Loading...
HomeMy WebLinkAbout41-26 applicationSITE PLAN APPLICATION PACKAGE Frederick County, Virginia Department of Planning and Development 107 North Kent Street, 2nd Floor Winchester, Virginia 22601 Telephone: (540) 665-5651 Website: www.fcva.us (Revised March 2026) 2 TABLE OF CONTENTS APPLICATION FOR SITE PLAN Site Plan Instructions ................................................................................................................... 4 Steps for Site Plan Approval ......................................................................................................... 5 Site Plan Application ................................................................................................................... 8 Site Plan Application Checklist .................................................................................................. 10 Site Plan Contents Checklists .................................................................................................... 11 Request for Review Agency Comments………………………………………………………………...15 Frederick County Public Works Review Checklist …………………………………….………16 Frederick County Fire Marshal Requirements for Site Plan Submittals………………………20 Frederick Water Review Checklist ..……………………………………………………………28 Virginia Department of Transportation Commercial Entrance Site Plan Checklist………….37 Fee Schedule ........................................................................................................................ …39 3 Please read all instructions carefully. If you have any questions regarding this application or your site plan, please feel free to contact us at (540) 665-5651. 4 SITE PLAN INSTRUCTIONS When is a site plan required? A site plan (or minor site plan) must be submitted to and approved by the county if new construction or additions to existing sites are proposed in the following zoning districts: A site plan is also required for the following types of development: (1)Any use in the business or industrial zoning districts, the EM Extractive Manufacturing District, the MS Medical Support District, or the HE Higher Education District. (2)Any nonresidential use(s) with automobile parking spaces. (3)Any of the following residential use(s) not required to submit a subdivision design plan for approval: Multiplexes, townhouses/back-to-back townhouses, garden apartments, age- restricted multifamily residential buildings, other allowed multifamily uses and mobile home parks. (4)Convalescent and nursing homes. (5)Public and semipublic uses and buildings. (6)Required landscaped buffers and landscaped screens. (7)Required recreational facilities. (8)Any parcel of land proposed to contain more than one dwelling unit, except those residential units allowed as agricultural accessory uses. (9)Non-residential uses permitted in the RP, R4 and R5 Zoning Districts. (10)The use, change of use or construction of any improvement or facility that is to be reviewed by the Planning Commission to determine conformance with the Comprehensive Plan under §15.2-2232 of the Code of Virginia. Will a proposed addition be considered as a “minor” or “major” site plan? If the proposed addition(s) or modification(s) do not alter the intensity of the primary use, does not exceed 10,000 square feet of building or disturbed area, and does not increase the existing structure area by 20%, then the site plan will be considered “minor”. B-1 Business Neighborhood District RP Residential Performance District B-2 Business General District R4 Residential Planned Community District B-3 Industrial Transition District R5 Residential Recreational Community District TM Technology-Manufacturing Park District MH-1 Mobile Home Community District M-1 Light Industrial District HE Higher Education District M-2 Industrial General District MS Medical Support District EM Extractive Manufacturing 5 STEPS FOR APPROVAL OF A SITE PLAN 1.Site Plan Preparation The site plan must be prepared by a certified engineer, architect, or surveyor licensed in the Commonwealth of Virginia, and shall meet all the requirements of the Frederick County Code. Site plans must show all the information specified on the site plan checklists. 2.Technical Review Committee The Technical Review Committee (TRC) allows applicants to discuss site plan concepts and design issues with all relevant review agencies prior to a formal submission of a site plan application. Applicants are not required to meet with the TRC; however, the TRC serves as a mechanism that helps streamline the site plan review process by providing instant feedback on potential design issues. The TRC is open to anyone who wishes to present a concept or site plan design; however, meeting with the TRC does not substitute for individual agency reviews that are necessary for a site plan approval. The Technical Review Committee meets every first and third Thursday of each month. The cut-off date for all agenda items is the close of business the Thursday prior to the meeting. Applicants must contact Planning and Development to be placed on the first available agenda. 3.Agency Comments Review and Application Submission A.Agency Comment Period: Planning and Development will determine which agency review comments are required after receiving the site plan application, supporting materials (digital and hard copy), and fee. Planning staff will distribute digital copies of all application materials and a comment sheet to the required review agencies for comments electronically. Comments are to be returned to Planning electronically, and will be compiled with other agency comments, including Planning and Development, and distributed to the applicant within 30 days. Typical Review Agencies (varies based on scope and location): •Frederick County (FC) Public Works •FC Building Inspections •FC Fire Marshal •FC Parks and Recreation •FC Geographic Information Systems (GIS) •Frederick County Public Schools (FCPS) •Frederick Water •Virginia Department of Transportation (VDOT) •Virginia Department of Health (VDH) 6 •Winchester Regional Airport •City of Winchester •Town of Middletown •Town of Stephens City Each applicable review agency will review the site plan to determine if it has all the necessary information. If information is missing or incomplete, the review agency will contact the applicant directly and copy Planning and Development staff. The site plan checklist included in this package specifies the information required to be shown on or attached to a site plan. Approval must be received from the applicable review agencies prior to the site plan being approved by the Planning Department. Subsequent reviews may be required to ensure agency comments are fully addressed. Resubmissions will be provided to all agencies regardless of approval status to ensure agency approval remains “valid.” B.Application Submission and Review Fee: The submission of a site plan application begins when the Department of Planning and Development receives a site plan for comment review. At the time the Department of Planning and Development accepts a site plan for comment, the applicant must also submit a completed application form (pages 8 and 9) and the review fee. Review fees are specified on the attached Development Review Fee Schedule. Frederick Water has a separate review fee. See page 36. 4.Final Site Plan Approval A site plan will receive final approval once all required information and approved review agency comments are submitted to the Department of Planning and Development. All final site plans are approved administratively by the Zoning Administrator. A.Three (3) full size sets of final plans must be submitted to the Planning Department for final approval. One (1) set will be returned to the applicant. B.A PDF copy of the final site plan must be submitted with the final sets. 5.Construction Activity Limited construction activity is permitted prior to final site plan approval. This allows applicants to move ahead and prepare the site while approval is pending. Applicants may apply for the following permits: A.Land Disturbance Permit: This permit is issued by the Frederick County Department of Public Works once a grading plan has been submitted and reviewed by the Frederick County Engineer. The cost of this permit is indicated on the attached Development Review Fee Schedule. The County Engineer may be contacted Monday through Friday from 8:00 a.m. to 4:00 p.m. at (540) 665-5643. 7 B.Footing Foundation Permit: Applicants may apply for a footing foundation permit prior to final site plan approval. This permit may be obtained at the applicant’s risk. Any revisions specified by the final site plan may affect footing foundations already set in place. Two copies of an engineered footing foundation drawing shall be submitted to the Department of Building and Inspections. The Plans Review Specialist will review and approve a Footing Foundation Permit once adequate footing details, basement details (if necessary), and groundwork details are provided. The Plans Review Specialist can be contacted Monday through Friday from 8:00 a.m. to 4:00 p.m. at (540) 665-5650. 6.Certificate of Occupancy Once all site development is complete, the applicant must contact the Planning and Development Department to schedule an inspection of the site. The inspection is necessary to ensure that all requirements shown on the approved site are complete. A final or temporary certificate of occupancy permit may be issued once the required improvements are complete or adequately bonded with Frederick County. Temporary certificates of occupancy are valid for 30 days and must be renewed. 7.Bonding If all improvements depicted on an approved site plan have not been completed the property owner can bond the incomplete items if deemed appropriate by the Zoning Administrator. When the improvements are permitted to be bonded the applicant must complete the Monetary Guaranty Estimate Worksheet. This worksheet needs to be completed and affixed with an engineer’s seal and provided to the Planning Department for review. Once the review of the worksheet has been completed and the amount approved by the County, the developer/owner will need to establish an Irrevocable Letter of Credit, a Performance Bond or cash for the monetary guarantee. 8 SITE PLAN APPLICATION 1.Project Title: _______________________________________________________________ 2.Project Description: ___________________________________________________________ __________________________________________________________________________ 3.Location of Property: _____________ ____________________________________________________ (Street Address): _________________ ___________________________________________________ ___________________________________________________________________________________ 4.Applicant/Designer: Name: _____________________________ Telephone: ___________________ Primary Point of Contact: ________________________ Email: ___________________ Address: _______________________________________________________________ 5.Property Owner (if different than above): Name: _____________________________ Telephone: ___________________ Address: ______________________________________________________________ 6.Property Information: a.Property Identification Number(s): ________________________________________ b.Total acreage of the parcel to be developed: ________________________________________ c.Total disturbed area of the parcel: ________________________________________ d. Present Use(s): ________________________________________ e.Proposed Use(s): ________________________________________ f.Magisterial District(s) ________________________________________ - Office Use Only- Date Application Received: _________________ Application #: __________________ Fees Received: _____________________ Receipt #: __________________ Initials:______________