Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
06-26 CUP Application
6 AAPPLICATIONN FORR CONDITIONALL USEE PERMIT FREDERICKK COUNTY,, VIRGINIAA ____________________________________________________________ _________________ 1. Property Owner(s) (please attach additional page(s) if more than two owners): Name: Specific Contact Person if Other than Above: Address: Telephone: Email: Name: Specific Contact Person if Other than Above: Address: Telephone: Email: 2. Other Interested Parties (such as a contract purchaser) (please attach additional page(s) if necessary): Name: Specific Contact Person if Other than Above: Address: Telephone: Email: 3. Law firm, engineering firm, or other person, if any, serving as the primary contact person for this application: Firm Name: Specific Contact Person at Firm: Address: Submittal Deadline __________ P/C Meeting __________ BOS Meeting __________ Philip A Kaes Douglas Sampson, Esq. 1983 Siler Road, Winchester, VA 22603 410-332-8661 Douglas.Sampson@saul.com Vicki D Kaes Douglas Sampson, Esq. 1983 Siler Road, Winchester, VA 22603 410-332-8661 Douglas.Sampson@saul.com The Towers, LLC d/b/a Vertical Bridge Laura Hughes 22 W Atlantic Ave., Suite 310, Delray Beach FL 33444 (201) 681-6183 Laura.Hughes@verticalbridge.com Saul Ewing LLP Douglas Sampson 1001 Fleet Street, 9th Floor, Baltimore, MD 21212 7 Telephone:Email: 4. The property has a road frontage of __________ feet and a depth of __________ feet and consists of __________ acres. (Please be exact) 5. The property is owned by ________________________________________ as evidenced by deed from ___________________________ (previous owner) recorded in deed book no. ________ on page ________, as recorded in the records of the Clerk of the Circuit Court, County of Frederick. Magisterial District:_______________________________________________________ Current Zoning:__________________________________________________________ 7. Adjoining Properties: Zoning: Use: North: South: East: West: 8. Conditional use(s) proposed: (cconsult with the Planning Dept. before completing): _______________________________________________________________________ 9. Describe, if applicable, any new buildings to-be-constructed associated with this use (attach additional documentation as necessary): _______________________________________________________________________ ________________________________________________________________________ 10. The following are all of the individuals, firms, or corporations owning property adjacent to all sides (including across street from) the property where the requested use will be conducted. These people will be notified by mail of this application: Name and Property Identification Number Address Name Property # Name Property # 410-332-8661 Douglas.Sampson@saul.com 122.36 Philip A Kaes and Vicki D Kaes Philip L. Kaes and Marlene L. Kaes 140005558 0271 6.Property Identification Number(s) (P.I.N.):____20A7$________________________________ Gainesboro RA Rural Area RA Rural Area Sububan/Residential/Undeveloped RA Rural Area Residential/Undeveloped RA Rural Area Residential/Undeveloped RA Rural Area Residential/Undeveloped Telecommunication Monopole Facility (Sect. 165-204.19) The Facility consists of a 199’ tall monopole (195’ pole, with a 4’ lightning rod) within a 50’ x 50’ (2,500 square feet) equipment compound surrounded by a 7’ tall chain link fence. (see site plans) Kenneth & Laura Kniffin, Trustees 20 A 1 George & Melissa Nilsen 20 A 5 2237 SILER RD WINCHESTER, VA 22603 2056 2214 SILER RD WINCHESTER, VA 22603-2042 BWH 8 Name Property # Name Property # Name Property # Name Property # Name Property # Name Property # Name Property # Name Property # 10. Please attach a sketch of the property (refer to “Application Steps”). 11. Please attach a written description of the proposed use (refer to “Application Steps”). I (we), the undersigned, do hereby respectfully make application and petition the governing body of Frederick County, Virginia to allow the use described in this application. I understand that the sign issued to me when this application is submitted must be placed at the front property line at least seven (7) days prior to the first public hearing and maintained so as to be visible until after the Board of Supervisors' public hearing. Your application for a Conditional Use Permit authorizes any member of the Frederick County Planning Commission, Board of Supervisors or Planning and Development Department to inspect your property where the proposed use will be conducted. *All owners listed on the property record shall sign the application. Signature of Applicant _____________________________________________________ Signature of Owner(s) ______________________________________________________ Abel & Heather Borromeo 20 A 12E Kenneth & Kaye Shepard 20 A 12 Brian & Patricia Harlow 20 A 12D Candice Watson 20 A 12C Matthew Byler 20 A 1B Matthew Byler 20 A 12A Steven Newman 19 7 9 Thomas & Holly Clarke 19 A 44G 150 GRAYSTONE LN WINCHESTER, VA 22603-2373 170 GRAYSTONE LN WINCHESTER, VA 22603 2373 200 GRAYSTONE LN WINCHESTER, VA 22603-2372 13832 HERONS LANDING WAY, #10 JACKSONVILLE, FL 32224-6001 280 GRAYSTONE LN WINCHESTER, VA 22603-2372 280 GRAYSTONE LN WINCHESTER, VA 22603-2372 1315 SILER ROAD WINCHESTER, VA 22603-2372 570 ADAMS RD WINCHESTER, VA 22603-2372 8 Name Property # Name Property # Name Property # Name Property # Name Property # Name Property # Name Property # Name Property # 10. Please attach a sketch of the property (refer to “Application Steps”). 11. Please attach a written description of the proposed use (refer to “Application Steps”). I (we), the undersigned, do hereby respectfully make application and petition the governing body of Frederick County, Virginia to allow the use described in this application. I understand that the sign issued to me when this application is submitted must be placed at the front property line at least seven (7) days prior to the first public hearing and maintained so as to be visible until after the Board of Supervisors' public hearing. Your application for a Conditional Use Permit authorizes any member of the Frederick County Planning Commission, Board of Supervisors or Planning and Development Department to inspect your property where the proposed use will be conducted. *All owners listed on the property record shall sign the application. Signature of Applicant _____________________________________________________ Signature of Owner(s) ______________________________________________________ Kevin & Brenda Campbell 20 A 32D Scott Todd Mayhew, Jr. 20 A 7C Martha Light 20 A 32A Jessica Kaes 20 A 8 William & Janelle Wilson 20 A 32K Philip and Vicki Kaes 20 A 7B Richard Dye 20 A 31A Brandyn & Philip Kaes 20 A 9B 2070 SILER RD WINCHESTER, VA 22603-2040 2081 SILER RD WINCHESTER, VA 22603-2054 2020 SILER RD WINCHESTER, VA 22603 2040 2041 SILER RD WINCHESTER, VA 22603-2054 1960 SILER RD WINCHESTER, VA 22603-2039 1981 SILER RD WINCHESTER, VA 22603-2039 11310 VALE RD OAKTON, VA 22124-1301 1981 SILER RD WINCHESTER, VA 22603 2053 8 Name Property # Name Property # Name Property # Name Property # Name Property # Name Property # Name Property # Name Property # 10. Please attach a sketch of the property (refer to “Application Steps”). 11. Please attach a written description of the proposed use (refer to “Application Steps”). I (we), the undersigned, do hereby respectfully make application and petition the governing body of Frederick County, Virginia to allow the use described in this application. I understand that the sign issued to me when this application is submitted must be placed at the front property line at least seven (7) days prior to the first public hearing and maintained so as to be visible until after the Board of Supervisors' public hearing. Your application for a Conditional Use Permit authorizes any member of the Frederick County Planning Commission, Board of Supervisors or Planning and Development Department to inspect your property where the proposed use will be conducted. *All owners listed on the property record shall sign the application. Signature of Applicant _____________________________________________________ Signature of Owner(s) ______________________________________________________ Ronald Kaes & Vicki Lynn Haggerty 20 A 7D Douglas A. Sampson Digitally signed by Douglas A. Sampson Date: 2026.07.17 11:09:38 -04'00' Douglas A. Sampson Digitally signed by Douglas A. Sampson Date: 2026.07.17 11:09:09 -04'00' 662 ADAMS RD WINCHESTER, VA 22603-1905 9 ______________________________________________________ Owners' Mailing Address ____________________________________________________ Owners' Telephone No. ____________________________________________________ *A signed Power of Attorney form is required if someone is signing on the owner(s) behalf. 1983 Siler Road, winchester, Virginia 410-332-8661 '!'$''!!&' "!&''' ' '' !'$$%#" ' )*,&',0( 0%''#'!00.%()&',0 (-',/0( 0**#$0#*!#'#0 0(*,"0',0,*,0#'"+,*0#*!#'#0 0 "('0 0 0 +#&#%0 00 9:AI66I'9IDI3'='I<'='9>=I3#>I Lrv«>^j« +G0G4015@EGD-211)#-;G Mk_k«k#« 6n«sk«k¦«¢k`we`«x«_«ky¦«tk«_k«n«tk«kz¦«sh«akb«_c¡k « 6o«{k«k«¢«tk«k««`k«`|f_«_«l¥kfkh«£k«n«_k¦«p«k_ft«¢k«¢}«dk«kkhkh« "!«R~j«N^i«Y~ gujj«Wq v^««§« $*(- G29:G0G4016AEGD-2G 11)%/<G )1!0.GB+2G #=I:A9'<I:(I:<I #;;64%#9>IA4>3I<'=;'%>I>:I>3'I><#%>=I:<I;#<%'6=I:)I6#9&I49I<'&'<4%5I:?9>DI 4<2494#I4&'9>4(4'&I$DI/66:A492I;<:;'<>DI4&'9>4.%#>4:9I9?7$'<= I 'gg«H«!«L7H«8.$««'«'« &:I3'<'$DI8#5'I%:9=>4>?>'I#9&I#;;:49>I . q«R^«R^ «/¤~ q«?@L« +G0G=<07E- <G «2jj«Rmj«*^vj«E.««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j« 34=I#;;:49>7'9>I=3#66I'C;4<'I:9'ID'#<I1:7I>3'I&#DI>3#>I4>I4=I=429'&I:<I#>I=?%3I =::9'<I>47'I#=II :>3'<A4='I<'=%49&I:<I8:&4(DI4> I *FDR5`c[;x 1x ,F`O;xF=x_FDRGjA0kE5O=xV=x5Sx;S`F`gx222222 222222323222 22222x4x *`5`; V=x VdR`gF`gV=x ,V eF`x xlxHxmx 0 n'/x(x x 5x#V`5]hx&d6OF7xIRx5S8xB[x`E;xLd[F_8F7`IVSx5?X[;_5F8x7;^bFCx`E5` `E;xY;[_WJxeEVx_FDS;8x`E;xB[;DVFTDxFS_`[dP;R`xY;[_VR5OOgx5YY;5[;8x6;?X[;xP;x5S8xE5_x57NSVeO;9D;8x`E; _5Qox6p?X[qxQ;xIRx`E;x Md[F_8F7`FVRx5@X\;_5F8x`EF_x 95gxV> <xx r:K- !"gxVPQF__FVRxfZF[;_x sd6OF7x itu.)$ +vwaFVUx%dP6;[x HJS(O[«LV*C=+«A« P049RTN)U:JH« «]« ,KDEJIZ1(BS5«J3«X;Qª«¨« © & % « F\-JEG<«« ̬ ̭ Frederick Home Frederick County Virginia LIFE AT THE TOP Pay/Lookup Taxes COUNTY OF FREDERICK Real Estate Payments Paid for Tax Year 2026 Map Number:20 A 7A Account#:8004256 Dept# Ticket# Seq# Owner Name Bill Date Description Amount Paid RE2026 21970 1 KAES PHILIPA 4/15/2026 122.36ACRES $1,145.07 This amount represents payments applied during calendar year 2026 and does not include Penalty, Interest, Credit Card Fees or Rebate Amounts. If this property has been bought/sold during the year, please refer to your closing statement/agent for accurate amounts. Total Paid:$1,145.07 Return to Search Printer Friendly Page Payment Home Personal Property Real Estate Dog Tags Pay Parking Violation Pay FOIA Charges Pay Planning Charges Other Payments ShoppingCart(0) Pin Options ̬ ̭ Frederick Home Frederick County Virginia LIFE AT THE TOP Pay/Lookup Taxes COUNTY OF FREDERICK Real Estate Payments Paid for Tax Year 2026 Map Number:20 A 7A Account#:8004256 Dept# Ticket# Seq# Owner Name Bill Date Description Amount Paid RE2026 21970 1 KAES PHILIPA 4/15/2026 122.36ACRES $1,145.07 This amount represents payments applied during calendar year 2026 and does not include Penalty, Interest, Credit Card Fees or Rebate Amounts. If this property has been bought/sold during the year, please refer to your closing statement/agent for accurate amounts. Total Paid:$1,145.07 Return to Search Printer Friendly Page Payment Home Personal Property Real Estate Dog Tags Pay Parking Violation Pay FOIA Charges Pay Planning Charges Other Payments ShoppingCart(0) Pin Options PlanSiteC-1Know what'sbelow.Callbefore you dig.verticalbridge DetailsSiteC-2Know what'sbelow.Callbefore you dig.verticalbridge Know what'sbelow.Callbefore you dig.verticalbridgeC-3Elevation &Antenna Details Statement of Justification in support of application for a Conditional Use Permit to Construct a 199’ Monopole Telecommunications Facility at 1983 Siler Road, Winchester, Virginia 22603 Applicant: The Towers, LLC 22 W Atlantic Ave Suite 310 Delray Beach FL 33444 Property Owner: Philip & Vicki Kaes 1983 Siler Road Winchester, Virginia 22603 Representatives: Douglas A. Sampson, Saul Ewing LLP 1001 Fleet Street, 9th Floor Baltimore, MD 21202 (410) 332-8661 Douglas.Sampson@saul.com Michael Lautar, Mastec Communications Group 10640 Iron Bridge Road, Suite 2B Jessup, MD 20794 (703) 928-0757 Michael.Lautar@MasTec.com Address: 1983 Siler Road, Winchester, Virginia 22603 Jurisdiction: Frederick County, Virginia District: Gainesboro Parcel Account #: 8027680 Property Info: Map 20, Lot 7, Sublot $ Parcel ID # (PIN): 20 A 7$ Lot Size: 122.36 Acres Zoning: RA (Rural Area) Current Use: Agricultural, Undeveloped Proposed Use: Agricultural with Telecommunications Tower Total Area of Disturbance: 3,563 square feet Pursuant to Section 15.2-2232 of the Code of Virginia and Chapter 23 and Sections 165- 103 and 165-204.19 of the Frederick County Zoning Ordinance (“Ordinance”), The Towers, LLC d/b/a Vertical Bridge (“Applicant”), by its agents Saul Ewing LLP and Mastec Communication s Group, hereby requests approval for a new telecommunication facility that includes a 199’ monopole (the “Facility”) on a portion of property located at 1983 Siler Road, Winchester, Virginia 22603, Tax ID# 8027680, PIN# 20 A 7$ (the “Property”). Pursuant to Ordinance § 165-204.19.C, a telecommunications tower is permitted in the RA District with a conditional use permit. 58860310.1 58860310.1 The Applicant respectfully requests a determination by the Frederick County Board of Supervisors that the Facility is in substantial compliance with the Ordinance and is authorized for a conditional use permit. This document and attached exhibits provide justification for the Facility, and a summary of how and why this proposal conforms with the Ordinance. EXHIBITS Exhibit 1: Existing Verizon Wireless Coverage Map Exhibit 2: Proposed Verizon Wireless Coverage Map with Facility Exhibit 3: RF Design Analysis from Millenium Engineering dated June 17, 2026 Exhibit 4: Site Plans in 8.5” x 11” Exhibit 5: Letters of Authorization by Landowners Exhibit 6: Photo Simulations of Proposed Monopole Exhibit 7 Affidavit of Landowners and Facility Owner Exhibit 8: Richard A. Forsten, Wendie C. Stable, and Olfunke O. Fagbami, Cell Phone Towers Do Not Affect Property Values, American Bar Association Probate & Property (May/June 2016) Exhibit 9: RF Safety FCC Compliance Letter Exhibit 10: NEPA Report, dated March 27, 2026 1 Exhibit 11: Verizon Wireless Search Area I. Verizon’s Goals and the Need for Improved Wireless Services Verizon Wireless is licensed by the Federal Communications Commission (“FCC”) to provide wireless telecommunications services in Frederick County, Virginia. Verizon Wireless has a significant need to improve the delivery of emergency and non-emergency wireless and broadband services to residents, businesses and commuters in this area of Winchester and Frederick County. (See Existing Radio Frequency Coverage Map attached as Exhibit 1). The nearest Verizon wireless facility is more than two miles to the west near Cross Junction. (See Ex. 1). There is a significant lack of adequate wireless facilities in the surrounding area, causing significant gaps in emergency and non-emergency wireless services. This has led to low throughput for subscribers, overloaded telecommunications antennas, and low-quality connections around the proposed site. The site of the Facility was chosen to improve wireless services in Frederick County, specifically east of Route 522, near Issacs Creek, Bucks Creek, Dawn Heights Trail, Fort Shenandoah, and Chestnut Grove. (See Proposed Verizon Wireless Coverage Map with Facility attached as Exhibit 2). The proposed Facility will add and improve emergency and non-emergency wireless and broadband services and ensure adequate overlapping coverage between and among existing coverage areas. The Facility will add and improve wireless broadband services and coverage capacity in this area of Frederick County. (See Exs. 1 & 2). Millenium Engineering, P.C. conducted an independent analysis of the design and radio frequency needs for the Facility. (See RF Design Analysis from Mi llenium Engineering dated June 1 An excerpt of the NEPA Report is attached here. The full report with appendices is over 200 pages and can be provided to the County upon request. 58860310.1 17, 2026 attached as Exhibit 3). Millenium Engineering determined: “The proposed facility will improve service and provide better handoff between the existing sites. The proposed facility will provide substantially improved in-building and data throughput speeds to wireless devices in the target area.” (See Ex. 3 at 1). The analysis concluded: the proposed communications facility is particularly suited (both in location and minimum height) required for Verizon to provide reliable service to subscribers in a rural northern section of Frederick County VA that currently suffers from a significant gap in reliable wireless service. I am not aware of any other more feasible alternatives of providing reliable wireless service in this area. The proposed communications facility in this location is necessary for the efficient operation and provision of wireless services to the area for which it is proposed. (See Ex. 3 at 2). At the request of Frederick County planning staff, the Applicant reviewed the three closest proeprties containing existing towers. Millenium Engineering reviewed the identified proeprties and determined none of them will meet the coverage objectives of this Facility. The three identified proeprties were: 1. 300’ tower on the westside of 522 on or near Redland Road (County owned). This tower is .7 miles from an SBA Lattice Tower on which Verizon Wireless is already co-located. The site name is “Cross Junction” and can be seen to the west on the included radio frequency maps. (See Exs. 1 & 2). The parcel is too close to the existing Cross Junction site and would not fill in the targeted gap in Verizon Wireless’s coverage addressed by the proposed Facility. 2. Existing tower at Gainesboro Elementary School (County owned) Verizon Wireless is already located on an SBA site about a mile east of the school called “Silver Lake.” Additionally, the property is more than 3.5 miles away from the proposed Facility and well outside of the targeted coverage area for this Facility. 3. 200’ tower at 126 Cross Junction. Verizon Wireless is on already located on the tower at this location. This is the site identified by Verizon as “Cross Junction” which is shown on the provided maps (See Exs. 1 & 2). The existing wireless coverage issues exist despite the existence of Cross Junction. The Facility includes space for up to three additional wireless carriers to co-locate their antennas, to allow other providers to address similar coverage gaps in their networks. (See Proposed Facility Site Plans attached as Exhibit 4 at C-3.) The proposed Facility will add and improve emergency and non-emergency wireless services in Frederick County, with minimal or no adverse impacts to the surrounding area. The Facility will allow residents, visitors, businesses and emergency personnel of Frederick County to experience improved wireless and broadband services, better quality calls, diminished dropped calls, and enhanced first responder services. 58860310.1 II. The Property and Current Use The Property is owned by Philip & Vicki Kaes, who have authorized the Applicant and its agents to pursue a Special Exception and any other zoning relief, site plan, building permits, or applications required for the Facility. (See Letters of Authorization by landowners attached as Exhibit 5). The Property is zoned RA (Rural Area) and is more than 120 acres in size. A telecommunications facility is permitted in RA district with a conditional use permit. See Ordinance § 165-204.19.C. The Property is an ideal location for the Facility given its location and zoning district. The Property is a very large parcel in the middle of an area of rural area zoning districts, predominantly composed of single-family homes and farmland. Locating the Facility on the Property will bring new and improved wireless and broadband services to the area, with minimal or no adverse impacts on the surrounding area. (See Exs. 1-3). The Property is in close proximity to nearby businesses, trails, creeks, and residential areas in need of new and improved emergency and non-emergency wireless and broadband services. The Facility will be located to the interior of the 122-acre parcel, maximizing the setback from all property lines and nearby adjacent properties. The Facility was also located in between acres of mature trees to the south, west and north, which will help screen the Facility from view. The closest property to the south has a large uninhabited and undeveloped area adjacent to the proposed Facility. Mature trees and rolling topography will screen the Facility from view. On February 14, 2026, the Applicant conducted a visual impact survey, during which a large red balloon (approximately 3 feet in diameter) was raised to a height of 199 feet. (See Photo Simulations attached as Exhibit 6). Photos of the balloon test in progress are included in the Photo Simulations. (See Ex. 6). The technician drove around the surface streets surrounding the Property and took photos of the balloon from the most visible locations. Throughout most of the radius, the balloon was not visible. Photographs were taken from a total of fifteen (15) separate vantage points in the areas surrounding the Property. The proposed Facility would only be visible or partially visible from six (6) locations. The Facility would not be visible from the other nine (9) locations. (See Ex. 6). The balloon test was conducted in mid-February when leaf foliage is at its lowest level. The potential visual impact will be further lessened from spring through fall when leaf foliage is at its peak and offers additional screening \. Based on the balloon fly and attached simulations, the Applicant determined the Facility will not have a significant visual impact on the surrounding area. (See Ex. 6). The Applicant and Verizon Wireless searched for existing towers or structures that could provide viable co-location for Verizon Wireless’s antennas. Co-locations are preferred locations and are much less expensive and time-consuming to bring online. The Applicant determined, and Verizon Wireless confirmed, that there are no nearby existing telecommunications facilities, water tanks, utility distribution structures, or tall buildings suitable to co-locate telecommunications antennas and to meet Verizon’s coverage needs. (See Ex. 3). This area of Frederick County is predominantly farmland, other agricultural uses, and single-family homes, where it is unlikely there would be any available tall structures suitable for co-location of telecommunications antennas. There are no tall structures within two miles of the proposed Facility. 58860310.1 With no viable co-location opportunity, Verizon Wireless determined that a new tower was required. The Applicant determined that the Property was viable from a technical perspective (i.e., radio frequency), a zoning perspective (i.e., preferred use on an exempt commercial use in a heavily agricultural and residential area and compliant with all regulations), and from a landowner perspective (i.e. a land owner willing to lease space). Verizon Wireless further determined that 199 feet is the minimum height of the Facility to both meet Verizon Wireless’s coverage objectives, and to provide viable co-location opportunities for other wireless providers. (See Ex. 3). If the height of the monopole were to be reduced further, it would not allow Verizon Wireless to meet its coverage goals. (See Exs. 1-3). It would also be much less likely that other wireless providers (such as AT&T and T-Mobile) would co-locate on the Facility, because the height of available co-location opportunities would be too low to be viable. If the height of the proposed Facility is reduced, other providers may need new towers – rather than co-locating on this Facility – to bring their own wireless and broadband coverage to this area. III. The Proposed Telecommunications Facility The Facility consists of a 199’ tall monopole (195’ pole, with a 4’ lightning rod) within a 50’ x 50’ (2,500 square feet) equipment compound surrounded by a 7’ tall chain link fence (6’ chain link fence with barbed wire on top). (See Ex. 4, Site Plan at C-2 & C-3). The monopole will allow Verizon Wireless to locate its antennas with a centerline of 190’ above ground level (AGL) and will accommodate at least two (and up to three) future carriers to locate antennas at 178’ AGL and 168’ AGL. (See Ex. 4 at C-3; Affidavit of Landowners and Facility Owner attached as Exhibit 7). The Facility will be accessed by an existing gravel access drive on the Property, which will be extended to access the compound. (See Ex. 4 at C-1). The compound will be accessed through a fenced gate. By utilizing the existing gravel accessway, the Facility will not significantly increase impervious surface area. The total disturbed area will be 3,563 square feet. (See Ex. 4 at C-1). The Facility meets all setback requirements in the Ordinance. The proposed monopole is setback from all adjacent property lines a distance equal to or greater than the height of the proposed monopole (199’). The proposed monopole is set back 230’-11” from the nearest property line to the south; 774’-7” from the property line to the east, and over a thousand feet from all other property lines. (See Ex. 4 at C-2). The area is largely rural and agricultural, with few dwellings. The Facility will be unmanned, free of public facilities, and only require occasional visits (about 1 visit per quarter) from a technician for routine inspections and maintenance. The Facility will have no impact on traffic. The Facility will have no adverse impact on the health, safety, or welfare of residents or workers in the area. The Facility will be free of odors, fumes, light, glare, and noise. The Facility will not be located within any airport or historic overlay district. The Facility will operate 24 hours a day, seven days a week, 365 days a year, to ensure adequate and reliable emergency and nonemergency wireless coverage. IV. Compliance With The 2035 Comprehensive Plan The Facility will not change the character of development in the area, will not affect the use and enjoyment of surrounding properties, and is in accordance with the Frederick County Comprehensive Plan. The Zoning Code permits telecommunications facilities in the RA (Rural Area) Zoning District with an approved Conditional Use Permit. See Zoning Code § 165-401.03. 58860310.1 The properties immediately adjacent and surrounding the Property are all zoned RA. The Property is over 122 acres in size, allowing the Facility to be located in the center of the Property, well away from adjacent properties and existing roadways. The proposed site is ideal, because its location and the lack of natural barriers will fill Verizon Wireless’s existing coverage gap with a single tower, and will likely also fill existing coverage gaps for other wireless providers. The Property is located in a rural area, that is surrounded by trees and rolling hills. As such, the proposed site will be screened by the existing landscape, and be made compatible with the setting, color, lighting, and topography of the area. (See Ex. 6). Additionally, the Facility will be built near the existing tree line, and will be surrounded by mature trees, further limiting the visual impact on the surrounding area. (See Ex. 4 at C1). AT&T’s Proposed Tower will not hinder any further development on adjacent properties or impair the value of the surrounding land. Substantial evidence shows that cell towers do not affect property values. (See Richard A. Forsten, Wendie C. Stable, and Olfunke O. Fagbami, Cell Phone Towers Do Not Affect Property Values, American Bar Association Probate & Property, at 10-15 (May/June 2016), a copy of which is attached as Exhibit 8).2 A number of studies and court cases have demonstrated that “cell towers have no appreciable effect on property values. . .” Id. at 15. In the study, AT&T examined property sales two years before and two years after a tower was erected. The overwhelming data demonstrated that the existence of the tower had no effect on the value of property sales, even where the tower was visible. Id. at 13-14. Many studies have demonstrated that proximity to a cell tower makes no measurable difference in property values.3 A study in Richmond, Virginia examined six towers and 140 properties, and concluded that “there was no consistent market evidence suggesting any negative impact upon improved residential properties exposed to such facilities . . .”4 A similar study of eleven separate cell phone tower sites in Virginia and Maryland compared properties where a tower was visible and properties where a tower was not visible. The study found that homes appreciated at approximately the same rate, whether or not the tower was visible.5 The Facility will have no effect on the environment of Frederick County. Given the mature trees and rolling topography, its visual impact will be minimal. The tower will be unmanned, and will not generate any noise, light, or fumes. Because the Facility will be unmanned, there will be no need for any additional facilities or amenities to be included There is an access roadway on the 2 Excerpt: pages 3-9 & 16-64 removed for convenience. 3 How Does the Proximity to a Cell Tower Impact Home Values?, Valbridge Property Advisors (Sept. 14, 2018), https://www.valbridge.com/news-article/647/how-does-the-proximity-to-a-cell-tower-impact-home-values. Thorne Consultants, Inc., Monopole Impact Study on Residential Lots in the Vicinity of the Bullis School Potomac, Montgomery County, Maryland (May 2, 2001), at 3. (Examining 111 transactions and determining that the proximity to a cell site had no effect on sales prices of homes or residential lots). Appraisal-Associates, Inc., Impact of a Telecommunications Tower upon Values of Residential Properties (Aug. 2005) (“The data demonstrates that residences in close proximity to a towers (less than one quarter mile or 2,000 feet in the case of the vast majority of the sales studied) did not incur a measurable diminution in value after development of the tower.”). 4 Allen G. Dorin Jr., MAI, SAR & Joseph W. Smith III, The Impact of Communications Towers on Residential property Values, Right of Way, Mar./Apr. 1999, https://www.irwaonline.org/eweb/upload/0399b.pdf. 5 Thorn Consultants, Inc., Monopole, Lattice and Water Towers Studies, (2010). 58860310.1 Property that will allow safe and adequate access to the Facility. The proposed access way will be 20 feet wide with an approved turn around for emergency vehicles. (See Ex. 4, Site Plan at C1). V. Compliance with Frederick County Zoning Ordinance § 165-103.01. Consideration; approval or disapproval. A. Certain uses in each zoning district are listed as being allowed with a conditional use permit. Because of their particular nature, such uses must be separately considered to protect the health, safety and welfare of the residents of the County and to avoid adverse impacts on surrounding properties. x Applicant’s Response: The Facility will not impact the health, safety, or welfare of residents in Frederick County, Virginia. The Federal Communications Commission (“FCC”) heavily regulates the strength of radio frequency (“RF”) waves produced by telecommunications towers. The Facility will comply with all FCC regulations. (See RF Safety FCC Compliance Letter attached as Exhibit 9). The Facility will pose no risk to the public and will not impact the health, safety, or welfare of residents of surrounding properties. With improved emergency and non-emergency wireless and broadband services, the Facility will provide a significant health and safety benefit to this area of Frederick County, providing reliable cellular service in case of emergency. B. The Board of Supervisors shall approve or disapprove, as a legislative function with recommendation from the Planning Commission, requests for conditional use permits. x Applicant’s Response: The Applicant looks forward to presenting this application at upcoming public hearings. § 165-103.02 Standards. In considering whether to approve a conditional use permit, the Board shall consider the following standards: A. The conditional use shall not tend to change the character and established pattern of development of the area of the proposed use. x Applicant’s Response: The Facility will not change the character and established pattern of development in the area. The Zoning Code permits telecommunications facilities in the RA (Rural Area) Zoning District with an approved conditional use permit. The properties immediately adjacent and surrounding the Property are all zoned RA. The Property is over 120 acres in size, allowing the Facility to be located in the center of the Property, well away from adjacent properties and existing roadways. A visual impact survey determined the Facility will not have a significant visual impact on the surrounding area. (See Ex. 6). B. The conditional use shall be in harmony with and shall not adversely affect the use and enjoyment of surrounding properties. 58860310.1 x Applicant’s Response: The Facility was specifically located in the center of the Property to maximize its distance from adjacent properties and nearby buildings. Existing mature trees will help screen the facility, and there will be minimal visual impact on the surrounding area. Additionally, the Facility will be unlit, unmanned, and free from odors, fumes, light, glare, and noise. It will not have any adverse effect on the use and enjoyment of surrounding proeprties. C. The conditional use shall be in accord with the polices expressed in the Comprehensive Plan of the County and with the intent of this chapter. x Applicant’s Response: The Public Facilities chapter of the 2035 Comprehensive Plan directs that advances in technology shall be embraced to further advance government services, and a variety of communication methods shall be used to engage the community and promote the accessibility of those services. This Facility is consistent with that goal. Further, the County is actively working to close the connectivity gap in its rural areas, which this Facility will address. D. The conditional use shall not adversely affect the natural character and environment of the County. x Applicant’s Response: The Facility Is Designed to Minimize Impact on Rural Character, Consistent with Rural Areas Goals. The Property was specifically chosen for its location in an existing wireless gap, and for the size and nature of the parcel which allow the Facility to be located away from adjacent parcels and roadways and to minimize the visual impact using distance, existing mature trees, and the rolling topography of the area. Additionally, the Property already ahs an existing accessway whch will reduce the need for additional land disturbance to create a new accessway. The total area of disturbance on the 122 acre parcel will be less than 4,000 square feet. E. The conditional use permit shall be approved only if adequate facilities, roads, safe access and drainage are provided. x Applicant’s Response: The facility will be unmanned, and will not require any water, sewer, or other facilities. The Facility will be visited by a technician 2- 4 times per year for routine inspection, maintenance, repairs and upgrades. The technician will use existing roadways and the existing accessway to access the Facility in a standard vehicle. There will be no increase in area traffic from the Facility and there are adequate existing roadways to service the Facility. Thanks to the minimal disturbance and large size of the parcel, no drainage or stormwater management will be required. F. The conditional use shall conform with all applicable regulations of the district in which it is located. 58860310.1 x Applicant’s Response: The Facility will conform with the Ordinance and all applicable laws and regulations. § 165-204.19 Telecommunications facilities, commercial. * * * C. Standard process projects. (1) Except as provided in Subsection B, no wireless facility or wireless support structure shall be sited, constructed, or operated except pursuant to a conditional use permit issued through the process defined in Part 103 of Article I of this chapter. The issuance of a conditional use permit for the siting, construction, and operation of a wireless facility is permitted within the zoning districts specified in this chapter, provided that, pursuant to Code of Virginia, § 15.2-2232(A), the general location or approximate location, character, and extent of such facilities are substantially in accord with the adopted Comprehensive Plan or part thereof and that adjoining properties, surrounding residential properties, land use patterns, scenic areas, and properties of significant historic value are not negatively impacted [based on current intro to County Code § 165- 204.19]. x Applicant’s Response: The Facility is permitted with a conditional use permit. As set forth in this application, the Facility is consistent with the Comprehensive Plan, and there are negligible adverse impacts on adjoining properties, surrounding properties, land use patterns, scenic areas, and areas of historic value. The Applicant conducted a National Environmental Policy Act of 1969 (“NEPA”) report. (See NEPA Report attached as Exhibit 10). According to the NEPA Report: It was determined that there were no historic properties identified within the Area of Potential Effects (APE) for direct effects, and no historic properties identified within the APE for visual effects. Additionally, the identification process did not locate archaeological materials that would be directly affected, or sites that are of cultural or religious significance to Tribes/NHOs. Documentation of these reviews was submitted to the SHPO via Form 620 on February 4, 2026. The SHPO concurred that the proposed undertaking would have no direct or visual effects on historic properties in a response letter dated February 26, 2026. A copy of the SHPO concurrence letter, Form 620, and associated documents are located in Appendix E. (See Ex. 10 at 6). 58860310.1 (2) Any person seeking to install a facility or structure pursuant to this subsection shall make application to the Zoning Administrator, accompanied by payment of a fee of $750. [Code of Virginia, § 15.2-2316.4:1(B)(2) ("the fee shall not exceed the actual direct costs to process the application, including permits and inspection")] The application shall be subject to consideration as follows and include the indicated information: (a) The Board of Supervisors shall approve or disapprove the application within 150 days of receipt of the complete application by the Zoning Administrator or such shorter period as required by federal law, unless the applicant and the Board agree to a longer period for approval or disapproval of the application. Within 10 days after receipt of an application and a valid electronic mail address for the applicant, the Zoning Administrator shall notify the applicant by electronic mail whether the application is incomplete and specify any missing information; otherwise, the application shall be deemed complete. [Code of Virginia, § 15.2- 2316.4:1(C)] x Applicant’s Response: The Applicant acknowledges this provision. (b) Information to be included with application: [1] A map depicting the search area used in siting the proposed facility or structure [Code of Virginia, § 15.2-2316.4:2(D); based on current § 165- 204.19A(2)]; x Applicant’s Response: Verizon Wireless identified this portion of Frederick County as deficient in wireless and broadband coverage. (See Ex.3). Verizon Wireless identified the area of dropped and failed calls and searched for suitable tall structures within a mile of that area. Finding no existing towers or tall structures, it was determined that a new Facility would need to be built in close proximity to the search ring. (See Verizon Wireless Search Area attached as Exhibit 11; see also Ex. 3). [2] Identification of all service providers and commercial telecommunications facility infrastructure within the search area [Code of Virginia, § 15.2-2316.4:2(D); based on current § 165-204.19A(3)]; x Applicant’s Response: Based on the search conducted by Verizon Wireless, there were no existing service providers or telecommunications facility infrastructure within the search area. (See Exs. 1-3 & 11). [3] Confirmation that attempts to co-locate on existing structures have been made and, if such attempts were unsuccessful, the reasons so [Code of Virginia, § 15.2-2316.4:2(D); based on current § 165-204.19A(3)]; 58860310.1 x Applicant’s Response: Co-location is always the preferred option for wireless carriers, when feasible. Co-location is faster and cheaper to provide wireless and broadband coverage to a given area. However, Verizon Wireless determined there were no existing telecommunication facilities or other structures of sufficient height within the target coverage area to offer a viable co-location opportunity. An independent radio frequency review agreed that there are no tall structures suitable for co-location. (See Ex. 3 at 1). Absent a suitable co-location opportunity, Verizon Wireless and the Applicant determined a new Facility was required. [4] Documentation issued by the Federal Communications Commission indicating that the proposed facility is in compliance with the Federal Communications Commission's established ANSI/IEEE standards for electromagnetic field levels and radio frequency radiation [based on current § 165-204.19A(4)]; x Applicant’s Response: Verizon Wireless is licensed by the FCC to provide wireless signals in Virginia, and is subject to all FCC rules and regulations governing electromagnetic fields. An independent analysis confirmed that the Facility “will comply with all applicable exposure limits and guidelines adopted by the FCC governing human exposure to radiofrequency electromagnetic fields (FCC Bulletin OET 65).” (See Ex. 9). The Facility will be in compliance with the standards of IRPA, FCC, IEEE, ANSI, and NCRP. (See Ex. 9). [5] An affidavit signed by the landowner and by the owner of the facility or structure stating that they are aware that either or both of them may be held responsible for the removal of the facility or structure as stated in Subsection E [based on current § 165-204.19A(5)]; and x Applicant’s Response: The landowners have provided the required affidavit. (See Ex. 7). [6] The applicant may voluntarily submit, and the Board may accept, conditions that address potential visual or aesthetic effects resulting from the placement of the facility or structure. [Code of Virginia, § 15.2- 2316.4:2(C)] x Applicant’s Response: The Applicant took great care in siting the Facility to minimize the visual impact and eliminate any adverse impacts on the surrounding area. The Applicant would be happy to consider any conditions proposed by the County. (3) If the Board of Supervisors grants a conditional use permit under this subsection, the following standards shall then apply to any property on which a wireless facility or wireless support structure is sited, in order to promote orderly development and mitigate 58860310.1 the negative impacts to adjoining properties, residential properties, land use patterns, scenic areas, and properties of significant historic value: (a) The Board may reduce the required setback distance for the wireless facility or wireless support structure as required by § 165-201.03B(8) of this Code if the applicant submits sufficient documentation, certified by a registered Virginia professional engineer, that, in the event of a collapse of the wireless facility or wireless support structure, the collapsed wireless facility or wireless support structure will be contained in a fall zone that does not extend into the area of the proposed reduced setback, measured from the center line of the base of the wireless facility or wireless support structure. The setback distance shall not be reduced to less than half the distance of the height of the wireless facility or wireless support structure if the adjoining property is zoned for residential use or if the principal use of the adjoining property is a residence. x Applicant’s Response: The Facility will be setback from all property lines at least the height of the proposed monopole. The Facility will be set back 1,035’-1” from the northern property line, 774’-7” from the east, 23’-111” from the south, and 1,048’-9” from the west. (See Ex. 4 at C-1). (b) Monopole-type construction shall be required for any new wireless facility or wireless support structure. The Board may allow lattice-type construction when existing or planned residential areas will not be impacted and when the site is not adjacent to identified historic resources. x Applicant’s Response: The proposed Facility is a monopole type construction. (See Ex. 4 at C-3). (c) No more than two signs shall be permitted on any wireless facility or wireless support structure. Such signs shall be limited to 1.5 square feet in area and shall be posted no higher than 10 feet above grade. x Applicant’s Response: The Applicant proposes no signs other than safety signs required by the FCC. The Applicant will comply with this provision. (d) When lighting is required for a wireless facility or wireless support structure, dual lighting shall be utilized which provides daytime white strobe lighting and nighttime red pulsating lighting unless otherwise mandated by the Federal Aviation Administration or the Federal Communications Commission. Strobe lighting shall be shielded from ground view to mitigate illumination to neighboring properties. Equipment buildings and other accessory structures operated in conjunction with the wireless facility or wireless support structure 58860310.1 shall utilize infrared lighting and motion-detector lighting to prevent continuous illumination. x Applicant’s Response: Because the Facility is below 200 feet, no lighting is required. The Applicant does not propose any lighting on the Facility. (See Ex. 4 at C-1, n. 8). (e) Every wireless facility and wireless support structure shall be constructed with materials of a galvanized finish or be of a noncontrasting blue or gray unless otherwise mandated by the Federal Aviation Administration or the Federal Communications Commission. x Applicant’s Response: The monopole will be constructed using galvanized steel. (See Ex. 6). (f) Every wireless facility and wireless support structure shall be adequately enclosed to prevent access by persons other than employees of the service provider. Appropriate landscaping and opaque screening shall be provided to ensure that equipment buildings and other accessory structures are not visible from adjoining properties, roads, or other rights-of-way. x Applicant’s Response: The Facility will be enclosed by an eight-foot tall fence, included a seven-foot chain link fence, with an additional foot of barbed wire anticlimbing strands on top. The Facility will be locked, with no available public access. The base of the Facility will largely not be visible from adjacent parcels or rights-of-way. No landscaping is proposed. Mature trees on the Property will offer additional screening. (4) If the Board of Supervisors denies a conditional use permit under this subsection, the Board shall: (a) Provide applicant with a written statement of the reasons for the denial [Code of Virginia, § 15.2-2316.4:1(E)(1)]; x Applicant’s Response: The Applicant acknowledges this provision. (b) Identify any modifications of which the County is aware that would permit it to approve the conditional use permit [Code of Virginia, § 15.2-2316.4:1(E)(2)]; and x Applicant’s Response: The Applicant acknowledges this provision. (c) Have supporting substantial record evidence in a written record publicly released within 30 days of denial [Code of Virginia, § 15.2-2316.4:1(F)(2)]. x Applicant’s Response: The Applicant acknowledges this provision. 58860310.1 D. Maintenance of existing facilities and/or structures and replacement of existing facilities and/or structures within a six-foot perimeter with substantially similar or same size or smaller facilities and/or structures are exempt from fees and permitting requirements under this section. [Code of Virginia, § 15.2-2316.4:3(A)] x Applicant’s Response: This provision is inapplicable to this application. E. Any facility or structure permitted by this section that is not operated or used for a continuous period of 12 months shall be considered abandoned, and the owner of such facility or structure shall remove same within 90 days of receipt of notice from the Frederick County Department of Planning and Development. If the facility or structure is not removed within the ninety-day period, the County may remove the facility and a lien may be placed to recover expenses. [Code of Virginia, § 15.2-2316.4(B)(6); based on current County Code § 165-204.19B(7)]. x Applicant’s Response: The Applicant and landowners acknowledge this requirement. The Applicant and landowners executed an affidavit recognizing this provision and agreeing to remove abandoned telecommunications equipment if the Facility is not operated or used for a 12 month period. (See Ex. 7). VII. Conclusion The Applicant respectfully requests that Frederick County grant the requested conditional use permit. If you need further information, please contact our zoning attorney, Douglas Sampson at 410-332-8661 or Douglas.Sampson@saul.com. EXHIBIT 1 ][NQGI[jQ<Y<[Gdg]dgQIj<gsZ<jIgQ<YhN]g6IgQv][dIgh][[IY<[G]kjhQGI<OI[EQIh][Ys1hIGQhEY]hkgI]gGQhjgQDkjQ][]NjPQhZ<jIgQ<YQh[]jdIgZQjjIGj]<[sk[<kjP]gQvIGdIgh][h]gjPQgGd<gjQIhIrEIdjDsqgQjjI[<OgIIZI[j([LVWLQJ/7(&RYHUDJH EXHIBIT ][NQGI[jQ<Y<[Gdg]dgQIj<gsZ<jIgQ<YhN]g6IgQv][dIgh][[IY<[G]kjhQGI<OI[EQIh][Ys1hIGQhEY]hkgI]gGQhjgQDkjQ][]NjPQhZ<jIgQ<YQh[]jdIgZQjjIGj]<[sk[<kjP]gQvIGdIgh][h]gjPQgGd<gjQIhIrEIdjDsqgQjjI[<OgIIZI[j3URSRVHGZLWK([LVWLQJ/7(&RYHUDJH EXHIBIT 3 MILLENNIUM ENGINEERING, P.C. 42 Old Barn Drive West Chester, Pennsylvania 19382 Cell: 610-220-3820 www.millenniumeng.com Email: pauldugan@comcast.net June 17, 2026 MasTec Communications Group Attn: Joshua Schakola, Zoning Manager 10640 Iron Bridge Road, Ste 2B Jessup, MD 20794 Re: RF Design of Proposed Communications Facility Vertical Bridge Site Name: BUCK SAW, Proposed 195’ Monopole Vertical Bridge Site Number: US-VA-5382 Site Address: 1983 Siler Road, Winchester, VA 22603 (Frederick County) Latitude 39° 19' 10.45" N, Longitude 78° 14' 59.11" W (NAD83), G.E. 926’ +/- A.M.S.L. Dear Mr. Schakola, I have performed an analysis to provide an independent evaluation and design review of the wireless communications facility proposed by Vertical Bridge and Verizon Wireless at the above referenced property. As a registered professional engineer, I am under the jurisdiction of the State Registration Boards in which I am licensed to hold paramount the safety, health, and welfare of the public and to issue all public statements in an objective and truthful manner. The proposed communications facility consists of a proposed 195’ monopole at the above referenced property. The proposed anchor tenant on this structure is Verizon Wireless at an antenna centerline of 190 feet. Verizon Wireless is currently licensed by the Federal Communications Commission (FCC) to provide wireless communication services to Frederick County VA and a large number of other counties in Virginia and throughout the nation. The license specifies the frequency band and power levels at which these carriers are authorized to operate their system. The objectives of the proposed communications facility are to provide new and improved reliable 4G LTE and 5G wireless communication coverage to a rural northern section of Frederick County, VA centered in an area between the Towns of Cross Junction, Siler, and Cedar Grove, VA. This area includes portions of Siler Road, Chestnut Grove Road, Brush Creek Road, and Hunting Ridge Road to name a few. The facility will provide improved service to the rural community and other secondary adjoining roads in the community. The proposed facility will improve service and provide better handoff between the existing sites. The proposed facility will provide substantially improved in-building and data throughput speeds to wireless devices in the target area. The proposed new facility will also offload existing wireless traffic to the area providing capacity enhancements to existing facilities to the area. There are no other identified existing tall structures within the target area suitable for collocation in this target area which I could identify during my online site visit and search of online tower database tools. Page 1 of 7 The proposed facility location is particularly suited to fulfill the objectives of providing new reliable coverage to the area in which it will serve. The new coverage will enhance public safety to the community where there currently is marginal coverage. Figure 1 - Delorme Topo street map identifying the location of the proposed structure Figure 2 – Propagation map of existing coverage Figure 3 demonstrates the enhanced coverage of the proposed facility and demonstrates how the proposed site enhances coverage and capacity for low band 700 MHz. The proposed facility will not interfere with county public safety mobile receivers in the vicinity of these facilities. We have provided evidence for countless new proposed facilities that the Verizon Wireless facility will have no impact to public safety mobile receivers in the county. Any reduction in height from that proposed reduces the coverage footprint to the area the site is intended to serve as outlined in the objectives. Maintaining optimum signal level threshold in all areas is not possible or practical, but reaching the target level where possible and where the users are using the devices is a critical design criteria for most locations within the footprint of the area the facility is intended to serve. The design thresholds contain a margin of safety (aka fade margin) that should be maintained in the design for a higher level of reliability under all reasonable conditions. Also, the connection and download speed of broadband wireless internet services degrades dramatically at or below design thresholds. The proposed facility at this location would provide coverage to an area that spans approximately 2-3 miles in all directions. The proposed structure location is “particularly suited” to provide the necessary reliable service to this area. The demand for wireless infrastructure has escalated dramatically over time and the need for reliable service is extremely important for public safety and everyday use. In summary, upon consideration of the many factors discussed herein, it is my opinion that the proposed communications facility is particularly suited (both in location and minimum height) required for Verizon to provide reliable service to subscribers in a rural northern section of Frederick County VA that currently suffers from a significant gap in reliable wireless service. I am not aware of any other more feasible alternatives of providing reliable wireless service in this area. The proposed communications facility in this location is necessary for the efficient operation and provision of wireless services to the area for which it is proposed. Respectfully, Paul Dugan, P.E. Registered Professional Engineer Virginia License Number 36239 Page 2 of 7 Topo North America™ 10Data use subject to license.© DeLorme. Topo North America™ 10.www.delorme.comTNMN (10.5°W)0¼½¾10½11½2mikmScale 1 : 50,0001" = 4,166.7 ft Data Zoom 12-0Page 3 of 7 ][NQGI[jQ<Y<[Gdg]dgQIj<gsZ<jIgQ<YhN]g6IgQv][dIgh][[IY<[G]kjhQGI<OI[EQIh][Ys1hIGQhEY]hkgI]gGQhjgQDkjQ][]NjPQhZ<jIgQ<YQh[]jdIgZQjjIGj]<[sk[<kjP]gQvIGdIgh][h]gjPQgGd<gjQIhIrEIdjDsqgQjjI[<OgIIZI[j([LVWLQJ/7(&RYHUDJHPage 4 of 7 ][NQGI[jQ<Y<[Gdg]dgQIj<gsZ<jIgQ<YhN]g6IgQv][dIgh][[IY<[G]kjhQGI<OI[EQIh][Ys1hIGQhEY]hkgI]gGQhjgQDkjQ][]NjPQhZ<jIgQ<YQh[]jdIgZQjjIGj]<[sk[<kjP]gQvIGdIgh][h]gjPQgGd<gjQIhIrEIdjDsqgQjjI[<OgIIZI[j3URSRVHGZLWK([LVWLQJ/7(&RYHUDJHPage 5 of 7 DECLARATION OF ENGINEER Paul Dugan, P.E., declares and states that he is a graduate telecommunications consulting engineer (BSE/ME Widener University 1984/1988), whose qualifications are a matter of record with the Federal Communications Commission (FCC). His firm, Millennium Engineering, P.C., has been retained by MasTec Communications Group on behalf of Vertical Bridge and Verizon Wireless to perform a RF design review for justification of a proposed communications facility for suitability to meet the requirements of the County and the community for which it serves. Mr. Dugan also states that the calculations or measurements made in the evaluation were made by himself or his technical associates under his direct supervision, and the summary letter and exhibits associated with the foregoing document was made or prepared by him personally. Mr. Dugan is a registered professional engineer in the Jurisdictions of Pennsylvania, New Jersey, Delaware, Maryland, Virginia, New York, Connecticut, District of Columbia, West Virginia, Colorado, Iowa, Illinois, and Puerto Rico with 45 years of engineering experience. Mr. Dugan is also an active member of the Association of Federal Communications Consulting Engineers, the National Council of Examiners for Engineering, the National Society of Professionals Engineers, the Pennsylvania Society of Professional Engineers, and the Radio Club of America. Mr. Dugan further states that all facts and statements contained herein are true and accurate to the best of his own knowledge, except where stated to be in information or belief, and, as to those facts, he believes them to be true. He believes under penalty of perjury the foregoing is true and correct. ______________________________ Paul Dugan, P.E. Executed this the 17th day of June, 2026. Page 6 of 7 PAUL DUGAN, P.E. 42 Old Barn Drive West Chester, PA 19382 Cell: 610-220-3820 Email: paul.mepc@gmail.com Web Page: www.millenniumeng.com EDUCATION: Widener University, Chester, Pennsylvania Master of Business Administration, July 1991 Master of Electrical Engineering, December 1988 Bachelor of Science, Electrical Engineering, May 1984 PROFESSIONAL Registered Professional Engineer in the following jurisdictions: ASSOCIATIONS: Pennsylvania, License Number PE-045711-E New Jersey, License Number GE41731 Maryland, License Number 24211 Delaware, License Number 11797 Virginia, License Number 36239 West Virginia, License Number 20258 Connecticut, License Number 22566 New York, License Number 079144 District of Columbia, License Number PE-900355 Colorado, License Number PE.0065295 Illinois, License Number 062.077508 Iowa, License Number P29790 Puerto Rico, License Number 18946 Full member of The Association of Federal Communications Consulting Engineers (www.afcce.org) January 1999 to Present Full member of The National Society of Professional Engineers (www.nspe.org) and the Pennsylvania Society of Professional Engineers (www.pspe.org) June 2003 to Present Actively participate in Chester County ARES/RACES Amateur Radio (CCAR www.w3eoc.org) which prepares and provides emergency backup communications for Chester County Department of Emergency Services, March 2005 to Present Full member of The National Council of Examiners for Engineering (www.ncees.org) May 2001 to Present Full Member of The Radio Club of America (www.radio-club-of-america.org) December 2003 to Present Pennsylvania Real Estate License Number RS347405 Keller Williams 2/2019 to Present PROFESSIONAL Millennium Engineering, P.C., West Chester, Pennsylvania EXPERIENCE: Position: President, August 1999 to Present (www.millenniumeng.com) Verizon Wireless, Plymouth Meeting, Pennsylvania Position: Cellular RF System Design/Performance Engineer, April 1990 to August 1999 Communications Test Design, Inc., West Chester, Pennsylvania Position: Electrical Engineer, May 1984 to April 1990 PERSONAL: Date/place of birth: November 21, 1961, West Chester, Pennsylvania; United States Citizen Page 7 of 7 EXHIBIT 4 PlanSiteC-1Know what'sbelow.Callbefore you dig.verticalbridge DetailsSiteC-2Know what'sbelow.Callbefore you dig.verticalbridge Know what'sbelow.Callbefore you dig.verticalbridgeC-3Elevation &Antenna Details EXHIBIT 5 EXHIBIT 6 EXHIBIT 7 EXHIBIT EXHIBIT 9 MILLENNIUM ENGINEERING, P.C. 42 Old Barn Drive West Chester, Pennsylvania 19382 Cell: 610-220-3820 www.millenniumeng.com Email: pauldugan@comcast.net June 17, 2026 MasTec Communications Group Attn: Joshua Schakola, Zoning Manager 10640 Iron Bridge Road, Ste 2B Jessup, MD 20794 Re: RF Safety FCC Compliance of Proposed Communications Facility Vertical Bridge Site Name: BUCK SAW, Proposed 195’ Monopole Vertical Bridge Site Number: US-VA-5382 Site Address: 1983 Siler Road, Winchester, VA 22603 (Frederick County) Latitude 39° 19' 10.45" N, Longitude 78° 14' 59.11" W (NAD83), G.E. 926’ +/- A.M.S.L. Dear Mr. Schakola, I have performed an analysis to provide an independent determination and certification that the proposed Verizon Wireless communications facility at the above referenced property will comply with Federal Communications Commission (FCC) exposure limits and guidelines for human exposure to radiofrequency electromagnetic fields (Code of Federal Regulation 47 CFR 1.1307 and 1.1310). As a registered professional engineer, I am under the jurisdiction of the State Registration Boards in which I am licensed to hold paramount the safety, health, and welfare of the public and to issue all public statements in an objective and truthful manner. The proposed communications facility consists of a proposed 195’ monopole at the above referenced property. The proposed anchor tenant on this structure is Verizon Wireless at an antenna centerline of 190 feet. The proposed Verizon Wireless antenna configuration consists of 9 total antennas as follows: x (2) multiband directional antennas (one JMA Wireless MX04FHG865-HG low band and one Samsung MF3208d-25A mid band) per sector (total of 6 multiband antennas), at a centerline of 190’, azimuth of 0-120-240; transmitting from these antennas will be (1) 700 MHz LTE wideband channel, (1) 850 MHz LTE & 5G wideband channel, (1) 1900 MHz LTE wideband channel, (1) AWS 2100 MHz LTE wideband channel, and (2) AWS3 2100 MHz LTE wideband channels x (1) LS6 5G panel antenna (Samsung- MT6433-77A), (1) per sector (brings total antennas to 9) at a centerline of 190’; azimuths of 0-120-240; transmitting from these antennas will be (1) LS6 3700 MHz 5G wideband channel The following assumptions are made for reasonable upper limit radiofrequency operating parameters for the proposed facility due to the Verizon Wireless antennas alone: x (6) 700/850/1900/2100 MHz (LTE) multiband directional antennas x (3) 3700 MHz 5G directional antennas x (1) 700 MHz LTE wideband channel at 4X40W max power/face before cable loss/antenna gain Page 1 of 7 x (1) 850 MHz LTE/5G wideband channel at 4X40W max power/face before cable loss/antenna gain x (1) 1900 MHz LTE wideband channel at 4x40W max power/face before cable loss/antenna gain x (1) 2100 MHz LTE AWS wideband channel at 4X40W max power/face before cable loss/antenna gain x (2) 2100 MHz LTE AWS3 wideband channels at 4x40W max power/face before cable loss/antenna gain x (1) 3700 MHz 5G wideband channel at 320W max power/face before cable loss/antenna gain x The facility would be at or near full capacity during busy hour Using the far-field power density equations from FCC Bulletin OET 65, the power density at any given distance from the antennas is equal to 0.360(ERP)/R2 where R is the distance to the point at which the exposure is being calculated. The given equation is a conversion of the OET 65 power density equation for calculating power density given the distance in feet and the result in metric units (mW/cm2). This calculated power density assumes the location is in the main beam of the vertical pattern of the antenna. After making an adjustment for the reduction in power density due to the vertical pattern of the transmit antenna, the calculated ground level power density is well below 1 % of the FCC general population exposure limit at any distance from the antenna system of Verizon Wireless. The 700 MHz “Upper C Block” transmit frequencies (746-757 MHz), which Verizon Wireless is licensed by the FCC to operate, have an uncontrolled/general population MPE FCC limit of 497 PW/cm2. The 850 MHz (cellular) “B Band” transmit frequencies (880-894 MHz), which Verizon Wireless is also licensed by the FCC to operate, have an uncontrolled/general population MPE FCC limit of 587 PW/cm2. The 1900 MHz (PCS) “C Block” transmit frequencies (1975-1990 MHz), which Verizon Wireless is also licensed by the FCC to operate, have an uncontrolled/general population MPE FCC limit of 1000 PW/cm2 or 1 mW/cm2. The 2100 MHz (AWS) “B Block”, “F Block” and “J Block” transmit frequencies (2120-2130, 2145-2155, 2170-2180 MHz), which Verizon Wireless is also licensed by the FCC to operate, have an uncontrolled/general population MPE FCC limit of 1000 PW/cm2 or 1 mW/cm2. The 3700 MHz C-Band transmit frequencies have an uncontrolled/general population MPE FCC limit of 1000 PW/cm2 or 1 mW/cm2. Therefore, the exposure at ground level at any distance from the structure would be substantially below 1 % of the FCC general population exposure limits due to Verizon Wireless antennas alone. The extremely low ground exposure levels are due to the elevated positions of the antennas in the structure and the low power which these systems operate. See Figures 1 and 2 in the back of this report which discusses the relationship between height, proximity or distance, and orientation to level of electromagnetic field exposure. In summary, the proposed communications facility will comply with all applicable exposure limits and guidelines adopted by the FCC governing human exposure to radiofrequency electromagnetic fields (FCC Bulletin OET 65). Federal law (FCC Rule Title 47 CFR 1.1307 and 1.1310) sets the national standard for compliance with electromagnetic field safety. The FCC exposure limits are based on exposure limits recommended by the National Council on Radiation Protection and Measurements (NCRP) and, over a wide range of frequencies, the exposure limits developed by the Institute of Electrical and Electronics Engineers, Inc., (IEEE) and adopted by the American National Standards Institute (ANSI). Thus, there is full compliance with the standards of the IRPA, FCC, IEEE, ANSI, and NCRP. General Information on Electromagnetic Field Safety Verizon Wireless facilities transmit and receive low power electromagnetic fields (EMF) between base station antennas and handheld devices (smart phones, ipads, laptops, jetpacks, etc.). The radiofrequency energy from these facilities and devices is non-ionizing electromagnetic energy. Non-ionizing, unlike X-Rays or other forms of potentially harmful energy in the microwave region, is not cumulative over time nor can the energy change the chemical makeup of atoms (e.g. strip electrons from ions). “Non-ionizing” simply means that the energy is not strong enough to break ionic bonds. Safe levels of electromagnetic fields were determined by numerous worldwide organizations, such the International Committee for Non-Ionizing Radiation Protection, a worldwide multi-disciplinary team of Page 2 of 7 researchers and scientists studying the effects of non-ionizing radiofrequency energy such as that emitted by base stations or cell phones. The FCC did not arbitrarily establish their own standards but, rather adopted the recommendations of all leading organizations that set standards and research the subject such as the Institute of Electrical and Electronics Engineers (IEEE), American National Standards Institute (ANSI), and National Council on Radiation Protection and Measurements (NCRP). When Verizon Wireless, or any commercial wireless communications licensee, is located on an antenna structure such as a self-supporting lattice type tower, lattice tower, guyed tower, watertank, etc. the antennas are typically 10 meters or more above ground level (10 meters = 32.81 feet). With the relatively low power and elevated positions of the antennas on the structure with respect to ground level, the maximum ground level exposure can rarely approach 1 % of the applicable FCC exposure limit regardless of how many sets of antennas are collocated on the structure. For this reason, the FCC considers the facilities “categorically excluded” from routine evaluation at antenna heights above 10 meters (or above 32.81 feet). Categorical exclusion exempts a site from routine on- site evaluation. However, the facility is not excluded from compliance with the federal exposure limits and guidelines. The types of facilities used by Verizon Wireless typically elevated on antenna structures (away from access to close proximity, i.e. greater than 10 meters or 32.81 feet) simply cannot generate ground level exposure levels that approach the limits under any circumstances. From a regulatory perspective, the FCC has sole jurisdiction over the regulation of electromagnetic fields from all facilities and devices. The FCC has established guidelines and limits over emissions and exposure to protect the general public. The FCC also has certain criteria that trigger when an environmental evaluation must be performed. The criteria are based on distance from the antennas (accessibility) and transmit power levels. CONCLUSIONS: 1)The proposed Verizon Wireless communications facility will comply with electromagnetic field safety standards by a substantial margin (well below 1 %) in all publicly accessible areas. This includes the base of the proposed structure and any areas in proximity to the structure. 2)Verizon Wireless takes appropriate measures to ensure that all telecommunications facilities (including this proposed facility) comply with applicable exposure limits and guidelines adopted by the FCC governing human exposure to radiofrequency electromagnetic fields (FCC Bulletin OET 65). 3)In cases where such compliance exists, the subject of electromagnetic field safety is preempted. The Telecommunications Act of 1996 states that: “No state or local government or instrumentality thereof may regulate the placement, construction, and modification of personal wireless service facilities on the basis of the environmental effects of radio frequency emissions to the extent that such facilities comply with the [FCC’s] regulations concerning such emissions.” Telecommunications Act of 1996, § 332[c][7][B][iv]. Respectfully, Paul Dugan, P.E. Registered Professional Engineer Virginia License Number 36239 Page 3 of 7 FIGURE 1: Diagram of Electromagnetic Field Strength as a Function of Distance and Antenna Orientation 7KH DERYH GLDJUDP LOOXVWUDWHV WKH FRQFHSWXDO UHODWLRQVKLS RI GLVWDQFH DQG RULHQWDWLRQ WR GLUHFWLRQDOSDQHODQWHQQDVXVHGLQZLUHOHVVFRPPXQLFDWLRQV$WWKHEDVHRIWKHVWUXFWXUH[ WKHGLVWDQFH5LVDPLQLPXPZKHQWKHDQJOHRIWKHGLUHFWLRQRISURSDJDWLRQș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ș 'LUHFWLRQDO 3DQHO$QWHQQD 0DLQGLUHFWLRQRIVLJQDO SURSDJDWLRQLVGLUHFWHG RQWKHKRUL]RQDW DQWHQQDKHLJKW :LUHOHVV &RPPXQLFDWLRQV $QWHQQD 6WUXFWXUH *URXQG/HYHO Page 4 of 7 % General Population MPE vs. Distance 0 20 40 60 80 100 120 040801201602002402803203604004404805205606006406807207608008408809209601000Distance (ft)% General Population Maximum Permissible Exposure (MPE)VZW MPE Contribution FCC Limit FIGURE 2: Graph of MPE Contribution vs. Distance 7KH DERYH JUDSK UHSUHVHQWV WKH FRQWULEXWLRQ RI 9=: WR WKH FRPSRVLWHHOHFWURPDJQHWLF ILHOG H[SRVXUH OHYHO DW DQ\ GLVWDQFH IURP WKH EDVH RI WKH VWUXFWXUH7KH FRQWULEXWLRQRI9=:ZLOO UHPDLQZHOOXQGHURIWKH)&&JHQHUDOSRSXODWLRQPD[LPXPSHUPLVVLEOHH[SRVXUH03(DWDQ\ GLVWDQFHDVVKRZQ Page 5 of 7 DECLARATION OF ENGINEER Paul Dugan, P.E., declares and states that he is a graduate telecommunications consulting engineer (BSE/ME Widener University 1984/1988), whose qualifications are a matter of record with the Federal Communications Commission (FCC). His firm, Millennium Engineering, P.C., has been retained by MasTec Communications Group on behalf of Vertical Bridge and Verizon Wireless to perform power density measurements or calculations for an existing or proposed communications facility and analyze the data for compliance with FCC exposure limits and guidelines for human exposure to radiofrequency electromagnetic fields. Mr. Dugan also states that the calculations or measurements made in the evaluation were made by himself or his technical associates under his direct supervision, and the summary letter certification of FCC compliance associated with the foregoing document was made or prepared by him personally. Mr. Dugan is a registered professional engineer in the Jurisdictions of Pennsylvania, New Jersey, Delaware, Maryland, Virginia, New York, Connecticut, District of Columbia, West Virginia, Colorado, Iowa, Illinois, and Puerto Rico with 45 years of engineering experience. Mr. Dugan is also an active member of the Association of Federal Communications Consulting Engineers, the National Council of Examiners for Engineering, the National Society of Professionals Engineers, the Pennsylvania Society of Professional Engineers, and the Radio Club of America. Mr. Dugan further states that all facts and statements contained herein are true and accurate to the best of his own knowledge, except where stated to be in information or belief, and, as to those facts, he believes them to be true. He believes under penalty of perjury the foregoing is true and correct. ______________________________ Paul Dugan, P.E. Executed this the 17th day of June, 2026. Page 6 of 7 PAUL DUGAN, P.E. 42 Old Barn Drive West Chester, PA 19382 Cell: 610-220-3820 Email: paul.mepc@gmail.com Web Page: www.millenniumeng.com EDUCATION: Widener University, Chester, Pennsylvania Master of Business Administration, July 1991 Master of Electrical Engineering, December 1988 Bachelor of Science, Electrical Engineering, May 1984 PROFESSIONAL Registered Professional Engineer in the following jurisdictions: ASSOCIATIONS: Pennsylvania, License Number PE-045711-E New Jersey, License Number GE41731 Maryland, License Number 24211 Delaware, License Number 11797 Virginia, License Number 36239 West Virginia, License Number 20258 Connecticut, License Number 22566 New York, License Number 079144 District of Columbia, License Number PE-900355 Colorado, License Number PE.0065295 Illinois, License Number 062.077508 Iowa, License Number P29790 Puerto Rico, License Number 18946 Full member of The Association of Federal Communications Consulting Engineers (www.afcce.org) January 1999 to Present Full member of The National Society of Professional Engineers (www.nspe.org) and the Pennsylvania Society of Professional Engineers (www.pspe.org) June 2003 to Present Actively participate in Chester County ARES/RACES Amateur Radio (CCAR www.w3eoc.org) which prepares and provides emergency backup communications for Chester County Department of Emergency Services, March 2005 to Present Full member of The National Council of Examiners for Engineering (www.ncees.org) May 2001 to Present Full Member of The Radio Club of America (www.radio-club-of-america.org) December 2003 to Present Pennsylvania Real Estate License Number RS347405 Keller Williams 2/2019 to Present PROFESSIONAL Millennium Engineering, P.C., West Chester, Pennsylvania EXPERIENCE: Position: President, August 1999 to Present (www.millenniumeng.com) Verizon Wireless, Plymouth Meeting, Pennsylvania Position: Cellular RF System Design/Performance Engineer, April 1990 to August 1999 Communications Test Design, Inc., West Chester, Pennsylvania Position: Electrical Engineer, May 1984 to April 1990 PERSONAL: Date/place of birth: November 21, 1961, West Chester, Pennsylvania; United States Citizen Page 7 of 7 EXHIBIT NEPA Report March 27, 2026 Buck Saw US-VA-5382 1983 Siler Road Winchester, Frederick County, VA 22603 Trileaf # 780030 Prepared For:Prepared By: The Towers, LLC Trileaf Corporation 22 West Atlantic Avenue, Suite 310 303 International Circle, Suite 150 Delray Beach, FL 33444 Hunt Valley, MD 21030 NEPA Report Summary Site Name/Location: Buck Saw / US-VA-5382 / Trileaf #780030 1983 Siler Road, Winchester, Frederick County, VA 22603 Latitude: 39° 19’ 10.45” N, Longitude: 78° 14’ 59.11” W Project Description: The Towers, LLC proposes to construct a new 195-foot-tall monopole communications tower, with an overall height of 199 including attachments, and associated ground-based equipment within a new 50-foot by 50-foot fenced compound. Access and utilities will be granted via a new 30-foot-wide easement, utilizing an existing gravel access drive directly south of the proposed lease area, extending approximately 0.22 miles generally east to connect with Siler Road. 1. Is the facility located in an officially designated wilderness area? [47 CFR 1.1307 (a)(1)] Yes No Data Sources:Site Reconnaissance Review of 7.5-Minute USGS Topographic Map (Appendix B) National Wilderness Preservation System Website (www.wilderness.net) 2. Is the facility located in an officially designated wildlife preserve? [47 CFR 1.1307 (a)(2)] Yes No Data Sources:Site Reconnaissance Review of 7.5-Minute USGS Topographic Map (Appendix B) US Fish & Wildlife Service National Wildlife Refuge System Map (Appendix B) 3. Will the facility: (i) affect listed threatened or endangered species or designated critical habitats; or (ii) jeopardize the continued existence of any proposed endangered or threatened species; or is it likely to result in the destruction or adverse modification of proposed critical habitats, as determined by the Secretary of the Interior pursuant to the Endangered Species Act of 1973? [47 CFR 1.1307 (a)(3)] Yes No Data Sources:Site Reconnaissance Review of US Fish & Wildlife Service Critical Habitat and Federally Listed Endangered Species (Appendix D) Informal Biological Assessment (Appendix D) Virginia Department of Wildlife Resources (DWR) Virginia Department of Conservation and Recreation (DCR) 4. Will the facility affect districts, sites, buildings, structures, or objects significant in American history, architecture, archeology, engineering or culture, that are listed, or are eligible for listing on the State or National Registers of Historic Places? [47 CFR 1.1307 (a)(4)] Yes No Data Sources:Site Reconnaissance Cultural Resource Investigation (Appendix E) State Historic Preservation Office Section 106 Review (Appendix E) 5. Will the facility affect an Indian religious site? [47 CFR 1.1307 (a)(5)] Yes No Data Sources:Site Reconnaissance Correspondence with Native American Tribes via FCC TCNS (Appendix F) Review of Bureau of Indian Affairs Indian Reservation Map (Appendix B) 6. Will the facility be located in a "floodplain", and not be placed at least one (1) foot above the base flood elevation of the floodplain? [47 CFR 1.1307 (a)(6)] Yes No Data Sources:Review of FEMA Flood Map (Appendix B) 7. Will the construction of the facility involve significant change in surface features (e.g. wetland fill, deforestation, or water diversion)? [47 CFR 1.1307 (a)(7)] Yes No Data Sources:Site Reconnaissance Review of 7.5-Minute USGS Topographic Map (Appendix B) Review of US Fish & Wildlife Service National Wetlands Inventory Map (Appendix B) Review of USDA NRCS Web Soil Survey Map (Appendix B) 8. Will the antenna tower or supporting structure be equipped with high intensity white lights and located in a residential neighborhood, as defined by the applicable zoning law? Yes No Data Sources:Construction Drawings (Appendix A) It is assumed that clients will not utilize high intensity white lights in residential areas 9. Will the facility cause human exposure to levels of radiofrequency radiation in excess of Commission-adopted guidelines? Yes No Data Sources:Construction Drawings (Appendix A) and/or interviews with clients Clients will comply with the established criteria regarding radio frequency exposure limits, as established at the time of this report March 27, 2026 Signature Date Elsie Boone Trileaf Corporation Name Company 1 NEPA Report ,QWURGXFWLRQ Trileaf Corporation (Trileaf) completed a NEPA Review for the above The Towers, LLC site. The purpose of a NEPA Review is to comply with the National Environmental Policy Act (NEPA) of 1969. Trileaf performed extensive research by consulting with appropriate state and federal agencies and reviewing readily available published lists, files, data, and maps to provide our clients with a complete NEPA document. The following summarizes the scope of work Trileaf performed in accordance with the Federal Communications Commission’s (FCC’s) rules implementing NEPA (47 CFR Section 1.1307 (a) (1) through (8) to determine whether any of the below listed FCC special interest items would be affected by the proposed action. Referenced materials are included as attachments, where applicable and available. The Towers, LLC proposes to construct a new 195-foot-tall monopole communications tower, with an overall height of 199 including attachments, and associated ground-based equipment within a new 50-foot by 50-foot (2,500 square feet) fenced compound within an overall 60-foot by 60-foot (3,600 square feet) lease area. Access and utilities will be granted via a new 30-foot-wide easement, utilizing an existing gravel access drive directly south of the proposed lease area, extending approximately 0.22 miles generally east to connect with Siler Road.The proposed project site is located at approximately 1983 Siler Road,Winchester, Frederick County, VA 22603 at 39° 19’ 10.45” North latitude and 78° 14’ 59.11” West longitude. During Trileaf’s site reconnaissance, it was observed that the site is currently agricultural land, and the areas surrounding the site are currently predominately agricultural and forested land. :LOOWKHIDFLOLW\EHORFDWHGLQDQRIILFLDOO\GHVLJQDWHGZLOGHUQHVVDUHD" Trileaf reviewed the USGS 7.5-minute topographic map titled “White Hall” Quadrangle, VA and information from the National Wilderness Preservation System (NWPS) (http://www.wilderness.net)to determine if the site is located within an officially designated wilderness area. There are currently 24 officially designated wilderness areas in the State of VA. The closest wilderness area to the project site is the Shenandoah Wilderness Area, which is located approximately 30 miles south of the project site. Based on this review, the project site is not located within an officially designated wilderness area. :LOOWKHIDFLOLW\EHORFDWHGLQDQRIILFLDOO\GHVLJQDWHGZLOGOLIHSUHVHUYH" Trileaf reviewed the USGS 7.5-minute topographic map titled “White Hall” Quadrangle,VA, and information from the National Wildlife Refuge (NWR) System (http://www.fws.gov/refuges) to determine if the site is located within an officially designated wildlife preserve or refuge. Based on this review, the project site is not located within an officially designated wildlife preserve or refuge. A copy of the NWR System map is located in Appendix B. 2 :LOOWKHIDFLOLW\LDIIHFWOLVWHGWKUHDWHQHGRUHQGDQJHUHGVSHFLHVRUGHVLJQDWHGFULWLFDOKDELWDW RULLOLNHO\MHRSDUGL]HWKHFRQWLQXHGH[LVWHQFHRIDQ\SURSRVHGHQGDQJHUHGRUWKUHDWHQHGVSHFLHV RUOLNHO\UHVXOWLQWKHGHVWUXFWLRQRUDGYHUVHPRGLILFDWLRQRISURSRVHGFULWLFDOKDELWDWVDV GHWHUPLQHGE\WKH6HFUHWDU\RIWKH,QWHULRUSXUVXDQWWRWKH(QGDQJHUHG6SHFLHV$FWRI" The Endangered Species Act (ESA) of 1973 (16 U.S.C. §§ 1536), as amended, protects endangered and threatened species and the ecosystems upon which they depend. As interpreted and implemented by 50 CFR 402, Section 7 of the ESA directs Federal agencies, in consultation with and with the assistance of the Secretary of the Interior, to utilize their authorities to further the purposes of the ESA. It also requires every Federal agency to ensure that any action it authorizes, funds or carries out, is not likely to jeopardize the continued existence of any endangered or threatened species or results in the destruction or adverse modification of critical habitat. On January 14, 2026, a Trileaf representative visited and photographed the project site to conduct an Informal Biological Assessment (IBA). In addition, Trileaf reviewed the United States Fish and Wildlife Service (USFWS) critical habitat information and determined that the site is not located within designated critical habitat. Based on the results of our assessment, impacts to listed and/or proposed, threatened and endangered species or critical habitats resulting from the proposed action are not anticipated. Therefore, Trileaf determined that the proposed project site will have a determination of “may affect; not likely to adversely affect” on the species, their habitats, or designated critical habitats. Copies of the IBA and critical habitat review are located in Appendix D. )('(5$/ On January 16, 2026, Trileaf reviewed the Section 7 Consultation guidance set forth by the USFWS – Virginia Ecological Services Field Office. Trileaf determined the project would have a determination of “may affect; not likely to adversely affect” on listed of proposed threatened or endangered species or critical habitats. According to guidance from USFWS – Virginia Ecological Field Office, the Service will notify within 30 calendar days if they determine the proposed action does not meet the criteria for a “may affect, not likely to adversely affect” (NLAA) determination. If a response is not received within that timeframe, the project may proceed with NLAA concurrence provided in the Northeast determination key. As of the date of this report, a response from USFWS negating Trileaf’s NLAA determination has not been received. Therefore, as Trileaf determined the project is not likely to adversely affect listed or proposed threatened or endangered species or critical habitats, no further consultation with the USFWS was required. A copy of the USFWS’ Section 7 guidance is located in Appendix D. 67$7( On February 10, 2026, Trileaf submitted project information to the VA DCR and VA DWR. On March 6, 2026, Trileaf received a response letter from VA DCR indicating that “natural heritage resources have not been documented within the submitted project boundary including a 100-foot buffer.” Based on current responses from the VA DWR, DWR is “unable to review and provide comments on projects that are not currently involved in one of the regulatory review processes for which they are a formal consulting agency.” As they are not a formal consulting agency for the purposes of this project, a response will not be received. A copy of the VA DCR and DWR responses are located in Appendix D. 7KH9$'&5LQGLFDWHVWKDWDVQHZDQGXSGDWHGLQIRUPDWLRQLVFRQWLQXDOO\DGGHGWR%LRWLFVWKH SURMHFWVKRXOGEHUHVXEPLWWHGLIWKHVFRSHRIWKHSURMHFWFKDQJHVDQGRUVL[PRQWKVSDVVHVIURP WKHOHWWHUGDWHEHIRUHWKHLQIRUPDWLRQLVXWLOL]HG0DUFK 3 :LOOWKHIDFLOLW\DIIHFWGLVWULFWVVLWHVEXLOGLQJVVWUXFWXUHVRUREMHFWVVLJQLILFDQWLQ$PHULFDQ KLVWRU\DUFKLWHFWXUHDUFKHRORJ\HQJLQHHULQJRUFXOWXUHWKDWDUHOLVWHGRUDUHHOLJLEOHIRUOLVWLQJLQ WKH1DWLRQDO5HJLVWHURI+LVWRULF3ODFHV" Trileaf referred to Section 106 of the National Historic Preservation Act (NHPA) of 1966 as amended (16 U.S.C. §§ 470 et seq.), the Advisory Council on Historic Preservation (ACHP) implementing regulations (36 CFR Part 800) and the Nationwide Programmatic Agreement (NPA) for Review of Effects on Historic Properties for Certain Undertakings Approved by the Federal Communications Commission dated September 2004 to determine if the project site is contained in, on, or within the viewshed of a building, site, district, structure, or object, significant in American history, architecture, archaeology, engineering, or culture, that is listed, or eligible for listing on the National Registers of Historic Places, or located in or on an Indian Religious Site. A search of the National Historic Landmarks (NHL), National Register of Historic Places (NRHP), State Historic Preservation Office (SHPO) files, and a field survey was conducted by Mr. Jason Flay, Secretary of the Interior-qualified Archaeologist contracted by Trileaf through Acheulean Consulting, to identify any cultural resources within the area of direct effects and within a 0.75-mile radius for visual effects. It was determined that there were no historic properties identified within the Area of Potential Effects (APE) for direct effects, and no historic properties identified within the APE for visual effects. Additionally, the identification process did not locate archaeological materials that would be directly affected, or sites that are of cultural or religious significance to Tribes/NHOs. Documentation of these reviews was submitted to the SHPO via Form 620 on February 4, 2026. The SHPO concurred that the proposed undertaking would have no direct or visual effects on historic properties in a response letter dated February 26, 2026. A copy of the SHPO concurrence letter, Form 620, and associated documents are located in Appendix E. On January 13, 2026, Winchester Planning and the Winchester-Frederick County Historical Society were notified of the proposed project and invited to comment on the proposed project’s potential effect on Historic Properties as well as indicate whether they are interested in consulting further on the proposed project. Additionally, a legal notice regarding the proposed telecommunications tower construction was posted in the Northern Virginia Daily on January 16, 2026. No comments from the local government, historical society, or legal notice have been received by Trileaf. Copies of the correspondence and legal notice are located in Appendix E. 1$7,21$/6&(1,&75$,/6 On October 5, 1999, the Cellular Telecommunications Industry Association, Personal Communications Industry Association, Appalachian Trail Conference, American Hiking Society, and representative Managing and Supporting Trails Organizations (MSTOs) for the National Scenic Trails signed a resolution for the Siting of Wireless Telecommunications Facilities Near National Scenic Trails. This resolution states that if a wireless telecommunications or site management company plans a new or significantly expanded facility within one mile of a National Scenic Trail, it will notify the non-profit group that supports the trail. In order to determine if the site is located within one mile of a National Scenic Trail, Trileaf reviewed information from the National Park Service (NPS) National Trails System created by the National Trails System Act of 1968. Based on this review, the project site is not located within one (1) mile of a National Scenic Trail. A copy of the trails map is located in Appendix B. 4 :LOOWKHIDFLOLW\DIIHFWDQ\,QGLDQUHOLJLRXVVLWHV" Trileaf referred to Section 106 of the National Historic Preservation Act (NHPA) of 1966 as amended (16 U.S.C. §§ 470 et seq.), the Advisory Council on Historic Preservation (ACHP) implementing regulations (36 CFR Part 800) and the Nationwide Programmatic Agreement (NPA) for Review of Effects on Historic Properties for Certain Undertakings Approved by the Federal Communications Commission dated September 2004 to determine if the project site is located in or on an Indian Religious Site. On January 12, 2026, Trileaf submitted project information through the Tower Construction Notification System (TCNS) to the FCC who initiated contact with the tribes on January 16, 2026. As of March 27, 2026, all tribes have confirmed clearance either directly or by default via the FCC referral process. Trileaf determined that the subject Property is not located on or near a Native American Religious or Sacred Site. However, if archaeological remains or resources are unearthed during construction activities, Trileaf recommends that the client stop construction and notify our office immediately. Tribal consultation documentation and associated correspondence is located in Appendix F. :LOOWKHIDFLOLW\EHORFDWHGLQDIORRGSODLQ DQGQRWEHSODFHGDWOHDVWRQHIRRWDERYHWKHEDVH IORRGHOHYDWLRQRIWKHIORRGSODLQ" Trileaf reviewed the relevant Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM) Panel #51069C0125E, dated January 29, 2021, to determine if the project was located within the 100-year floodplain. Trileaf determined that the property is located in Zone X, areas determined to be outside the 500-year floodplain. Therefore, the project site is not located within a 100-year floodplain. A copy of the FEMA FIRM showing the project site location is located in Appendix B. :LOO WKHFRQVWUXFWLRQRIWKHIDFLOLW\LQYROYHVLJQLILFDQWFKDQJHLQVXUIDFHIHDWXUHVHJZHWODQG ILOOGHIRUHVWDWLRQRUZDWHUGLYHUVLRQ" Trileaf determined through site reconnaissance, review of the relevant USGS 7.5-minute topographic map titled “White Hall” Quadrangle, VA, and review of the relevant USFWS National Wetlands Inventory Map (http://www.fws.gov/wetlands/Data/Mapper.html) that there are no federally designated wetlands on or in the immediate vicinity of the proposed project site. Trileaf’s site assessment did not reveal any evidence of potential wetlands or hydrophytic vegetation located on or in the immediate vicinity of the project site. Additionally, a review of the United States Department of Agriculture (USDA) Soil Survey (http://websoilsurvey.sc.egov.usda.gov) did not indicate hydric soils at the project site. Based on this review, no designated wetland areas were located within the vicinity of this project and no significant changes in surface features resulting from the proposed undertaking are anticipated. Copies of the soil map and wetlands map are located in Appendix B. =RQLQJ+LJK,QWHQVLW\:KLWH/LJKWV5DGLR)UHTXHQF\ As a standard practice, The Towers, LLC does not construct facilities requiring high intensity white lights that are to be located in residentially zoned neighborhoods. According to The Towers, LLC, high intensity white lights will not be used for towers less than 500 feet in height. 5 5DGLR)UHTXHQF\ FCC licensees transmitting from antennas mounted on The Towers, LLC owned antenna structures will comply with the established criteria regarding radio frequency exposure limits in accordance with the Second Report and Order, as well as the FCC Code of Federal Regulations [47 CFR § 1.1307, § 1.1310] published at the time of this report. &RQFOXVLRQ A NEPA Review of the proposed undertaking was performed by Trileaf Corporation in conformance with the FCC rules and regulations for implementing NEPA; 47 CFR 1.1301 to 1.1319. Based on data obtained during the Site visit, consultation with government agencies, and a review of readily available information from other sources, the preparation and filing of an Environmental Assessment will not be required and no further NEPA-related action is required for the proposed undertaking. 4XDOLILFDWLRQV Elsie Boone Assistant Project Manager Brooks Thacker Group Manager EXHIBIT