Loading...
HomeMy WebLinkAboutmisc correspondence LETTER OF TRANSMITTAL DATE: 12.05.2025 JOB NO. CRMUL25002 TO: Frederick County Dept. of Planning & Development 107 North Kent Street, 2nd Floor Winchester, VA 22601 ATTENTION: Plans Review – Amy Feltner FROM: Dan Brzezynski RE: Carmeuse Eastern Berm Project Site Plan WE ARE SENDING YOU ☒ Attached Via: the following items: ☐ Plans ☐ COPIES DESCRIPTION 1 Site Plan – Carmeuse Eastern Berm Project THESE ARE TRANSMITTED as checked below: ☒ For Review and Comments ☐ For Your Approval ☐ For Your Use ☐ As Requested REMARKS COPY TO File RECEIVED BY 117 East Piccadilly Street Winchester, VA 22601 Tel: 540 – 667 - 2139 Fax: 540 – 665 - 0493 Account #: 8027519 As of: 12/2/2025 9:21:32 PM PID: 27519 Frederick County Report Property Owner Name:O-N MINERALS (CHEMSTONE) COMPANY D/B/A CARMEUSE LIME & STONE INC Mailing Address: 6920 POINTE INVERNESS WAY STE 301 FORT WAYNE , IN 46804 7926 Parcel Use:COMMERCIAL/INDUSTRIA - VAC Magisterial District:05 - STONEWALL Property Information Physical Address:0  BRUCETOWN RD  Tax Map #:34/ A/ 11/ / Size (Acres):98.72 Legal Description:98.72 ACRES Utilities Year Gas Electric Sewer Water Utilities Street Type Lot Type 2025 No Electric None None N/A Gravel N/A Current Assessment Year Land Improvements Land Use Value Total 2025 $681,200 $0 N/A $681,200 Land Land Type Size Units Unit Price Appraised Commercial 98.72 ACRES 6,900.00 681,200.00 Total 98.72 681,200 Deed Transfers Deed Date Book Page Deed Type Est. Sale Owner 11/3/2022 13329 0 LR $5,922,000 O-N MINERALS (CHEMSTONE) COMPANY 11/1/1995 848 606 LR $0 FREDERICK LAND COMPANY LC 1/1/1900 0 0 LR $0 FIRST NATIONAL BANK OF YORK Not a Legal Document Subject to terms and conditions www.actDataScout.com Map  1 Carmeuse Americus – Winchester Plant 2021 Current legal company name O-N Minerals (Chemstone) Company Operations Narrative: The mining operation, in Clearbrook, Virginia, started in 1960. The Global Stone Corporation purchased the operation in 1999. The mining method is an open pit quarry operation. Stone is mined from three different seams: Lenoir – low calcium Mosheim – high calcium Beekmantown – low calcium A contract driller and blaster is utilized in the pit. Carmeuse provides equipment for the rest of the operation – loading, hauling, crushing, and sizing. There is one primary crushing plant. There is a high calcium sand plant for manufacturing glass sand and feeding calcium. High calcium limestone is also process through our vertical lime kilns to manufacture a pebble lime product. Furthermore, there is an aggregate plant that manufactures various sized limestone aggregate. W&L of Virginia has an asphalt plant located on the property. Frederick County of Virginia has a water treatment plant on the property. Italia Cemente operates a concrete batch plant. All three sites have been carved off the mining permit. Drainage Control Current drainage patterns are shown on the amendment maps, as blue arrows. Drainage is controlled by diverting the water either into the quarry excavation or by collecting the stormwater runoff in storm water sumps. Water is temporarily retained which allows sediment to settle out in the catchment areas prior to pumping and discharge according to the parameters of our existing VPDES discharge monitoring requirements. The current Pit elevation is 402’ approximately 200’ deep, with the final planned elevation at approximately 360’ above sea level. Water from the Pit area is pumped out for plant process water as needed, if not needed; water is pumped into Clear Brook Run. Mining waste material, overburden and topsoil stockpile areas are shown on the mine map. Screening berms will be used and will be setback a minimum of no closer than 25 feet from the property boundary. Typical berm cross sections are enclosed based on type of material and slope required in DMME regulations. Fill slopes will be graded to a maximum of 2:1 slopes for predominantly clay soils. Fill slopes may be graded steeper if a 1.5 static safety factor can be shown. 2 There is a DMM approved on-site disposal area. It is currently being used for off spec lime. The acceptable on-site generated wastes (tires, screen cloth etc.) are being sent off-site for recycling or disposal. As mining progresses, some open pit areas will be backfilled with overburden and on-site generated mine wastes. Other pits will have to remain open to allow access to future underground reserves. Concurrent with mining, inactive slopes of elevated overburden fills will be contoured to acceptable grades and temporarily re-vegetated if undisturbed for a 12-month period. Also concurrent with mining, other inactive disturbed areas undisturbed for an approximant 24 month period will be covered with stone or re- vegetated according to the after mining plan to prevent erosion. The overburden pile will be contoured in 50 foot lifts sloped two to one. The bench at the base of each slope will be approximately 20 feet wide with a berm to the outside and a swale on the inside for drainage control. This swale will direct drainage towards open pits for settlement control and will employ periodic stone check dams to slow water velocity. Post Mining Land Use The final quarry excavations will be allowed to fill with water to supply the Frederick County water treatment plant or other interested parties. Mining equipment will be removed prior to occupation by Frederick Water. Facilities will be constructed for the management of water storage such as access roads, small buildings and enclosures, pumping equipment and water monitoring. Other reclamation will be accomplished by the appropriate contouring and seeding. Fill slopes will be graded to a maximum of 2:1 slopes for predominately clay soils or steeper slopes may be used that exhibit a safety factor of 1.5. Rocky slopes may be graded steeper if a 1.5 static safety factor can be shown. Areas which will not support vegetation, such as solid rock areas, will not be re-vegetated. Re-vegetated areas will be fertilized using a 10-10-10 blend at 300 lbs. per acre and seeded following the currently approved DMME seed mixture requirements. Builds, equipment, and debris will be removed as necessary to allow future industrial uses of the land. Hydrogeology Evaluation Summary This application references a hydrogeology evaluation submitted with previous applications by Science Application International Corporation for Frederick Co. that analyzed the effect of a water withdrawal well from the same geologic formation and in the same groundwater catchment basin as the Global Stone Chemstone Winchester Quarry. The report concluded that the well has a reliable yield of 0.5 million gallons per day (mgd) in the catchment area that has over 2.2 mgd of groundwater available and should not have an unreasonable impact on the aquifer. The quarry normally pumps 0.864 mgd of which over 10% of the water is reused in the wash plant, screening plant, 3 dust control and water truck applications. Also, a large percentage of the water we pump is surface water, not groundwater, which falls directly into the quarry drainage area. Assuming a 90 acre drainage area and an annual precipitation of 27.99 in. (climate.virginia.edu) = 0.25 mgd of surface water. Therefore, the estimated overall groundwater withdrawal attributed to the quarry operation, 50% of 0.86 mgd minus the 0.25 mgd of surface water equals 0.31 mgd. This is significantly less than the 0.50 mgd withdrawal rate that was determined to be acceptable from the SAIC groundwater study. In 2018 Electro Resistivity testing was performed on the property to be added to mining. This was done to evaluate the potential impact on subsurface water and potential source for a spring adjacent to mining activity. This spring supplies water to one structure owned by Carmeuse and possibly to an adjacent property. The report suggests the source of the spring is both shallow and deeper ground water sources. With this knowledge, we are prepared to maintain the spring discharge should our mining impact it. Should our mining cause the spring water to enter the pit area we will pump this water to a permitted outfall in the same water course.