Loading...
HomeMy WebLinkAboutPlanning Response 117 East Piccadilly Street, Suite 200 T: 540-667-2139 www.pennoni.com Winchester, VA 22701 Page 1 of 2 February 26, 2026 Ms. Amy Feltner Planner County of Frederick Department of Planning and Development 107 North Kent Street, Suite 202 Winchester, VA 22601 RE: SP #52-25 – Carmeuse Eastern Berm Ms. Feltner, We are in receipt of your comments dated February 3, 2026, for the review of SP #52-25 – Carmeuse Eastern Berm. We have addressed your comments and our specific responses are noted below. 1. Reference Number. Add the site plan reference number #52-25 RESPONSE: Site Plan number has been provided. See sheet CS0000. 2. Excavation Notes. Excavation shall be no closer than 100 feet from any property zoned RA, RP, R4, R5 or MH1. No excavation shall be located closer than 200 feet from any dwelling or platted residential subdivision. (§165-608.05(B)(2)). Excavation shall be no closer than 100 feet from any road, street, or highway right-of-way. The Board of Supervisors may reduce the required front setback for excavation to 50 feet if it determines that, through the use of measures, such as landscaping or screening, the effective protection afforded to adjacent properties has not been reduced. (§165- 608.05(A)(2)). Provide these notes on the coversheet and distances, measured in feet, to the site plan. RESPONSE: Notes have been provided and setbacks have been identified on the plan. See sheets CS0000 & CS1000 thru CS2201. 3. Machinery Notes. All crushing or screening machinery shall be set back at least 300 feet from any property boundary. (165-608.05(B)(3). Provide these notes on the coversheet and the distances, measured in feet, to the site plan. RESPONSE: Notes have been provided and setbacks have been identified on the plan. See sheets CS0000 & CS1000 thru CS2201. 4. Additional Requirements. All uses in the EM District must conform with all state, federal, and local regulations. All mining operations shall submit to the Zoning Administrator a copy of the operations plan required by state agencies with the required site plan. Provide the necessary documentation from the Department of Mining & Minerals. February 26, 2026 SP #52-25 – Carmeuse Eastern Berm FCP&D – Ms. Amy Feltner Page 2 of 2 RESPONSE: The current Operations plan has been provided with the resubmission. 5. Photometric Plan. A photometric plan is required to be provided that includes lighting levels (foot candles) at the property line. Additionally, a note shall be added stating all outdoor lighting shall conform to §165-201.07 and be designed, shielded, aimed, located and maintained to shield adjacent properties and shall be full-cutoff fixtures. (§165-201.07(B)(1). If no lighting is proposed provide a note that states so. RESPONSE: A note has been provided as no lighting is proposed or required. See sheet CS0000. 6. Agency Approvals. Comment sheets (approvals) are required from the following agencies: the Frederick County Inspections Department, the Frederick County Fire Marshal, Virginia Department of Transportation, Frederick Water, and the Frederick County Engineer (Public Works). RESPONSE: Noted and provided with submission. If you have any comments or questions, please feel free to contact us. Thank you. Dan Brzezynski, PE Project Manager Pennoni 117 East Piccadilly Street | Winchester, VA 22601 Direct: +1 540-771-2090 www.pennoni.com | DBrzezynski@Pennoni.com