SITE BACKGROUND AND HISTORY
The Shenandoah -Oak Ridge Property consists of 52.6 Acres identified by County records as Tax
Map Parcel 85- A -273D. The Property is zoned RA (Rural Areas) with other RA zoned properties
bordering the site to the West. East and adjacent to the subject Property is the actively developing
Shenandoah Age Restricted Community which is zoned R5 (Residential Recreational Community).
Currently, Shenandoah is approved for the construction of 2,130 age restricted dwelling units and is
served by the Crooked Run Waste Water Treatment Plant which was constructed in conjunction
with the approval of the original Shenandoah Master Plan. This application seeks to rezone the
Shenandoah — Oak Ridge Property to R5 with a maximum of 160 age restricted single family
dwellings to allow the property to develop as an extension of the adjacent age restricted community
that is currently under development.
Currently, the Property is vacant. The development of the subject site for age restricted residential
use would serve as a logical expansion of the community that is currently under development as it
would allow for a seamless integration of the subject property with the existing, adjacent R5 zoning.
LOCATION AND ACCESS
The Shenandoah -Oak Ridge Property is land- locked with other RA zoned parcels separating it from
Hudson Hollow Road to the West and the developing age restricted community bounding the
Property to the East (See Figure 1). Fortunately, the design of the adjacent community includes a
main roadway, Rachel Carson Drive, that fronts the subject Property. Via Rachel Carson Drive,
access will be provided to Route 522, Route 277, and Hudson Hollow Road.
The Applicant has proffered out the potential for a direct access to nearby Hudson Hollow Road.
This provides for the connection to the planned road network within the existing Shenandoah
Community and avoids dispersing traffic onto portions of Hudson Hollow Road where the road
alignments are less suited for higher traffic volumes. Additionally, the Applicant has proffered to
provide a minimum of two connections from the Oak Ridge Property to Rachel Carson Drive in the
Shenandoah Community to provide appropriate options for emergency response vehicles.
Figure 1
f l
r r f \
{ 4
r �
R
1 '=
PrOp3t1d RI 3T BpPiB
JDA
CD SMA
' � RAaet LanmAnryCaAltlar
��f �� ` _ Rsaidondal
Intivc¢ial
r� InatrW�onal
A • ' � { `�� ReoeaSon
f Mxetl -u"
OW Planrwd J t Dwwiopm ftt
r _ , Eastern Frederick
County
Long Lange
f Land Use Plan
V
-
Nkr
ti SHENANDOAH — OAK RIDGE Patton, Harris, Rust &Associates, pc
l LONG RANGE LAND USE PLAN 117 E. Picadilly St. Winchester, Virginia 22601
p a VOICE: (540) 667 -2139 FAX: (540) 665 -0493
FREDERICK COUNTY, MGM
Figure 2
• i
COMPREHENSIVE PLAN
The Shenandoah - Oak Ridge Property is located well outside of the Urban Development Area
(UDA) and Sewer and Water Service Area (SWSA). As depicted on Figure 2, The UDA and SWSA
were established as the intended boundary for residential development by the service area of the
Opequon and Parkins Mill Wastewater Treatment Plants. Sewer service to the project would be
provided by the Crooked Run Wastewater Treatment Plant which has been constructed as part of
the Shenandoah project. As such, the SWSA /UDA concept does not apply to this rezoning
application. Instead, the subject boundary is the Crooked Run Service Area. The Crooked Run
Service Area was established in 2001 by an agreement between the Frederick County Sanitation
Authority, Frederick - Winchester Service Authority, and the previous owner of the 2,130 unit
Shenandoah development who still maintains ownership of the retail areas of that project. The
subject Property is located adjacent to the Crooked Run Service Area as defined by the 2001
agreement. The Frederick County Sanitation Authority must obtain permission from the developer
prior to serving any areas outside of the existing Shenandoah boundaries with sewer service. As the
developer of the existing Shenandoah project is the applicant for this rezoning, extension of sewer
service by the Crooked Run Treatment Plant to the subject Property will not be an issue. A revised
agreement between the FCSA, FWSA, and the developer would expand the current Crooked Run
Service Area boundary to incorporate the subject site in accordance with the stipulations set forth in
the 2001 agreement between the three parties.
The Frederick County Zoning Ordinance requires that R5 communities be a minimum of 500 acres
in size and be developed in a carefully planned setting. As the existing R5 zoned Shenandoah
Community totals more than 900 acres, incorporation of the 52 acre Oak Ridge Property with the
current design of Shenandoah would meet the ordinance requirements.
TRAFFIC
A traffic impact analysis (TIA) was prepared for this application using composite data collected from
other studies in the area as well as actual traffic counts. Using traffic generation figures from the
LT.E. Trip Generation Manual, 7 Edition the TIA projects that the proposed development will
produce 1,392 vehicle trips per day (VPD).
Figure 3 depicts how traffic would enter and leave the site. A connection to Rachel Carson Drive in
the Shenandoah Community would allow traffic to safely enter and exit from Route 522, Route 277,
-2-
Figure 3
0 0
and Route 636 (See figure 4). The connection to Route 522 has already been constructed, with the
connections to Route 277 and Route 636 scheduled to be made later in the development process of
Shenandoah. The TIA indicates that several transportation improvements would be necessary in
order to accommodate a level of service (LOS) C or better for the subject intersections assuming a
2015 buildout. These improvements include additional turn lanes at the intersections of Route
277 /Route 636 and Route 277 /Route 522 as well as an additional West bound through lane for
Route 277. It is important to note that Background traffic alone warrants every transportation
improvement mentioned above as the development generated traffic represents less than 7% of the
Background traffic.
In recognition of the impact the subject development will have on the transportation system, the
Applicant has proffered $500.00 per residential unit for transportation improvements within the
vicinity of the site. This money could be used towards the transportation improvements warranted
as a result of Background traffic alone.
SITE SUITABILITY
The site does not contain conditions that would preclude or substantially hinder development
activities. The following table provides an area summary of environmental features:
Shenandoah -Oak Ridge Property
Environmental Features
Total Project Area
52.6 acres
Area in Flood Plain
0.0 acres
0.0%
Area in Steep Slopes
0.0 acres
0.0%
Area in Wetlands
TBD
TB
Lakes & Ponds
0.0 acres
0.0%
Flood plain data for the subject parcels is delineated on the Flood Insurance Study Map for
Frederick County prepared by the U.S. Department of Housing and Urban Development,
Community Panel #510063- 0200B, effective date July 17, 1978. The site is located in Flood Zone
C, which denotes areas of minim flooding outside of the 100 -year flood plain. Flood Zone A, 100 -
year flood plain, exists coincident with the West Fork of Crooked Run, though this area is located
immediately west of the subject site's Southwest boundary.
The General Soil Map of the Soil Survey of Frederick County, Virginia indicates that the soils
comprising the subject parcels fall under the Weikert - Berks - Blairton soil association, with the
particular geology identified by the Soil Survey as Berks channery silt loams with slopes ranging
-3-
ar
0
LV
l kT
t D
a
SHENANDOAH — OAK RIDGE Patton, Harris, Rust & Associates, pc
GENERALIZED DEVELOPMENT PLAN 117 E. Picadilly St. Winchester, Virginia 22601
p V a VOICE: (540) 667 -2139 FAX: (540) 665 -0493
fREDER/CK COUNTY, ORG/N61
Figure 4
•
from 3% to 25% on the Eastern half of the Property and Weikert -Berks channery silt loams with
slopes of 25% to 65% to the West. Such geology is prevalent on land located east of Interstate 81
and is not identified as prime farmland by the Frederick County Comprehensive Plan.
The site is predominantly wooded and no history of agricultural use has been identified. The
Property is located within the Stephens Run drainage area. The site has a high elevation of 695.0
feet with a low elevation of 605.0 feet. A ridgeline tins from north to south roughly along the
center of the property. Drainage flows West of the ridge line to the West Fork of Crooked Run and
East of the ridge line towards Lake Frederick (See Figure 5).
The National Wetlands Inventory does not identify any wetlands on the Shenandoah -Oak Ridge
Property, however any potential wetlands would be identified by a wetlands delineation as part of
the Master Plan phase of the project. No lakes or ponds are located on the Property.
No area of the Property contains slopes that are greater than 50 percent according to 5 foot contour
data. The engineering phase of the project will examine contour data at a closer scale (2 foot) and
determine if any steep slopes exist along the western and southern boundary of the Property. The
topography of the site lends towards incorporating the steeper slopes found west of the
aforementioned ridge line into the required 30 percent open space for the project.
SEWAGE CONVEYANCE AND WATER SUPPLY
Sewer Service will be provided by connection to the lines planned for the Shenandoah Age
Restricted Development to be treated at the Crooked Run Treatment Plant. Using a standard rate
of 200 gallons per day /dwelling unit, it is projected that the proposed development would produce
32,000 gallons of sewer flow per day. The Crooked Run plant was designed to treat up to 375,000
gallons per day and is currently permitted for 250,000 gallons per day. Should future needs dictate
an expansion of the treatment plant, it is possible for the plant to be permitted to treat up to 600,000
gallons of water per day.
Water service will be provided by looping a line from the Shenandoah Community through the Oak
Ridge Property. Water consumption for the project will be roughly equivalent to the projected
sewage generation of 32,000 gallons per day.
-4-
v
.A •fyfi � ��
r
�"
Figure 5
0
SOLID WASTE DISPOSAL FACILITIES
The following table shows a projection of solid waste generation as a part of this project.
Unit Type
Units
Waste Generation
Total Waste lbs
Single Family
( Age Restricted
160
9 lbs /day
1,440
Proffered curb -side pickup will be an improvement to solid waste issues associated with increased
dumpster use in the County.
HISTORIC SITES AND STRUCTURES
The Frederick County Rural Landmarks Survey does not identify any potentially significant
structures on the subject acreage or within close proximity of the properties. The subject properties
are not located within the study boundary or core area of any identified Civil War battlefield.
IMPACT ON COMMUNITY FACILITIES
The Applicant has proffered in accordance with the newest Frederick County Fiscal Impact Model
to mitigate the projected fiscal impact on community facilities attributable to the proposed rezoning.
In addition to these proffers, the Applicant has proffered $2,000.00 for each single family detached
dwelling unit and $1,000.00 for each single family attached dwelling unit towards ttansportation
1 0
improvements in the general vicinity of the site.
• Fire and Rescue:
• General Government:
• Public Safety:
• Library:
• Parks and Recreation:
Single Family Detached
$790.00 per unit
$320.00 per unit
$671.00 per unit
$372.00 per unit
$2,239.00 per unit
Single Family Attached
$583.00 per unit
$245.00 per unit
$513.00 per unit
$285.00 per unit
$1,712.00 per unit
TOTAL:
$4,392.00 per unit
$3,338.00 per unit
-5-
0 0
A Traffic Impact Analysis of the
Shenandoah — Oak Ridge Property
Located in:
Frederick County, Virginia
Prepared for:
Oxbridge Development
600 Jefferson Plaza, Suite 550
Rockville, MD 20852
Prepared by:
Patton Harris Rust & Associates, pc
Eng neers. Surveyors. Planners. Landscape Architects.
PH y-� ♦ 10212 Governor Lane Boulevard
Suite 1007
JJJ @ LLL�
` \ i
Williamsport. Maryland 21795
T 301 .223.4010 • F 301.223.6831
January 12, 2007
0 9
OVERVIEW
Report Summary
Patton Harris Rust & Associates (PHR +A) has prepared this document to present
the traffic impacts associated with the proposed Shenandoah — Oak Ridge Property
development located along the southwest quadrant of the intersection of Route 277 &
Route 340/522, in Frederick County, Virginia. The proposed project is to be comprised of
160 single- family attached units. Access is to be provided via three (3) site - driveways
located along Double Church Road (Route 636), Route 277 and Route 340/522,
respectively. The project is to be built -out over a single transportation phase by the Year
2015. PHR +A has performed traffic analyses for existing, 2015 background (without
development) and 2015 build -out (with development) conditions. Figure 1 is provided to
illustrate the location of the proposed Shenandoah — Oak Ridge Property with respect to
the surrounding roadway network.
Methodology
The traffic impacts accompanying the Shenandoah — Oak Ridge Property
development were obtained through a sequence of activities as the narratives that follow
document:
• Assessment of background traffic including other planned projects in the study
area,
• Calculation of trip generation for the proposed Shenandoah — Oak Ridge
Property,
• Distribution and assignment of the Shenandoah — Oak Ridge Property
development - generated trips onto the completed roadway network,
• Analysis of capacity and level of service using Synchro software for existing
and future conditions.
PH R clmoac7Anahsis of the Shenandoah -Oak Numb 1 P rove 142 -1-8
� 1Y Project Numbcr: 1 3 1 42 -1 -8
January 12, 2007
Page I
E
No Scale
�y.
Lakc',
Ftodcri
SITE
:F \-
Figure 1 Vicinity Map: Shenandoah -Oak Ridge Property, in Frederick County, VA
P � ATraffic Lnoacr Analysis of the Shenandoah-Oak e 1 142-- 8
Project Numb r. 13142 -1 -8
January 12, 2007
Page 2
0 0
EXISTING CONDITIONS
PHR +A conducted AM and PM peak hour manual turning movement counts at the
intersections of Route 277 /Double Church Road (Route 636) and Route 277 /Route 340-
522. ADT (Average Daily Traffic) was established along each of the study area roadway
links using a "k" factor (the ratio of PM peak hour traffic volumes to 24 -hour traffic
volumes) of 8.8 % based on the published Virginia Department of Transportation (VDOT)
traffic count data.
Figure 2 shows the existing ADT (Average Daily Trips) and AM/PM peak hour
traffic volumes at key locations throughout the study area roadway network. Figure 3
illustrates the respective existing lane geometry and levels of service. All traffic count data
and Synchro levels of service worksheets are included in the Appendix section of this
report. PHR +A has provided Table 1 to show the existing levels of service and 95`
percentile back of queue for each study area intersection.
P A Traffic Impact Anahsis of the Shenandoah -Oak Ridge 1 142-1 8
Project Num r: 13142 -1 -8
January 12, 2007
Page 3
0
No Scale
T A
(3
(131)51 i
® 22(75)
_
328 (410)
a N
-
35(106)
N N N
v V
1 43(96)
e I
4-M 40 0(SSS)
e
g N
(4493 �I
4) 3
4 )393
1
(
9
• 1
v, n
wl
°na
Dogwood
Sit e_Drive
SITE
0
cr
_Site�Dri�_ #1 a
_u
7
O
ai
Average Daily4Tiips
Figure 2
Existing Traffic Conditions
P
A Traffic Impact Analysis of the Shenandoah -Oak Ridee Property
Project Number: 13142 -1 -8
January 12, 2007
Page 4
0
0
No Scale
n�
a�
Signalized
Intersection
LOS =B(B)
Signalized
Intersection
LOS =C(C)
Figure 3
Site -Drive kl��_
r Denotes Free -flow condition
AM Peak Hour (PM Peak Hour)
(x) AM Approach LOS (PM Approach LOS)
Existing Lane Geometry and Levels of Service
P IJ l �l l ATraFFc Impact Analysis of the Shena
ber: 1 31 2 -1
L l Project Number: 13142 -1 -8
January 12, 2007
Page 5
0
0
Table 1
Shenandoah - Oak Ridge Property
Levels of Service and Back of Queue (95 %) Results
Existing Conditions
Intersection
Traffic
Control
Lane
Group/
A proach
AM Peak Hour
PM Peak Hour
LOS
Back of
Queue
LOS
Back of
Queue
EB/L
B
22.0
B
53.0
EB/T
B
192.0
B
209.0
EB /R
A
20.0
A
31.0
EB LOS
B
B
WB/L
B
22.0
B
51.0
Route 277 &
Double Church
Road
Signalized
WB/TR
B
216.0
C
327.0
WB LOS
B
C
NB/-
NBrrR
B
A
103.0
1 40.0
C
B
106.0
1 115.0
NB LOS
B
B
SB/L
C
69.0
C
86.0
SB/TR
r
B
59.0
C
161.0
SB LOS
C
C
Overall
LOS
B
B
EB/LT
C
546.0
C
1 440.0
EB/R
A
1 13.0
A
23.0
EB LOS
C
C
WB/L
B
60
B
1 102
WB/TR
B
392.0
C
539.0
WB LOS
B
C
NB/L
D 96.0 D 70.0
Route 277 & Route
340/522
Signalized
NBfr
NB/R
D 133.0 D 56.0
Free -flow condition
NB LOS
C
B
SB/L.
C 119.0 C 223.0
SB/T
C 48.0 C 143.0
SB/T
SB/R
Free -flow condition
NB LOS
C
C
Overall
LOS
C
C
* Assumed 25 feet Vehicle Length
EB = Eastbound, WB = Westbound, NB = Northbound, SB = Southbound
L Left, T:Thru, R: Right
P � ATraffic Impact Analysis of the Shenandoah -Oak Numb 1 142-1 8
Project Number: 13142 -1 -8
January 12, 2007
Page 6
E
2015 BACKGROUND CONDITIONS
0
In order to establish the 2015 base conditions, PHR +A applied a conservative
growth rate of 7% per year (compounded annually) to the existing traffic volumes coming
fronYgoing to south of Route 340/522 and 5% growth rate (compounded annually) to all
other traffic movements, respectively. Additionally, PHR +A included specific future
developments located within the vicinity of the proposed site. Using the 7 th Edition of the
Institute of Transportation Engineers' (ITE) Trip Generation Report PHR +A has provided
Tables 2a and 2b to summarize the 2015 "other developments" trip generation. Figure A
is provided in the Appendix section of this report to show the location of the background
developments. Figure 5 shows the 2015 background ADT and AM/PM peak hour traffic
volumes at key locations throughout the study area. Figure 6 shows the respective 2015
background lane geometry and AM/PM peak hour levels of service. All Synchro levels of
service worksheets are included in the Appendix section of this report. PHR +A has
provided Table 3 to show the levels of service and 95 percentile back of queue for each
study area intersection during 2015 background conditions.
Table 2a
2015 "Other" Background Development: Shenandoah
Trip Generation Summary
Code
Land Use
Amount
AM Peak Hour
In Out Total
In
PM Peak Hour
Out Total
ADT
Frederick County
ADT
230
Townhouse /Condo
52 units
5
25
31
24
251
Elderly Housing - Detach
1,640 units
118
192
310
225
144
369
5,838
252
Elderly Housing - Attach
450 units
16
20
36
30
19
50
1,566
560
Church
10,000 SF
4
3
7
3
3
7
91
590
Library
10,000 SF
6
2
8
34
37
72
739
710
Office
100,000 SF
165
23
188
32
158
191
1,334
732
United States Post Off.
10,000 SF
42
38
80
56
53
109
1,082
820
Retail
140,000 SF
117
75
192
375
406
782
8,451
Sub -Total
467
353
820
756
822
1,578
19,101
Clarke County
251
Elderly Housing - Detach
140 units
14
23
37
38
24
63
721
253
Congregate Care
100 units
4
2
6
9
8
17
202
252
Elderly Housing - Attach
200 units
7
9
16
13
9
22
696
Sub -Total
25
34
59
61
41
102
1,619
Total Shenandoah Tripsl
492
387
879
1 817
863
1,680
1 20,720
Table 2b
2015 "Other" Background Development: Dogwood
Trip Generation Summary
Code
Land Use
Amount
AM
In
Peak
Out
Hour
Total
PM
In
Peak Hour
Out Total
ADT
230
Townhouse /Condo
52 units
5
25
31
24
12 35
452
255
Retirement Community
160 units
18
10
29
33
35 68
450
Total Trips
24
36
59
56
47 103
902
P IJ i tl t A Traffic Impact Analysis of the Shenandoah- Oak
ber 1 142 -1-8
1 11 Project Number 13142 -1 -8
January 12, 2007
Page 7
0 0
No Scale
v i
Ak
(6;7j1 S\
%2 ,' 8� * **10
%-139(86)
4 aQ -o(o)
Site-
Y � Drive
0
`r
-+-
78 5(10;
74 (123)
a N Q
ice3vrive #1
(216)97
(3 )135
ry s
AM Peak Hour (PM Peak Hour)
Figure 4
3 q(176
76 (777)
54 164)
1\
1 y n
� o
0
2015 Background Traffic Conditions
P � ATraffic Impact Anahsis of the Shenandoah -Oak R : 1 142 -1-8
' Project Numb 13142 -1 -8
January 12, 2007
Page 8
o co
22 2(149)
6 70(947)
y
(
♦py '225(400)
(775 )648 e
(132)39 Y
Y
w
N o
b e}
e-I ^J t7
x U v
n
h a
Dogwood
Site-Drive
S ��
_ (31)23 ma�
q g
p n
(16)13 �,
tl tl
�
o
y a
Q
a
b
O
O
rl
Si te -Drive #1
O
a
ice3vrive #1
(216)97
(3 )135
ry s
AM Peak Hour (PM Peak Hour)
Figure 4
3 q(176
76 (777)
54 164)
1\
1 y n
� o
0
2015 Background Traffic Conditions
P � ATraffic Impact Anahsis of the Shenandoah -Oak R : 1 142 -1-8
' Project Numb 13142 -1 -8
January 12, 2007
Page 8
0 0
— •'Suggested
Improvements"
' h ER - ]heft' l'I'hro
WR -1 UN I Thra &
U 1 Right
C(A)_ .
No Scale Q o U ��'� (C) (C)
L D(D)
(D)D
�«
(A)A - CI'.0 >
Signalized
Signalized Si '
li, �' Intersection
Intersection
=+o LOS =C(F) LOS =G(C)._.. --- - - --
n
A�
1 R oute277 e�A(s) (C) Ilk (�
(D)
e U� D
U A)A (8 7A �qf S C(F)
A)q� ■�
F
Q 0 l
Signaized U Q (h7F (8)A
E` W Signalized
iiiASSS Intersections p v Intersection
LOS =A(B) LOS =F(F)
*f8l@ Unsignalized
S} Intersection r°
eL^ ri - Unsignalized
a
SSITE Wood Intersection
ATE Site•Drive
`(D)C
- -_ • - "suggested
` a
Improvements"
U " W6-1 Right
- I Rig Q fj
U N6 Right Q y
U ( RR 1 Right Site -D
nve #1
1
f�l
I B)A njn� 19
Signalized y
` •y) U , Intersection �" H
f .�.. i r
t S(gnali ed_ I �UV - LOS =A(B) vN,
Intersection U
LOS =C(C)
Denotes Free -flow condition
* Denotes Unsignalized Critical Movement
AM Peak Hour (PM Peak Hour)
nr ry +n (x) AM Approach LOS (PM Approach LOS)
T
Figure 5 2015 Background Lane Geometry and Levels of Service
P l l ATrafRc Impact Analysis of the Shenandoah-Oak Prone
rty
Project Number: ber: 1 13142 -1 -8
January 12
T ,
Page age 9
9
9 0
Table 3
Shenandoah - Oak Ridge Property
Levels of Service and Back of Queue (95%) Results
2D15 Background Conditions (w / suggested improvements)
TnfBC
Intersection
Loos,
Approach
AM Peak
Hour
PM Peak
Hour
Qtocue
Rack of
Que
EB/L
A
31.0
B
82.0
EB/T
C
4900
D
6350
EB/R
A
31.0
A
45.0
ER LOS
C
C
WB/L
B
30.0
D
166.0
WBa
WB(I
B
181.0
1
C
2640
Route 277&
Double Church
Road
Signalised
WBB
A
250
A
32.0
Vt%LOS
B
C
NB /L
NB/r
C
C
241.0
620
D
C
290.0
139.0
NB /R
A
31.0
A
55.0
NB LOS
C
C
- 7B - /L
-- 7 - F - 93
0
C
99.0
SBU
C
680
D
159.0
SB/R
A
1 430
B
640
SB LOS
C
C
Overall
LOS
C
C
EB /L
D
181.0
D
113.0
EB/r
EB/r
C
2520
D
3230
EBB
A
250
A
46.0
EB LOS
C
C
75 -/L
WB/L
D
104
D
203
WRIT
WRIT
C
253.0
C
410.0
WBB
A
50.0
A
400
Route 277 &Route
Signalised
WB LOS
C
C
3401522
MUL,
C
91.0
D
760
NB?
NBrI
D
1 2450
E
159.0
1
NB /R
Free Bow
condition
NB LOS
I C
C
S9/L
C
131.0
D
3310
SB/r
Spa
C
98.0
1
D
3240
1
SBB
Free -0owcanditi
on
NB LOS
C
C
Overall
LOS
C
C
EB /LR
B
25.0
D
1 250
NB/L
A
25.0
B
250
Route 340'522&
DogwoodDrise
Uusistalissd
NB/f
NB/r
-
-
-
-
SRU
SB ?R
ER/L
B
630
C
151.0
EBB
A
36.0
A
58.0
EB LOS
B
B
NB/L
A
44.0
B
159.0
Route 34W522&
Signalized
NRn'
NB/fl
A
103.0
A
550
No LOS
A
B
Site -Drive al
SEV'r
SB/1
B
87.0
C
3150
SB /R
A
29.0
A
44.0
SR LOS
B
C
Overall
LOS
A
B
EleT
A
301.0
B 4500
EB /R
A
250
A 25.0
EB LOS
A
B
-- TB/L -
A
1 32.0
C 129.0
Route 277 &Site-
Signalised
WBa
B
305.0
C 1 7770
WB LOS
A
C
Drive M2
mot,
C 53.0
C IND
NB /R
A 290
A 42.0
NB LOS
B
B
Overall
LOS
A
C
Double Church
WB/LR
B
250
B
250
Rased & Slte Drive
Unsigualixd
NB/IR
-
-
-
-
#3
1
S&l.T
A
25.0
A
25.0
• Assumed 25 feet Vehicle Length
EB = Eastbound, WB =Wcho ound. NB = Northbound, SR = Southbound
L Lea, T:Tuu, R: Right
Minimum queue length is assumd to M 25 feet
PW A Tragic Impact Analvsis of the Shenandoah -Oak r Property
Project Numb : 1 13142 -1 -8
January 12, 2007
Page 10
0
TRIP GENERATION
0
PHR +A determined the number of trips entering and exiting the site using
equations and rates provided in the 7 Edition of the Institute of Transportation Engineers'
(ITE) Trip Generation Report Table 4 is provided below to summarize the trip generation
associated with the proposed Shenandoah — Oak Ridge Property development.
'Cable 4
Proposed Development: Shenandoah • Oak Ridge Property
Trio Generation Summary
TRIP DISTRIBUTION AND TRIP ASSIGNMENT
The distribution of trips, shown in Figure 6, were based upon local travel patterns
for the roadway network surrounding the proposed Shenandoah — Oak Ridge Property
development site. Figure 7 shows the respective development - generated AM /PM peak
hour trips and ADT assignments.
2015 BUILD -OUT CONDITIONS
Shenandoah — Oak Ridge Property development assigned trips (Figure 6) were
added to the 2015 background traffic volumes (Figure 4) to obtain 2015 build -out
conditions. Figure 8 shows the 2015 build -out ADT and AM/PM peak hour traffic
volumes at key locations within the study area. Figure 9 shows the respective 2015 build -
out lane geometry and AM /PM peak hour levels of service. All Synchro levels of service
worksheets are included in the Appendix section of this report. Table 5 shows the levels
of service and 95 percentile back of queue for each study area intersection during 2015
build -out conditions.
P � A Traffic Impact Analysis of the Shenandoah -Oak Pro
Project Number. ber: 1 13142 2 -1 -8
January 12, 2007
Page 11
AM Peak Hour
PM Peak Hour
ADT
Code Land Use Amount
In Out Total
I In Out Total
230 Townhouse/Condo 160 units
13 62 75
59 29 88
1,392
Total
13 62 75
59 29 88
1.392
TRIP DISTRIBUTION AND TRIP ASSIGNMENT
The distribution of trips, shown in Figure 6, were based upon local travel patterns
for the roadway network surrounding the proposed Shenandoah — Oak Ridge Property
development site. Figure 7 shows the respective development - generated AM /PM peak
hour trips and ADT assignments.
2015 BUILD -OUT CONDITIONS
Shenandoah — Oak Ridge Property development assigned trips (Figure 6) were
added to the 2015 background traffic volumes (Figure 4) to obtain 2015 build -out
conditions. Figure 8 shows the 2015 build -out ADT and AM/PM peak hour traffic
volumes at key locations within the study area. Figure 9 shows the respective 2015 build -
out lane geometry and AM /PM peak hour levels of service. All Synchro levels of service
worksheets are included in the Appendix section of this report. Table 5 shows the levels
of service and 95 percentile back of queue for each study area intersection during 2015
build -out conditions.
P � A Traffic Impact Analysis of the Shenandoah -Oak Pro
Project Number. ber: 1 13142 2 -1 -8
January 12, 2007
Page 11
0 0
No Scale
t
Figure 6
Trip Distribution Percentages
P
ATraffic Impact Analvsis of the Shenandoah -Oak Ridee Propertv
Project Number: 13142 -1 -8
January 12, 2007
Page 12
0
0
No Scale
9 (4)
9)
�I � �h
it' 2(9)
L � �
ev
�l�
X3(6)
](6)
(3)3..R
(3)6
ur
a �o
v �n
Dogwood
Site -Drive
V
1 ® 6(3)
lr Site -
Drive
t
Figure 7
Development - Generated Trip Assignments
SITE
�o
M
N
Un
_v
0
0
AM Peak Hour (PM Peak Hour)
1
h
n
1
P � A Traffic Impact Analysis of the Shenandoah-Oak Ride Property
Project Number: 13142 -1 -8
January 12, 2007
Pave 13
0 0
No Scale
4�
J
1�
(6 3)S S6
(29 ) 9S9
58316)
54 ( 1 64) 2)
o h
h j
/ ®785 (1078)
x
(S � N
Dogwood
(131)76 a 1 r
t -
� b
B�
f
Q
1
(
q g
_
(16)13
tl Y
te r,
C w
22 2(149)
67 1(953)
1(
X
(99)153
(778)655
I jr
(132)39
T
7 M
n n o
SITE
® 45(89)
wl�0o(o
Site.
Drive
0 0
V Q
[n
G7
Figure 8
2015 Build -out Traffic Conditions
M
h
u
7
a
M Peak Hour (PM Peak Hour)
1 t
P � ATrafficlmnact Analysis ofthe Shenandoah -Oak Ri
Project Numbe : 1 13142 -1 -8 8
January 12, 2007
Page 14
Dogwood
o
t -
Site -Driv
B�
f
1
(
q g
_
(16)13
tl Y
a
o ^'
a
N
P � ATrafficlmnact Analysis ofthe Shenandoah -Oak Ri
Project Numbe : 1 13142 -1 -8 8
January 12, 2007
Page 14
0 0
No Scale
Signalized $<
n Intersection In
n LOS =C(E)
(t7j - g
( ?)A
Improvements"
r.B -1 Left' 1 Tbru
B - 1 Left, 1 Thru
I Rieht
3� t ! /e277 ��A(C (C) a r
/ e �� II � � Rn cN
e� D(F) ( �
U i t
_ Signalized v (B)A ^ ^ Signalized
d�1
Inter sectionC p - ^ Intersection
z LOS =A(C) cz �" LOS =F(F)
Unsignalized _
!t Intersection i
I V r' Unsignalized
Intersection
SITE
D o gwood �
Site -Drive
[ r 'Suggested U
Improvements"
WB-1 -I Rig Right
NR 6 J
- 1 Right SR . I Right
Signalized y
Intersection T
LOS =A(B)
- u
Figure 9
2015 Build -out Lane Geometry and Levels of Service
P
1
Denotes Free-flow condition
* Denotes Unsignalized Critical Movement
AM Peak Hour (PM Peak Hour)
(x) AM Approach LOS (PM Approach LOS)
AA Traffic Impact Analysis of the Shenandoah -Oak Ridge Proyeer�Impact Anatvsis of the Shenandoah -Oak Ridge Proyeerry
Project Number: 13142 -1 -8
January 12, 2007
Page 15
0 0
Table 5
Shenandoah - Oak Ridge Property
Levels of Service and Back of Queue (95 %) Results
2015 Build -out Conditions (w/ suggested improvements)
INerser0on
Traffic
Control
Lane
AM Peak
Hour
PM Peak Hour
OS
Raek or
Queue
LOS
Ifack of
Queu
f
A
3LO
B
82A
C
493.0
D
649.0
A
32.0
A
46.0
ER LOS
C
C
WB/L
B
30.0
D
169.0
WHO
WB?
B
1830
1
C
265.0
Rome 271 &
Double Chueh
Road
Signalized
�"R
A
25.0
A
320
N'BLOS
B
C
NB/L
NB
C
C
250.0
62.0
D
C
291.0
139.0
NBIR
A
31.0
A
550
NB LOS
C
C
SB/L
C
830
C
99.0
Sea
C
680
D
1590
SB /R
A
430
B
640
SB LOS
C
C
Overall
LOS
C
C
EB /L
D
1860
D
11]0
EB/r
Ella
C
256.0
D
326.0
EB/R
A
25.0
A
47.0
Ell LOS
C
C
WB/L
WB/L
D
104
D
207
WBO'
WBR
C
254.0
C
4150
WB/R
A
580
A
40.0
Rome277 &Rouen
Signalized
WBLOS
C
C
NBh
C
91.0
D
7610
340/522
NBO
NB?
D
2530
E
175 0
NB/R
Free- flowronditi
on
NB LOS
C
C
SB/L
C
131.0
D
320.0
SBO'
SB?
C
990
D
332.0
I
SB /R
FmnOow
condition
NB LOS
C
C
Overall
LOS
C
C
EB/LR
B
250
D
260
NBA-
A
25.0
B
25.0
Route 340/522&
DogwocdDrivc
Unsignalized
NB?
NB/r
SIVf
SBOR
EWL
B
71.0
C
167.0
EB /R
A
39.0
A
63.0
Ell LOS
B
B
NB/L
A
45.0
C
1810
Route 340522&
Sigralizd
Nita
NB/f
A
1
103.0
A 1
55.0
Sim -Drive pl
NB LOS
A
B
SB?
SBO
B
87.0
C
3150
SBM
A
29.0
A
460
SR LOS
B I
C
Overall
LOS
A
B
A
305 0
H 450 0
A
25.0
A 25.0
A
B
A
30.0
C
140.0
Route 277 &Site-
ANB
A
310.0
C
7770
Wit
A
C
Drive #2
C 620
C 108.0
A 31.0
A 43.0
B
B
Overall
LOS
A
C
Double Chush
W1 'L"
B 25.0
B 25.0
Road &Sim -Drive
UnsignelizM
NB/IB
- -
- -
1
N3
SB/LT
A 250
A 25.0
Assumed 25 fat V chick Length
EB = Eastbound. We = Wcutound, NB = Nonhhound, SB = Saelihound
L: Left, T:Tha, R: Right
Minimum queue k.& is mmmM to be 25 tent
P L_J l �l `
P A Traffic Impact Analysis of the Shenan Oak 13142 -1 8
l l Project Number. 13142 -1 -8
January 12, 2007
Page 16
0
CONCLUSION
The traffic impacts associated with the proposed Shenandoah — Oak Ridge Property
development are acceptable and manageable. Assuming suggested improvements, all the
study area intersections will maintain approach and overall levels of service "C" or better
during 2015 build -out conditions. The following describes the suggested roadway
improvements for each of the study area intersections during 2015 build -out condition as
shown in Figure 9.
• Route 277 /Double Church Road (Route 636) This intersection will require a
westbound thru and right -turn lane, a northbound right turn lane and a southbound
right -turn lane to maintain acceptable levels of service during 2015 background and
build -out conditions.
• Route 277 /Route 340 -522 This intersection will require an eastbound left-tum and
thru lane and a westbound left -turn, thru and right -turn lane to maintain acceptable
levels of service during 2015 background and build -out conditions.
• Route 340- 522/Site -Drive #l : This is a new intersection. It will require traffic
signalization and separate turning lanes in all directions to maintain acceptable
levels of service during 2015 background and build -out conditions.
• Route 277 /Site -Drive #2 : This is a new intersection. It will require traffic
signalization and separate turning lanes in all directions to maintain acceptable
levels of service during 2015 background and build -out conditions.
• Double Church Road (Route 636) /Site -Drive #3 This is a new intersection. It will
maintain acceptable levels of service with unsignalized intersection and shared
lanes in all directions during 2015 build -out conditions.
• Route 340 - 522 /Dogwood Site -Drive This is a new intersection. It will maintain
acceptable levels of service with unsignalized intersection during 2015 build -out
conditions.
P �l l A Traffic lrnnact Analysis of the Shenandoah-Oak e
l l mbe r: 1 13142 -1 142-1
P roject Nu -8 8
January 12, 2007
Page 17
0
No Scale
)!,d rick
A
Figure A Vicinity Map: Location of Background Developments
0
Shenandoah - Oak Ridge
3: Route 277 & Route 340/522
Existing_AM
1/12/2007
on
aa[a.r,iow
2.0
2.0
^ 2:0 ..'
2.0
,' , s2i0'
_'- 2'0
`:2 0
2:0 ; '2.0
Lead /Lag
Lag
Lag
LanelGroup'. -
EBL_{EBT "EBR WBI- W_BT
WBR,_NBL_vNBT�'NBR_SBL,,:
1.00
1.00
S_BR
Lane Configurations
IdeabFlow (vphpl)
Storage Length (ft)
Storag Lanes
Total Lost Time (s) Y
_ .1
_ 0
0
^ 4.0
1900
_
4.0
7�
1900
200
1
4.0
1
300
_?
4.0
1900
_ ..�
4.0
1
0
_0�''
4.0
�__
1 900
300
1
4.0
tt
-1900
4 .0
__ i!_
1900
0
_ _t.
4.0
_ _ 00 �, -_
19
150
1
1900 tt
4.0
_,_ _1900 _r
_
0
1i
4.0
Leadin Detector (ft)'_
Traili Detector (ft)
50
0
50
0
50
0
.. 50
0
- 50
0
5G
0
50
0
_ _ 50
0
_4.0
50`
0
=_ _ 50
X50
0
Turriin-' Speed (mph)_
.:Min,
4145
5282
tTravel.Tim (s)
43.5
142.5
49.8
�0
11'18
Lane Util. Factor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.95
1.
1.00
0.95
1.00
Fr: .
_
215
6850
115
0:960
28
PeaKHour Factor
0.90
0.850
0.90
0:90
0:85
Flt Protecte
'0:90
0.991
0:90'
0.950
oi90
01.90
0.950
9%
9%
0.950
9%
9%
Setd: Flow- (prot)_
_ 0
1727
1482.
1656
.
0
1583
:3167
141
. 1583',
3 167.
1417:
Flt Permitted
, ,'68
0.732
181.
0.290
103`.
31
0.687
0
530
0.393
103
603
on
aa[a.r,iow
2.0
2.0
^ 2:0 ..'
2.0
,' , s2i0'
_'- 2'0
`:2 0
2:0 ; '2.0
Lead /Lag
Lag
Lag
Headway Factor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Link•Speed (rnpl)
..Yes
45
Vehicle Extens (s)
45
3.0
3.0
1 50
3.0
3.0
50
L ink Distance (ft)
Redalll Mode,
7426
None .
None=
7377
None
.:Min,
4145
5282
tTravel.Tim (s)
43.5
142.5
49.8
15.5
11'18
89.9
29.0 29.6 89.9
565
0:48
72.0
,:'1
Volume (vph)
84
393
18
93
400
143
61
215
163
115
93
28
PeaKHour Factor
0.90
0.90.
0.90
0:90
0.90
0:90
'0:90
.0:90
0:90'
0:90
oi90
01.90
Heavy Vehicles ( %)
9%
9%
9%
9%
9%
9%
14%
14%
14%
14%
14%
14%
A..j :;Flow (Vpf p
93:'
437
20)
v 103103
444
159
, ,'68
.• 239
181.
128'
103`.
31
Lane Group Flow (vph)
0
530
20
103
603
0
68
239
181
128
103
31
Tul rhT
Perm
Perm , pm + pt
:
Perm :..
Free
pm + pt.
Free
Protected Phases
2
1
6
8
7
4
Permitted "Rnases
2'
2`.°
6
8
-
Free
: :4r
, Free
Detector Phases
2
2
2
1
6
8
8
7
4
Minimum Initiat
4:0
4.0
- 4.0
2.0
4.0
4
4.0
2.0
;4.0
Minimum Split (s)
10.0
10.0
10.0
8.0
1 0.0
10.0
10.0
8.0
10.0
Tol tal,S plit - ,(s)
65.0'
'65i0a
85� 0' '° 9:0
x.74.0
' •0.0,
' 22.0 ',22.0
0:0
'24:0
'46.0.
& .. -Q
Total Split ( %)
54.2%
54.2%
54.2%
7.5%
61.7%
0.0%
18.3%
18.3%
0.0%
20.0% 38.3%
0. 0%
Mani numeGreen (s)
59.0'.
59:0
590 '
3:0'
68
16.0 .
16:0.
18.0 .40.0
Yellow Time (s)
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
All =Red Time (s
2.0
2.0
^ 2:0 ..'
2.0
,' , s2i0'
_'- 2'0
`:2 0
2:0 ; '2.0
Lead /Lag
Lag
Lag
Lag
Lead
Lag
Lag
Lead
Lead' -La O ptimized
Yes
Yes
Yes
Yes
Yes`
..Yes
Vehicle Extens (s)
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0 3.0
Redalll Mode,
None
None .
None=
None
None
.:Min,
Act Effct Green (s)
43.5
43.5
48.8
49.8
15.5
15.5
89.9
29.0 29.6 89.9
Actuated g /C Ratio
0:48
0.48-•
0:53
0.55
= 0:17
0f17
1:00
0.31 , 0.33 1 -.00
v/c Rat
0.86
0.03
0.30
0.64
0.34
0.44
0.13
0.36 0.10 0.02
Contr&Dela
29:2
6:0-
12.8'.
115:9
- _ . 46
_ 7.
.0:2
27 :9 246
Queue Delay
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0 0.0 0.0
Total`Dela
292,
6.0
1 88
15.9
46:3'
:42:7
0 „�2
27:9 24 6 ,` ` 0.0
LOS
C
A
B
B
D
D
A
C C A
Ap proach Dela
28:3,
� X15.4
27 4
_
Approach LOS
C
_ -_
B
C
C
Baseline
Patton Harris Rust & Associates
Synchro 6 Report
Pagel
0 0
Shenandoah - Oak Ridge Existing.AM
3: Route 277 & Route 340/522 1/12/2007
--p. (- *-- 'I- -*\ 4/
90th - 0 /.ilb Green s)__
59T
590
-7 59.0
- 3.0
68.0
90th %ile Term Code
Max
Max
Max
Max
Hold
70th E:
`�9.69
— 0 - 6 - 970
Hold
-7- 3 - CF - 68T -7- 1'
5.9
70th Wile Term Code
Max
Max
Max
Max
Hold
50th Wile Green
1-7_.0_4
344
47.0
3 .0
56.0
50th We Term Code
Gap
dap
- Z�aip
Max -
- TFo — Id -
30th Wile Green s)
33.8
33:8
318
3.0
42.8
1 0th %ile Term Co(
Queue Len gth 50tH
Queue Length 95th
#546
13
Max
Hold
96
133
Gap
Hold
13.4
32.2
Gap
Hold
7
25
Gap
Hold
0.0
5.9
SkiD
Hold
#546
13
60
392
96
133
0
119
L34�_
+
&
- '
7
44065
200
300
_:7297
300
150
249
878
344
1104
260
719
1'417
432
0
0
0
0
0
0
0
0
'0
0
0
0
0:
0
0
0
0
0
0
0
0
0
0
I
.;nlitq.qnfl Phiqp.q 3 Rnijte 277 & Route 340/522
1 .1
4 . - o2
I* o4
9 191
G5 i 11
46
06
\41 o7
08
--- 111
24 - - - 1 11122's-
- '
a
no
Baseline Synchro 6 Report
Page 2
Patton Harris Rust & Associates
Shenandoah - Oak Ridge Existing.AM
6: Route 277 & Double Church Road 1/12/2007
-4\ t r 4/
Lane Configurations
Ideal Flow (ypnpj)
Storage Length (ft)
� forag2 L a � neS -
Total Lost Time (s)
1900
150
4.0
1900
4.0
1900 -1900
1000
4.0
225
-
4.
T
1900
*1900
0
0
- 0
I
1900 --
275
1
4.0
T+
- �900. _
4.0
-- �! ,- 00
_ !
0
0 .-
4.0
I
-- i - 900 -7 1 , q - ff
200
4.0
T.
4.0
:T90
0
4.0
Leading Detector (f )_
Trailing Detector (ft)
50
0
___5O
0
0
50
0
50
0
40 62
102 0
50
0
X50'
0
0
0
'- A2.0
LT:u� rn-thg - (mph)
--
Perm
I
Protected Phases
5
2
5
----
- 9
'15 -----
- -
Lead
_ _�p2
Lane Util. Factor
1.00
1.00
1.00
1.00
100
1.00
1.00
1.00
1.00
.
T 05
00
TOO
Frt
1
6
7.
8
'0:991.
4
Minimum lnitidf� s
Minimum Solit (s)
0;925
4.0*
10.0
-4.0
10.0
0:909
1
Fit Protected
0.955
.,4 O � -
10.0
O
- 4.0
10.0
0.950
10.8
10.8
0.950
Acii j/C Ratio
0.38 "
0.950
0.39,
U&
S Flow ( plo t )
1656
1743
1482
1656
1727
v/c Ratio
1
1706
- ,,0
f7
0.62
0
Fit Permitted
0.405
0.27
0.444
1U'
16:4-
0.500
7 8 - 4'
;1 5 . 8 '. --,
0.704
29i2;
15.5
Satd.'Flbw• per
106
.1-743
1 ;482"
_174
__1727
0
922
1706
0
1299
- 16�7
Right Turn on Red
�_I �84
, 15 . 8.` , 8:9 , t.
Yes
LOS
Yes
B
A
Yes
B
6
Yes
CZaM Pim., IPTCAP)
B
S7
r
%
B
3.6
B
sp
1.00 1.00 1.00 1.00 1.00
; . . " 1 40 7 - 'A- - ,
jlldvaIL I IIIIU t ap I - . or., . IDO.0 I - - 11
Volume (voh) 36 314 51 35 328 22 158 37 37 64 36 56
Heavy Vehicles (%)
9%
9%
9%
9%
9%
9% 3%
3%
3% 3%
3% 3%
1 .
L Flow (�P±)
Lane Group Flow (vph)
- 40
40
- 349'
349
57
57
39
388
0 176
41
82
4,1 :71
0 71
40 62
102 0
Lrn iype ,
0 gL+pt
P6rrh.
m - t
'- A2.0
P-a+p t
2 �0%' �',
Perm
I
Protected Phases
5
2
Lead
1
6
3
8
Lead
4
P&ffiittea
2
2,
6
Yes
Yes
Yes .
Yes
Detector Phases
5
2
2
1
6
3
8
4
4
Minimum lnitidf� s
Minimum Solit (s)
2.0
8.0
4.0*
10.0
-4.0
10.0
. ZOr
8.0
4.0
10.0
�2.0
8.0
-4-.0
10.0
.,4 O � -
10.0
O
- 4.0
10.0
11.3% 48.8%
Maximum,Greenr ( s)''
3:0
33.0,
33LU
3i() ,
33.u.
<11.0
L 'b!U
V.U.
Id. u
Yellow Time (s)
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
2
- 2'0,
'- A2.0
- :2�07
2 �0%' �',
::'2*01
2t0 ' 4 % ,
2�0 .,,� 2.0
Lead/Lag
Lead
Lag
Lag
Lead
Lag
Lead
Lag
Lag
ReadmLag,Optimize?
Yes,
Yes
Yes
Yes .
Yes
- ,'Yes
:Ye§
Te's
Vehicle Extension (s)
Recail.Moae 7 7
3.0 3.0
- None. ; None
3.0
None
3.0
3.0
3.0
N
3.0 3.0
3.0
Act Effct Green (s)
22.9
21.7
21.7
22.2
20.2
21.8
22.0
10.8
10.8
Acii j/C Ratio
0.38 "
0.39
0.39,
U&
0:36
0:37
. 0.39 =
.0.19
:.0.19
v/c Ratio
0.11
0.52
0.09
0.11
0.62
0.35
0.12
0.28
0.27
Cohteol'Delayv
1U'
16:4-
7 8 - 4'
;1 5 . 8 '. --,
819
29i2;
15.5
Queue Delay
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
13
�_I �84
, 15 . 8.` , 8:9 , t.
29:2 15.5
LOS
B
B
A
B
B
6
A
C
B
,pr
'5p
Approach LOS
- 14:4
B
%
B
3.6
B
21 1
C
Baseline Synchro 6 Report
Page 3
Patton Harris Rust & Associates
1
0 0
Shenandoah - Oak Ridge Existing_AM
6: Route 277 & Double Church Road 1/12/2007
auin /one ureen,
90th %ile Term Code
70th',WVGreen'
70th %ile Term Code
a.e
Max
Max
ca. i,
Hold
Hold
ca. i
Hold
Hold
a.e ca: i _
Max Gap
Max Gap
H.v
Max
Max
co.0
Hold
Hold
_ U.0 _
Max
Max
V.v
Max
Max
50th %ile Greem
50th %ile Term Code
30th %ile Green (s)
30th %ile T erm Cod
3.0
Max
0'0
Skip
28:3
Hold
i2 :4..
Hold
28.3
Hold
12:4.
Hold
0.0
Skip
0.0
Skip
19:3 _
Gap
12.4 _
Gap
9:7
Gap
7.0
Gap
24.6
Hold
19:4
Hold
_ _ 89
Gap
6.4
Gap
8.9
Gap
6.4
Gap
-
r�,-
{10th %ile Greerc
0.0 ,
7.3
7.3
0.0
7:3 :
` Y ' -
5:5
10th %ile Term Code
Skip
Hold
Hold
Skip
Gap
Skip
Gap
Gap
Gap
Queue!.Len 50th (ft)
8
87
0 '
8
929
4.4
9
_
25' .,
14
Queue Length 95th (ft)
22
192
20
22
216
103
40
69
59
Internal Link,Dist (ft)
1990
12655
—
7231 —
199
-1
Turn Bay Length (ft)
150
1000
225
275
2 00
Base Ca pacity (vpl5)_
358
912
802
359
885
544
828
— 285 4116
_- }
Starvation Cap Reductn
0
0
0
0
0
0
0
0
0
Spillba k Cap
00
0
::0"
0,
, . 0
- 0
. 0'
-.0'.:
0'w
Storage Ca p Reductn
0
0
0
0
0
0
0
0
0
Reduced.v /c Ratio
0.11
'U8
0.07.
0:11
' 0.44
0.32
.0¢90
O:25,'
0:25
Solits and Phases: 6: Route 277 & Double Church Road
`m1
J T� m2
■ m3
1� m4
m5
F
(f 06
A t
08
Baseline Synchro 6 Report
Page 4
Patton Harris Rust & Associates
Shenandoah - Oak Ridge
3: Route 277 & Route 340/522
, .-
Yes;
-Yes
-, 4.1 T:8
;..r •
;Yes
56:5
,' .
Existing_PM
1/12/2007
,72.0'
I
Volume (vph)
35
444
64
167
558
96
40
78
142
221
314
EBL =?DEBT
_EBR' tWBL_kWBT
. WBR�NBL--�NBT
NBR� +SBL SBTF SBR
Lane Configurations
IdeatFlow (yphpq__: -
Storage Length (ft)
Storag Lanes .- --
Total Lost Time (s ~ i 4
190071900
0
D
0
---
--
4.0
1900
200
1
_ 4.0
��„
1900
-
300
1
4 0
- 1900_ 1900,
0
__ ._ 0
4.0 4.0
!�___
1900
300
1
4.0
tt . _if
1900_
-
0
-- -- .j
4.0 4.0
4900 �_ tT ..._..r
1900_
_
150
4
4.0 4 .0
1900
0
4.0
Leading Detector
Trailing Detector (ft)
50
0
50
0
50
0
_ 50
0
= 50
0
_
50
0
50'_
0
_ 50
0
50
0
50
0
50
0
Tul rnin Speed (mph)_
15
493
9
155
-620
_ 9,
". 15
87
_ 97
5
349
9
Lane Util. Factor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.95
1.00
1.00
0.95
1 .00
Frt
40.2'
2
0.850
1
0.978
Queue Delay
8
0:850
7
_
0.850
Flt Protected
2.'.
0.996
2
0.950
Total'. Dela -
_
0.950
4.0 ..
Free
0.950
;,40:2'
Flee
Satd.:Flow (prot)
0
173.6.
1482
1656
1705
-, 0
1583
3167
_14
1583
316 1417
At Permitted
Minimum lnitialr
0.864
4':0
0.289
4.0
0.542
4.0
6
0.571
Minimum Split (s)
10.0
Satd.,Flow,
0
1506
1482
504
1705
0
.903
3167
1417:
952
3167.
.1.417
Right Turn on Red
= 22.0
18.3%
a. 0:0, 24:0 46:Q.
0.0% 20.0% 38.3%
Yes
Maximum Green (s) ° °.
x59:0 ":`
Yes
:59:0
" ;3.0; :68E0
Yes
16:0':,
116:0
Yes
Satd: :Flow (RTOR)
_
71
_
12
4.0
4.0
4.0
158
4.0
4.0
911
Headway Factor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.0
1.00
Link Speed (mph) .
2;Q
45, •.
45
50...
50.
Link D istance (ft)
7426
_
7377
4145
528
Tavel Time (s)
, .-
Yes;
-Yes
-, 4.1 T:8
;..r •
;Yes
56:5
,' .
, "4Y.esS:-
,72.0'
I
Volume (vph)
35
444
64
167
558
96
40
78
142
221
314
82
Peak Houn.Facto
;0:90
0'.90
'0:90
0.90:
'0,90
-0.90
0,90
.0'90
0:90
ot90.
0.90
0:90
Heavy Vehicles ( %)
9%
9%
9%
9%
9%
9%
14%
14%
14%
14%
14%
14%
Adj. (yph)
39 .'
493
71
186
-620
.107
44
87
158
.246..
349
91_I
Lane Group Flow (vph)
TuTy
0
Perm-.
532
.
71
P.erm
186
pm +p
727
° `.
0
44
Perm:
87
158
'Free.
246
pm + pt.
349
91
Fre
Protected Phases
40.2'
2
-. 27:7 :.
1
6
Queue Delay
8
0.0
7
4
0.0
P- ermitted Phases; 1.
2.'.
0.0
2
:. 6
Total'. Dela -
_
8
4.0 ..
Free
4.
;,40:2'
Flee
Detector Phases
2
2
2
1
6
C
207
' ' -
C
8
8
A C
- . - -,g, ;' ...,21
__
7
4
Baseline
Patton Harris Rust & Associates
Minimum lnitialr
'' 4 0r•' 4:0
4':0
2:0'
4.0
4.0
4.0
6
Report
Page 1
Minimum Split (s)
10.0
10.0
10.0
8.0
10.0
10.0
10.0
8.0
10.0
Total;S (s) - � '• *
Total Split ( %)
z65.0 : •65 0, .65.0 " 9:0..1.74.0:
54.2% 54.2% 54.2% 7.5% 61.7%
r0.0 .. 22:0
0.0% 18.3%
= 22.0
18.3%
a. 0:0, 24:0 46:Q.
0.0% 20.0% 38.3%
0.0
0.0%
Maximum Green (s) ° °.
x59:0 ":`
59!0
:59:0
" ;3.0; :68E0
16:0':,
116:0
?t
; , J8.0 , __40.0
_
Yellow Time (s)
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
Alit RedrTimet(sT -
`.2.0
„ 2:0
20
..2:0 `
:20.
11
-,2,0
- .2:0 :.
%
':2:0 .�.
2;Q
Lead- La
;:Yes:'
Yes;
-Yes
Ye .'
;..r •
;Yes
Yes=
:,
, "4Y.esS:-
,,,
I
Vehicle Extension (s)
3.0
3.0
3.0
3. 0
3.0
3.0
3.0
3.0
3.0
Recali "'
None.
None .•
None'.'None'
Tone
Min
- "Min
None C,'Min
A ct Effct Gr (s)
37.7
37.7
47.3
47.3
12.0
12.0
89.6
33.7
33.7
89.6
Actuated; /C
, '°
0[42
: 0:42
"0:53
`153 ' ,.
0:13
.0x,13
1:00 ;0:38 :,
0:38
1:00
v/c Ratio
0.84
0.11
0.56
0.80
0.36
0.20
0.11
0.51
0.29
0.06
Y _ „'`-
Control Dela r
-_
" -'-
27:1
4.0 .'
_
19 3
21:0
45:5 -
40.2'
0.2;
-. 27:7 :.
22:4
Queue Delay
0.
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Total'. Dela -
_
27A
4.0 ..
103 • ; 2 1:0 � .'
.: 455
;,40:2'
- 0 :2
27r7� `.•.2
;
0:1
LOS
A roaclrDela
P Y_� - -
Approac L OS
C
2434?
C
A B
- - �,
�_
C
207
' ' -
C
D
_�_
_
D
',19:1
B
A C
- . - -,g, ;' ...,21
__
C
3
C
A
�
Baseline
Patton Harris Rust & Associates
Synchro
6
Report
Page 1
i •
Shenandoah - Oak Ridge
3: Route 277 & Route 340/522
Existing_PM
1/12/2007
70th %ileGteen (s) — " 46:7
70th %ile Term C ode
50th. %ile Greer (s)
`46:7
Gap Gap
-36.8 • 36
46:7 _ - 3.0
Gap
368
_
Max
•3:0 .
`55J _„
Hold
45:8
12:7 , 12.7
Gap Gap
9.8. 9:8
18.0- °
Max
18.0:
36 7
Hold
33 8
I
.,. -_,,•
50th %ile Term Code
30th %ile.Green (s)
30th %ile Term Code
Gap
27:0
Gap
Gap
.27.0
Gap
Gap
27.0
Gap
Max
3.0
Max
Hold
36.0
Hold
Gap
7:1
Gap
Ga
7.1
Gap
'. _ _
Max
14.0
Gap
Hold
Hold
`oth %ileGteeh
16:3
16.3
16.3
3.0
-25.3
5i5,
5:5
_
_
8:3
"19:8
10th %ile Term Code
Gap
Gap
Gap
M ax
Hold
Gap
Gap
Gap
Hold
(Queue Len 50t1i (8)
267
0:
- 55
327
24
24'
—0
101
• 7 -
0
Queue Len gth 95th (ft)
440
23
102
539
70
56
0
223
143
0
IntemaliEink bW (ft)_
;7346
• .
72 97
r
4065
5202
Turn Bay Length (ft)
200
300
300
150
Base Ca pacity_(Vp'h)
828
, 846
335
1 080 —
177
622
1417
486
.1387
1417
Stary ation Cap Reductn
0
0
0
0
0
0
0
0
0
0
S pillbadk Cap'Reductn
0
0
0
0
0
0
0'
•'0
0
0
Storage Cap Reductn
0
0
0
0
0
0
0
0
0
0
❑ -A ..aa .;r; Q�t�..
-
'n,9A
Henn
mSa,
n a7
_n..95-
n4 &
-7 W - Ti
n.51 ^,
:.095,
nn
ml.►
m2
��• m4
93 JIJ65
la _J_
1 7 06
� m7
A I 08
74's — 11
24`i - '- y22
__
:- 11
Baseline Synchro 6 Report
t Page 2
Patton Harris Rust & Associates
� � `'- t � T � `► 1 r
Rnlitc nnri Phacar 3• Rni da 977 R Rni ita 340/522
Shenandoah - Oak Ridge Existing_PM
6: Route 277 & Double Church Road 1/12/2007
t-- 7 f ~ 4 - ..*\ T A y 1 r
1990 1900' ' 1900.1900' 19001900 ,1900' "1900, 1900' 1900 190 1900
150
1000
225
0
275
0 200 0
y o
Pet n ; pm +pt
Lane Util. Factor
0
11
1 .00
4.0
4.0 4.0
4.0
4.0 4
4.0
4.0 4.0 4.0
_ . 5 0
Y- 50 50
56
50 -
50.:
50 �.� 50
0
0 0
_
0
0
0
0 0 0
ul rnin bpeeo tmpnl_
io
a
io
a o
y o
Pet n ; pm +pt
Lane Util. Factor
1.00
1.00 1.00
1 .00
1.00
1.00 1.00 1.00
1.00 1.00
1.00 1.00
�-�
2 6
0850 ...
"'-
0:97
0:915
; ;'�
3 8
Flt Protected
0.950
0.950
0.950
0.950
S atd:,Flow (pro
-1656
1743 1482
1656
1703
01 1752 . 1688
1752
9682 -_ 10
Flt Permitted
0.262
0.415
0.266
0.603
LAS ® LY/MEN WL• MINES e::r�VrINMIMM MAWINE am rUMMElZ!r�fia
Turn
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.0C
45 ': 45 . 4C
2070 12735 7311
10 75 151 97 129
3% 3% 3%
Lane Group Flow (vph)
122
378 146 118 539
0 168 251
0 87 227 0
Tut rjT
pm + pt -.
Pet n ; pm +pt
p n + pt °
Perm.
Protected Phases
5
2 1 6
3 8
4
Permitted Phases',
2,.
2 6
8 -
4;
Detector Phases
5
2 2 1 6
3 8
4 4
L
Baseline
Synchro 6 Report
Page 3
Patton Harris Rust & Associates
ContrihDela -- 135 18:1 : 3:4, 1&39!0 '2T:5• 13:1 ., . ,3414. '260
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0 0
Shenandoah - Oak Ridge Existing
6: Route 277 & Double Church Road 1/12/2007
LaneLUrOUP,
/bb'
z45
4d `
90tti 33'.
90th %ile Term Code Max Hold
'310
Hold
.0
Max
- 3.0
Max
9.0
Max
-26
Hold
11 .0
Max
11 0
Max
70th%ileGreen s)
70th %ile Term Code
.0 33.0
Max Hold
.0
Hold
Max
Max
9.0
Max
26.0 -
Hold
11.0
Max
11.0
Max
50th,%ile Green s)__
50th %ile Term Code
5.0 27
Max Hold
277
Hold
3 - '2 - 77
Max
Gap
9.0
Max
26.0'
Hold
11.0
Max
-- 11 - 0
Max
��Ot%ile Green (s)
30th %ile Term Code
3.0 2139
Max Hold
2•.9
Hold
3.0
Max
21.9
Gap
8.4
Gap
23t8
Hold
9.4
Gap
9.4 1
Gap
1 1 �Ot:o/.ile Green (s) '
0:0 --- 6 — .8'8i8
0.0
5:7.
1 0th %ile Term Code
Skip Hold
Hold
Skip
Gap
Skip
Hold
Gap
Gap
n,ja,,PTAn';�t
97
1.111
h
97 -
9n7
rlq•
- 50
. q7
164 1
51 327 106 1
12655 72
225 275
J84,
/bb'
z45
4d `
0
0
0
0
0
0
6"o
08
0
0
0
0
0:44,
0:33:
---
'0:3
0!53'
10�' 01
fi
- t+ o2
o3 o4
9
39 s —'z 10
15s- ll5l1Zs
'A
4—
05
Y o6
08
Baseline Synchro 6 Report
I Page 4
Patton Harris Rust & Associates
Solits and Phases: 6: Route 277 & Double Church Road
0
Shenandoah - Oak Ridge Background_AM
3: Route 277 & Route 340/522 1/12/2007
Lane
Storage Length (ft)
0
200
300
0
300
0
150
0
_ ^
Storag Lanes
0
_ . -�
1
-_
~
0
1 _�.'
_
__
1�
:1
Total Lost Time (s)
4.0
4.0
4.0
4.
4 .0
4.0
4
4 .0
4.0
4.0
4.0
_ 4.0
Leading (ft)
T railing Detector (ft)
,' 50
0
50
0
50.
00
50'
0
, 50. ,
0
_
50
0
50
0
_ -50
0
50
0
_' _ 5
_ 0
50
0
Tu �rning Speed�(mph) �
-: 15
=
9
•. • .15
9 ,:
15 -.,
; , 9
15
_ 9
Lane Util. Factor _
1.00
1.00
1.00
_
1.00
1.00
1.00
1.00
0.95
1.00
1.00
1.00
F
0.850
0:963
0:850
-
_0.95
0:850
Flt Protected
0.991
0.950
0.950
0.950
Satd. Flow, (prot)�_
0
1727
1482
1656
1679.
0
1583
3167 41
583
_ 3167
1 4
Flt Permitted
0.470
0.174
0.581
0.235
LOS F A D B F F A F D A
L
Baseline Synchro 6 Report
Page 1
Patton Harris Rust & Associates
Permitted:Phases. 2 2 6 - - '8' 'Feed 4 Free
Detector Phases 2 2 2 1 6 8 8 7 4
Gohtrol Dela , 320:7 2:7 43:2 16:•1`'. 222:4 272:'7'.. '0.5 226.8 4,4.7 0.-1
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0 0
Shenandoah - Oak Ridge Background — AM
3: Route 277 & Route 340/522 1/12/2007
-,-* --,, 7 'r .4— '1- 4 \ t / ,P. 41
90th %Ile Term Code
Max
Max
Max
Max
Max
s__.
Max
Max
Hold
17_0E_P/.ile green
.77�O
77.0
— 17 - 0
_
3.0
_0 —"-,,Max
T6
, 0: �
11 0
0
220
70th %Ile Term Code
Max
Max
Max
Max
Hold
Max
Max
Max
Hold
50th�o/
77 .0
77.0
77.0.
3.0
8 6.0
1:1.0
11.0
50th %Ile Term Code
Max
Max
Max
Max
Hold
Max
Max
Max
Hold
77.0
77.0
.77.6
3.0"
�86.0
—
7"
11.0
5-0
—
.22 0
30th %Ile Term Code
Max
Max
M
x
M
Hold
Max
Max
Max
Hold
1 1_0th%ile Green (§)
77.0
77.0
77:0
—3.0 .
86.0
11.0
1
22.0.
1 0th %Ile Term Code
Max
Max
Max
Max
Hold
Max
Max
Max
Hold
Queue shown is maximum after two cycles.
95th percentile volume exce9d cap ity eue
�jc: �q�
Queue shown is maximum after two cycles.
Splits and Phases: 3: Route 277 & Route 340/522
P .1
"V o2
o4
94 1#183
I 1¢ 2 8
s__.
06
\v. o7
I 08
Baseline Synchro 6 Report
I Page 2
Patton Harris Rust & Associates
, /,Utliil/ofleActuatec� UvcleE 12U"
50th %ile Actuated Cycle: 120
30tfii %ilp'Achf2ted' G_VC14�1 20—.
0 0
Shenandoah - Oak Ridge
6: Route 277 & Double Church Road
0.950
1.00
0.950
0.950
0.95u
1.00
Background _AM
1/12/2007
_1656__1_T4
1656 1
0 . 1~752
1706 76 •1752 9675
r__0
Flt Permitted
0.137
.
0.180
0.364
0.676
Lane�Group`"
;EBL
EBTjtEBIR
IWBLL
BIR
NB
BT
±NB_R_,
Right Turn on Red
rT S_B_R
Lane Configur
12735
Yes
Yes
Yes
Satd.,Flow'
-
- 142
- 5
Travel:Time,
�__
31.4
Ideal_Flow (vphpl)
- 1900
_190D
1900
1900'
1900 1900
1900 '
1900
1900 '
1900
1900 .1900
Storage Length (ft)
Storag Lanes
Total Lost Time (s)
150
1
4.0
4.0
1000
- 1 _
�4.0
225
1
4.0
- -
4.0
0
0
4.0
275
1
4.0
4.0
0
- _ - �0
4.0
200��
1
4.0
0
_-_- - _ _ 0
4.0 4. 0
Leadin Detector (ft)_
50
- 50
50
'50•.
50�
0:90
50 ,
50
•0:90
50'
, 50•
Trailing D etector (ft)
0
0
_
0
0
_
0
__
0
0
3%
0
0
Tut - rnin gSpeed.(mph)
15
AdjirFlo ph)
9
15.9
942
.60
- 15
' ;38
_
9
15,9
'63
Lane Util. Factor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00 1.00
Flt Protected
0.950
1.00
0.950
0.950
0.95u
1.00
Sat d, Flow, rot)^
_1656__1_T4
1656 1
0 . 1~752
1706 76 •1752 9675
r__0
Flt Permitted
0.137
.
0.180
0.364
0.676
RecallUode" ' '' •
Satd. Flow (perm)
-239
1743, 1182-
- 314: 1729
- 0,671
1 7013t. - 0_1247 9247 1675
- 0
Right Turn on Red
Act Effct Gr (s)
Yes
12735
Yes
Yes
Yes
Satd.,Flow'
-
- 142
- 5
Travel:Time,
63 -7 82
31.4
Headway Factor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
L•ink.Speed (mph) ...
., • , ,
., 1 51 „
.
:.
45 .
3.0
RecallUode" ' '' •
- -:40
None "None
None
40
; . None .'-
Link Distance ( ft)
. , -• Min .°
2070
Act Effct Gr (s)
35.7
12735
32.0
35.7
14855
27.2
27.2
2077
1
Travel:Time,
'0.47
31.4
0:43
0:47':
193:0
• -0:37
0.37
253.2
0:14'"
v/c Ratio
35:4
0.84
Volume (vph)
56
567
128
54
576
34
284
57
57
99
56
87
Peak MourFactor -.
0:90.
01:90
0:90
0:90
0.90
0:90
-` 0:90
090
•0:90
• 00'
0.90.
0.90
Heavy Vehicles ( %)
9%
9%
9%
9%
9%
9%
3%
3%
3%
3%
3%
3%
AdjirFlo ph)
"62'
' 630 -
942
.60
640,
' ;38
• .-•316"
163
'63
' 1',10,.
.62'
: 97
Lane Group Flow (vph)
62
630
142
60
678
0
316
126
0
110
159
0
Tul rn T
pm +
Perm
. pm +
pm +pt
`Perm '
Protected Phases
5
2
1
6
3
8
4
Permitted Phases
2
%2
.:6
'8
- 7
Detector Detector Phases
5
2
2
1
6
3
8
4
4
Minimum;Jnitial,
2.0
^4:0
4.0
2:0:,
4.0
" 2:0"
4'.D .
4:0
Minimum Split (s)
8.0
10.0
10.0
8.0
10.0
8.0
10.0
10.0
10.0
Tol 1al S plit..( §) -
'9'0'
39:0'
39:0
9.0-
39.0
'0:0
'_17.0
32.0
'0.0
15:0 -
-15;0
: '0!0
Total Split ( %)
11.3% 48.8% 48.8%
11.3% 48.8%
0.0%
21. 40.0 %
0.0%
18.8% 18.8%
0 .0%
Maximum[Green (s)
'
' 33:0 1
33:0
3:0
. 33:0:
7 11:0`
2&0
:+ :
;9
-,9 0
Yellow Time (s)
4.0
n,n
4.0
n n.
4.
n.. n.
4.
..non.
4.0
n^
_
4.0
"On
4.0
. ?.n
4.0
... 2n
4.0
• -7 n.
Llea07La
Yes
- Yes
Yes
-Yes
Yes'. -
'•Te5
•3
Try
TUb ,t
Vehicle Extension (s)
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
RecallUode" ' '' •
None
None "None
None
None-
; . None .'-
. Mm• `
. , -• Min .°
`Min
Act Effct Gr (s)
35.7
32.0
32.0
35.7
32.0
27.2
27.2
10.5
1
Acfu dtea j /G Ratio
'0.47
:,0:43'
0:43
0:47':
0.43
• -0:37
0.37
.0:14
0:14'"
v/c Ratio
0.30
0.84
0.20
0.25
0.91
0.73
0.19
0.63
0.52
0.0 0.0 0.0
0.0
0.0
0.0 0.0
0.0 0.0
2'4 `;28 6 _-
11-3
•3
. 31 B 1 1.1 ...
476. 23 0
B C A
B
C
C B
D C
134
- - 25.9 " -_
C
C
C
C
Baseline
Patton Harris Rust & Associates
Synchro 6 Report
Page 3
• •
Shenandoah - Oak Ridge Background — AM
6: Route 277 & Double Church Road 1/12/2007
uutn -/.iie careen tsy
; s.u, •
- ij.v
jj.0
i - 19
17. s 'k:!— IFA 15
40.0
ZI.U' .
U;U
– Va — x --- '
90th %ile Term Code
Max
Max
Max
Max
Max
----- axHoid
—
Max
90th l9/%i!2GE2e Green ( s ) -- _ - 10,
.
310'
3.0 -
33.0
1
--- -
9: 0
- 9 _.
70th %ile Term Code
Max
Max
Max
Max
Max
Max
Hold
Max
Max
50th %ile Green S
3.0
33.0
--
33.0
3 . 0
33.0
- -- T1
— 0 , 26 0
9.0 -
50th %ile Term Code
Max
Max
Max
Max
Max
Max
Hold
Max
Max
30th %�ilE (S).
3
3
33 �O3
0
-- 3 - 3-0 -
11.0
26.0
--
0
30th %ile Term Code
Max
Hold
Hold
Max
Max
Max
Hold
Max
Max
Splits and Phases: 6: Route 277 & Double Church Road
Baseline Synchro 6 Report
Page 4
Patton Harris Rust & Associates
o2
3 o4
9TTF 1
i - 19
17. s 'k:!— IFA 15
. 39
.0 1
o5
o6
08
gist F I
39Z, Im
Baseline Synchro 6 Report
Page 4
Patton Harris Rust & Associates
Shenandoah - Oak Ridge Background — AM
8: Dogwood Drive & Route 340/522 1/12/2007
--* 4 \
Lane
Baseline Synchro 6 Report
Page 5
Patton Harris Rust & Associates
ngth (ft)
0
0
25
25
- Fe — s -
eed (mph)
15
9
15
9
�Ctor
0.850
0.996
�
0
- 0:9_ 5
- '
(Prot)
1752
1568
1752 3167
3163 0
,d
5
9
(perm)
1752
1568
1752 3167
3163
TCtor,
1�00,7
1
170C, T700r,
1,00,
I uv
.670
I (mph)
30
50
50
e (s)
36.2
56.5
56.5
>l )' 7--
23
— 71 - § 7 - - ,- 87 - TO
— 4"2198 -- , -- 15
71
Factor
0.90
0.90
0.90 0.90
0.90 0.90
Baseline Synchro 6 Report
Page 5
Patton Harris Rust & Associates
• 0
Shenandoah - Oak Ridge Background — AM
12: Site-Dr #1 & Route 340/522 1/12/2007
_-* -- 4
Lane
1900 1 r'.111 90W, 1900! 1900 .x 1900
0
0 300
100
4.0
4.0 4.0 4:6 4.0
4.0
7- 5 - 0
1 — 50- 1 6b7�"90 -1 760 —
5=01
0
0 0 0 0
0
S.
7 T 7 1 — 5 1
Lane Util. Factor
Baseline Synchro 6 Report
Page 6
Patton Harris Rust & Associates
PEirmittbdMh sbs,-�' - 777, T7
Detector Phases 4 4 5 2 6 6
0 0
Shenandoah - Oak Ridge Background AM
12: Site-Dr #1 & Route 340/522 1/12/2007
--* -,.* 4 \
%ile Term Code
:/.�i 16, �Gree
%ile Term Code
% i le �-(j Green
Wile Term Code
z/U ZG7P P `nf s)
Max
I
Ino 51
1 0th %ile Term Code Skip Skip Skip Dwell Dwell Dwell
Tg =h
Queue Length 95th (ft)
55
0
32
18'
46
7 �'40
107 75
�,
26
115e
Turn Bay Length (ft)
�396�
06
300
34
100
Base Ec fy�
(y
Starvation Cap Reductn
0
0 0
0
0
0
ill ack.Ca 'Rbductn
0 -
01"
Storage Cap Reductin
0
0
0
0
0
0
ffi'fli�5rP vIF`N
— 0 - 2 —
Natural Cycle: 40
CFnt Fp.TA
Maximum V/G Ratio: 0.44
.c;nlit.q And Phqqp.q 12 Site-Dr #1 & Route 340/522
%
T
re
7�7
2
i o4
5
06
Baseline Synchro 6 Report
Page 7
Patton Harris Rust & Associates
0 0
Shenandoah - Oak Ridge Background _AM
14: Site -Dr #3 & Double Church Road 1/12/2007
,(- *-- Z
La Group } °w °.'' WBL° WBR BT r;;;:iN BR r: S SBT + _
Lane Configurations
16ealf,Flow,:
-1900
Turning Speed (mph)
15 _
9
9 15
LaneUtd Factoi,
1.00 1.00 1 00
1 00� 1 00
.a. —�.Jx
_.. ..�..�t .n_.. ......._.��..r..._ .,-. h �.. _. .,. ''i
Frt
0.
Flt @rotected. •.
Os990
< _
f__. _.• _ _ _ . W
Said. Flow (prof)
1596
0 1845
0 0
1 826
_ _
Flt•. Permitted
a
-1845
_
�0
Said, Flow (perm)
159
0
0
1826
Headwa
1..00
1e00� 1 00-
00 711 1 00
. __1
w
Link Speed (mph)
30
4 0
40
- —z--- -
Link,Dlstancg',(ft) 2743 ..
2206
_ ti« .
14855`
0.90 0.90 0.90 0.90 0 .90 0.90
Adj. Flow (vph) 0 43 400 0 54 210
Sign Control Stop Free Free
ntersecti oM3ummary
Area Type: Other
Intersection Capacity Utilizati 44.9% ICU Level of Service A
71 ,"-' -`
Baseline Synchro 6 Report
Page 8
Patton Harris Rust & Associates
0 0
Shenandoah - Oak Ridge Background — AM
16: Route 277 & Site-Dr #2 1/12/2007
--0 ' 1- * 4 1' 4,-- 4
Tr -
9C r-f
906 900 9or
100
100
0 0
4.0
4.0
4.0
4.0
4.0 4.0
50
— Eb - 9�0: - 9 - 0 - 7' - ' - 60 - 77
O'�
0
0
0
0
0 0
---
, -- - --
--
0;850
L 850
Fit Protected 0.950 0.950
Satd[ =ow (p- Z=1 - ,I
-A
Fit Permitted 0.266 0.950
Approach LOS A A B
Baseline Synchro 6 Report
Page 9
Patton Harris Rust & Associates
Pe -
Detector Phases 4 4 8 8 2 2
Shenandoah - Oak Ridge
� o4
1IFe_
49 —s=-
Background - AM
16: Route 277 & Site-Dr #2
1/12/2007
4
/0-
FlaffelGrEd T �A E 13 :R W BT t N_ B 0-LN B R, "L;JL-�
p7
-
j E 7 43 _.0T:7 - 5 - 0
90th %ile Term Code Max
Max
Max
Max Max
Max
20th �/ile7G (s)'_'
_T4_.97_3Vg_i
'-�4 50
5
70th Wile Term Code Hold
Hold
Gap
Gap Max
Max
�r6�en —(§ rd,
0
27ij
-
.17
:
. 0 T,,
7
50th %ile Term Code Hold
Hold
Gap
Max
Max
- ......
Green, ,20.3
,`20:3
�.20t3
- Gap
5:&
U
lo�
,,bile - __I
30th %ile Term Code Hold
Hold
Gap
Gap Max
Max
jf0_thPN =re _L1a_6_
�_1367�_31
0
_,Yb:�
1 0th %ile Term Code Hold
Hold
Gap
Gap Max
Max
otk 109
0LEeue _ EIe — ngthF 7— r50th, ft
0,
,
'' 6_
—0.
_-,
Queue Length 95th (ft) 196
6
17
198 53
29
IF [Dist — 5
=3f6�_
Turn Bay Length (ft)
100
100
=ae. - 7'_i307.
- 1,197-
368
"_1307'290
Starvation Cap Reductn 0
0
0
0 0
0
ill dckCa_ ucth �7
_7
7,
Storage Cap Reductn 0
0
0
0 0
0
PaHiIrGri pntiA
.
n 07—
n.5�904;7�
=-7-
- 7
* 0
� o4
1IFe_
49 —s=-
4-
08
Baseline Synchro 6 Report
Page 10
Patton Harris Rust & Associates
Maximum v/c Ratio: 0.78
.qnlit.q nnrl Phnqp..q- 16 Route 277 & Site-Dr #2
0
Shenandoah - Oak Ridge Background_PM
3: Route 277 & Route 340/522 1/12/2007
-,* --,, -,* f -+-- *,- 4 1
Lane Conflaurations
Storage Length (ft)
0
200
300
0
300
0 150
0
Stdrage
0, ..L
1
-1
1.00
01
1.00
1.00
1.00
1.00
1.00
EIanes
1.00
-
1.00
Niiiiii is�LedQ�pfii);
=, - - 50
Total Lost Time (s)
4.0
4.0 4.0
4.0
4.0
4.0
4.0
4.0
4.0 4.0
4.0
4.0
�-'ea6nj_'Db�tector (�ff
5282
TravelravelTime;
Volume (vph)
56 7
�65
Trailing Detector (ft)
0
0 0
0
0
711 168
0
0
0 0
-
=',QW�
00;
=Tdrnm
0�p =ed
O!901
�
- 0!1! -,ff9or
'0 .�
i
Lane Util. Factor
1.00
1.00 1.00
1.00
1.00
1.00
1.00
0.95
1.00 1.00
0.95
1.00
FF77
14%
- 08567
108_
1 47
- 65 - 2
Flt Protected
0.994
0.950
0.950
Lane Group Flow (vph)
0.950
969
147
8W170i7w7Cp:Eol):,�.
1218
�lt733 f4=82,=1=656
94
- 1 rO
397
T6
1
- 71 5 8 -3
T141'7
31 - 67,
- :' - f - 4 1
Flt Permitted
,' r + t,
0.265
0.061
P �,-'�,-
P r Ne
f Fe -
-- _mM+Tptf.��
0.400
0.286
1
6
8
7
4
Right Turn on Red
Yes
Yes
Yes
Yes
SatWFldw! RTLR
Headway Factor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Niiiiii is�LedQ�pfii);
=, - - 50
7-
Link Distance (ft)
7426
7377
4145
5282
TravelravelTime;
Volume (vph)
1^12:5
97 775 132
400
1'14:8' - 77,
947
149
85
96:5:
282
357 343
711 168
F ,, 0M , , t�'OK
0".
-
=',QW�
00;
MO.-
O!901
�
- 0!1! -,ff9or
'0 .�
i
Heavy Vehicles
9%
9%
9%
9%
9%
9%
14%
14%
14%
14%
14%
14%
L.dj '., Fl ow, (yp
108_
1 47
- 65 - 2
Lane Group Flow (vph)
0
969
147
444
1218
0
94
313
397
381
790
187
LL!ypt-
Pe rm
-e
,' r + t,
P �,-'�,-
P r Ne
f Fe -
-- _mM+Tptf.��
Protected Phases
2
1
6
8
7
4
�-2
-7
Free
Detector Phases
2
2
2
1
6
8
8
7
4
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
- :73 , .27 �7
4
X-651TO-5 1,47 -, -,0 2
LOS F B F D F F A F F A
F
Baseline Synchro 6 Report
Page 1
Patton Harris Rust & Associates
0 0
Shenandoah - Oak Ridge Background_PM
3: Route 277 & Route 340/522 1/12/2007
win /oiie ureen (s,p
'A .2
o4
bU;U ',]U;U Yb.0
U
O.U: _zz-U -
- -bU.0
90th %ile Term Code
Max
Max
Max
Max
Max
Max
Max
Max Max
- _' - 60 —
q
�'8.07
&0`
=21
r0f
70th %ile Term Code
Max
Max
Max
Max
Max
Max
Max
Max Max
60 @ ----
— 0',
7�0
8'; 0 22:&,
50th %ile Term Code
Max
Max
Max
Max
Max
Max
Max
Max Max
d0 Green, s),
615�6 7 60 — .0
-'60
O::
0.0 =6.27
30th %ile Term Code
Max
Max
Max
Max
Max
Max
Max
Max Max
,10 th :,,o: e - G reen — ( S T7 —,
1
6F67
�60�0'
11
00 ,
�10.01
— 76.6 -- , I '.' 7,
0
"
1 0th %ile Term Code
Max
Max
Max
Max
Max
Max
Max
Max Max
Maximum v/c Ratio: 3.73
Splits and Phases: 3: Route 277 & Route 340/522
01
'A .2
o4
16 5_.'" l
It
06
o7
08
IN
Baseline Synchro 6 Report
Page 2
Patton Harris Rust & Associates
0 0
Shenandoah - Oak Ridge Background
6: Route 277 & Double Church Road 1/12/2007
-,* -- t (- 4-- '1- 4 \ t / ,0, \,I* l 41
Storage Length (ft) 150 1000
Total Lost Time (s) 4.0 4.0 --
= ead , ng - L � D : e = feCtor ( tF 0 0
Trailing Detector (ft) 0 0 0
I=urnmg�§�SC -
. LeLd ff
225 0 275
4.0 - 0' - 0.' "TO 4.0
0 0 0
0 200 u
5 6
4.0 4.0 4.0 4.0 4.0
0.; -,- 907-771
0 0---- 0
15 9
Lane Util. Factor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00 1.00
1.00
1.00
1.00
7 �25 3 2
321 150
,�, , ,
200 121
�,35 4 �-
132 186
Pe�ak�Hour,FactoF
'0
0: 912 _
90,
Fit Protected
0.950
Heavy Vehicles
9%
0.950
9% 9%
9%
0.950
3%
0.950
3% 3%
3% 3%
(p=o C)
- -1,90 , :
- 738!
31 1
�63 �d2�9
1
, _CF
�147 207
j6L6g��7��'b
Flt Permitted
0.078
317 182
992
0.161
357
389
0.211
354 0
0.532
P M+K)t
M+pL
Protected Phases
5
---
1768
1
38
1
-- 682
11
0
Right Turn on Red
4
-
Pdrrfiltt�R
Yes
�. "I
7 , . -=
- '6
Yes
Yes
I I
Yes
LS �td,Wlow(�ETQR 'n-7
2
2 1
3 ,1 _7
1, , -
.. ,, ;�:
�
,
, - TO
�
Headway Factor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00 1.00
1.00
1.00
1.00
ttkjpRed-'(ffioh , ,.a 777745.
Link Distanc(;�ft)
2070
12735
14855
2077
�E�_T7%& 77,777�T
7a7:VEEPf71
, Tr -7 FT7§'
Volume (vph)
-,�-311.4-
171
664
285 164
777
116
7 �25 3 2
321 150
,�, , ,
200 121
�,35 4 �-
132 186
Pe�ak�Hour,FactoF
69
:90 - 1
90,
0 `. 90i' 77go
� �
Heavy Vehicles
9%
9% 9%
9%
9%
3%
3%
3% 3%
3% 3%
AQ7, - (vp�'.7
- -1,90 , :
- 738!
31 1
�63 �d2�9
�1 W
222! 131 ;,
�147 207
Lane Group Flow (vph)
190
738
317 182
992
0
357
389
0 134
354 0
P M+K)t
M+pL
Protected Phases
5
2
1
6
3
8
4
-
Pdrrfiltt�R
7-
7, ",
I
�. "I
7 , . -=
- '6
-
I I
Detector Phases
5
2
2 1
6
3
8
4
4
F
Baseline Synchro 6 Report
Page 3
Patton Harris Rust & Associates
0 0
Shenandoah - Oak Ridge Background—PM
6: Route 277 & Double Church Road 1/12/2007
qutnz%iie ureen
90th %ile Term Code
70F - % ile
70th %ile Term Co
Max
r.
Max
Max Max
— 9 &
Max Max
J.u -*-!!!L.--.,,-
Max
Max
- �P.u-
Max Max
Max Max
Max
Hold
-' .
Max '
Max
Max
Max
9
�f 06
'S
4b�F
10 101547-
�,01 ��4C��--7--� --7
110
10
50th %ile Term Code
Max
Hold
Hold
Max
Max
Max
Hold
Max
Max
�4�.O.
-- 4 - 9.0-,.
V9 —, 0 -- 7 - 3 --7--
.0
110T
10i ; i
30th %ile Term Code
Max
Hold
Hold
Max
Max
Max
Hold
Max
Max
11 =OtO/. re6n..
1 0th %ile Term Code
Max
Hold
Hold
Max
Max
Max
Hold
Max
Max
06eu iLeh�thi5(Ktff
- 750 I
Queue Length 95th (ft)
#234
#584
42
#124
#996
#405
281
#199
#416
Iht&naFl(n��QDQF
�-1�99O
7
7
Turn Bay Length (ft)
150
1000
225
275
200
Base,6 F��citX��yp
L1691:.r
911t
23r
§860, �
7�477
�037 771
Starvation Cap Reductn
S pi116ackyGapReductn
0
- '':0
0
•a 0;
0
!
0
z —�,O
0
"" , 7
770
0
. -
0
0 0
Storage Can Reductn
0
0
0
0
0
0
0
0
0
Rnlitq and Phq.qp.q P) Route 277 & Double Church Road
4"ol
g2
3
o4
9�
-
55s - -- 13
.1 71 i
K
o5
�f 06
'S
A t 08
10 101547-
Baseline Synchro 6 Report
Page 4
Patton Harris Rust & Associates
ffrorXis WM:Fl Fra N VMMIWC �#ACW�WJIMM 110 16 A KUWIJUN .l1271! I
0 0
Shenandoah - Oak Ridge Background
8: Dogwood Drive & Route 340/522 1/12/2007
_A --, -4\ 1
Lane
00 E1900'' 1900 1;900' 190d1 1900' I
0 0 25 25 _
15 9 15 - 9
0 ' .1:00' , 1 00 : 0 9 - Oi95 0 95'.
0.850 0.996
jntersedtioh Summary' v a _y
Area Type: Oth
(;nntrol�Tvoes;f�Jnsinnal¢edI - - '-
/ice A
Baseline Synchro 6 Report
Page 5
Patton Harris Rust & Associates
H„ e av y Vehicles ( %) . 3% - ,3 %t . 3 % ,,3
Adi. Flow (voh) 34 18 22 771 1340 41
0 0
I
Shenandoah - Oak Ridge Background—PM
12: Site-Dr #1 & Route 340/522 1/12/2007
- -,* 4 \ t
Lane
Storage Length (ft) 0 0 300
St �or TL
Total Lost Time (s) 4.0 4.0 4.0 4.0
ppnrjinn n7o (ft) rn, ��rn 50 - 750 -
1-1
Approach LOS B B C
Baseline
Patton Harris Rust & Associates
Synchro 6 Report
Page 6
jTraveNTimd ( A10 34, ' 565
Volume (vph) 216 302 286 498 1018 204
Eu�
�n IT, yp
p
Protected Phases 4 5 2 6
P57rMitt5d:. Rh-agb �7777 1 6�77 -r� 77 7
4..
Detector Phases 4 4 5 2 6 6
Trailing Detector (ft)
0
0
0 0
0 0
7-
t.Tuffinffig�S�A—ed�(—TpF)
15
Lane Util. Factor
1.00
1.00
1.00 0.95
0.95 1.00
Frt
0.850
0 t6 50 ,
Fit Protected
0.950
0.950
(p Lot ffff
�atdF§w�
L�752�
52 67,
FB-
�3T
1568��,_
, - 7 - 71 - 568°
�77
Fit Permitted
0.950
0.143
Storage Length (ft) 0 0 300
St �or TL
Total Lost Time (s) 4.0 4.0 4.0 4.0
ppnrjinn n7o (ft) rn, ��rn 50 - 750 -
1-1
Approach LOS B B C
Baseline
Patton Harris Rust & Associates
Synchro 6 Report
Page 6
jTraveNTimd ( A10 34, ' 565
Volume (vph) 216 302 286 498 1018 204
Eu�
�n IT, yp
p
Protected Phases 4 5 2 6
P57rMitt5d:. Rh-agb �7777 1 6�77 -r� 77 7
4..
Detector Phases 4 4 5 2 6 6
0 0
Shenandoah - Oak Ridge Background
12: Site-Dr #1 & Route 340/522 1/12/2007
-,* --* 4 \
9Uthi,/,jleL(,reen (§)I -L1.0
90th %ile Term Code
'
Max
1.0, '
Max
9.0
Hold
2.
22-U
Max
Max
Max
ITO': 3
70th %ile Term Code
Max
Max
Max
Hold
Max
Max
50t
17b7 Tj 710 9.0
Max Max Max
37
Hold
6 �2O
Max Max
50th %ile Term Code
30ft%ile
30th %ile Term Code
1,1 .0
11.01
9.0
37.0,
22__ 22.
Max Max
Max
Max
Max
Hold
jTth �)i_
S
1 0th %ile Term Code
8.0
L8�.o
7�
.0
35.5�
1-
20.5,
Gap
Gap
Gap
Max
Hold Gap
dueu&iLehctffy T,7-=79�
— ,53,
�36
7
— '8
.8234 4061-
0 0 0 0
SDIits and Phases: 12: Site-Dr #1 & Route 340/522
I* t o2
-! o4
43i'-
o5
1 06
Baseline
Synchro 6 Report
Page 7
Patton Harris Rust & Associates
Queue shown is maximum after two cycles.
9
Shenandoah - Oak Ridge
14: Site -Dr #3 & Double Church Road
0
Background
1/12/2007
f *-- t '�
Lane Configurations
0eaI7Flow' v
` ° 1900 1
1000 r
ry 79 :' 1
1900 ` 1800 1000
v h
a _
_
._
T urning Speed (mph) 1
15 9
9 9
9 15
Utll F.ac r 1
1'00 "
"1: 1
1`0 0
00 1 ,
- '1
a __.��._......�. v
v.._.._ 1
,- 0
Frt 0
0.865
—� — 7 ._. _
_�. _
_ _
Satd. Flow (prot) 1
159 1
1845 0
0 0 1832
ft -'.
Baseline Synchro 6 Report
Page 8
Patton Harris Rust & Associates
0 0
Shenandoah - Oak Ridge Background—PM
16: Route 277 & Site-Dr #2 1/12/2007
__ - 4 ,' '4— � /0
;2 9 : 0 i 6— f 90-01
-"�b 900
LEI-f�OLCFI =
9
�
100 100 0
4.0
4.0
4.0 4.0
y,4 f
4.0 4.0
5
'50, _'5
50i
0.950
T=urnj'ngj9
77
- '6 - '
Lane Util. Factor
1.00 1.00 1.00 1.00
1.00 1.00
Fr - 7
77�',
- 77 — " - 6
_O'
Fit Protected
0.950
0.950
9 9 743
�
777 -7- 71
Fit Permitted
0.198
0.950
Baseline Synchro 6 Report
Page 9
Patton Harris Rust & Associates
Pe �-i-
Detector Phases 4 4 8 8 2 2
0 0
Shenandoah - Oak Ridge Background—PM
16: Route 277 & Site-Dr #2 1/12/2007
'-.* � 4 \ 1
Splits and Phases: 16: Route 277 & Site-Dr #2
'\'* m 2
1 o4
1 5's - - IS155
1 =- 2-- E
1 08
Baseline Synchro 6 Report
Page 10
Patton Harris Rust & Associates
1 ��/57effr 4 9 O� — 4�9O - =9C� '. - 0 ,
70th %ile Term Code Hold Hold Max Max Max Max
60 ��9//oe�GG-t22 — re en ( s) '�49 0 49 - 49 — 0` - �FQ — I=
50th %ile Term Code Hold Hold Max Max Max Max
LOF T 0 — 0- - 4 - 9 - 0 - 4:9::
30th Wile Term Code Hold Hold Max Max Max Max
0 0
Shenandoah - Oak Ridge
Background—AM—Suggested
Imp.
3: Route 277 & Route 340/522
��43 , 384 -
, ' w
1/12/2007
__* __► -,*
4_ t
1.00 1.00
1.00
4 /
Right Turn on Red
Yes Yes Yes
Yes
at RTC) ,
3)
��43 , 384 -
, ' w
Headway Factor
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
1.00 1.00
1.00
LiAk,SneddWn
� 4 5 7 -46, " - '.7 �50�
7426
4145
150 648 3 225 670 222 121 460 346 178
14% 14% 14%
Lane
43
76
a
Baseline
Synchro 6 Report
Page 1
Patton Harris Rust & Associates
. . . . . . . . . . . .
. . . . . . . . . . . OB50, — o ..857o
Fit Protected 0.950 0.950 0.950 0.950
Satd - 1656,,: T 1 1 417:1583 ' , 9 583' - 04, 7--
3167 . �j =64LI
Fit Permitted 0.950 0.950 0.581 0.200
llurnllypL "Trot Feerm, , 'vrot p a+ u , ,
_. ree�,pm+p -,rree
p
Protected Phases 5 2 1 6 3 8 7 4
- R — errMifi ff L�FasE�s- 4 7 - -171 - - �7
: I I ;� — 7& 1 � 7' Free
Detector Phases 5 2 2 1 6 6 3 a 7 4
0
Shenandoah - Oak Ridge
3: Route 277 & Route 340/522
14
�=as6a - -257z•
Starvation Cap Reductn
fO
0 0
S ll6dck�C6p, ,0.'
0
Background Imp.
1/12/2007
0 0
_1
�-,O'.667
--V
�
4—
A_
4
t / P.
\ -V
l
o5
__
o7
08
l'Ti-
-
NBL L �AN_ R - - BF�ZSB� - -
ffff6 �NIEBQnQ3�Tr 1 W BT B R 'A BT l_ %=RIf S
901.i16 - S� ILO -1
1TOX
26 0
- ; - 1'3.CF -- 28� - 0,
�
.� 3 0
- 144'.0'-
4
90th %ile Term Code
Max
Max
Max
Max
Max
Max
Max
Max
Max Hold
6 511 reen sE7
;70ff 6 1.
2& ':
01 0 . 7=01
70th %ile Term Code
Max
Max
Max
Max
Max
Max
Max
Max
Max Hold
6 �?/Jle.Gree7n, (s)
= .. 25 . 0 �
0 --
f2
— ffT - ' T-
7 1 -- '�
f6
3 7 Y-
50th %ile Term Code
Max
Hold
Hold
Gap
Gap
Gap
Max
Max
Max Hold
;reen (i)
1-
22 7
22.7
- - CF �F
, ::
-
-
30th %ile Term Code
Max
Hold
Hold
Gap
Gap
Gap
Max
Max
Gap Hold
q W - .I- f�
0
9 A
7 a "
I G� 0
i6.. ?
imernai UISV LT)
Turn Bay Length (ft)
14
�=as6a - -257z•
Starvation Cap Reductn
fO
0 0
S ll6dck�C6p, ,0.'
Storage Cap Reductn
0 0
FlAducP �fio�- -
�-,O'.667
�f
Snlits and Phases 3: Route 277 & Route 340/522
0 131 98 0
2=02
150
7
0 0 0 0
�o
0 0 0 0
4
I o2
■ o3
o4
1 9'i
IN
32 i I
9TI IM30
Z I
'A
F
l
o5
e6
o7
08
l'Ti-
20 sue =z I Is
Baseline Synchro 6 Report
I Page 2
Patton Harris Rust & Associates
E
Shenandoah - Oak Ridge
6: Route 277 & Double Church Road
Background Imp.
1/12/2007
Trailing Detector (ft)
1,=ur nin�g
§p±e�:Qn
0
--v
(- 4 ---
-"-
41 t
Lane Util. Factor
1.00
1.00
1.00
1.00 0.95
-0.
1.00 1.00 1.00 1.00
1.00 1.00
Fit Protected
0.95
-
1 6
0.950
3
EBE K L, - T - K6WBR , 7'NE3L'�LqNETE-�-4N - B - .RS7BL,=<TS - R ,- T Ej -- ,T
I V 7�
- - ! SgR
igurations
F, �es
i
tt
�-'6
V ii t
r
3
- 1�49 - 2 , ,
90-0-1
Detector Phases
5
2
2 1 6
=56C, �]1762�,l
3
.ngth (ft)
150
1000
225
0
---"
275
0
00
. . . . . . . . . .
10.0 10.0
0.557
Total Split
`oi 120° 41,0'g10 25161 725'0 -
16.7% 48.9% 48.9% 13.3% 45.6% 45.6% 17.8% 27.8% 27.8% 10.0%
0.716
71 �5r 't-,`C9
Yellow Time (s) 4.0
8fo 3&0
4.0 4.0 4.0 4.0 4.0 4.0 4.0
S atd
"T '7"
Time (s)
4.0
4.0 4.0
4.0 4.0
4.0
4.0 4.0
4.0 4.0
4.0 4.0
Et F�t - ®r (ft)
-
76 0
- � O - -
� ,6F 50
0
0 ,', 0 7--_
.
Yes
-7--0-
, 50 5
Trailing Detector (ft)
1,=ur nin�g
§p±e�:Qn
0
0
0 0
0 0
0 0 0 0 0 0
1 5 9; Ts
Lane Util. Factor
1.00
1.00
1.00
1.00 0.95
1.00
1.00 1.00 1.00 1.00
1.00 1.00
Fit Protected
0.95
-
1 6
0.950
3
8
0.950
7 4
F, �es
0.950
�-'6
d - =Fl o w (p
1656 16 5 6
3
- 1�49 - 2 , ,
- 165
Detector Phases
5
2
2 1 6
=56C, �]1762�,l
3
849�'j�
EE8
Fit Permitted
0.294
8.0
10.0
0.196
10.0 8.0
. . . . . . . . . .
10.0 10.0
0.557
Total Split
`oi 120° 41,0'g10 25161 725'0 -
16.7% 48.9% 48.9% 13.3% 45.6% 45.6% 17.8% 27.8% 27.8% 10.0%
0.716
71 �5r 't-,`C9
Yellow Time (s) 4.0
8fo 3&0
4.0 4.0 4.0 4.0 4.0 4.0 4.0
S atd
ff, 27 - 3� - 1;5 7 1 ' - 11482- 102
.18�45
- ]�8:457
13�21 _
-1
_
Right Turn on Red
Yes
Yes
Yes
Yes
Headway Factor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
L i =nk
qeEK_
'7�,77
, 451
:40'
Link Distance (ft)
2070
12735
14855
2077
Tr
--------
'7:J193-0
Z:
2 12
- 4,
Volume (vph)
PTqPRWur, ra'ctor
56
"0.�9 17-0190G
567
128
0.
54
576
' Tgo
34
6 - 9o,
284
- ,o , 9o -
57
=96-76
57
99
56
87
0
Heavv Vehicles (%)
9%
9%
9%
9%
9%
9%
3%
3%
3%
3%
3%
3%
Lane Group Fl (vph)
bZ�, , WU4
62 630
14Z 'Uu, 13)
142 60 640
0
38 316
0,5 "'. 11 0j
63 63
110 62 97
jl,urn I yp
q +
a
FrW:0 +0 .
L _r�L
_ +pt
�F, pn+p - , ',PTrF
Pe t
Protected Phases
5
2
1 6
3
8
7 4
F, �es
r2'-"".
�-'6
Detector Phases
5
2
2 1 6
6
3
8
8
7 4 4
M i n i �mdrw rh �TiWi@)�
Minimum Split (s)
8.0
10.0
10.0 8.0 10.0
10.0 8.0
. . . . . . . . . .
10.0 10.0
:b , �4Of-, '9'.0
8.0 10.0 10.0
Total Split
`oi 120° 41,0'g10 25161 725'0 -
16.7% 48.9% 48.9% 13.3% 45.6% 45.6% 17.8% 27.8% 27.8% 10.0%
6T - 8 : 11
20.0% 20.0%
71 �5r 't-,`C9
Yellow Time (s) 4.0
8fo 3&0
4.0 4.0 4.0 4.0 4.0 4.0 4.0
a 0 �41 2 0 '71 00
4.0 4.0 4.0 4.0
Baseline Synchro 6 Report
I Page 3
Patton Harris Rust & Associates
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Redall Mode' :r --�, None ,!, iNoh6 ��Ron�e� �' No 7 VT
�465 ��ne' �. in- - i , in
Act Effct Green (s) 36.2 31.4 31.4 34.5 30.6 30.6 26.8 20.0 20.0 15.5 10.4 10.4
A atio .4 � 70Y. - 42� � �0.4.2-- -0 �27, �00,.O -14, f �
3 3
v/c Ratio 0.17 0.34 0.20 0.21 0.46 0.06 0.63 0.12 0.13 0.36 0.24 0.32
0 0
Shenandoah - Oak Ridge Background Imp.
6: Route 277 & Double Church Road 1/12/2007
Splits and Phases: 6: Route 277 & Double Church Road
.1
o2
3
M 11
06
08
Baseline Synchro 6 Report
Page 4
Patton Harris Rust & Associates
Baseline Synchro 6 Report
I Page 5
Patton Harris Rust & Associates
0
0
Shenandoah - Oak Ridge
Background-AM_Suggested Imp.
8: Dogwood Drive
& Route 340/522
1/12/2007
Ma i- , " , �FBL
Lane Configurations
tt tl*
N =1ow
0
i
Storage Length (ft)
0 0
25
25
=tora
Les '
Turning Speed (mph)
15
15
9
LEn L
.00. 1
: l 4
- =0 7 :!j _ 7 - 7
.9�2
Frt
M53
0.996
F
�096 L
M5
Flow (prot)
1703 0
1752
3167 3163 0
,Satd.
FI FPera
-- 0
t �69
t
Satcl. Flow (perm)
1703 0
1752
3167 3163 0
R — 7 -- j — 00 7-- i —00-11
� T' - ff
(M
Link Spee ...ph)
50 50
Travel Time (s)
36.2
56.5 56.5
Baseline Synchro 6 Report
I Page 5
Patton Harris Rust & Associates
0
Shenandoah - Oak Ridge Background—AM—Suggested Imp.
12: Site-Dr #1 & Route 340/522 1/12/2007
_,* l -4\
Lane
�1�—f- --r-7-7-7.
4.0 4.0 4.0 4.0 4.0 4.0
'�
0 0 0 0
17
T5�0— _ , j
Fit Protected 0.950 0.950
7 - 7q
TaTd F =ow - (p=o 6�! ,1568 — 11-752 :D 67731=6f - -15ff —
Fit Permitted 0.950 0.408
Patton Harris Rust & Associates
Baseline Synchro 6 Report
Page 6
0
Shenandoah - Oak Ridge Background Imp.
12: Site-Dr #1 & Route 340/522 1/12/2007
4 �
I
,;nlitq and Phases 12: Site-Dr #1 & Route 340/522
. A
'T 0
4o. o4
05
90th Wile Term Code
Max
Max
Max
Hold
Gap
Gap
76_th_F%! jjreen(§) _
�_97_�9
70th %ile Term Code
Gap
Gap
Max
Hold
Gap
Gap
60 F - -/6 i 1 en@)�
a8:2
8;2 8.
�
50th %ile Term Code
Gap
Gap
Max
Hold
Gap
Gap
30t 1i ° /6:i le =G�ee n
776_.8_68'
7 5
5
7 7
30th %ile Term Code
Gap
Gap
Gap
Gap
Gap
..0_1
:U
— Hold
__ 7
0.6 1, .77
—
1 0th %ile Term Code
Skip
Skip
Skip
Dwell
Dwell
Dwell
Lh
241-
.0,
18
~ 91
j
Queue Length 95th (ft)
63
36
44
103
87
29
Internal Li n k Dist (ft) " 1396.
8 234
Turn Bay Length (ft)
300
100
r w 6 ; z � — A,, W I h
— 4 - f Tf — ;
A 7T,
— 9 - F t q
--
934R - -
, -- i — sq P
c �( 1
T
I 1 7
— 7 7 7
I
,;nlitq and Phases 12: Site-Dr #1 & Route 340/522
. A
'T 0
4o. o4
05
o6
IMMI
Baseline Synchro 6 Report
f Page 7
Patton Harris Rust & Associates
0 0
Shenandoah - Oak Ridge Background Imp.
14: Site-Dr #3 & Double Church Road 1/12/2007
f ,- t /,-
Lane Configurations
y
T+
FT
t !ew (v:-Pfi-
— q6(F - -1 — q0'0'H9
0,
, ��qL
gin
Turning Speed (mph)
15
9
9
15
=ne Eil,'F,96
- 1 - . - 00 ,
- 1 , — 001
71 7
q
Frt
0
FIPP�rotected' 7
990
,
Satcl. Flow (prot)
1596
0
1845
0
0
1826
01
Satc. Flow (perm)
1596
0
1845
0
0
78
Lac.tor
�=eadw�ay
07,
ifUo
.6
1160 �-,00
Link Speed (mph)
30
40
40
E lF IZ 5 i EU 'Fe (ft)
-- ------ - -
Travel Time (s)
62.3
37.6
253.2
Fu — e
,V�6
Peak Hour Factor
0.90
0.90
0.90
0.90
0.90
0.90
Baseline Synchro 6 Report
Page 8
Patton Harris Rust & Associates
0
Shenandoah - Oak Ridge
16: Route 277 & Site -Dr #2
0
Background Imp.
1
Lane Configurations
T
?
1
t I
r
deal Flow° v h` - 1 , 90 - 0 7 - 1
- 90 - 6r
1900
1900 1900
X 1900
Storage Length (ft)
too
too
0
0
Stora`g
Total Lost Time (s)
4.0
4.0
4.0
4.0 4.0
4.0
L'eading (ft) - --
50
50
50 "
50 " - 967 - ' - 607 7 -
w ,
Trailing Detector (ft)
0
0
0
0 0
_
0
_ 4
Turnin S eed' m h
—
—
9
15
_ .
15
— -
9 ^.
Lane Util. Factor
1.00
1.00
_ 1.00 1.00
1.00
FrtT
_1.00
0850
_1
0 � 850 !�_ u �__.____
Flt Protected
0.950
0.950
Baseline
Synchro 6 Report
Page 9
Patton Harris Rust & Associates
Permiged:Phr ases
Detector Phases 2 2 6 6 8 8
%APP Dela y r � . -.- ' _ ..�`.W
9 1 - 9 8 "1'4'.6 F µ d
a ' -:. .. !.�.,..�.._
Approach LOS A A B
0 0
Shenandoah - Oak Ridge Background Imp.
16: Route 277 & Site-Dr #2 1/12/2007
� Z If *--
1
Snlit and PhF3qeq 16 Route 277 & Site-Dr #2
o2
8
50 s
90th We Term Code
Max
Max
Max Max
Gap
Gap
�r�(�C7
�9�3,,
39�
=
7,i
70th We Term Code
Hold
Hold
Gap Gap
Gap
Gap
=reen
A
2E4
2 4�-=9 4Llr
50th We Term Code
Hold
Hold
Gap Gap
Gap
L11'
Gap
� Gieent (s)
� '-1
4
'�1.1
6. 6.0-
QL
30th %ile Term Code
Hold
Hold
Gap Gap
Gap
,
Gap
I.q A
7'
1
Snlit and PhF3qeq 16 Route 277 & Site-Dr #2
o2
8
50 s
06
20==
Baseline Synchro 6 Report
I Page 10
Patton Harris Rust & Associates
Queue Length 95th (ft) 301 11 32 305 53 29
7 7- - 7346, : 2276 t,��
fn — Unk DlTFft
tern5l W ' 1
5 — 7 —
0
Shenandoah - Oak Ridge
3: Route 277 & Route 340/522
0
Background_PM-Suggested Imp.
1/12/2007
Co
Storage Length (ft)
0
200
300
0
300
790
0 150 9
Storage Lane
Yes Yes
Pe �
rim,7 7 P 7 FFt efm
-- 4.0
Headway Factor
Total Lost Time (s)
4.0
4.0 4.0
4.0 4.0
4.0
1.00
4.0
4.0 4.0 4.0 4.0
Leading
1.00
j 01
.L
LDT�i TIDN
-,-' ,
50
��4,
0
_2e_�tK�tor'(IC:
Trailing Detector (ft)
0
0 0
-
0 0
0
0
0
0 0 0 0
Tu - rn p=e d - (Fpf
4.0
777 8i 0 �r
4.0
5:
_ Win g
Lane Util. Factor
1.00
0.95 1.00
0.97 0.95
1.00
1.00
0.95
1.00 1.00 0.95 1.00
-
-56i5
0.8
-,,
0 866 7
v �
.850 0 850
Fit Protected
0.950
947
0.950
85
0.950
357
0.950
Eat:d �Ffo - (pro:t )
- 165 - 6
148 321 - 33 - 31T -
-,- lK8L2 �1583
0=90=0
Fit Permitted
0.950
1.
0.950
0�9W
0.364
Heavv Vehicles (%)
0.267
S , Flo . 7- f 471,7 j
9% 9%
_1312 -, 1A§L,12�t3,
- 3312
: 1'482'_ '6077TY1677W4W
14%
5 w 67
Riaht Turn on Red
14%
Yes
Yes
Yes Yes
Satd."Flow: ( RT(DR),
108
861 147 444 1052 166
A 36
313
b b .-
790
187
2
Yes Yes
Pe �
rim,7 7 P 7 FFt efm
.L�ee
Headway Factor
1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
.L
LDT�i TIDN
-,-' ,
45,
��4,
-45 - i � -� -
i . , - 1 , --- ' - 7 - 7 - 77
7'510-'
-z-
-�
..... go
16.1%
Link Distance (ft)
16.7%
7426
0.0%
7377
4.0
777 8i 0 �r
4.0
4145
n
n a n
5282
F
L�ravef
J 2:5!
7 7�1
=78
-56i5
2.07�
Volume (vph)
97
775
132 400
947
149
85
282
357
343
711
168
1!7e7aFRVlF a ctor
=
0=90=0
.
90 - 709 - 0
-- b - 9 - 070 - 6 -
1.
. M90
0�9W
: 0.90
Heavv Vehicles (%)
9%
9%
9% 9%
9%
9%
14%
14%
14%
14%
14%
14%
Ewe Group Flow (vph)
108
861 147 444 1052 166
94
313
397 381
790
187
�Xes
Yes Yes
Pe �
rim,7 7 P 7 FFt efm
.L�ee
p +F,
.1
-
3.0
Protected Phases
5
2 1 6
3
8
7
4
27.3 27.3 15.0
Ne -
7mitte-EiVias5577 �111
�1 �- 7T 7-- 77 -��
11.0
- 7 - 7.F
F ree �r, ; -4
��4,
:'F ��ree
Detector Phases 5 2 2 1 6 6
i�l q()T � - ��Q , 4T 5
Minimum Split (s) 10.0 10.0 10.0 8.0 10.0 10.0
,q, ,I- ^ '1;4 ' . 5 � 71 LE
LT�q I lit s - 3270r;
3 8 7 4
�d
8.0 10.0 8.0 10.0
�f 5�0 T 30.0 1 � 0 0 ,
m77 T(j7d 2 4
Total Split (%)
16.1%
35.6% 35.6% 21.1% 40.6% 40.6% 10.0%
16.7%
0.0% 26.7% 33.3%
0.0%
9RK,T7umR,CEre&7n(- t .
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0
4.0
777 8i 0 �r
4.0
"',241
4.0
n
Lead/Lag
Lead
Lag Lag Lead
Lag Lag Lead
Lag
Lead Lag
Tg:(D� �
Yes
�Yw es, , % - �e - �
�, �YE��Y Y
�Xes
Yes Yes
Vehicle Extension (s)
3.0
3.0 3.0 3.0
3.0 3.b 3.0
3.0
3.0 3.0
M - e,.
N e,
01107�None N on e
on67NZne1-- Mm7
IN 7 W
N
,Eecall
Act Effct Green (s)
10.2
27.3 27.3 15.0
34.8 34.8 16.0
11.0
89.3 35.0 27.9 89.3
Adtu 7 �1 r 6 -, 6 1 3 1 7! W
.0:39 = 0 '-�
X007 �,
v/c Ratio
0.59
0.85 0.27 0.82
0.82 0.24 0.59
0.80
0.28 0.89 0.80 0.13
Co trol� Delay
0., 37 �6-"
5 �f� 0 47-2 0
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0
,Tq Del � ;�! �, " =..
0.0 0.0 0.0 0.0 0.0
1 r)q
n
n a n
r A n
F
A D D A
Baseline Synchro 6 Report
I Page 1
Patton Harris Rust & Associates
Shenandoah - Oak Ridge
3: Route 277 & Route 340/522
0
Background_PM_Suggested Imp.
1/12/2007
90th %ile Term Code
�70th1 %ile Green (s)
70th %ile T erm Code
Max
8 5
Max
Max
:26:0. •
Max
Max
26:0
Max
Max
13.0
Max
Max Max
_
30!5 .30.5' ^=
Max Max
Max
'3 0'
� -
Max
Max
- - 9.0
Max
Max Max
180? ;.240
Max Max
50thr %ile Green (s
_8:5'
. 2 61 0
26.0,
13 0 30:5
- ,30.5.
.0
- -9A �.� IEFO
"11
50th % ile Term Code
Max
Max
M ax
Max
Ma
Max
Max
Max
Max
Max
30tfii %ile:Gr (s)
8.5;
26.0^
26.0
.--•. �__
^13 0 `:30:5"
30.5'
:' = 3.0
9.0
M d
18.0 � ,
_
24 0
30th We Term Code
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Snlits and Phases- 3: Route 277 & Route 340 /522
m1
- * - i� m2
'\ m3
1* m4
m5
06
m7
Q
� m8
1415x"
36.5 =— :_�
24,s'y ., ^_., a_a
15 Ta% I 1W
Baseline Synchro 6 Report
Page 2
Patton Harris Rust & Associates
0 0
Shenandoah - Oak Ridge Background Imp.
6: Route 277 & Double Church Road 1/12/2007
150 1000 225 0 2 75 0 200 0
4.0� 4.0 4.0 _ 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Trailing Detector (ft)
Turnip iS - eed m h i
t 9_P� ( P)
0
.'.15
0 0
-
9
0 0 0
�' -
- • 15F 9; ;-
0
. 15
0
0
--
, 9'
0
15, +r
0
_u
9
Lane Utt. Factor
1.00
1.00
1.00
1.00
0.95
1.00
1.00
1.00
1.00
1.00
1.00
1.00
9%
9%
9%
0.850
3%
'.
" °0:850
3% 3% 3 %°
Adj Flow, (vph)
0.850
738r
x`0:850
182'..
Flt Protected
0.950
-222
134 7M77 ,207
0.95
190
738
0.950
182
863
0.950
357
167
Satd: Flow� `
" 4656;
,tr7,43'
.1;482'...1656
Y 1 - 17 52
13312 1482 .,,17,
5 f --- 45
18568
� 1 °� _
1752r `:18,45:
- ':1568
Flt Permitted
0.190
2
0.108
6
0.353
8
0.651
PefmittedrPt aces -, '
; 772 `,
_,
Sat &.Fhow = (perm)
'ti331 1x743 '1482;
188'
33121 1482;,�65f'
1201T'
-•1845
1568
Right Turn on R
2
2
Yes
6
6
Yes
8
8
Yes
Yes
Satd! F' ,low (RT
e' r _^_
3 7 . `M'
-_ '`
,
129! _
'•,' .
<
222 - 77
,
, 205
Headway Factor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Lin "�'T
- --
-
45•
40,
40
,
Link Distance (ft)
2070
12735
14855
2077
TrcvcLTima 1e1 7 77
7
- q i
, . •
..'
1930
.?, :...
`.. r253i2.
` ,-
'3� 5 4
I
Volume (vph)
171
664
285
164
777
11
321
150
200
121 132 186
Peak�HourFact6C --
0M,.
0'9W 0
0
•
0.90. - _`0:90
- 0.90°
"0190r' ?0:90 'r 0:90
Heavy Vehicles ( %)
9%
9%
9%
9%
9%
9%
3%
3%
3%
3% 3% 3 %°
Adj Flow, (vph)
990 .,
738r
.131,7
182'..
863 r 129 ^ ^ '
357, , 167:
-222
134 7M77 ,207
Lane Group Flow (vph)
190
738
317
182
863
129
357
167
222
134 147 207
Tul m l
pm +
�' pm +pt" �4 "• ° -
Pe�m, + pt '
'P'e_r
+ pt� - '' : - 'Perm
Protected Phases
5
2
1
6
3
8
7 4
PefmittedrPt aces -, '
; 772 `,
`,
..,2 <,
•4
Detector Phases
5
2
2
1
6
6
3
8
8
7 4 4
Baseline Synchro 6 Report
Page 3
Patton Harris Rust & Associates
0 0
Shenandoah - Oak Ridge Background Imp.
6: Route 277 & Double Church Road 1/12/2007
I
.;nlitq and Phqqp.. 6- Route 277 & Double Church Road
t m1
- t* o2
03
o4
127sl-s
114
197U�� =1
I M 115, i t
it
1 -10 4 0
o5
oG
o7
08
15 s
IM]41rs L- A
Til
Baseline
Synchro 6 Report
Page 4
Patton Harris Rust & Associates
0 90 ( 57- --� 7
��60 1 —35'. 13.0,.
70t "i 0
0 �
70th %ile Term Code Max Max Max Max Hold Hold Max Hold Hold Max Max Max
50th G�reea@F C�_715:d 13 -0 , -i — 90 — ' - i - 9 - 0 - 3 9 6 ob
50th %ile Term Code Max Max Max Max Hold Hold Max Hold Hold Max Max Max
30th %ile Term Code Max Max Max Max Hold Hold Max Hold Hold Max Max Max
0 0
Shenandoah - Oak Ridge Background Imp.
8: Dogwood Drive & Route 340/522 1/12/2007
_,* 1 -4 \ T ►�
Lane
Id ,,;�
1900` 11900,
1,900;
1900 x1900
'1900
Storage Length ( it)
0
0
25
25
$torag 1
v
--
0 ,
�9
1 ti
0 .
Turning Speed (mph)
15
15
9
Lahe'Ut }Factor
1100
Frt
0.953
0.996
Sign Control Stop Free
Baseline Synchro 6 Report
f I Page 5
Patton Harris Rust & Associates
Heavy Vehicles; %) o.... _; 3% ..,3 % 14 % ' ,1'A %a ':3% �
Adj. Flow (vph) 34 18 22 771 1340 41
Ua rie ?Ciro inFlrfw:(vnhY_ ,F9 W_.— `[__-.—
0
Shenandoah - Oak Ridge
12: Site-Dr #1 & Route 340/522
0
Background_PM—Suggested Imp.
1/12/2007
--,* l 4\
on
1,00 1.00 1.00 1.00 1.00 1.00
30 901 50
476 8314 4141
335 ;'.. 1r134 ',:56:5 �
PeWHoUrFactoir,
U90 =
� ,0.90
,0.90
,0k90 10.901
Heavy Vehicles (%)
3% 3%
3%
14%
14%
3%
'Ad
7 4T" 336'
318
3
1,1311
22T��
Lane Group Flow (vph)
240 336
318
553
1131
227
Protected Phases
4
5
2
6
R&rf A
T.
Detector Phases
4 4
5
2
6
6
X 23
B C
Baseline Synchro 6 Report
I Page 6
Patton Harris Rust & Associates
Fit Protected 0.950 0.950
Fit Permitted 0.950 0.143
7777—�
. Queue Delay 0 0.0 0 0 ao 0.0
7
Total2el a y V Q04' ,19.9w.`' =4 2LT2
LOS C A B A C A
Shenandoah - Oak Ridge
12: Site-Dr #1 & Route 340/522
11
Background Imp.
1/12/2007
--* --,* 4 \ t 1 4/
Splits and Phases: 12: Site-Dr #1 & Route 340/522
* t o2
s o4
43
175=
'\ 05
06
15 7= 2Z I rO;Il
28 E=17—=- -- s .
z -
Baseline Synchro 6 Report
Page 7
Patton Harris Rust & Associates
90th %ile Term Code Max Max Max Hold Max Max
�Oth/01
70th %ile Term Code Max Max Max Hold Max Max
SOtFir %ile Green (s) 11.0 14 >.0 9 7777 �
. 0, 7 f22 . 0,
50th %ile Term Code Max Max Max Hold Max Max
Shenandoah - Oak Ridge
14: Site -Dr #3 & Double Church Road
0
Background_PM_Suggested Imp.
1/12/2007
f 4 - f �' �►
Flt.P o ected`
L
"
�0
0,993. _
Satd. Flow (prot)
1596
1845 0 0
1 832
Flf Permitted'
Satd. Flow (perm)
1596
0 1845 0 0
1832
Headwa Factor
,,1 -00
.1100:' 1a00 . =100 -100
01K 0
^:
Link Speed (mph)
30
40
4
LmkDistance'
Travel Time (s)
62.3
37.6 _
253.2
Vnlumedvnhl .:
0..'
867 0 ' ":52
500
., -� . , 1
Baseline Synchro 6 Report
Page 8
Patton Harris Rust & Associates
lntersection Summary
Area Type: Other
Cdn rrol T €.Unsi .
Intersection Capacity Utilization 77.0% ICU Level of Servi D��
A' nlvQZPanrri^ /minFl f5, s. _.:... . , ., , .
0 0
Shenandoah - Oak Ridge Background Imp.
16: Route 277 & Site -Dr #2 1/12/2007
0.169 0.950
Baseline Synchro 6 Report
Page 9
Patton Harris Rust & Associates
__� _ _� __
Ert;� <� -•'��. ,:,', -.. ; <0!850 ..0:850..
Flt Protected 0.950 0.950
Permittedf_PM — ses 6 $ '8
Detector Phases 2 2 6 6 8 8
• •
Shenandoah - Oak Ridge Background_PM_Suggested Imp.
16: Route 277 & Site-Dr #2 1/12/2007
4
Solits and Phases: 16: Route 277 & Site-Dr #2
02
V 06
Baseline Synchro 6 Report
Page 10
Patton Harris Rust & Associates
.0 - 7 -
=70h -/,ife ff
�r — 01 - 2
70th %ile Term Code Max Max Max Max Max Max
0 0
Shenandoah - Oak Ridge Build-out _AM
3: Route 277 & Route 340/522 1/12/2007
F
Baseline Synchro 6 Report
Page 1
Patton Harris Rust & Associates
0.850 0:963 0:850•. �, -0.850
Flt Protected 0.991 0.950 0.950 0.950
_P.ermittedsPhases * { -- . 4� 2'. � 6 - • - , :,8� . • . ;' Free'
Detector Phases 2 2 2 1 6 8 8 7 4
Shenandoah - Oak Ridge Build-out — AM
3: Route 277 & Route 340/522 1/12/2007
We Term
Max
Max
.qn[itq and Phnqpq• 2 Route 277 & Route 340/522
kv, �.,VJFU
`.1
1 4 o2
I i� o4
191 11183Kv
y
iLL� I I t
I v - 06
o7
1 o8
192,_F=
1 I — Id
17� IN
Baseline Synchro 6 Report
Page 2
Patton Harris Rust & Associates
17 T7 _0' — 0-
8=6 1 0 _1,i 01 2 2 0 1
70th %ile Term Code Max Max Max Max Hold Max Max Max Hold
g — P/jId.Gree, (s) � - 77 - 7.0 , ''77.0 77 - _'3. 0' �60, �7. 71 1
o
.0 2.0
0 0
Shenandoah - Oak Ridge Build-out — AM
6: Route 277 & Double Church Road 1/12/2007
Baseline Synchro 6 Report
Page 3
Patton Harris Rust & Associates
�086_0_� �'O �925
Flt Protected 0.950 0.950 0.950 0.950
- _Y - T159 7— 1 - 9 _'_�6 - 7 - 6
9 t .1656 ; -1743� 9;482 '
Fit Permitted 0.129 0.178 0.364 0.676
ff �rittq�d
..........
Detector Phases 5 2 2 1 6 3 8 4 4
0
Shenandoah - Oak Ridge
6: Route 277 & Double Church Road
40
Build-out AM
1/12/2007
Max
01
o2
03
o4
TVII
39s;_ I M
I
05
06 1
06
7F
IM
3ZiT_
Baseline Synchro 6 Report
f Page 4
Patton Harris Rust & Associates
0 t h �/j I e .6 ��en, 33:0; 3 �3.O , 7773 � 7, ' �
'_:=9:0�
7" 9:
70th Wile Term Code Max Max Max Max Max Max Hold Max Max
30th %ile Term Code Max Hold Hold Max Max Max Hold Max Max
'Qnhfc nnrq Phncpc- P- Rniitp 977 9 T)nijhlp f'.hjjrrh Road
0 0
Shenandoah - Oak Ridge Build-out — AM
8: Dogwood Drive & Route 340/522 1/12/2007
-,* ---* 4 \ t 1 41
Lane Configurations
FdeaI - �"�'_'�19007
Storage Length (ft)
0
r
1900! �
0
I
190=0
25
tt tT+
WE
��fjd�LoIL96 T
25
- -_'i
Storage Lanes' `
Turning Speed (mph)
15 9 , 15
9
Lane — Ut I I. Factor '7- - -roo
�j
— 1 , 00 -- d -- 95
'aE5
�0
Frt
0.850
0.996
F It
Wotected
7 0:95 _7
Satd. Flow (prot)
1752
1568
1752
3167
3163
0
F FtPermlttE� m.,
�950'
Satc. Flow (perm)
1752
1568
1752
3167
3163
0
"Fact6r
,actbr
'ea w F
IWO
7 17T0 7 �,�
=MT-6-0-1,
. . 0, i-'I�D&', _
Link Speed (mph)
!�i_n_k4 b_EtYTd_e'( )_:_-1
30
5
50
�41 4 1,
50
�,4.1
Travel Time (s)
36.2
56.5
56.5
jV61 ybfi)"
Perak Hmir Factor
090
- 713, � �%8
0.90 0.90
91§7� � _50.177�1 6
0.90 0.90 0.90
Baseline Synchro 6 Report
Page 5
Patton Harris Rust & Associates
0 0
Shenandoah - Oak Ridge Build-out — AM
12: Site-Dr #1 & Route 340/522 1/12/2007
-.-* ---* 4\
Baseline Synchro 6 Report
Page 6
Patton Harris Rust & Associates
Flt Permitted 0.950 0.424
PdfifittedlPhases,
nPtPr.tnr Phnqp..q 4 4 5 2 6 6
_�ppr w
_Loacnyel�ayL��',,z 0. r=7r77
', �01
Approach LOS A A A
0 0
Shenandoah - Oak Ridge Build-out _AM
12: Site -Dr 41 & Route 340/522 1/12/2007
Splits and Phases: 12: Site -Dr #1 & Route 340/522
m2
m4
v5 4 e6
Baseline Synchro 6 Report
Page 7
Patton Harris Rust & Associates
� Z � T 1 r
Baseline Synchro 6 Report
Page 8
Patton Harris Rust & Associates
ntersecti onSu_mmary p.,
0
Shenandoah - Oak
Ridge
Build-out — AM
14: Site-Dr #3 & Double Church
Road
1/12/2007
' 'l-
t
ane — upIL , ,�
AWBR MNBV�
'BR
S
Lane Configurations
�deal'Fjo
Turning Speed (mph)
15 9
9
15
Lahe�Ufil. Factor
_1_0__��O___
" — f _00 r - . ...F_ _7�1
�0_ -
_0
Frt
0.865
FIt
90
Satc. Flow (prot)
1596 0
1845
0
0
1826
FlVl?e_rmift&dT
90
Satc. Flow (perm)
1596 0
1845
0
0
1826
R Factor
.00, j70
j
. 00.7
.00- 7
—17 =L7
Link Speed (mph)
30
40
40
Fi�hkir,W&t (41
: =
0
-
77
Baseline Synchro 6 Report
Page 8
Patton Harris Rust & Associates
ntersecti onSu_mmary p.,
0
Shenandoah - Oak Ridge Build-out _AM
16: Route 277 & Site -Dr #2 1/1 2/2007
MCI,
Baseline Synchro 6 Report
Page 9
Patton Harris Rust & Associates
__
Flt Protected 0.950 0.950
Shenandoah - Oak Ridge Build-out — AM
16: Route 277 & Site-Dr #2 1/12/2007
e2
- v - P' o4
T
Baseline Synchro 6 Report
Page 10
Patton Harris Rust & Associates
,qnlitq and Phap. 16: Route 277 & Site-Dr #2
0 0
Shenandoah - Oak Ridge Build-out _PM
3: Route 277 & Route 340/522 1/12/2007
---, ` t 4\ t l
Lane
0 300 0 150 0
�4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
i u�nni y.gµe�u In iPii�
io
v.nv
a
io
u:au
a
io
a
io.
a
Lane Util. Factor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.95 1.00
1.00
0.95 1.00
14%
14%
14%
0:850.
Ad Flow. (vph)
0. 89 0
'�
147
Ot850
1059
` _0:850
Flt Protected
319"'
0.994
1381
0.950
190
Lane Group Flow (vph)
0.950
974
0.950
451
Satd: Flow (11rod)
0
.1733
1482
1656
1708
0
71583 '
3167 1417
.1583
3167 1419,
Flt P ermitted
pm +
0.247
0.061
'Free
0.400
. -,
0.286
Protected Phases
Sat& Flow (perm)
0
431,
1482
` 106
1708
- 0:'
667
3167' 1417
;477
3167 .'14171
Right Turn on Red
P•ermitted`Pheses
2•
Yes
2
.6'
Yes
Yes
Yes
11 18 262 162
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
- 45 45 50 1 1 1 50
- _ - -5. - ' 1111, -6 .. .. ,h6.S.. •,. :.
rran nuur,revwi
v.av
v.nv
.. u:av
' u:au -
u:au
u.au
.. u:au
uau
u:au
lv ;uv
u:av
v.av
Heavy Vehicles ( %)
9 %
9%
9%
9%
9%
9%
14%
14%
14%
14%
14%
14%
Ad Flow. (vph)
1.10'
864`
147
-451
1059
166
7 94 ,
319"'
400
1381
,800
190
Lane Group Flow (vph)
0
974
147
451
1225
0
94
319
400
381
800
190
TuiTul„ m T ,
Peim,
Perm
pm +
-
Perm..
'Free
pm +
. -,
Free
Protected Phases
2
1
6
8
7
4
P•ermitted`Pheses
2•
2
.6'
8
Free
` 4'.
Free
Detector Phases
2
2
2
1
6
8
8
7
4
F
Baseline Synchro 6 Report
Page 1
Patton Harris Rust & Associates
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total. I,Dela ` 9376:2 1 -1.4" 421.0 44.7 344.7 131 ?5`,; - 0.5 430:9 125:9. 0.2
LOS F B F D F F A F F A
• •
Shenandoah - Oak Ridge Build- out — PM
3: Route 277 & Route 340/522 1/12/2007
Term Code
Max
Max
Max
Max
Max
Max
Max
Max
Max
Green (s)
Term Code
Green (s)
60.0
Max
60.0
60.0
Max
60.0
60'.0
Max
60.0
10.0
Max
10.0
76.0__
Max
76.0
8.0
Max
8.0
.8 .0
Max _
- 8:0
8.0_
Max
8.0
2200
Max _
22.0
Term Code
Max
Max
Max
Max
Max
Max
Max
Max
Max 7 _T�
Green (s)
60. 0.
60'.0
60'.0
10.0 ''
_
76.0 ''
-.8.0 "'
_
8:0 8:0 _.
8.0
"22.0
Torm r.nrio
Max
Max
Max
Max
Max
Max
Max
Max
Max
7nth �� %iIA.GF}uatiari'CVCIa'.1.1 O4 d.' _ ' . ,
4 , 01
m2
+ 04
1 6V
115
s ._ - —_- .; tl28s—
-- s
06
o7
08
-- — -
Baseline Synchro 6 Report
Page 2
Patton Harris Rust & Associates
Intersection!Si :386:7 ;Intersection LOS F j
Intersection Capacity Utilization 145.9 % ICU Level of Service H
Q 1;+� —A a• P�.,to 977 R Rni ita q4n /522
0 0
Shenandoah - Oak Ridge Build-out _PM
6: Route 277 & Double Church Road 1/12/2007
Lane
1 1
st°rag e,canes .
, 1 1 I_ I :
u
1,
u,
i
:.
n u
�4.0
Total Lost Time (s)
4.0
4.0
4.0
4.0
4.0
4.0
4.
4.0
4.0
4.0
4.0
Leadin (ft)
{ .:5O
50
- 50 = .. 50
_.
X 50
•. 50
, 50 "`� � 501
__ ��_!
_''''
Trailing Detector (ft)
0
0
0
0
0
0
0
0
0
T ninr g Speed-(mph)
<, 15 .•
.- --
9 .15;
-
� 9 "
.:
. »'
15
-'
9 5
9
Lane Util. Factor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1. 00
17W __�____ -'
�,
. ,,.'0:850
-7
0598
_
..
0914
m
Oi912
Fit Pro tected
0.950
0.950
0.95
0.950
_
Satd
1 6
17.43 1482.: ,1.656
.1:710
0"
,1752 1686
:A`
=1752}'
1682
. " 0
Flt Permitted
0.078
0.154
0.211
0.532
Satd:;Fldw ^ : (Perm)
136
.1743 1482
-
268_
17,10
0
• 389:=
1686Ow°
`981' '.,16 2 �0
Right Turn on Red
Yes
Yes
Yes
Yes
Satdt'Fbwl ";
7
' 11
70h
x'60
Headway Factor
1.00
1.00
1.00
1.00
1.00
1.00
1.0
1.00
1.00
1.00
1.00
1.00
Link Speedr(mpfi {mpfi) i'
.
r, 45.
7 q5
. M
q � _ "'__
__ f qp
Link Distance (ft)
2070
12735
14855
2077
Tavel TiTime!
31:4'
Volume (vph)
171
673
291
164
782
11 6
323
150
200
121
132
186
Feak?Nour,Facto�
O[90' .'090
0.90:::
090 Z '0:90'
:0!90
:0190'`'•0!90
- OM:"
O'i90
X0:90
Heaw Vahicles I %1
9%
9%
9%
9%
9%
9%
3%
3
3%
3%
3%
3%
Baseline Synchro 6 Report
Page 3
Patton Harris Rust & Associates
0 0
Shenandoah - Oak Ridge Build- out _ PM
P
6: Route 277 & Double Church Road 1/12/2007
---4' --,, --* 4— 41
70th %ile Term Code
Snlits and Phases 6: Route 277 & Double Church Road
N
.1
o2
m 3
o4
gFsT
Id
I;Z I
IWA 1 9 1 it
.1* o5
'G
�`I 08
loril
IF
Baseline
Synchro 6 Report
Page 4
Patton Harris Rust & Associates
50th Wile Term Code Max Max Max Max Max Max Hold Max Max
30th �'4 U �4 — �4 - 17 - " 'i , 1 i - 73 - 6. �o
SL o � 110,
30th %ile Term Code Max Hold Hold Max Max Max Hold Max Max
TOt Gf6em gj_ �U. _3�0 48 10 7 — 6- j 7
1 0th Wile Term Code Max Hold Hold Max Max Max Hold Max Max
0 0
Shenandoah - Oak Ridge Build-out _PM
8: Dogwood Drive & Route 340/522 1/12/2007
Baseline Synchro 6 Report
Page 5
Patton Harris Rust & Associates
-,�, ``, T d
Shenandoah - Oak Ridge Build-out _PM
12: Site -Dr #1 & Route 340/522 1
---* ---, 4 \ T j
Baseline Synchro 6 Report
Page 6
Patton Harris Rust & Associates
FR ..0`.850
Flt Protected 0.950 0.950
8atd.'Flow:p�t "1752" 1568 `4752., 316T, 3167 1568 %°
Flt Permitted 0.950 0.143
7
Detector Phases 4 4 5 2 y 6 6
0 0
Shenandoah - Oak Ridge Build-out — PM
12: Site-Dr #1 & Route 340/522 1/12/2007
--* --,* 4 \ 4 1 41
o2
4k o4
4TEM-�Y
05
06
15
IM_
Baseline Synchro 6 Report
Page 7
Patton Harris Rust & Associates
, 70_tff_P/_oi I e Green � s= 1:1.0 , 1, 9 _0a', 37 — 0 - -2ZO .'-
70th %ile Term Code Max Max Max Hold Max Max
Sn1its and Phases: 12: Site-Dr #1 & Route 340/522
0 0
Shenandoah - Oak Ridge Build-out — PM
14: Site-Dr #3 & Double Church Road 1/12/2007
Baseline Synchro 6 Report
Page 8
Patton Harris Rust & Associates
,Or I-
Shenandoah - Oak Ridge Build-out — I'M
16: Route 277 & Site-Dr #2 1/12/2007
�
r,lu"
ge Length (ft)
100
I �Iu I
100 0
"I
0
U.V")V
_erfn) 17.43 '-�l 5T8
ga ( — p
F
Lost Time (s)
4.0
4.0
4.0 4.0 4.0
4.0
hg.Detdctor- f . . . . . . .
ig Detector (ft) 0
0
0, - 0 50
0 0 0
= 0
0
7
— ,1 57 7
Iltil. Factor
1.00
1.00
1.00 1.00 1.00
1.00
=7 L7 7
Fit Permitted
U.1 /U
U.V")V
_erfn) 17.43 '-�l 5T8
ga ( — p
F
3�0% 47
-1
I 68,1 -'
Right Turn on Red
Yes
Yes
a , l 291
.
77 7—
7.-
Headway Factor__
1.00
1.00
1.00
1.00
1.00
1.00
Qi edj(mp � -, 1 Y 745�
L
77 9
4—
a, - —'
-
Link Distance (ft)
12735
7426
2356
ne�
-d93 &
1112
�67 ,
Volume (vph)
875
131
131
078
134
134
Pea �, H ZUTu r., F a c t o r;
0. 90
0 ! 9 0 6. 90
1 — 9 U, -
- " 9.9, -0
---------
.'Ago -
Heavy Vehicles
9%
3%
3%
9%
3%
3%
8LdjLaTw( "
9�72,
-146'-"
�146
- -1
-71 159 �
-. ;149 -. -.
Lane Group Flow (vph)
972
146
146
_L198�
1198
149
149
Turn
7
erm ��'
I
Protected Phases
2
6
8
-- 777 - 77777771
f.Nhases
g�E7rm�ittedj
77777�77:
7
8 , � 7=r=
__-777
n.toptnr PhqqPQ
6
8
8
2 95 :
Approach LOS B C B
Baseline Synchro 6 Report
Page 9
Patton Harris Rust & Associates
Shenandoah - Oak Ridge Build-out — PM
16: Route 277 & Site-Dr #2 1/12/2007
4 / 01
.qnlitq Rnd Phnqp.q 16- Route 277 & Site-Dr #2
Ti� o2
8
06
53 's _27
IN
I
Baseline
Synchro 6 Report
Page 10
Patton Harris Rust & Associates
50throj� T)c — 0.' _,P_�0-47 7 — A� —
— f170 -- , — fl — 0
50th %ile Term Code Hold Hold Max Max Max Max
0 9
Minimum
I
4.0
C
[Evil]
1% 33.3%
3l0. X24;0
4.0 4.0
Baseline Synchro 6 Report
I i Page I
Patton Harris Rust & Associates
Shenandoah - Oak Ridge Build-out Imp.
3: Route 277 & Route 340/522 1/12/2007
-.* --,, -- v 'r - 4 \ t 4/
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode None None Fo dneC.'None - Non
Act Effct Green (s) 12.4 25.0 25.0 13.2 25.7 25.7 21.1 16.1 84.2 34.0 27.1 84.2
-1 , - ' �O3 1 � 0' 25 0!,12. ' �32�
0�1 5 6' . 1'.00
� _b 31,
v/c Ratio 0.70 0.74 0.09 0.50 0.74 0.40 0.49 0.86 0.28 0.58 0.27 0.05
0
Shenandoah - Oak Ridge Build-out Imp.
3: Route 277 & Route 340/522 1/12/2007
CnlBc .n,f Phxpr 3• Rntitp 977 A Rnutp 3dn /599
m1
1 m2
\ m3
+ m4
19'i _
913
s. =�- _._, i_ -_ _
--
9s. M-30
's<- -_ - �-- _ ` 0
9 m5
�=
m6
\11 m7
-4 1 08
1 _ .
34 s: °Y 4' : - - _
' I FFJ20
's - ij - .- . I'll
Baseline
Synchro 6 Report
Page 2
Patton Harris Rust & Associates
autn roue careen tst i r.0 Zo.0 Lo.0 IJ Lo_V eo.0 J.0 14 - y IJ.V
90th %ile Term Code Max Max Max Max _ Max Max Max Max Max Hold
0
Shenandoah - Oak Ridge
6: Route 277 & Double Church Road
0
Build-out Imp.
111212007
Fit Protected
0.950
0.0 0.0 0.0
� - 6 , 7 �9-1, �12�TEF
7
A C C
0.950
Approach LOS C
0.950
C
C
U.UbU
--
8atd [ow ( -
Fit Permitted
- V 12
1 56 — 133
0195
0.289 ..bb/
149 17
U
V752
0.716
1 845. -1 568
ETa �rm
504, , 1 �7
-7
1
340 •Mff,
14�2 , — 1027 - 1T45
�EF
--
,
— 1845=1§6
Right Turn on Red
S�aTd, i F low , (A T O
Yes
Yes
Yes
Yes
Headway Factor
1.00 1.00
1.00
1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00 1.00
Link SpeedT(mph)
71 - �-
_4 51
40,
" il4t�
Link Distance (ft)
. 5 . ,--
2070
4-31
;, " 7, -,.
12735
193.
14855
2512
2077
Volume (vph)
56 569
130
54
585
34 290
57
57
99
56 87
�W - r�F - Mto — r'-
�-, 0 � �90' 0 90 � ,Tb 0
0 �
- 0 �� 90-- 0 901, - 0 1 v
.90
Heavv Vehicles (%)
9% 9%
9%
9%
9
9% 31/.
3%
3%
3%
3% A%
11-111
62
4
Queue Delay 0.0 0.0 0.0 0.0
Total Delay, :15 =4
� -
LOS A C A B
� �- 2�O4�
. proacn , Ejelay L , , .� -
Wo De1a0
_p
0.0
B
0.0 0.0 0.0
� - 6 , 7 �9-1, �12�TEF
7
A C C
0.0 0.0 0.0 0.0
_�Q
A C C A
Approach LOS C
B
C
C
Baseline
Synchro 6 Report
Page 3
Patton Harris Rust & Associates
rjermrttea;,F'nases,, - , . :-'u ' , - �, " 0 , ; .. - - ',O,: - ,
Dptertor Phases 5 2 2 1 6 6 3 8 8 7 4 4
0 0
Shenandoah - Oak Ridge
Build-out—AM_Suggested
o3
Imp.
6: Route 277 & Double Church Road
127v 1
1/12/2007
t
Q,Iif� .,q phase..- r- PnuA. 977 P. nnithlp r.hiirrh Rnpri
■ 01
o2 - F4\
o3
127v 1
t
05
f OG
151
Baseline
Synchro 6 Report
Page 4
Patton Harris Rust & Associates
t', �Ac.. Un coordinated' , E5Mordi
Maxi v/c Ratio: 0.84
#r 95th 7,[
longe percent le exceedTc Lp= y� 15F
Queue shown is maximum after two cycles.
0 0
Shenandoah - Oak Ridge Build- out_AM_Suggested Imp.
8: Dogwood Drive & Route 340/522 1/12/2007
Lane
25
Frt
-- k5
Baseline
Synchro 6 Report
Page 5
Patton Harris Rust & Associates
0 0
Shenandoah - Oak Ridge Build-out Imp.
12: Site-Dr #1 & Route 340/522 1/12/2007
F�11
A
Baseline Synchro 6 Report
Page 6
Patton Harris Rust & Associates
uso '1=77 —, 0'.850 - -77
Fit Protected 0.950 0.950
9
Fit Permitted 0.950 0.408
— a,3.6
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0
0 0
Shenandoah - Oak Ridge Build-out Imp.
12: Site-Dr #1 & Route 340/522 1/12/2007
Solits and Phases: 12: Site-Dr #1 & Route 340/522
02
M
i _ ,te
05
ji 06
Baseline Synchro 6 Report
Page 7
Patton Harris Rust & Associates
4\ 41
• •
Shenandoah - Oak Ridge Build- out_AM_Suggested Imp.
14: Site -Dr #3 & Double Church Road 1/12/2007
*�- T
FIt P(otected'
Satd. Flow (prot)
1596
0
1845
0
0
1826
Flt<Permitted —�_
—_
'r 0 990
' ? - ��
Satd. Flow (perm)
1596
0
1845
0
0
1826
Headwa
1' 00
'4 ---
F - ,- - 17
1 OO
s_00
1.00
1 00
Link Speed (mph)
30
40
40�
Lmk Distance,
Travel Time (s)
62 3
'— + «' .
2206 '
37 6
'~
1'4855,:
253.2
Volume (yph) ;
Peak Hour Factor
0
0.90
45i
0.90
360
0.90
- '0
0.90
50
0.90
189! _!
0.90
— ,7 - 7-7 7-- 1 . +
Other
Intersection
ICU Level of Service A
Baseline
Patton Harris Rust & Associates
Synchro 6 Report
Page 8
0
Shenandoah - Oak Ridge
16: Route 277 & Site -Dr #2
L
Build-out Imp.
1/12/2007
-i Z ` e-- 4 ti !°
tiai 1 1
A A C
Baseline Synchro 6 Report
Page 9
Patton Harris Rust & Associates
F.rt%,,. Oi856, ..:.
—g T
Flt Protected 0.950 0.950 _
Detector Phases 2 2 6 6 8 8
0 0
Shenandoah - Oak Ridge Build-out—AMSuggested Imp.
16: Route 277 & Site-Dr #2 1/12/2007
--,* � ` 4- 4 \ t.*
vl� o2
8
, OF 06
531=Z'
Baseline Synchro 6 Report
Page 10
Patton Harris Rust & Associates
Reduced v/d Ratio 0 68 " : : = ,0.07 ' :,0.07 426 . �0 58 , 1 5
Splits and Phases: 16: Route 277 & Site-Dr #2
0 0
Shenandoah - Oak Ridge Build- out_PM_Suggested Imp.
3: Route 277 & Route 340/522 1/12/2007
Lane
Storage Length (tt)
2 °. ,•
0
_ 1
200 300
j 2
Peak Hour Factor `
0
300
0
150
9%
0
Total Lost Time (s)
4.0
4.
4.0
4 0
4.0
4.0
4.0
4 4.0
4 0
4.0
4.0
Leading •Detecfot (ft
5°
' 0
50- ,
` �' S0
s50
• X50
::; °50
50 _
� _
..50 50 :
6"" R8' '� ' €F�ee Y4 Free
Detector Phases
--
Trailing Detector (ft)
Tuming pe
Lane Util. Factor
0
5 i
1.00
0
0.95
0
'9
1.00
0
'.'.15
0.97
0 0
'
0.95 1.00
0
i6 -'
1.00
0 0
.
0.95 1 .00
0
1.00
0
0.95
- - b - 8
0
1.00
=9'4!5 >32'0� .n32.0.:' 19:0',
*3615 365, >,�
90�.r;14':0
00�• 25.0•,':,300 °p!
Total Split ( %) 16.1 % 35.6% 35.6% 21.1 % 40.6% 40.6%
Maximum- Greern -,;8 5 ` 26[0• " 26:0 31 D :30!5 30!x,
0850,
Yellow Time (s)
0 !85 0
4.0 4.0 4.0
4.0 4.0
5
Flt Protected
0 .950
•'2 0�
"20" 2 0 " 2 0
0.950
', '.' 2 0 '�`�? 0
Lead /Lag
0.950
Lag Lag Lead
0.950
Lead Lag
Lead Lag
Said: ±Flowc -1656 i
3312 1482r
x
:3213.` 3312
1
1583'
3167 1`4122
1 583
21x3,167 X1:41
Flt Permitted
0.950
o a NOne „`•None�;tNone•'i - Ndhe„ None�?=Nones?�Min
•, "= . None •:'Min ;;'
0.950
10.2
27.2 27.2 15.0
0.400
15.0 10.0
0.286
Act uated, ' _`
01 =t -.
Satd "F1ow_
1656
3312,.1482e
s °1:00.' 0.39 °::0!31,;' -11:00
.- 3213';
-3312.
1.482'." 667 ^3167 141 Z'
977' 3162 :1:417
Right Turn on Red
0.28 0.86 0.81 0.13
Control,Dela .;-
Yes
..3T.2r , 6.6; 51�.0't
'32H "4T3r' 37 7 ....6815
Yes
Queue Delay
Yes
0.0 0.0 0.0
0.0 0.0
Yes
SatddFlow, '�� • �
_ �
:135
.- ,r
""
, ;166'
• , .::395),
1 F
_' .'
• •190
Headway Factor
1.00
1.00
1 .00
1.00
1.0
1.00
1.00
1.00 1.00
1.00
1.00
1.00
Link Speed=(mph)
..
;45�
".,.
45
;
r
:507
Link Distance (ft)
7426
7377
4145
5282
Tfavel=Timei +. ",
Volume (vph
^t12�5; _ „r141�11:8 "- _� 56:5
99 778 1 4 953 149 85 287
'" _ .r,iz.u^ :� 'f
360 343 720 171
Peak Hour Factor `
°- 0:90. 0!90; 0:90 -0:90
'0!90 ° 0:90
_0:90 ,0.90 D: 90a-'0!90 2.90 0!90
Heavy Vehicles ( %)
9%
9% 9% 9%
9% 9%
14% 14%
14% 14% 14% 14%
Adj t'rFlow; (vpf)
110 > :864' - '147 451'
1059 a166a = 94 •319 ;* 04 0 381 ` .800 190
Lane Group Flow (vph)
110
864 147 451
1059 166
94 319
400 381 800 190
lurnT e
TEN 1
Protected P hases
P,roterm:
5
- '.Pro f
2 1
Perm . pm + f':�_
6 3 8
-
'Fee pm +p �rFree
7 4
f?ermittedFPhases
,2''
6"" R8' '� ' €F�ee Y4 Free
Detector Phases
5
2 2 1
6 6
3 8
7 4
Minimumilr itial:
Minimum Split (
4!0 ;
10.0
,4t0 9i0 • - 2.Or,' -
10.0 1 0.0 8.0
`4:0� 9'.Or
10.0 10.0
8.0 10.0
8.0 10.0
TioI�S pl�t;(s) g
=9'4!5 >32'0� .n32.0.:' 19:0',
*3615 365, >,�
90�.r;14':0
00�• 25.0•,':,300 °p!
Total Split ( %) 16.1 % 35.6% 35.6% 21.1 % 40.6% 40.6%
Maximum- Greern -,;8 5 ` 26[0• " 26:0 31 D :30!5 30!x,
10.0% 15.6% 0.0% 27.8% 33.3% 0.0%
`,8 0 x S" a• sr 19 0 r, 24 0 ;;',
Yellow Time (s)
4.0
4.0 4.0 4.0
4.0 4.0
4.0 4.0
4.0 4.0
AlhRed';Time!
•'2 0�
"20" 2 0 " 2 0
" >20 2'0 � =`-�2 0; .2 =0
', '.' 2 0 '�`�? 0
Lead /Lag
Lead
Lag Lag Lead
Lag Lag
Lead Lag
Lead Lag
Lead-,L+a� g O ptimizev
Yes Y Yes Yes 4: ' Yesr
*Yes Yes • y Yes. Yes " : h Ye`s 'Yes
Vehicle Extension (s)
3.0
3.0 3.0 3.0
3.0 3.0
3.0 3.0
3.0 3.0
RecaIICMo�'�' - ' - de= �� '.''N
o a NOne „`•None�;tNone•'i - Ndhe„ None�?=Nones?�Min
•, "= . None •:'Min ;;'
Act Effct Green (s)
10.2
27.2 27.2 15.0
34.8 34.8
15.0 10.0
89.1 34.8 27.7 89.
Act uated, ' _`
01 =t -.
x0:31,,, 031' 0 ^17~`
=0 -39
010 ^ ": %0 *11
s °1:00.' 0.39 °::0!31,;' -11:00
v/c Ratio
0.60
0.85 0.27 0.83
0.82 0.24
0.58 0.90
0.28 0.86 0.81 0.13
Control,Dela .;-
^5111•
..3T.2r , 6.6; 51�.0't
'32H "4T3r' 37 7 ....6815
X0!5:' 42 3 .:37 3 0_2
Queue Delay
0.0
0.0 0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0 0.0 0.0
T'otal;Dela
LOS
Ap proach(Dela y a
Approach LOS
' 0
' ,.66 '518 { :32a "> 43,>.: 68 15 a +0.5i, 42:3. 373; ' 2
D D A D C A D E A D D A
T- .e -,�-� - . ,..:.. 3 �r� r�--- r^r,: 53xi -?.'.c t ' • s�.�3 ...... -36 x;<�:,i
,35A tN< a
C C C C
Baseline
Patton Harris Rust & Associates
Synchro 6 Report
Page 1
0 0
Shenandoah - Oak Ridge Build- out_PM_Suggested Imp.
3: Route 277 & Route 340/522 1/12/
90tfi %ile.Greeh:
90th %i T erm Code
8.5
Max
26:0
Max
26.0
Max
13.0
Max
30.5
Max
Max
3:0
Max
8.0
Max
_ 19.0
Max
24:0
Max
70th %ile GFeeh, .
70th %ile Term Code
' 8,5
Max
26;0
Max
26.0
Max
13 0' -: 30'.5
Max Max
'30.5
Max
3:0'
Max
8'.0
Max
_ :19.0 _.
Max
-7 -19.0
24(F Jl
Max
50th %ile Green (s)
8.5,
'26.0
26.0
13.0
30x5
30'5
10
8.0
_
24.0
50th %ile Term C ode
Max
Max
Max
Ma x
Max
Max
Ma
Max
Max
Max
30ih %ile Green (s} '
Znth 0/ UP Torm r'.nrio
8.5
MAY
26.0.
Max
26.0
Max
Max
30.5
Max
30'.5
Max
3:0
Max
8:0
Max J
Max
Max
Cnlitc AM Phacec• 3' Rnute 277 h Route 340/522
ml o2
\ 03 + o4
19's JIM 32, S. a
911 1, 30s._.
A 6=
f
�
05 e6
m7
1 19136.5
-1
25 s:- ='
14 "s —:.
Baseline Synchro 6 Report
Page 2
Patton Harris Rust & Associates
0
Shenandoah - Oak Ridge
6: Route 277 & Double Church Road
0
Build- out_PM_Suggested Imp.
1/12/2
Lane
Storage Length (ft)
150
9%
1000
225
9%
0
275
3%
0
200
J%
0
Storag
1
748
748
1>
182c-
182
•869
869
. 129'
129
359
359
167
167
222
222
`: ,134'
134
947
147
207
207
Total Lost Time (s)
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
Leadin Detector ft)
50
`50.
50
50
50
50
50. =
50
50
'50
50'
` 50
Trailing Detector (ft)
0
0
0
0
0
0
0
0
0
0
0
0
Tul rnin g'Speed (mph)
157
1
9
15
y am'
9
15
7
9
-'15
� ' 9
Lane Util. Factor
1.00
1.00
1.00
1.00
0.95
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Frt ..
4;4:0
z12;0-
0:850
.'4140
19.0;
0:850
=25.0.
i
0:850
,15.0
Total Split ( %)
0.8 50
Flt P rotected
0.950
45.6%
21.1% 27.8% 27.8%
0.950
16.7%
16.7%
0.950
40
4.0
. '38 0 -
4.0
0.950
' 6:0 >;.';35:0'
4.0 4.0
':' 35'.0'
4.0
Satd:'Flow (prot)
-1656
1743
1482
1656'
3312
'1482
1752
1845
1568
.1.752
1845
1568
Flt Permitted
0.187
9n...•..'>.n...
0.108
0.353
0.651
Satd:rFlow (perm)
326
1743:
1482
188 ,
3312
- 1482
651
1845.
•1568
1201
,1845
1568
Right Turn on Red
Yes
Yes
Yes
Yes
Satd::Flow (RTOR)
323
•:129
x222
_
- 204
Headway Factor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
I- in4.Cnooili /.n:.Fl»
- I _I
!Ar,
-
t dri.
..I
.4n,
:-
I .
.... :4n'
:il 4 IY:i.0 - zoo.0 =.
171 673 291 164 782 116 323 150 200 121 132 186
Heav Vehicles ( %)
9%
9%
9%
9%
9%
9%
3%
3%
3%
3%
J%
3
Ad j:�F.low (vph) --
Lane Group Flow (vph)
990
190
748
748
323
323
182c-
182
•869
869
. 129'
129
359
359
167
167
222
222
`: ,134'
134
947
147
207
207
Tul _ mrT - '
pm +
37.4
Perm pm +p .,'
- ». '
tPerm
pm + pt .
•
Perm"
+ pt
-
Perm
Protected Phases
5
2
0:.42
1
6
0.23 -
3
8
Or12 .
7
4
0.56
Permltted'Phases
2•
0.81
2
0.19
0.90
0.39
0.42
0.55
18 ; ' 4
.
4
Detector Phases
5
2
2
1
6
6
3
8
8
7
4
4
Minimum Initial (s)
Minimum Split (s)
' ',2 0.'
8.0
' 4:0
10.0
AT 7
10.0
. - 20 :. >4:0
8.0 10.0
^" •4 °:0
10.0
2:0: ;
8.0
4:0
10.0
4:0
10.0
`' '.2 .0
8.0
-4's0
10.0
-4:0
10.0
Tol tal,S plit(2) .-
15.0'
'44'0"
4;4:0
z12;0-
- ,41-.0
.'4140
19.0;
-25.0,
=25.0.
i
' 15.0.,
,15.0
Total Split ( %)
16 .7%
48.9% 48.9%
13.3% 45.6%
45.6%
21.1% 27.8% 27.8%
10.0%
--
16.7%
16.7%
Maximum Green (s)
Yellow Time (s)
40
4.0
. '38 0 -
4.0
38:0
4.0
' 6:0 >;.';35:0'
4.0 4.0
':' 35'.0'
4.0
. - :13:0 "
4.
19,0
4.0
19:0
4.0
• °3;0.
4.0
` 9'0 ->19:0
4.0 4.0
AH r... -r..4 ..
- on
ton
O•n.
-o�n .:
*,2n
..9'n
79n,
--9n.
9�n..
9n...•..'>.n...
9n
Vehicle Extension (s)
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
Recall!Mode, -`
None ..None
None. 'None
None
'None.
None
. M17
:Min NoNone
-Min :
MinMin
Act Effct Green (s)
50.7
40.0
40.0
45.4
37.4
37.4
29.8
20.8
20.8
1 5.8
1
10.8
Actuate d g /C Ratio
0.56
- :0.45,
0:45
0:51
0:.42
0:42
O.33
0.23 -
0:23:.
,0.18
Or12 .
0:12
v/c Ratio
0.56
0.96
0.38
0.81
0.63
0.19
0.90
0.39
0.42
0.55
0.66
0.56
Queue Delay
0.0
0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0
0.0
u.0
u.0
Total: Dela
15:4.
50.4
3.3 45-41
LOS
B
D
A D
C A
D C
A
C
D
B
- -� -^^T
A. proacli0ela y.,=
w : .,
- --
33r1 .24: =7
-,�
34_:8 ..
.,,
.30.5.
-
a
Approach LOS
C
C
C
C
Baseline Synchro 6 Report
Page 3
Patton Harris Rust & Associates
0 0
Term Code Max Max Max Max Hold Hold Max Hold
erm Code Max Max Max Max Hold Hold Max Hold Hold Max
Rnlifc .nri Phacec' r Rnuta 977 R nnuhle Church Road
01
2
m3
t +�` m4
12 �- 1 W144
s
�
- --
1.4
m5
F
�
� m7
a,�j
4
m8
15rs`�. I lCf
._ :. T— A9's
I lFQ5
_;_._2 s€
Baseline
Synchro 6 Report
Page 4
Patton Harris Rust & Associates
Shenandoah - Oak Ridge Build- out_PM_Suggested Imp.
6: Route 277 & Double Church Road 1/12/2007
'A -~ t4\ T r'► 1 r
3nth % ile Term Code Max Max Max Max Hold Hold Max Hold Hold Max Max Max
0 0
Shenandoah - Oak Ridge Build-out Imp.
8: Dogwood Drive & Route 340/522 1/12/2007
� -,* 4, t
1900 1 900 1 1960 966 -1906 '
'0
0 1- --- - . I --- � - ---.I
9 15 9
1'.00, 1.00 0.99 -0'95�
Baseline Synchro 6 Report
Page 5
Patton Harris Rust & Associates
Fnt—arsecb—o-n
0 0
Shenandoah - Oak Ridge Build-out Imp.
12: Site -Dr #1 & Route 340/522 1/12/2007
4 \ T 1
I ooiai,;J
Total Split ( %)
28.3%
28.3% 25.0%
71.7%
46.7%
46.7 %
Maximum',Green (s)
11'0
- 11'0'
9 0
' '37
'22.0'
• •22:0'
Yellow Time (s)
4.0
4.0
4.0
4.0
4.0
4.0
AIL`- Red.Time `,
',•? 2A'
' 2i0
• 2.0,
M!,
. 204
;2:0 -..
Lead /Lag
Lead
Lag
Lag
Lead= La
°' '
•
Yes
Yes
_Yes. -'
Vehicle Extension (s)
3.0
3.0
3.0
3.0
3.0
3.0
Recall Mod -r ' e "r
_ None
'None..
None'
Mim
Act Effct Green (s) .
12.4
12.4
38.7
38.7
23.7
23.7
Actuated g /CtRatio
0.21'
021.
0.657'
0.65.
0.40
' ,0:407.
v/c Ratio
0.67
0.59
0.76
0.27
0.89
0.32
Control Dela ;
31'.1.
. 7.7
23.5'
4.8,
2713
4.5 ; _
Queue Delay
0.0
0.0
0.0
0.0
0.0
0.0
lToTaltDela
LOS
31U'
C
;, 77,,
A
23:5
C
_
4:8(-'!27:3 v " 4".5 •, a.
A C A
Baseline Synchro 6 Report
Page 6
Patton Harris Rust & Associates
Fft•, 0:850 0:850 Y
Flt Protected 0.950 0.950
Satd. Flow (prot) - 1 1568 1752 3167 3167 ''1568
Flt Permitted 0.950 0.143
P- ermittedlP,hases 4 - . 2 . . ,, 6 : :. ,, • -:. -
Detector Phases 4 4 5 2 6 6
Minimum ?Initial. " 2:0, 2.0 2;0 '4_,0 ' ';r4':0 _4:0
Minimum SDlit (s) 8.0 6.0 8.0 10.0 10.0 10.0
Shenandoah - Oak Ridge
12: Site-Dr #1 & Route 340/522
0
Build-out Imp.
1/12/2007
_-" --* -4\ t 4
90th %ile Term Code
Max
Max
Max
Hold
Max
Max
, 70th!/::11:e:6r — eeh
70th %ile Term Code
1 1:0
Max
11.0
Max
9,0
Max
37:0
Hold
22
Max
22.0
Max
50th %ile Green s)
:19
11.&,
9�0,
37:0
22Q
22.0.
50th %ile Term Code
Max
Max
Max
Hold
Max
Max
30th %ile (
11.0
9.0..-37.0
22.0
22.0
30th %ile Term Code
Max
Max
Max
Hold
Max
Max
,1 nth -/-tip (gash W
A "
R q
47
. q 5 —f �
20 -
20 R
%ile Term Code
S I
nlits and Phases: 12 Site-Dr #1 & Route 340/522
o2
04
'*\ 05
ji 06
15 i� I Wl
28 s- -7 I Im
Baseline Synchro 6 Report
Page 7
Patton Harris Rust & Associates
0 0
Shenandoah - Oak Ridge Build-out Imp.
14: Site-Dr #3 & Double Church Road 1/12/2007
k- t
Llahb[Gir&ffipi
VVBL R
T
Lane Configurations
Ideal Flow VP PA
1900
1900
----
1900
T9-00 77
—jq0b�---------=
Turning Speed (mph)
15
9
9
15
Lane-U Fil
1.00
1M
1e001
1.00
17
.00
Frt
0.865
Bit — Protected
0.993
Satc. Flow (prot)
1596
0
1845
0
0
1832
F It �Permiltcl
- 0.993
Satcl. Flow (perm)
1596
0
1845
0
0
1832
- Fn
I - nn,
nn
Baseline Synchro 6 Report
I Page 8
Patton Harris Rust & Associates
Link Speed (mph) 30 40 4U
E 2743 2206 -14955 -
Travel Time (s) 62.3 37.6 253.2
Volume 0 '83 585 0 88
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90
0 0
Shenandoah - Oak Ridge Build-out Imp.
16: Route 277 & Site -Dr #2 1/12/
Lane
300 1900
1900
1900 .1'900
.1900
1 00
100
0
0
Turnin ^8peetl (mph)
74.3%
9
15
4.0 4.0
4.0
� 4.0 4.0
4.0
50 50
50
'_ 50 - '50_
_
, , ; 50, • _ ,_ ma r _
Trailing D etector (ft)
0
0
0
0
0
0
Total Split ( %
Turnin ^8peetl (mph)
74.3%
9
15
46 0 .
15
9
1
Lane Util. Factor
1.00
1.00
1.00
1.00
1.00
1.00
4.0
Frt '
A111=Red'Time, 20
Os850
20
2.0"
02:0
0I850
_
Flt Protected
0.950
0.950
Lead -La' g!bp m z ?'
Satd: Flow (p
it 743
- 1568
1752
1743
1.752
-•.1568
3.0
Flt Permitted
3.0
3.0
0.169
Recall Mode :
0 .950
None
None
Satd.!Flow ( (m) .' .1243
Min v , Min ' •' '. .. :" - ' `�
'1568
312
1743"'
`1252.'
x.1568.'
12.1
Tot _tal S plit (s) .' ,
.: 'b2U':.'-
b2:u
Dz:u
.bZ.u"
-1611 ,.:.
A ".
Total Split ( %
74.3% 74.3%
74.3%
74.3% 25.7% 25.7%
Maximum; Green (s)
46 0 .
46 0
46 0
46.0 '.
12:0
12:0
Yellow Time (s)
4.0
4.0
4.
4.0
4.0
4.0
A111=Red'Time, 20
: 210-
20
2.0"
02:0
't 2.0' • '.,' " ''�
Lead /Lag
Lead -La' g!bp m z ?'
^
Vehicle Extension (s)
3.0
3.0
3.0
3.0
3.0
3.0
Recall Mode :
., :None
None
None
- None
Min v , Min ' •' '. .. :" - ' `�
Act Effct Green (s)
48.1
48.1
48.1
48.1
12.1
12.1
Actuatedi /CRatio.;
"071
.'0.71,:
0.7
0.71
.A
We Ratio
0.79
0.13
0.66
0.98
0.48
0.37
Control Dela
.'`13.7
.14
25:8
33:3'
29,2:_
7.3
Queue Delay
0.0
0.0
0.0
0.0
0.0
0.0 --
Total4Dela -Fr a
1-317
ai4'
25[8;'
333': 29!2
7.3, r - .: 7
LOS
B
A
C
C
C
A
Baseline Synchro 6 Report
Page 9
Patton Harris Rust & Associates
PetmittediPhase' s - -2 6'
Detector Phases 2 2 6 6 8 8
Minimum Initial (s) 4.0' , 4.0 4.0 . 4:0" 4.0,
Minimum Split (s) 10.0 10.0 10.0 10.0 10.0 10.0
0
Shenandoah - Oak Ridge Build-out Imp.
16: Route 277 & Site-Dr #2 1/12/2007
--* ' - V � *— 4 \ /
90th %ile Green
�6. 0 ,
46.0
46'0 ,
46.0
. it
. I I •
90th %ile Term Code
Max
Max
Max
Max
Max
Max
70th %ile Green s)
46.0
46.0
46.0
46.0
12.0
12.0 f
70th %ile Term Code
Max
Max
Max
Max
Max
Max
50th 5 /6il �Gneen
46.0
-46v0
46�0
46
1
— 7 — , 1
50th %ile Term Code
Hold
Hold
Max
Max
Gap
Gap
30th Green' ( s)
46.0
46:0
46.0
46.0
9.2
92
30th %ile Term Code
Hold
Hold
Max
Max
Gap
Gap
110th %ile Green s)
46.0'
46.0
46:0
•46:0'
0.43
6.6
1 0th %ile Term Code
Hold
Hold
Max
Max
Gap
Gap
(ft)
231
2
29
402
. it
. I I •
(ft)
#450
17
#140
#777
108
43
1
12655
7346
2276
100
100
1
1228.
t1 -
220
-
: 1228
360
4 33
uctn
0
0
0
0
0
0
6t - n ,
0,
0j
In
0
0
0
0
0
0
•
0
0-13
066
0.98
0.43
0.34i
.qnlitq and Phases• 1 6' Rnijt( 277 & Site-Dr #2
o2
52:F --
06
52 lbf
les
Baseline Synchro 6 Report
Page 10
Patton Harris Rust & Associates
Interstction'bignal Dela - '22!f mtersecvomLL9b.-U
Intersection Capacity Utilization 70.8% ICU Level of Service C
TPe riod (min)
90th %ile Actuated Cycle: 70 —71
, To�th-/Dle AEtuatedrCVcIe 70� — ------
0
Intersection:
E -W:
ROUTE 277
Weather
RAIN
File Name
N -S:
DOUBLE CHURCH RD
Count By
JJP
Input By
JJP
Location
WINCHESTER,VA
Count Date
11/72006
15 Minute
EB:
ROUTE 277
WB:
ROUTE 277
NB:
DOUBLE CHURCH RD
SB:
DOUBLE
CHURCH
RD
15 Min.
Period
N,S,
Period
Begining
Left
Then,
Right
Taal
Left
Tlmt
Right
Total
Left
Than
Right
Total
Left
Than
Right
Total
E &W
Begining
700
14
66
9
89
6
79
1
86
33
7
10
5D
14
7
l6
37
262
7:00
7:15
6
100
15
L2l
10
72
3
85
31
10
12
53
14
7
LO
31
290
7:15
7:30
7
78
12
97
7
91
7
105
33
5
8
46
19
14
14
47
295
7:30
7:45
9
61
15
85
7
92
3
102
52
9
9
70
18
7
16
41
298
7:45
800
14
75
9
98
11
73
9
93
42
13
8
63
13
8
16
37
291
8:00
815
8
59
8
75
6
57
3
66
37
6
12
55
17
7
18
42
238
5:15
8:30
13
67
17
97
12
61
7
80
34
15
9
58
l0
5
18
33
268
8:30
8:45
20
61
17
98
7
64
9
80
32
9
8
49
13
8
16
37
264
8:45
A.M. Total
91
567
102
760
66
589
42
697
294
74
76
444
103
63
124
305
2206
A.M. Total
16:00
20
66
20
106
24
93
13
130
29
31
17
77
20
18
33
71
384
16:00
16:15
21
83
29
133
21
103
13
137
31
17
14
62
21
21
28
70
402
16:15
16:30
34
78
34
146
27
94
17
138
26
14
25
65
24
23
31
78
427
16:30
16:45
29
90
40
159
15
99
15
129
31
26
41
98
16
26
32
74
460
16:45
17:00
28
98
37
163
28
110
19
157
34
20
27
81
16
21
35
72
473
17:00
17:15
26
74
31
131
29
98
22
149
48
26
33
107
29
17
27
73
460
17:15
17:30
27
78
23
128
34
103
19
156
38
25
28
91
17
21
26
64
439
17:30
17:45
24
65
27
116
18
82
16
116
44
17
2L
82
29
17
21
67
381
11:45
P.M. Total
209
632
241
1082
196
782
134
1112
281
176
206
663
172
164
233
569
3426
P.M. Total
I How
EB:
ROUTE 277
WE:
ROUTE 277
NB:
DOUBLE CHURCH RD
SB:
DOUBLE CHURCH
RD
1 Hour
Period
N,S,
Period
Begining
Left
Thm
Right
Total
Left
Thm
Right
Total
Left
Than
Right
Total
Left
Thm
Right
Total
E & W
Begining
7:00
36
305
51
392
30
334
14
378
149
31
39
219
65
35
56
156
1145
7:00
7:15
36
314
51
401
35
328
22
385
158
37
37
232
64
36
56
156
1L74
7:L5
730
38
273
44
355
31
313
22
366
164
33
37
234
67
36
64
167
1122
7:30
7:45
44
262
49
355
36
283
22
341
165
43
38
246
58
27
68
153
1095
7:45
8:00
55
262
51
368
36
255
28
319
145
43
37
225
53
28
68
149
1061
8:00
16:00
104
317
123
544
87
389
58
534
117
88
97
302
81
88
124
293
1673
16:00
16:15
Ill
349
140
601
91
406
64
561
122
77
107
306
77
91
126
294
1762
16:15
16:30
117
340
142
599
99
401
73
573
139
86
126
351
85
87
125
297
1820
16:30
16:45
110
340
Lit
581
L06
4L0
75
591
151
97
129
377
78
85
120
283
1932
16.45
17:00
105
315
118
538
109
393
76
578
164
88
t09
361
91
76
109
276
1753
L7:00
I Hour
EB:
ROUTE 277
WB:
ROUTE 277
NB:
DOUBLE CHURCH RD
SB:
DOUBLE CHURCH
RD
UE&W
tHow
Period
Period
Begining
Left
Th.
Right
Tot.]
Left
Thru
Right
Total
Left
Thm
Right
Total
Left
Thou
Right
To
Begining
7:15
36
314
51
401
35
348
22
385
158
37
37
232
64
36
56
156
1174
7:15
A.M. Peak
PHF =
0.83
PHF =
0.92
PHF =
0.83
PHF =
0.83
0.98
A.M. Peak
16:45
110
340
131
581
106
410
75
591
151
97
129
377
78
85
120
283
1832
16:45
P.M. Peak
PHF =
0.89
PHF =
0.94
PHF =
0.88
PHF =
0.96
0.97
P.M. Peak
E
0
Intersection:
E-W:
ROOTE522
Weather
DRY
Fi] Name
N -S:
ROUTE 277
Count By
UP
I nput By
AP
Location
WINCHESTER,VA
Count Datel
1119r006
l5 Minute
EH:
ROUTE
522
WB:
ROUTE 522
NB:
ROUTE 277
T SB:
7
IS Min.
Period
N,S,
Period
Begining
Left
Tine
Right
Total
Left
Thru
Right
Total
Left
Tom
Right
Total
Right
Taal
E&W
Begining
7:00
17
79
6
102
23
106
30
159
17
36
49
102
30
20
11
61
424
7:00
7:15
29
92
4
125
29
97
40
166
15
53
39
107
27
27
4
58
456
7:15
7:30
24
119
5
148
22
109
35
166
21
70
33
124
23
22
6
51
489
7:30
7:45
14
103
3
120
19
88
38
145
8
56
42
106
35
24
7
66
437
745
8:00
20
85
7
112
17
88
30
135
6
40
30
76
19
15
8
42
365
8:00
8:15
37
54
3
94
14
112
46
172
18
46
28
92
34
25
6
65
423
8:15
8:30
21
49
1
71
28
122
33
183
7
42
35
84
24
21
7
52
390
8:30
8:45
11
67
5
83
18
90
28
136
9
31
22
62
31
20
8
59
340
8:45
A.M. Total
173
648
34
855
170
812
280
1262
101
374
278
753
223
174
57
454
3324
A.M. Total
16:00
17
92
11
120
37
120
25
182
11
33
34
78
67
88
23
178
558
1600
16:15
15
108
13
136
33
124
25
182
6
21
22
49
55
66
19
140
507
16:15
16:30
8
99
15
122
50
156
32
238
14
26
39
79
51
72
27
150
589
16:30
16:45
10
98
16
124
33
139
26
198
7
16
32
55
56
83
23
162
539
16:45
17:00
11
120
15
146
41
130
20
191
8
14
36
58
54
80
19
153
548
17:00
17:15
6
127
l8
151
43
133
IS
194
II
22
35
68
60
79
13
152
565
17:15
17:30
5
102
16
123
31
140
16
187
16
37
22
75
44
92
14
150
535
17:30
17:45
5
86
14
105
31
122
24
177
12
23
28
63
43
59
19
121
466
17:45
P.M. Total
77
832
118
1027
299
1064
186
1549
85
192
248
525
430
619
157
1206
4307
P.M. Taal
1 Hour
EB:
ROUTE 522
WB:
ROUTE 522
NB:
ROUTE 277
SB:
ROUTE 277
1 Hour
Period
N,S,
Period
Begining
Left
Thru
Right
Total
Left
Thou
Right
Total
Left
Thru
Right
Total
Left
Than
Right
Taal
E & W
Begining
7:00
84
393
18
495
93
400
143
636
61
215
163
439
115
93
28
236
1806
7:00
7:15
87
399
19
505
87
382
143
612
50
219
144
413
104
88
25
217
1747
7:15
7:30
95
361
18
474
72
397
149
618
53
212
133
398
111
86
27
224
1714
7:30
7:45
92
291
14
397
78
410
147
635
39
184
135
358
112
85
28
225
1615
745
8:00
89
255
16
360
77
412
137
626
40
159
115
314
108
81
29
218
1518
8:00
16:00
50
397
55
502
153
539
108
800
38
96
127
261
229
309
92
630
2193
1600
16:15
44
425
59
528
157
549
103
809
35
77
129
241
216
301
88
605
2183
16:15
16:30
35
444
64
543
167
558
96
821
40
78
142
260
221
314
82
617
2241
16:30
16:45
32
447
65
544
148
542
80
770
42
89
125
256
214
334
69
617
2187
1645
17:00
27
435
63
525
146
525
78
749
47
96
121
264
201
310
65
576
2114
17:00
1 Hour
EB:
ROUTE 522
WB:
ROUTE 522
NB:
ROUTE 277
SB:
ROUTE
277
1 Hour
Period
N,S,
Period
Begining
Left
Than
Right
Total
Left
Thru
Right
Total
Left
Thru
Right
Total
Left
Thou
Right
Taal
E & W
Begining
7:00
84
393
18
495
93
400
143
636
61
215
163
439
115
93
28
236
1806
7:00
A.M. Peak
PHF =
0.84
PHF =
0.96
PHF =
0.89
PHF =
0.89
0.92
A.M. Peak
16:30
35
444
64
543
167
558
96
821
40
78
142
260
221
314
82
617
2241
16:30
P.M. Peak
PHF =
0.90
PHF =
0.86
PHF =
0.82
PHF =
0.95
0.95
P.M. Peak