HomeMy WebLinkAbout05-08 ApplicationSeptember 25, 2008
BPG Properties, Ltd.
cJo Michael J. Coughlin
Walsh, Colucci, Lubeley, Emrich & Walsh, PC
4310 Prince William Parkway, Ste. 300
Prince William, VA 22192
Department of Planning and Development
540/665 -5651
FAX: 540/665-6395
RE: REZONING 905 -08, BPG PROPERTIES, LTD./I -81 DISTRIBUTION CENTER
Dear Mr. Coughlin:
This letter serves to confirm action taken by the Frederick County Board of Supervisors at their
meeting of September 24, 2008. The above - referenced application was approved to rezone 59 acres
from RA (Rural Areas) District to 133 (Business, Industrial Transition) District, with proffers, for
office and warehouse uses. The properties are located approximately 0.61 miles north of the Route l l
intersection with Cedar Hill Road (route 671), bounded on the west by Interstate 81 and on the east by
Martinsburg Pike (Route 11) in the Stonewall Magisterial District, and are identified with Property
Identification Numbers 33 -A -109 and 33 -A -110.
The proffer dated June 19, 2008 and last revised September 17, 2008, that was approved as a part of
this rezoning application, is unique to this property and is binding regardless of ownership. Enclosed
is a copy of the adopted proffer statement for your records.
Please do not hesitate to contact this office if you have any questions regarding the approval of this
rezoning application.
Sincerely,
------------
/ Michael T. Ruddy, A1CP
Deputy Planning Director
MRTlohd
Attachment
cc: Robin & Kay Boyce, PO Box 67, Clearbrook, VA 22624
Charles S. DeHaven, Jr., Stonewall District Supervisor
Gary Oates and Richard Ruckman, Stonewall District Planning Commissioners
Jane Anderson, Real Estate
Commissioner of Revenue
107 North Kent Street, Suite 202 • Winchester, Virginia 22601 -5000
1i r
•
REZONING APPLICATION 405 -08
BPG PROPERTIES, LTD/I -81 DISTRIBUTION CENTER
Staff Report for the Board of Supervisors
Prepared: September 17, 2008
Staff Contact: Michael T. Ruddy, AICP, Deputy Planning Director
STAFF UPDATE FOR 09/24/08 BOARD OF SUPERVISORS MEETING:
The Planning Commission recommended approval of this request at their September 17, 2008 meeting.
The recommendation of the Commission included consideration of two items as changes to the Proffer
Statement; amending the language of the trail and landscaping easement that runs along the Route 1 I
frontage of the property to include an allowance for grading and drainage adjacent to Route I1 in
support of future improvements to Route 11, and ensuring that $125,000.00 signalization improvement
contribution in Proffer 3.4 is directed solely at the signal and intersection improvement at the future
entrance at Branson Spring Road and not at internal improvements accessing this future entrance.
The Applicant has modified the Proffer Statement to address thel Planning Commission's
recommendation. The latest and final proffer statement is dated September 17, 2008. The
Applicant has also modified their proffer statement to provide for the future dedication of up to 100' of
right -of -way for the extension of Branson Spring Road, generally from the current location of Branson
Spring Road, parallel to the northern property line of the property. This potential extension of Branson
Springs Road is an improvement that has been envisioned during the ongoing Route 1 1 north planning
effort.
More minor modifications to the final proffer statement have addressed the comments previously
provided by Mr. Bob Mitchell, including the critical timing mechanism for the $550,000.00 monetary
contribution to address the transportation impacts generated by this request. This payment will be made
at the time of issuance of the first building permit on the property.
STAFF RECOMMENDATION FOR 09/24/08 BOARD OF SUPERVISORS MEETING:
The B3 land use proposed in this rezoning is consistent with the Northeast Land Use Plan. Many of the
impacts associated with this rezoning request have been mitigated by the Applicant. However, careful
consideration of the transportation impacts associated with this request and the proffered monetary
contribution aimed at mitigating the impacts should occur similar to the consideration provided by the
Planning Commission. It is recognized that the Applicant has increased their monetary contribution for
transportation. However, transportation improvements have not been provided that would achieve a
level of service C or address the Comprehensive Plan.
0
Rezoning 404 -08 — BPG /I -81 Distribution Center
September 17, 2008
Page 2
0
This report is prepared by the Frederick County Planning Staff to provide information to the
Planning Commission and the Board of Supervisors to assist them in making a decision on this
application. It may also be useful to others interested in this zoning "latter. Unresolved issues
concerning this application are noted by staff where relevant throughout this staff report.
I
Reviewed Action
Planning Commission: 08/06/08 Tabled 45 days by Commission
Planning Commission: 09/17/08 Approved
Board of Supervisors: 09/24/08 Pending
PROPOSAL To rezone 59 acres from RA (Rural Areas) District to 133 (Business, Industrial
Transition) District, with proffers.
LOCATION The properties are located approximately 0.61 miles north of the Route 11 intersection
with Cedar Hill (Route 671), bounded on the west by Interstate Route 81 and on the east by Martinsburg
Pike (Route 11).
MAGISTERIAL DISTRICT Stonewall
PROPERTY ID NUMBER 33 -A -109 and 33 -A -110
PROPERTY ZONING RA (Rural Areas)
PRESENT USE Residential and agricultural
ADJOINING PROPERTY ZONING & PRESENT USE
North:
RA (Rural Areas)
Use:
Residential /Agricultural
South:
RA (Rural Areas)
Use:
Residential /Agricultural
East:
RA (Rural Areas)
Use:
Residential /Agricultural
West:
RA (Rural Areas)
Use:
Residential /Agricultural
PROPOSED USES Office and Warehouse Uses
• •
Rezoning 404 -08 — BPG/1 -81 Distribution Center
September 17, 2008
Page 3
REVIEW EVALUATIONS:
Virginia Department of Transportation: The documentation within the application to rezone this
property appears to have a significant measurable impact on Route 11. This route is the VDOT
roadway which has been considered as the access to the property referenced. VDOT is satisfied that the
revised transportation proffers offered in the BPG Properties /1 -81 Distribution Center Rezoning
Application dated June 19, 2008 addressed transportation concerns associated with this request. We
have the following comments: 1. The opportunity to realign their proposed entrance with Branson
Springs Road in the futures will have a positive impact on the overall traffic movement on Route 11.
2. These proffers provide for the necessary entrance /turn lane improvements at the initial entrance in
accordance with VDOT requirements at the time of site plan review. 3. While the Department
recognizes that there are traffic impact deficiencies at both the Route 11 and Rest Church Road
intersection and Route 1 I and Brucetown/Hopewell Road intersection, it appears the best solution is to
accept a monetary contribution from the applicant. This would allow Frederick County and VDOT to
make future decisions on the appropriate use of these funds.
Frederick County, Deputy Director - Transportation: It appears that your updated TIA addressed my
previous concerns regarding background traffic. While it continues to be my position that the ideal
entrance for this site would align with Branson Spring Road, it appears that you are attempting to meet
this goal with your proffers. While it is generally the preference of staff that physical improvements be
put in place as opposed to cash proffers, the right -of -way issues in this situation and the fact that the
greatest needs are on property not controlled by your client make the cash form of proffer appropriate in
this case. I would again note that there is a draft transportation plan in process right now that calls for
the extension of Branson Spring Road across the northern portion of your client's property. I would ask
that your client consider making accommodations for this future roadway.
Fire Marshall: Plan approval recommended.
Clcarbrook Vol. Fire Dept.: As long as the design has the standard fire codes.
Department of Inspections: No Comment.
Department of Public Works: No comments received for this application. COMMENTS of 2007
APPLICATION: 1. Refer to C. Site Suitability: The site description indicates that the area is underlain
by carbonate sedimentary bedrock resulting in karst terrain. Indicate if the karst terrain contains
sinkholes or potential piping channels. Also, indicate if the site is marked by numerous rock outcaps
which will, most probably, require blasting to accommodate site development. 2. Refer to the Traffic
Impact Analysis. The proposed trip generator summary included on page 8 of the Traffic Impact
Analysis (TIA) reflects the number of trips associated with 150 employees. However, the TIA has
conveniently avoided the amount of truck traffic associated with the proposed distribution center.
Considering the nature of the development, evaluating the truck traffic is critical in determining the real
impact on the road network. Revise the TIA accordingly and resubmit. 1 Refer to F. Site Drainage:
Elaborate on the statement "low impact type stormwater management techniques ". We anticipate that
the stormwater runoff will be dramatically increased because of the proposed development including
739,000 square feet of warehouse space, 11,000 square feet of office space, and numerous acres of
• 0
Rezoning 404 -08 — BPG/1 -81 Distribution Center
September 17, 2008
Page 4
pavement. Therefore, we anticipate that onsite stormwater management will be required to mitigate
offsite impacts. This mitigation may also require quality as well as quantity control considering the
potential for the transport of hydrocarbon contaminated runoff from the parking areas. Indicate how
this potential environmental impact will be addressed in the design phase lof the subject project.
Frederick - Winchester Servicc Authority: No comments.
Sanitation Authority Department: We will provide sewer and water service to this site.
Department of Parks & Recreation: The Parks and Recreation Department would recommend the
proffer statement include a ten foot trail on an adequate easement which to construct the trail. The trail
design should meet VDOT and ASHTO guidelines.
Health Department: The Health Dept. has no objection under the following conditions: 1. All
buildings on site are to be served by the public water and sewer system as approved by the Frederick
County Sanitation Authority. 2. All wells are to be abandoned according to the Private Well
Regulations. 3. All septic tanks are to be pumped by an approved septic hauler and abandoned by
filling with sand or gravel. 4. Permits are to be obtained from the Health Dept. for a proposal for a
motel, hotel or restaurant. 5. All designs submitted should provide forprotection of the Branson Spring
from any contaminants or drainage due to the proposed future construction.
Winchester Regional Airport: We have reviewed the proposed rezoning application and determined
that the proposed development plan will Dot have an impact on operations at the Winchester Regional
Airport. While the proposed site lies within the airport's airspace, it does fall outside of the airport's
Part 77 close in surfaces; therefore, special conditional will not be requested.
Frederick County Public Schools: We offer no comments.
Historic Resources Advisory Board: The HRAB considered this rezoning proposal during their
meeting of January 16, 2007. The HRAB reviewed information associated with the Frederick County
Rural Landmarks Survey Report and the Virginia Department of Historic Resources, as well as
information provided by the applicant. At that time, the HRAB felt that the proffers associated with
historic preservation and recognition was adequate, but made two recommendations which included:
1. Since the last time a survey was done in 1990, the HRAB felt that the applicant must fill out a
preliminary Information Form (PIT) from the Department of Historic Resources (DHR) for the
Nathaniel Branson House, which is located on the property proposed to be rezoned. The PIF will
determine if the Nathaniel Branson House can receive state recognition for its historical value.
2. The HRAB requested that a landscaped berm be placed along the frontage of the property, so that the
viewshed of the Alexander Branson House (across Route 11) would not be negatively impacted by
the placement of a 739,000 square foot industrial structure.
Attorney Comments: Please see attached comments dated July 18, 2008
0 0
Rezoning 404 -08 — BPG/1 -81 Distribution Center
September 17, 2008
Page 5
PlanninjZ & Zonine
1) Site History
The original Frederick County zoning map (U.S.G.S. Inwood Quadrangle) identities the subject
parcels as being zoned A -2 (Agricultural General). The County's agricultural zoning districts
were subsequently combined to form the RA (Rural Areas) District upon adoption of an
amendment to the Frederick County Zoning Ordinance on May 10, 1989. The corresponding
revision of the zoning map resulted in the re- mapping of the subject property and all other A -1
and A -2 zoned land to the RA District.
The Applicant previously attempted to rezone these properties in 2007. Rezoning Application
RZ #07 -07 was denied by the Board of Supervisors on September 12, 2007. For the purposes of
this current application, the request for a different zoning classification, B3 rather than M1, is
substantially different from the previous request and may be processed by Frederick County
pursuant to Section 165 -11 of the Frederick County Zoning Ordinance.
2) Comprehensive Poliev Plan
The Frederick County Comprehensive Policy Plan is an official public document that serves as
the community's guide for making decisions regarding development, preservation, public
facilities and other key components of community life. The primary goal of this plan is to
protect and improve the living environment within Frederick County. It is in essence a
composition of policies used to plan for the future physical development of Frederick County.
[Comprehensive Policy Plan, p. I -I J
Land Use
The parcel comprising this rezoning application is located within the` County's Sewer and Water
Service Area (S WSA) and the site is within the limits of the Northeast Land Use Plan. The plan
designates the site for business use. The commercial / industrial transition land use proposed in
this rezoning is consistent with the Northeast Land Use Plan. The plan states that "Business and
commercial land uses are proposed along the Martinsburg Pike corridor, on the east and west
side of Interstate 81 exits 317, 321 and 323. It is envisioned that commercial uses which cater
to the interstate traveler will be developed along the three Interstate 81 interchanges, while
retail, service and office land uses will occur along the Martinsburg Pike corridor ".
Transportation
Plans for new development should provide for the right -of -ways necessary to implement
planned road improvements and new roads shown on the road plan should be constructed by the
developer when warranted by the scale, intensity, or impacts of the development. Existing roads
should be improved as necessary by adjacent development to implement the intentions of the
plan (Comprehensive Plan 7 -6).
0 0
Rezoning 404 -08 — BPG /I -81 Distribution Center
September 17, 2008
Page 6
The Eastern Road Plan of the Comprehensive Policy Plan does include this portion of the
County. The Northeast Land Use Plan calls for Martinsburg Pike to be improved to a four -lane
facility. The Plan also states that proposed industrial and commercial development should only
occur if impacted roads function at Level of Service (LOS) Category C or better. This
application does not provide that Level of Service. The Frederick County Bicycle Plan
designates Route 11 as a short-term designated route.
Site Access and design.
The Northeast Land Use Plan discourages individual lot access on the Martinsburg Pike
corridor, encourages inter - parcel connections, and recommends adequate screening from
adjoining land uses and recommends greater setbacks and buffers and screening along
Martinsburg Pike. This development has proffered commercial entrance limitations on
Martinsburg Pike from the property. The project has also proposed interparcel connectivity
with the adjacent parcels to the north. It may be anticipated that additional development
opportunities on the adjacent properties may occur in the future. Pedestrian accommodations
have been provided along the projects frontage with Route 11.
3) Site Suitability/F.nvironment
The site does not contain any environmental features that would either constrain or preclude site
development. There are no identified areas of steep slopes, floodplains or woodlands. This
area is also known for karst topography. The Frederick County Engineer has identified that a
detailed geotechnical analysis will be needed as part of the detailed site plan design.
The HRAB made two recommendations based upon the presence of the Nathaniel Branson
House on the property. The HRAB felt that the applicant must fill out a Preliminary
Information Form (PIT) from the Department of Historic Resources (DHR) for the Nathaniel
Branson House, and the HRAB requested that a landscaped berm tie placed along the frontage
of the property, so that the viewshed of the Alexander Branson House (across Route 11) would
not be negatively impacted by the placement of a 739,000 square foot industrial structure. The
application provides for additional landscape screening along Route 11 in an effort to tailor
corridor improvements, beyond those customarily required by ordinance, to effectively enhance
the corridor appearance of Route 11 and address the comments offered by the HRAB.
4) Potential Impacts
Proposed Uses: The applicant has proffered that the property shall be developed with notmore..
than seven hundred fifty thousand (750,000) square feet of permitted uses. It should be further
guaranteed that additional land uses that may make up this square footage should be
limited, such as the limitation that the applicant placed on office uses, to ensure the impacts can
be appropriately measured.
A. Transportation
Traffic Impact Analysis.
The traffic impact analysis (TIA) prepared for this application was amended from the TIA that
0 0
Rezoning #04 -08 — BPG /1 -81 Distribution Center
September 17, 2008
Page 7
was prepared for the original rezoning request. The structure of the TIA is now acceptable to
the County and VDOT as it is consistent with acceptable practices. The TIA still shows impacts
at the evaluated intersections that have not been, or cannot be, addressed by the applicant.
As you may recall, the TIA previously evaluated two scenarios. The amended TIA models the
proffered land use scenario.
The TIA indicates that Level of Service C conditions or better will be maintained on study roads
and intersections with the completion of several area improvements including improvements at
the intersection of Route 11 /Hopewell Road/Brucetown Road land improvements at the
intersection of Route I 1 /Rest Church Road. None of the above improvements identified in
the TIA have been addressed by this application. The applicant
signalization agreement with VDOT.
Transportation Program.
The applicant's transportation program is limited to providing for i
via deceleration lanes and providing for a monetary contribution
improvements that would be completed by others in the amount of
proffered to enter into a signalization agreement with VDOT. As
necessary improvements identified in the TIA have not been addr
addition, the Applicant's transportation program does not provide
Eastern Road Plan element of the Comprehensive Plan, in particuL
proffered to enter into a
e required access to the site
)wards area transportation
350,000. The applicant has
as the case previously, the
sed by this application. In
)r or advance the County's
, the widening of Route 11.
As previously noted, interparcel connectivity should be a consideration with this application.
Particular attention has been paid to the property to the north of this project. The extension of
Branson Springs Road to the west through this site and over Interstate 81 is a concept that has
recently been discussed and should continue to be evaluated with this project and as The
Northeastern Frederick Land Use Plan is being reevaluated.
Additional comments from Mr. John Bishop, Frederick County Transportation Planner are
summarized as follows.
Applicant should be preparing their site to make for an easy transition to an entrance
area that aligns with Branson Springs Rd.
Access should be granted to the entrance mentioned in the bullet above for the
property to the north.
Right -away should be considered for an extension of Branson Springs along the
northern portion of the property.
4. Cash proffer amount is improved.
9 0
Rezoning #04 -08 — BPG /I -81 Distribution Center
September 17, 2008
Page 8
C. Design Standards
The Northeast Land Use Plan recommends adequate screening from adjoining land uses and
recommends greater setbacks and buffers and screening along Martinsburg Pike. The site is
surrounded on all sides by RA (Rural Areas) zoned property, which is either in agricultural or
residential use. While it is possible that these uses may change ink the future, in line with the
Northeast Land Use Plan, for the moment, screening should be addressed.
The project's location on a major corridor warrants particular attention. This has been provided
for in this latest version of the application. Some additional clarification to allow for an
improved landscaped area should be worked into the application. Consideration should also be
given to screening along Interstate 81. The applicant has discussed addressing this issue and
should incorporate this into the proffer statement.
D. Community Facilities
The development of this site will have an impact on community facilities and services.
However, it is recognized that commercial uses generally provide a positive impact on
community facilities through the additional generation of tax revenue. This application
addresses the impacts to Fire and Rescue services by providing a monetary contribution in an
amount of $10,000.
Proffer Statement —Dated June 19, 2008. Updated through September] 7,2008 (Please see updates
provided to PC and BOS for a review of the changes to the proffers).
A) Generalized Development Plan
A Generalized Development Plan has been provided by the applicant. Staff would suggest that
the flexibility written into the paragraph introducing the GDP may be too flexible and should be
addressed.
B) Land Use
The applicant has provided that the amount of office space on the property will be incorporated
into the primary use structure. Further, the applicant has proffered the development of no more
than 750,000 square feet. It would be advisable to further guarantee the development ofthe site
will be for one building only, consistent with the GDP.
The applicant has proffered out specific land uses.
The Applicant has proffered a ten foot wide landscape strip along Route 1 I including a variety
of landscape plantings. This proffer should be expanded to allow for a broader area of
planting in the area set aside between the right -of -way and the parking setback. The applicant
has proffered to employ the Ml district setback and yard requirements for the development of
this site.
0 0
Rezoning 904 -08 — BPG /1 -81 Distribution Center
September 17, 2008
Page 9
The applicant has limited the fagade materials of the buildings fronting along Route 11 and
Interstate 81 to a variety of materials.
Proffer 7 is redundant as they are required by current
C) Transportation
The Applicant's proffered transportation improvements include the dedication of an additional
ten feet of right -of -way for future improvements to Route 11 to be done by others. Right turn
deceleration lanes have been proffered. The proffered right turn lanes are the minimum that
would be required by VDOT during the development of the site.
The Applicant has proffered to enter into a signalization agreement with VDOT and has
proffered a $350,000 monetary contribution at the time of Certificate of Occupancy for
unspecified improvements within the Route 11 corridor. Such impr vements would be done by
others.
The Applicant has proffered to construct a ten foot wide asphal multi -use trail along their
frontage on Route 11.
In general, the transportation proffer is much simpli/ted from that previously offered The
mechanism for obtaining the transportation proffer is improved and the dollar value of the
proffer is more than before. However, it should be carefully evaluated to ensure that the
amount is sufficient to address and mitigate the transportation impacts associated with this
request. An update to the County's Development Impact Model is presently being prepared.
This will be a very important tool to evaluate what may be the appropriate transportation
contribution for development projects.
D) Community Facilities I
The Applicant has proffered $10,000 to Frederick County for use by Clearbrook Volunteer Fire
and Rescue.
STAFF CONCLUSIONS FOR 08/06/08 PLANNING COMMISSION MEETING:
The B3 land use proposed in this rezoning is consistent with the Northeast Land Use Plan. Many of the
impacts associated with this rezoning request have been mitigated by the Applicant. However, careful
consideration of the transportation impacts associated with this request and the proffered monetary
contribution aimed at mitigating the impacts should occur. Transportation improvements have not been
provided that would achieve a level of service C or address the Comprehensive Plan.
u
Rezoning 404 -08 — BPG /1 -81 Distribution Center
September 17, 2008
Page 10
0
The applicant's team provided their cost estimates for transportation improvements based on the impact
of background traffic versus the percentage of impact generated from the project. They calculated
their share for background transportation infrastructure improvements to be $350,000 which would
cover traffic signalization, a share in the construction of the Hopewell /Brucetown intersection, and the
left -turn lane at Rest Church Road. The applicant's team pointed out revisions to their proffer which
included a maximum of 750,000 square -feet of permitted use located within one building or within
multiple buildings; one entrance to the property with availability for access by adjoining property and
inter - parcel connections; the removal of food stores and hardware stores as allowable uses; utilization of
Ml side yards and setbacks; enhanced landscaping; modifications to trip numbers from background
traffic with growth rates; and the use of 1TE trip generation numbers for traffic modeling.
A property owner in the Stonewall District, Mr. George Sempeles, spoke'during the public comment
portion of the hearing; he was in favor of growth and development along Route 1 t North. lie believed
this area needed business growth in order to fund the road improvements needed at the Brucetown
interchange and the Route 1 1 /Rest Church entrance. Regarding the issues involving truck traffic, he
commented that the new FBI Records Management site will not generate truck traffic, thereby reducing
the amount of background traffic. Furthermore, he pointed out an additional 12 -foot right -of -way
reserved alone his side of the road for a left -turn lane within the corridor between Clearbrook and Rest
Church, which could be used to accommodate traffic.
Commissioners raised issues involving the inadequacy of transportation infrastructure in this area and
their concerns about the impact of additional truck -traffic from the proposed use in addition to existing
background traffic. They questioned whether the applicant's monetary contribution towards
transportation infrastructure was sufficient and whether the traffic impacts from the proposed use were
adequately addressed. The lack of sufficient right -of -way at this location to fix the infrastructure
geometrically or structurally was discussed and the possibility of a traffic management plan was raised.
A member of the Commission commented about a few of the successful rezoning projects in this area
and a couple of things those projects had in common were the installation of a split -rail fence along the
corridor and each of the projects not only agreed to dedicate the ten -foot right -of -way along Route 11,
but to build their section of the 12 -foot lane across the entire frontage. It was noted that the
Comprehensive Policy Plan calls for Route 11 to be a four -lane divided highway. It was suggested that
this project's applicants should consider following suit with these provisions. Commission members
agreed with the need to eliminate hardware stores and food stores as an allowed use. The
Commissioners pointed out that their Bylaws state that if revised proffers are not received prior to the
agenda mailing, the Commission should table the application in order to provide time for the public to
review the new proffers.
The Planning Commission voted unanimously to table the rezoning application for 45 days in order to
provide the public with the opportunity to review the revised proffers that were submitted after the
agenda mailing and to give the applicant the opportunity to refine the application based on the issues
raised.
9
Rezoning 904 -08 — BPG /1 -81 Distribution Center
September 17, 2008
Page 1 I
0
(Note: Commissioner Watt was absent for this vote; Commissioners Rucicman, Triplett, and Ken were
absent from the meeting.)
STAFF
The Applicant previously provided the Planning Commission with a revised proffer statement prior to
your 08/06/08 meeting. In this revision, the Applicant attempted to address those issues identified in
the staff report and those items identified by Mr. Bob Mitchell during his legal review dated July 18,
2008. Following this Commission meeting, the Applicant further revised their proffer statement in an
effort to address the issues identified by the Planning Commission. The date of this latest revision to
the proffer statement is August 25, 2008.
In summary, the changes to the substance of the proffer statement are as follows.
The Applicant has proffered out additional land uses including Food' Stores or groceries and
Building materials, hardware, garden supply, mobile home dealers and retail nurseries. It was
previously recognized that such uses could generate higher vehicle trip counts than originally
anticipated by this request.
Changes to the Applicants transportation program include a commitment to no more than one
entrance to the property. However, provisions have been made for the I closure of this entrance in
favor of a future entrance aligned with Branson Springs Road which is to be constructed by
others. A contribution up to 50 percent of the cost of this entrance and signalization, up to an
amount not to exceed $125,000.00 has been made. Proffers 3.3 and 3.4 regarding the potential for
this relocated entrance to the property appear to warrant additional attention due to the specific
language and a concern that the cap of $125,000.00 may not ultimately achieve a 50 percent share
of the ultimate cost of the project.
The Applicant has increased their monetary contribution by $200,000.00, to $550,000.00 from
$350,000.00, for transportation improvements in the Route 11 north corridor. The County
Attorney's concern regarding the timing of this contribution at issuance of building permit rather
than at the time of a Certificate of Occupancy for a use on the property remains valid.
The Applicant has proffered to provide additional tree plantings along the properties frontage.
with Interstate 81 and has also proposed the construction of a split rail fence along the properties
Route 11 frontage.
In general, the more detailed comments previously offered by Mr. Mitchell appear to remain
unaddressed. Any additional comments provided by the County Attorney will be forwarded to
the Commission.
Rezoning #04 -08 — BPG /1 -81 Distribution Center
September 17, 2008
Page 12
P
Staff s conclusions for this meeting remain generally the same as our previous conclusion. The B3 land
use proposed in this rezoning is consistent with the Northeast Land Use Plan. Many of the impacts
associated with this rezoning request have been mitigated by the Applicant. However, careful
consideration of the transportation impacts associated with this request and the proffered monetary
contribution aimed at mitigating the impacts should occur. It is recognized that the Applicant has
increased their monetary contribution for transportation. However, transportation improvements have
not been provided that would achieve a level of service C or address the Comprehensive Plan.
• a
REZONING APPLICATION 405 -08
BPG PROPERTIES, LTD /1 -81 DISTRIBUTION CENTER
Staff Report for the Board of Supervisors
Prepared: September 2, 2008
Staff Contact: Michael T. Ruddy, AICP, Dep Planning Director
STAFF
The Applicant previously provided the Planning Commission wither revised proffer statement prior to
your 08/06/08 meeting. In this revision, the Applicant attempted to address those issues identified in
the staff report and those items identified by Mr. Bob Mitchell during his legal review dated July 18,
2008. Following this Commission meeting, the Applicant further revised their proffer statement in an
effort to address the issues identified by the Planning Commission. The date of this latest revision to
the proffer statement is August 25, 2008. 1
In summary, the changes to the substance of the proffer statement are as
The Applicant has proffered out additional land uses including Food Store's or groceries and Building
materials, hardware, garden supply, mobile home dealers and retail nurseries. It was previously
recognized that such uses could generate higher vehicle trip counts than originally anticipated by this
request.
Changes to the Applicant's transportation program include a commitment to no more than one entrance
to the property. However, provisions have been made for the closure of thislentrance in favor of future
entrance aligned with Branson Springs Road which is to be constructed by others. A contribution up to
50 percent of the cost of this entrance and signalization, up to an amount not to exceed $125,000.00 has
been made. Proffers 3.3 and 3.4 regarding the potential for this relocated entrance to the property
appear to warrant additional attention due to the specific language and Ia concern that the cap of
$125,000.00 may not ultimately achieve a 50 percent share of the ultimate cost of the project.
The Applicant has increased their monetary contribution by $200,000.00, to $550,000.00 from
$350,000.00, for transportation improvements in the Route 11 north corridor. The County Attorney's
concern regarding the timing of this contribution at issuance of building permit rather than at the time of
a Certificate of Occupancy for a use on the property remains valid.
The Applicant has proffered to provide additional tree plantings along the properties frontage with
Interstate 81 and has also proposed the construction of a split rail fence along the properties' Route I 1
frontage.
In general, the more detailed comments previously offered by Mr. Mitchell appear to remain
unaddressed. Any additional comments provided by the County Attorney will be forwarded to the
Commission.
i
0
Rezoning 904 -08 — BPG /1 -81 Distribution Center
September 2. 2008
Page 2
0
This report is prepared by the Frederick County Planning Staff to provide information to the
Planning Commission and the Board of Supervisors to assist them in making a decision on this
application. It may also be useful to others interested in this zoning "ratter. Unresolved issues
concerning this application are noted by staff where relevant throughout this staff report.
Reviewed Act
Planning Commission: 08/06/08 Tabled 45 days
Planning Commission: 09/17/08 Pen
Board of Supervisors: 09/24/08 Pend
PROPOSAL To rezone 59 acres from RA (Rural Areas) District
Transition) District, with proffers.
LOCATION The properties are located approximately 0.61 miles north
with Cedar Hill (Route 671), bounded on the west by Interstate Route 81 an
Pike (Route 11).
MAGISTERIAL DISTRICT Stonewall
PROPERTY ID NUMBER 33 -A -109 and 33-A-110
PROPERTY ZONING RA (Rural Areas)
PRESENT USE Residential and agricultural
ADJOINING PROPERTY ZONING & PRESENT USE
Commission
B3 (Business, Industrial
e Route 11 intersection
the east by Martinsburg
North:
RA (Rural Areas)
Use:
Residential /Agricultural
South:
RA (Rural Areas)
Use:
Residential /Agricultural
East:
RA (Rural Areas)
Use:
Residential /Agricultural
West:
RA (Rural Areas)
Use:
Residential /Agricultural
PROPOSED USES Office and Warehouse Uses
0 0
Rezoning ##04 -08 — BPG/I -81 Distribution Center
September 2, 2008
Paae 3
REVIEW EVALUATIONS:
Virginia Department of Transportation: The documentation within the application to rezone this
property appears to have a significant measurable impact on Route 11.1 'this route is the VDOT
roadway which has been considered as the access to the property referenced. V DOT is satisfied that the
revised transportation proffers offered in the BPG Properties/I -81 Distribution Center Rezoning
Application dated June 19 2008 addressed transportation concerns associated with this request. We
have the following comments: 1. The opportunity to realign their proposed entrance with Branson
Springs Road in the futures will have a positive impact on the overall traffic movement on Route 11.
2. These proffers provide for the necessary entrance /turn lane improvements at the initial entrance in
accordance with VDOT requirements at the time of site plan review. 3. While the Department
recognizes that there are traffic impact deficiencies at both the Route l I and Rest Church Road
intersection and Route 11 and Brucetown/Flopewell Road intersection, it appears the best solution is to
accept a monetary contribution from the applicant. This would allow Frederick County and VDOT to
make future decisions on the appropriate use of these funds.
Frederick County, Deputy Director - Transportation: It appears that your'updated TIA addressed my
previous concerns regarding background traffic. While it continues to be!my position that the ideal
entrance for this site would align with Branson Spring Road, it appears that you are attempting to meet
this goal with your proffers. While it is generally the preference of staff that physical improvements be
put in place as opposed to cash proffers, the right -of -way issues in this situation and the fact that the
greatest needs are on property not controlled by your client make the cash form of proffer appropriate in
this case. I would again note that there is a draft transportation plan in process right now that calls for
the extension of Branson Spring Road across the northern portion of your client's property. I would ask
that your client consider making accommodations for this future roadway.
Fire Marshall: Plan approval recommended.
Clearbrook Vol. Fire Dept.: As long as the design has the standard fire codes '
Department of Inspections: No Comment.
Department of Public Works: No comments received for this application. COMMENTS of 2007
APPLICATION: 1. Refer to C. Site Suitability: The site description indicates that the area is underlain
by carbonate sedimentary bedrock resulting in karst terrain. Indicate if the karst terrain contains
sinkholes or potential piping channels. Also, indicate if the site is marked by numerous rock outcaps
which will, most probably, require blasting to accommodate site development., 2 -Refer to, the. Traffic.,.
Impact .Analysis. The proposed trip generator summary included on page 8 of the Traffic Impact
Analysis (TIA) reflects the number of trips associated with 150 employees. However, the TIA has
conveniently avoided the amount of truck traffic associated with the proposed distribution center.
Considering the nature of the development, evaluating the truck traffic is critical in determining the real
impact on the road network. Revise the TIA accordingly and resubmit. 3. Refer to F. Site Drainage:
Elaborate on the statement "low impact type stomiwater management techniques ". We anticipate that
the stormwater runoff will be dramatically increased because of the proposed development including
739,000 square feet of warehouse space, 11,000 square feet of office space, and numerous acres of
0 0
- Rezoning 904 -08 — BPG'I -81 Distribution Center
September 2, 2008
Page 4
pavement. Therefore, we anticipate that onsite stormwater management will be required to mitigate
offsite impacts. This mitigation may also require quality as well as quantity control considering the
potential for the transport of hydrocarbon contaminated runoff from the parking areas. Indicate how
this potential environmental impact will be addressed in the design phase of the subject project.
Frederick- Winchester Service Authority: No comments.
Sanitation Authority Department: We will provide sewer and water
Department of Parks & Recreation: The Parks and Recreation Departi
proffer statement include a ten foot trail on an adequate easement which to
design should meet VDOT and ASHTO guidelines.
Health Department: The Health Dept. has no objection under the foll
buildings on site are to be served by the public water and sewer system as
County Sanitation Authority. 2. All wells are to be abandoned accol
Regulations. 3. All septic tanks are to be pumped by an approved septic
filling with sand or gravel. 4. Permits are to be obtained from the Health
motel, hotel or restaurant. 5. All designs submitted should provide for prote
from any contaminants or drainage due to the proposed future constructior
to this site.
would recommend the
truct the trail. The trail
g conditions: 1. All
ived by the Frederick
to the Private Well
er and abandoned by
. for a proposal for a
of the Branson Spring
Winchester Regional Airport: We have reviewed the proposed rezoning application and determined
that the proposed development plan will not have an impact on operations at the Winchester Regional
Airport. While the proposed site lies within the airport's airspace, it does fall outside of the airport's
Part 77 close in surfaces; therefore, special conditional will not be requested.
Frederick County Public Schools: We offer no comments.
Historic Resources Advisory Board: The HRAB considered this rezoning proposal during their
meeting of January 16, 2007. The HRAB reviewed information associated with the Frederick County
Rural Landmarks Survey Repo r[ and the Virginia Department of Historic Resources, as well as
information provided by the applicant. At that time, the HRAB felt that the proffers associated with
historic preservation and recognition was adequate, but made two recommendations which included:
1. Since the last time a survey was done in 1990, the HRAB felt that the applicant must fill out a
preliminary Information Form (PIF) from the Department of Historic Resources (DHR) for the
.Nathaniel Branson House, which is located on the property., proposed to be rezoned. -.,The PIF will
determine if the Nathaniel Branson House can receive state recognition for its historical value.
2. The HRAB requested that a landscaped berm be placed along the frontage of the property, so that the
viewshed of the Alexander Branson House (across Route 11) would not be negatively impacted by
the placement of a 739,000 square foot industrial structure.
—. Attorney Comments: Please see attached comments dated July 18, 2008..
0 0
Rezoning #04 -08 — BPG /1 -81 Distribution Center - -. - -.-
September 2. 2008
Page 5
Planning & Zoning:
1) Site history
The original Frederick County zoning map (U.S.G.S. Inwood Quadrangle) identifies the subject
parcels as being zoned A -2 (Agricultural General). The County's agricultural zoning districts
were subsequently combined to form the RA (Rural Areas) District upon adoption of an
amendment to the Frederick County Zoning Ordinance on May 10, 1989. The corresponding
revision of the zoning map resulted in the re- mapping of the subject property and all other A -1
and A -2 zoned land to the RA District.
The Applicant previously attempted to rezone these properties in 2007. Rezoning Application
RZ #07 -07 was denied by the Board of Supervisors on September 121 2007. For the purposes of
this current application, the request for a different zoning classification. B3 rather than MI, is
substantially different from the previous request and may be processed by Frederick County
pursuant to Section 165 -11 of the Frederick County Zoning Ordinance.
2) Comprehensive Policy Plan
The Frederick County Comprehensive Policy Plan is an official public document that serves as
the community's guide for making decisions regarding development, preservation, public
facilities and other key components of community life. The primary goal of this plan is to
protect and improve the living environment within Frederick County. It is in essence a
composition of policies used to plan for the future physical development of Frederick County.
[Comprehensive Policy Plan, p. 1 -1J
Land Use
The parcel comprising this rezoning application is located within the County's Sewer and Water
Service Area (SWSA) and the site is within the limits of the Northeast Land Use Plan. The plan
designates the site for business use. The commercial / industrial transition land use proposed in
this rezoning is consistent with the Northeast Land Use Plan. The plan states that "Business and
commercial land uses are proposed along the Martinsburg Pike corridor, on the east and west
side of Interstate 81 exits 317, 321 and 323. It is envisioned that commercial uses which cater
to the interstate traveler will be developed along the three Interstate 81 interchanges, while
retail, service and office land uses, will, occur along the - Martinsburg Pike corridor''. ._._ -.
Transportation
Plans for new development should provide for the right -of -ways necessary to implement
planned road improvements and new roads shown on the road plan should be constructed by the
developer when warranted by the scale, intensity, or impacts of the development. Existing roads
should be improved as necessary by adjacent development to implement the intentions of the
plan (Comprehensive Plan 7 -6).
Rezoning #04-08 — BPG /1 -81 Distribution Center
September 2, 2008
Page 6
The Eastern Road Plan of the Comprehensive Policy Plan does include this portion of the
County. The Northeast Land Use Plan calls for Martinsburg Pike to�be improved to a four -lane
facility. The Plan also states that proposed industrial and commercial development should only
occur if impacted roads function at Level of Service (LOS) Category C or better. This
application does not provide that Level of Service. The Frederick County Bicycle Plan
designates Route 11 as a short-term designated route.
Site Access and design.
The Northeast Land Use Plan discourages individual lot access on the Martinsburg Pike
corridor, encourages inter - parcel connections, and recommends adequate screening from
adjoining land uses and recommends greater setbacks and buffers and screening along
Martinsburg Pike. This development has proffered commercial entrance limitations on
Martinsburg Pike from the property. The project has also proposed interparcel connectivity
with the adjacent parcels to the north. It may be anticipated that additional development
opportunities on the adjacent properties may occur in the future. Pedestrian accommodations
have been provided along the projects frontage with Route 11.
3) Site Suitabilitv /Environment
The site does not contain any environmental features that would either constrain or preclude site
development. There are no identified areas of steep slopes, floodpl,ains or woodlands. This
area is also known for karst topography. The Frederick County Engineer has identified that a
detailed geotechnical analysis will be needed as part of the detailedlsite plan design.
The HRAB made two recommendations based upon the presence of the Nathaniel Branson
House on the property. The HRAB felt that the applicant must fill out a Preliminary
Information Form (PIF) from the Department of Historic Resources (DHR) for the Nathaniel
Branson House, and the HRAB requested that a landscaped berm belplaced along the frontage
of the property, so that the viewshed of the Alexander Branson House (across Route 1 1) would
not be negatively impacted by the placement of a 739,000 square foot industrial structure. The
application provides for additional landscape screening along Route 11 in an effort to tailor
corridor improvements, beyond those customarily required by ordinance, to effectively enhance
the corridor appearance of Route 11 and address the comments offered by the HRAB.
4) Potential Impacts
Proposed Uses:..The applicant has.proffered that the property shall be developed with not
than seven hundred fifty (750,000) square feet of permitted uses. It should be further
guaranteed that additional land uses that may make up this square footage should be
limited, such as the limitation that the applicant placed on office uses, to ensure the impacts can
be appropriately measured.
A. Transportation
Traffic Impact Analysis.
The traffic impact analysis (TIA) prepared for this application was amended from the TIA that
9 9
Rezoning #04 -08 — BPG /I -81 Distribution Center
September 2, 2008
Page 7
was prepared for the original rezoning request. The structure of the TIA is now acceptable to
the County and VDOT as it is consistent with acceptable practices. The TIA still shows impacts
at the evaluated intersections that have not been, or cannot be, addressed by the applicant.
As you may recall, the TIA previously evaluated two scenarios. The amended TIA models the
proffered land use scenario.
The TIA indicates that Level of Service C conditions or better will be maintained on study roads
}
and intersections with the completion of several area improvements including improvements at
the intersection of Route II /Hopewell Road/Brucetown Road and improvements at the
intersection of Route 11 /Rest Church Road. None of the above improvements identified in
the TIA have been addressed by this application. The applicant i as proffered to enter into a
signalization agreement with VDOT.
Transportation Program.
The applicant's transportation program is limited to providing for the required access to the site
via deceleration lanes and providing for a monetary contribution towards area transportation
improvements that would be completed by others in the amount of $350,000. The applicant has
proffered to enter into a signalization agreement with VDOT. As was the case previously, the
necessary improvements identified in the TIA have not been addressed by this application. In
addition, the Applicant's transportation program does not provide for or advance the County's
Eastern Road Plan element of the Comprehensive Plan, in particular,) the widening of Route 11.
As previously noted, interparcel connectivity should be a consideration with this application.
Particular attention has been paid to the property to the north of this project. The extension of
Branson Springs Road to the west through this site and over Interstate 81 is a concept that has
recently been discussed and should continue to be evaluated wit this project and as The
Northeastern Frederick Land Use Plan is being reevaluated.
Additional comments from Mr. John Bishop, Frederick County Transportation Planner are
summarized as follows.
1. Applicant should be preparing their site to make for an easy transition to an entrance
area that aligns with Branson Springs Rd.
2. Access the,,,,
_ .- granted ., eta above r or r _
ess s„ ou e rante, tot e entrance mentioned in u
property to the north.
3. Right -away should be considered for an extension of Branson Springs along the
northern portion of the property.
4. Cash proffer amount is improved.
Rezoning #.04 -08 -- BPG /1 -81 Distribution Center
September 2, 2008
Pace 8
C. Design Standards
The Northeast Land Use Plan recommends adequate screening from adjoining land uses and
recommends greater setbacks and buffers and screening along Martinsburg Pike. The site is
surrounded on all sides by RA (Rural Areas) zoned property, which is either in agricultural or
residential use. While it is possible that these uses may change in the future, in line with the
Northeast Land Use Plan, for the moment, screening should be addressed.
The project's location on a major corridor warrants particular attention. This has been provided
for in this latest version of the application. Some additional clarification to allow for an
improved landscaped area should be worked into the application. Consideration should also be
given to screening along Interstate 81. The applicant has discussei addressing this issue and
should incorporate this into the proffer statement.
D. Community Facilities
The development of this site will have an impact on community facilities and services.
However, it is recognized that commercial uses generally provide a positive impact on
community facilities through the additional generation of tax revenue. This application
addresses the impacts to Fire and Rescue services by providing a monetary contribution in an
amount o f $10,000.
Proffer Statement — Dated June 19, 2008.
A) Generalized Development Plan
A Generalized Development Plan has been provided by the applicant. Staff would suggest that
the flexibility written into the paragraph introducing the GDP may be flexible and should be
addressed.
B) Land Use
The applicant has provided that the amount of office space on the property will be incorporated
into the primary use structure. Further, the applicant has proffered the development of no more
than 750,000 square feet. It would be advisable to further guarantee the development of the site
will be for one building only, consistent with the GDP.
The applicant has proffered out specific land uses.
The Applicant has proffered a ten foot wide landscape strip along Route 11 including a variety
of landscape plantings. This proffer should be expanded to allow for a broader area of
planting in the area set aside between the right -of -way and the parking setback. The applicant
has proffered to employ the M 1 district setback and yard requirements for the development of
this site.
i
Rezoning 404 -08 — BPG /I -81 Distribution Center
September 2, 2008
Page 9
The applicant has limited the fagade materials of the buildings fronting along Route 11 and
Interstate 81 to a variety of materials.
Proffer 7 is redundant as they are required by current
C) Transportation
The Applicant's proffered transportation improvements include the dedication of an additional
ten feet of right -of -way for future improvements to Route 11 to be done by others. Right turn
deceleration lanes have been proffered. The proffered right turn lanes are the minimum that
would be required by VDOT during the development of the site. I
The Applicant has proffered to enter into a signalization agreement with VDOT and has
proffered a $350,000 monetary contribution at the time of Certificate of Occupancy for
unspecified improvements within the Route I 1 corridor. Such improvements would be done by
others.
The Applicant has proffered to construct a ten foot wide asphalt multi -use trail along their
frontage on Route 11. 1
In general, the transportation proffer is much simplifiedfrom that previously offered. The
mechanism for obtaining the transportation proffer is improved and the dollar value of the
proffer is more than before. However, it should be carefully evaluated to ensure that the
amount is sufficient to address and mitigate the transportation impacts associated with this
request. An update to the County's Development Impact Model is presently being prepared
This will be a very important tool to evaluate what may be the appropriate transportation
contribution for development projects.
D) Community Facilities
The Applicant has proffered $10,000 to Frederick County for use by i Clearbrook Volunteer Fire
and Rescue.
STAFF CONCLUSIONS FOR 08/06/08 PLANNING COMMISSION MEETING:
The B3 land use proposed in this rezoning is consistent with the Northeast Land Use Plan. Many of the
impacts g q mitigated by the Applicant. However, careful
consideration deration of the transportation impacts associated'Wit
been mi
-- h this request and the proffered monetary
contribution aimed at mitigating the impacts should occur. Transportation improvements have not been
provided that would achieve a level of service C or address the Comprehensive Plan.
0
Rezoning #04 -08 — BPG /I -81 Distribution Center..
September 2, 2008
Page 10
The applicant's team provided their cost estimates for transportation impro)
of background traffic versus the percentage of impact generated from the
their share for background transportation infrastructure improvements to
cover traffic signalization, a share in the construction of the Hopewell /Bru(
left -turn lane at Rest Church Road. The applicant's team pointed out revi
included a maximum of 750,000 square -feet of permitted use located wii
multiple buildings; one entrance to the property with availability for acces
inter - parcel connections; the removal of food stores and hardware stores as
M1 side yards and setbacks; enhanced landscaping; modifications to trip
traffic with growth rates; and the use of ITE trip generation numbers for t
menis based on the impact
project. They calculated
)e $350,000 which would
town intersection, and the
ons to their proffer which
in one building or within
by adjoining property and
lowable uses; utilization of
umbers from background
ffic modeling.
A property owner in the Stonewall District, Mr. George Sempeles, spoke during the public comment
portion of the hearing; he was in favor of growth and development along Route 11 North._ He believed
this area needed business growth in order to fund the road improvements needed at the Brucetown
interchange and the Route 1 I/Rest Church entrance. Regarding the issues involving truck traffic, he
commented that the new FBI Records Management site will not generate trick traffic, thereby reducing
the amount of background traffic. Furthermore, he pointed out an additional 12 -foot right -of -way
reserved along his side of the road for a left -turn lane within the corridor between Clearbrook and Rest
Church, which could be used to accommodate traffic. I
Commissioners raised issues involving the inadequacy of transportation infrastructure in this area and
their concerns about the impact of additional truck - traffic from the proposed use in addition to existing
background traffic. They questioned whether the applicant's monetary contribution towards
transportation infrastructure was sufficient and whether the traffic impacts from the proposed use were
adequately addressed. The lack of sufficient right -of -way at this location to fix the infrastructure
geometrically or structurally was discussed and the possibility of a traffic management plan was raised.
A member of the Commission commented about a few of the successful rezoning projects in this area
and a couple of things those projects had in common were the installation of a split -rail fence along the
corridor and each of the projects not only agreed to dedicate the ten -foot right -of -way along Route 11,
but to build their section of the 12 -foot lane across the entire frontage. It was noted that the
Comprehensive Policy Plan calls for Route 11 to be a four -lane divided highway. It was suggested that
this project's applicants should consider following suit with these provisions. Commission members
agreed with the need to eliminate — hardware stores and food stores as an allowed use. The
Commissioners pointed out that their Bylaws state that'if revised proffers are not received prior to the
agenda mailing, the Commission should table the application in order to provide time for the public to
review the new proffers.
The Planning Commission voted unanimously to table the rezoning application for 45 days in order to
provide the public with the opportunity to review the revised proffers that were submitted after the
agenda mailing and to give the applicant the opportunity to refine the application based on the issues
raised.
Rezoning 904 -08 — BPG /1 -81 Distribution Center
September 2, 2008
Page 11
(Note: Commissioner Watt was absent for this vote; Commissioners
absent from the meeting.)
Please see front page of this report.
Staffs conclusions for this meeting remain generally the same as our previ
use proposed in this rezoning is consistent with the Northeast Land Use
associated with this rezoning request have been mitigated by the Ap
consideration of the transportation impacts associated with this request
contribution aimed at mitigating the impacts should occur. It is recogn
increased their monetary contribution for transportation. However, transpc
not been provided that would achieve a level of service C or address the 1
Triplett, and Kerr were
conclusion. The B3 land
n. Many of the impacts
ant. However, careful
the proffered monetary
I that the Applicant has
:ion improvements have
iorehensive Plan.
raised by the Planning Commission.
I -81 Distribution C
ReZoning
REZ 05 - 08
PIN: 33-A- 109, 33-A- 110
— Future R07 Bypass
Zoning
M2(Induaaial, General Djs u
�Appllentlpn
4W BI Muemen. Neighborhood Districp
• MH I(Mabile Home Communi(,Dja ct)
Urban DevelopmeutMa• B2 Mee—, (hnenl Door.)
• MS (Medial Suppart Dimncp
#M%oSWSA
• B3 (Business. Indusulal Trruorfinn DiN c1) — R4 (Retldatial Planed Commumty Diancl)
•EM(Ek --- Manufedynng ul et)
4a 3(R i4enlfal ReurefiodCommuNty District)
• FIE(Higher Fducafmn Do )et)
ORAR Area Disuitp
I_ MI l,Indushial, LeghcDisl[itt]
RP(Re ®dentist P<riolmanceDisaict)
0 250 500 1,000 Feet
Map Document ( N- \Plannine_And_Ne'+elopment \_t LocatIr_Mps\ 20081181_❑ istdhutionGenteY _REZ0508_070708. mxd) ]x72008
0 0
A. Site Background and History
The 1 -81 Distribution Center property consists of 2 parcels with PIN #'s 33 -((A)) -109
&33-((A))-110. The 59.077 acres of land are located as shown on the attached
Figure 1 Location Map. The site lies outside the Urban Development Area of
Frederick County. (See Figure 2). 1
The site had historically been used for agriculture. Principle access is provided by
U. S. Route 11 "Martinsburg Pike ".
�� �t
go
V
. Sp (I
A4
auliv __y ry
"meta
1 . \
a
esb ro
34
. .. 522
Haypold
Sn
q
Obi 42 1^ i
4m r
, 45 f .,
Le et
� a
!! Pn }l9s
v44.
/
o '
53
�7
I 37
•
// ♦ �
.9F��n � 7
J
C � �
•� [
u �
63
ry
66
Iii BISTRIBUTMN CENTER
FREDERICK COUNTY. Maw
RES
Mr
Date'10 /24/06
Job No,o07 °06-0072
wot.
H. ,
7RL'm OEM- DIC.
vaaseDe
Fl ®uwe
URBAN DEVELOPMENT AREA
Cadd file no.,
��
Scale- N/A
0 0
B Location and Access
The sites has 2077' frontage on U. S. Route 11 "Martinsburg Pike" which will be the
principle access to the development parcel. Figure 3 shows the location of the site with
respect to area transportation planning.
The site will utilize U. S. Route 11 for this rezoned use.
There will be one (1) access point for the site as depicted on the GDP and as reflected in
the Proffer Statement. The "Initial Entrance" will be 700' south of Branson Spring Road
and the "Future Entrance" will be aligned with Branson Spring.
Since the site is located within the I -81 corridor and is situated between exits 321 and
323, traffic to and from the site will be provided with options. Refer to Traffic Impact
Analysis by PHR &A for existing and anticipated traffic movements.
SITE
° s
]6
L'i 1 1x- �+'�1.
F RECONPl si' IN
YFUNMTOBE tl . d - ^ CONNECTION PROVIDED BY ESTER ��—~a AL R m� P, fi6a
ry
.l
`q
{ wnchesler �f � 1 }
f >
REMOVE F'LOAD
g
j
6� 1'P 1 ♦ ws (r}'
In _ r
i
W F,Bdenck
REMOVE
IN7EACHANGE
County
19P
StepbEns �
ry 7 •�
617
t i � �. P \• -\ N:o Ivf4:l secrcxcma
)) ,&
'm'. 66e ...,mnieveaox•
S f € S m a._. svvV APSp xaN]wY
f°" (° // NFI!OUfYF`19 io FOP➢Wp +pH
y� EFPTNp yGVNI.NI
J Ic V \J' _ •_�� - -v ..4WTM ON IEW nL13NIX Y
I � FMI;mNS„oYZOPFOnuanFleO
K1 Y.gL6XFnNE SVSRn
M3lE �kvWn alpwnY \` } v W IMFI WNaMF
vv� �mYaYw n �m pimvin9 �, �: 'AI'FMNAKKiErNPgJYFHENYB
N �
-Az J L Alk
m H}4 164% WR
JL JILI
if �ri.y ,d� d
FREDERICK CMMW, VIRGWA
Date,10 /24/06 Job N*47-
Cadd flle na,
fA1TSSNDYE16Dl[T4 Scale N/A
waa
M NI
j � 4
y] }:.
0 •
C. Site Suitability
The project and general geographic area is underlain by carbonate sedimentary
bedrock which results in karst terrain. Topographic mapping for the site indicates a
site typical of the karst terrain with gentle slopes and reasonable level plain areas.
Typical of other properties within the area, this site is generally suitable for the
proposed facility.
A site characterization showing important environmental features is included in
Figure 4. The following chart provides an area summary:
I -81 Distribution Center Site Characteristics
Total Project Area
Area in Flood Plain
Area in Woodlands
Area in Steep Slopes
Area in Wetlands
Lakes & Ponds
59.077 Acres
0.00 Acres
0.00 Acres
0.00 Acres
0.00 Acres
0.00 Acres
The property is planned for a warehouse facility with an approximate building area of
750,000 square feet and parking for 100 +/- cars, 200 trailers, 'and 150 loading docks.
16
1�; } "v
0 0
D. Traffic
The transportation impact analysis prepared for this project shows that under the
conditions provided, traffic generation from this site is acceptable and manageable
considering the overall development of the U. S. Route 11 /I -81 corridor. Under the
conditions imposed by this rezoning, this roadway system will continue to function at
a level of service of "C" or better during the 2010 background and build -out
conditions, respectively.
As is stated in the Traffic Impact Analysis, the development of this site to
accommodate a 750,000 +/- square foot warehouse facility does not significantly
affect the existing or proposed roadway system.
0 0
REZONING APPLICATION FORM
FREDERICK COUNTY, VIRGINIA
be completed by Planning
ling Amendment Number .
Hearing. Date V('
Fee Amount Paid $
Date Received 4)
BOS Hearing Date 9 c! / o g'
The following information shall be provided by the applicant;
All parcel identification numbers, deed book and page numbers maybe obtained from the Office of
the Commissioner of Revenue, Real Estate Division, 107 North Kent Street' Winchester.
1. Applicant:
Name:. BPG Properties, Ltd.
Telephone: (703) 6 8 0 -4 664
Address: c/o Walsh, Colucci, Lubeley, Emrich 6 Walsh, PC
4310 Prince William Parkway Ste 300 Prince William VA 22 192
2. Property Owner (if different than Above)
Name: Estate of Roy Riley Boyce, Jr. Telephone:
Address:
PO Box 67
3. Contact person if other than.above
Name: Michael J. Cough Telephone: ; ( 703 ) 680 -4664
027
4. Checklist: Check the following items that have been included with this application.
Location map X Agency Comments X
Plat X Fees X
Deed to property X Impact. Analysis Statement. X
Verification of taxes paid X Proffer Statement X
10
0 •
5. The Code of Virginia allows us to. request full disclosure of ownership in relation to
rezoning applications.
Please list below all owners or parties in interest of the land to be rezoned:
Estate of Roy Riley Boyce, Jr.
BPG Properties, Ltd.
G. A) Current Use.of the Propelty: Agri with existing residence
i
B) Proposed Use of the Property: 750,Og0.square feet of warehouse and ancillary
uses permitted by the Proffer Statement.
7. Adjoining Property:
PARCEL ID NUMBER USE ZONING
33- A -86A, 86B, 87B, 111 Residential RA
33 -A -87, 108, 112 Agricultural RA
33 -12 -24 Agricultural RA
33- A -105B Commercial M -1
8. Location:. The property is located at (give exact location based on nearest road and distance
from nearest intersection, using road names and route numbers):
Approximately 0.61 +/- miles north of the Route 11
intersection with state route 671 (Cedar Hill). Bounded
on the west by Interstate Route 81 and on the east by ..
Route 11 (Martinsburg Pike).
11
0
0
9. The following information should be provided according,to the type of rezoning
proposed
i
Number of Units. Proposed
Single Family homes: N/A Townhome: N/A Multi - Family: N/A
Non - Residential Lots; N/A Mobile Home: N/A Hotel Rooms: N/
Square Footage of Proposed Uses
Office: N/A Service Station: N/A
Retail: N/A Manufacturing: N/A i
Restaurant: N /A Warehouse: 750,000
Other: N/A
10. Signature:
I (we), the undersigned, do hereby respectfully make application and petition the Frederick
County Board of Supervisors to amend the zoning ordinance and to change the zoning map
of Frederick County, Virginia. I (we) authorize Frederick County officials to enter the
property for site inspection purposes.
I (we) understand that.the sign issued when this application is submitted must be placed at
the front property line at least.seven days .prior to the Planning:Commission public hearing
and the Board of Supervisors' publichearing and maintained so as to be visible from the road
right -of -way until the hearing.
I (we) hereby certify that this application and its accompanying materials are true and
accurate to the best of my (our) knowledge,
Applicant(s): Date: S yti 0�
as
1 `l Date:
2- � � .l i i
Owner(s): 4 "t Date: j� 1�
- Date: �
1501
0
Adjoining Property Owners
Rezoning
.
Owners of property adjoining the land will be notified of the Planning Commission and the Board of
Supervisors meetings. For the purpose of this application, adjoining property is any property
abutting the requested property on the side or rear or any property directly across a public
right -of -way, a private right -of -way, or a watercourse from the requested property. The
applicant is required to obtain the following information on each adjoining property including the
parcel identification number which may be obtained from the office of the Commissioner of
Revenue. The Commissioner of the Revenue is located on the 2nd floor of the Frederick County
Administrative Building, 107 North Kent Street.
Name and Property Identification Number
Address
Named lee pragg
P 0 B:c 174
r�ngrhrrrk 17A 22624
Property # 33 -7-111
Name C W Sr & Jbhne 9qoeird
2897 NhIbnd,rrg pike
CLemixaok VA 22656
'
Property # 33 -4-112
Name Ika>ald S. CLi�
4123 Nh� Pike
CLca ] , VA 22624
Property # 33 -A-103
Name y M Bcyce
P O B:c 67
CLeaftrcnk ' VA 22624
Property # 33 -A-86A
Name yay tr B:�,�
P O Bic 67
Clearbralc vA 22624
Property # 33-A-8
Name Dx Ad C. Cock
4030 Martindinn Pike
C VA 22624
Property # 33 -A-87B
Name GLEn E. & Judy S. asmll
2619 6kdsicb Pced
Clsmtrcck VA 22624
Property # 33 -73-87
Name Fairfield pgin cE ;.red. aD. IIC
7897 MRt;nda Filn
Sbgimscn VA 22656
Property # 33 -12 -24
Name N rtuiaJ3zg Pike Assoc., ILC
4150 Matxm ,ng Pike
CLemtrzck VA 22624
Property# 33A 1058
i>
„
.O
4 � e
/ Y
f
500 1000 1500
SCALE: 1 -500'
CURRENT OWLIER: ROBIN HULL & KAY MARIE MORRISON
IeLIF WE #060000235
1M 33 ((A)) PRCLS 109 & 110
IIII'� SIIRVE'i HAS BEE14 PREPARED WITHOUT THE BENEFIT OF
A TITLE REPORT. THEREFORE, THIS PLAT MAY NOT INDICATE
ALL F..I•ICUTABRANCFS ON THE PROPERTY.
THE EXISTENCE OF VEGETATED OR TIDAL WETLANDS WAS NOT
IIITERMINED DURING THIS SURVEY.
Ihii: EXACT 1.0CA110N OR EXISTENCE OF UNDERGROUND UTILITIES
W.aS NOT ESTABLISHED DURING THIS SURVEY.
lamoa
.N
vca f��
aa1s1 �c:
DAVID F. SPR16GS
No. 1853
K s, &
ti SUR .
AUGUST 14, 2006
IPF = IRON PIN FOUND
IRS = IRON ROD SET
SEE SHEET 3 OF 3 FOR CURVE TABLE.
PARCEL 109 = 18.9306 AC.f
PARCEL 110 = 40.1464 AC.t
TOTAL AREA = 59.0770 AC.f
I HEREBY CERTIFY THAT THIS SURVEY AND ANY INFORMATION SF
HEREON IS BASED ON AN ACTUAL FIELD RUN SURVEY MADE UN
SUPERVISION AND THERE ARE NO APPARENT ENCROACHMENTS 0
THAN THOSE SHOWN OR NOTED.
BOUNDARY SURVEY ON THE PROPEF
ROBIN HULL &
KAY MARIE MORRISOf
STONEWALL MAGISTERIAL DISTRI
FREDERICK COUNTY, VIRGINIA
DATE: AUGUST 14, 2006 SCALE: 1”
L 1 111 0
TRIAD ENGINEERING, IN(
200 AVIATION DRIVE WINCHESTE
(54.0) 667 -9300 FAX (540)
C O
` J r
10
IVIA I Uli LIN - SHEET 3 OF 3
TM 33
PRCL
40.1464
IRS
N S18'31'55 "R
J s > '3 " h` 142.22'
N/F `
CHARLES W, &
JOLINE S. ORNDOFF
577/694
POST
MANHOLE- \` ////����
FRAME &Y <
BARN 2 STORY �--
BRICK 7 �1
HOUSE GRAVEL) /
D/W 110
0 44, 3
�j i
r �
IRS Q--
FENCE
POST FENCE WIRE \` r J
REMAINS FENCE
N>p.36 qs, l c,, /
W
O ON "I
O ICY 6>, 09 ' IRS / 2
w
S67'35'13 "E - 905.20' o ° y
TO SET STONE FIND.
SEE SHEET 3 OF 3 FOR
200 O 200 40i
SCALE: 1
w
a =
N 0
O
Z
Q
Z
� o
NLTIi 0p `�' l
o� 0
DAVID F. SPRIGGS
No, 1853
Z SUR` e.
AUGUST 14, 2006
BOUNDARY SURVEY ON THE PROPE
ROBIN HULL &
KAY MARIE MORRIS01
STONEWALL MAGISTERIAL DISTF
FREDERICK COUNTY, VIRGINI,
DATE: AUGUST 14, 2006 SCALE: 1
TRIAD ENGINEERING, IN
200 AVIATION DRIVE WINCHESTI
(540) 667 -9300 FAX (540)
. o,
N .
N
U
h 4
C O
` J r
10
IVIA I Uli LIN - SHEET 3 OF 3
TM 33
PRCL
40.1464
IRS
N S18'31'55 "R
J s > '3 " h` 142.22'
N/F `
CHARLES W, &
JOLINE S. ORNDOFF
577/694
POST
MANHOLE- \` ////����
FRAME &Y <
BARN 2 STORY �--
BRICK 7 �1
HOUSE GRAVEL) /
D/W 110
0 44, 3
�j i
r �
IRS Q--
FENCE
POST FENCE WIRE \` r J
REMAINS FENCE
N>p.36 qs, l c,, /
W
O ON "I
O ICY 6>, 09 ' IRS / 2
w
S67'35'13 "E - 905.20' o ° y
TO SET STONE FIND.
SEE SHEET 3 OF 3 FOR
200 O 200 40i
SCALE: 1
w
a =
N 0
O
Z
Q
Z
� o
NLTIi 0p `�' l
o� 0
DAVID F. SPRIGGS
No, 1853
Z SUR` e.
AUGUST 14, 2006
BOUNDARY SURVEY ON THE PROPE
ROBIN HULL &
KAY MARIE MORRIS01
STONEWALL MAGISTERIAL DISTF
FREDERICK COUNTY, VIRGINI,
DATE: AUGUST 14, 2006 SCALE: 1
TRIAD ENGINEERING, IN
200 AVIATION DRIVE WINCHESTI
(540) 667 -9300 FAX (540)
r
r /
/ o
z
r
r a
z
EL _
/
je
r
c �
� C �
<v
r�
r
/
/Qv O
O �
o ,
h
IRS
IPF — N28`12'06 "W — 2164.80'
.� TO SET STONE END.
I CURVE IDELTA ANGLE IARC LENGTH IRADIUS ITANGENT I CHORD DIRECTION CF
C1 07'03 "33'" 701.03 5690.00 350.96 513'38'12 "W 7C
C2 02'52'17" 285.15 5690.00 142.60 518'36'07 "W 28
``5 643 " BOARD N/F
3 S4 3p FENCE DONALD S. CLINE
�
IRE WB 97/507 r
FENCE �
IPF�' "E I
REMAINS TM 33 ((A)) 332.62'
�C/L METAL PRCL 109 IRS ;
TOWER 18.9306 AC.t WIRE
FENCE
"ME C/L METAL '
. TOWER r
� � r C/L N0. VA.
,POWER CO. R/W
5/308
\ VEPCO R/W
Z -r,
C/L METAL ��� 308/47
TOWER
TM 110)) \FENCE
40. 1464" AC.± REMAINS 4p'
'--� APPROX. R /W\
WB 33/254 1 VHC
MON. END r
_ SHED A ^
/ / `FENCE WELL 97.47'
L /` REMAINS IRS `��Zl� " 10 1 w O ^
IRS
MATCH LINE - SHEET 2 OF 3
0
200 O 200 400 600
r o
LTH OF Y 1
O�
DAVID F. SPRIGGS
No. 1853
AUGUST 14, 2006
BOUNDARY SURVEY ON THE PROPE
ROBIN HULL &
KAY MARIE MORRISOI
STONEWALL MAGISTERIAL DISTF
FREDERICK COUNTY, VIRGINI
DATE: AUGUST 14, 2006 SCALE: 1
Qm c c o l'�H
TRIAD ENGINEERING, IN
200 AVIATION DRIVE WINCHEST
(540) 667 -9300 FAX (540)
SCALE: 1"-200-
REZONING APPLICATION #05 -08
BPG PROPERTIES, LTD./I -81 DISTRIBUTION CENTER
Staff Report for the Planning Commission
Prepared: July 16, 2008
Staff Contact: Michael T. Ruddy, AICP, Deputy Planning Director
This report is prepared by the Frederick County Planning Staff to provide information to the
Planning Commission and the Board of Supervisors to assist them in making a decision on this
application. It may also be useful to others interested in this zoning matter. Unresolved issues
concerning this application are noted by staff where relevant throughout this staff report.
Reviewed
Planning Commission: 08/06/08
Board of Supervisors: 09/24/08
Action
Pending
Pending
I
PROPOSAL To rezone 59 acres from RA (Rural Areas) District to B3 (Business, Industrial
Transition) District, with proffers.
LOC The properties are located approximately 0.61 miles north of the Route 1 1 intersection
with Cedar Hill (Route 671), bounded on the west by Interstate Route 81 and on the east by Martinsburg
Pike (Route 11).
MAGISTERIAL DISTRICT Stonewall
PROPERTY Ill NUMBER 33 -A -109 and 33 -A -110
PROPERTY ZONING RA (Rural Areas)
PRESENT USE Residential and agricultural
ADJOINING PROPERTY ZONING & PRESENT USE
North:
RA (Rural Areas)
South:
RA (Rural Areas)
East:
RA (Rural Areas)
West:
RA (Rural Areas)
Use:
Residential /Agricultural
Use:
Residenti al /Agricultural
Use:
Residential /Agricultural
Use:
Residential /Agricultural
PROPOSED USES Office and Warehouse Uses
Rezoning 404 -08 — BPG /I -81 Distribution Center
July 16, 2008
Page 2
REVIEW EVALUATIONS:
Virginia Department of Transportation: The documentation within the application to rezone this
property appears to have a significant measurable impact on Route 11. This route is the VDOT
roadway which has been considered as the access to the property referenced. VDOT is satisfied that the
revised transportation proffers offered in the BPG Properties /I -81 Distribution Center Rezoning
Application dated June 19, 2008 addressed transportation concerns associated with this request. We
have the following comments: 1. The opportunity to realign their proposed entrance with Branson
Springs Road in the futures wilt have a positive impact on the overall traffic movement on Route 11.
2. These proffers provide for the necessary entrance /turn lane improvements at the initial entrance in
accordance with VDOT requirements at the time of site plan review. 3. While the Department
recognizes that there are traffic impact deficiencies at both the Route 11 and Rest Church Road
intersection and Route 11 and Brucetown /Hopewell Road intersection, it appears the best solution is to
accept a monetary contribution from the applicant. This would allow Frederick County and VDOT to
make future decisions on the appropriate use of these funds. Before development, this office will
require a complete set of construction plans detailing entrance designs, drainage features, and traffic
flow data from the I.T.E. Trip Generation Manual, Seventh Edition for review. VDOT reserves the
right to comment on all right -of -way needs, including right -of -way dedications, traffic signalization, and
off -site roadway improvements and drainage. Any work performed on the State's right -of -way must be
covered under a land use permit. This permit is issued by this office and requires an inspection fee and
surety bond coverage.
Frederick County, Deputy Director - Transportation: It appears that your updated TIA addressed my
previous concerns regarding background traffic. While it continues to be my position that the ideal
entrance for this site would align with Branson Spring Road, it appears that you are attempting to meet
this goal with your proffers. While it is generally the preference of staff that physical improvements be
put in place as opposed to cash proffers, the right -of -way issues in this situation land the fact that the
greatest needs are on property not controlled by your client make the cash form of proffer appropriate in
this case. I would again note that there is a draft transportation plan in process right now that calls for
the extension of Branson Spring Road across the northern portion of your clienCs property. I would ask
that your client consider making accommodations for this future roadway.
Fire Marshall: Plan approval recommended.
Clearbrook Vol. Fire Dept.: As long as the design has the standard fire codes.
Department of Inspections: No Comment.
Department of Public Works: No comments received for this application. COMMENTS of 2007
APPLICATION: 1. Refer to C. Site Suitability: The site description indicates that the area is underlain
by carbonate sedimentary bedrock resulting in karst terrain. Indicate if the karst terrain contains
sinkholes or potential piping channels. Also, indicate if the site is marked by numerous rock outcaps
which will, most probably, require blasting to accommodate site development. 2. Refer to the Traffic
Impact Analysis. The proposed trip generator summary included on page 8 of the Traffic
0 0
Rezoning 904 -08 — BPG /I -81 Distribution Center
July 16, 2008
Page 3
Impact Analysis (TIA) reflects the number of trips associated with 150 employees. However, the TIA
has conveniently avoided the amount of truck traffic associated with the proposed distribution center.
Considering the nature of the development, evaluating the truck traffic is critical in determining the real
impact on the road network. Revise the TIA accordingly and resubmit. 3. Refer to F. Site Drainage:
Elaborate on the statement "low impact type stormwater management techniques ". We anticipate that
the stormwater runoff will be dramatically increased because of the proposed development including
739,000 square feet of warehouse space, 11,000 square feet of office space, and numerous acres of
pavement. Therefore, we anticipate that onsite stormwater management will be required to mitigate
offsite impacts. This mitigation may also require quality as well as quantity control considering the
potential for the transport of hydrocarbon contaminated runoff from the parking areas. Indicate how
this potential environmental impact will be addressed in the design phase of the subject project.
Frederick - Winchester Service Authoritv: No comments.
Sanitation Authority Department: We will provide sewer and water service to this site.
Department of Parks & Recreation: The Parks and Recreation Department would recommend the
proffer statement include a ten foot trail on an adequate easement which to construct the trail. The trail
design should meet VDOT and ASI -ITO guidelines.
Health Department: The Health Dept. has no objection under the following conditions: 1. All
buildings on site are to be served by the public water and sewer system as approved by the Frederick
County Sanitation Authority. 2. All wells are to be abandoned according to the Private Well
Regulations. 3. All septic tanks are to be pumped by an approved septic hauler and abandoned by
filling with sand or gravel. 4. Permits are to be obtained from the Health Dept.ifor a proposal for a
motel, hotel or restaurant. 5. All designs submitted should provide for protection of the Branson Spring
from any contaminants or drainage due to the proposed future construction.
Winchester Regional Airport: We have reviewed the proposed rezoning application and determined
that the proposed development plan will not have an impact on operations at the Winchester Regional
Airport. While the proposed site lies within the airport's airspace, it does fall outside of the airport's
Part 77 close in surfaces; therefore, special conditional will not be requested.
Frederick County Public Schools: We offer no comments.
Historic Resources Advisory Board: The HRAB considered this rezoning proposal during their
meeting of January 16, 2007. The HRAB reviewed information associated with the Frederick County
Rural Landmarks Survey port and the Virginia Department of Historic Resources, as well as
information provided by the applicant. At that time, the HRAB felt that the proffers associated with
historic preservation and recognition was adequate, but made two recommendations which included:
1. Since the last time a survey was done in 1990, the HRAB felt that the applicant must fill out a
preliminary Information Form (PIF) from the Department of Historic Resources (DHR) for the
Nathaniel Branson House, which is located on the property proposed to be rezoned. The PIT will
determine if the Nathaniel Branson House can receive state recognition for its historical value.
0 0
Rezoning 904 -08 — BPG/1 -81 Distribution Center
July 16, 2008
Page 4
2. The HRAB requested that a landscaped berm be placed along the frontage of the property, so that the
viewshed of the Alexander Branson House (across Route 11) would not be negatively impacted by
the placement of a 739,000 square foot industrial structure.
Attornev Comments: Comments pending
Planninlz & Zonine:
1) Site History
The original Frederick County zoning map (U.S.G.S. Inwood Quadrangle) identifies the subject
parcels as being zoned A -2 (Agricultural General). The County's agricultural zoning districts
were subsequently combined to form the RA (Rural Areas) District upon adoption of an
amendment to the Frederick County Zoning Ordinance on May 10, 1989. The corresponding
revision of the zoning map resulted in the re- mapping of the subject property and all other A -1
and A -2 zoned land to the RA District.
The Applicant previously attempted to rezone these properties in 2007. Rezoning Application
RZ #07 -07 was denied by the Board of Supervisors on September 12, 2007 For the purposes of
this current application, the request for a different zoning classification. B3 rather than Ml, is
substantially different from the previous request and may be processed by Frederick County
pursuant to Section 165 -11 of the Frederick County Zoning Ordinance.
i
i
2) Comprehensive Policy Plan
The Frederick County Comprehensive Policy Plan is an official public document that serves as
the community's guide for making decisions regarding development, preservation, public
facilities and other key components of community life. The primary goal of this plan is to
protect and improve the living environment within Frederick County. It is in essence a
composition of policies used to plan for the future physical development of Frederick County.
[Comprehensive Policy Plan, p. 1 -1J
Land Use
The parcel comprising this rezoning application is located within the County's Sewer and Water
Service Area (S WSA) and the site is within the limits of the Northeast Land Use Plan. The plan
designates the site for business use. The commercial / industrial transition land use proposed in
this rezoning is consistent with the Northeast Land Use Plan. The plan states that "Business and
commercial land uses are proposed along the Martinsburg Pike corridor, on the east and west
side of Interstate 81 exits 317, 321 and 323. It is envisioned that commercial uses which cater
to the interstate traveler will be developed along the three Interstate 81 interchanges, while
retail, service and office land uses will occur along the Martinsburg Pike corridor ".
Rezoning 904 -08 — BPG/I -81 Distribution Center
July 16, 2008
Page 5
Transportation
Plans for new development should provide for the right -of -ways necessary to implement
planned road improvements and new roads shown on the road plan should be constructed by the
developer when warranted by the scale, intensity, or impacts of the development. Existing roads
should be improved as necessary by adjacent development to implement the intentions of the
plan (Comprehensive Plan 7 -6).
The Eastern Road Plan of the Comprehensive Policy Plan does include this portion of the
County. The Northeast Land Use Plan calls for Martinsburg Pike to be improved to a four -lane
facility. The Plan also states that proposed industrial and commercial development should only
occur if impacted roads function at Level of Service (LOS) Category C or better. This
application does not provide that Level of Service. The Frederick County Bicycle Plan
designates Route 11 as a short-term designated route.
Site Access and design.
The Northeast Land Use Plan discourages individual lot access on the Martinsburg Pike
corridor, encourages inter - parcel connections, and recommends adequate screening from
adjoining land uses and recommends greater setbacks and buffers and screening along
Martinsburg Pike. This development has proffered commercial entrance limitations on
Martinsburg Pike from the property. The project has also proposed interparcel connectivity
with the adjacent parcels to the north. It may be anticipated that additional development
opportunities on the adjacent properties may occur in the future. Pedestrian accommodations
have been provided along the projects frontage with Route 11.
3) Site Suitabilitv /Environment
The site does not contain any environmental features that would either constrain or preclude site
development. There are no identified areas of steep slopes, floodplains or woodlands. This
area is also known for karst topography. The Frederick County Engineer has identified that a
detailed geotechnical analysis will be needed as part of the detailed site plan design.
The HRAB made two recommendations based upon the presence of the Nathaniel Branson
House on the property. The HRAB felt that the applicant must fill out a Preliminary
Information Form (PIF) from the Department of Historic Resources (DI -IR) for the Nathaniel
Branson House, and the HRAB requested that a landscaped berm be placed along the frontage
of the property, so that the viewshed of the Alexander Branson House (across Route 11) would
not be negatively impacted by the placement of a 739,000 square foot industrial structure. The
application provides for additional landscape screening along Route 11 in an effort to tailor
corridor improvements, beyond those customarily required by ordinance, to effectively enhance
the corridor appearance of Route I I and address the comments offered by the HRAB.
4) Potential Impacts
Proposed Uses: The applicant has proffered that the property shall be developed with not more
than seven hundred fifty thousand (750,000) square feet of permitted uses. It should be further
guaranteed that additional land uses that may make up this square footage should be
0
Rezoning #04 -08 — BPG /I -81 Distribution Center
July 16, 2008
Page 6
limited, such as the limitation that the applicant placed on office uses, to ensure the impacts can
be appropriately measured.
A. Transportation
Traffic Impact Analysis.
The traffic impact analysis (TIA) prepared for this application was amend from the TIA that
was prepared for the original rezoning request. The structure of the TIA is now acceptable to
the County and VDOT as it is consistent with acceptable practices. The TIA still shows impacts
at the evaluated intersections that have not been, or cannot be, addressed Iby the applicant.
As you may recall, the TIA previously evaluated two scenarios. The amended TIA models the
proffered land use scenario.
The TIA indicates that Level of Service C conditions or better will be maintained on study roads
and intersections with the completion of several area improvements including improvements at
the intersection of Route H /Hopewell Road /Brucetown Road and improvements at the
intersection of Route I1 /Rest Church Road. None of the above improvements identified in
the TIA have been addressed by this application. The applicant has proffered to enter into a
signalization agreement with VDOT.
Transportation Program.
The applicant's transportation program is limited to providing for the required access to the site
via deceleration lanes and providing for a monetary contribution towards area transportation
improvements that would be completed by others in the amount of $350,000. The applicant has
proffered to enter into a signalization agreement with VDOT. As was the lcase previously, the
necessary improvements identified in the TIA have not been addressed by this application. In
addition, the Applicant's transportation program does not provide for or advance the County's
Eastern Road Plan element of the Comprehensive Plan, in particular, the widening of Route 11.
As previously noted, inter connectivity should be a consideration with this application.
Particular attention has been paid to the property to the north of this project. The extension of
Branson Springs Road to the west through this site and over Interstate 81 is a concept that has
recently been discussed and should continue to be evaluated with this project and as The
Northeastern Frederick Land Use Plan is being reevaluated.
Additional comments from Mr. John Bishop, Frederick County Transportation Planner are
summarized as follows.
1. Applicant should be preparing their site to make for an easy transition to an entrance
area that aligns with Branson Springs Rd.
2. Access should be granted to the entrance mentioned in the bullet above for the
property to the north.
3. Right -away should be considered for an extension of Branson Springs along the
northern portion of the property.
4. Cash proffer amount is improved.
0 0
Rezoning 904 -08 — BPG /1 -81 Distribution Center
July 16, 2008
Page 7
C. Design Standards
The Northeast Land Use Plan recommends adequate screening from adjoining land uses and
recommends greater setbacks and buffers and screening along Martinsburg Pike. The site is
surrounded on all sides by RA (Rural Areas) zoned property, which is either in agricultural or
residential use. While it is possible that these uses may change in the future, in line with the
Northeast Land Use Plan, for the moment, screening should be addressed.
The project's location on a major corridor warrants particular attention. This has been provided
for in this latest version of the application. Some additional clarification to allow for an
improved landscaped area should be worked into the application. Consideration should also be
given to screening along Interstate 81. The applicant has discussed addressing this issue and
should incorporate this into the proffer statement.
D. Community Facilities
The development of this site will have an impact on community fa(
However, it is recognized that commercial uses generally provide a
community facilities through the additional generation of tax revenu
addresses the impacts to Fire and Rescue services by providing a moneta
amount of $10,000.
Proffer Statement — Dated June 19. 2008.
ities and services.
ositive impact on
This application
contribution in an
A) Generalized Development Plan I
A Generalized Development Plan has been provided by the applicant. Staff would suggest that
the flexibility written into the paragraph introducing the GDP may be too flexible and should be
addressed.
B) Land Use
The applicant has provided that the amount of office space on the property will be incorporated
into the primary use structure. Further, the applicant has proffered the development of no more
than 750,000 square feet. It would be advisable to further guarantee the development of the site
will be for one building only, consistent with the GDP.
The applicant has proffered out specific land uses.
The Applicant has proffered a ten foot wide landscape strip along Route 1 1 including a variety
of landscape plantings. This proffer should be expanded to allow for a broader area of
planting in the area set aside between the right -of -way and the parking setback. The applicant
has proffered to employ the M 1 district setback and yard requirements for, the development of
this site.
Rezoning #04 -08 — BPG /I -81 Distribution Center
July 16, 2008
Page 8
The applicant has limited the fapade materials of the
Interstate 81 to a variety of materials.
0
buildings fronting along Route 11 and
Proffer 7 is redundant as they are required by current ordinance.
C) Transportation
The Applicant's proffered transportation improvements include the dedication of an additional
ten feet of right -of -way for future improvements to Route 11 to be done by others. Right turn
deceleration lanes have been proffered. The proffered right turn lanes are the minimum that
would be required by VDOT during the development of the site.
The Applicant has proffered to enter into a signalization agreement with VDOT and has
proffered a $350,000 monetary contribution at the time of Certificate of Occupancy for
unspecified improvements within the Route I I corridor. Such improvements would be done by
others.
The Applicant has proffered to construct a ten foot wide asphalt multi -use trail along their
frontage on Route 11.
In general, the transportation proffer is much simplifled from that previously offered. The
mechanism for obtaining the transportation proffer is improved and the dollar value of the
proffer is more than before. However, it should he carefully evaluated to ensure that the
amount is sufficient to address and mitigate the transportation impacts associated with this
request. An update to the County's Development Impact Model is presently being prepared.
This will be a very important tool to evaluate what may be the appropriate transportation
contribution for development projects.
D) Communitv Facilities
The Applicant has proffered $10,000 to Frederick County for use by Clearbrook Volunteer Fire
and Rescue.
STAFF CONCLUSIONS FOR 08/06/08 PLANNING COMMISSION MEETING:
The B3 land use proposed in this rezoning is consistent with the Northeast band Use Plan. Many of the
impacts associated with this rezoning request have been mitigated by the Applicant. Flowever, careful
consideration of the transportation impacts associated with this request and the proffered monetary
contribution aimed at mitigating the impacts should occur. Transportation improvements have not been
provided that would achieve a level of service C or address the Comprehensive Plan.
Following the requirement for a public hearing, a recommendation
by the Planning Commission to the Board of Supervisors concerning this rezoning application
would be appropriate. The applicant should be prepared to adequatelV address all concerns
raised by the Planning Commission.
i-el (Rnv vuliES) NR� �RSN
0.
I
e 1
I
II
I
�L-
iiiiiiuui finiuTiiiiiiii WHIN iiiiniiniiiii iiiiiwniiiii' ioiiaiiioiiiiiii
V5. Ri 11 (00' WIVE)
GDP
z
o�
IFIt
�s
oa
w
wz
N�
�'
I
I�
w
II
GDP
z
�s
oa
w
wz
N�
�'
a
wo
w
Uj
vneermwxcE
m�
O
GDP
PLANT LIST- ZONING
TREES \
KE Q SCIENTIFIC NAME
DISTRICT BUFFER
COMMON NAME
Red M�
NOTE: FULL SCREEN 3 TREES FOR EVERY 10' OF TOTAL W hite e
2534'/10 =254 Trees (4 DECIDUOUS: 85 Dec. Trees)
PLANT LIST. SI TE L
T ANDSCAPING REQUIREMENTS
KEY QUAN. SCIENTIFIC NAME
COMMON NAME
NOTE: 1
OVER 100,000
TREE FOR 26 000 s V f Elm Zelkova
00 sq. t. OF FIRST 100,000 sq. ft. IMPERVIOUS
sq. ft.
Im p. Area= 333 Trees) + 1
TREE FOR
TRE
LIST.' ROUTE 11 PROFFER LANDSCAPING
KEY QUAN.
SCIENTIFIC NC ME
CL 20
PS
Cu ressoc aris le andii COMMON NAME
23
Pinus strobus
Le and C ress
ZC 20
Zelkova car inifolia
Eastern White Pine
SHRUBS
Elm Zelkova
KEY QUAN.
SCIENTIFIC NAME
BS 200
Buxus sem ervirens
COMMON NAME
CA 175
Clethro alnifolia
Boxwood
JC 150
Jun! erus communis
Summersweet Clethro
NOTE: 3 TREES FOR EVERY 100';
COMMon
25 SHRUBS
( =21; 21x3 =63
FOR EVERY
Trees;21x25 =525
Shrubs)
TYPE SIZE
TYPE SIZE
1 TREE FOR EACH 5,000 sq. ft.
10 SPACES (150 spaces =15 Tree:
TYPE SIZE
TYPE SIZE
1
F .._
I
sWMB
I-
I
Ij
I:
�In
ml
�I
I -el (a /w vnales)
N�F
C FO
- -' - - --
.._ rserencN - - -- I
i�1TT�1Tll�lllllfllil ^ ifi'i "111'1111 111111 VIII
I
I
I �
1
I
I
I
II
I
POSSIBLE BUILDING 1.1111,
NO
1 I
11 EN I
I
co"
./I,
CAL NO. V0.
I Ppw. P CO. yw
zasnca
I I
I � I
I
I II I
I ji
I
I I I; I
oL IR a l
GUN
� n I�I F
L;I I
o POSeD IV yy I.I I
Emcnnqu J
– PXOPoEED iry IFNL NIUBE EN— iMNLE__—
0
DRRS Meeting — June 26, 2008:
Introduction:
• Request to allow building height to 45'
• Display boards to illustrate our request
• The height request is typical of what is req
developers
• Racking — most users utilize racking to organi
higher stacking plans (25' to 28')
• Clearance for ESFR sprinkler: 3'
• Underside of Joist: 32' 3"
• Top of Structure: 41' 6" (from finished floor)
B2
•
by users and
product and allow for
• Finished Floor Elevation (41' 6 ") vs. Loading Dock Elevation (45' 6 ")
• Calculation for total building height @ 32' clear
• Average of the four sides of the building: 43' 6"
Board A.3 — Exterior Rendering:
• Finished Floor Elevation vs. Loading Dock Elevation
• Parapet (not included in height calculations)
• Example of users:
• Solaris Paper in Shenandoah County
• PlyGem Industries in Rockingham County
• Home Depot in Frederick County
Route 11 Perspective:
• Distance from Route 11 to building: approximately 300'
�, `�_. W
ILL
�ili _j'IL Li� II �iw pul N
� III N Q Q
z C) =3
J rt, I W I I
W
Q), ❑l
a U
' o
! I o
t l IDrArl'x o
III
i
_I
(Y
III l�I
v
(Y
a
v IY
I11
G
J
(V
❑' 7
Y
ry U
n_
n
3AOE7 3a'P!�PZ!9 O! !t91 ?F S03 iD £ m
II
g I,
if J y
T 3 V1
3
U
_;I
-I; III III
III IV 4
LL III (L u 11 I LL
�I LLI-j
I-w I -i ul rtl'ul ul
U:
C
Y
LL
Q
C
LL
cf:
C
R
C
0
f
w
u
u
F-,
W
x
C)
z
Q
G4
w
W
i
C �
C � J
C
0
� Q
>
DU
Q
H C7
z�
w-
U>
z�
o�
�o
Q1 U
H
�U
G1 �
W
w
U
d
d
w�
U
�
N (v
wv
C L Z
ui
Q
IL
n Q
o
z
2.
IL
a
w,
n
I
u
u
F-,
W
x
C)
z
Q
G4
w
W
i
C �
C � J
C
0
� Q
>
DU
Q
H C7
z�
w-
U>
z�
o�
�o
Q1 U
H
�U
G1 �
W
w
U
d
d
QII
I
o
W
2.
w
a
w,
n
z
r
�iW
an
�
Q
JiW
u
u
F-,
W
x
C)
z
Q
G4
w
W
i
C �
C � J
C
0
� Q
>
DU
Q
H C7
z�
w-
U>
z�
o�
�o
Q1 U
H
�U
G1 �
W
w
U
d
d