Loading...
HomeMy WebLinkAbout06-07 Traffic Impact AnalysisDece:aber 2006 Shenandoah — Oak Ridge SITE BACKGROUND AND HISTORY The Shenandoah -Oak Ridge Property consists of 52.6 Acres identified by County records as Tax Map Parcel 85- A -273D. The Property is zoned RA (Rural Areas) with other RA zoned properties bordering the site to the West. East and adjacent to the subject Property is the actively developing Shenandoah Age Restricted Community which is zoned R5 (Residential Recreational Community). Currently, Shenandoah is approved for the construction of 2,130 age restricted dwelling units and is served by the Crooked Run Waste Water Treatment Plant which was constructed in conjunction with the approval of the original Shenandoah Master Plan. This application seeks to rezone the Shenandoah — Oak Ridge Property to R5 with a maximum of 160 age restricted single family dwellings to allow the property to develop as an extension of the adjacent age restricted community that is currently under development. Currently, the Property is vacant. The development of the subject site for age restricted residential use would serve as a logical expansion of the community that is currently under development as it would allow for a seamless integration of the subject property with the existing, adjacent R5 zoning. LOCATION AND ACCESS The Shenandoah -Oak Ridge Property is land- locked with other RA zoned parcels separating it from Hudson Hollow Road to the West and the developing age restricted community bounding the Property to the East (See Figure 1). Fortunately, the design of the adjacent community includes a main roadway, Rachel Carson Drive, that fronts the subject Property. Via Rachel Carson Drive, access will be provided to Route 522, Route 277, and Hudson Hollow Road. The Applicant has proffered out the potential for a direct access to nearby Hudson Hollow Road. This provides for the connection to the planned road network within the existing Shenandoah Community and avoids dispersing traffic onto portions of Hudson Hollow Road where the road alignments are less suited for higher traffic volumes. Additionally, the Applicant has proffered to provide a minimum of two connections from the Oak Ridge Property to Rachel Carson Drive in the Shenandoah Community to provide appropriate options for emergency response vehicles. Figure 1 f l r r f \ { 4 r � R 1 '= PrOp3t1d RI 3T BpPiB JDA CD SMA ' � RAaet LanmAnryCaAltlar ��f �� ` _ Rsaidondal Intivc¢ial r� InatrW�onal A • ' � { `�� ReoeaSon f Mxetl -u" OW Planrwd J t Dwwiopm ftt r _ , Eastern Frederick County Long Lange f Land Use Plan V - Nkr ti SHENANDOAH — OAK RIDGE Patton, Harris, Rust &Associates, pc l LONG RANGE LAND USE PLAN 117 E. Picadilly St. Winchester, Virginia 22601 p a VOICE: (540) 667 -2139 FAX: (540) 665 -0493 FREDERICK COUNTY, MGM Figure 2 • i COMPREHENSIVE PLAN The Shenandoah - Oak Ridge Property is located well outside of the Urban Development Area (UDA) and Sewer and Water Service Area (SWSA). As depicted on Figure 2, The UDA and SWSA were established as the intended boundary for residential development by the service area of the Opequon and Parkins Mill Wastewater Treatment Plants. Sewer service to the project would be provided by the Crooked Run Wastewater Treatment Plant which has been constructed as part of the Shenandoah project. As such, the SWSA /UDA concept does not apply to this rezoning application. Instead, the subject boundary is the Crooked Run Service Area. The Crooked Run Service Area was established in 2001 by an agreement between the Frederick County Sanitation Authority, Frederick - Winchester Service Authority, and the previous owner of the 2,130 unit Shenandoah development who still maintains ownership of the retail areas of that project. The subject Property is located adjacent to the Crooked Run Service Area as defined by the 2001 agreement. The Frederick County Sanitation Authority must obtain permission from the developer prior to serving any areas outside of the existing Shenandoah boundaries with sewer service. As the developer of the existing Shenandoah project is the applicant for this rezoning, extension of sewer service by the Crooked Run Treatment Plant to the subject Property will not be an issue. A revised agreement between the FCSA, FWSA, and the developer would expand the current Crooked Run Service Area boundary to incorporate the subject site in accordance with the stipulations set forth in the 2001 agreement between the three parties. The Frederick County Zoning Ordinance requires that R5 communities be a minimum of 500 acres in size and be developed in a carefully planned setting. As the existing R5 zoned Shenandoah Community totals more than 900 acres, incorporation of the 52 acre Oak Ridge Property with the current design of Shenandoah would meet the ordinance requirements. TRAFFIC A traffic impact analysis (TIA) was prepared for this application using composite data collected from other studies in the area as well as actual traffic counts. Using traffic generation figures from the LT.E. Trip Generation Manual, 7 Edition the TIA projects that the proposed development will produce 1,392 vehicle trips per day (VPD). Figure 3 depicts how traffic would enter and leave the site. A connection to Rachel Carson Drive in the Shenandoah Community would allow traffic to safely enter and exit from Route 522, Route 277, -2- Figure 3 0 0 and Route 636 (See figure 4). The connection to Route 522 has already been constructed, with the connections to Route 277 and Route 636 scheduled to be made later in the development process of Shenandoah. The TIA indicates that several transportation improvements would be necessary in order to accommodate a level of service (LOS) C or better for the subject intersections assuming a 2015 buildout. These improvements include additional turn lanes at the intersections of Route 277 /Route 636 and Route 277 /Route 522 as well as an additional West bound through lane for Route 277. It is important to note that Background traffic alone warrants every transportation improvement mentioned above as the development generated traffic represents less than 7% of the Background traffic. In recognition of the impact the subject development will have on the transportation system, the Applicant has proffered $500.00 per residential unit for transportation improvements within the vicinity of the site. This money could be used towards the transportation improvements warranted as a result of Background traffic alone. SITE SUITABILITY The site does not contain conditions that would preclude or substantially hinder development activities. The following table provides an area summary of environmental features: Shenandoah -Oak Ridge Property Environmental Features Total Project Area 52.6 acres Area in Flood Plain 0.0 acres 0.0% Area in Steep Slopes 0.0 acres 0.0% Area in Wetlands TBD TB Lakes & Ponds 0.0 acres 0.0% Flood plain data for the subject parcels is delineated on the Flood Insurance Study Map for Frederick County prepared by the U.S. Department of Housing and Urban Development, Community Panel #510063- 0200B, effective date July 17, 1978. The site is located in Flood Zone C, which denotes areas of minim flooding outside of the 100 -year flood plain. Flood Zone A, 100 - year flood plain, exists coincident with the West Fork of Crooked Run, though this area is located immediately west of the subject site's Southwest boundary. The General Soil Map of the Soil Survey of Frederick County, Virginia indicates that the soils comprising the subject parcels fall under the Weikert - Berks - Blairton soil association, with the particular geology identified by the Soil Survey as Berks channery silt loams with slopes ranging -3- ar 0 LV l kT t D a SHENANDOAH — OAK RIDGE Patton, Harris, Rust & Associates, pc GENERALIZED DEVELOPMENT PLAN 117 E. Picadilly St. Winchester, Virginia 22601 p V a VOICE: (540) 667 -2139 FAX: (540) 665 -0493 fREDER/CK COUNTY, ORG/N61 Figure 4 • from 3% to 25% on the Eastern half of the Property and Weikert -Berks channery silt loams with slopes of 25% to 65% to the West. Such geology is prevalent on land located east of Interstate 81 and is not identified as prime farmland by the Frederick County Comprehensive Plan. The site is predominantly wooded and no history of agricultural use has been identified. The Property is located within the Stephens Run drainage area. The site has a high elevation of 695.0 feet with a low elevation of 605.0 feet. A ridgeline tins from north to south roughly along the center of the property. Drainage flows West of the ridge line to the West Fork of Crooked Run and East of the ridge line towards Lake Frederick (See Figure 5). The National Wetlands Inventory does not identify any wetlands on the Shenandoah -Oak Ridge Property, however any potential wetlands would be identified by a wetlands delineation as part of the Master Plan phase of the project. No lakes or ponds are located on the Property. No area of the Property contains slopes that are greater than 50 percent according to 5 foot contour data. The engineering phase of the project will examine contour data at a closer scale (2 foot) and determine if any steep slopes exist along the western and southern boundary of the Property. The topography of the site lends towards incorporating the steeper slopes found west of the aforementioned ridge line into the required 30 percent open space for the project. SEWAGE CONVEYANCE AND WATER SUPPLY Sewer Service will be provided by connection to the lines planned for the Shenandoah Age Restricted Development to be treated at the Crooked Run Treatment Plant. Using a standard rate of 200 gallons per day /dwelling unit, it is projected that the proposed development would produce 32,000 gallons of sewer flow per day. The Crooked Run plant was designed to treat up to 375,000 gallons per day and is currently permitted for 250,000 gallons per day. Should future needs dictate an expansion of the treatment plant, it is possible for the plant to be permitted to treat up to 600,000 gallons of water per day. Water service will be provided by looping a line from the Shenandoah Community through the Oak Ridge Property. Water consumption for the project will be roughly equivalent to the projected sewage generation of 32,000 gallons per day. -4- v .A •fyfi � �� r �" Figure 5 0 SOLID WASTE DISPOSAL FACILITIES The following table shows a projection of solid waste generation as a part of this project. Unit Type Units Waste Generation Total Waste lbs Single Family ( Age Restricted 160 9 lbs /day 1,440 Proffered curb -side pickup will be an improvement to solid waste issues associated with increased dumpster use in the County. HISTORIC SITES AND STRUCTURES The Frederick County Rural Landmarks Survey does not identify any potentially significant structures on the subject acreage or within close proximity of the properties. The subject properties are not located within the study boundary or core area of any identified Civil War battlefield. IMPACT ON COMMUNITY FACILITIES The Applicant has proffered in accordance with the newest Frederick County Fiscal Impact Model to mitigate the projected fiscal impact on community facilities attributable to the proposed rezoning. In addition to these proffers, the Applicant has proffered $2,000.00 for each single family detached dwelling unit and $1,000.00 for each single family attached dwelling unit towards ttansportation 1 0 improvements in the general vicinity of the site. • Fire and Rescue: • General Government: • Public Safety: • Library: • Parks and Recreation: Single Family Detached $790.00 per unit $320.00 per unit $671.00 per unit $372.00 per unit $2,239.00 per unit Single Family Attached $583.00 per unit $245.00 per unit $513.00 per unit $285.00 per unit $1,712.00 per unit TOTAL: $4,392.00 per unit $3,338.00 per unit -5- 0 0 A Traffic Impact Analysis of the Shenandoah — Oak Ridge Property Located in: Frederick County, Virginia Prepared for: Oxbridge Development 600 Jefferson Plaza, Suite 550 Rockville, MD 20852 Prepared by: Patton Harris Rust & Associates, pc Eng neers. Surveyors. Planners. Landscape Architects. PH y-� ♦ 10212 Governor Lane Boulevard Suite 1007 JJJ @ LLL� ` \ i Williamsport. Maryland 21795 T 301 .223.4010 • F 301.223.6831 January 12, 2007 0 9 OVERVIEW Report Summary Patton Harris Rust & Associates (PHR +A) has prepared this document to present the traffic impacts associated with the proposed Shenandoah — Oak Ridge Property development located along the southwest quadrant of the intersection of Route 277 & Route 340/522, in Frederick County, Virginia. The proposed project is to be comprised of 160 single- family attached units. Access is to be provided via three (3) site - driveways located along Double Church Road (Route 636), Route 277 and Route 340/522, respectively. The project is to be built -out over a single transportation phase by the Year 2015. PHR +A has performed traffic analyses for existing, 2015 background (without development) and 2015 build -out (with development) conditions. Figure 1 is provided to illustrate the location of the proposed Shenandoah — Oak Ridge Property with respect to the surrounding roadway network. Methodology The traffic impacts accompanying the Shenandoah — Oak Ridge Property development were obtained through a sequence of activities as the narratives that follow document: • Assessment of background traffic including other planned projects in the study area, • Calculation of trip generation for the proposed Shenandoah — Oak Ridge Property, • Distribution and assignment of the Shenandoah — Oak Ridge Property development - generated trips onto the completed roadway network, • Analysis of capacity and level of service using Synchro software for existing and future conditions. PH R clmoac7Anahsis of the Shenandoah -Oak Numb 1 P rove 142 -1-8 � 1Y Project Numbcr: 1 3 1 42 -1 -8 January 12, 2007 Page I E No Scale �y. Lakc', Ftodcri SITE :F \- Figure 1 Vicinity Map: Shenandoah -Oak Ridge Property, in Frederick County, VA P � ATraffic Lnoacr Analysis of the Shenandoah-Oak e 1 142-- 8 Project Numb r. 13142 -1 -8 January 12, 2007 Page 2 0 0 EXISTING CONDITIONS PHR +A conducted AM and PM peak hour manual turning movement counts at the intersections of Route 277 /Double Church Road (Route 636) and Route 277 /Route 340- 522. ADT (Average Daily Traffic) was established along each of the study area roadway links using a "k" factor (the ratio of PM peak hour traffic volumes to 24 -hour traffic volumes) of 8.8 % based on the published Virginia Department of Transportation (VDOT) traffic count data. Figure 2 shows the existing ADT (Average Daily Trips) and AM/PM peak hour traffic volumes at key locations throughout the study area roadway network. Figure 3 illustrates the respective existing lane geometry and levels of service. All traffic count data and Synchro levels of service worksheets are included in the Appendix section of this report. PHR +A has provided Table 1 to show the existing levels of service and 95` percentile back of queue for each study area intersection. P A Traffic Impact Anahsis of the Shenandoah -Oak Ridge 1 142-1 8 Project Num r: 13142 -1 -8 January 12, 2007 Page 3 0 No Scale T A (3 (131)51 i ® 22(75) _ 328 (410) a N - 35(106) N N N v V 1 43(96) e I 4-M 40 0(SSS) e g N (4493 �I 4) 3 4 )393 1 ( 9 • 1 v, n wl °na Dogwood Sit e_Drive SITE 0 cr _Site�Dri�_ #1 a _u 7 O ai Average Daily4Tiips Figure 2 Existing Traffic Conditions P A Traffic Impact Analysis of the Shenandoah -Oak Ridee Property Project Number: 13142 -1 -8 January 12, 2007 Page 4 0 0 No Scale n� a� Signalized Intersection LOS =B(B) Signalized Intersection LOS =C(C) Figure 3 Site -Drive kl��_ r Denotes Free -flow condition AM Peak Hour (PM Peak Hour) (x) AM Approach LOS (PM Approach LOS) Existing Lane Geometry and Levels of Service P IJ l �l l ATraFFc Impact Analysis of the Shena ber: 1 31 2 -1 L l Project Number: 13142 -1 -8 January 12, 2007 Page 5 0 0 Table 1 Shenandoah - Oak Ridge Property Levels of Service and Back of Queue (95 %) Results Existing Conditions Intersection Traffic Control Lane Group/ A proach AM Peak Hour PM Peak Hour LOS Back of Queue LOS Back of Queue EB/L B 22.0 B 53.0 EB/T B 192.0 B 209.0 EB /R A 20.0 A 31.0 EB LOS B B WB/L B 22.0 B 51.0 Route 277 & Double Church Road Signalized WB/TR B 216.0 C 327.0 WB LOS B C NB/- NBrrR B A 103.0 1 40.0 C B 106.0 1 115.0 NB LOS B B SB/L C 69.0 C 86.0 SB/TR r B 59.0 C 161.0 SB LOS C C Overall LOS B B EB/LT C 546.0 C 1 440.0 EB/R A 1 13.0 A 23.0 EB LOS C C WB/L B 60 B 1 102 WB/TR B 392.0 C 539.0 WB LOS B C NB/L D 96.0 D 70.0 Route 277 & Route 340/522 Signalized NBfr NB/R D 133.0 D 56.0 Free -flow condition NB LOS C B SB/L. C 119.0 C 223.0 SB/T C 48.0 C 143.0 SB/T SB/R Free -flow condition NB LOS C C Overall LOS C C * Assumed 25 feet Vehicle Length EB = Eastbound, WB = Westbound, NB = Northbound, SB = Southbound L Left, T:Thru, R: Right P � ATraffic Impact Analysis of the Shenandoah -Oak Numb 1 142-1 8 Project Number: 13142 -1 -8 January 12, 2007 Page 6 E 2015 BACKGROUND CONDITIONS 0 In order to establish the 2015 base conditions, PHR +A applied a conservative growth rate of 7% per year (compounded annually) to the existing traffic volumes coming fronYgoing to south of Route 340/522 and 5% growth rate (compounded annually) to all other traffic movements, respectively. Additionally, PHR +A included specific future developments located within the vicinity of the proposed site. Using the 7 th Edition of the Institute of Transportation Engineers' (ITE) Trip Generation Report PHR +A has provided Tables 2a and 2b to summarize the 2015 "other developments" trip generation. Figure A is provided in the Appendix section of this report to show the location of the background developments. Figure 5 shows the 2015 background ADT and AM/PM peak hour traffic volumes at key locations throughout the study area. Figure 6 shows the respective 2015 background lane geometry and AM/PM peak hour levels of service. All Synchro levels of service worksheets are included in the Appendix section of this report. PHR +A has provided Table 3 to show the levels of service and 95 percentile back of queue for each study area intersection during 2015 background conditions. Table 2a 2015 "Other" Background Development: Shenandoah Trip Generation Summary Code Land Use Amount AM Peak Hour In Out Total In PM Peak Hour Out Total ADT Frederick County ADT 230 Townhouse /Condo 52 units 5 25 31 24 251 Elderly Housing - Detach 1,640 units 118 192 310 225 144 369 5,838 252 Elderly Housing - Attach 450 units 16 20 36 30 19 50 1,566 560 Church 10,000 SF 4 3 7 3 3 7 91 590 Library 10,000 SF 6 2 8 34 37 72 739 710 Office 100,000 SF 165 23 188 32 158 191 1,334 732 United States Post Off. 10,000 SF 42 38 80 56 53 109 1,082 820 Retail 140,000 SF 117 75 192 375 406 782 8,451 Sub -Total 467 353 820 756 822 1,578 19,101 Clarke County 251 Elderly Housing - Detach 140 units 14 23 37 38 24 63 721 253 Congregate Care 100 units 4 2 6 9 8 17 202 252 Elderly Housing - Attach 200 units 7 9 16 13 9 22 696 Sub -Total 25 34 59 61 41 102 1,619 Total Shenandoah Tripsl 492 387 879 1 817 863 1,680 1 20,720 Table 2b 2015 "Other" Background Development: Dogwood Trip Generation Summary Code Land Use Amount AM In Peak Out Hour Total PM In Peak Hour Out Total ADT 230 Townhouse /Condo 52 units 5 25 31 24 12 35 452 255 Retirement Community 160 units 18 10 29 33 35 68 450 Total Trips 24 36 59 56 47 103 902 P IJ i tl t A Traffic Impact Analysis of the Shenandoah- Oak ber 1 142 -1-8 1 11 Project Number 13142 -1 -8 January 12, 2007 Page 7 0 0 No Scale v i Ak (6;7j1 S\ %2 ,' 8� * **10 %-139(86) 4 aQ -o(o) Site- Y � Drive 0 `r -+- 78 5(10; 74 (123) a N Q ice3vrive #1 (216)97 (3 )135 ry s AM Peak Hour (PM Peak Hour) Figure 4 3 q(176 76 (777) 54 164) 1\ 1 y n � o 0 2015 Background Traffic Conditions P � ATraffic Impact Anahsis of the Shenandoah -Oak R : 1 142 -1-8 ' Project Numb 13142 -1 -8 January 12, 2007 Page 8 o co 22 2(149) 6 70(947) y ( ♦py '225(400) (775 )648 e (132)39 Y Y w N o b e} e-I ^J t7 x U v n h a Dogwood Site-Drive S �� _ (31)23 ma� q g p n (16)13 �, tl tl � o y a Q a b O O rl Si te -Drive #1 O a ice3vrive #1 (216)97 (3 )135 ry s AM Peak Hour (PM Peak Hour) Figure 4 3 q(176 76 (777) 54 164) 1\ 1 y n � o 0 2015 Background Traffic Conditions P � ATraffic Impact Anahsis of the Shenandoah -Oak R : 1 142 -1-8 ' Project Numb 13142 -1 -8 January 12, 2007 Page 8 0 0 — •'Suggested Improvements" ' h ER - ]heft' l'I'hro WR -1 UN I Thra & U 1 Right C(A)_ . No Scale Q o U ��'� (C) (C) L D(D) (D)D �« (A)A - CI'.0 > Signalized Signalized Si ' li, �' Intersection Intersection =+o LOS =C(F) LOS =G(C)._.. --- - - -- n A� 1 R oute277 e�A(s) (C) Ilk (� (D) e U� D U A)A (8 7A �qf S C(F) A)q� ■� F Q 0 l Signaized U Q (h7F (8)A E` W Signalized iiiASSS Intersections p v Intersection LOS =A(B) LOS =F(F) *f8l@ Unsignalized S} Intersection r° eL^ ri - Unsignalized a SSITE Wood Intersection ATE Site•Drive `(D)C - -_ • - "suggested ` a Improvements" U " W6-1 Right - I Rig Q fj U N6 Right Q y U ( RR 1 Right Site -D nve #1 1 f�l I B)A njn� 19 Signalized y ` •y) U , Intersection �" H f .�.. i r t S(gnali ed_ I �UV - LOS =A(B) vN, Intersection U LOS =C(C) Denotes Free -flow condition * Denotes Unsignalized Critical Movement AM Peak Hour (PM Peak Hour) nr ry +n (x) AM Approach LOS (PM Approach LOS) T Figure 5 2015 Background Lane Geometry and Levels of Service P l l ATrafRc Impact Analysis of the Shenandoah-Oak Prone rty Project Number: ber: 1 13142 -1 -8 January 12 T , Page age 9 9 9 0 Table 3 Shenandoah - Oak Ridge Property Levels of Service and Back of Queue (95%) Results 2D15 Background Conditions (w / suggested improvements) TnfBC Intersection Loos, Approach AM Peak Hour PM Peak Hour Qtocue Rack of Que EB/L A 31.0 B 82.0 EB/T C 4900 D 6350 EB/R A 31.0 A 45.0 ER LOS C C WB/L B 30.0 D 166.0 WBa WB(I B 181.0 1 C 2640 Route 277& Double Church Road Signalised WBB A 250 A 32.0 Vt%LOS B C NB /L NB/r C C 241.0 620 D C 290.0 139.0 NB /R A 31.0 A 55.0 NB LOS C C - 7B - /L -- 7 - F - 93 0 C 99.0 SBU C 680 D 159.0 SB/R A 1 430 B 640 SB LOS C C Overall LOS C C EB /L D 181.0 D 113.0 EB/r EB/r C 2520 D 3230 EBB A 250 A 46.0 EB LOS C C 75 -/L WB/L D 104 D 203 WRIT WRIT C 253.0 C 410.0 WBB A 50.0 A 400 Route 277 &Route Signalised WB LOS C C 3401522 MUL, C 91.0 D 760 NB? NBrI D 1 2450 E 159.0 1 NB /R Free Bow condition NB LOS I C C S9/L C 131.0 D 3310 SB/r Spa C 98.0 1 D 3240 1 SBB Free -0owcanditi on NB LOS C C Overall LOS C C EB /LR B 25.0 D 1 250 NB/L A 25.0 B 250 Route 340'522& DogwoodDrise Uusistalissd NB/f NB/r - - - - SRU SB ?R ER/L B 630 C 151.0 EBB A 36.0 A 58.0 EB LOS B B NB/L A 44.0 B 159.0 Route 34W522& Signalized NRn' NB/fl A 103.0 A 550 No LOS A B Site -Drive al SEV'r SB/1 B 87.0 C 3150 SB /R A 29.0 A 44.0 SR LOS B C Overall LOS A B EleT A 301.0 B 4500 EB /R A 250 A 25.0 EB LOS A B -- TB/L - A 1 32.0 C 129.0 Route 277 &Site- Signalised WBa B 305.0 C 1 7770 WB LOS A C Drive M2 mot, C 53.0 C IND NB /R A 290 A 42.0 NB LOS B B Overall LOS A C Double Church WB/LR B 250 B 250 Rased & Slte Drive Unsigualixd NB/IR - - - - #3 1 S&l.T A 25.0 A 25.0 • Assumed 25 feet Vehicle Length EB = Eastbound, WB =Wcho ound. NB = Northbound, SR = Southbound L Lea, T:Tuu, R: Right Minimum queue length is assumd to M 25 feet PW A Tragic Impact Analvsis of the Shenandoah -Oak r Property Project Numb : 1 13142 -1 -8 January 12, 2007 Page 10 0 TRIP GENERATION 0 PHR +A determined the number of trips entering and exiting the site using equations and rates provided in the 7 Edition of the Institute of Transportation Engineers' (ITE) Trip Generation Report Table 4 is provided below to summarize the trip generation associated with the proposed Shenandoah — Oak Ridge Property development. 'Cable 4 Proposed Development: Shenandoah • Oak Ridge Property Trio Generation Summary TRIP DISTRIBUTION AND TRIP ASSIGNMENT The distribution of trips, shown in Figure 6, were based upon local travel patterns for the roadway network surrounding the proposed Shenandoah — Oak Ridge Property development site. Figure 7 shows the respective development - generated AM /PM peak hour trips and ADT assignments. 2015 BUILD -OUT CONDITIONS Shenandoah — Oak Ridge Property development assigned trips (Figure 6) were added to the 2015 background traffic volumes (Figure 4) to obtain 2015 build -out conditions. Figure 8 shows the 2015 build -out ADT and AM/PM peak hour traffic volumes at key locations within the study area. Figure 9 shows the respective 2015 build - out lane geometry and AM /PM peak hour levels of service. All Synchro levels of service worksheets are included in the Appendix section of this report. Table 5 shows the levels of service and 95 percentile back of queue for each study area intersection during 2015 build -out conditions. P � A Traffic Impact Analysis of the Shenandoah -Oak Pro Project Number. ber: 1 13142 2 -1 -8 January 12, 2007 Page 11 AM Peak Hour PM Peak Hour ADT Code Land Use Amount In Out Total I In Out Total 230 Townhouse/Condo 160 units 13 62 75 59 29 88 1,392 Total 13 62 75 59 29 88 1.392 TRIP DISTRIBUTION AND TRIP ASSIGNMENT The distribution of trips, shown in Figure 6, were based upon local travel patterns for the roadway network surrounding the proposed Shenandoah — Oak Ridge Property development site. Figure 7 shows the respective development - generated AM /PM peak hour trips and ADT assignments. 2015 BUILD -OUT CONDITIONS Shenandoah — Oak Ridge Property development assigned trips (Figure 6) were added to the 2015 background traffic volumes (Figure 4) to obtain 2015 build -out conditions. Figure 8 shows the 2015 build -out ADT and AM/PM peak hour traffic volumes at key locations within the study area. Figure 9 shows the respective 2015 build - out lane geometry and AM /PM peak hour levels of service. All Synchro levels of service worksheets are included in the Appendix section of this report. Table 5 shows the levels of service and 95 percentile back of queue for each study area intersection during 2015 build -out conditions. P � A Traffic Impact Analysis of the Shenandoah -Oak Pro Project Number. ber: 1 13142 2 -1 -8 January 12, 2007 Page 11 0 0 No Scale t Figure 6 Trip Distribution Percentages P ATraffic Impact Analvsis of the Shenandoah -Oak Ridee Propertv Project Number: 13142 -1 -8 January 12, 2007 Page 12 0 0 No Scale 9 (4) 9) �I � �h it' 2(9) L � � ev �l� X3(6) ](6) (3)3..R (3)6 ur a �o v �n Dogwood Site -Drive V 1 ® 6(3) lr Site - Drive t Figure 7 Development - Generated Trip Assignments SITE �o M N Un _v 0 0 AM Peak Hour (PM Peak Hour) 1 h n 1 P � A Traffic Impact Analysis of the Shenandoah-Oak Ride Property Project Number: 13142 -1 -8 January 12, 2007 Pave 13 0 0 No Scale 4� J 1� (6 3)S S6 (29 ) 9S9 58316) 54 ( 1 64) 2) o h h j / ®785 (1078) x (S � N Dogwood (131)76 a 1 r t - � b B� f Q 1 ( q g _ (16)13 tl Y te r, C w 22 2(149) 67 1(953) 1( X (99)153 (778)655 I jr (132)39 T 7 M n n o SITE ® 45(89) wl�0o(o Site. Drive 0 0 V Q [n G7 Figure 8 2015 Build -out Traffic Conditions M h u 7 a M Peak Hour (PM Peak Hour) 1 t P � ATrafficlmnact Analysis ofthe Shenandoah -Oak Ri Project Numbe : 1 13142 -1 -8 8 January 12, 2007 Page 14 Dogwood o t - Site -Driv B� f 1 ( q g _ (16)13 tl Y a o ^' a N P � ATrafficlmnact Analysis ofthe Shenandoah -Oak Ri Project Numbe : 1 13142 -1 -8 8 January 12, 2007 Page 14 0 0 No Scale Signalized $< n Intersection In n LOS =C(E) (t7j - g ( ?)A Improvements" r.B -1 Left' 1 Tbru B - 1 Left, 1 Thru I Rieht 3� t ! /e277 ��A(C (C) a r / e �� II � � Rn cN e� D(F) ( � U i t _ Signalized v (B)A ^ ^ Signalized d�1 Inter sectionC p - ^ Intersection z LOS =A(C) cz �" LOS =F(F) Unsignalized _ !t Intersection i I V r' Unsignalized Intersection SITE D o gwood � Site -Drive [ r 'Suggested U Improvements" WB-1 -I Rig Right NR 6 J - 1 Right SR . I Right Signalized y Intersection T LOS =A(B) - u Figure 9 2015 Build -out Lane Geometry and Levels of Service P 1 Denotes Free-flow condition * Denotes Unsignalized Critical Movement AM Peak Hour (PM Peak Hour) (x) AM Approach LOS (PM Approach LOS) AA Traffic Impact Analysis of the Shenandoah -Oak Ridge Proyeer�Impact Anatvsis of the Shenandoah -Oak Ridge Proyeerry Project Number: 13142 -1 -8 January 12, 2007 Page 15 0 0 Table 5 Shenandoah - Oak Ridge Property Levels of Service and Back of Queue (95 %) Results 2015 Build -out Conditions (w/ suggested improvements) INerser0on Traffic Control Lane AM Peak Hour PM Peak Hour OS Raek or Queue LOS Ifack of Queu f A 3LO B 82A C 493.0 D 649.0 A 32.0 A 46.0 ER LOS C C WB/L B 30.0 D 169.0 WHO WB? B 1830 1 C 265.0 Rome 271 & Double Chueh Road Signalized �"R A 25.0 A 320 N'BLOS B C NB/L NB C C 250.0 62.0 D C 291.0 139.0 NBIR A 31.0 A 550 NB LOS C C SB/L C 830 C 99.0 Sea C 680 D 1590 SB /R A 430 B 640 SB LOS C C Overall LOS C C EB /L D 1860 D 11]0 EB/r Ella C 256.0 D 326.0 EB/R A 25.0 A 47.0 Ell LOS C C WB/L WB/L D 104 D 207 WBO' WBR C 254.0 C 4150 WB/R A 580 A 40.0 Rome277 &Rouen Signalized WBLOS C C NBh C 91.0 D 7610 340/522 NBO NB? D 2530 E 175 0 NB/R Free- flowronditi on NB LOS C C SB/L C 131.0 D 320.0 SBO' SB? C 990 D 332.0 I SB /R FmnOow condition NB LOS C C Overall LOS C C EB/LR B 250 D 260 NBA- A 25.0 B 25.0 Route 340/522& DogwocdDrivc Unsignalized NB? NB/r SIVf SBOR EWL B 71.0 C 167.0 EB /R A 39.0 A 63.0 Ell LOS B B NB/L A 45.0 C 1810 Route 340522& Sigralizd Nita NB/f A 1 103.0 A 1 55.0 Sim -Drive pl NB LOS A B SB? SBO B 87.0 C 3150 SBM A 29.0 A 460 SR LOS B I C Overall LOS A B A 305 0 H 450 0 A 25.0 A 25.0 A B A 30.0 C 140.0 Route 277 &Site- ANB A 310.0 C 7770 Wit A C Drive #2 C 620 C 108.0 A 31.0 A 43.0 B B Overall LOS A C Double Chush W1 'L" B 25.0 B 25.0 Road &Sim -Drive UnsignelizM NB/IB - - - - 1 N3 SB/LT A 250 A 25.0 Assumed 25 fat V chick Length EB = Eastbound. We = Wcutound, NB = Nonhhound, SB = Saelihound L: Left, T:Tha, R: Right Minimum queue k.& is mmmM to be 25 tent P L_J l �l ` P A Traffic Impact Analysis of the Shenan Oak 13142 -1 8 l l Project Number. 13142 -1 -8 January 12, 2007 Page 16 0 CONCLUSION The traffic impacts associated with the proposed Shenandoah — Oak Ridge Property development are acceptable and manageable. Assuming suggested improvements, all the study area intersections will maintain approach and overall levels of service "C" or better during 2015 build -out conditions. The following describes the suggested roadway improvements for each of the study area intersections during 2015 build -out condition as shown in Figure 9. • Route 277 /Double Church Road (Route 636) This intersection will require a westbound thru and right -turn lane, a northbound right turn lane and a southbound right -turn lane to maintain acceptable levels of service during 2015 background and build -out conditions. • Route 277 /Route 340 -522 This intersection will require an eastbound left-tum and thru lane and a westbound left -turn, thru and right -turn lane to maintain acceptable levels of service during 2015 background and build -out conditions. • Route 340- 522/Site -Drive #l : This is a new intersection. It will require traffic signalization and separate turning lanes in all directions to maintain acceptable levels of service during 2015 background and build -out conditions. • Route 277 /Site -Drive #2 : This is a new intersection. It will require traffic signalization and separate turning lanes in all directions to maintain acceptable levels of service during 2015 background and build -out conditions. • Double Church Road (Route 636) /Site -Drive #3 This is a new intersection. It will maintain acceptable levels of service with unsignalized intersection and shared lanes in all directions during 2015 build -out conditions. • Route 340 - 522 /Dogwood Site -Drive This is a new intersection. It will maintain acceptable levels of service with unsignalized intersection during 2015 build -out conditions. P �l l A Traffic lrnnact Analysis of the Shenandoah-Oak e l l mbe r: 1 13142 -1 142-1 P roject Nu -8 8 January 12, 2007 Page 17 0 No Scale )!,d rick A Figure A Vicinity Map: Location of Background Developments 0 Shenandoah - Oak Ridge 3: Route 277 & Route 340/522 Existing_AM 1/12/2007 on aa[a.r,iow 2.0 2.0 ^ 2:0 ..' 2.0 ,' , s2i0' _'- 2'0 `:2 0 2:0 ; '2.0 Lead /Lag Lag Lag LanelGroup'. - EBL_{EBT "EBR WBI- W_BT WBR,_NBL_vNBT�'NBR_SBL,,: 1.00 1.00 S_BR Lane Configurations IdeabFlow (vphpl) Storage Length (ft) Storag Lanes Total Lost Time (s) Y _ .1 _ 0 0 ^ 4.0 1900 _ 4.0 7� 1900 200 1 4.0 1 300 _? 4.0 1900 _ ..� 4.0 1 0 _0�'' 4.0 �__ 1 900 300 1 4.0 tt -1900 4 .0 __ i!_ 1900 0 _ _t. 4.0 _ _ 00 �, -_ 19 150 1 1900 tt 4.0 _,_ _1900 _r _ 0 1i 4.0 Leadin Detector (ft)'_ Traili Detector (ft) 50 0 50 0 50 0 .. 50 0 - 50 0 5G 0 50 0 _ _ 50 0 _4.0 50` 0 =_ _ 50 X50 0 Turriin-' Speed (mph)_ .:Min, 4145 5282 tTravel.Tim (s) 43.5 142.5 49.8 �0 11'18 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1. 1.00 0.95 1.00 Fr: . _ 215 6850 115 0:960 28 PeaKHour Factor 0.90 0.850 0.90 0:90 0:85 Flt Protecte '0:90 0.991 0:90' 0.950 oi90 01.90 0.950 9% 9% 0.950 9% 9% Setd: Flow- (prot)_ _ 0 1727 1482. 1656 . 0 1583 :3167 141 . 1583', 3 167. 1417: Flt Permitted , ,'68 0.732 181. 0.290 103`. 31 0.687 0 530 0.393 103 603 on aa[a.r,iow 2.0 2.0 ^ 2:0 ..' 2.0 ,' , s2i0' _'- 2'0 `:2 0 2:0 ; '2.0 Lead /Lag Lag Lag Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Link•Speed (rnpl) ..Yes 45 Vehicle Extens (s) 45 3.0 3.0 1 50 3.0 3.0 50 L ink Distance (ft) Redalll Mode, 7426 None . None= 7377 None .:Min, 4145 5282 tTravel.Tim (s) 43.5 142.5 49.8 15.5 11'18 89.9 29.0 29.6 89.9 565 0:48 72.0 ,:'1 Volume (vph) 84 393 18 93 400 143 61 215 163 115 93 28 PeaKHour Factor 0.90 0.90. 0.90 0:90 0.90 0:90 '0:90 .0:90 0:90' 0:90 oi90 01.90 Heavy Vehicles ( %) 9% 9% 9% 9% 9% 9% 14% 14% 14% 14% 14% 14% A..j :;Flow (Vpf p 93:' 437 20) v 103103 444 159 , ,'68 .• 239 181. 128' 103`. 31 Lane Group Flow (vph) 0 530 20 103 603 0 68 239 181 128 103 31 Tul rhT Perm Perm , pm + pt : Perm :.. Free pm + pt. Free Protected Phases 2 1 6 8 7 4 Permitted "Rnases 2' 2`.° 6 8 - Free : :4r , Free Detector Phases 2 2 2 1 6 8 8 7 4 Minimum Initiat 4:0 4.0 - 4.0 2.0 4.0 4 4.0 2.0 ;4.0 Minimum Split (s) 10.0 10.0 10.0 8.0 1 0.0 10.0 10.0 8.0 10.0 Tol tal,S plit - ,(s) 65.0' '65i0a 85� 0' '° 9:0 x.74.0 ' •0.0, ' 22.0 ',22.0 0:0 '24:0 '46.0. & .. -Q Total Split ( %) 54.2% 54.2% 54.2% 7.5% 61.7% 0.0% 18.3% 18.3% 0.0% 20.0% 38.3% 0. 0% Mani numeGreen (s) 59.0'. 59:0 590 ' 3:0' 68 16.0 . 16:0. 18.0 .40.0 Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All =Red Time (s 2.0 2.0 ^ 2:0 ..' 2.0 ,' , s2i0' _'- 2'0 `:2 0 2:0 ; '2.0 Lead /Lag Lag Lag Lag Lead Lag Lag Lead Lead' -La O ptimized Yes Yes Yes Yes Yes` ..Yes Vehicle Extens (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Redalll Mode, None None . None= None None .:Min, Act Effct Green (s) 43.5 43.5 48.8 49.8 15.5 15.5 89.9 29.0 29.6 89.9 Actuated g /C Ratio 0:48 0.48-• 0:53 0.55 = 0:17 0f17 1:00 0.31 , 0.33 1 -.00 v/c Rat 0.86 0.03 0.30 0.64 0.34 0.44 0.13 0.36 0.10 0.02 Contr&Dela 29:2 6:0- 12.8'. 115:9 - _ . 46 _ 7. .0:2 27 :9 246 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total`Dela 292, 6.0 1 88 15.9 46:3' :42:7 0 „�2 27:9 24 6 ,` ` 0.0 LOS C A B B D D A C C A Ap proach Dela 28:3, � X15.4 27 4 _ Approach LOS C _ -_ B C C Baseline Patton Harris Rust & Associates Synchro 6 Report Pagel 0 0 Shenandoah - Oak Ridge Existing.AM 3: Route 277 & Route 340/522 1/12/2007 --p. (- *-- 'I- -*\ 4/ 90th - 0 /.ilb Green s)__ 59T 590 -7 59.0 - 3.0 68.0 90th %ile Term Code Max Max Max Max Hold 70th E: `�9.6­9 — 0 - 6 - 970 Hold -7- 3 - CF - 68T -7- 1' 5.9 70th Wile Term Code Max Max Max Max Hold 50th Wile Green 1-7_.0_4 344 47.0 3 .0 56.0 50th We Term Code Gap dap - Z�aip Max - - TFo — Id - 30th Wile Green s) 33.8 33:8 318 3.0 42.8 1 0th %ile Term Co( Queue Len gth 50tH Queue Length 95th #546 13 Max Hold 96 133 Gap Hold 13.4 32.2 Gap Hold 7 25 Gap Hold 0.0 5.9 SkiD Hold #546 13 60 392 96 133 0 119 L34�_ + & - ' 7 44065 200 300 _:7297 300 150 249 878 344 1104 260 719 1'417 432 0 0 0 0 0 0 0 0 '0 0 0 0 0: 0 0 0 0 0 0 0 0 0 0 I .;nlitq.qnfl Phiqp.q 3 Rnijte 277 & Route 340/522 1 .1 4 . - o2 I* o4 9 191 G5 i 11 46 06 \41 o7 08 --- 111 24 - - - 1 11122's- - ' a no Baseline Synchro 6 Report Page 2 Patton Harris Rust & Associates Shenandoah - Oak Ridge Existing.AM 6: Route 277 & Double Church Road 1/12/2007 -4\ t r 4/ Lane Configurations Ideal Flow (ypnpj) Storage Length (ft) � forag2 L a � neS - Total Lost Time (s) 1900 150 4.0 1900 4.0 1900 -1900 1000 4.0 225 - 4. T 1900 *1900 0 0 - 0 I 1900 -- 275 1 4.0 T+ - �900. _ 4.0 -- �! ,- 00 _ ! 0 0 .- 4.0 I -- i - 900 -7 1 , q - ff 200 4.0 T. 4.0 :T90 0 4.0 Leading Detector (f )_ Trailing Detector (ft) 50 0 ___5O 0 0 50 0 50 0 40 62 102 0 50 0 X50' 0 0 0 '- A2.0 LT:u� rn-thg - (mph) -- Perm I Protected Phases 5 2 5 ---- - 9 '15 ----- - - Lead _ _�p2 Lane Util. Factor 1.00 1.00 1.00 1.00 100 1.00 1.00 1.00 1.00 . T 05 00 TOO Frt 1 6 7. 8 '0:991. 4 Minimum lnitidf� s Minimum Solit (s) 0;925 4.0* 10.0 -4.0 10.0 0:909 1 Fit Protected 0.955 .,4 O � - 10.0 O - 4.0 10.0 0.950 10.8 10.8 0.950 Acii j/C Ratio 0.38 " 0.950 0.39, U& S Flow ( plo t ) 1656 1743 1482 1656 1727 v/c Ratio 1 1706 - ,,0 f7 0.62 0 Fit Permitted 0.405 0.27 0.444 1U' 16:4- 0.500 7 8 - 4' ;1 5 . 8 '. --, 0.704 29i2; 15.5 Satd.'Flbw• per 106 .1-743 1 ;482" _174 __1727 0 922 1706 0 1299 - 16�7 Right Turn on Red �_I �84 , 15 . 8.` , 8:9 , t. Yes LOS Yes B A Yes B 6 Yes CZaM Pim., IPTCAP) B S7 r % B 3.6 B sp 1.00 1.00 1.00 1.00 1.00 ; . . " 1 40 7 - 'A- - , jlldvaIL I IIIIU t ap I - . or., . IDO.0 I - - 11 Volume (voh) 36 314 51 35 328 22 158 37 37 64 36 56 Heavy Vehicles (%) 9% 9% 9% 9% 9% 9% 3% 3% 3% 3% 3% 3% 1 . L Flow (�P±) Lane Group Flow (vph) - 40 40 - 349' 349 57 57 39 388 0 176 41 82 4,1 :71 0 71 40 62 102 0 Lrn iype , 0 gL+pt P6rrh. m - t '- A2.0 P-a+p t 2 �0%' �', Perm I Protected Phases 5 2 Lead 1 6 3 8 Lead 4 P&ffiittea 2 2, 6 Yes Yes Yes . Yes Detector Phases 5 2 2 1 6 3 8 4 4 Minimum lnitidf� s Minimum Solit (s) 2.0 8.0 4.0* 10.0 -4.0 10.0 . ZOr 8.0 4.0 10.0 �2.0 8.0 -4-.0 10.0 .,4 O � - 10.0 O - 4.0 10.0 11.3% 48.8% Maximum,Greenr ( s)'' 3:0 33.0, 33LU 3i() , 33.u. <11.0 L 'b!U V.U. Id. u Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 2 - 2'0, '- A2.0 - :2�07 2 �0%' �', ::'2*01 2t0 ' 4 % , 2�0 .,,� 2.0 Lead/Lag Lead Lag Lag Lead Lag Lead Lag Lag ReadmLag,Optimize? Yes, Yes Yes Yes . Yes - ,'Yes :Ye§ Te's Vehicle Extension (s) Recail.Moae 7 7 3.0 3.0 - None. ; None 3.0 None 3.0 3.0 3.0 N 3.0 3.0 3.0 Act Effct Green (s) 22.9 21.7 21.7 22.2 20.2 21.8 22.0 10.8 10.8 Acii j/C Ratio 0.38 " 0.39 0.39, U& 0:36 0:37 . 0.39 = .0.19 :.0.19 v/c Ratio 0.11 0.52 0.09 0.11 0.62 0.35 0.12 0.28 0.27 Cohteol'Delayv 1U' 16:4- 7 8 - 4' ;1 5 . 8 '. --, 819 29i2; 15.5 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 13 �_I �84 , 15 . 8.` , 8:9 , t. 29:2 15.5 LOS B B A B B 6 A C B ,pr '5p Approach LOS - 14:4 B % B 3.6 B 21 1 C Baseline Synchro 6 Report Page 3 Patton Harris Rust & Associates 1 0 0 Shenandoah - Oak Ridge Existing_AM 6: Route 277 & Double Church Road 1/12/2007 auin /one ureen, 90th %ile Term Code 70th',WVGreen' 70th %ile Term Code a.e Max Max ca. i, Hold Hold ca. i Hold Hold a.e ca: i _ Max Gap Max Gap H.v Max Max co.0 Hold Hold _ U.0 _ Max Max V.v Max Max 50th %ile Greem 50th %ile Term Code 30th %ile Green (s) 30th %ile T erm Cod 3.0 Max 0'0 Skip 28:3 Hold i2 :4.. Hold 28.3 Hold 12:4. Hold 0.0 Skip 0.0 Skip 19:3 _ Gap 12.4 _ Gap 9:7 Gap 7.0 Gap 24.6 Hold 19:4 Hold _ _ 89 Gap 6.4 Gap 8.9 Gap 6.4 Gap - r�,- {10th %ile Greerc 0.0 , 7.3 7.3 0.0 7:3 : ` Y ' - 5:5 10th %ile Term Code Skip Hold Hold Skip Gap Skip Gap Gap Gap Queue!.Len 50th (ft) 8 87 0 ' 8 929 4.4 9 _ 25' ., 14 Queue Length 95th (ft) 22 192 20 22 216 103 40 69 59 Internal Link,Dist (ft) 1990 12655 — 7231 — 199 -1 Turn Bay Length (ft) 150 1000 225 275 2 00 Base Ca pacity (vpl5)_ 358 912 802 359 885 544 828 — 285 ­ 4116 _- } Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 Spillba k Cap 00 0 ::0" 0, , . 0 - 0 . 0' -.0'.: 0'w Storage Ca p Reductn 0 0 0 0 0 0 0 0 0 Reduced.v /c Ratio 0.11 'U8 0.07. 0:11 ' 0.44 0.32 .0¢90 O:25,' 0:25 Solits and Phases: 6: Route 277 & Double Church Road `m1 J T� m2 ■ m3 1� m4 m5 F (f 06 A t 08 Baseline Synchro 6 Report Page 4 Patton Harris Rust & Associates Shenandoah - Oak Ridge 3: Route 277 & Route 340/522 , .- Yes; -Yes -, 4.1 T:8 ;..r • ;Yes 56:5 ,' . Existing_PM 1/12/2007 ,72.0' I Volume (vph) 35 444 64 167 558 96 40 78 142 221 314 EBL =?DEBT _EBR' tWBL_kWBT . WBR�NBL--�NBT NBR� +SBL SBTF SBR Lane Configurations IdeatFlow (yphpq__: - Storage Length (ft) Storag Lanes .- -- Total Lost Time (s ~ i 4 190071900 0 D 0 --- -- 4.0 1900 200 1 _ 4.0 ��„ 1900 - 300 1 4 0 - 1900_ 1900, 0 __ ._ 0 4.0 4.0 !�___ 1900 300 1 4.0 tt . _if 1900_ - 0 -- -- .j 4.0 4.0 4900 �_ tT ..._..r 1900_ _ 150 4 4.0 4 .0 1900 0 4.0 Leading Detector Trailing Detector (ft) 50 0 50 0 50 0 _ 50 0 = 50 0 _ 50 0 50'_ 0 _ 50 0 50 0 50 0 50 0 Tul rnin Speed (mph)_ 15 493 9 155 -620 _ 9, ". 15 87 _ 97 5 349 ­ 9 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1 .00 Frt 40.2' 2 0.850 1 0.978 Queue Delay 8 0:850 7 _ 0.850 Flt Protected 2.'. 0.996 2 0.950 Total'. Dela - _ 0.950 4.0 .. Free 0.950 ;,40:2' Flee Satd.:Flow (prot) 0 173.6. 1482 1656 1705 -, 0 1583 3167 _14 1583 316 1417 At Permitted Minimum lnitialr 0.864 4':0 0.289 4.0 0.542 4.0 6 0.571 Minimum Split (s) 10.0 Satd.,Flow, 0 1506 1482 504 1705 0 .903 3167 1417: 952 3167. .1.417 Right Turn on Red = 22.0 18.3% a. 0:0, 24:0 46:Q. 0.0% 20.0% 38.3% Yes Maximum Green (s) ° °. x59:0 ":` Yes :59:0 " ;3.0; :68E0 Yes 16:0':, 116:0 Yes Satd: :Flow (RTOR) _ 71 _ 12 4.0 4.0 4.0 158 4.0 4.0 911 Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.0 1.00 Link Speed (mph) . 2;Q 45, •. 45 50... 50. Link D istance (ft) 7426 _ 7377 4145 528 Tavel Time (s) , .- Yes; -Yes -, 4.1 T:8 ;..r • ;Yes 56:5 ,' . , "4Y.esS:- ,72.0' I Volume (vph) 35 444 64 167 558 96 40 78 142 221 314 82 Peak Houn.Facto ;0:90 0'.90 '0:90 0.90: '0,90 -0.90 0,90 .0'90 0:90 ot90. 0.90 0:90 Heavy Vehicles ( %) 9% 9% 9% 9% 9% 9% 14% 14% 14% 14% 14% 14% Adj. (yph) 39 .' 493 71 186 -620 .107 44 87 158 .246.. 349 91_I Lane Group Flow (vph) TuTy 0 Perm-. 532 . 71 P.erm 186 pm +p 727 ° `. 0 44 Perm: 87 158 'Free. 246 pm + pt. 349 91 Fre Protected Phases 40.2' 2 -. 27:7 :. 1 6 Queue Delay 8 0.0 7 4 0.0 P- ermitted Phases; 1. 2.'. 0.0 2 :. 6 Total'. Dela - _ 8 4.0 .. Free 4. ;,40:2' Flee Detector Phases 2 2 2 1 6 C 207 ' ' - C 8 8 A C - . - -,g, ;' ...,21 __ 7 4 Baseline Patton Harris Rust & Associates Minimum lnitialr '' 4 0r•' 4:0 4':0 2:0' 4.0 4.0 4.0 6 Report Page 1 Minimum Split (s) 10.0 10.0 10.0 8.0 10.0 10.0 10.0 8.0 10.0 Total;S (s) - � '• * Total Split ( %) z65.0 : •65 0, .65.0 " 9:0..1.74.0: 54.2% 54.2% 54.2% 7.5% 61.7% r0.0 .. 22:0 0.0% 18.3% = 22.0 18.3% a. 0:0, 24:0 46:Q. 0.0% 20.0% 38.3% 0.0 0.0% Maximum Green (s) ° °. x59:0 ":` 59!0 :59:0 " ;3.0; :68E0 16:0':, 116:0 ?t ; , J8.0 , __40.0 _ Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Alit RedrTimet(sT - `.2.0 „ 2:0 20 ..2:0 ` :20. 11 -,2,0 - .2:0 :. % ':2:0 .�. 2;Q Lead- La ;:Yes:' Yes; -Yes Ye .' ;..r • ;Yes Yes= :, , "4Y.esS:- ,,, I Vehicle Extension (s) 3.0 3.0 3.0 3. 0 3.0 3.0 3.0 3.0 3.0 Recali "' None. None .• None'.'None' Tone Min - "Min None C,'Min A ct Effct Gr (s) 37.7 37.7 47.3 47.3 12.0 12.0 89.6 33.7 33.7 89.6 Actuated; /C , '° 0[42 : 0:42 "0:53 `153 ' ,. 0:13 .0x,13 1:00 ;0:38 :, 0:38 1:00 v/c Ratio 0.84 0.11 0.56 0.80 0.36 0.20 0.11 0.51 0.29 0.06 Y _ „'`- Control Dela r -_ " -'- 27:1 4.0 .' _ 19 3 21:0 45:5 - 40.2' 0.2; -. 27:7 :. 22:4 Queue Delay 0. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total'. Dela - _ 27A 4.0 .. 103 • ; 2 1:0 � .' .: 455 ;,40:2' - 0 :2 27r7� `.•.2 ; 0:1 LOS A roaclrDela P Y_� - - Approac L OS C 2434? C A B - - �, �_ C 207 ' ' - C D _�_ _ D ',19:1 B A C - . - -,g, ;' ...,21 __ C 3 C A � Baseline Patton Harris Rust & Associates Synchro 6 Report Page 1 i • Shenandoah - Oak Ridge 3: Route 277 & Route 340/522 Existing_PM 1/12/2007 70th %ileGteen (s) — " 46:7 70th %ile Term C ode 50th. %ile Greer (s) `46:7 Gap Gap -36.8 • 36 46:7 _ - 3.0 Gap 368 _ Max •3:0 . `55J _„ Hold 45:8 12:7 , 12.7 Gap Gap 9.8. 9:8 18.0- ° Max 18.0: 36 7 Hold 33 8 I .,. -_,,• 50th %ile Term Code 30th %ile.Green (s) 30th %ile Term Code Gap 27:0 Gap Gap .27.0 Gap Gap 27.0 Gap Max 3.0 Max Hold 36.0 Hold Gap 7:1 Gap Ga 7.1 Gap '. _ _ Max 14.0 Gap Hold Hold `oth %ileGteeh 16:3 16.3 16.3 3.0 -25.3 5i5, 5:5 _ _ 8:3 "19:8 10th %ile Term Code Gap Gap Gap M ax Hold Gap Gap Gap Hold (Queue Len 50t1i (8) 267 0: - 55 327 24 24' —0 101 • 7 - 0 Queue Len gth 95th (ft) 440 23 102 539 70 56 0 223 143 0 IntemaliEink bW (ft)_ ;7346 • . 72 97 r 4065 5202 Turn Bay Length (ft) 200 300 300 150 Base Ca pacity_(Vp'h) 828 , 846 335 1 080 — 177 622 1417 486 .1387 1417 Stary ation Cap Reductn 0 0 0 0 0 0 0 0 0 0 S pillbadk Cap'Reductn 0 0 0 0 0 0 0' •'0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 ❑ -A ..aa .;r; Q�t�.. - 'n,9A Henn mSa, n a7 _n..95- n4 & -7 W - Ti n.51 ^, :.095, nn ml.► m2 ��• m4 93 JIJ65 la _J_ 1 7 06 � m7 A I 08 74's — 11 24`i - '- y22 __ :- 11 Baseline Synchro 6 Report t Page 2 Patton Harris Rust & Associates � � `'- t � T � `► 1 r Rnlitc nnri Phacar 3• Rni da 977 R Rni ita 340/522 Shenandoah - Oak Ridge Existing_PM 6: Route 277 & Double Church Road 1/12/2007 t-- 7 f ~ 4 - ..*\ T A y 1 r 1990 1900' ' 1900.1900' 19001900 ,1900' "1900, 1900' 1900 190 1900 150 1000 225 0 275 0 200 0 y o Pet n ; pm +pt Lane Util. Factor 0 11 1 .00 4.0 4.0 4.0 4.0 4.0 4 4.0 4.0 4.0 4.0 _ . 5 0 Y- 50 50 56 50 - 50.: 50 �.� 50 0 0 0 _ 0 0 0 0 0 0 ul rnin bpeeo tmpnl_ io a io a o y o Pet n ; pm +pt Lane Util. Factor 1.00 1.00 1.00 1 .00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 �-� 2 6 0850 ... "'- 0:97 0:915 ; ;'� 3 8 Flt Protected 0.950 0.950 0.950 0.950 S atd:,Flow (pro -1656 1743 1482 1656 1703 01 1752 . 1688 1752 9682 -_ 10 Flt Permitted 0.262 0.415 0.266 0.603 LAS ® LY/MEN WL• MINES e::r�VrINMIMM MAWINE am rUMMElZ!r�fia Turn 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.0C 45 ': 45 . 4C 2070 12735 7311 10 75 151 97 129 3% 3% 3% Lane Group Flow (vph) 122 378 146 118 539 0 168 251 0 87 227 0 Tut rjT pm + pt -. Pet n ; pm +pt p n + pt ° Perm. Protected Phases 5 2 1 6 3 8 4 Permitted Phases', 2,. 2 6 8 - 4; Detector Phases 5 2 2 1 6 3 8 4 4 L Baseline Synchro 6 Report Page 3 Patton Harris Rust & Associates ContrihDela -- 135 18:1 : 3:4, 1&39!0 '2T:5• 13:1 ., . ,3414. '260 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0 Shenandoah - Oak Ridge Existing 6: Route 277 & Double Church Road 1/12/2007 LaneLUrOUP, /bb' z45 4d ` 90tti 33'. 90th %ile Term Code Max Hold '310 Hold .0 Max - 3.0 Max 9.0 Max -26 Hold 11 .0 Max 11 0 Max 70th%ileGreen s) 70th %ile Term Code .0 33.0 Max Hold .0 Hold Max Max 9.0 Max 26.0 - Hold 11.0 Max 11.0 Max 50th,%ile Green s)__ 50th %ile Term Code 5.0 27 Max Hold 277 Hold 3 - '2 - 77 Max Gap 9.0 Max 26.0' Hold 11.0 Max -- 11 - 0 Max ��Ot%ile Green (s) 30th %ile Term Code 3.0 2139 Max Hold 2•.9 Hold 3.0 Max 21.9 Gap 8.4 Gap 23t8 Hold 9.4 Gap 9.4 1 Gap 1 1 �Ot:o/.ile Green (s) ' 0:0 --- 6 — .8'8i8 0.0 5:7. 1 0th %ile Term Code Skip Hold Hold Skip Gap Skip Hold Gap Gap n,ja,,PTAn';�t 97 1.111 h 97 - 9n7 rlq• - 50 . q7 164 1 51 327 106 1 12655 72 225 275 J84, /bb' z45 4d ` 0 0 0 0 0 0 6"o 08 0 0 0 0 0:44, 0:33: --- '0:3 0!53' 10�' 01 fi - t+ o2 o3 o4 9 39 s —'z 10 15s- ll5l1Zs 'A 4— 05 Y o6 08 Baseline Synchro 6 Report I Page 4 Patton Harris Rust & Associates Solits and Phases: 6: Route 277 & Double Church Road 0 Shenandoah - Oak Ridge Background_AM 3: Route 277 & Route 340/522 1/12/2007 Lane Storage Length (ft) 0 200 300 0 300 0 150 0 _ ^ Storag Lanes 0 _ . -� 1 -_ ~ 0 1 _�.' _ __ 1� :1 Total Lost Time (s) 4.0 4.0 4.0 4. 4 .0 4.0 4 4 .0 4.0 4.0 4.0 _ 4.0 Leading (ft) T railing Detector (ft) ,' 50 0 50 0 50. 00 50' 0 , 50. , 0 _ 50 0 50 0 _ -50 0 50 0 _' _ 5 _ 0 50 0 Tu �rning Speed�(mph) � -: 15 = 9 •. • .15 9 ,: 15 -., ; , 9 15 _ 9 Lane Util. Factor _ 1.00 1.00 1.00 _ 1.00 1.00 1.00 1.00 0.95 1.00 1.00 1.00 F 0.850 0:963 0:850 - _0.95 0:850 Flt Protected 0.991 0.950 0.950 0.950 Satd. Flow, (prot)�_ 0 1727 1482 1656 1679. 0 1583 3167 41 583 _ 3167 1 4 Flt Permitted 0.470 0.174 0.581 0.235 LOS F A D B F F A F D A L Baseline Synchro 6 Report Page 1 Patton Harris Rust & Associates Permitted:Phases. 2 2 6 - - '8' 'Feed 4 Free Detector Phases 2 2 2 1 6 8 8 7 4 Gohtrol Dela , 320:7 2:7 43:2 16:•1`'. 222:4 272:'7'.. '0.5 226.8 4,4.7 0.-1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0 Shenandoah - Oak Ridge Background — AM 3: Route 277 & Route 340/522 1/12/2007 -,-* --,, 7 'r .4— '1- 4 \ t / ,P. 41 90th %Ile Term Code Max Max Max Max Max s__. Max Max Hold 17_0E_P/.ile green .77�O 77.0 — 17 - 0 _ 3.0 _0 —"-,,Max T6 , 0: � 11 0 0 220 70th %Ile Term Code Max Max Max Max Hold Max Max Max Hold 50th�o/ 77 .0 77.0 77.0. 3.0 8 6.0 1:1.0 11.0 50th %Ile Term Code Max Max Max Max Hold Max Max Max Hold 77.0 77.0 .77.6 3.0" �86.0 — 7" 11.0 5-0 — .22 0 30th %Ile Term Code Max Max M x M Hold Max Max Max Hold 1 1_0th%ile Green (§) 77.0 77.0 77:0 —3.0 . 86.0 11.0 1 ­­ 22.0. 1 0th %Ile Term Code Max Max Max Max Hold Max Max Max Hold Queue shown is maximum after two cycles. 95th percentile volume exce9d cap ity eue �jc: �q� Queue shown is maximum after two cycles. Splits and Phases: 3: Route 277 & Route 340/522 P .1 "V o2 o4 94 1#183 I 1¢ 2 8 s__. 06 \v. o7 I 08 Baseline Synchro 6 Report I Page 2 Patton Harris Rust & Associates , /,Utliil/ofleActuatec� UvcleE 12U" 50th %ile Actuated Cycle: 120 30tfii %ilp'Achf2ted' G_VC14�1 20—. 0 0 Shenandoah - Oak Ridge 6: Route 277 & Double Church Road 0.950 1.00 0.950 0.950 0.95u 1.00 Background _AM 1/12/2007 _1656__1_T4 1656 1 0 . 1~752 1706 76 •1752 9675 r__0 Flt Permitted 0.137 . 0.180 0.364 0.676 Lane�Group`" ;EBL EBTjtEBIR IWBLL BIR NB BT ±NB_R_, Right Turn on Red rT S_B_R Lane Configur 12735 Yes Yes Yes Satd.,Flow' - - 142 - 5 Travel:Time, �__ 31.4 Ideal_Flow (vphpl) - 1900 _190D 1900 1900' 1900 1900 1900 ' 1900 1900 ' 1900 1900 .1900 Storage Length (ft) Storag Lanes Total Lost Time (s) 150 1 4.0 4.0 1000 - 1 _ �4.0 225 1 4.0 - - 4.0 0 0 4.0 275 1 4.0 4.0 0 - _ - �0 4.0 200�� 1 4.0 0 _-_- - _ _ 0 4.0 4. 0 Leadin Detector (ft)_ 50 - 50 50 '50•. 50� 0:90 50 , 50 •0:90 50' , 50• Trailing D etector (ft) 0 0 _ 0 0 _ 0 __ 0 0 3% 0 0 Tut - rnin gSpeed.(mph) 15 AdjirFlo ph) 9 15.9 942 .60 - 15 ' ;38 _ 9 15,9 '63 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Flt Protected 0.950 1.00 0.950 0.950 0.95u 1.00 Sat d, Flow, rot)^ _1656__1_T4 1656 1 0 . 1~752 1706 76 •1752 9675 r__0 Flt Permitted 0.137 . 0.180 0.364 0.676 RecallUode" ' '' • Satd. Flow (perm) -239 1743, 1182- - 314: 1729 - 0,671 1 7013t. - 0_1247 9247 1675 - 0 Right Turn on Red Act Effct Gr (s) Yes 12735 Yes Yes Yes Satd.,Flow' - - 142 - 5 Travel:Time, 63 -7 82 31.4 Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 L•ink.Speed (mph) ... ., • , , ., 1 51 „ . :. 45 . 3.0 RecallUode" ' '' • - -:40 None "None None 40 ; . None .'- Link Distance ( ft) . , -• Min .° 2070 Act Effct Gr (s) 35.7 12735 32.0 35.7 14855 27.2 27.2 2077 1 Travel:Time, '0.47 31.4 0:43 0:47': 193:0 • -0:37 0.37 253.2 0:14'" v/c Ratio 35:4 0.84 Volume (vph) 56 567 128 54 576 34 284 57 57 99 56 87 Peak MourFactor -. 0:90. 01:90 0:90 0:90 0.90 0:90 -` 0:90 090 •0:90 • 00' 0.90. 0.90 Heavy Vehicles ( %) 9% 9% 9% 9% 9% 9% 3% 3% 3% 3% 3% 3% AdjirFlo ph) "62' ' 630 - 942 .60 640, ' ;38 • .-•316" 163 '63 ' 1',10,. .62' : 97 Lane Group Flow (vph) 62 630 142 60 678 0 316 126 0 110 159 0 Tul rn T pm + Perm . pm + pm +pt `Perm ' Protected Phases 5 2 1 6 3 8 4 Permitted Phases 2 %2 .:6 '8 - 7 Detector Detector Phases 5 2 2 1 6 3 8 4 4 Minimum;Jnitial, 2.0 ^4:0 4.0 2:0:, 4.0 " 2:0" 4'.D . 4:0 Minimum Split (s) 8.0 10.0 10.0 8.0 10.0 8.0 10.0 10.0 10.0 Tol 1al S plit..( §) - '9'0' 39:0' 39:0 9.0- 39.0 '0:0 '_17.0 32.0 '0.0 15:0 - -15;0 : '0!0 Total Split ( %) 11.3% 48.8% 48.8% 11.3% 48.8% 0.0% 21. 40.0 % 0.0% 18.8% 18.8% 0 .0% Maximum[Green (s) ' ' 33:0 1 33:0 3:0 . 33:0: 7 11:0` 2&0 :+ : ;9 -,9 0 Yellow Time (s) 4.0 n,n 4.0 n n. 4. n.. n. 4. ..non. 4.0 n^ _ 4.0 "On 4.0 . ?.n 4.0 ... 2n 4.0 • -7 n. Llea07La Yes - Yes Yes -Yes Yes'. - '•Te5 •3 Try TUb ,t Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 RecallUode" ' '' • None None "None None None- ; . None .'- . Mm• ` . , -• Min .° `Min Act Effct Gr (s) 35.7 32.0 32.0 35.7 32.0 27.2 27.2 10.5 1 Acfu dtea j /G Ratio '0.47 :,0:43' 0:43 0:47': 0.43 • -0:37 0.37 .0:14 0:14'" v/c Ratio 0.30 0.84 0.20 0.25 0.91 0.73 0.19 0.63 0.52 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2'4 `;28 6 _- 11-3 •3 . 31 B 1 1.1 ... 476. 23 0 B C A B C C B D C 134 - - 25.9 " -_ C C C C Baseline Patton Harris Rust & Associates Synchro 6 Report Page 3 • • Shenandoah - Oak Ridge Background — AM 6: Route 277 & Double Church Road 1/12/2007 uutn -/.iie careen tsy ; s.u, • - ij.v jj.0 i - 19 17. s 'k:!— IFA 15 40.0 ZI.U' . U;U – Va — x --- ' 90th %ile Term Code Max Max Max Max Max ----- axHoid — Max 90th l9/%i!2GE2e Green ( s ) -- _ - 10, . 310' 3.0 - 33.0 1 --- - 9: 0 - 9 _. 70th %ile Term Code Max Max Max Max Max Max Hold Max Max 50th %ile Green S 3.0 33.0 -- 33.0 3 . 0 33.0 - -- T1 — 0 , 26 0 9.0 - 50th %ile Term Code Max Max Max Max Max Max Hold Max Max 30th %�ilE (S). 3 3 33 �O3 0 -- 3 - 3-0 -­ 11.0 26.0 -- 0 30th %ile Term Code Max Hold Hold Max Max Max Hold Max Max Splits and Phases: 6: Route 277 & Double Church Road Baseline Synchro 6 Report Page 4 Patton Harris Rust & Associates o2 3 o4 9TTF 1 i - 19 17. s 'k:!— IFA 15 . 39 .0 1 o5 o6 08 gist F I 39Z, Im Baseline Synchro 6 Report Page 4 Patton Harris Rust & Associates Shenandoah - Oak Ridge Background — AM 8: Dogwood Drive & Route 340/522 1/12/2007 --* 4 \ Lane Baseline Synchro 6 Report Page 5 Patton Harris Rust & Associates ngth (ft) 0 0 25 25 - Fe — s - eed (mph) 15 9 15 9 �Ctor 0.850 0.996 � 0 - 0:9_ 5 - ' (Prot) 1752 1568 1752 3167 3163 0 ,d 5 9 (perm) 1752 1568 1752 3167 3163 TCtor, 1�00,7 1 170C, T700r, 1,00, I uv .670 I (mph) 30 50 50 e (s) 36.2 56.5 56.5 >l )' 7-- 23 — 71 - § 7 - - ,- 87 - TO — 4"2198 -- , -- 15 71 Factor 0.90 0.90 0.90 0.90 0.90 0.90 Baseline Synchro 6 Report Page 5 Patton Harris Rust & Associates • 0 Shenandoah - Oak Ridge Background — AM 12: Site-Dr #1 & Route 340/522 1/12/2007 _-* -- 4 Lane 1900 1 r'.111 90W, 1900! 1900 .x 1900 0 0 300 100 4.0 4.0 4.0 4:6 4.0 4.0 7- 5 - 0 1 — 50- 1 6b7�"90 -1 760 — 5=01 0 0 0 0 0 0 S. 7 T 7 1 — 5 1 Lane Util. Factor Baseline Synchro 6 Report Page 6 Patton Harris Rust & Associates PEirmittbdMh sbs,-�' - 777, T7 Detector Phases 4 4 5 2 6 6 0 0 Shenandoah - Oak Ridge Background AM 12: Site-Dr #1 & Route 340/522 1/12/2007 --* -,.* 4 \ %ile Term Code :/.�i 16, �Gree %ile Term Code % i le �-(j Green Wile Term Code z/U ZG7P P `nf s) Max I Ino 51 1 0th %ile Term Code Skip Skip Skip Dwell Dwell Dwell Tg =h Queue Length 95th (ft) 55 0 32 18' 46 7 �'40 107 75 �, 26 115e Turn Bay Length (ft) �396� 06 300 34 100 Base Ec fy� (y Starvation Cap Reductn 0 0 0 0 0 0 ill ack.Ca 'Rbductn 0 - 01" Storage Cap Reductin 0 0 0 0 0 0 ffi'fli�5rP vIF`N — 0 - 2 — Natural Cycle: 40 CFnt Fp.TA Maximum V/G Ratio: 0.44 .c;nlit.q And Phqqp.q 12 Site-Dr #1 & Route 340/522 % T re 7�7 2 i o4 5 06 Baseline Synchro 6 Report Page 7 Patton Harris Rust & Associates 0 0 Shenandoah - Oak Ridge Background _AM 14: Site -Dr #3 & Double Church Road 1/12/2007 ,(- *-- Z La Group } °w °.'' WBL° WBR BT r;;;:iN BR r: S SBT + _ Lane Configurations 16ealf,Flow,: -1900 Turning Speed (mph) 15 _ 9 9 15 LaneUtd Factoi, 1.00 1.00 1 00 1 00� 1 00 .a. —�.Jx _.. ..�..�t .n_.. ......._.��..r..._ .,-. h �.. _. .,. ''i Frt 0. Flt @rotected. •. Os990 < _ f__. _.• _ _ _ . W Said. Flow (prof) 1596 0 1845 0 0 1 826 _ _ Flt•. Permitted a -1845 _ �0 Said, Flow (perm) 159 0 0 1826 Headwa 1..00 1e00� 1 00- 00 711 1 00 . __1 w Link Speed (mph) 30 4 0 40 - —z--- - Link,Dlstancg',(ft) 2743 .. 2206 _ ti« . 14855` 0.90 0.90 0.90 0.90 0 .90 0.90 Adj. Flow (vph) 0 43 400 0 54 210 Sign Control Stop Free Free ntersecti oM3ummary Area Type: Other Intersection Capacity Utilizati 44.9% ICU Level of Service A 71 ,"-' -` Baseline Synchro 6 Report Page 8 Patton Harris Rust & Associates 0 0 Shenandoah - Oak Ridge Background — AM 16: Route 277 & Site-Dr #2 1/12/2007 --0 ' 1- * 4 1' 4,-- 4 Tr - 9C r-f 906 900 9or 100 100 0 0 4.0 4.0 4.0 4.0 4.0 4.0 50 — Eb - 9�0: - 9 - 0 - 7' - ' - 60 - 77 O'� 0 0 0 0 0 0 --- , -- - -- -- 0;850 L 850 Fit Protected 0.950 0.950 Satd[ =ow (p- Z=1 - ,I -A Fit Permitted 0.266 0.950 Approach LOS A A B Baseline Synchro 6 Report Page 9 Patton Harris Rust & Associates Pe - Detector Phases 4 4 8 8 2 2 Shenandoah - Oak Ridge � o4 1IFe_ 49 —s=- Background - AM 16: Route 277 & Site-Dr #2 1/12/2007 4 /0- FlaffelGrEd T �A E 13 :R W BT t N_ B 0-LN B R, "L;JL-� p7 - j E 7 43 _.0T:7 - 5 - 0 90th %ile Term Code Max Max Max Max Max Max 20th �/ile7G (s)'_' _T4_.97_3Vg_i '-�4 50 5 70th Wile Term Code Hold Hold Gap Gap Max Max �r6�en —(§ rd, 0 27ij - .17 : . 0 T,, 7 50th %ile Term Code Hold Hold Gap Max Max - ...... Green, ,20.3 ,`20:3 �.20t3 - Gap 5:& U lo� ,,bile - __I 30th %ile Term Code Hold Hold Gap Gap Max Max jf0_thPN =re _L1a_6_ �_1367�_31 0 _,Yb:� 1 0th %ile Term Code Hold Hold Gap Gap Max Max otk 109 0LEeue _ EIe — ngthF 7— r50th, ft 0, , '' 6_ —0. _-, Queue Length 95th (ft) 196 6 17 198 53 29 IF [Dist — 5 =3f6�_ Turn Bay Length (ft) 100 100 =ae. - 7'_i307. - 1,197- 368 "_1307'290 Starvation Cap Reductn 0 0 0 0 0 0 ill dckCa_ ucth �7 _7 7, Storage Cap Reductn 0 0 0 0 0 0 PaHiIrGri pntiA . n 07— n.5�904;7� =-7- - 7 * 0 � o4 1IFe_ 49 —s=- 4- 08 Baseline Synchro 6 Report Page 10 Patton Harris Rust & Associates Maximum v/c Ratio: 0.78 .qnlit.q nnrl Phnqp..q- 16 Route 277 & Site-Dr #2 0 Shenandoah - Oak Ridge Background_PM 3: Route 277 & Route 340/522 1/12/2007 -,* --,, -,* f -+-- *,- 4 1 Lane Conflaurations Storage Length (ft) 0 200 300 0 300 0 150 0 Stdrage 0, ..L 1 -1 1.00 01 1.00 1.00 1.00 1.00 1.00 EIanes 1.00 - 1.00 Niiiiii is�LedQ�pfii); =, - - 50 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 �-'ea6nj_'Db�tector (�ff 5282 TravelravelTime; Volume (vph) 56 7 �65 Trailing Detector (ft) 0 0 0 0 0 711 168 0 0 0 0 - =',QW� 00; =Tdrnm 0�p =ed O!901 � - 0!1! -,ff9or '0 .� i Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00 FF77 14% - 08567 108_ 1 47 - 65 - 2 Flt Protected 0.994 0.950 0.950 Lane Group Flow (vph) 0.950 969 147 8W170i7w7Cp:Eol):,�. 1218 �lt733 f4=82,=1=656 94 - 1 rO 397 T6 1 - 71 5 8 -3 T141'7 31 - 67, - :' - f - 4 1 Flt Permitted ,' r + t, 0.265 0.061 P �,-'�,- P r Ne f Fe - -- _mM+Tptf.�� 0.400 0.286 1 6 8 7 4 Right Turn on Red Yes Yes Yes Yes SatWFldw! RTLR Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Niiiiii is�LedQ�pfii); =, - - 50 7- Link Distance (ft) 7426 7377 4145 5282 TravelravelTime; Volume (vph) 1^12:5 97 775 132 400 1'14:8' - 77, 947 149 85 96:5: 282 357 343 711 168 F ,, 0M , , t�'OK 0". - =',QW� 00; MO.- O!901 � - 0!1! -,ff9or '0 .� i Heavy Vehicles 9% 9% 9% 9% 9% 9% 14% 14% 14% 14% 14% 14% L.dj '., Fl ow, (yp 108_ 1 47 - 65 - 2 Lane Group Flow (vph) 0 969 147 444 1218 0 94 313 397 381 790 187 LL!ypt- Pe rm -e ,' r + t, P �,-'�,- P r Ne f Fe - -- _mM+Tptf.�� Protected Phases 2 1 6 8 7 4 �-2 -7 Free Detector Phases 2 2 2 1 6 8 8 7 4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 - :73 , .27 �7 4 X-651TO-5 1,47 -, -,0 2 LOS F B F D F F A F F A F Baseline Synchro 6 Report Page 1 Patton Harris Rust & Associates 0 0 Shenandoah - Oak Ridge Background_PM 3: Route 277 & Route 340/522 1/12/2007 win /oiie ureen (s,p 'A .2 o4 bU;U ',]U;U Yb.0 U O.U: _zz-U - - -bU.0 90th %ile Term Code Max Max Max Max Max Max Max Max Max - _' - 60 — q �'8.07 &0` =21 r0f 70th %ile Term Code Max Max Max Max Max Max Max Max Max 60 @ ---- — 0', 7�0 8'; 0 22:&, 50th %ile Term Code Max Max Max Max Max Max Max Max Max d0 Green, s), ­ 615�6 7 60 — .0 -'60 O:: 0.0 =6.27 30th %ile Term Code Max Max Max Max Max Max Max Max Max ,10 th :,,o: e - G reen — ( S T7 —, 1 6F67 �60�0' 11 00 , �10.01 — 76.6 -- , I '.' 7, 0 " 1 0th %ile Term Code Max Max Max Max Max Max Max Max Max Maximum v/c Ratio: 3.73 Splits and Phases: 3: Route 277 & Route 340/522 01 'A .2 o4 16 5_.'" l It 06 o7 08 IN Baseline Synchro 6 Report Page 2 Patton Harris Rust & Associates 0 0 Shenandoah - Oak Ridge Background 6: Route 277 & Double Church Road 1/12/2007 -,* -- t (- 4-- '1- 4 \ t / ,0, \,I* l 41 Storage Length (ft) 150 1000 Total Lost Time (s) 4.0 4.0 -- = ead , ng - L � D : e = feCtor ( tF 0 0 Trailing Detector (ft) 0 0 0 I=urnmg�§�SC - . LeLd ff 225 0 275 4.0 - 0' - 0.' "TO 4.0 0 0 0 0 200 u 5 6 4.0 4.0 4.0 4.0 4.0 0.; -,- 907-771 0 0---- 0 15 9 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 7 �25 3 2 321 150 ,�, , , 200 121 �,35 4 �- 132 186 Pe�ak�Hour,FactoF '0 0: 912 _ 90, Fit Protected 0.950 Heavy Vehicles 9% 0.950 9% 9% 9% 0.950 3% 0.950 3% 3% 3% 3% (p=o C) - -1,90 , : - 738! 31 1 �63 �d2�9 1 , _CF �147 207 j6L6g��7��'b Flt Permitted 0.078 317 182 992 0.161 357 389 0.211 354 0 0.532 P M+K)t M+pL Protected Phases 5 --- 1768 1 38 1 -- 682 11 0 Right Turn on Red 4 - Pdrrfiltt�R Yes �. "I 7 , . -= - '6 Yes Yes I I Yes LS �td,Wlow(�ETQR 'n-7 2 2 1 3 ,1 _7 1, , - .. ,, ;�: � , , - TO � Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ttkjpRed-'(ffioh , ,.a 777745. Link Distanc(;�ft) 2070 12735 14855 2077 �E�_T7%& 77,777�T 7a7:VEEPf71 , Tr -7 FT7§' Volume (vph) -,�-311.4- 171 664 285 164 777 116 7 �25 3 2 321 150 ,�, , , 200 121 �,35 4 �- 132 186 Pe�ak�Hour,FactoF 69 :90 - 1 90, 0 `. 90i' 77go � � Heavy Vehicles 9% 9% 9% 9% 9% 3% 3% 3% 3% 3% 3% AQ7, - (vp�'.7 - -1,90 , : - 738! 31 1 �63 �d2�9 �1 W 222! 131 ;, �147 207 Lane Group Flow (vph) 190 738 317 182 992 0 357 389 0 134 354 0 P M+K)t M+pL Protected Phases 5 2 1 6 3 8 4 - Pdrrfiltt�R 7- 7, ", I �. "I 7 , . -= - '6 - I I Detector Phases 5 2 2 1 6 3 8 4 4 F Baseline Synchro 6 Report Page 3 Patton Harris Rust & Associates 0 0 Shenandoah - Oak Ridge Background—PM 6: Route 277 & Double Church Road 1/12/2007 qutnz%iie ureen 90th %ile Term Code 70F - % ile 70th %ile Term Co Max r. Max Max Max — 9 & Max Max J.u -*-!!!L.--.,,- Max Max - �P.u- Max Max Max Max Max Hold -' . Max ' Max Max Max 9 �f 06 'S 4b�F 10 101547- �,01 ��4C��--7--� --7 110 10 50th %ile Term Code Max Hold Hold Max Max Max Hold Max Max �4�.O. -- 4 - 9.0-,. V9 —, 0 -- 7 - 3 --7-- .0 110T 10i ; i 30th %ile Term Code Max Hold Hold Max Max Max Hold Max Max 11 =OtO/. re6n.. 1 0th %ile Term Code Max Hold Hold Max Max Max Hold Max Max 06eu iLeh�thi5(Ktff - 750 I Queue Length 95th (ft) #234 #584 42 #124 #996 #405 281 #199 #416 Iht&naFl(n��QDQF �-1�99O 7 7 Turn Bay Length (ft) 150 1000 225 275 200 Base,6 F��citX��yp L1691:.r 911t 23r §860, � 7�477 �037 771 Starvation Cap Reductn S pi116ackyGapReductn 0 - '':0 0 •a 0; 0 ! 0 z —�,O 0 "" , 7 770 0 . - 0 0 0 Storage Can Reductn 0 0 0 0 0 0 0 0 0 Rnlitq and Phq.qp.q P) Route 277 & Double Church Road 4"ol g2 3 o4 9� - 55s - -- 13 .1 71 i K o5 �f 06 'S A t 08 10 101547- Baseline Synchro 6 Report Page 4 Patton Harris Rust & Associates ffrorXis WM:Fl Fra N VMMIWC �#ACW�WJIMM 110 16 A KUWIJUN .l1271! I 0 0 Shenandoah - Oak Ridge Background 8: Dogwood Drive & Route 340/522 1/12/2007 _A --, -4\ 1 Lane 00 E1900'' 1900 1;900' 190d1 1900' I 0 0 25 25 _ 15 9 15 - 9 0 ' .1:00' , 1 00 : 0 9 - Oi95 0 95'. 0.850 0.996 jntersedtioh Summary' v a _y Area Type: Oth (;nntrol�Tvoes;f�Jnsinnal¢edI - - '- /ice A Baseline Synchro 6 Report Page 5 Patton Harris Rust & Associates H„ e av y Vehicles ( %) . 3% - ,3 %t . 3 % ,,3 Adi. Flow (voh) 34 18 22 771 1340 41 0 0 I Shenandoah - Oak Ridge Background—PM 12: Site-Dr #1 & Route 340/522 1/12/2007 - -,* 4 \ t Lane Storage Length (ft) 0 0 300 St �or TL Total Lost Time (s) 4.0 4.0 4.0 4.0 ppnrjinn n7o (ft) rn, ��rn 50 - 750 - 1-1 Approach LOS B B C Baseline Patton Harris Rust & Associates Synchro 6 Report Page 6 jTraveNTimd ( A10 34, ' 565 Volume (vph) 216 302 286 498 1018 204 Eu� �n IT, yp p Protected Phases 4 5 2 6 P57rMitt5d:. Rh-agb �7777 1 6�77 -r� 77 7 4.. Detector Phases 4 4 5 2 6 6 Trailing Detector (ft) 0 0 0 0 0 0 7- t.Tuffinffig�S�A—ed�(—TpF) 15 Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 1.00 Frt 0.850 0 t6 50 , Fit Protected 0.950 0.950 (p Lot ffff �atdF§w� L�752� 52 67, FB- �3T 1568��,_ , - 7 - 71 - 568° �77 Fit Permitted 0.950 0.143 Storage Length (ft) 0 0 300 St �or TL Total Lost Time (s) 4.0 4.0 4.0 4.0 ppnrjinn n7o (ft) rn, ��rn 50 - 750 - 1-1 Approach LOS B B C Baseline Patton Harris Rust & Associates Synchro 6 Report Page 6 jTraveNTimd ( A10 34, ' 565 Volume (vph) 216 302 286 498 1018 204 Eu� �n IT, yp p Protected Phases 4 5 2 6 P57rMitt5d:. Rh-agb �7777 1 6�77 -r� 77 7 4.. Detector Phases 4 4 5 2 6 6 0 0 Shenandoah - Oak Ridge Background 12: Site-Dr #1 & Route 340/522 1/12/2007 -,* --* 4 \ 9Uthi,/,jleL(,reen (§)I -L1.0 90th %ile Term Code ' Max 1.0, ' Max 9.0 Hold 2. 22-U Max Max Max ITO': 3 70th %ile Term Code Max Max Max Hold Max Max 50t 17b7 Tj 710 9.0 Max Max Max 37 Hold 6 �2O Max Max 50th %ile Term Code 30ft%ile 30th %ile Term Code 1,1 .0 11.01 9.0 37.0, 22__ 22. Max Max Max Max Max Hold jTth �)i_ S 1 0th %ile Term Code 8.0 L8�.o 7� .0 35.5� 1- 20.5, Gap Gap Gap Max Hold Gap dueu&iLehctffy T,7-=79� — ,53, �36 7 — '8 .8234 4061- 0 0 0 0 SDIits and Phases: 12: Site-Dr #1 & Route 340/522 I* t o2 -! o4 43i'- o5 1 06 Baseline Synchro 6 Report Page 7 Patton Harris Rust & Associates Queue shown is maximum after two cycles. 9 Shenandoah - Oak Ridge 14: Site -Dr #3 & Double Church Road 0 Background 1/12/2007 f *-- t '� Lane Configurations 0eaI7Flow' v ` ° 1900 1 1000 r ry 79 :' 1 1900 ` 1800 1000 v h a _ _ ._ T urning Speed (mph) 1 15 9 9 9 9 15 Utll F.ac r 1 1'00 " "1: 1 1`0 0 00 1 , - '1 a __.��._......�. v v.._.._ 1 ,- 0 Frt 0 0.865 —� — 7 ._. _ _�. _ _ _ Satd. Flow (prot) 1 159 1 1845 0 0 0 1832 ft -'. Baseline Synchro 6 Report Page 8 Patton Harris Rust & Associates 0 0 Shenandoah - Oak Ridge Background—PM 16: Route 277 & Site-Dr #2 1/12/2007 __ - 4 ,' '4— � /0 ;2 9 : 0 i 6— f 90-01 -"�b 900 LEI-f�OLCFI = 9 � 100 100 0 4.0 4.0 4.0 4.0 y,4 f 4.0 4.0 5 '50, _'5 50i 0.950 T=urnj'ngj9 77 - '6 - ' Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Fr - 7 77�', - 77 — " - 6 _O' Fit Protected 0.950 0.950 9 9 743 � 777 -7- 71 Fit Permitted 0.198 0.950 Baseline Synchro 6 Report Page 9 Patton Harris Rust & Associates Pe �-i- Detector Phases 4 4 8 8 2 2 0 0 Shenandoah - Oak Ridge Background—PM 16: Route 277 & Site-Dr #2 1/12/2007 '-.* � 4 \ 1 Splits and Phases: 16: Route 277 & Site-Dr #2 '\'* m 2 1 o4 1 5's - - IS155 1 =- 2-- E 1 08 Baseline Synchro 6 Report Page 10 Patton Harris Rust & Associates 1 ��/57effr 4 9 O� — 4�9O - =9C� '. - 0 , 70th %ile Term Code Hold Hold Max Max Max Max 60 ��9//oe�GG-t22 — re en ( s) '�49 0 49 - 49 — 0` - �FQ — I= 50th %ile Term Code Hold Hold Max Max Max Max LOF T 0 — 0- - 4 - 9 - 0 - 4:9:: 30th Wile Term Code Hold Hold Max Max Max Max 0 0 Shenandoah - Oak Ridge Background—AM—Suggested Imp. 3: Route 277 & Route 340/522 ��43 , 384 - , ' w 1/12/2007 __* __► -,* 4_ t 1.00 1.00 1.00 4 / Right Turn on Red Yes Yes Yes Yes at RTC) , 3) ��43 , 384 - , ' w Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 LiAk,SneddWn � 4 5 7 -46, " - '.7 �50� 7426 4145 150 648 3 225 670 222 121 460 346 178 14% 14% 14% Lane 43 76 a Baseline Synchro 6 Report Page 1 Patton Harris Rust & Associates . . . . . . . . . . . . . . . . . . . . . . . OB50, — o ..857o Fit Protected 0.950 0.950 0.950 0.950 Satd - 1656,,: T 1 1 417:1583 ' , 9 583' - 04, 7-- 3167 . �j =64LI Fit Permitted 0.950 0.950 0.581 0.200 llurnllypL "Trot Feerm, , 'vrot p a+ u , , _. ree�,pm+p -,rree p Protected Phases 5 2 1 6 3 8 7 4 - R — errMifi ff L�FasE�s- 4 7 - -171 - - �7 : I I ;� — 7& 1 � 7' Free Detector Phases 5 2 2 1 6 6 3 a 7 4 0 Shenandoah - Oak Ridge 3: Route 277 & Route 340/522 14 �=as6a - -257z• Starvation Cap Reductn fO 0 0 S ll6dck�C6p, ,0.' 0 Background Imp. 1/12/2007 0 0 _1 �-,O'.667 --V � 4— A_ 4 t / P. \ -V l o5 __ o7 08 l'Ti- - NBL L �AN_ R - - BF�ZSB� - - ffff6 �NIEBQnQ3�Tr 1 W BT B R 'A BT l_ %=RIf S 901.i16 - S� ILO -1 1TOX 26 0 - ; - 1'3.CF -- 28� - 0, � .� 3 0 - 144'.0'- 4 90th %ile Term Code Max Max Max Max Max Max Max Max Max Hold 6 511 reen sE7 ;70ff 6 1. 2& ': 01 0 . 7=01 70th %ile Term Code Max Max Max Max Max Max Max Max Max Hold 6 �?/Jle.Gree7n, (s) = .. 25 . 0 � 0 -- f2 — ffT - ' T- 7 1 -- '� f6 3 7 Y- 50th %ile Term Code Max Hold Hold Gap Gap Gap Max Max Max Hold ;reen (i) 1- 22 7 22.7 - - CF �F , :: - - 30th %ile Term Code Max Hold Hold Gap Gap Gap Max Max Gap Hold q W - .I- f� 0 9 A 7 a " I G� 0 i6.. ? imernai UISV LT) Turn Bay Length (ft) 14 �=as6a - -257z• Starvation Cap Reductn fO 0 0 S ll6dck�C6p, ,0.' Storage Cap Reductn 0 0 FlAducP �fio�- - �-,O'.667 �f Snlits and Phases 3: Route 277 & Route 340/522 0 131 98 0 2=02 150 7 0 0 0 0 �o 0 0 0 0 4 I o2 ■ o3 o4 1 9'i IN 32 i I 9TI IM30 Z I 'A F l o5 e6 o7 08 l'Ti- 20 sue =z I Is Baseline Synchro 6 Report I Page 2 Patton Harris Rust & Associates E Shenandoah - Oak Ridge 6: Route 277 & Double Church Road Background Imp. 1/12/2007 Trailing Detector (ft) 1,=ur nin�g §p±e�:Qn 0 --v (- 4 --- -"- 41 t Lane Util. Factor 1.00 1.00 1.00 1.00 0.95 -0. 1.00 1.00 1.00 1.00 1.00 1.00 Fit Protected 0.95 - 1 6 0.950 3 EBE K L, - T - K6WBR , 7'NE3L'�LqNETE-�-4N - B - .RS7BL,=<TS - R ,- T Ej -- ,T I V 7� - - ! SgR igurations F, �es i tt �-'6 V ii t r 3 - 1�49 - 2 , , 90-0-1 Detector Phases 5 2 2 1 6 =56C, �]1762�,l 3 .ngth (ft) 150 1000 225 0 ---" 275 0 00 . . . . . . . . . . 10.0 10.0 0.557 Total Split `oi 120° 41,0'g10 25161 725'0 - 16.7% 48.9% 48.9% 13.3% 45.6% 45.6% 17.8% 27.8% 27.8% 10.0% 0.716 71 �5r 't-,`C9 Yellow Time (s) 4.0 8fo 3&0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 S atd "T '7" Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Et F�t - ®r (ft) - 76 0 - � O - - � ,6F 50 0 0 ,', 0 7--_ . Yes -7--0- , 50 5 Trailing Detector (ft) 1,=ur nin�g §p±e�:Qn 0 0 0 0 0 0 0 0 0 0 0 0 1 5 9; Ts Lane Util. Factor 1.00 1.00 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Fit Protected 0.95 - 1 6 0.950 3 8 0.950 7 4 F, �es 0.950 �-'6 d - =Fl o w (p 1656 16 5 6 3 - 1�49 - 2 , , - 165 Detector Phases 5 2 2 1 6 =56C, �]1762�,l 3 849�'j� EE8 Fit Permitted 0.294 8.0 10.0 0.196 10.0 8.0 . . . . . . . . . . 10.0 10.0 0.557 Total Split `oi 120° 41,0'g10 25161 725'0 - 16.7% 48.9% 48.9% 13.3% 45.6% 45.6% 17.8% 27.8% 27.8% 10.0% 0.716 71 �5r 't-,`C9 Yellow Time (s) 4.0 8fo 3&0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 S atd ff, 27 - 3� - 1;5 7 1 ' - 11482- 102 .18�45 - ]�8:457 13�21 _ -1 _ Right Turn on Red Yes Yes Yes Yes Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 L i =nk qeEK_ '7�,77 , 451 :40' Link Distance (ft) 2070 12735 14855 2077 Tr -------- '7:J193-0 Z: 2 12 - 4, Volume (vph) PTqPRWur, ra'ctor 56 "0.�9 17-0190G 567 128 0. 54 576 ' Tgo 34 6 - 9o, 284 - ,o , 9o - 57 =96-76 57 99 56 87 0 Heavv Vehicles (%) 9% 9% 9% 9% 9% 9% 3% 3% 3% 3% 3% 3% Lane Group Fl (vph) bZ�, , WU4 62 630 14Z 'Uu, 13) 142 60 640 0 38 316 0,5 "'. 11 0j 63 63 110 62 97 jl,urn I yp q + a FrW:0 +0 . L _r�L _ +pt �F, pn+p - , ',PTrF Pe t Protected Phases 5 2 1 6 3 8 7 4 F, �es r2'-"". �-'6 Detector Phases 5 2 2 1 6 6 3 8 8 7 4 4 M i n i �mdrw rh �TiWi@)� Minimum Split (s) 8.0 10.0 10.0 8.0 10.0 10.0 8.0 . . . . . . . . . . 10.0 10.0 :b , �4Of-, '9'.0 8.0 10.0 10.0 Total Split `oi 120° 41,0'g10 25161 725'0 - 16.7% 48.9% 48.9% 13.3% 45.6% 45.6% 17.8% 27.8% 27.8% 10.0% 6T - 8 : 11 20.0% 20.0% 71 �5r 't-,`C9 Yellow Time (s) 4.0 8fo 3&0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 a 0 �41 2 0 '71 00 4.0 4.0 4.0 4.0 Baseline Synchro 6 Report I Page 3 Patton Harris Rust & Associates Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Redall Mode' :r --�, None ,!, iNoh6 ��Ron�e� �' No 7 VT �465 ��ne' �. in- - i , in Act Effct Green (s) 36.2 31.4 31.4 34.5 30.6 30.6 26.8 20.0 20.0 15.5 10.4 10.4 A atio .4 � 70Y. - 42� � �0.4.2-- -0 �27, �00,.O -14, f � 3 3 v/c Ratio 0.17 0.34 0.20 0.21 0.46 0.06 0.63 0.12 0.13 0.36 0.24 0.32 0 0 Shenandoah - Oak Ridge Background Imp. 6: Route 277 & Double Church Road 1/12/2007 Splits and Phases: 6: Route 277 & Double Church Road .1 o2 3 M 11 06 08 Baseline Synchro 6 Report Page 4 Patton Harris Rust & Associates Baseline Synchro 6 Report I Page 5 Patton Harris Rust & Associates 0 0 Shenandoah - Oak Ridge Background-AM_Suggested Imp. 8: Dogwood Drive & Route 340/522 1/12/2007 Ma i- , " , �FBL Lane Configurations tt tl* N =1ow 0 i Storage Length (ft) 0 0 25 25 =tora Les ' Turning Speed (mph) 15 15 9 LEn L .00. 1 : l 4 - =0 7 :!j _ 7 - 7 .9�2 Frt M53 0.996 F �096 L M5 Flow (prot) 1703 0 1752 3167 3163 0 ,Satd. FI FPera -- 0 t �69 t Satcl. Flow (perm) 1703 0 1752 3167 3163 0 R — 7 -- j — 00 7-- i —00-11 � T' - ff (M Link Spee ...ph) 50 50 Travel Time (s) 36.2 56.5 56.5 Baseline Synchro 6 Report I Page 5 Patton Harris Rust & Associates 0 Shenandoah - Oak Ridge Background—AM—Suggested Imp. 12: Site-Dr #1 & Route 340/522 1/12/2007 _,* l -4\ Lane �1�—f- --r-7-7-7. 4.0 4.0 4.0 4.0 4.0 4.0 '� 0 0 0 0 17 T5�0— _ , j Fit Protected 0.950 0.950 7 - 7q TaTd F =ow - (p=o 6�! ,1568 — 11-752 :D 67731=6f - -15ff — Fit Permitted 0.950 0.408 Patton Harris Rust & Associates Baseline Synchro 6 Report Page 6 0 Shenandoah - Oak Ridge Background Imp. 12: Site-Dr #1 & Route 340/522 1/12/2007 4 � I ,;nlitq and Phases 12: Site-Dr #1 & Route 340/522 . A 'T 0 4o. o4 05 90th Wile Term Code Max Max Max Hold Gap Gap 76_th_F%! jjreen(§) _ �_97_�9 70th %ile Term Code Gap Gap Max Hold Gap Gap 60 F - -/6 i 1 en@)� a8:2 8;2 8. � 50th %ile Term Code Gap Gap Max Hold Gap Gap 30t 1i ° /6:i le =G�ee n 776_.8_68' 7 5 ­ 5 7 7 30th %ile Term Code Gap Gap Gap Gap Gap ..0_1 :U — Hold __ 7 0.6 1, .77 — 1 0th %ile Term Code Skip Skip Skip Dwell Dwell Dwell Lh 241- .0, 18 ~ 91 j Queue Length 95th (ft) 63 36 44 103 87 29 Internal Li n k Dist (ft) " 1396. 8 234 Turn Bay Length (ft) 300 100 r w 6 ; z � — A,, W I h — 4 - f Tf — ; A 7T, — 9 - F t q -- 934R - - , -- i — sq P c �( 1 T I 1 7 — 7 7 7 I ,;nlitq and Phases 12: Site-Dr #1 & Route 340/522 . A 'T 0 4o. o4 05 o6 IMMI Baseline Synchro 6 Report f Page 7 Patton Harris Rust & Associates 0 0 Shenandoah - Oak Ridge Background Imp. 14: Site-Dr #3 & Double Church Road 1/12/2007 f ,- t /,- Lane Configurations y T+ FT t !ew (v:-Pfi- — q6(F - -1 — q0'0'H9 0, , ��qL gin Turning Speed (mph) 15 9 9 15 =ne Eil,'F,96 - 1 - . - 00 , - 1 , — 001 71 7 q Frt 0 FIPP�rotected' 7 990 , Satcl. Flow (prot) 1596 0 1845 0 0 1826 01 Satc. Flow (perm) 1596 0 1845 0 0 78 Lac.tor �=eadw�ay 07, ifUo .6 1160 �-,00 Link Speed (mph) 30 40 40 E lF IZ 5 i EU 'Fe (ft) -- ------ - - Travel Time (s) 62.3 37.6 253.2 Fu — e ,V�6 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Baseline Synchro 6 Report Page 8 Patton Harris Rust & Associates 0 Shenandoah - Oak Ridge 16: Route 277 & Site -Dr #2 0 Background Imp. 1 Lane Configurations T ? 1 t I r deal Flow° v h` - 1 , 90 - 0 7 - 1 - 90 - 6r 1900 1900 1900 X 1900 Storage Length (ft) too too 0 0 Stora`g Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 L'eading (ft) - -- 50 50 50 " 50 " - 967 - ' - 607 7 - w , Trailing Detector (ft) 0 0 0 0 0 _ 0 _ 4 Turnin S eed' m h — — 9 15 _ . 15 — - 9 ^. Lane Util. Factor 1.00 1.00 _ 1.00 1.00 1.00 FrtT _1.00 0850 _1 0 � 850 !�_ u �__.____ Flt Protected 0.950 0.950 Baseline Synchro 6 Report Page 9 Patton Harris Rust & Associates Permiged:Phr ases Detector Phases 2 2 6 6 8 8 %APP Dela y r � . -.- ' _ ..�`.W 9 1 - 9 8 "1'4'.6 F µ d a ' -:. .. !.�.,..�.._ Approach LOS A A B 0 0 Shenandoah - Oak Ridge Background Imp. 16: Route 277 & Site-Dr #2 1/12/2007 � Z If *-- 1 Snlit and PhF3qeq 16 Route 277 & Site-Dr #2 o2 8 50 s 90th We Term Code Max Max Max Max Gap Gap �r�(�C7 �9�3,, 39� = 7,i 70th We Term Code Hold Hold Gap Gap Gap Gap =reen A 2E4 2 4�-=9 4Llr 50th We Term Code Hold Hold Gap Gap Gap L11' Gap � Gieent (s) � '-1 4 '�1.1 6. 6.0- QL 30th %ile Term Code Hold Hold Gap Gap Gap , Gap I.q A 7' 1 Snlit and PhF3qeq 16 Route 277 & Site-Dr #2 o2 8 50 s 06 20== Baseline Synchro 6 Report I Page 10 Patton Harris Rust & Associates Queue Length 95th (ft) 301 11 32 305 53 29 7 7- - 7346, : 2276 t,�� fn — Unk DlTFft tern5l W ' 1 5 — 7 — 0 Shenandoah - Oak Ridge 3: Route 277 & Route 340/522 0 Background_PM-Suggested Imp. 1/12/2007 Co Storage Length (ft) 0 200 300 0 300 790 0 150 9 Storage Lane Yes Yes Pe � rim,7 7 P 7 FFt efm -- 4.0 Headway Factor Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 1.00 4.0 4.0 4.0 4.0 4.0 Leading 1.00 j 01 .L LDT�i TIDN -,-' , 50 ��4, 0 _2e_�tK�tor'(IC: Trailing Detector (ft) 0 0 0 - 0 0 0 0 0 0 0 0 0 Tu - rn p=e d - (Fpf 4.0 777 8i 0 �r 4.0 5: _ Win g Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 - -56i5 0.8 -,, 0 866 ­7 v � .850 0 850 Fit Protected 0.950 947 0.950 85 0.950 357 0.950 Eat:d �Ffo - (pro:t ) - 165 - 6 148 321 - 33 - 31T - -,- lK8L2 �1583 0=90=0 Fit Permitted 0.950 1. 0.950 0�9W 0.364 Heavv Vehicles (%) 0.267 S , Flo . 7- f 471,7 j 9% 9% _1312 -, 1A§L,12�t3, - 3312 : 1'482'_ '6077TY1677W4W 14% 5 w 67 Riaht Turn on Red 14% Yes Yes Yes Yes Satd."Flow: ( RT(DR), 108 861 147 444 1052 166 A 36 313 b b .- 790 187 2 Yes Yes Pe � rim,7 7 P 7 FFt efm .L�ee Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 .L LDT�i TIDN -,-' , 45, ��4, -45 - i � -� - i . , - 1 , --- ' - 7 - 7 - 77 7'510-' -z- -� ..... go 16.1% Link Distance (ft) 16.7% 7426 0.0% 7377 4.0 777 8i 0 �r 4.0 4145 n n a n 5282 F L�ravef J 2:5! 7 7�1 =78 -56i5 2.07� Volume (vph) 97 775 132 400 947 149 85 282 357 343 711 168 1!7e7aFRVlF a ctor = 0=90=0 . 90 - 709 - 0 -- b - 9 - 070 - 6 - 1. . M90 0�9W : 0.90 Heavv Vehicles (%) 9% 9% 9% 9% 9% 9% 14% 14% 14% 14% 14% 14% Ewe Group Flow (vph) 108 861 147 444 1052 166 94 313 397 381 790 187 �Xes Yes Yes Pe � rim,7 7 P 7 FFt efm .L�ee p +F, .1 - 3.0 Protected Phases 5 2 1 6 3 8 7 4 27.3 27.3 15.0 Ne - 7mitte-EiVias5577 �111 �1 �- 7T 7-- 77 -�� 11.0 - 7 - 7.F F ree �r, ; -4 ��4, :'F ��ree Detector Phases 5 2 2 1 6 6 i�l q()T � - ��Q , 4T 5 Minimum Split (s) 10.0 10.0 10.0 8.0 10.0 10.0 ,q, ,I- ^ '1;4 ' . 5 � 71 LE LT�q I lit s - 3270r; 3 8 7 4 �d 8.0 10.0 8.0 10.0 �f 5�0 T 30.0 1 � 0 0 , m77 T(j7d 2 4 Total Split (%) 16.1% 35.6% 35.6% 21.1% 40.6% 40.6% 10.0% 16.7% 0.0% 26.7% 33.3% 0.0% 9RK,T7umR,CEre&7n(- t . Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 777 8i 0 �r 4.0 "',241 4.0 n Lead/Lag Lead Lag Lag Lead Lag Lag Lead Lag Lead Lag Tg:(D� � Yes �Yw es, , % - �e - � �, �YE��Y Y �Xes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.b 3.0 3.0 3.0 3.0 M - e,. N e, 01107�None N on e on67NZne1-- Mm7 IN 7 W N ,Eecall Act Effct Green (s) 10.2 27.3 27.3 15.0 34.8 34.8 16.0 11.0 89.3 35.0 27.9 89.3 Adtu 7 �1 r 6 -, 6 1 3 1 7! W .0:39 = 0 '-� X007 �, v/c Ratio 0.59 0.85 0.27 0.82 0.82 0.24 0.59 0.80 0.28 0.89 0.80 0.13 Co trol� Delay 0., 37 �6-" 5 �f� 0 47-2 0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ,Tq Del � ;�! �, " =.. 0.0 0.0 0.0 0.0 0.0 1 r)q n n a n r A n F A D D A Baseline Synchro 6 Report I Page 1 Patton Harris Rust & Associates Shenandoah - Oak Ridge 3: Route 277 & Route 340/522 0 Background_PM_Suggested Imp. 1/12/2007 90th %ile Term Code �70th1 %ile Green (s) 70th %ile T erm Code Max 8 5 Max Max :26:0. • Max Max 26:0 Max Max 13.0 Max Max Max _ 30!5 .30.5' ^= Max Max Max '3 0' � - Max Max - - 9.0 Max Max Max 180? ;.240 Max Max 50thr %ile Green (s _8:5' . 2 61 0 26.0, 13 0 30:5 - ,30.5. .0 - -9A �.� IEFO "11 50th % ile Term Code Max Max M ax Max Ma Max Max Max Max Max 30tfii %ile:Gr (s) 8.5; 26.0^ 26.0 .--•. �__ ^13 0 `:30:5" 30.5' :' = 3.0 9.0 M d 18.0 � , _ 24 0 30th We Term Code Max Max Max Max Max Max Max Max Max Max Snlits and Phases- 3: Route 277 & Route 340 /522 m1 - * - i� m2 '\ m3 1* m4 m5 06 m7 Q � m8 1415x" 36.5 =— :_� 24,s'y ., ^_., a_a 15 Ta% I 1W Baseline Synchro 6 Report Page 2 Patton Harris Rust & Associates 0 0 Shenandoah - Oak Ridge Background Imp. 6: Route 277 & Double Church Road 1/12/2007 150 1000 225 0 2 75 0 200 0 4.0� 4.0 4.0 _ 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Trailing Detector (ft) Turnip iS - eed m h i t 9_P� ( P) 0 .'.15 0 0 - 9 0 0 0 �' - - • 15F 9; ;- 0 . 15 0 0 -- , 9' 0 15, +r 0 _u 9 Lane Utt. Factor 1.00 1.00 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 9% 9% 9% 0.850 3% '. " °0:850 3% 3% 3 %° Adj Flow, (vph) 0.850 738r x`0:850 182'.. Flt Protected 0.950 -222 134 7M77 ,207 0.95 190 738 0.950 182 863 0.950 357 167 Satd: Flow� ` " 4656; ,tr7,43' .1;482'...1656 Y 1 - 17 52 13312 1482 .,,17, 5 f --- 45 18568 � 1 °� _ 1752r `:18,45: - ':1568 Flt Permitted 0.190 2 0.108 6 0.353 8 0.651 PefmittedrPt aces -, ' ; 772 `, _, Sat &.Fhow = (perm) 'ti331 1x743 '1482; 188' 33121 1482;,�65f' 1201T' -•1845 1568 Right Turn on R 2 2 Yes 6 6 Yes 8 8 Yes Yes Satd! F' ,low (RT e' r _^_ 3 7 . `M' -_ '` , 129! _ '•,' . < 222 - 77 , , 205 Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lin "�'T - -- - 45• 40, 40 , Link Distance (ft) 2070 12735 14855 2077 TrcvcLTima 1e1 7 77 7 - q i , . • ..' 1930 .?, :... `.. r253i2. ` ,- '3� 5 4 I Volume (vph) 171 664 285 164 777 11 321 150 200 121 132 186 Peak�HourFact6C -- 0M,. 0'9W 0 0 • 0.90. - _`0:90 - 0.90° "0190r' ?0:90 'r 0:90 Heavy Vehicles ( %) 9% 9% 9% 9% 9% 9% 3% 3% 3% 3% 3% 3 %° Adj Flow, (vph) 990 ., 738r .131,7 182'.. 863 r 129 ^ ^ ' 357, , 167: -222 134 7M77 ,207 Lane Group Flow (vph) 190 738 317 182 863 129 357 167 222 134 147 207 Tul m l pm + �' pm +pt" �4 "• ° - Pe�m, + pt ' 'P'e_r + pt� - '' : - 'Perm Protected Phases 5 2 1 6 3 8 7 4 PefmittedrPt aces -, ' ; 772 `, `, ..,2 <, •4 Detector Phases 5 2 2 1 6 6 3 8 8 7 4 4 Baseline Synchro 6 Report Page 3 Patton Harris Rust & Associates 0 0 Shenandoah - Oak Ridge Background Imp. 6: Route 277 & Double Church Road 1/12/2007 I .;nlitq and Phqqp.. 6- Route 277 & Double Church Road t m1 - t* o2 03 o4 127sl-s 114 197U�� =1 I M 115, i t it 1 -10 4 0 o5 oG o7 08 15 s IM]41rs L- A Til Baseline Synchro 6 Report Page 4 Patton Harris Rust & Associates 0 90 ( 57- --� 7 ��60 1 —35'. 13.0,. 70t "i 0 0 � 70th %ile Term Code Max Max Max Max Hold Hold Max Hold Hold Max Max Max 50th G�reea@F C�_715:d 13 -0 , -i — 90 — ' - i - 9 - 0 - 3 9 6 ob 50th %ile Term Code Max Max Max Max Hold Hold Max Hold Hold Max Max Max 30th %ile Term Code Max Max Max Max Hold Hold Max Hold Hold Max Max Max 0 0 Shenandoah - Oak Ridge Background Imp. 8: Dogwood Drive & Route 340/522 1/12/2007 _,* 1 -4 \ T ►� Lane Id ,,;� 1900` 11900, 1,900; 1900 x1900 '1900 Storage Length ( it) 0 0 25 25 $torag 1 v -- 0 , �9 1 ti 0 . Turning Speed (mph) 15 15 9 Lahe'Ut }Factor 1100 Frt 0.953 0.996 Sign Control Stop Free Baseline Synchro 6 Report f I Page 5 Patton Harris Rust & Associates Heavy Vehicles; %) o.... _; 3% ..,3 % 14 % ' ,1'A %a ':3% � Adj. Flow (vph) 34 18 22 771 1340 41 Ua rie ?Ciro inFlrfw:(vnhY_ ,F9 W_.— `[__-.— 0 Shenandoah - Oak Ridge 12: Site-Dr #1 & Route 340/522 0 Background_PM—Suggested Imp. 1/12/2007 --,* l 4\ on 1,00 1.00 1.00 1.00 1.00 1.00 30 901 50 476 8314 4141 335 ;'.. 1r134 ',:56:5 � PeWHoUrFactoir, U90 = � ,0.90 ,0.90 ,0k90 10.901 Heavy Vehicles (%) 3% 3% 3% 14% 14% 3% 'Ad 7 4T" 336' 318 3 1,1311 22T�� Lane Group Flow (vph) 240 336 318 553 1131 227 Protected Phases 4 5 2 6 R&rf A T. Detector Phases 4 4 5 2 6 6 X 23 B C Baseline Synchro 6 Report I Page 6 Patton Harris Rust & Associates Fit Protected 0.950 0.950 Fit Permitted 0.950 0.143 7777—� . Queue Delay 0 0.0 0 0 ao 0.0 7 Total2el a y V Q04' ,19.9w.`' =4 2LT2 LOS C A B A C A Shenandoah - Oak Ridge 12: Site-Dr #1 & Route 340/522 11 Background Imp. 1/12/2007 --* --,* 4 \ t 1 4/ Splits and Phases: 12: Site-Dr #1 & Route 340/522 * t o2 s o4 43 175= '\ 05 06 15 7= 2Z I rO;Il 28 E=17—=- -- s . z - Baseline Synchro 6 Report Page 7 Patton Harris Rust & Associates 90th %ile Term Code Max Max Max Hold Max Max �Oth/01 70th %ile Term Code Max Max Max Hold Max Max SOtFir %ile Green (s) 11.0 14 >.0 9 7777 � . 0, 7 f22 . 0, 50th %ile Term Code Max Max Max Hold Max Max Shenandoah - Oak Ridge 14: Site -Dr #3 & Double Church Road 0 Background_PM_Suggested Imp. 1/12/2007 f 4 - f �' �► Flt.P o ected` L " �0 0,993. _ Satd. Flow (prot) 1596 1845 0 0 1 832 Flf Permitted' Satd. Flow (perm) 1596 0 1845 0 0 1832 Headwa Factor ,,1 -00 .1100:' 1a00 . =100 -100 01K 0 ^: Link Speed (mph) 30 40 4 LmkDistance' Travel Time (s) 62.3 37.6 _ 253.2 Vnlumedvnhl .: 0..' 867 0 ' ":52 500 ., -� . , 1 Baseline Synchro 6 Report Page 8 Patton Harris Rust & Associates lntersection Summary Area Type: Other Cdn rrol T €.Unsi . Intersection Capacity Utilization 77.0% ICU Level of Servi D�� A' nlvQZPanrri^ /minFl f5, s. _.:... . , ., , . 0 0 Shenandoah - Oak Ridge Background Imp. 16: Route 277 & Site -Dr #2 1/12/2007 0.169 0.950 Baseline Synchro 6 Report Page 9 Patton Harris Rust & Associates __� _ _� __ Ert;� <� -•'��. ,:,', -.. ; <0!850 ..0:850.. Flt Protected 0.950 0.950 Permittedf_PM — ses 6 $ '8 Detector Phases 2 2 6 6 8 8 • • Shenandoah - Oak Ridge Background_PM_Suggested Imp. 16: Route 277 & Site-Dr #2 1/12/2007 4 Solits and Phases: 16: Route 277 & Site-Dr #2 02 V 06 Baseline Synchro 6 Report Page 10 Patton Harris Rust & Associates .0 - 7 - =70h -/,ife ff �r — 01 - 2 70th %ile Term Code Max Max Max Max Max Max 0 0 Shenandoah - Oak Ridge Build-out _AM 3: Route 277 & Route 340/522 1/12/2007 F Baseline Synchro 6 Report Page 1 Patton Harris Rust & Associates 0.850 0:963 0:850•. �, -0.850 Flt Protected 0.991 0.950 0.950 0.950 _P.ermittedsPhases * { -- . 4� 2'. � 6 - • - , :,8� . • . ;' Free' Detector Phases 2 2 2 1 6 8 8 7 4 Shenandoah - Oak Ridge Build-out — AM 3: Route 277 & Route 340/522 1/12/2007 We Term Max Max .qn[itq and Phnqpq• 2 Route 277 & Route 340/522 kv, �.,VJFU `.1 1 4 o2 I i� o4 191 11183Kv y iLL� I I t I v - 06 o7 1 o8 192,_F= 1 I — Id 17� IN Baseline Synchro 6 Report Page 2 Patton Harris Rust & Associates 17 T7 _0' — 0- 8=6 1 0 _1,i 01 2 2 0 1 70th %ile Term Code Max Max Max Max Hold Max Max Max Hold g — P/jId.Gree, (s) � - 77 - 7.0 , ''77.0 77 - _'3. 0' �60, �7. 71 1 o .0 2.0 0 0 Shenandoah - Oak Ridge Build-out — AM 6: Route 277 & Double Church Road 1/12/2007 Baseline Synchro 6 Report Page 3 Patton Harris Rust & Associates �086_0_� �'O �925 Flt Protected 0.950 0.950 0.950 0.950 - _Y - T159 7— 1 - 9 _'_�6 - 7 - 6 9 t .1656 ; -1743� 9;482 ' Fit Permitted 0.129 0.178 0.364 0.676 ff �rittq�d .......... Detector Phases 5 2 2 1 6 3 8 4 4 0 Shenandoah - Oak Ridge 6: Route 277 & Double Church Road 40 Build-out AM 1/12/2007 Max 01 o2 03 o4 TVII 39s;_ I M I 05 06 1 06 7F IM 3ZiT_ Baseline Synchro 6 Report f Page 4 Patton Harris Rust & Associates 0 t h �/j I e .6 ��en, 33:0; 3 �3.O , 7773 � 7, ' � '_:=9:0� 7" 9: 70th Wile Term Code Max Max Max Max Max Max Hold Max Max 30th %ile Term Code Max Hold Hold Max Max Max Hold Max Max 'Qnhfc nnrq Phncpc- P- Rniitp 977 9 T)nijhlp f'.hjjrrh Road 0 0 Shenandoah - Oak Ridge Build-out — AM 8: Dogwood Drive & Route 340/522 1/12/2007 -,* ---* 4 \ t 1 41 Lane Configurations FdeaI - �"�'_'�19007 Storage Length (ft) 0 r 1900! � 0 I 190=0 25 tt tT+ WE ��fjd�LoIL96 T 25 -­ -_'i Storage Lanes' ` Turning Speed (mph) 15 9 , 15 9 Lane — Ut I I. Factor '7- - -roo �j — 1 , 00 -- d -- 95 'aE5 �0 Frt 0.850 0.996 F It Wotected 7 0:95 _7 Satd. Flow (prot) 1752 1568 1752 3167 3163 0 F FtPermlttE� m., �950' Satc. Flow (perm) 1752 1568 1752 3167 3163 0 "Fact6r ,actbr 'ea w F IWO 7 17T0 7 �,� =MT-6-0-1, . . 0, i-'I�D&', _ Link Speed (mph) !�i_n_k4 b_EtYTd_e'( )_:_-1 30 5 50 �41 4 1, 50 �,4.1 Travel Time (s) 36.2 56.5 56.5 jV61 ybfi)" Perak Hmir Factor 090 - 713, � �%8 0.90 0.90 91§7� � _50.177�1 6 0.90 0.90 0.90 Baseline Synchro 6 Report Page 5 Patton Harris Rust & Associates 0 0 Shenandoah - Oak Ridge Build-out — AM 12: Site-Dr #1 & Route 340/522 1/12/2007 -.-* ---* 4\ Baseline Synchro 6 Report Page 6 Patton Harris Rust & Associates Flt Permitted 0.950 0.424 PdfifittedlPhases, nPtPr.tnr Phnqp..q 4 4 5 2 6 6 _�ppr w _Loacnyel�ayL��',,z 0. r=7r77 ­', �01 Approach LOS A A A 0 0 Shenandoah - Oak Ridge Build-out _AM 12: Site -Dr 41 & Route 340/522 1/12/2007 Splits and Phases: 12: Site -Dr #1 & Route 340/522 m2 m4 v5 4 e6 Baseline Synchro 6 Report Page 7 Patton Harris Rust & Associates � Z � T 1 r Baseline Synchro 6 Report Page 8 Patton Harris Rust & Associates ntersecti onSu_mmary p., 0 Shenandoah - Oak Ridge Build-out — AM 14: Site-Dr #3 & Double Church Road 1/12/2007 ' 'l- t ane — upIL , ,� AWBR MNBV� 'BR S Lane Configurations �deal'Fjo Turning Speed (mph) 15 9 9 15 Lahe�Ufil. Factor _1_0__��O___ " — f _00 r - . ...F_ _7�1 �0_ - _0 Frt 0.865 FIt 90 Satc. Flow (prot) 1596 0 1845 0 0 1826 FlVl?e_rmift&dT 90 Satc. Flow (perm) 1596 0 1845 0 0 1826 R Factor .00, j70 j . 00.7 .00- 7 —17 =L7 Link Speed (mph) 30 40 40 Fi�hkir,W&t (41 : = 0 - 77 Baseline Synchro 6 Report Page 8 Patton Harris Rust & Associates ntersecti onSu_mmary p., 0 Shenandoah - Oak Ridge Build-out _AM 16: Route 277 & Site -Dr #2 1/1 2/2007 MCI, Baseline Synchro 6 Report Page 9 Patton Harris Rust & Associates __ Flt Protected 0.950 0.950 Shenandoah - Oak Ridge Build-out — AM 16: Route 277 & Site-Dr #2 1/12/2007 e2 - v - P' o4 T Baseline Synchro 6 Report Page 10 Patton Harris Rust & Associates ,qnlitq and Phap. 16: Route 277 & Site-Dr #2 0 0 Shenandoah - Oak Ridge Build-out _PM 3: Route 277 & Route 340/522 1/12/2007 ---, ` t 4\ t l Lane 0 300 0 150 0 �4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 i u�nni y.gµe�u In iPii� io v.nv a io u:au a io a io. a Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00 14% 14% 14% 0:850. Ad Flow. (vph) 0. 89 0 '� 147 Ot850 1059 ` _0:850 Flt Protected 319"' 0.994 1381 0.950 190 Lane Group Flow (vph) 0.950 974 0.950 451 Satd: Flow (11rod) 0 .1733 1482 1656 1708 0 71583 ' 3167 1417 .1583 3167 1419, Flt P ermitted pm + 0.247 0.061 'Free 0.400 . -, 0.286 Protected Phases Sat& Flow (perm) 0 431, 1482 ` 106 1708 - 0:' 667 3167' 1417 ;477 3167 .'14171 Right Turn on Red P•ermitted`Pheses 2• Yes 2 .6' Yes Yes Yes 11 18 262 162 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 - 45 45 50 1 1 1 50 - _ - -5. - ' 1111, -6 .. .. ,h6.S.. •,. :. rran nuur,revwi v.av v.nv .. u:av ' u:au - u:au u.au .. u:au uau u:au lv ;uv u:av v.av Heavy Vehicles ( %) 9 % 9% 9% 9% 9% 9% 14% 14% 14% 14% 14% 14% Ad Flow. (vph) 1.10' 864` 147 -451 1059 166 7 94 , 319"' 400 1381 ,800 190 Lane Group Flow (vph) 0 974 147 451 1225 0 94 319 400 381 800 190 TuiTul„ m T , Peim, Perm pm + - Perm.. 'Free pm + . -, Free Protected Phases 2 1 6 8 7 4 P•ermitted`Pheses 2• 2 .6' 8 Free ` 4'. Free Detector Phases 2 2 2 1 6 8 8 7 4 F Baseline Synchro 6 Report Page 1 Patton Harris Rust & Associates Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total. I,Dela ` 9376:2 1 -1.4" 421.0 44.7 344.7 131 ?5`,; - 0.5 430:9 125:9. 0.2 LOS F B F D F F A F F A • • Shenandoah - Oak Ridge Build- out — PM 3: Route 277 & Route 340/522 1/12/2007 Term Code Max Max Max Max Max Max Max Max Max Green (s) Term Code Green (s) 60.0 Max 60.0 60.0 Max 60.0 60'.0 Max 60.0 10.0 Max 10.0 76.0__ Max 76.0 8.0 Max 8.0 .8 .0 Max _ - 8:0 8.0_ Max 8.0 2200 Max _ 22.0 Term Code Max Max Max Max Max Max Max Max Max 7 _T� Green (s) 60. 0. 60'.0 60'.0 10.0 '' _ 76.0 '' -.8.0 "' _ 8:0 8:0 _. 8.0 "22.0 Torm r.nrio Max Max Max Max Max Max Max Max Max 7nth �� %iIA.GF}uatiari'CVCIa'.1.1 O4 d.' _ ' . , 4 , 01 m2 + 04 1 6V 115 s ._ - —_- .; tl28s— -- s 06 o7 08 -- — - Baseline Synchro 6 Report Page 2 Patton Harris Rust & Associates Intersection!Si :386:7 ;Intersection LOS F j Intersection Capacity Utilization 145.9 % ICU Level of Service H Q 1;+� —A a• P�.,to 977 R Rni ita q4n /522 0 0 Shenandoah - Oak Ridge Build-out _PM 6: Route 277 & Double Church Road 1/12/2007 Lane 1 1 st°rag e,canes . , 1 1 I_ I : u 1, u, i :. n u �4.0 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4. 4.0 4.0 4.0 4.0 Leadin (ft) { .:5O 50 - 50 = .. 50 _. X 50 •. 50 , 50 "`� � 501 __ ��_! _'''' Trailing Detector (ft) 0 0 0 0 0 0 0 0 0 T ninr g Speed-(mph) <, 15 .• .- -- 9 .15; - � 9 " .: . »' 15 -' 9 5 9 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1. 00 17W __�____ -' �, . ,,.'0:850 -7 0598 _ .. 0914 m Oi912 Fit Pro tected 0.950 0.950 0.95 0.950 _ Satd 1 6 17.43 1482.: ,1.656 .1:710 0" ,1752 1686 :A` =1752}' 1682 . " 0 Flt Permitted 0.078 0.154 0.211 0.532 Satd:;Fldw ^ : (Perm) 136 .1743 1482 - 268_ 17,10 0 • 389:= 1686Ow° `981' '.,16 2 �0 Right Turn on Red Yes Yes Yes Yes Satdt'Fbwl "; 7 ' 11 70h x'60 Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.0 1.00 1.00 1.00 1.00 1.00 Link Speedr(mpfi {mpfi) i' . r, 45. 7 q5 . M q � _ "'__ __ f qp Link Distance (ft) 2070 12735 14855 2077 Tavel TiTime! 31:4' Volume (vph) 171 673 291 164 782 11 6 323 150 200 121 132 186 Feak?Nour,Facto� O[90' .'090 0.90::: 090 Z '0:90' :0!90 :0190'`'•0!90 - OM:" O'i90 X0:90 Heaw Vahicles I %1 9% 9% 9% 9% 9% 9% 3% 3 3% 3% 3% 3% Baseline Synchro 6 Report Page 3 Patton Harris Rust & Associates 0 0 Shenandoah - Oak Ridge Build- out _ PM P 6: Route 277 & Double Church Road 1/12/2007 ---4' --,, --* 4— 41 70th %ile Term Code Snlits and Phases 6: Route 277 & Double Church Road N .1 o2 m 3 o4 gFsT Id I;Z I IWA 1 9 1 it .1* o5 'G �`I 08 loril IF Baseline Synchro 6 Report Page 4 Patton Harris Rust & Associates 50th Wile Term Code Max Max Max Max Max Max Hold Max Max 30th �'4 U �4 — �4 - 17 - " 'i , 1 i - 73 - 6. �o SL o � 110, 30th %ile Term Code Max Hold Hold Max Max Max Hold Max Max TOt Gf6em gj_ �U. _3�0 48 10 7 — 6- j 7 1 0th Wile Term Code Max Hold Hold Max Max Max Hold Max Max 0 0 Shenandoah - Oak Ridge Build-out _PM 8: Dogwood Drive & Route 340/522 1/12/2007 Baseline Synchro 6 Report Page 5 Patton Harris Rust & Associates -,�, ``, T d Shenandoah - Oak Ridge Build-out _PM 12: Site -Dr #1 & Route 340/522 1 ---* ---, 4 \ T j Baseline Synchro 6 Report Page 6 Patton Harris Rust & Associates FR ..0`.850 Flt Protected 0.950 0.950 8atd.'Flow:p�t "1752" 1568 `4752., 316T, 3167 1568 %° Flt Permitted 0.950 0.143 7 Detector Phases 4 4 5 2 y 6 6 0 0 Shenandoah - Oak Ridge Build-out — PM 12: Site-Dr #1 & Route 340/522 1/12/2007 --* --,* 4 \ 4 1 41 o2 4k o4 4TEM-�Y 05 06 15 IM_ Baseline Synchro 6 Report Page 7 Patton Harris Rust & Associates , 70_tff_P/_oi I e Green � s= 1:1.0 , 1, 9 _0a', 37 — 0 - -2ZO .'- 70th %ile Term Code Max Max Max Hold Max Max Sn1its and Phases: 12: Site-Dr #1 & Route 340/522 0 0 Shenandoah - Oak Ridge Build-out — PM 14: Site-Dr #3 & Double Church Road 1/12/2007 Baseline Synchro 6 Report Page 8 Patton Harris Rust & Associates ,Or I- Shenandoah - Oak Ridge Build-out — I'M 16: Route 277 & Site-Dr #2 1/12/2007 � r,lu" ge Length (ft) 100 I �Iu I 100 0 "I 0 U.V")V _erfn) 17.43 '-�l 5T8 ga ( — p F Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 hg.Detdctor- f . . . . . . . ig Detector (ft) 0 0 0, - 0 50 0 0 0 = 0 0 7 — ,1 57 7 Iltil. Factor 1.00 1.00 1.00 1.00 1.00 1.00 =7 L7 7 Fit Permitted U.1 /U U.V")V _erfn) 17.43 '-�l 5T8 ga ( — p F 3�0% 47 -1 I 68,1 -' Right Turn on Red Yes Yes a , l 291 . 77 7— ­ 7.- Headway Factor__ 1.00 1.00 1.00 1.00 1.00 1.00 Qi edj(mp � -, 1 Y 745� L 77 9 4— a, - —' - Link Distance (ft) 12735 7426 2356 ne� -d93 & 1112 �67 , Volume (vph) 875 131 131 078 134 134 Pea �, H ZUTu r., F a c t o r; 0. 90 0 ! 9 0 6. 90 1 — 9 U, - - " 9.9, -0 --------- .'Ago - Heavy Vehicles 9% 3% 3% 9% 3% 3% 8LdjLaTw( " 9�72, -146'-" �146 - -1 -71 159 � -. ;149 -. -. Lane Group Flow (vph) 972 146 146 _L198� 1198 149 149 Turn 7 erm ��' I Protected Phases 2 6 8 -- 777 - 77777771 f.Nhases g�E7rm�ittedj 77777�77: 7 8 , � 7=r= __-777 n.toptnr PhqqPQ 6 8 8 2 95 : Approach LOS B C B Baseline Synchro 6 Report Page 9 Patton Harris Rust & Associates Shenandoah - Oak Ridge Build-out — PM 16: Route 277 & Site-Dr #2 1/12/2007 4 / 01 .qnlitq Rnd Phnqp.q 16- Route 277 & Site-Dr #2 Ti� o2 8 06 53 's _27 IN I Baseline Synchro 6 Report Page 10 Patton Harris Rust & Associates 50throj� T)c — 0.' _,P_�0-47 7 — A� — — f170 -- , — fl — 0 50th %ile Term Code Hold Hold Max Max Max Max 0 9 Minimum I 4.0 C [Evil] 1% 33.3% 3l0. X24;0 4.0 4.0 Baseline Synchro 6 Report I i Page I Patton Harris Rust & Associates Shenandoah - Oak Ridge Build-out Imp. 3: Route 277 & Route 340/522 1/12/2007 -.* --,, -- v 'r - 4 \ t 4/ Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None Fo dneC.'None - Non Act Effct Green (s) 12.4 25.0 25.0 13.2 25.7 25.7 21.1 16.1 84.2 34.0 27.1 84.2 -1 , - ' �O3 1 � 0' 25 0!,12. ' �32� 0�1 5 6' . 1'.00 � _b 31, v/c Ratio 0.70 0.74 0.09 0.50 0.74 0.40 0.49 0.86 0.28 0.58 0.27 0.05 0 Shenandoah - Oak Ridge Build-out Imp. 3: Route 277 & Route 340/522 1/12/2007 CnlBc .n,f Phxpr 3• Rntitp 977 A Rnutp 3dn /599 m1 1 m2 \ m3 + m4 19'i _ 913 s. =�- _._, i_ -_ _ -- 9s. M-30 's<- -_ - �-- _ ` 0 9 m5 �= m6 \11 m7 -4 1 08 1 _ . 34 s: °Y 4' : - - _ ' I FFJ20 's - ij - .- . I'll Baseline Synchro 6 Report Page 2 Patton Harris Rust & Associates autn roue careen tst i r.0 Zo.0 Lo.0 IJ Lo_V eo.0 J.0 14 - y IJ.V 90th %ile Term Code Max Max Max Max _ Max Max Max Max Max Hold 0 Shenandoah - Oak Ridge 6: Route 277 & Double Church Road 0 Build-out Imp. 111212007 Fit Protected 0.950 0.0 0.0 0.0 � - 6 , 7 �9-1, �12�TEF 7 A C C 0.950 Approach LOS C 0.950 C C U.UbU -- 8atd [ow ( - Fit Permitted - V 12 1 56 — 133 0195 0.289 ..bb/ 149 17 U V752 0.716 1 845. -1 568 ETa �rm 504, , 1 �7 -7 1 340 •Mff, 14�2 , — 1027 - 1T45 �EF -- , — 1845=1§6 Right Turn on Red S�aTd, i F low , (A T O Yes Yes Yes Yes Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Link SpeedT(mph) 71 - �- _4 51 40, " il4t� Link Distance (ft) . 5 . ,-- 2070 4-31 ;, " 7, -,. 12735 193. 14855 2512 2077 Volume (vph) 56 569 130 54 585 34 290 57 57 99 56 87 �W - r�F - Mto — r'- �-, 0 � �90' 0 90 � ,Tb 0 0 � - 0 �� 90-- 0 901, - 0 1 v .90 Heavv Vehicles (%) 9% 9% 9% 9% 9 9% 31/. 3% 3% 3% 3% A% 11-111 62 4 Queue Delay 0.0 0.0 0.0 0.0 Total Delay, :15 =4 � - LOS A C A B � �- 2�O4� . proacn , Ejelay L , , .� - Wo De1a0 _p 0.0 B 0.0 0.0 0.0 � - 6 , 7 �9-1, �12�TEF 7 A C C 0.0 0.0 0.0 0.0 _�Q A C C A Approach LOS C B C C Baseline Synchro 6 Report Page 3 Patton Harris Rust & Associates rjermrttea;,F'nases,, - , . :-'u ' , - �, " 0 , ; .. - - ',O,: - , Dptertor Phases 5 2 2 1 6 6 3 8 8 7 4 4 0 0 Shenandoah - Oak Ridge Build-out—AM_Suggested o3 Imp. 6: Route 277 & Double Church Road 127v 1 1/12/2007 t Q,Iif� .,q phase..- r- PnuA. 977 P. nnithlp r.hiirrh Rnpri ■ 01 o2 - F4\ o3 127v 1 t 05 f OG 151 Baseline Synchro 6 Report Page 4 Patton Harris Rust & Associates t', �Ac.. Un coordinated' , E5Mordi Maxi v/c Ratio: 0.84 #r 95th 7,[ longe percent le exceedTc Lp= y� 15F Queue shown is maximum after two cycles. 0 0 Shenandoah - Oak Ridge Build- out_AM_Suggested Imp. 8: Dogwood Drive & Route 340/522 1/12/2007 Lane 25 Frt -- k5 Baseline Synchro 6 Report Page 5 Patton Harris Rust & Associates 0 0 Shenandoah - Oak Ridge Build-out Imp. 12: Site-Dr #1 & Route 340/522 1/12/2007 F�11 A Baseline Synchro 6 Report Page 6 Patton Harris Rust & Associates uso '1=77 —, 0'.850 - -77 Fit Protected 0.950 0.950 9 Fit Permitted 0.950 0.408 — a,3.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0 0 Shenandoah - Oak Ridge Build-out Imp. 12: Site-Dr #1 & Route 340/522 1/12/2007 Solits and Phases: 12: Site-Dr #1 & Route 340/522 02 M i _ ,te 05 ji 06 Baseline Synchro 6 Report Page 7 Patton Harris Rust & Associates 4\ 41 • • Shenandoah - Oak Ridge Build- out_AM_Suggested Imp. 14: Site -Dr #3 & Double Church Road 1/12/2007 *�- T FIt P(otected' Satd. Flow (prot) 1596 0 1845 0 0 1826 Flt<Permitted —�_ —_ 'r 0 990 ' ? - �� Satd. Flow (perm) 1596 0 1845 0 0 1826 Headwa 1' 00 '4 --- F - ,- - 17 1 OO s_00 1.00 1 00 Link Speed (mph) 30 40 40� Lmk Distance, Travel Time (s) 62 3 '— + «' . 2206 ' 37 6 '~ 1'4855,: 253.2 Volume (yph) ; Peak Hour Factor 0 0.90 45i 0.90 360 0.90 - '0 0.90 50 0.90 189! _! 0.90 — ,7 - 7-7 7-- 1 . + Other Intersection ICU Level of Service A Baseline Patton Harris Rust & Associates Synchro 6 Report Page 8 0 Shenandoah - Oak Ridge 16: Route 277 & Site -Dr #2 L Build-out Imp. 1/12/2007 -i Z ` e-- 4 ti !° tiai 1 1 A A C Baseline Synchro 6 Report Page 9 Patton Harris Rust & Associates F.rt%,,. Oi856, ..:. —g T Flt Protected 0.950 0.950 _ Detector Phases 2 2 6 6 8 8 0 0 Shenandoah - Oak Ridge Build-out—AMSuggested Imp. 16: Route 277 & Site-Dr #2 1/12/2007 --,* � ` 4- 4 \ t.* vl� o2 8 , OF 06 531=Z' Baseline Synchro 6 Report Page 10 Patton Harris Rust & Associates Reduced v/d Ratio 0 68 " : : = ,0.07 ' :,0.07 426 . �0 58 , 1 5 Splits and Phases: 16: Route 277 & Site-Dr #2 0 0 Shenandoah - Oak Ridge Build- out_PM_Suggested Imp. 3: Route 277 & Route 340/522 1/12/2007 Lane Storage Length (tt) 2 °. ,• 0 _ 1 200 300 j 2 Peak Hour Factor ` 0 300 0 150 9% 0 Total Lost Time (s) 4.0 4. 4.0 4 0 4.0 4.0 4.0 4 4.0 4 0 4.0 4.0 Leading •Detecfot (ft 5° ' 0 50- , ` �' S0 s50 • X50 ::; °50 50 _ � _ ..50 50 : 6"" R8' '� ' €F�ee Y4 Free Detector Phases -- Trailing Detector (ft) Tuming pe Lane Util. Factor 0 5 i 1.00 0 0.95 0 '9 1.00 0 '.'.15 0.97 0 0 ' 0.95 1.00 0 i6 -' 1.00 0 0 . 0.95 1 .00 0 1.00 0 0.95 - - b - 8 0 1.00 =9'4!5 >32'0� .n32.0.:' 19:0', *3615 365, >,� 90�.r;14':0 00�• 25.0•,':,300 °p! Total Split ( %) 16.1 % 35.6% 35.6% 21.1 % 40.6% 40.6% Maximum- Greern -,;8 5 ` 26[0• " 26:0 31 D :30!5 30!x, 0850, Yellow Time (s) 0 !85 0 4.0 4.0 4.0 4.0 4.0 5 Flt Protected 0 .950 •'2 0� "20" 2 0 " 2 0 0.950 ', '.' 2 0 '�`�? 0 Lead /Lag 0.950 Lag Lag Lead 0.950 Lead Lag Lead Lag Said: ±Flowc -1656 i 3312 1482r x :3213.` 3312 1 1583' 3167 1`4122 1 583 21x3,167 X1:41 Flt Permitted 0.950 o a NOne „`•None�;tNone•'i - Ndhe„ None�?=Nones?�Min •, "= . None •:'Min ;;' 0.950 10.2 27.2 27.2 15.0 0.400 15.0 10.0 0.286 Act uated, ' _` 01 =t -. Satd "F1ow_ 1656 3312,.1482e s °1:00.' 0.39 °::0!31,;' -11:00 .- 3213'; -3312. 1.482'." 667 ^3167 141 Z' 977' 3162 :1:417 Right Turn on Red 0.28 0.86 0.81 0.13 Control,Dela .;- Yes ..3T.2r , 6.6; 51�.0't '32H "4T3r' 37 7 ....6815 Yes Queue Delay Yes 0.0 0.0 0.0 0.0 0.0 Yes SatddFlow, '�� • � _ � :135 .- ,r "" , ;166' • , .::395), 1 F _' .' • •190 Headway Factor 1.00 1.00 1 .00 1.00 1.0 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Link Speed=(mph) .. ;45� ".,. 45 ; r :507 Link Distance (ft) 7426 7377 4145 5282 Tfavel=Timei +. ", Volume (vph ^t12�5; _ „r141�11:8 "- _� 56:5 99 778 1 4 953 149 85 287 '" _ .r,iz.u^ :� 'f 360 343 720 171 Peak Hour Factor ` °- 0:90. 0!90; 0:90 -0:90 '0!90 ° 0:90 _0:90 ,0.90 D: 90a-'0!90 2.90 0!90 Heavy Vehicles ( %) 9% 9% 9% 9% 9% 9% 14% 14% 14% 14% 14% 14% Adj t'rFlow; (vpf) 110 > :864' - '147 451' 1059 a166a = 94 •319 ;* 04 0 381 ` .800 190 Lane Group Flow (vph) 110 864 147 451 1059 166 94 319 400 381 800 190 lurnT e TEN 1 Protected P hases P,roterm: 5 - '.Pro f 2 1 Perm . pm + f':�_ 6 3 8 - 'Fee pm +p �rFree 7 4 f?ermittedFPhases ,2'' 6"" R8' '� ' €F�ee Y4 Free Detector Phases 5 2 2 1 6 6 3 8 7 4 Minimumilr itial: Minimum Split ( 4!0 ; 10.0 ,4t0 9i0 • - 2.Or,' - 10.0 1 0.0 8.0 `4:0� 9'.Or 10.0 10.0 8.0 10.0 8.0 10.0 TioI�S pl�t;(s) g =9'4!5 >32'0� .n32.0.:' 19:0', *3615 365, >,� 90�.r;14':0 00�• 25.0•,':,300 °p! Total Split ( %) 16.1 % 35.6% 35.6% 21.1 % 40.6% 40.6% Maximum- Greern -,;8 5 ` 26[0• " 26:0 31 D :30!5 30!x, 10.0% 15.6% 0.0% 27.8% 33.3% 0.0% `,8 0 x S" a• sr 19 0 r, 24 0 ;;', Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 AlhRed';Time! •'2 0� "20" 2 0 " 2 0 " >20 2'0 � =`-�2 0; .2 =0 ', '.' 2 0 '�`�? 0 Lead /Lag Lead Lag Lag Lead Lag Lag Lead Lag Lead Lag Lead-,L+a� g O ptimizev Yes Y Yes Yes 4: ' Yesr *Yes Yes • y Yes. Yes " : h Ye`s 'Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 RecaIICMo�'�' - ' - de= �� '.''N o a NOne „`•None�;tNone•'i - Ndhe„ None�?=Nones?�Min •, "= . None •:'Min ;;' Act Effct Green (s) 10.2 27.2 27.2 15.0 34.8 34.8 15.0 10.0 89.1 34.8 27.7 89. Act uated, ' _` 01 =t -. x0:31,,, 031' 0 ^17~` =0 -39 010 ^ ": %0 *11 s °1:00.' 0.39 °::0!31,;' -11:00 v/c Ratio 0.60 0.85 0.27 0.83 0.82 0.24 0.58 0.90 0.28 0.86 0.81 0.13 Control,Dela .;- ^5111• ..3T.2r , 6.6; 51�.0't '32H "4T3r' 37 7 ....6815 X0!5:' 42 3 .:37 3 0_2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 T'otal;Dela LOS Ap proach(Dela y a Approach LOS ' 0 ' ,.66 '518 { :32a "> 43,>.: 68 15 a +0.5i, 42:3. 373; ' 2 D D A D C A D E A D D A T- .e -,�-� - . ,..:.. 3 �r� r�--- r^r,: 53xi -?.'.c t ' • s�.�3 ...... -36 x;<�:,i ,35A tN< a C C C C Baseline Patton Harris Rust & Associates Synchro 6 Report Page 1 0 0 Shenandoah - Oak Ridge Build- out_PM_Suggested Imp. 3: Route 277 & Route 340/522 1/12/ 90tfi %ile.Greeh: 90th %i T erm Code 8.5 Max 26:0 Max 26.0 Max 13.0 Max 30.5 Max Max 3:0 Max 8.0 Max _ 19.0 Max 24:0 Max 70th %ile GFeeh, . 70th %ile Term Code ' 8,5 Max 26;0 Max 26.0 Max 13 0' -: 30'.5 Max Max '30.5 Max 3:0' Max 8'.0 Max _ :19.0 _. Max -7 -19.0 24(F Jl Max 50th %ile Green (s) 8.5, '26.0 26.0 13.0 30x5 30'5 10 8.0 _ 24.0 50th %ile Term C ode Max Max Max Ma x Max Max Ma Max Max Max 30ih %ile Green (s} ' Znth 0/ UP Torm r'.nrio 8.5 MAY 26.0. Max 26.0 Max Max 30.5 Max 30'.5 Max 3:0 Max 8:0 Max J Max Max Cnlitc AM Phacec• 3' Rnute 277 h Route 340/522 ml o2 \ 03 + o4 19's JIM 32, S. a 911 1, 30s._. A 6= f � 05 e6 m7 1 19136.5 -1 25 s:- =' 14 "s —:. Baseline Synchro 6 Report Page 2 Patton Harris Rust & Associates 0 Shenandoah - Oak Ridge 6: Route 277 & Double Church Road 0 Build- out_PM_Suggested Imp. 1/12/2 Lane Storage Length (ft) 150 9% 1000 225 9% 0 275 3% 0 200 J% 0 Storag 1 748 748 1> 182c- 182 •869 869 . 129' 129 359 359 167 167 222 222 `: ,134' 134 947 147 207 207 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Leadin Detector ft) 50 `50. 50 50 50 50 50. = 50 50 '50 50' ` 50 Trailing Detector (ft) 0 0 0 0 0 0 0 0 0 0 0 0 Tul rnin g'Speed (mph) 157 1 9 15 y am' 9 15 7 9 -'15 � ' 9 Lane Util. Factor 1.00 1.00 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt .. 4;4:0 z12;0- 0:850 .'4140 19.0; 0:850 =25.0. i 0:850 ,15.0 Total Split ( %) 0.8 50 Flt P rotected 0.950 45.6% 21.1% 27.8% 27.8% 0.950 16.7% 16.7% 0.950 40 4.0 . '38 0 - 4.0 0.950 ' 6:0 >;.';35:0' 4.0 4.0 ':' 35'.0' 4.0 Satd:'Flow (prot) -1656 1743 1482 1656' 3312 '1482 1752 1845 1568 .1.752 1845 1568 Flt Permitted 0.187 9n...•..'>.n... 0.108 0.353 0.651 Satd:rFlow (perm) 326 1743: 1482 188 , 3312 - 1482 651 1845. •1568 1201 ,1845 1568 Right Turn on Red Yes Yes Yes Yes Satd::Flow (RTOR) 323 •:129 x222 _ - 204 Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 I- in4.Cnooili /.n:.Fl» - I _I !Ar, - t dri. ..I .4n, :- I . .... :4n' :il 4 IY:i.0 - zoo.0 =. ­ 171 673 291 164 782 116 323 150 200 121 132 186 Heav Vehicles ( %) 9% 9% 9% 9% 9% 9% 3% 3% 3% 3% J% 3 Ad j:�F.low (vph) -- Lane Group Flow (vph) 990 190 748 748 323 323 182c- 182 •869 869 . 129' 129 359 359 167 167 222 222 `: ,134' 134 947 147 207 207 Tul _ mrT - ' pm + 37.4 Perm pm +p .,' - ». ' tPerm pm + pt . • Perm" + pt - Perm Protected Phases 5 2 0:.42 1 6 0.23 - 3 8 Or12 . 7 4 0.56 Permltted'Phases 2• 0.81 2 0.19 0.90 0.39 0.42 0.55 18 ; ' 4 . 4 Detector Phases 5 2 2 1 6 6 3 8 8 7 4 4 Minimum Initial (s) Minimum Split (s) ' ',2 0.' 8.0 ' 4:0 10.0 AT 7 10.0 . - 20 :. >4:0 8.0 10.0 ^" •4 °:0 10.0 2:0: ; 8.0 4:0 10.0 4:0 10.0 `' '.2 .0 8.0 -4's0 10.0 -4:0 10.0 Tol tal,S plit(2) .- 15.0' '44'0" 4;4:0 z12;0- - ,41-.0 .'4140 19.0; -25.0, =25.0. i ' 15.0., ,15.0 Total Split ( %) 16 .7% 48.9% 48.9% 13.3% 45.6% 45.6% 21.1% 27.8% 27.8% 10.0% -- 16.7% 16.7% Maximum Green (s) Yellow Time (s) 40 4.0 . '38 0 - 4.0 38:0 4.0 ' 6:0 >;.';35:0' 4.0 4.0 ':' 35'.0' 4.0 . - :13:0 " 4. 19,0 4.0 19:0 4.0 • °3;0. 4.0 ` 9'0 ->19:0 4.0 4.0 AH r... -r..4 .. - on ton O•n. -o�n .: *,2n ..9'n 79n, --9n. 9�n.. 9n...•..'>.n... 9n Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall!Mode, -` None ..None None. 'None None 'None. None . M17 :Min NoNone -Min : MinMin Act Effct Green (s) 50.7 40.0 40.0 45.4 37.4 37.4 29.8 20.8 20.8 1 5.8 1 10.8 Actuate d g /C Ratio 0.56 - :0.45, 0:45 0:51 0:.42 0:42 O.33 0.23 - 0:23:. ,0.18 Or12 . 0:12 v/c Ratio 0.56 0.96 0.38 0.81 0.63 0.19 0.90 0.39 0.42 0.55 0.66 0.56 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 u.0 u.0 Total: Dela 15:4. 50.4 3.3 45-41 LOS B D A D C A D C A C D B - -� -^^T A. proacli0ela y.,= w : ., - -- 33r1 .24: =7 -,� 34_:8 .. .,, .30.5. - a Approach LOS C C C C Baseline Synchro 6 Report Page 3 Patton Harris Rust & Associates 0 0 Term Code Max Max Max Max Hold Hold Max Hold erm Code Max Max Max Max Hold Hold Max Hold Hold Max Rnlifc .nri Phacec' r Rnuta 977 R nnuhle Church Road 01 2 m3 t +�` m4 12 �- 1 W144 s � - -- 1.4 m5 F � � m7 a,�j 4 m8 15rs`�. I lCf ._ :. T— A9's I lFQ5 _;_._2 s€ Baseline Synchro 6 Report Page 4 Patton Harris Rust & Associates Shenandoah - Oak Ridge Build- out_PM_Suggested Imp. 6: Route 277 & Double Church Road 1/12/2007 'A -~ t4\ T r'► 1 r 3nth % ile Term Code Max Max Max Max Hold Hold Max Hold Hold Max Max Max 0 0 Shenandoah - Oak Ridge Build-out Imp. 8: Dogwood Drive & Route 340/522 1/12/2007 � -,* 4, t 1900 1 900 1 1960 966 -1906 ' '0 0 1- --- - . I --- � - ---.I 9 15 9 1'.00, 1.00 0.99 -0'95� Baseline Synchro 6 Report Page 5 Patton Harris Rust & Associates Fnt—arsecb—o-n 0 0 Shenandoah - Oak Ridge Build-out Imp. 12: Site -Dr #1 & Route 340/522 1/12/2007 4 \ T 1 I ooiai,;J Total Split ( %) 28.3% 28.3% 25.0% 71.7% 46.7% 46.7 % Maximum',Green (s) 11'0 - 11'0' 9 0 ' '37 '22.0' • •22:0' Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 AIL`- Red.Time `, ',•? 2A' ' 2i0 • 2.0, M!, . 204 ;2:0 -.. Lead /Lag Lead Lag Lag Lead= La °' ' • Yes Yes _Yes. -' Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mod -r ' e "r _ None 'None.. None' Mim Act Effct Green (s) . 12.4 12.4 38.7 38.7 23.7 23.7 Actuated g /CtRatio 0.21' 021. 0.657' 0.65. 0.40 ' ,0:407. v/c Ratio 0.67 0.59 0.76 0.27 0.89 0.32 Control Dela ; 31'.1. . 7.7 23.5' 4.8, 2713 4.5 ; _ Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 lToTaltDela LOS 31U' C ;, 77,, A 23:5 C _ 4:8(-'!27:3 v " 4".5 •, a. A C A Baseline Synchro 6 Report Page 6 Patton Harris Rust & Associates Fft•, 0:850 0:850 Y Flt Protected 0.950 0.950 Satd. Flow (prot) - 1 1568 1752 3167 3167 ''1568 Flt Permitted 0.950 0.143 P- ermittedlP,hases 4 - . 2 . . ,, 6 : :. ,, • -:. - Detector Phases 4 4 5 2 6 6 Minimum ?Initial. " 2:0, 2.0 2;0 '4_,0 ' ';r4':0 _4:0 Minimum SDlit (s) 8.0 6.0 8.0 10.0 10.0 10.0 Shenandoah - Oak Ridge 12: Site-Dr #1 & Route 340/522 0 Build-out Imp. 1/12/2007 _-" --* -4\ t 4 90th %ile Term Code Max Max Max Hold Max Max , 70th!/::11:e:6r — eeh 70th %ile Term Code 1 1:0 Max 11.0 Max 9,0 Max 37:0 Hold 22 Max 22.0 Max 50th %ile Green s) :19 11.&, 9�0, 37:0 22Q 22.0. 50th %ile Term Code Max Max Max Hold Max Max 30th %ile ( 11.0 9.0..-37.0 22.0 22.0 30th %ile Term Code Max Max Max Hold Max Max ,1 nth -/-tip (gash W A " R q 47 . q 5 —f � 20 - 20 R %ile Term Code S I nlits and Phases: 12 Site-Dr #1 & Route 340/522 o2 04 '*\ 05 ji 06 15 i� I Wl 28 s- -7 I Im Baseline Synchro 6 Report Page 7 Patton Harris Rust & Associates 0 0 Shenandoah - Oak Ridge Build-out Imp. 14: Site-Dr #3 & Double Church Road 1/12/2007 k- t Llahb[Gir&ffipi VVBL R T Lane Configurations Ideal Flow VP PA 1900 1900 ---- 1900 T9-00 77 —jq0b�---------= Turning Speed (mph) 15 9 9 15 Lane-U Fil 1.00 1M 1e001 1.00 17 .00 Frt 0.865 Bit — Protected 0.993 Satc. Flow (prot) 1596 0 1845 0 0 1832 F It �Permiltcl - 0.993 Satcl. Flow (perm) 1596 0 1845 0 0 1832 - Fn I - nn, nn Baseline Synchro 6 Report I Page 8 Patton Harris Rust & Associates Link Speed (mph) 30 40 4U E 2743 2206 -14955 - Travel Time (s) 62.3 37.6 253.2 Volume 0 '83 585 0 88 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0 0 Shenandoah - Oak Ridge Build-out Imp. 16: Route 277 & Site -Dr #2 1/12/ Lane 300 1900 1900 1900 .1'900 .1900 1 00 100 0 0 Turnin ^8peetl (mph) 74.3% 9 15 4.0 4.0 4.0 � 4.0 4.0 4.0 50 50 50 '_ 50 - '50_ _ , , ; 50, • _ ,_ ma r _ Trailing D etector (ft) 0 0 0 0 0 0 Total Split ( % Turnin ^8peetl (mph) 74.3% 9 15 46 0 . 15 9 1 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 4.0 Frt ' A111=Red'Time, 20 Os850 20 2.0" 02:0 0I850 _ Flt Protected 0.950 0.950 Lead -La' g!bp m z ?' Satd: Flow (p it 743 - 1568 1752 1743 1.752 -•.1568 3.0 Flt Permitted 3.0 3.0 0.169 Recall Mode : 0 .950 None None Satd.!Flow ( (m) .' .1243 Min v , Min ' •' '. .. :" - ' `� '1568 312 1743"' `1252.' x.1568.' 12.1 Tot _tal S plit (s) .' , .: 'b2U':.'- b2:u Dz:u .bZ.u" -1611 ,.:. A ". Total Split ( % 74.3% 74.3% 74.3% 74.3% 25.7% 25.7% Maximum; Green (s) 46 0 . 46 0 46 0 46.0 '. 12:0 12:0 Yellow Time (s) 4.0 4.0 4. 4.0 4.0 4.0 A111=Red'Time, 20 : 210- 20 2.0" 02:0 't 2.0' • '.,' " ''� Lead /Lag Lead -La' g!bp m z ?' ^ Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode : ., :None None None - None Min v , Min ' •' '. .. :" - ' `� Act Effct Green (s) 48.1 48.1 48.1 48.1 12.1 12.1 Actuatedi /CRatio.; "071 .'0.71,: 0.7 0.71 .A We Ratio 0.79 0.13 0.66 0.98 0.48 0.37 Control Dela .'`13.7 .14 25:8 33:3' 29,2:_ 7.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 -- Total4Dela -Fr a 1-317 ai4' 25[8;' 333': 29!2 7.3, r - .: 7 LOS B A C C C A Baseline Synchro 6 Report Page 9 Patton Harris Rust & Associates PetmittediPhase' s - -2 6' Detector Phases 2 2 6 6 8 8 Minimum Initial (s) 4.0' , 4.0 4.0 . 4:0" 4.0, Minimum Split (s) 10.0 10.0 10.0 10.0 10.0 10.0 0 Shenandoah - Oak Ridge Build-out Imp. 16: Route 277 & Site-Dr #2 1/12/2007 --* ' - V � *— 4 \ / 90th %ile Green �6. 0 , 46.0 46'0 , 46.0 . it . I I • 90th %ile Term Code Max Max Max Max Max Max 70th %ile Green s) 46.0 46.0 46.0 46.0 12.0 12.0 f 70th %ile Term Code Max Max Max Max Max Max 50th 5 /6il �Gneen 46.0 -46v0 46�0 46 1 — 7 — , 1 50th %ile Term Code Hold Hold Max Max Gap Gap 30th Green' ( s) 46.0 46:0 46.0 46.0 9.2 92 30th %ile Term Code Hold Hold Max Max Gap Gap 110th %ile Green s) 46.0' 46.0 46:0 •46:0' 0.43 6.6 1 0th %ile Term Code Hold Hold Max Max Gap Gap (ft) 231 2 29 402 . it . I I • (ft) #450 17 #140 #777 108 43 1 12655 7346 2276 100 100 1 1228. t1 - 220 - : 1228 360 4 33 uctn 0 0 0 0 0 0 6t - n , 0, 0j In 0 0 0 0 0 0 • 0 0-13 066 0.98 0.43 0.34i .qnlitq and Phases• 1 6' Rnijt( 277 & Site-Dr #2 o2 52:F -- 06 52 lbf les Baseline Synchro 6 Report Page 10 Patton Harris Rust & Associates Interstction'bignal Dela - '22!f mtersecvomLL9b.-U Intersection Capacity Utilization 70.8% ICU Level of Service C TPe riod (min) 90th %ile Actuated Cycle: 70 —71 , To�th-/Dle AEtuatedrCVcIe 70� — ------ 0 Intersection: E -W: ROUTE 277 Weather RAIN File Name N -S: DOUBLE CHURCH RD Count By JJP Input By JJP Location WINCHESTER,VA Count Date 11/72006 15 Minute EB: ROUTE 277 WB: ROUTE 277 NB: DOUBLE CHURCH RD SB: DOUBLE CHURCH RD 15 Min. Period N,S, Period Begining Left Then, Right Taal Left Tlmt Right Total Left Than Right Total Left Than Right Total E &W Begining 700 14 66 9 89 6 79 1 86 33 7 10 5D 14 7 l6 37 262 7:00 7:15 6 100 15 L2l 10 72 3 85 31 10 12 53 14 7 LO 31 290 7:15 7:30 7 78 12 97 7 91 7 105 33 5 8 46 19 14 14 47 295 7:30 7:45 9 61 15 85 7 92 3 102 52 9 9 70 18 7 16 41 298 7:45 800 14 75 9 98 11 73 9 93 42 13 8 63 13 8 16 37 291 8:00 815 8 59 8 75 6 57 3 66 37 6 12 55 17 7 18 42 238 5:15 8:30 13 67 17 97 12 61 7 80 34 15 9 58 l0 5 18 33 268 8:30 8:45 20 61 17 98 7 64 9 80 32 9 8 49 13 8 16 37 264 8:45 A.M. Total 91 567 102 760 66 589 42 697 294 74 76 444 103 63 124 305 2206 A.M. Total 16:00 20 66 20 106 24 93 13 130 29 31 17 77 20 18 33 71 384 16:00 16:15 21 83 29 133 21 103 13 137 31 17 14 62 21 21 28 70 402 16:15 16:30 34 78 34 146 27 94 17 138 26 14 25 65 24 23 31 78 427 16:30 16:45 29 90 40 159 15 99 15 129 31 26 41 98 16 26 32 74 460 16:45 17:00 28 98 37 163 28 110 19 157 34 20 27 81 16 21 35 72 473 17:00 17:15 26 74 31 131 29 98 22 149 48 26 33 107 29 17 27 73 460 17:15 17:30 27 78 23 128 34 103 19 156 38 25 28 91 17 21 26 64 439 17:30 17:45 24 65 27 116 18 82 16 116 44 17 2L 82 29 17 21 67 381 11:45 P.M. Total 209 632 241 1082 196 782 134 1112 281 176 206 663 172 164 233 569 3426 P.M. Total I How EB: ROUTE 277 WE: ROUTE 277 NB: DOUBLE CHURCH RD SB: DOUBLE CHURCH RD 1 Hour Period N,S, Period Begining Left Thm Right Total Left Thm Right Total Left Than Right Total Left Thm Right Total E & W Begining 7:00 36 305 51 392 30 334 14 378 149 31 39 219 65 35 56 156 1145 7:00 7:15 36 314 51 401 35 328 22 385 158 37 37 232 64 36 56 156 1L74 7:L5 730 38 273 44 355 31 313 22 366 164 33 37 234 67 36 64 167 1122 7:30 7:45 44 262 49 355 36 283 22 341 165 43 38 246 58 27 68 153 1095 7:45 8:00 55 262 51 368 36 255 28 319 145 43 37 225 53 28 68 149 1061 8:00 16:00 104 317 123 544 87 389 58 534 117 88 97 302 81 88 124 293 1673 16:00 16:15 Ill 349 140 601 91 406 64 561 122 77 107 306 77 91 126 294 1762 16:15 16:30 117 340 142 599 99 401 73 573 139 86 126 351 85 87 125 297 1820 16:30 16:45 110 340 Lit 581 L06 4L0 75 591 151 97 129 377 78 85 120 283 1932 16.45 17:00 105 315 118 538 109 393 76 578 164 88 t09 361 91 76 109 276 1753 L7:00 I Hour EB: ROUTE 277 WB: ROUTE 277 NB: DOUBLE CHURCH RD SB: DOUBLE CHURCH RD UE&W tHow Period Period Begining Left Th. Right Tot.] Left Thru Right Total Left Thm Right Total Left Thou Right To Begining 7:15 36 314 51 401 35 348 22 385 158 37 37 232 64 36 56 156 1174 7:15 A.M. Peak PHF = 0.83 PHF = 0.92 PHF = 0.83 PHF = 0.83 0.98 A.M. Peak 16:45 110 340 131 581 106 410 75 591 151 97 129 377 78 85 120 283 1832 16:45 P.M. Peak PHF = 0.89 PHF = 0.94 PHF = 0.88 PHF = 0.96 0.97 P.M. Peak E 0 Intersection: E-W: ROOTE522 Weather DRY Fi] Name N -S: ROUTE 277 Count By UP I nput By AP Location WINCHESTER,VA Count Datel 1119r006 l5 Minute EH: ROUTE 522 WB: ROUTE 522 NB: ROUTE 277 T SB: 7 IS Min. Period N,S, Period Begining Left Tine Right Total Left Thru Right Total Left Tom Right Total Right Taal E&W Begining 7:00 17 79 6 102 23 106 30 159 17 36 49 102 30 20 11 61 424 7:00 7:15 29 92 4 125 29 97 40 166 15 53 39 107 27 27 4 58 456 7:15 7:30 24 119 5 148 22 109 35 166 21 70 33 124 23 22 6 51 489 7:30 7:45 14 103 3 120 19 88 38 145 8 56 42 106 35 24 7 66 437 745 8:00 20 85 7 112 17 88 30 135 6 40 30 76 19 15 8 42 365 8:00 8:15 37 54 3 94 14 112 46 172 18 46 28 92 34 25 6 65 423 8:15 8:30 21 49 1 71 28 122 33 183 7 42 35 84 24 21 7 52 390 8:30 8:45 11 67 5 83 18 90 28 136 9 31 22 62 31 20 8 59 340 8:45 A.M. Total 173 648 34 855 170 812 280 1262 101 374 278 753 223 174 57 454 3324 A.M. Total 16:00 17 92 11 120 37 120 25 182 11 33 34 78 67 88 23 178 558 1600 16:15 15 108 13 136 33 124 25 182 6 21 22 49 55 66 19 140 507 16:15 16:30 8 99 15 122 50 156 32 238 14 26 39 79 51 72 27 150 589 16:30 16:45 10 98 16 124 33 139 26 198 7 16 32 55 56 83 23 162 539 16:45 17:00 11 120 15 146 41 130 20 191 8 14 36 58 54 80 19 153 548 17:00 17:15 6 127 l8 151 43 133 IS 194 II 22 35 68 60 79 13 152 565 17:15 17:30 5 102 16 123 31 140 16 187 16 37 22 75 44 92 14 150 535 17:30 17:45 5 86 14 105 31 122 24 177 12 23 28 63 43 59 19 121 466 17:45 P.M. Total 77 832 118 1027 299 1064 186 1549 85 192 248 525 430 619 157 1206 4307 P.M. Taal 1 Hour EB: ROUTE 522 WB: ROUTE 522 NB: ROUTE 277 SB: ROUTE 277 1 Hour Period N,S, Period Begining Left Thru Right Total Left Thou Right Total Left Thru Right Total Left Than Right Taal E & W Begining 7:00 84 393 18 495 93 400 143 636 61 215 163 439 115 93 28 236 1806 7:00 7:15 87 399 19 505 87 382 143 612 50 219 144 413 104 88 25 217 1747 7:15 7:30 95 361 18 474 72 397 149 618 53 212 133 398 111 86 27 224 1714 7:30 7:45 92 291 14 397 78 410 147 635 39 184 135 358 112 85 28 225 1615 745 8:00 89 255 16 360 77 412 137 626 40 159 115 314 108 81 29 218 1518 8:00 16:00 50 397 55 502 153 539 108 800 38 96 127 261 229 309 92 630 2193 1600 16:15 44 425 59 528 157 549 103 809 35 77 129 241 216 301 88 605 2183 16:15 16:30 35 444 64 543 167 558 96 821 40 78 142 260 221 314 82 617 2241 16:30 16:45 32 447 65 544 148 542 80 770 42 89 125 256 214 334 69 617 2187 1645 17:00 27 435 63 525 146 525 78 749 47 96 121 264 201 310 65 576 2114 17:00 1 Hour EB: ROUTE 522 WB: ROUTE 522 NB: ROUTE 277 SB: ROUTE 277 1 Hour Period N,S, Period Begining Left Than Right Total Left Thru Right Total Left Thru Right Total Left Thou Right Taal E & W Begining 7:00 84 393 18 495 93 400 143 636 61 215 163 439 115 93 28 236 1806 7:00 A.M. Peak PHF = 0.84 PHF = 0.96 PHF = 0.89 PHF = 0.89 0.92 A.M. Peak 16:30 35 444 64 543 167 558 96 821 40 78 142 260 221 314 82 617 2241 16:30 P.M. Peak PHF = 0.90 PHF = 0.86 PHF = 0.82 PHF = 0.95 0.95 P.M. Peak