Loading...
HomeMy WebLinkAbout03-07 ApplicationCOUNA INK Department of Planning and Development 540/665 -5651 FAX: 540/665-6395 17 Mr. Evan Wyatt Greenway Engineering 151 Windy Hill Lane Winchester. VA 22602 RE: REZONING 403 -07, EASY LIVING ASSOCIATES Dear Evan: This letter serves to confirm action taken by the Frederick County Board of Supervisors at their meeting of May 9, 2007. The above - referenced application was approved to rezone 4.02 acres from RA (Rural Areas) District to B2 (General Business) District, and 15 acres from RA to B3 (Industrial Transition Business) District, totaling 19.02 acres, with proffers (a maximum of 120,000 square feet has been proffered). The properties are located on the west side of Martinsburg Pike (Route 11), approximately 600 feet north of the Martinsburg Pike /Old Charles Town Road (Route 761) intersection, in the Stonewall Magisterial District, and are identified with Property Identification Numbers 44 -1 -B, 4413-1 -2, 4413-1 -3, 4413-1 -3A, 4413-1 -4 and 4413-1 -6. The proffer, revised May 9, 2007, which was approved as a part of this rezoning application is unique to this property and is binding regardless of ownership. Enclosed is a copy of the adopted proffer statement for your records. Please do not hesitate to contact this office if you have any questions regarding the approval of this rezoning application. Sincerely, Michael T. Ruddy Deputy Planning Director MRT /bad Attachment cc: Charles S. DeHaven, Jr., Stonewall District Supervisor John H. Light and Gary Oates, Stonewall District Planning Commissioners Jane Anderson, Real Estate Commissioner of Revenue Easy Living Associates, 112 S. Cameron St., Winchester, VA 22601 107 North Kent Street, Suite 202 Winchester, Virginia 22601 -5000 1 REZONING APPLICATION 903 -07 EASY LIVING ASSOCIATES Staff Report for the Board of Supervisors Prepared: April 30, 2007 Staff Contact: Michael T. Ruddy, AICP, Deputy Planning Director This report is prepared by the Frederick County Planning Staff to provide information to the Planning Commission and the Board of Supervisors to assist them in making a decision on this application. It may also be useful to others interested in this zoning matter. Unresolved issues concerning this application are noted by staff where relevant throughout this staff report. Reviewed Action Planning Commission: 04/18/07 Recommended Approval Board of Supervisors: 05/09/07 Pending PROPOSAL To rezone 4.02 acres from RA (Rural Areas) District to B2 (General Business) District, and 15 acres from RA District to B3 (Industrial Transition Business) District, totaling 19.02 acres, with proffers (a maximum of 120,000 square feet has been proffered). LOCATION The properties are located on the west side of Martinsburg Pike (Route 11), approximately 600 feet north of the Martinsburg Pike /Old Charles Town Road (Route 761) intersection. MAGISTERIAL DISTRICT Stonewall PROPERTY ID NUMBERS 44 -1 -13, 4413-1-2,4413-1-3,4413-1-3A, 4413-1 -4 and 4413-1 -6 PROPERTY ZONING RA (Rural Areas) PRESENT USE Residential and Vacant ADJOINING PROPERTY ZONING & PRESENT USE North: Ml (Light Industrial) Use: Residential RA (Rural Areas) Residential South: RA (Rural Areas) Use: Vacant East: RA (Rural Areas) Use: Residential/Vacant West: MH1 (Mobile Home District) Use: Mobile Home Park PROPOSED USES Commercial uses (a maximum of 120,000 square feet has been proffered) 0 0 Rezoning #03 -07 — Easy Living Associates Page 2 April 2, 2007 REVIEW EVALUATIONS: Virginia Department of Transportation: The documentation within the application to rezone this property appears to have significant measurable impact on Route 11. This route is the VDOT roadway which has been considered as the access to the property referenced. VDOT is satisfied that the transportation proffers offered in the Easy Living Associates Rezoning Application dated September 15, 2006 addresses transportation concerns associated with this request. Before development, this office will require a complete set of construction plans detailing entrance designs, drainage features, and traffic flow data from the I.T.E. Trip Generation Manual, Seventh Edition for review. VDOT reserves the right to comment on all right -of -way needs, including right -of -way dedications, traffic signalization, and off -site roadway improvements and drainage. Any work performed on the State's right -of -way must be covered under a land use permit. This permit is issued by this office and requires an inspection fee and surety bond coverage. Fire Marshall: Plan approval recommended. Department of Inspections: No comments. Department of Public Works: 1. Refer to Page 4, Wetlands: A wetlands delineation study shall be performed prior to the master development plan submitted to verify that no upland wetlands exist within the proposed project boundaries. 2. Refer to Page 4, Soil Types: Expand this discussion to include descriptions of the existing karst geology and the potential for sinkhole development. A detailed geotechnical analysis is recommended as part of the detailed site plan design. Frederick - Winchester Service Authority: No comments. Sanitation Authority Department: We have the sewer and water capacity to service this site. Department of Parks & Recreation: No comments. Winchester Regional Airport: We have determined that the proposed development plan will not have an impact on operations at the Winchester Regional Airport. While the proposed site lies within the airport's airspace, it does fall outside of the airport's Part 77 close in surfaces. Historic Resources Advisory Board: It appears that the proposal does not significantly impact historic resources and it is not necessary to schedule a formal review of the rezoning application by the HRAB. According to the Rural Landmarks Survey, there are no significant historic structures located on the properties nor are there any possible historic districts in the vicinity. It was also noted that the National Park Service Study of Civil War Sites in the Shenandoah Valley does identify a core battlefield within this area, but further research displays that this parcel has lost its integrity with respect to historic value. 9 9 Rezoning #03 -07 — Easy Living Associates Page 3 April 30, 2007 Frederick County Public Schools: No comments. County Attorney: It is my opinion that the proposed proffer statement is generally in a form to meet the requirements of the Frederick County Zoning Ordinance and the Code of Virginia, subject to the following comments: 1. In Proffer C.2., staff should determine whether the proffer contained in the second sentence is sufficiently definite. 2. It is not clear to me the relationship between Proffers C.3. and C.6. The staff should review this. 3. In Proffer E., the proffer should provide that the monetary contribution shall be to Frederick County "for ", rather than "directed to" the Clearbrook Volunteer Fire and Rescue Company and County fire and rescue services. In addition, at the end of the second sentence the words "all commercial structures" should be changed to "each commercial structure." It should be noted that I have not reviewed the substance of the proffers as to whether the proffers are suitable and appropriate for the rezoning of this specific property, or whether other proffers would be appropriate, as it is my understand that that review will be done by the staff and the Planning Commission. Planning Department: Please see attached letter dated January 25, 2007 from Michael T. Ruddy, Deputy Director. Planning & Zoning: 1) Site History The original Frederick County zoning map (U.S.G.S. Stephenson Quadrangle) identifies the subject parcels as being zoned A -2 (Agricultural General). The County's agricultural zoning districts were subsequently combined to form the RA (Rural Areas) District upon adoption of an amendment to the Frederick County Zoning Ordinance on May 10, 1989. The corresponding revision of the zoning map resulted in the re- mapping of the subject property and all other A -I and A -2 zoned land to the RA District. 2. Comprehensive Policv Plan The Frederick County Comprehensive Policy Plan is an official public document that serves as the community's guide for making decisions regarding development, preservation, public facilities and other key components of community life. The primary goal of this plan is to protect and improve the living environment within Frederick County. It is in essence a composition of policies used to plan for the future physical development of Frederick County. [Comprehensive Policy Plan, p. 1 -1] Land Use The parcel comprising this rezoning application is located within the County's Sewer and Water Service Area (S WSA) and the site is within the limits of the Northeast Land Use Plan. The Northeastern Frederick Land Use Plan generally provides for commercial uses in the vicinity of this site and along Route 11, Martinsburg Pike. The Plan also recognizes the existing industrial zoning surrounding this site and the Developmentally Sensitive Areas (DSA's) which front the Rezoning #03 -07 — Easy Living Associates Page 4 April 30, 2007 site. The application of quality design standards for future development is also an objective of the Plan. Transportation The Eastern Road Plan of the Comprehensive Policy Plan does include this portion of the County. The Northeast Land Use Plan calls for Martinsburg Pike to be improved to a four -lane facility. The Plan also states that proposed industrial and commercial development should only occur if impacted roads function at Level of Service (LOS) Category C or better. The Frederick County Bicycle Plan designates Route 11 as a short-term designated route. Site Access The Northeast Land Use Plan states that individual access to industrial sites should be discouraged along Martinsburg Pike. This development has proffered that one public street entrance and one commercial entrance shall be permitted on Martinsburg Pike from the property. The project proposes additional access enhancements that safely accommodate the existing traffic to the Easy Living Mobile Home Park through the project. Pedestrian accommodations have been provided internally to the project and along the projects frontage with Route 11. 3. Site Suitability /Environment The site does not contain any environmental features that would either constrain or preclude site development. There are no identified areas of steep slopes, floodplains or woodlands. This area is also known for karst topography. The Frederick County Engineer has identified that a detailed geotechnical analysis will be needed as part of the detailed site plan design. 4. Potential Impacts A. Transportation Traffic Impact Analysis. The traffic impact analysis (TIA) prepared for this application assumed 120,000 square feet of a variety of commercial uses and a 16 pump gas station with mart. Using trip generation figures from the I.T.E. Trip Generation Manual, 7 t Edition the proposed rezoning is projected to generate 9,803 average daily trips (ADT). The TIA indicates that Level of Service C conditions or better will be maintained on study roads and intersections with the proposed signalization of Old Charles Town Road and Route 11, for which the Stephenson Village project has proffered the construction. The applicant has proffered the signalization of the main project entrance and Martinsburg Pike. The Traffic Impact Analysis (TIA) distributes approximately 35 percent of the traffic from the site along Route 11 North to the intersection of Route 11 and Hopewell Road, Route 672, in Clearbrook. Recent TIA's have demonstrated level of service and lane geometry issues at this intersection, the ultimate solution to which has yet to be determined. This application 0 0 Rezoning #03 -07 — Easy Living Associates Page 5 April 30, 2007 participates in providing a solution to achieve acceptable levels of service at this intersection by providing a monetary contribution in the amount of $50,000 that may be used to allow for the development of improvements in the general area of this intersection. This project should be evaluated in relationship with other projects in this area that are currently under various stages of review. Interparcel connectivity should be a consideration with this application. Particular attention was provided to the properties to the west and south of this project. Consideration was also given to potential interparcel connection to the property to the north. However, this interparcel access was not pursued by the Applicant. The properties to the south are likely to encounter entrance spacing issues due to the proposed entrances and anticipated signalization improvements. Interparcel connections through the B -2 commercial property will help facilitate movement within the commercial properties and avoid additional conflicts on Route 11. Interparcel connectivity between the commercial areas, Route 11, and access to the existing mobile home park has been thoroughly provided by the applicant. B. Sewer and Water The FCSA has an eight inch sewer force main adjacent to the Winchester and Western Railroad approximately 1000 feet west of the property to which the Applicants will connect. This commercial development is expected to generate 500 gallons /day /acre for a total of 9,519 gpd. The FCSA has a ten inch water main along Route 11 and a 20 inch water main adjacent to the Winchester and Western Railroad. This development is expected to generate 1000 gallons /day /acre for a total of 19,020 gpd. The FCSA has stated that they have the water and sewer capacity to service this site. C. Design Standards The project's location on a major corridor and adjacent to an area identified as a developmentally sensitive area warrants particular attention. This attention is provided in the application by a combination of proffered commitments including a proffer to provide a detailed corridor enhancement strip 20 feet in width along the frontage of the property. Included within this strip is a ten foot multi -use trail and landscape plantings. The applicant has also proffered a limitation on the signage on the property by limiting the business signs to one monument sign (15 feet high and 100 square feet in size) for the land uses on the B3 portion of the property and two monument style signs (10 feet high and 50 square feet in size) for the B2 portion of the property. The applicant has further proffered general building material specifications and finally special consideration has been provided to the buffer and screening of the adjacent properties, in particular, any potential preservation of identified wooded areas. D. Community Facilities The development of this site will have an impact on Fire and Rescue Services. However, it is recognized that commercial uses generally provide a positive impact on community facilities through the additional generation of tax revenue. This application does address the impacts to Fire and Rescue services by providing a monetary contribution in an amount of $12,000. 9 0 Rezoning 403 -07 — Easy Living Associates Page 6 April 30, 2007 5. Proffer Statement - Dated September 15, 2006 (Revised March 21, 2007) 1. Generalized Development Plan A Generalized Development Plan has been proffered which identifies the general location of the B2 and B3 zoning districts, the general location of the primary public street system and commercial entrance on Route 11, the general location of the realigned private drive serving the Easy Living Mobile Home Park, and the zoning district buffers. 2. Land Use Restrictions The applicant has proffered the following land use restrictions: a. The prohibition of a variety of uses within both the B2 and B3 zoning districts that will be on the property. b. A limitation on the maximum amount of structural square footage that may be constructed on the property. A maximum of 120,000 square feet of total structure area, 30,000 square feet within the B2 portion of the property and 90,000 within the B3 portion of the property, has been proffered. 2. Transportation The applicant has proffered a limitation on the entrances onto Route 11, the re- alignment of the Easy Living Mobile Home Park access road to the new public street, sidewalk accommodations, and interparcel connectivity. In addition, the applicant proffer includes construction of an additional lane of Route 11 along the frontage of the property with the triggered timing of its construction, the signalization of the main entrance to the project, and a monetary contribution in the amount of $50,000 that may be used to allow for the development of improvements in the general area of the intersection of Route 11 and Hopewell and Brucetown Roads. The applicant has also proffered the dedication of an additional ten feet of right -away along the property's frontage of Route 11. 3. Site Design Standards The Applicant has proffered to provide a detailed corridor enhancement strip 20 feet in width along the frontage of the property. Included within this strip is a ten foot multi -use trail and landscape plantings. The applicant has proffered a limitation on the signage on the property by limiting the business signs to one monument sign (15 feet high and 100 square feet in size) for the land uses on the B3 portion of the property and two monument style signs (ten feet high and 50 square feet in size) for the B2 portion of the property. The applicant has also proffered general building material specifications and finally special consideration has been provided to the buffer and screening of the adjacent properties, in particular, any potential preservation of identified wooded areas. 4. Monetary Contribution to Offset Impact of Development This application does address the impacts to Fire and Rescue services by providing a monetary contribution in an amount of $12,000 ($6,000 for the Clearbrook Volunteer Fire and Rescue Department and $6,000 for County Fire and Rescue Services). 0 0 Rezoning #03 -07 — Easy Living Associates Page 7 April 30, 2007 STAFF CONCLUSIONS FOR 04/18/07 PLANNING COMMISSION MEETING: The land uses proposed in this rezoning are generally consistent with the Northeast Land Use Plan. The application provides a level of sensitivity to the identified Developmentally Sensitive Areas, addresses the appearance of the Route 11 corridor, and recognizes the transportation improvements identified for this corridor. Further, the impacts associated with this rezoning request appear to have been mitigated by the Applicant. The Commission should ensure that a satisfactory level of expectation has been met regarding 1) site design considerations, 2) inter parcel connections, and 3) monetary contributions to address offsite transportation improvements. PLANNING COMMISSION SUMMARY AND ACTION OF THE 04/18/07 MEETING A member of the Commission raised the issue of the lack of comprehensive transportation plan for the entire Route 11 corridor; concern was expressed that the typical traffic solution to accommodate recent development seemed solely to be the addition of another traffic signal. One potential solution raised to alleviate pressure on Route 11 was inter - parcel connectivity; also envisioned was a future need for a four or five -lane Route 11 North and possible exit/entrance ramps onto I -81. It was stated that the County needed to implement a comprehensive transportation plan for the Route 11 North corridor before any further development is accepted in this area; this would allow the development community to proffer potentials to offset the mitigation of traffic impacts to Route 11. Other Commissioners did not want to penalize applicants coming before the Commission because the County did not have an updated plan. They pointed out that the County's current Eastern Road Plan and the Northeast Land Use Plan states that commercial and industrial development can occur if impacted roads function at a LOS "C" or better. Other Commissioners commented that the Northeast Land Use Plan is lacking and needs to be improved immediately. Another issue raised by a member of the Commission involved scoping for TIAs. A question was raised about the consistency of the background studies between projects in the same immediate vicinity. There were no public comments. A motion was made and seconded to table for 45 days in order to have discussions between the parties involved to determine if an inter - parcel transportation plan for the western side of Route 11 would help with transportation. This motion failed by a majority vote. Another motion was made, seconded, and passed by a majority vote to recommend approval of the rezoning with the stipulation that the applicant continue to work with the staff to attempt to improve their transportation proffers. The majority vote was as follows: YES (REC. APPROVAL) Kriz, Ours, Oates, Mohn, Kerr, Triplett, Morris, Manuel, Unger, Wilmot NO: Light (Note: Commissioners Thomas and Watt were absent from the meeting.) 0 Rezoning #03 -07 — Easy Living Associates Page 8 April 30, 2007 STAFF UPATE FOR 05/09/07 BOARD MEETING: The Applicant has provided staff with a revised Proffer Statement dated April 30, 2007, including a revised Generalized Development Plan. The modifications seek to address some of the inter parcel access concerns and connectivity issues identified during the Planning Commission meeting. Specifically, the Applicant's modifications (Proffers C.8 and C.9) provide for the reservation of a 50 foot right -of -way, identified on the GDP and generally adjacent to the back of the properties which front along Route 11, for the purpose of the construction of a future north -south public street by others. The reserved right -of -way would be dedicated to the County within 90 days of the written request by the County. This application does not provide for the construction of this public street as part of their development. Rather, the opportunity has been secured for other properties that may develop in the future to implement what would be a reverse frontage road which could serve to minimize additional entrances on to Route 11. The nature of this proffer revision should be evaluated in comparison to the opportunity to make an inter parcel connection as part of the Easy Living projects road construction. Frederick County, VA Re - Zoning REZ# 03 - 07 Application Easy Living Commercial Cent P D: 44- 1- B,44B -1 -2, 44B- 1- - 33, , 44 44B -1 -3B, Location in the Gountl 44B - 1 - 4, 44B - 1 - 6 Map Features 0 Application D Lakesmonds — Streams Streets , Ptlmary ti Secondary — Terciery La Urban Derelopment Area ar SWSA Location in Surrounding Area GK Ct 0 125 250 50�]eel m ® Case Planner: Mike ° Frederick County, VA Re - Zoning REZ# 03 - 07 Application Location in the Gountl Easy Living Commercial Cent Map Features O Applioation Zoning p LakesPOnds W Bt (Business, Neighborhood District) — Streams s B2 (Business, General District) Streets W Bit (Business, Industrial Transition District) I Primary EM (Exbe lbe MinuleUUdng DistriU) ti Becantlary adia HE (Higher Education District) ti Tertiary slia MI (industrial, LghtDilrn .1 Urban DevelopmenlAmao M2 (industrial, General DisMd) M swS alia MHI(MObile Home Cpmmunity DietdU) sili MS (Medical Support DisMCt) e► R4 (Residential, Planned Community User e► RS (Residential Recreational Community[ RAZ (Rural Area Zone) RP (Residential Performance District) ParcellD: 44- I- B,44B -1 -2, 44B -1- 3,4413 -1 -3B 44B -I- 4,4413 -1 -6 Location in Surrounding Area wr = 0 125 250 SO ® Case Planner. Mike Location in Surrounding Area E ck —. 12^ 250 50 Fae1 Case Planner: Mike Frederick County, VA Location in the County Map Features Re - Zoning REZ #03 -07 Application Easy Living Commercial Cent Parcel ID: 44- 1- B,44B -1 -2, 44B- I- 3,44B -1 -310 44B- 1- 4,44B -1 -6 O Application Lone Range Land Use O L kmlPondc Rural Commundy Center ^ Streams Residential gVaaft Business �- Primary i& Industrial �. Secondary s, Institutional ti Temiary S; Recreation Me Urban Oeveloprant A,ea® Historic M SN ® MixebUSe eID Planned Unit Oevelopmenl I ' Frederick County, Easy Living Commercial Cent Location in the Lountl Map Features O Application D Lakes /Ponds -- 5lreams Stomata Primary N Secondary Temlary . Urban Oesolopraut"a ar SWSA Parcel ID: 44- 1- B -1 -2, 44B- 1- 3,44B -1 -3H 44B- 1- 4,44B -1 -6 Location In - aurrounaing „rea a 125 250 'S eel 0 0 REZONING APPLICATION FORM FREDERICK COUNTY, VIRGINIA The following information shall be provided by the applicant: All parcel identification numbers, deed book and page numbers may be obtained from the Office of the Commissioner of Revenue, Real Estate Division, 107 North Kent Street, Winchester. 1. 2. 3. Applicant: Name: Greenway Engineering Telephone: (540) 662 -4185 Address: 151 Windy Hill Lane Winchester, VA 22602 Property Owner (if different from above) Name: Easy Living Associates Telephone: (540) 662 -3486 Address: 112 South Cameron Street Winchester, VA 22601 Contact person if other than above Name: Evan Wyatt, AICP Telephone: (540) 662 -4185 4. Checklist: Check the following items that have been included with this application. Location map X Agency Comments X Plat X Fees X Deed to Property X Impact Analysis Statement X Verification of taxes paid X Proffer Statement X 11 • 5. The Code of Virginia allows us to request full disclosure of ownership in relation to rezoning applications. Please list below all owners or parties in interest of the land to be rezoned: Easy Living Associates Jacob H. Yost 111, Manager 6. A) Current Use of the Property: B) Proposed Use of the Property Residential and Unimproved Commercial 7. Adjoining Property: Please refer to attached Adjoining Property Owner List 8. Location: The property is located at (give exact located based on nearest road and distance from nearest intersection, using road names and route number): The subject property is located on the west side of Martinsbure Pike (U.S. Route 11), approximately 600 feet north of the Martinsburg Pike /Old Charles Town Road (Route 76t) intersection. C Information to be Submitted for Capital Facilities Impact Model In order for the Planning Staff to use its capital facilities impact model, it is necessary for the applicant to provide information concerning the specifics of the proposed use. Otherwise, the planning staff will use the maximum possible density or intensity scenario for the proposed Zoning District as described on Page 9 of the application package. 9. Parcel Identification/Location: Parcel Identification Numbers 44- ((1)) -B, 44B- ((1)) -2, 44B- ((1)) -3, 44B-((I))-3A, 44B-((I))-4 and 44B- ((1)) -6 Districts Magisterial: Fire Service: Rescue Service: 10. 11. Stonewall High School: Clearbrook Middle School: Clearbrook Elementary School: 15.0 James Wood James Wood Stonewall Zoning Change: List the acreage included in each new zoning category being requested. Acres Current Zoning Zoning Requested 4.02 RA District B -2 District 15.0 RA District B -3 District 19.02 Total Acreage to be rezoned The following information should be provided according to the type of rezoning proposed: Number of Units Proposed Single Family homes: Townhome: Multi- Family Non - Residential Lots: Mobile Home: Hotel Rooms: Square Footage of Proposed Uses Office: Service Station: Retail: Manufacturing: Restaurant: Warehouse: * The Proffer Statement limits the square footage of development to 30,000 square feet of commercial within the B -2 District and 90,000 square feet within the B -3 District portions of the Property. 0 0 12. Signature: I (we), the undersigned, do hereby respectfully make application and petition the Frederick County Board of Supervisors to amend the zoning ordinance and to change the zoning map of Frederick County, Virginia. I (we) authorize Frederick County officials to enter the property for site inspection purposes. I (we) understand that the sign issued when this application is submitted must be placed at the front property line at least seven days prior to the Planning Commission public hearing and the Board of Supervisors' public hearing and maintained so as to be visible from the road right -of -way until the hearing. I (we) hereby certify that this application and its accompanying materials are true and accurate to the bet of my (our) knowledge. Applicant(s): Date: S 3 Owner (s �� C�' rr Date: 2- ��.7 Eti Special Limited Power of Attorney County of Frederick, Virginia Frederick Planning Web Site: www.co.frederick.va-us Department of Planning & Development, County of Frederick, Virginia, 107 North Kent Street, Suite 202 Winchester, Virginia 22601 Phone 540- 665 -5651 Facsimile 540 -665 -6395 Planning office, County of Frederick, Virginia, 107 Kent Street, Winchester, Virginia 22601 Phone 540- 665 -5651 Facsimile 540- 665.6395 Know All Men By These Presents: That I (We) (Name) Easy Living Associates. Jacob H. Yost, III.Manager (Phone) (540) 662 -9470 (Address) 2489 -3 Martinsburg Pike. Stephenson, VA 22656 the owner(s) of all those tracts or parcels of land ( "Property ") conveyed to me (us), by deed recorded in the Clerk - s Office of the Circuit Court of the County of Frederick, Virginia. by Instrument No. 060016824 on Page Deed Book No. 626 on Page 810, Deed Book No. 644 on Page 818 Instrument No. 020008972 on Page_ Deed Book No. 903 on Page 244 Deed Book No. 659 on Page 693. and is described as Parcel: 44 Lot: B Block: I Section: _ Subdivision: Parcel: 44B Lot: 2 Block: I Section: _ Subdivision: _ Parcel: 44B Lot: 3 Block: I Section: Subdivision: _ Parcel: 44B Lot: 3A Block: I Section: Subdivision: Parcel 44B Lot: 4 Block: I Section: Subdivision: _ Parcel: 44B Lot: 6 Block: I Section: Subdivision: _ do hereby make, constitute and appoint (Name) Greenway Engineering (Phone) (540) 662 -4185 (Address) 151 Windy Hill Lane Winchester. VA 22602 To act as my true and lawful attorney -in -fact for and in my (our) name, place and stead with full power and authority I (we) would have if acting personally to file planning application for my (our) above described Property. including: ® Rezoning (Including proffers) ❑ Conditional Use Permits ❑ Master Development Plan (Preliminary and Final) ❑ Subdivision ❑ Site Plan ❑ Comprehensive Policy Plan Amendment My attorney -in -fact shall have the authority to offer proffered conditions and to make amendments to previously approved proffered conditions except as follows: This authorization shall expire one year from the day it is signed, or until it is otherwise rescinded or modified. In witness hereof, I (we) have heeretq_stt lny (,rsi�[) -H� nd spal this ZZvlct day of AYC() . 200 7 , -�� State-OfVirginia, City/ oum f f . To-wit: I. i 6nff L. Keliso, a Notary Public in and46 — r t ejurisdiction aforesaid, certify that the person(s) who signed to the foregoing instrument and who'I (are) known to me. personally appeared before me and has acknowledged the same before me in the jurisdiction aforesaid this 22 \1 day of \142y&) .200 7 . C " ne o,(, � My Commission Expires: F eb . 20 08 Notary Public • • 2 44 1 D1 EASY LIVING ASSOCIATES 2489 -3 MARTINSBURG PIKE STEPHENSON, VA 22656 3 44 1 D PAYNE, O. L. & RUTH B. PO BOX 160 STEPHENSON, VA. 22656 4 44 1 A SIMKHOVITCH, RONALD S. & 2929 VALLEY AVE WINCHESTER, VA. 22601 5 44B 1 12D WAMPLER, JACK K SR & JACK K JR P/A WAMPLER'S MOBILE HOMES 2648 MARTINSBURG PIKE STEPHENSON, VA 22656 6 44B 1 12B SIMKHOVITCH, RONNIE S JR 2601 MARTINSBURG PIKE STEPHENSON, VA 22656 7 44B 1 12A 0 8 44B 1 12 0 9 44B 1 11A DYE, JANET S. PO BOX 356 STEPHENSON, VA 22656 10 44B 1 11 0 11 44B 1 10A PYNE, DONALD A & DOROTHY L 2565 MARTINSBURG PIKE STEPHENSON, VA. 22656 12 44B 1 10A1 0 13 44B 1 9 0 14 44B 1 8 SIMMONS, ANN H. C/O DAVID HIETT 2543 MARTINSBURG PIKE STEPHENSON, VA. 22656 15 44B 1 7 CAMPBELL, STEPHANIE J 2537 MARTINSBURG PIKE STEPHENSON, VA 22656 16 44 A 50 CUTSHAW ENTERPRISES, L C PO BOX 2337 WINCHESTER, VA 22604 17 44 A 49 SHANHOLTZ, DAVID L ET AILS 791 MARPLE RD WINCHESTER, VA 22603 18 44 A 48 MCKEE, JANNEY T. C/O MOULDEN, MELVIN 932 ALLEN DR WINCHESTER, VA. 22601 19 44 A 48A THARP, SHARON M 1855 SENSENY RD WINCHESTER, VA 22602 20 44 A 47 CAMPBELL, BEVERLY L & GARLAND L SR 114 WINDING RIDGE LN WINCHESTER, VA 22603 21 44 A 43 BISHOP, GREGORY A & AMARI, THOMAS 285 BOGGESS LN WINCHESTER, VA 22603 22 44B 1 1 D T SHIRLEY PROPERTIES LLC 2455 MARTINSBURG PIKE STEPHENSON, VA 122656 5/l/2007 Adjoining Property Owners.xls 1 of 1 II• Feet 300 15 0 3 600 7 r%UJU III IIJ. F I vpU L IJVVI IGI J IVICLP E C 9 11 � 13 15 22 20 21 8 10 12 14 \/ 17 A 16 / \\ 18 \\ Le end r� Parcel Boundaries O Subject Parcels Adjoining Parcels Cn Cn Z W d v � a cc F d $g CL :: F FLS WYi / V! cc Q W Z V i j 0 OU QQ � z fr a W � J o- QO Z_ W Z 0 Q w d o m In V ° w ft Q z U) w 0 Q o U O w 2 } o 0_ F Z d U 0 m Z C7 Q L U J 0 LL Z J U O c J 0 N Q W d w z ZO o c O o U Cr Z Z w A � tit: ��►•��r:�u•.r•� ■►vr:�.•� Feet 1,500 750 0 1,500 3,000 Legend Q Subject Parcels = Parcel Boundaries Zoning B2 (Business, General District) - B3 (Business, Industrial Transition District) - EM (Extractive Manufacturing District) M1 (Industrial, Light District) M2 (Industrial, General District) .i MH1 (Mobile Home Community District) 0 R4 (Residential, Planned Community District) RA (RurallAreas District) RP (Residential Performance District) V z a W W z Z5 Z W FF 2 6- a N3 LU L r F \r 4E � Q d� w� U) W Cc Q W — H UZ OW C U CO J Q Q 0 U Z Er 5; W J } i5; cl) QU W 0_ Q U Z_ Z O N n Z Q Z O U O J M a m N O U o N � W J ^ a L CL g U o Q z rnz U)Z Q p ¢ o O N Z Q o W F CO Z LD j w p (7O m d LL Z — Q U = > 3 2 Y Z ° o O J v o M a m N O U o N � W J ^ a L te Z. r '+ _ - /'1C1 IQI LJVGI vivvV IVIGLP cc ku ' ;' Q st 5.. t -' "F Y " f e O ♦ wt -_ r' �'t .Y. _.f! °Y i ' @t 7e •Z LU , �, �M.nr f y ryM i Y i.flrx a.y� LU + ."p, ll 1 r t l 4` . .� 49 9. _ .C, Aa' ;:L "F�ls' M° �4�T�: ..,.{ " - ,. "- _ ters Mill '§' f ;$�& � , tl .ti.- Y�yf t � "►�. -t LU r Lu / T r cc s LU IL � � � ♦ � r�rn r- w 7 w C e 2 Q W Y- ._ cn U Q Q C!3 U w Z tr y Q U o w ' ago s�r4 w U Q Feet 700 350 0 700 1,400 _ •, rim, CL F U m o �QZ E" 3: Lo?� w 0C7o Q U > w J Q > O) � W o CO O J _ Z w C7 Z Q w 2 U Z LL w Z W m W Q Z w w N N w 0 w w 0 o s F W 0 1,20 600 JVV%DM OL uum IVIdy f c gy m pry- U1 tl C 17 F?fy Feet j e 1,200 2 /�j . i Mill C� 9a i/ // Le end Q Subject Parcels Parcel Boundaries Sewer -Water Service Area Urban Development Area cc W W z W a GF v z W [o IlE a� q �o s e; $ wm CO W Cc I Uz Q 0 Q QQ � 0 < >W U) J U) 0 QU W ' a o = O N W W J Q a F— m U ❑ d Q z z W 2 Q ¢ I ❑ U Q > m � qS W o � SQ F} Q j w z ¢ 0U ' a o = O N W W J Q a II. �e b i �^ l � 1 $ c • r�fa LI IV II UI III IGI IIQI I GGLEUI qUO IVICX If W ft IX W z W GF Dryo z a7 Yry� W ra d o W cc �F a d ` 2 � W sp7 W rr CO 9 H W - a F W Uz 11 $ O W Q cn U W in J LL Q Q J J % �L) ��} 1 Z_ c z 2i W U) U O > Q oC W f W %Char /es =� ? ~ z z �. � R w ~ U) C7 w a o Le � _ o �.eg d u� � a Q LL J Q Subject Parcels p � (r w 0 Parcel Boundaries mo o ° ¢ w U) � w C7 2 3 0 m Lakes & Ponds > z o < Y z �_ ® Floodplain ¢ � O o N D >- Z Q OC w e ® Wetlands C w w p , Q w C7 w Feet o Streams z p 9 500 250 0 500 1,000 5 ft. Contour Lines o J rr a a 14C, FREDERICK - POPLIMENTO LOAMS, 7 TO 15 PERCENT SLOPES Feet �\ 17C, FREDERICK- POPLIMENTO -ROCK OUTCROP COMPLEX, 2 TO 15 PERCENT SLOPES 500 250 0 500 1 ,000 39B, SWIMLEY SILT LOAM, 2 TO 7 PERCENT SLOPES w -' N w A w O F- o w LL ° o = 6 a 1 IIJLVI IV I % CLALLAI 634-113 i cc W W z_ W N �d G W b db Ic R ;" F �x 5 d� U Mg 4 W y 11 W I1 Q Q W C U Z W W cc U) U Q Q Q 0 U LU Z rr �W U U) 0 O Q U U W = 1 I Q 0 z J U) W U U) 0 J ■B■ Q � � UJ �z� FD O Y Z u m 3 w p w W d Z � W o —` N W J Le end o/a Charles T Q Subject Parcels � Ra i Parcel Boundaries Civil War Battlefields - Stephensons Depot Landmarks ® 34 -102 Woodburn 34 -113 Kenilworth 34 -717 Rose Lawn ^\ i cc W W z_ W N �d G W b db Ic R ;" F �x 5 d� U Mg 4 W y 11 W I1 Q Q W C U Z W W cc U) U Q Q Q 0 U LU Z rr �W U U) 0 O Q U U W = 1 I Q 0 z J U) W U U) 0 J ■B■ Q � � UJ �z� FD O Y Z u m 3 w p w W d Z � W o —` N W J • • NOTES: 1. BOUNDARY SHOWN HEREON WAS DETERMINED BY A FIELD RUN SURVEY PERFORMED BY ARTZ k ASSOCIATES ON MARCH 18, 2004. 2. THIS PLAT IS SUBJECT TO EASEMENTS AND RESTRICTIONS OF RECORD. 3, NO TITLE REPORT FURNISHED. 4. SEE SHEET 2 FOR COURSE INFORMATION. I� �I 44 -1 -D O.L. & RUTH B. 1a5 GA " 132 Na PAYNE o'�sj P 381/225 ASSOCIATES ESMT. IN 802/1267 v A9 44-1-A TM ((44B /v RONALD S. & VELMA D. ? 2' SIMKHOVITCH �F 883/181 B J 3 0.192 ACRES ?8• ' 14.714 TM #446 -1 -1 ACRES .4413 -1 -121) WAMPLER'S MOBILE PROPOSED HOMES TM -s 927/1092 c 99 13 .004 ACJ (14 .004A PROPOSED ZONING (15.006 AC) / 2 / hM� N / 1441 ACRES TM #44 -1 -8 (1.002 AC.) :j S B�Sl r S �ti , BB � c� cv sr" 1a5 GA " 132 Na 44 -1 -C ! s % o'�sj P EASY LIVING so' R/w ASSOCIATES ESMT. IN 802/1267 468/634 26 `, (s 1.1 ACRES TM ((44B -1 -4 0.192 ACRES TM #4413-1 -3 TM #446 -1 -1 CHARLES EDWARD & PROPOSED EVELYN 1). SHIPLEY g2 ZONING (4.021 AC) PROPOSED REZONING PLAT EASY LIVING ASS®CIATES LAND STONEWALL DISTRICT, FREDERICK COUNTY, VIRGINIA SCALE: I`= 200' DATE: AUGUST 31, 2006 PRESENT OWNER; EASY LIVING ASSOCIATES SEE SHEET 2 FOR TAX MAP AND DEED INFORMATION PROJECT ,#20650 '' y 'B y �S f J 9 L9,. - /!�kT s p9 �� Ff( . , Q ,�.� l AV f' P " 1H OF 'P°% MICHAEL M. ARTi No 1951 9- ky SUR� 44 -1 -D1 EASY LIVING ASSOCIATE'E 468/629 / / SHEET 2 OF 2 CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE C1 2824.79 100.26' 100.26' S 4728'24" W 0702'01" C2 2824.79' 171.14' 171.11' S 45'13'33" W 03'28'16" C3 2824.79' 69.78' 69.78' S 4T40'OB" W 01'24'55" C4 762.13 60.67 60.65' S 48'59'30 W 04'33'40" C5 2824.79' 1 155.83' 155.81' S 5 1'11'14" W 03'09'38" LINE BEARING DISTANCE L1 S 47'58'26" W 34.43' L2 S 47'49'52" W 100.68' L3 S 49'28'27" E 304.27' L4 N 49'34'25" W 310.33' L5 N 47'42'31" E 215.61' L6 S 4925'02" E 94.75 17 N 40'34'25" E 239.86' L8 N 49'24'49" W 64.79' 19 N 49'24'49" W 248.88' L10 N 49'28'13" W 116.43' L71 N 49'23'12" W 109.95' L12 N 40'39'59" E 69.31' L13 S 49'26'16" E 124.94' L14 S 49'25'34" E 319.76' L15 N 4T44'34" E 40.28' L16 N 48'54'26" W 155.23' L17 N 4T41'00" E 201.44' AREA TABULATION PROPOSED B2 ZONING TM 1.113 AC TM 44B -1 -3 0.192 AC TM 44B -1 -3A 0.441 AC 144B-1-2 TM 448 -1 -4 1.126 AC TM 448 -1 -6 (PART OF 0.710 AC TM 44 -1 -8 (PART OF 0.439 AC TOTAL B2 ZONING: 4.021 AC PROPOSED B3 ZONING: TM TM 44-1-8 6 �PART PART OF 14.004 AC. AC. TOTAL B3 ZONING: 15.006 AC. PRESENT OWNER: EASY LIVING ASSOCIATES TM #44B -1 -2 TM #44B -1 -3 TM #44B -1 -3A TM #44B -1 -4 TM #44B -1 -6 TM #44 -1 -B 1.113 ACRES 0:192 ACRES 0.441 ACRES 1.126 ACRES 14.714 ACRES 1.441 ACRES OB 626, PG 810 - DB - 903, PG 244 INST.# 020008972 OB 903, PG 244 DB 438, PG 629 INST.# 060016824 COURSE SHEET FOR PROPOSED REZONING PLAT EASY LIVING ASSOCIATES LAND STONEWALL DISTRICT, FREDERICK COUNTY, VIRGINIA DATE: AUGUST 31, 2006 PRESENT OWNER: EASY LIVING ASSOCIATES PROJECT #20650 2 � MICHAEL M. ARTZ r No. 1951 $/47tlbb S M. ( . 'N O SUR -y0 Artz and Associates, PLC 1 A 5 6 idl f V Ilg E Lmering P LC LV1D sURT1N0 WE) PLAVNI C CEVEIDPHENT 16 Ent Pkcadill Sbeet WINCHESTER, VA 22601 -4740 TEL 540 -667 -3233 FM 540 - 667 -9180 I TOLL MEE 1- 600 - 755 -7320 / W N W N O O v D a `o' J m 0 CD CD O m u, X N N N O W m J m Vl A W N— O m m J m N A W N A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A 44 A A A A A -Cl A A A A W W W W W W W� W fD 07 07 D D D D D D W J 00 O D p p D CO (D J W Co O O - ` N N N N D D D D W p D C D O< � >� D D cn x O 2 < 3 D M A D-i K� z m x� x< z cn m x m M U) m MZ m D O - z< 1) mO� 0 C W f7 =DrjEr� p O m -i- m < Z r- <mm DZNm cnz - > ()� ) G) m0<0 ?)Z { >mmz Z p cn xDx 0- Q. o <M - u D 377. 21 (n �O W OT.OcO mD< CC) r XZ ZED D J Q°Q D�m`p p' CO CAD 0>. > m O0 �y� W m C/7 p < 37 R� nmm — D r �C) p 2 r 7 z m Fn cn m D x Cn < Z D m r m x cn 3 O W m m M O 3 m U) N Am N -+ m (D W J (D M Om ni N N N (n - 0 O N mm (D�A N N N (n N A m N W A m O A N W m W m D M J W Ol co — CO (O W (O izo cn ->OOKK -m K O �g<Ow c Zm DD D X DD >xK M G 0 -0 �� � N rmD zai zpmvzz x1 z ° zz - ° -i CA (A- < m W CA.�.— W - - -- W W D— Z c p C C c C C X z p: G) p ?) m m 31 37 m c G) m O O O G) G) 1) m r z m m m 'om O 7 7 7 7 7 7 D m mm m mm m mzzzzzzmm m m mmzmm mC�C)C)C)OC)mm v v mm0 xxxxxxxxx x x xxxx= mmmmmmmmm m m mmmmm zcAmcAowozz z z zzCAzz m —i � —i ���wm C/) CA CQCn -4 CACA Ommmmmm00 O O OOm00 Z 373)3)37377)zz z z ZZ37ZZ < < < < < < < < < < < < >>>>>>>>> D D D 1 9999 N N N N N N N N N N N N N N N N N N O O N N O N N O O N N N N N N N N N N m m m OOOOOO m m m m m m m m m m N m l m m m O O m O N m W W N 1 W A m m m m m m m m O O O 1 O O N O O 00 O O a �^ � LL•' N y Y _ N qJ O fd 5 r � f �t Xi e xe❑ UO U w �" Q v o w 0 C m CL CD 0 w N N N _ ®n W _ V v M1 3 i / u'i Y F. IN EASY LIVING a GREENWAY ENGIPI M1 1—. n m rs Winchester. Vit'Stnlx 22602 Telephone 54o- 662 -4185 Engineers FAX 540- 722 -0528 S., .1. f W v 4 x� F n A a. e • k m i T tWi n F. IN EASY LIVING a I' STONEWALL MAGISTERIAL DISTRICT FREDERICK COUNTY, VIRGINIA EASY LIVING ASSOCIATES COMMERCIAL CENTER DATE:2007 -03 -23 JJOB NUMBER: 0633 DESIGNED BY: DWE ADJOINING PROPERTY OWNERS MAP SCALE: 1 Inch equals 300 Feet GREENWAY ENGIPI 151 W1nJy Bill Lone 1—. n m rs Winchester. Vit'Stnlx 22602 Telephone 54o- 662 -4185 Engineers FAX 540- 722 -0528 S., .1. m Qroan— ,nq... 4 x� n A a. e N co K v h6 p. .F x n re " eiv 1'H ° YW � 4 N ,u t, �, S m �? ✓`+^I t"f� � �L l p �f�� . .h %vt '�K � iWyC 1Y 'J ^�" ,d9. ss�... , y, x. l "'� 1 t 0 " i'.. 2 t k : t�� s Eul I' STONEWALL MAGISTERIAL DISTRICT FREDERICK COUNTY, VIRGINIA EASY LIVING ASSOCIATES COMMERCIAL CENTER DATE:2007 -03 -23 JJOB NUMBER: 0633 DESIGNED BY: DWE ADJOINING PROPERTY OWNERS MAP SCALE: 1 Inch equals 300 Feet GREENWAY ENGIPI 151 W1nJy Bill Lone 1—. n m rs Winchester. Vit'Stnlx 22602 Telephone 54o- 662 -4185 Engineers FAX 540- 722 -0528 S., .1. m Qroan— ,nq... n A a. k N co I' STONEWALL MAGISTERIAL DISTRICT FREDERICK COUNTY, VIRGINIA EASY LIVING ASSOCIATES COMMERCIAL CENTER DATE:2007 -03 -23 JJOB NUMBER: 0633 DESIGNED BY: DWE ADJOINING PROPERTY OWNERS MAP SCALE: 1 Inch equals 300 Feet GREENWAY ENGIPI 151 W1nJy Bill Lone 1—. n m rs Winchester. Vit'Stnlx 22602 Telephone 54o- 662 -4185 Engineers FAX 540- 722 -0528 S., .1. m Qroan— ,nq... Map Data Source: Frederick County, Va. GIS Department, 2006 Data REZONING APPLICATION 903 -07 EASY LIVING ASSOCIATES Staff Report for the Planning Commission Prepared: April 2, 2007 Staff Contact: Michael T. Ruddy, AICP, Deputy Planning Director This report is prepared by the Frederick County Planning Staff to provide information to the Planning Commission and the Board of Supervisors to assist them in making a decision on this application. It may also be useful to others interested in this zoning matter. Unresolved issues concerning this application are noted by staff where relevant throughout this staff report. Reviewed Planning Commission: 04/18/07 Board of Supervisors: 05/09/07 Action Pending Pending PROPOSAL To rezone 4.02 acres from RA (Rural Areas) District to B2 (General Business) District, and 15 acres from RA District to B3 (Industrial Transition Business) District, totaling 19.02 acres, with proffers (a maximum of 120,000 square feet has been proffered). LOCATION The properties are located on the west side of Martinsburg Pike (Route 11), approximately 600 feet north of the Martinsburg Pike /Old Charles Town Road (Route 76 1) intersection MAGISTERIAL DISTRICT Stonewall PROPERTY ID NUMBERS 44 -1 -B, 4413-1-2,4413-1-3. 44B -1 -3A, 4413-1 -4 and 44B -1 -6 PROPERTY ZONING RA (Rural Areas) PRESENT USE Residential and Vacant ADJOINING PROPERTY ZONING & PRESENT USE North: M1 (Light Industrial) Use: Residential RA (Rural Areas) Residential South: RA (Rural Areas) Use: Vacant East: RA (Rural Areas) Use: Residential/Vacant West: MH 1 (Mobile Home District) Use: Mobile Home Park PROPOSED USES Commercial uses (a maximum of 120,000 square feet has been proffered) 0 0 Rezoning #03 -07 — Easy Living Associates Page 2 April 2, 2007 REVIEW EVALUATIONS: Virginia Department of Transportation: The documentation within the application to rezone this property appears to have significant measurable impact on Route 11. This route is the VDOT roadway which has been considered as the access to the property referenced. VDOT is satisfied that the transportation proffers offered in the Easy Living Associates Rezoning Application dated September 15, 2006 addresses transportation concerns associated with this request. Before development, this office will require a complete set of construction plans detailing entrance designs, drainage features, and traffic flow data from the I.T.E. Trip Generation Manual, Seventh Edition for review. VDOT reserves the right to comment on all right -of -way needs, including right -of -way dedications, traffic signalization, and off -site roadway improvements and drainage. Any work performed on the State's right -of -way must be covered under a land use permit. This permit is issued by this office and requires an inspection fee and surety bond coverage. Fire Marshall: Plan approval recommended. Department of Inspections: No comments. Department of Public Works: 1. Refer to Page 4, Wetlands: A wetlands delineation study shall be performed prior to the master development plan submitted to verify that no upland wetlands exist within the proposed project boundaries. 2. Refer to Page 4, Soil Types: Expand this discussion to include descriptions of the existing karst geology and the potential for sinkhole development. A detailed geotechnical analysis is recommended as part of the detailed site plan design. Frederick - Winchester Service Authority: No comments. Sanitation Authority Department: We have the sewer and water capacity to service this site. Department of Parks & Recreation: No comments. Winchester Regional Airport: We have determined that the proposed development plan will not have an impact on operations at the Winchester Regional Airport. While the proposed site lies within the airport's airspace, it does fall outside of the airport's Part 77 close in surfaces. Historic Resources Advisory Board: It appears that the proposal does not significantly impact historic resources and it is not necessary to schedule a formal review of the rezoning application by the HRAB. According to the Rural Landmarks Survey, there are no significant historic structures located on the properties nor are there any possible historic districts in the vicinity. It was also noted that the National Park Service Study of Civil War Sites in the Shenandoah Valley does identify a core battlefield within this area, but further research displays that this parcel has lost its integrity with respect to historic value. 0 0 Rezoning 403 -07 — Easy Living Associates Page 3 April 2, 2007 Frederick County Public Schools: No comments. County Attorney: It is my opinion that the proposed proffer statement is generally in a form to meet the requirements of the Frederick County Zoning Ordinance and the Code of Virginia, subject to the following comments: 1. In Proffer C.2., staff should determine whether the proffer contained in the second sentence is sufficiently definite. 2. It is not clear to me the relationship between Proffers C.3. and C.6. The staff should review this. 3. In Proffer E., the proffer should provide that the monetary contribution shall be to Frederick County "for ", rather than "directed to" the Clearbrook Volunteer Fire and Rescue Company and County fire and rescue services. In addition, at the end of the second sentence the words "all commercial structures" should be changed to "each commercial structure." It should be noted that I have not reviewed the substance of the proffers as to whether the proffers are suitable and appropriate for the rezoning of this specific property, or whether other proffers would be appropriate, as it is my understand that that review will be done by the staff and the Planning Commission. Plannine Department: Please see attached letter dated January 25, 2007 from Michael T. Ruddy, Deputy Director. Planning & Zonine: 1) Site History The original Frederick County zoning map (U.S.G.S. Stephenson Quadrangle) identifies the subject parcels as being zoned A -2 (Agricultural General). The County's agricultural zoning districts were subsequently combined to form the RA (Rural Areas) District upon adoption of an amendment to the Frederick County Zoning Ordinance on May 10, 1989. The corresponding revision of the zoning map resulted in the re- mapping of the subject property and all other A -1 and A -2 zoned land to the RA District. 2. Comprehensive Policy Plan The Frederick County Comprehensive Policy Plan is an official public document that serves as the community's guide for making decisions regarding development, preservation, public facilities and other key components of community life. The primary goal of this plan is to protect and improve the living environment within Frederick County. It is in essence a composition of policies used to plan for the future physical development of Frederick County. [Comprehensive Policy Plan, p. 1 -1] Land Use The parcel comprising this rezoning application is located within the County's Sewer and Water Service Area (SWSA) and the site is within the limits of the Northeast Land Use Plan. The Northeastern Frederick Land Use Plan generally provides for commercial uses in the vicinity of this site and along Route 11, Martinsburg Pike. The Plan also recognizes the existing industrial zoning surrounding this site and the Developmentally Sensitive Areas (DSA's) which front the 0 Rezoning #03 -07 — Easy Living Associates Page 4 April 2, 2007 site. The application of quality design standards for future development is also an objective of the Plan. Transportation The Eastern Road Plan of the Comprehensive Policy Plan does include this portion of the County. The Northeast Land Use Plan calls for Martinsburg Pike to be improved to a four -lane facility. The Plan also states that proposed industrial and commercial development should only occur if impacted roads function at Level of Service (LOS) Category C or better. The Frederick County Bicycle Plan designates Route 11 as a short-term designated route. Site Access The Northeast Land Use Plan states that individual access to industrial sites should be discouraged along Martinsburg Pike. This development has proffered that one public street entrance and one commercial entrance shall be permitted on Martinsburg Pike from the property. The project proposes additional access enhancements that safely accommodate the existing traffic to the Easy Living Mobile Home Park through the project. Pedestrian accommodations have been provided internally to the project and along the projects frontage with Route 11. 3. Site Suitability /Environment The site does not contain any environmental features that would either constrain or preclude site development. There are no identified areas of steep slopes, floodplains or woodlands. This area is also known for karst topography. The Frederick County Engineer has identified that a detailed geotechnical analysis will be needed as part of the detailed site plan design. 4. Potential Impacts A. Transportation Traffic Impact Analysis. The traffic impact analysis (TIA) prepared for this application assumed 120,000 square feet of a variety of commercial uses and a 16 pump gas station with mart. Using trip generation figures from the I.T.E. Trip G Manual, 7` Edition the proposed rezoning is projected to generate 9,803 average daily trips (ADT). The TIA indicates that Level of Service C conditions or better will be maintained on study roads and intersections with the proposed signalization of Old Charles Town Road and Route 11, for which the Stephenson Village project has proffered the construction. The applicant has proffered the signalization of the main project entrance and Martinsburg Pike. The Traffic Impact Analysis (TIA) distributes approximately 35 percent of the traffic from the site along Route 11 North to the intersection of Routs 11 and Hopewell Road, Route 672, in Clearbrook. Recent TIA's have demonstrated level of service and lane geometry issues at this intersection, the ultimate solution to which has yet to be determined. This application 0 0 Rezoning 903 -07 — Easy Living Associates Page 5 April 2, 2007 participates in providing a solution to achieve acceptable levels of service at this intersection by providing a monetary contribution in the amount of $50,000 that may be used to allow for the development of improvements in the general area of this intersection. This project should be evaluated in relationship with other projects in this area that are currently under various stages of review. Interpareel connectivity should be a consideration with this application. Particular attention was provided to the properties to the west and south of this project. Consideration was also given to potential interparcel connection to the property to the north. However, this interparcel access was not pursued by the Applicant. The properties to the south are likely to encounter entrance spacing issues due to the proposed entrances and anticipated signalization improvements. Interparcel connections through the B -2 commercial property will help facilitate movement within the commercial properties and avoid additional conflicts on Route 11. Interparcel connectivity between the commercial areas, Route 11, and access to the existing mobile home park has been thoroughly provided by the applicant. B. Sewer and Water The FCSA has an eight inch sewer force main adjacent to the Winchester and Western Railroad approximately 1000 feet west of the property to which the Applicants will connect. This commercial development is expected to generate 500 gallons /day /acre for a total of 9,519 gpd. The FCSA has a ten inch water main along Route I 1 and a 20 inch water main adjacent to the Winchester and Western Railroad. This development is expected to generate 1000 gallons /day /acre for a total of 19,020 gpd. The FCSA has stated that they have the water and sewer capacity to service this site. C. Design Standards The project's location on a major corridor and adjacent to an area identified as a developmentally sensitive area warrants particular attention. This attention is provided in the application by a combination of proffered commitments including a proffer to provide a detailed corridor enhancement strip 20 feet in width along the frontage of the property. Included within this strip is a ten foot multi -use trail and landscape plantings. The applicant has also proffered a limitation on the signage on the property by limiting the business signs to one monument sign (15 feet high and 100 square feet in size) for the land uses on the B3 portion of the property and two monument style signs (10 feet high and 50 square feet in size) for the B2 portion of the property. The applicant has further proffered general building material specifications and finally special consideration has been provided to the buffer and screening of the adjacent properties, in particular, any potential preservation of identified wooded areas. D. Community Facilities The development of this site will have an impact on Fire and Rescue Services. However, it is recognized that commercial uses generally provide a positive impact on community facilities through the additional generation of tax revenue. This application does address the impacts to Fire and Rescue services by providing a monetary contribution in an amount of $12,000. 0 0 Rezoning #03 -07 — Easy Living Associates Page 6 April 2, 2007 5. Proffer Statement -Dated September 15, 2006 (Revised March 21, 2007) 1. Generalized Development Plan A Generalized Development Plan has been proffered which identifies the general location of the B2 and B3 zoning districts, the general location of the primary public street system and commercial entrance on Route 11, the general location of the realigned private drive serving the Easy Living Mobile Home Park, and the zoning district buffers. 2. Land Use Restrictions The applicant has proffered the following land use restrictions: a. The prohibition of a variety of uses within both the B2 and B3 zoning districts that will be on the property. b. A limitation on the maximum amount of structural square footage that may be constructed on the property. A maximum of 120,000 square feet of total structure area, 30,000 square feet within the B2 portion of the property and 90,000 within the B3 portion of the property, has been proffered. 2. Transportation The applicant has proffered a limitation on the entrances onto Route 11, the re- alignment of the Easy Living Mobile Home Park access road to the new public street, sidewalk accommodations, and interparcel connectivity. In addition, the applicant proffer includes construction of an additional lane of Route 1 1 along the frontage of the property with the triggered timing of its construction, the signalization of the main entrance to the project, and a monetary contribution in the amount of $50,000 that may be used to allow for the development of improvements in the general area of the intersection of Route 11 and Hopewell and Brucetown Roads. The applicant has also proffered the dedication of an additional ten feet of right -away along the property's frontage of Route 11. 3. Site Design Standards The Applicant has proffered to provide a detailed corridor enhancement strip 20 feet in width along the frontage of the property. Included within this strip is a ten foot multi -use trail and landscape plantings. The applicant has proffered a limitation on the signage on the property by limiting the business signs to one monument sign (15 feet high and 100 square feet in size) for the land uses on the B3 portion of the property and two monument style signs (ten feet high and 50 square feet in size) for the B2 portion of the property. The applicant has also proffered general building material specifications and finally special consideration has been provided to the buffer and screening of the adjacent properties, in particular, any potential preservation of identified wooded areas. 4. Monetary Contribution to Offset Impact of Development This application does address the impacts to Fire and Rescue services by providing a monetary contribution in an amount of $12,000 ($6,000 for the Clearbrook Volunteer Fire and Rescue Department and $6,000 for County Fire and Rescue Services). 0 Rezoning 03 -07 — Easy Living Associates Page 7 April 2, 2007 STAFF CONCLUSIONS FOR 04/18/07 PLANNING COMMISSION MEETING: The land uses proposed in this rezoning are generally consistent with the Northeast Land Use Plan. The application provides a level of sensitivity to the identified Developmentally Sensitive Areas, addresses the appearance of the Route 1 l corridor, and recognizes the transportation improvements identified for this corridor. Further, the impacts associated with this rezoning request appear to have been mitigated by the Applicant. A recommendation by the Planning Commission to the Board of Supervisors concerning this rezoning application would be appropriate. The applicant should be prepared to adequately address all concerns raised by the Planning Commission.