL WBT WBR
1900
4.0
1.00
1.00
0.95
1770
0.95
1770
7
0.92
8
0
8
Prot
5
1.4
3.9
0.04
6.5
3.0
63
0.00
0.13
51.0
1.00
0.9
51.9
D
HCM Average Control Delay
HCM Volume to Capacity ratio
Actuated Cycle Length (s)
Intersection Capacity Utilization
Analysis Period (min)
c Critical Lane Group
r
1900 1900
4.0 4.0
0.95 1.00
1.00 0.85
1.00 1.00
3539 1583
1.00 1.00
3539 1583
919 40
0.92 0.92
999 43
0 14
999 29
Perm
2
71.0
74.5
0.68
7.5
3.0
2417
c0.28
0.41
7.6
1.00
0.5
8.2
A
8.4
A
2
71.0
74.5
0.68
7.5
3.0
1081
0.02
0.03
5.6
1.00
0.0
5.6
A
Intersection Summary
8.8
0.36
109.1
42.1%
15
1900 1900 1900
4.0 4.0 4.0
1.00 0.91 1.00
1.00 1.00 0.85
0.95 1.00 1.00
1770 5085 1583
0.95 1.00 1.00
1770 5085 1583
17 1046 13
0.92 0.92 0.92
18 1137 14
0 0 4
18 1137 10
Prot Perm
1 6
3.1
5.6
0.05
6.5
3.0
91
c0.01
0.20
49.6
1.00
1.1
50.7
D
72.7
76.2
0.70
7.5
3.0
3552
0.22
0.32
6.4
1.00
0.2
6.6
A
7.3
A
6
72.7
76.2
0.70
7.5
3.0
1106
0.01
0.01
5.0
1.00
0.0
5.0
A
HCM Level of Service
Sum of lost time (s)
ICU Level of Service
NBL NBT NBR SBL SBT SBR
4 r
1900 1900 1900 1900 1900 1900
4.0 4.0 4.0 4.0 4.0
1.00 1.00 0.95 0.95 1.00
1.00 0.85 1.00 1.00 0.85
0.95 1.00 0.95 0.96 1.00
1778 1583 1681 1703 1583
0.95 1.00 0.95 0.96 1.00
1778 1583 1681 1703 1583
18 1 8 14 2 5
0.92 0.92 0.92 0.92 0.92 0.92
20 1 9 15 2 5
0 0 8 0 0 5
0 21 1 8 9 0
Split Perm Split Perm
8 8 4 4
8 4
3.2 3.2 2.8 2.8 2.8
6.7 6.7 6.3 6.3 6.3
0.06 0.06 0.06 0.06 0.06
7.5 7.5 7.5 7.5 7.5
3.0 3.0 3.0 3.0 3.0
109 97 97 98 91
c0.01 0.00 c0.01
0.19
48.6
1.00
0.9
49.5
D
49.1
D
0.00
0.01
48.1
1.00
0.0
48.1
D
A
16.0
A
0.08
48.7
1.00
0.4
49.0
D
0.09
48.7
1.00
0.4
49.1
D
48.9
D
0.00
0.00
48.4
1.00
0.0
48.5
D
HH Hunt Assited Living Synchro 6 Report
Gorove /Slade Associates, Inc.
Page 2
HH Hunt Assisted Livi Traffic Impact Analysis
APPENDIX E
INTERSECTION CAPACITY ANALYSIS RESULTS FUTURE CONDITIONS WITHOUT DEVELOPMENT
HCM Unsignalized Intlection Capacity Analysis Backgctl PM Peak Hour Traffic Volumes
3: Route 50 Echo Lane
Movement
Lane Configurations
Sign Control
Grade
Volume (veh /h)
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft /s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free
cM capacity (veh /h)
0 Direction, Lane
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
EBL EBT EBR
Free
0%
0 1312 1
0.92 0.92 0.92
0 1426 1
a
4
a•:
i rfJSE'S ar4;
588
0.89 0.89 0.89 0.89 0.89 0.89
1201 1427 1829 2628 714 1914 2628 400
968 1427 1677 2579 714 1773 2580 63
4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9
2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
100 100 100 100 100 100 100 100
626 472 55 22 374 46 22 875
EB 1
951
0
0
1700
0.56
0
0.0
0.0
EB 2
476
0
1
1700
0.28
0
0.0
WB 1
400
0
0
1700
0.24
0
0.0
0.0
1111111111MMINOW WNW
0.0
39.6%
15
art- t j
WBL WBT WBR NEL NET NER SWL SWT SWR
tft t
Free Stop Stop
0% 0% 0%
0 1105 0 0 0 0 0 0 2
0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
0 1201 0 0 0 0 0 0 2
WB2 WB3 WB4 NE1
0
0
0
400 400 0
0 0 0
0 0 0
1700 1700 1700
0.24 0.24 0.00
0 0 0
0.0 0.0 0.0
1700
0.00
0
0.0
A
0.0
A
ICU Level of Service
None None
SW 1
2
0
2
875
0.00
0
9.1
A
9.1
A
A
o t
ewe N:
2/1/2008
HH Hunt Assited Living Synchro 6 Report
Gorove /Slade Associates, Inc. Page 1
HCM Signalized Inter Lion Capacity Analysis Backg. PM Peak Hour Traffic Volumes
5: Route 50 Botanical Boulevard 2/1/2008
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations tt r vi t+ r 4 r 4 r
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Lane Util. Factor 1.00 0.95 1.00 1.00 0.91 1.00 1.00 1.00 0.95 0.95 1.00
Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 0.85 1.00 1.00 0.85
Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 0.95 0.95 1.00
Satd. Flow (prot) 1770 3539 1583 1770 5085 1583 1770 1583 1681 1681 1583
Flt Permitted 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 0.95 0.95 1.00
Satd. Flow (perm) 1770 3539 1583 1770 5085 1583 1770 1583 1681 1681 1583
Volume (vph) 62 1209 41 42 1053 207 18 0 16 119 0 32
Peak -hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Adj. Flow (vph) 67 1314 45 46 1145 225 20 0 17 129 0 35
RTOR Reduction (vph) 0 0 14 0 0 97 0 0 16 0 0 31
Lane Group Flow (vph) 67 1314 31 46 1145 128 0 20 1 65 64 4
Turn Type Prot Perm Prot Perm Split Perm Split Perm
Protected Phases 5 2 1 6 8 8 4 4
Permitted Phases 2 6 8 4
Actuated Green, G (s) 7.4 58.6 58.6 5.3 56.5 56.5 4.5 4.5 8.3 8.3 8.3
Effective Green, g (s) 9.9 62.1 62.1 7.8 60.0 60.0 8.0 8.0 11.8 11.8 11.8
Actuated g/C Ratio 0.09 0.59 0.59 0.07 0.57 0.57 0.08 0.08 0.11 0.11 0.11
Clearance Time (s) 6.5 7.5 7.5 6.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Lane Grp Cap (vph) 166 2079 930 131 2886 899 134 120 188 188 177
v/s Ratio Prot c0.04 c0.37 0.03 0.23 c0.01 c0.04 0.04
v/s Ratio Perm 0.02 0.08 0.00 0.00
v/c Ratio 0.40 0.63 0.03 0.35 0.40 0.14 0.15 0.01 0.35 0.34 0.02
Uniform Delay, d1 45.1 14.3 9.2 46.5 12.8 10.7 45.7 45.2 43.4 43.4 41.8
Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Incremental Delay, d2 1.6 1.5 0.1 1.6 0.4 0.3 0.5 0.0 1.1 1.1 0.1
Delay (s) 46.7 15.8 9.2 48.2 13.2 11.1 46.2 45.2 44.5 44.4 41.9
Level of Service D B A D B B D D D D D
Approach Delay (s) 17.0 14.0 45.7 43.9
Approach LOS B B D D
Intersection Summary
HCM Average Control Delay 17.4 HCM Level of Service B
HCM Volume to Capacity ratio 0.52
Actuated Cycle Length (s) 105.7 Sum of lost time (s) 12.0
Intersection Capacity Utilization 56.7% ICU Level of Service B
Analysis Period (min) 15
c Critical Lane Group
HH Hunt Assited Living Synchro 6 Report
Gorove /Slade Associates, Inc. Page 2
HCM Unsignalized Inteection Capacity Analysis BackgotOSAT Peak Hour Traffic Volumes
3: Route 50 Echo Lane 2/1/2008
Movement
Lane Configurations
Sign Control
Grade
Volume (veh /h)
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft /s)
Percent Blockage
Right turn flare (veh)
Median type`s
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free
cM capacity (veh /h)
Direction, Lane
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
EBL
0
0.92
0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
HH Hunt Assited Living
Gorove /Slade Associates, Inc.
it
EBT EBR WBL
f
Free
0
1512 0 0
0.92 0.92 0.92
1643 0 0
O ti
WBT WBR NEL NET NER
r
Free Stop
0% 0%
1608 0 0 0 0
0.92 0.92 0.92 0.92 0.92
1748 0 0 0 0
0.74
2.2
100
387
EB 1
1096
0
0
1700
0.64
0
0.0
0.0
EB 2
548
0
0
1700
0.32
0
0.0
WB 1
583
0
0
1700
0.34
0
0.0
0.0
0.0
45.1%
15
2.2
100
390
WB 2
583
0
0
1700
0.34
0
0.0
588
WB 3
583
0
0
1700
0.34
0
0.0
WB 4
0
0
0
1700
0.00
0
0.0
ICU Level of Service
3.5
100
28
NE 1
0
0
0
1700
0.00
0
0.0
A
0.0
A
4.0
100
4
SW 1
3
0
3
807
0.00
0
9.5
A
9.5
A
3.3
100
317
A
SWL SWT SWR
0
0.92
0
3.5
100
12
Stop
0%
0
0.92
0
None
4.1 4.1 7.5 6.5 6.9 7.5 6.5
4.0
100
4
3
0.92
3
0.74 0.74 0.74 0.74 0.74
1748 1643 2229 3391 822 2570 3391 583
1317 1643 1964 3526 822 2421 3526 0
6.9
3.3
100
807
Synchro 6 Report
Page 1
HCM Signalized Inter.ion Capacity Analysis BackgotSAT Peak Hour Traffic Volumes
5: Route 50 Botanical Boulevard 2/1/2008
Movement
Lane Configurations
Ideal Flow (vphpl)
Total Lost time (s)
Lane Util. Factor
Frt
Ht Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Volume (vph)
Peak -hour factor, PHF
Adj. Flow (vph)
RTOR Reduction (vph)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Actuated Green, G (s)
Effective Green, g (s)
Actuated g/C Ratio
Clearance Time (s)
Vehicle Extension (s)
Lane Grp Cap (vph)
v/s Ratio Prot
v/s Ratio Perm
v/c Ratio
Uniform Delay, d1
Progression Factor
Incremental Delay, d2
Delay (s)
Level of Service
Approach Delay (s)
Approach LOS
Intersection Summary
HCM Average Control Delay
HCM Volume to Capacity ratio
Actuated Cycle Length (s)
Intersection Capacity Utilization
Analysis Period (min)
c Critical Lane Group
EBL EBT EBR WBL
1900
4.0
1.00
1.00
0.95
1770
0.95
1770
7
0.92
8
0
8
Prot
5
1.0
3.5
0.04
6.5
3.0
69
0.00
0.12
41.5
1.00
0.8
42.2
D
r
1900 1900
4.0 4.0
0.95 1.00
1.00 0.85
1.00 1.00
3539 1583
1.00 1.00
3539 1583
1354 42
0.92 0.92
1472 46
0 16
1472 30
Perm
2
35.9
39.4
0.44
7.5
3.0
1560
c0.42
0.94
23.9
1.00
12.8
36.8
D
36.1
D
2
35.9
39.4
0.44
7.5
3.0
698
0.02
0.04
14.3
1.00
0.1
14.4
B
29.1
0.74
89.4
64.9%
15
1900
4.0
1.00
1.00
0.95
1770
0.95
1770
18
0.92
20
0
20
Prot
1
2.0
4.5
0.05
6.5
3.0
89
c0.01
0.22
40.8
1.00
1.3
42.1
D
WBT WBR NBL NBT
+1 r 4
1900 1900 1900 1900
4.0 4.0 4.0
0.91 1.00 1.00
1.00 0.85 1.00
1.00 1.00 0.95
5085 1583 1778
1.00 1.00 0.95
5085 1583 1778
1487 14 18 1
0.92 0.92 0.92 0.92
1616 15 20 1
0 7 0 0
1616 8 0 21
Perm Split
6 8 8
6
36.9 36.9 3.8
40.4 40.4 7.3
0.45 0.45 0.08
7.5 7.5 7.5
3.0 3.0 3.0
2298 715 145
0.32 c0.01
a--
0.01
0.70 0.01
19.7 13.5
1.00 1.00
1.0 0.0
20.7 13.5
C B
20.9
C
HCM Level of Service
Sum of lost time (s)
ICU Level of Service
0.14
38.1
1.00
0.5
38.6
D
38.2
D
NBR
1900
4.0
1.00
0.85
1.00
1583
1.00
1583
18
0.92
20
18
2
Perm
8
3.8
7.3
0.08
7.5
3.0
129
0.00
0.01
37.7
1.00
0.0
37.8
D
C
16.0
C
0.66
30.2
1.00
3.9
34.1
SBL SBT SBR
4
1900 1900 1900
4.0 4.0 4.0
0.95 0.95 1.00
1.00 1.00 0.85
0.95 0.95 1.00
1681 1686 1583
0.95 0.95 1.00
1681 1686 1583
508 2 102
0.92 0.92 0.92
552 2 111
0 0 83
276 278 28
Split Perm
4 4
18.7
22.2
0.25
7.5
3.0
417
0.16
18.7
22.2
0.25
7.5
3.0
419
c0.16
4
18.7
22.2
0.25
7.5
3.0
393
0.66
30.2
1.00
3.9
34.2
C C C
32.8
C
0.02
0.07
25.7
1.00
0.1
25.8
HH Hunt Assited Living Synchro 6 Report
Gorove /Slade Associates, Inc. Page 2
HH Hunt Assisted Liviratfic Impact Analysis
APPENDIX F -1
TRIP GENERATION FOR BACKGROUND DEVELOPMENTS
HH Hunt Assited Living Dement
Future Background Lane Configuration and Traffic Control
LEGEND
Existing Conditions
Lane Configuration
Traffic Signal
Stop Sign
Background Site Trip Distributions
LEGEND
t-
15
0 Peak HourTraffic
-00// 00 Volumes
r
Route 50 (Northwestern Pike)
Route 50 (Northwestern Pike)
J
e
s
r
40%
Background Site Generated Traffic Volumes
LEGEND
00 Site Traffic Volumes
-00/00
—00 /00
—30/97 Route 50 Northwestern Pike
Valley Health Systems Property and Degrange Property
Background Developments Site Generated PM /SAT Peak Hour Traffic Volumes
February 1, 2008
HH Hunt Assisted LivilTraffic Impact Analysis
APPENDIX F -2
TRIP DISTRIBUTION FOR BACKGROUND DEVELOPMENTS
HH Hunt Assited Living D
Future Background Lane Configuration and Traffic Control
LEGEND
Existing Conditions
Lane Configuration
Traffic Signal
TT Stop Sign
Background Site Trip Distributions
15%
LEGEND
X 00 /00 Peak HourTraffc
r
—00 /0/00 Volumes
00
Route 50 (Northwestern Pike)
Route 50 (Northwestern Pike)
E
40%
Background Site Generated Traffic Volumes
LEGEND
on
000 Site Traffic Volumes
n00/00
453/398--
188/399 Route 50 Nort hwestern Pike
453/398—
188/399
WWW Property
Background Developments Site Generated PM /SAT Peak Hour Traffic Volumes
February 1, 2008
HH Hunt Assisted Liviiratfic Impact Analysis
APPENDIX G
INTERSECT /ON CAPACITY ANALYSIS RESULTS FUTURE CONDITIONS WITH DEVELOPMENT
HCM Unsignalized Int•ction Capacity Analysis Full PM Peak Hour Traffic Volumes
3: Route 50 Echo Lane 2/1/2008
i
Movement EBL EBT EBR WBL WBT WBR NEL NET NER SWL SWT SWR
Lane Configurations 114 t r f r
Sign Control Free Free Stop Stop
Grade 0% 0% 0% 0%
Volume (veh /h) 0 1312 2 0 1105 0 0 0 7 0 0 2
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 0 1426 2 0 1201 0 0 0 8 0 0 2
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage <r; t� .r.. .r�* x n`>k' C9rs{ tip 1 i ^7
9 t i 0` MHO
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft) oppopospinglim
pX, platoon unblocked 0.89
vC, conflicting volume 1201 1428
vC1, stage 1 conf vol
vC2, stage 2 conf vol
Direction, Lane
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Intersection Summary 's
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
HH Hunt Assited Living
Gorove /Slade Associates, Inc.
588
vCu, unblocked vol 968 1428 1678 2580 714 1782 2581 64
tC, single (s) 4.1
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5
p0 queue free 100 100 100
cM capacity (veh /h) 626 472 55
4.1 7.5 6.5 6.9 7.5 6.5
EB1 EB2 WB1 WB2 WB3 WB4 NE1 SW1
951 478 400 400 400 0 8 2
0 0 0 0 0 0 0 0
0 2 0 0 0 0 8 2
1700 1700 1700 1700 1700 1700 374 874
0.56 0.28 0.24 0.24 0.24 0.00 0.02 0.00
0 0 0 0 0 0 2 0
0.0 0.0 0.0 0.0 0.0 0.0 14.8 9.1
B A
0.0 0.0 14.8 9.1
B A
0.1
46.3%
15
ICU Level of Service
None
0.89 0.89 0.89 0.89 0.89
1830 2628 714 1922 2629 400
4.0
100
22
3.3
98
374
A
3.5
100
45
None
4.0
100
22
6.9
3.3
100
874
Synchro 6 Report
Page 1
HCM Signalized Intersiion Capacity Analysis Full PM Peak Hour Traffic Volumes
5: Route 50 Botanical Boulevard
Movement
Lane Configurations
Ideal Flow (vphpl)
Total Lost time (s)
Lane Util. Factor
Frt
Fit Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Volume (vph)
Peak -hour factor, PHF
Adj. Flow (vph)
RTOR Reduction (vph)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Actuated Green, G (s)
Effective Green, g (s)
Actuated g/C Ratio
Clearance Time (s)
Vehicle Extension (s)
Lane Grp Cap (vph)
v/s Ratio Prot
v/s Ratio Perm
v/c Ratio
Uniform Delay, dl
Progression Factor
Incremental Delay, d2
Delay (s)
Level of Service
Approach Delay (s)
Approach LOS
Intersection Summary
f
7.8
10.3
0.10
6.5
3.0
170
c0.04
HCM Average Control Delay
HCM Volume to Capacity ratio
Actuated Cycle Length (s)
Intersection Capacity Utilization
Analysis Period (min)
c Critical Lane Group
Gorove /Slade Associates, Inc.
EBL EBT EBR
tt r
1900 1900 1900
4.0 4.0 4.0
1.00 0.95 1.00
1.00 1.00 0.85
0.95 1.00 1.00
1770 3539 1583
0.95 1.00 1.00
1770 3539 1583
62 1216 41
0.92 0.92 0.92
67 1322 45
0 0 14
67 1322 31
Prot Perm
5 2
59.5
63.0
0.59
7.5
3.0
2082
c0.37
0.39 0.63
45.5 14.5
1.00 1.00
1.5 1.5
47.0 16.0
D B
17.2
B
17.8
0.52
107.1
56.9%
15
WBL
1900
4.0
1.00
1.00
0.95
1770
0.95
1770
54
0.92
59
0
59
P rot
WBT WBR NBL
1900 1900
4.0 4.0
0.91 1.00
1.00 0.85
1.00 1.00
5085 1583
1.00 1.00
5085 1583
1053 207
0.92 0.92
1145 225
0 97
1145 128
Perm
HCM Level of Service
Sum of lost time (s)
ICU Level of Service
4
1900 1900
4.0
1.00
1.00
0.95
1770
0.95
1770
0
0.92
0
0
21
19
0.92
21
0
0
Split
8
NBT NBR
IMF
1900
4.0
1.00
0.85
1.00
1583
1.00
1583
20
0.92
22
20
2
Perm
1 6 8 4
2 6 8 4
59.5 5.8 57.5 57.5 4.5 4.5 8.3 8.3 8.3
63.0 8.3 61.0 61.0 8.0 8.0 11.8 11.8 11.8
0.59 0.08 0.57 0.57 0.07 0.07 0.11 0.11 0.11
7.5 6.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5
3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
931 137 2896 902 132 118 185 185 174
0.03 0.23 c0.01 c0.04 0.04
0.02 0.08 0.00 0.00
0.03 0.43 0.40 0.14 0.16 0.01 0.35 0.35 0.02
9.3 47.1 12.8 10.8 46.4 45.9 44.1 44.1 42.5
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
0.1 2.2 0.4 0.3 0.6 0.0 1.2 1.1 0.1
9.3 49.3 13.2 11.1 47.0 45.9 45.3 45.2 42.6
A D B B D D D D D
14.4 46.4 44.7
B D D
B
12.0
B
2/1/2008
SBL S SBR
r
1900 1900 1900
4.0 4.0 4.0
0.95 0.95 1.00
1.00 1.00 0.85
0.95 0.95 1.00
1681 1681 1583
0.95 0.95 1.00
1681 1681 1583
119 0 32
0.92 0.92 0.92
129 0 35
0 0 31
65 64 4
Split Perm
4
HH Hunt Assited Living Synchro 6 Report
Page 2
HCM Unsignalized Intction Capacity Analysis FAR PM Peak Hour Traffic Volumes
9: Site Access Ward Avenue 2/1/2008
'N 4 1 I
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations r
Sign Control Stop Free Free
Grade 0% 0% 0%
Volume (veh /h) 5 0 0 34 79 12
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 5 0 0 37 86 13
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type None
Median storage veh)
Upstream signal (ft) 333
pX, platoon unblocked
vC, conflicting volume 123 86 99
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 123 86 99
tC, single (s) 6.4 6.2 4.1
tC, 2 stage (s)
tF (s) 3.5 3.3 2.2
p0 queue free 99 100 100
cM capacity (veh /h) 872 973 1494
Direction, Lane EB 1 NB 1 NB 2 SB 1 SB 2
Volume Total 5 0 37 86 13
Volume Left 5 0 0 0 0
Volume Right 0 0 0 0 13
cSH 872 1700 1700 1700 1700
Volume to Capacity 0.01 0.00 0.02 0.05 0.01
Queue Length 95th (ft) 0 0 0 0 0
Control Delay (s) 9.2 0.0 0.0 0.0 0.0
Lane LOS A
Approach Delay (s) 9.2 0.0 0.0
Approach LOS A
Intersection Summary
Average Delay 0.4
Intersection Capacity Utilization 14.2% ICU Level of Service A
Analysis Period (min) 15
HH Hunt Assited Living Synchro 6 Report
Gorove /Slade Associates, Inc. Page 3
HCM Unsignalized Intction Capacity Analysis Fut•SAT Peak Hour Traffic Volumes
3: Route 50 Echo Lane
Movement EBL EBT EBR WBL WBT WBR NEL
Lane Configurations t'+ t
Sign Control Free Free
Grade 0% 0%
Volume (veh /h) 0 1512 2 0 1609 0 0
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 0 1643 2 0 1749 0 0
Pedestrians
Lane Width (ft)
Walking Speed (ft /s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked 0.75
vC, conflicting volume 1749 1646 2231 3393 823 2582 3395 583
vC1, stage 1 conf vol
vC2, stage 2 conf vol r
vCu, unblocked vol 1325 1646 1970 3527 823 2440 3528 0
tC, single (s) 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free 100 100 100 100 97 100 100 100
cM capacity (veh /h) 386 389 28 4 317 12 4 810
Direction, Lane
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
411 HH Hunt Assited Living
Gorove /Slade Associates, Inc.
None
588
EB 1 EB 2 WB 1 WB 2 WB 3 WB 4 NE 1 SW 1
1096 550 583 583 583 0 11 3
0 0 0 0 0 0 0 0
0 2 0 0 0 0 11 3
1700 1700 1700 1700 1700 1700 317 810
0.64 0.32 0.34 0.34 0.34 0.00 0.03 0.00
0 0 0 0 0 0 3 0
0.0 0.0 0.0 0.0 0.0 0.0 16.8 9.5
C A
0.0 0.0 16.8 9.5
C A
0.1
51.9%
15
ICU Level of Service
NET NER SWL SWT SWR
4
Stop Stop
0% 0%
0 10 0 0 3
0.92 0.92 0.92 0.92 0.92
0 11 0 0 3
0.75 0.75 0.75 0.75 0.75
A
None
2/1/2008
Synchro 6 Report
Page 1
HCM Signalized Inters ion Capacity Analysis FuttOSAT Peak Hour Traffic Volumes
5: Route 50 Botanical Boulevard
Movement
Lane Configurations
Ideal Flow (vphpl)
Total Lost time (s)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Volume (vph)
Peak -hour factor, PHF
Adj. Flow (vph)
RTOR Reduction (vph)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Actuated Green, G (s)
Effective Green, g (s)
Actuated g/C Ratio
Clearance Time (s)
Vehicle Extension (s)
Lane Grp Cap (vph)
v/s Ratio Prot
v/s Ratio Perm
vlc Ratio
Uniform Delay, dl
Progression Factor
Incremental Delay, d2
Delay (s)
Level of Service
Approach Delay (s)
Approach LOS
Intersection Summary
EBL EBT EBR WBL
1900
4.0
1.00
1.00
0.95
1770
0.95
1770
116
0.92
126
0
126
Prot
5
10.8
13.3
0.12
6.5
3.0
216
c0.07
0.58
45.3
1.00
4.0
49.3
D
HCM Average Control Delay
HCM Volume to Capacity ratio
Actuated Cycle Length (s)
Intersection Capacity Utilization
Analysis Period (min)
c Critical Lane Group
r
1900 1900
4.0 4.0
0.95 1.00
1.00 0.85
1.00 1.00
3539 1583
1.00 1.00
3539 1583
1364 42
0.92 0.92
1483 46
0 16
1483 30
Perm
2
52.4
55.9
0.51
7.5
3.0
1813
c0.42
0.82
22.3
1.00
4.2
26.6
C
27.9
C
2
52.4
55.9
0.51
7.5
3.0
811
0.02
0.04
13.2
1.00
0.1
13.3
B
30.9
0.76
109.1
71.8%
15
1900
4.0
1.00
1.00
0.95
1770
0.95
1770
34
0.92
37
0
37
Prot
1
5.0
7.5
0.07
6.5
3.0
122
0.02
0.30
48.3
1.00
1.4
49.7
D
WBT WBR NBL NBT NBR SBL SBT SBR
ttt r 4 r
1900 1900 1900 1900 1900
4.0 4.0 4.0 4.0
0.91 1.00 1.00 1.00
1.00 0.85 1.00 0.85
1.00 1.00 0.95 1.00
5085 1583 1778 1583
1.00 1.00 0.95 1.00
5085 1583 1778 1583
1487 97 20 1 13
0.92 0.92 0.92 0.92 0.92
1616 105 22 1 14
0 52 0 0 13
1616 53 0 23 1
Perm Split Perm
6 8 8
6 8
46.6 46.6 4.3 4.3
50.1 50.1 7.8 7.8
0.46 0.46 0.07 0.07
7.5 7.5 7.5 7.5
3.0 3.0 3.0 3.0
2335 727 127 113
0.32 c0.01
0.03 0.00
0.69 0.07 0.18 0.01
23.4 16.5 47.6 47.1
1.00 1.00 1.00 1.00
1.7 0.2 0.7 0.0
25.1 16.7 48.3 47.1
C B D D
25.1 47.9
C D
HCM Level of Service
Sum of lost time (s)
ICU Level of Service
4 4\ t
16.0
C
C
2/1/2008
d
4 r
1900 1900 1900
4.0 4.0 4.0
0.95 0.95 1.00
1.00 1.00 0.85
0.95 0.95 1.00
1681 1686 1583
0.95 0.95 1.00
1681 1686 1583
508 2 102
0.92 0.92 0.92
552 2 111
0 0 89
276 278 22
Split Perm
4 4
18.4
21.9
0.20
7.5
3.0
337
0.16
0.82
41.7
1.00
14.3
56.0
E
18.4
21.9
0.20
7.5
3.0
338
c0.16
0.82
41.7
1.00
14.8
56.6
E
52.8
D
4
18.4
21.9
0.20
7.5
3.0
318
0.01
0.07
35.3
1.00
0.1
35.4
D
4, HH Hunt Assited Living Synchro 6 Report
Gorove /Slade Associates, Inc.
Page 2
HCM Unsignalized Int•ection Capacity Analysis
9: Site Access Ward Avenue
I
Movement ESL EBR NBL NBT SBT SBR
Lane Configurations
Sign Control Stop Free Free
Grade 0% 0% 0%
Volume (veh /h) 6 0 0 27 57 16
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 7 0 0 29 62 17
Pedestrians
Lane Width (ft)
Walking Speed (fits)
Percent Blockage
Right turn flare (veh)
Median type None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 91 62 79
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 91 62 79
tC, single (s) 6.4 6.2 4.1
tC, 2 stage (s)
tF (s) 3.5 3.3 2.2
p0 queue free 99 100 100
cM capacity (veh /h) 909 1003 1519
Direction, Lane EB 1 NB 1 NB 2 SB 1 SB 2
333
Volume Total 7 0 29 62 17
Volume Left 7 0 0 0 0
Volume Right 0 0 0 0 17
cSH 909 1700 1700 1700 1700
Volume to Capacity 0.01 0.00 0.02 0.04 0.01
Queue Length 95th (ft) 1 0 0 0 0
Control Delay (s) 9.0 0.0 0.0 0.0 0.0
Lane LOS A
Approach Delay (s) 9.0 0.0 0.0
Approach LOS A
Intersection Summary
FutO SAT Peak Hour Traffic Volumes
2/1/2008
Average Delay 0.5
Intersection Capacity Utilization 13.3% ICU Level of Service A
Analysis Period (min) 15
HH Hunt Assited Living Synchro 6 Report
Gorove /Slade Associates, Inc. Page 3
HH Hunt Assisted Livin,raffic Impact Analysis
APPENDIX H
QUEUING ANALYSIS
HH Hunt Assisted Living Development Traffic Impact Analysis
Table: Future with Development (2013) Queuing Analysis
Intersection (Lane Group)
Route 50 and Ward Avenue /Botanical Boulevard
Eastbound Left 39 84 85 150
Eastbound Through 337 494 499 715
Eastbound Right 3 24 5 28
Westbound Left 34 77 25 58
Westbound Through 166 235 351 425
Westbound Right 0 42 4 37
Northbound Through 17 37 15 41
Northbound Right 0 23 0 20
Southbound Left 38 84 197 344
Southbound Through 37 82 198 348
Southbound Right 0 28 0 47
January 31, 2008
PM Peak Hour SAT Peak Hour
50th% 95th% 50
95th
Queues Fut. PM Peak Hour Traffic Volumes
5: Route 50 Botanical Boulevard
Lane Group
Lane Group Flow (vph)
v/c Ratio
Control Delay
Queue Delay
Total Delay
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
HH Hunt Assited Living
Gorove /Slade Associates, Inc.
EBL EBT EBR WBL
67 1322 45 59
0.34 0.59 0.04 0.32
44.4 18.0 7.0 45.0
0.0 0.0 0.0 0.0
44.4 18.0 7.0 45.0
39 337 3 34
84 494 24 77
508
250 250
226 2244 1017
0 0 0
0 0 0
0 0 0
0.30 0.59 0.04
150
217
0
0
0
0.27
WBT WBR
1145 225
0.38 0.22
14.7 2.8
0.0 0.0
14.7 2.8
166 0
235 42
788
3042 1037
0
0
0
0.22
0
0
0
0.38
NBT NBR SBL SBT SBR
21 22 65 64 35
0.12 0.12 0.31 0.30 0.15
42.5 18.3 41.7 41.5 14.6
0.0 0.0 0.0 0.0 0.0
42.5 18.3 41.7 41.5 14.6
12 0 38 37 0
37 23 84 82 28
253 1247
75
348 329 324 324 334
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0.06 0.07 0.20 0.20 0.10
2/1/2008
Synchro 6 Report
Page 1
Queues FutL AT Peak Hour Traffic Volumes
5: Route 50 Botanical Boulevard 2/1/2008
Lane Group
Lane Group Flow (vph)
v/c Ratio
Control Delay
Queue Delay
Total Delay
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
EBL EBT EBR WBL
126 1483 46 37
0.55 0.77 0.05 0.22
53.6 26.4 8.9 49.4
0.0 0.0 0.0 0.0
53.6 26.4 8.9 49.4
85 499 5 25
150 #715 28 58
508
250 250 150
256 1921 874 222
0 0 0 0
0 0 0 0
0 0 0 0
0.49 0.77 0.05 0.17
WBT
1616
0.70
26.0
0.0
26.0
351
425
788
2325
0
0
0
0.70
WBR
105
0.14
5.6
0.0
5.6
4
37
776
0
0
0
0.14
95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
NBT
23
0.13
47.7
0.0
47.7
15
41
253
296
0
0
0
0.08
NBR
14
0.08
21.8
0.0
21.8
0
20
275
0
0
0
0.05
SBL
276
0.77
55.5
0.0
55.5
197
#344
75
375
0
0
0
0.74
SBT
278
0.77
55.7
0.0
55.7
198
#348
1247
376
0
0
0
0.74
SBR
111
0.26
8.9
0.0
8.9
0
47
439
0
0
0
0.25
HH Hunt Assited Living Synchro 6 Report
Gorove /Slade Associates, Inc. Page 1
Land Use
ITE
Land
Use
Code
Size
Trip Generation
PM Peak Hour
SAT Peak Hour
Weekday (24 hour
In
Out
Total
In
Out
Total
In
Out
Valley Health Systems Property
Warehousing
150
5 Acres
ssx
25
65%
48
73
sox
33
50%
33
66
50%
192
5o%
192
Office
710
50,000 Sqaure Feet
17%
23
63%
112
135
5o%
63
sox
62
125
sax
390
50%
390
Office Park
750
5 Acres
75%
34
85%
194
228
sox
74
sax
73
147
50x
1,121
sow
1,121
Nursing Home
620
24,000 Sqaure Feet
47%
4
53%
6
10
sox
50%
50%
82
Sox
82
Elderly Housing Attached
253
80 Units
61%
5
39%
3
8
sax
101
50%
100
201
sox
139
50%
139
Subtotal
91
363
454
271
268
201
1,924
1,922
Degrange Property
Business Hotel
312
50 Rooms
box
19
4ox
12
31
50%
5o%
5o%
182
sox
182
Research Development Park
760
5 Acres
12%
9
esw
68
77
sox
106
50x
105
211
50x
199
50%
199
Shopping Center
820
25,000 Sqaure Feet
48%
121
52%
131
252
sox
177
sox
177
354
Sow
1,398
50x
1,398
Drive -in Bank
912
2,400 Square Feet
Sow
66
Sow
65
131
50x
55
50%
55
110
50%
403
50x
403
H -T Restaurant
832
7,600 Sqaure Feet
6o%
50
40%
33
83
sox
602
50%
602
1,204
Sow
496
sox
496
Subtotal
265
309
574
940
939
1,879
2,678
2,676
WWW Property
Office Park
750
35 Acres
Isw
136
65%
769
905
50x
514
sow
513
1,027
50%
3,152
sox
3,152
Shopping Center
820
150,000 Sqaure Feet
48%
394
52%
427
821
sox
568
50x
568
1,136
sox
4,424
50x
4,424
Subtotal
530
1,196
1,726
1,082
1,081
2,163
7,576
7,575
Totals
827
1,804
2,631
2,208
2,203
4,073
11,514
11,508
Source: Trip Generation Manual, 6th Edition. Institute of transportation Engineers. 2003. Note:
data for AM Peak Hour and PM Peak Hour show data for Peak Hour of Adiarent
Groot Trafr7T.
Background Vehicle Trip Generation
respectively, 7 9 am and 4 6 pm, when provided.
4
,,4Pi?„4-04-Atir. oititY
cY77 04%;4:11/4174%ec6z-s%Poi`*%*
1 1
I
1!
i
X X
m X
m (.1'.1
v
-4 co -4 z -4 n
G G) 6) G G
cn
_-I m m m v
m
z
r
z
r
0
0
crl
r.-mr71 414146INS Yr
4%1 m=
411
Skt
t
1
grv
hge,
6 47