A Traffic Impact Analysis of the
Opequon Crossing
Located in:
Frederick County, Virginia
Prepared for:
Wayne L. Hill
The Ryland Group, Inc.
Washington Division
4100 Monument Corner Drive
Fairfax, VA 22030
Prepared by:
Patton Harris Rust & Associates
Eng neer s. Surveyors. Planners. Landscape Ar chi tech.
10212 Governor Lane Boulevard
Suite 1007
PH Williamsport. Maryland 21795
T 301 .223.4010 • F 301 .223.6831
November 18, 2008
0
n
LJ
IJ
0
OVERVIEW
Report Summary
6
Patton Harris Rust & Associates (PHR +A) has prepared this document to present
the traffic impacts associated with the proposed Opequon Crossing development located
along the south side of Route 7 (Berryville Pike), east of Valley Mill Road, in Frederick
County, Virginia. The proposed project will include 155 single - family detached units and
170 townhouse units. Access will be provided via a sole site- driveway to be located along
the west side of the proposed Haggerty Connector Road. The proposed Haggerty
Connector will serve as the connection between the site and Route 7. The development
will be built -out in a single phase by the year 2010. PHR+A has provided Figure I to
illustrate the location of Opequon Crossing with respect to the surrounding roadway
network.
Methodology
All methodology utilized in this report was based upon the December 11, 2007
scoping meeting (in Edinburg, VA) with Virginia Department of Transportation (VDOT)
and Frederick County staff. The traffic impacts accompanying the Opequon Crossing
development were obtained through a sequence of activities as the narratives that follow
document.
• Assessment of background traffic including other planned projects in the area of
impact,
• Calculation of trip generation for the proposed Opequon Crossing development,
• Distribution and assignment of the Opequon Crossing development - generated trips
onto the study area roadway network,
• Analysis of capacity and levels of service for existing and future conditions using
Synchro 7.
EXISTING CONDITIONS
In order to determine the existing traffic volumes along Route 7 at the proposed
Haggerty Connection, PHR +A conducted AM and PM peak hour manual turning
movement counts at the intersection of Route 7Nalley Mill Road in Frederick County,
Virginia. PHR +A established the ADT (Average Daily Traffic) along each of the study
area roadway links using a "k" factor (the ratio of PM peak hour traffic volumes to 24 -hour
traffic volumes) of 7.70 % based upon Virginia Department of Transportation (VDOT)
2006 traffic count data.
Figure 2 shows the existing ADT and AM /PM peak hour traffic volumes along
Route 7 at the proposed location of the Haggerty Connection. Figure 3 shows the existing
lane geometry along Route 7. Traffic count data worksheet is included in the Appendix
section of this report.
P
A Daffic /mnac( Anal vdis of (he Opequon Crossing
Project Number: 12617 -1-0
November 18, 2008
Page I
0 6
i
0
No Scale
.:-..,- _..f��
`r
pFactory
z f
j�lea
ciao
r�C Llfl �ds =Rd? �� SITE' '
`f Lly4, \
Q { h
w '
li7
J,
P 1
-
�r �
A
F 1 "N-1 V
Figure I Vicinity Map: Opequon Crossing, in Frederick County, Virginia
P
ATm(dc Impact Anakvi.s of die OPeaann Crossing
Project Number: 12617 -1 -0
November 18, 2008
Page 2
C�
•
No Scale
SITE
r
AM Peak HOur(Pil4 Peak Hour)
•
Figure 2
Existing Traffic Conditions
P
A Trn(rc Impact Analvsi.s oldie Opeouon Crossing
Project Number: 12617 -1 -0
November 18, 2003
Pagc 3
•
r
C �
J
0
No Scale
4 0
SITE
Figure 3 Existing Lane Geometry and Level of Service
P
A Dalpc Impel Ann(FSi.s of the Oncnuon Crossine
Project Number: 12617 -1 -0
November IS, 2008
Page 4
0 0
• 2010 BACKGROUND CONDITIONS
PHR +A increased the existing traffic volumes along Route 7 using a growth rate
(per the December 11, 2007 seeping meeting) of two percent (2 %) per year through Year
2010. Additionally, PHR +A included all trips relating to specific future "other
developments" located within the vicinity of the site. Based upon the T h Edition of the
Institute of Transportation Engineers' (ITE) Trip Generation Report Table 1 is provided
to summarize the 2010 "other developments" trip generation.
Table 1
"Other Developments"
2010 Trip Generation Summary
Code Land Use
Amount
In
AM Peak Hour
Out
Total
In
PM Peak Hour
Out Total
ADT
Twin Lakes Phase 10
230 Townhouse/Condo
71 units
8
28
36
30
17
46
464
Total
8
28
36
30
17
46
464
Haggerty Properly
210 Single - Family Detached
76 units
16
47
63
53
31
84
760
230 Townhouse/Condo
224 units
26
87
113
94
53
147
1,466
Total
42
134
176
147
84
231
2,226
Figure 4 shows the 2010 background ADT and AM /PM peak hour traffic volumes
at the intersection of Route 7/Haggerty Connector Road. Figure 5 shows the
corresponding 2010 background lane geometry and levels of service. All Synchro 7 levels
of service worksheets are included in the Appendix section of this report. Table 2 is
provided to show the 95 percentile back of queue and levels of service for each lane group
during 2010 background conditions.
A Tm(Rc Impact Ann(vsis o te ec N umber: 2617 -1-0
H Novanbe Crossinq
Project umber i 18, 2 008
1-0
r 18, 2
Page 5
0
No Scale
0
AM Peak Hour(PM Peak Hour)
Figure 4 2010 Background Traffic Conditions
P RA
A Traffic /nroacl Anal v.Vis of the Ooeauon Cro.ssinc
Project Number: 12617 -1 -0
November 18, 2008
Page 6
0 0
0
0
J
Figure 5 2010 , Background Lane Geometry and Level of Service
P H A
A Daffic lnu>acl Anahsis of the Oneauon Crossing
Project Number: 12617 -1 -0
November 18, 2008
Paec 7
Signaliud'. 'Sex'
Intersection Inlcn,`cti.n"
No Scale
A)q�
7
Unsignalind
Intersection
y
�
i
�'Yi `9
lt'
JP � P
7
°c
G o`
SITE
C• N
G
3
art O�
` s
i
y
4�
Un51gnalized
Intersection
Denotes Unsignalized Critical Movement
T T A
AM Peak Hour (PM Peak Hour)
J
Figure 5 2010 , Background Lane Geometry and Level of Service
P H A
A Daffic lnu>acl Anahsis of the Oneauon Crossing
Project Number: 12617 -1 -0
November 18, 2008
Paec 7
•
Levels of Service and Back of Queue (95 %) Results
2010 Background Conditions
J
* Assumed 25 feet Vehicle Length
L
Table 2
Opequon Crossing
Intersection
Traffic
Control
Lane Group/
Approach
AM Peak Hour
PM Peak Hour
LOS
Back of
ueue
LOS
Back of
Oueue
Route 7 & Haggerty
Road
Signalized
EB/T
B
331.D
A
96.0
EB/TR
EB LOS
B
A
WB/L
A
25.0
A
26.0
WB/T -Lapel
A
97.0
B
391.0
WB/T -Lane2
WB LOS
A
B
NB/LR
B
72.0
B
46.0
NB LOS
B
B
Overall LOS
B
B
Haggerty Rd & Site-
Driveway / Iaggerty
Dr #2
Unsignalized
EB/LR
A
25.0
A
25.0
NB /LT
A
25.0
A
25.0
SB/TR
-
-
Haggerty Road &
gg Y
Haggerty Dr #1
Unsignalized
WB /LR
A
25.0
A
25.0
NB/TR
-
-
SB /LT
A
25.0
A
25.0
EB = Eastbound, WB = Westbound, NB = Northbound, SB = Southbound, L: Left, T:Thm, R: Right
P H A
A Traffic hnnact Analysis of the Oneguon Cwssinp
Project Number: 12617 -1 -0
November 18, 2008
Page 8
0 0
0 TRIP GENERATION
PHR +A determined the number of trips entering and exiting the site using
equations and rates provided in the 7 th Edition of the Institute of Transportation Engineers'
(ITE) Trip Generation Report as well as using the rates provided by VDOT Staunton
District for ITE Code 230. Table 3 was prepared to summarize the total trip generation
associated with the proposed Opequon Crossing development.
Table 3
Proposed Development: Opequon Crossing
Trin Generation Summar
Code
Land Use
Amount
In
ANI Peak Hour
Out Total
In
PM Peak Hour
Out 'Total
ADT
210
Single- Family Detached
155 units
29
88 118
100
59 159
1,550
230
Townhouse/Condo
170 units
20
66 86
71
40 111
1,1w
Total
49
154 204
171
99 270
2,658
TRIP DISTRIBUTION AND TRIP ASSIGNMENT
• The distribution of trips was based upon local travel patterns for the road network
surrounding the proposed site. PHR +A utilized the trip distribution percentages shown in
Figure 6 to assign the Opequon Crossing trips (Table 3) throughout the study area roadway
network. Figure 7 shows the respective development - generated AMIPM peak hour trips
and ADT assignments.
2010 BUILD -OUT CONDITIONS
C
The Opequon Crossing assigned trips (Figure 7) were added to the 2010
background traffic volumes (Figure 4) to obtain 2010 build -out conditions. Figure 8
shows the 2010 build -out ADT and AM/PM peak hour traffic volumes at key locations
through out the study area roadway network. Figure 9 shows the respective 2010 build -out
lane geometry and AMIPM peak hour levels of service. PHR +A has provided Table 4 to
show the 95 percentile back of queue and levels of service for each lane group during
2010 build -out conditions. All Synchro 7 levels of service worksheets are included in the
Appendix section of this report.
P
A 7 naf6c hnoact Anolvsis of (he Onequon Crossing
Project Number: 12617 -1 -0
November 18, 2008
Page 9
• !
i
No Scale
�)�
ke
7
4
Go c
y��
6 Oz
SIT b �~
O
f
O ! C
PtLd N`t i
Q .
P
f �� fy
- D n� n
Figure 6 Trip Distribution Percentage
P �
ATraffic /ngmc(AardvsP ofdie N umber: 12617 -1-0
Project umber 12617 -1 -0
November I8, 2008
Paoe 10
0
0
No Scale
AM Peak Hour(PM Peak Hour)
Figure 7 Development- Generated Trip Assignments
PH ATra((ic Impact AnahwP oect N umber: 1 2617 - 1 -0
R+A
Project umber: 12617 -I -0
November 18, 2008
Page I I
9
E
No Scale
AM Peak Hour(PM Peak Hour)
0
Figure 8
2010 Build -out Traffic Conditions
P H A
A Tragic /mI)acl Analysis of the Onenuon Crossing
Project Number: 12617 -1 -U
November 18, 2WS
Page 12
• •
0
•
sigoahzzd '. °New
:lnterseUion,` Intersection"
i),LOS B(B)
14
No Scale
i e• ; rg r
4
7
Unsignalized
Intersection
7
.lp�P "tiOC
c`
G
S IT E
e�
SIT b 3 6
5
C
��P O
U HF �L
�d
J
�
N
0
Q c
e G o yJ�
Unsignahzed
Intersection
* Denotes Unsignalized Critical Movement
AM Peak Hour (PM Peak Hour)
__D A
Figure 9 2010 Build -out Lane Geometry and Level of Service
P
A Dallic Gnyact Analvsis of die Onegoon Crossing
Project Number: 12617 -1 -0
November 19. 2008
Page 13
•
•
0
Table 4
Opequon Crossing
Levels of Service and Back of Queue (95 %) Results
2010 Build -out Conditions
Intersection
Traffic
Control
Lane Group/
Approach
AM Peak Hour
PM Peak Hour
LOS
ac o
ueue
LOS
ac o
ueue
Route 7 & Haggerty
Road
Signalized
EWT
C
462.0
A
146.0
EB /TR
EB LOS
C
A
WB/L
B
38.0
B
83.0
WB/T -Lanel
B
141.0
B
426.0
WB T -Lane2
WB LOS
B
B
NB/LR
C
170.0
C
161.0
NB LOS
C
C
Overall LOS
B
B
Haggerty Rd & Site-
Driveway /Haggerty
Dr #2
Unsignalized
EB /LR
B
35.0
B
25.0
NB/LT
A
25.0
A
25.0
SBIfR
-
-
Haggerty Road &
Haggerty Dr #1
Unsignalized
WB/LR
A
25.0
A
25.0
NB/TR
-
-
SB/LT
A
25.0
A
25.0
0
* Assumed 25 feet Vehicle Length
EB = Eastbound, WB = Westbound, NB = Northbound, SB = Southbound, L: Left, T:Thru, R: Right
•
P H A
A Traffic Impel Analysis of (he Oneguon Cro.ssinu
Project Number: 12617 -1 -0
November 18, 2008
Page 14
•
u
u
E
CONCLUSION
Based upon Synchro 7 analysis results, all study area intersections of the proposed
Opequon Crossing will maintain level of service "C" or better during 2010 build -out
conditions.
A Traffic Impact Analv.eis o(Me Oueuuon Crossing
Project Number: 12617 -1 -0
November 18, 2008
Page 15
11
•
0
E
0
"SIX -YEARS AFTER" DEVELOPMENT
2016 TRAFFIC IMPACTS
PHR +A applied an annual growth rate of 2% to the existing traffic volumes through
Year 2016. Additionally, all trips relating to specific future "other developments" located
within the vicinity of the site were included. The trip generation for the background
development remains consistent with the Table I of "2010 background conditions" (Page
5). The Opequon Crossing development assigned trips (Table 3) were then added to the
2016 background conditions to obtain 2016 build -out conditions. Figure 10 shows the
2016 build -out ADT and AM /PM peak hour traffic volumes at key locations throughout
the study area network. Figure 11 shows the respective 2016 build -out lane geometry and
AM/PM peak hour levels of service. Table 5 is provided to show the 95' percentile back
of queue and levels of service for each Zane group during 2016 build -out conditions. All
Synchro levels of service worksheets are included in the Appendix section of this report.
P
A Traffic Impact Anal"is of the Oneouon C ossink
Project Number: 12617 -1 -0
November 18, 2008
Page 16
• 0
11
•
•
No Scale
e �?
e
09 )1 S2 r� 3x(18191
` 2)511 8(133)
s 9 S` 7
` J
lya'�j z� G
S•^ •^
SITE .
rs a
P
P� I
O
s
AM Peak Hour(PM Peak Hour)
17 T) . A
Figure 10 2016 Build -out Traffic Conditions
P
A 7rafOc 6nimei Analysis of the Oueguon Oossine
Project Number: 12617 -1 -0
November 18. 2008
PaPc 17
•
0
•
•
Signaliixd "New
Intersection' Intence[ion"
No Scale
_,�_ B(C)
lg1C� - 7
a
Unsigmalized
Intersection
P
c
G
gC�
SITE Q�
v
.� O
O
��P�O a
P�
O�y
X 4
J .l
P, 1(
y
d ` s
�G
Unsignalizad
Intersection
* Denotes Unsignalized Critical Movement
AM Peak Hour (PM Peak Hour)
T7 T_), A
H 1.1.
Figure 11 2016 Build -out Lane Geometry and Level of Service
P
ATrnffic /mpacr Anahais of the Oneouon Crossine
Project Number: 12617 -1 -0
November 18, 2008
Page 18
0
•
Ci
Table 5
Opequon Crossing
Levels of Service and Back of Queue (95 %) Results
2016 Build -out Conditions
Intersection
Traffic
Control
Lane Croup/
Approach
AM Peak Hour
PM Peak Hour
LOS
ac o
ueue
LOS
ac o
Oueue
Route 7 & Haggerty
Road
Signalized
EB/T
C
567.0
A
168.0
EB/TR
EB LOS
C
I A
WB /L
C
41.0
C
122.0
WB/I -Lapel
B
166.0
C
570.0
WB/T-Lane2
WB LOS
B
C
NB /LR
C
182.0
C
103.0
NB LOS
C
C
Overall LOS
C
C
Haggerty Rd & Site-
Driveway/Haggerty
Dr #2
Unsignalized
EB /LR
B
35.0
B
25.0
NB /LT
A
25.0
A
25.0
SB/TR
-
-
Haggerty Road &
Haggerty Dr #1
Unsignalized
WB /LR
A
25.0
A
25.0
NB/TR
-
-
SB /LT
A
25.0
A
25.0
•
* Assumed 25 feet Vehicle Length
EB = Eastbound, W B = Westbound, NB = Northbound, SB = Southbound, L: Left, T:'I'hru, R: Right
•
P
A Daffic bnnnct Anuh•sis of the Ooegtum Gossine
Project Number: 12617 -1 -0
November 18, 2008
Page 19
• 0
0
•
2016 CONCLUSION
Based upon Synchro 7 analysis results, all study area intersections of the proposed
Opequon Crossing will maintain level of service "C" or better during 2016 build -out
conditions.
P H A
AfgiffL ],POuct Analy -io ofthe Onegu 000055111¢
Project Number: 12617 -1 -0
November 18, 2008
Page 20
0 0
Administrative Guidelines
January 29, 2008
0 ���� jjjj Virginia Department PRE -SCOPE OF WORK MEETING FORM
ofTransportation
Information on the Project
Traffic Impact Analysis Base Assumptions
The applicant is responsible for having this form completed and returned to VDOT and the locality no
less than three (3) business days prior to the meeting. If a completed form is !not received by this
deadline, the scope of work meeting may be postponed.
Consultant Name. _'. Patton Harris Rust & Associates c/o Michael Glickman
Tele..,! (301) 223-4010
E-mail' Michael.Glickman @phra.com
DeveloperjOw'netName: , "'I Wayne L. Hill, The Ryland Group, Inc. Washington Division
4
n
i s
Project Information
fr
Project Name .. ; ' „
Opecluon Crossing
Protect Location °:
Project is located south of Route 7 along the proposed Haggerty
`(Attach regional and site) ,.
Connection Road in Frederick County, Virginia
specific location ma
Project "Description _. -.
',Including type of application _
;`(rezoning; subdivision site
The Project includes 155 units of Single Family detached and 170 units of
;plan), businesssquare .
Townhouse /Condo.
ft, number of dwelling units -
'access,location, etc. Attach
additional sheet if necessary
Locality /County..
Frederick County
Proposed =Use . `
(Check'all that apply „attach • .
Residential
Commercial ❑
Mixed Use ❑
Other ❑
additional pagesas necessa '
Residential # of Units:
Mixed Use:
ITE LU Code(s):
# Res. Units:
ITE LU Code(s):
210 Single Family Detached (155
units)
230 Townhouse /Condo (170 units)
Commercial Use Scl Ft:
ITE LU Code(s):
Commercial Use Scl Ft:
Other:
ITE LU Code(s):
Paee I of 6
U
Administrative Guidelines
Ah
IMF
4
January 29, 2008
"t t L } l F�Jn
6 ..."�
0
t.`.j. a F
TrafFc Im ct =Anal sis
i ...�
„a id {
A'ssum tions.. ,: •_.., r,_,:. •,......_ _.
il
. �....._,
Study, Period
Existing Year: 2008
Build -out Year: 2010
Design Year: 2016
Study Area Boundaries
North: Route 7 (Berryville Pike)
South:
(attach map) ° ;.
East: Haggerty Connection
West:
1xter ha Factors Thatr.:
Could: Affect. Project,"
(Planned: road improvements,_
other nearby A evelopments)
Consistency Wlth
Compreiens(ve Plan `
Available Traffic 'Data
f z:
<(Historical, "forecasts)
Trip Distribution: `.
Road Name: Berryville Pike
N %
S %
E40%
W 60 %
(Attach sketch)
Road Name:
N %
S %
E %
W
Road Name:
N %
S %
E %
W
'
Road Name:
N _%
S %
E_%
W
Annual.Vehlcle Trip
Peak Period for'.:
� PM
Growth" Rate ..
°
2 �°
1 1 Study
Circle all that a' ' I' `
(7 9) (4 6)
(10
1. Route 7 /Proposed Haggerty
5 '
Connection Road.
2• Haggerty Connection Road /Haggerty
6
"Study Intersection`s "'
:and /or`Road Segments:
Driveway #2/Site-Drivewa
*(Attach additional she1et,s!as ..
3. Haggerty Connection Road /Haggerty
necessary) -
Drivewa #1
7
4.
8.
Trip Adjustment "
Internal allowance: ❑ Yes 0 No
Pass -by allowance: ❑ Yes
2 No
Factors `
Reduction: % trips
Reduction: % trips
Software Methodology
0 Synchro ❑ HCS (v.2000 / +) El aaSIDRA El CORSIM El
Other
7raffi 61 Signal, Proposed
or Affected =
(Analysis'software to be_used, '..
`progressionspeed }'cycle: '
length)
•
Page 2 of 6
Administrative Guidelines
Haggerty Property, Twin Lakes development.
January 29, 2008
=Plan Submission'
El Master Development Plan (MDP) El Generalized Development Plan (GDP)
❑ Preliminary/Sketch Plan ❑ Other Plan type (Final Site, Subd. Plan)
+Additional Issues.fo be 0 Queuing analysis ❑ Weaving analysis ❑ Merge analysis
addressed =` ❑ Intersection(s) ❑ TDM Measures ❑ Other
NOTES on ASSUMPTIONS:
0
0
SIGNED: DATE: 01 /29/2008
Applicant or Consultant
PRINT NAME: Michael Glickman, PE
Applicant or Consultant
Page 3 of 6
0 0
•
Administrative Guidelines
No Scale
•
t
January 29, 2008
Figure 1 Vicinity Map: Village at Opequon in Frederick County, Virginia
\J
Page 4 0l' 6
0
l J
•
Administrative Guidelines
January 29, 2008
No Scale
0
e
7
I
Go c
et`
SITE
0
c
0
2
n
4- P si
n D A
Figure 2 Trip Distribution Percentage
Page 5 of 6
Administrative Guidelines
•
Table 1
Proposed Development: Village at Opequon
January 29, 2008
irm t,eneranon �!)ummar
\J
•
Code
Land Use
Amount
In
AM Peak Hour
Out Total
In
PM Peak Hour
Out Total
ADT
210
Sin-le- Family Detached
155 units
29
88 118
100
1
59 1 159
1.550
230
Townhouse /Condo
170 units
20
66 86
71
40 111
1,108
Total
49
154 204
171
99 270
2,658
0
Page 6 of 6
Intersecrion�' ° Intersection"
LOS4(B)
No Scale (A)g 7
E G +
L
SITE
0
y AM Peak Hour (PM Peak Hour)
2010 Build -out L ane Geometry and Level of Service
Figure 1 Revised Build -out Lane Geometry and Level of Service
2016 Build -out Lane Geometry and Level of Service
T T
0
11
Table 1
Opequon Crossing
Levels of Service and Back of Queue (95 %) Results
2010 Build -out Conditions
Intersection
Traffic
Control
Lane Group/
Approach
AM Peak Hour
PM Peak Hour
LOS
uk
LOS
ac
Route 7 & Haggerty
Road
Signalized
EB/'F-Lane 1
B
425.0
B
218.0
217.0
EB/T -Lane 2
EB/R
A
25.0
A 1
49.0
EB LOS
B
B
WB /L
D
56.0
C
134.0
WB/I -Lane 1
A
102.0
B
388.0
WB /T -Lane 2
WB LOS
A
B
NB/L
D
173.0
C
115.0
NB /R
A
1 48.0
A
26.0
NB LOS
C
C
Overall LOS
B
B
* Assumed 25 feet Vehicle Length
EB = Eastbound, WB = Westbound, NB = Northbound, SB = Southbound, L: Left, T:Thru, R Right
. Table 2
Opequon Crossing
Levels of Service and Back of Queue (95 %) Results
2016 Build -out Conditions
Intersection
Traffic
Control
Lane Group/
Approach
AM Peak Hour
PMIPeak Hour
LOS
ac o
ueue
LOS
I
ac o
Oueue
Route 7 & Haggerty
Road
Signalized
EB/T -Lane 1
B
516.0
B 1
218.0
EB/T -Lane 2
EB /R
A
25.0
A
43.0
EB LOS
B
B
WB/L
D
56.0
D
138.0
WB /T -Lane 1
A
112.0
B
424.0
WB/T -Lane 2
WB LOS
A
B
NB/L
D
187.0
D
122,0
NB/R
A
50.6
A
29.0
NB LOS
C
C
Overall LOS
B
B
Assulllcu 25 fum v cuwic �,cugw
EB = Eastbound, WB = Westbound, NB = Northbound, SB = Southbound, L: Left, T:Thru, R: Right