HomeMy WebLinkAbout53-25 Planning Comment letterCOUNTY of FREDERICK
Department of Planning and Development
540/ 665-5651
Fax: 540/ 665-6395
107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000
December 15, 2025
Pennoni Associates, Inc.
Attn: Mike Artz
117 East Picadilly Street, Suite 200
Winchester, Virginia, 22601
RE: Review Comments Site Plan #53-25: Midgard Self-Storage
Property Identification Number (PIN): 75B-A-1
Mike Artz:
Planning Staff has reviewed the above-referenced site plan to determine if administrative
approval can be granted. At this time, administrative approval cannot be granted. This site
plan cannot be approved until the issues in this letter, as well as all issues of the other
review agencies, have been adequately addressed. Please review Staff’s comments listed
below and then prepare a revised site plan which adequately addresses each concern.
Review Comments:
(1) Cover Sheet:
• Site Plan number: Add site plan reference number SP#53-25.
• Owner contact info: Add the owner’s phone number.
(2) Sheet 2:
• FEMA floodplain note: Include a note whether the property is located within the
FEMA Floodplain.
• Proffers: Include reference to REZ 04-18 and include proffers.
• Previous Site Plan: Include reference to previously approved site plan for the
property.
• Hours of operation: Include a note stating that the facility will be closed to the
public from 11:00 PM to 6:00 AM in accordance with proffer B.
• Setback: Identify the 5’ parking setback.
• Lighting: Include a note that no additional lighting is proposed or provide a
photometric in accordance with 165-201.10.
(3) Sheet 3:
• Setback: Identify the 5’ parking setback.
• Demarcation: Parking spaces are to be demarcated with four-inch durable white
lines. Identify striping in the proposed parking.
• Parking: Include updated parking figures for trucks and any additional customer
parking.
(4) Agency Approvals: Comment sheets (approvals) are required from the following
agencies:, Inspections Department
Additional comments may be provided on subsequent submission.
After you have revised the site plan, please resubmit one (1) copy so that Staff may verify
the information contained on the plan addresses the above comments. Staff will also need
all approved review agency comment sheets, at least five (3) copies of the final plan set
and a digital (PDF) copy for approval. Do not hesitate to contact me if you have any
questions or concerns regarding this letter. Thank you for your consideration.
Sincerely,
Eric Bittner
Planner II
Attachments: 04-18 Proffer Statement
cc: