HomeMy WebLinkAbout49-25 Checklist - Frederick WaterPO Box 1877, Winchester, VA 22604-8377
315 Tasker Road, Stephens City, VA 22655 Review Checklist 540.868.1061 voice
540.868.1429 fax
This checklist is to be completed by the design professional and submitted with the site plan.
In order to maintain reasonable review times for all submissions, should a plan reflect a gross
failure to incorporate Frederick Water standards into the design, the submission may be returned
for correction without a complete Frederick Water review. The partial review still counts as a review
and could require additional fees.
Subdivision/
Site Plan
Name:
Carroll Industrial Park Lot 9
Design
Professional
Name:
Dan Murphy
Design
Professional
Phone:
540-247-3671
Design
Professional
Signature:
Dan Murphy
I attest that the plan review form, plans, and other documents comply with current Frederick Water requirements or justifications are
provided.
Tax Map
(PIN):
43-21-9, 43-21-7
Submission
Date:
11 /19 /2025
Submission
Number:
1
Review Checklist https://checklist.frederickwater.com/
1 of 12 11/19/2025, 9:15 AM
Requirements
Review Key
OK
Incomplete
N Not Applicable
Unacceptable
Provide justifications for items other than OK.
General
Description Design
Professional Notes
1. Owner's/developer's contact
information, including Email
2. Magesterial district, tax map, and
address, if applicable
3. Utility contact information
4. North arrow on all plan sheets
5. Scale references on all plan
sheets
6. Current FW Standards and
Specifications have been reviewed
for compliance at frederickwater.com
Review Checklist https://checklist.frederickwater.com/
2 of 12 11/19/2025, 9:15 AM
7. Current FW construction notes are
on plans
8. All existing easements within
planview are shown including deed
book and page or instrument number
9. Vicinity map included
10. General, overall utility layout
sheet with features labeled is
included
11. Current existing water and
sanitary sewer infrastructure within
planview is shown and described
12. Required on-site FW easements
are identified
13. Required off-site FW easements
are identified
14. Note has been added to
landscape drawings that no trees or
shrubs shall be placed on FW
easements
15. Note has been added to all
applicable sheets that irrigation lines
and devices, light poles,
transformers, junction boxes,
pedestals, other obstacles and all
dry utilities shall not be placed on
Frederick Water easements;
perpendicular irrigation lines and dry
utility crossings are permitted with
Review Checklist https://checklist.frederickwater.com/
3 of 12 11/19/2025, 9:15 AM
18" minimum vertical separation
16. Note has been added to all
applicable sheets that valves,
manholes, ARVs and other Frederick
Water surface features shall not be
placed in curb and gutter, nor sloped
portion of handicapped ramps;
contractor shall coordinate locations
with the Frederick Water inspector
17. Note has been added to all
applicable sheets that retaining walls
and their tie backs such as geo grid
or other supports shall not be placed
in Frederick Water easements
N
18. Project Acceptance
Requirements per FW standards
(page 4) have been considered in
project phasing
19. Existing site conditions are
shown within planview and labeled,
i.e. ex. structures, utilities, etc.
20. Master development plan
reviewed for compliance and MDP #,
date included. Any variance from
MDP water or sewer requirements is
explained
N
21. Proffer statement reviewed for
compliance and copy included
N
22. Exceptions to FW requirements
are described and justification(s)
provided
Review Checklist https://checklist.frederickwater.com/
4 of 12 11/19/2025, 9:15 AM
23. Length of water and sewer lines
on private property to be owned by
FW kept to minimum
24. Lot numbers, building numbers,
and street names are shown on all
sheets
25. All plan sheets have been
reconciled to reflect the same
information
26. Match lines are provided on all
applicable sheets
N
27. Existing FW infrastructure
requiring field adjustment where
grade changes occur has been
shown
N
28. Existing FW facilities to be
removed are noted accordingly;
significant items, fire hydrants,
valves, etc., are noted to be
furnished to FW inspector
N
29. Ownership of existing and
proposed water and sanitary sewer
is labeled
30. Continuity of service to adjacent
parcels has been considered and
easements provided
N
31. Dry utility layout provided for
congested areas
N
32. FW easements are exclusive;
crossings permitted only as
necessary
Review Checklist https://checklist.frederickwater.com/
5 of 12 11/19/2025, 9:15 AM
33. Street ownership (VDOT or
private) is shown
34. Water and sanitary sewer usage
is shown in peak GPM and GPD
N
35. Plan review fee worksheet is
completed and check is included in
same envelope
Water
Description Design
Professional Notes
36. Project water system has been
modeled and provided and brief
summary included on plan
N
37. Air release has been evaluated
and shown
N
38. FW's water infrastructure has
been evaluated and can meet project
demands
N
39. Water meter size(s) are shown
40. Fire line(s) to building show gate
valve 10'–20' off building with
ownership line; valve is the end of
FW ownership
N
41. Double check valve assembly(s)
size and location shown
N
Review Checklist https://checklist.frederickwater.com/
6 of 12 11/19/2025, 9:15 AM
42. Combined fire and domestic
risers are shown as applicable or
justification provided
N
43. Water segments are labeled on
plan and profile
44. Sanitary sewer crossings are
shown under water lines with min.
18" separation
N
45. Sanitary lateral crossings have
lot number and elevation shown on
profile
N
46. All crossings are labeled
including min. 18" separation
N
47. Connection to existing lines are
labeled and include party
responsible for field connection
N
48. Special conditions, service
disruption, bypass piping, etc., are
clearly detailed and blow-up detail
provided
N
49. Existing and proposed line
diameters, pipe types, etc., are
shown
50. Water lines shall be CL 52 DIP
51. Water lines under permeable
pavers should be minimized
N
52. Bollards around fire hydrants in
truck and other vulnerable areas are
shown
Review Checklist https://checklist.frederickwater.com/
7 of 12 11/19/2025, 9:15 AM
53. Applicable FW detail drawings
are included
54. Restrained joints in fill areas and
20' onto original ground are reflected
N
55. Existing FW laterals, services,
main stubs, etc., unutilized are
shown with details for disconnection
and removal
56. Neptune Protectus 3 or Neptune
Mach 10 Ultrasonic fire meter
including size is shown for private
firelines
N
57. Fire lines are shown as CL 52
DIP and restrained
N
58. Pipe types are shown on plan
and profile for all segments
59. Valves are shown on all
branches of tees, crosses, wyes, etc.
60. Minimum 25' pre-blast is shown
for main-line stubs labeled
N
61. Water main stubs have gate
valve, MJ cap, full 20' joint of CL 52
DIP and flushing assy shown and
labeled
N
62. Air release and vacuum breaker
valves have been evaluated and
shown
N
Review Checklist https://checklist.frederickwater.com/
8 of 12 11/19/2025, 9:15 AM
63. Appropriate FW detail drawings
are included
64. Virginia Department of Health's
Project Summary Report is
completed and included, see http://
www.vdh.virginia.gov/content/
uploads/sites/14/2016/04/General-
Permit-Project-Summary-Report.pdf
Sanitary Sewer
Description Design
Professional Notes
65. Project sanitary sewer system
has been modeled
N
66. FW's sanitary sewer
infrastructure has been evaluated
and can meet project demands
N
67. Manhole rim elevations are
shown
68. Sewer segments are labeled on
plan and profile
69. Water line crossings are shown
above sewer min. 18" separation
N
70. All crossings are labeled
including min. 18" separation
N
71. Connection points are labeled
and identify party performing
connection
Review Checklist https://checklist.frederickwater.com/
9 of 12 11/19/2025, 9:15 AM
72. Special conditions, service
disruption, bypass piping, etc., are
clearly detailed
N
73. Line diameters, pipe types, etc.,
are shown
74. Sewer lines under permeable
pavers should be minimized
N
75. Applicable FW detail drawings
are included
76. Existing FW laterals, services,
main stubs, etc., unutilized are
shown with details for disconnection
and removal
77. Restrained joints in fill areas and
20' onto original ground are reflected
N
78. Drop connections are noted on
plans and profiles; justification is
provided
N
79. Multiple inside drop connections
into same manhole have been
evaluated and larger manhole is
identified
N
80. Manholes larger than 4' are
labeled
N
81. Deep sewer laterals are noted on
plans and profiles
N
Review Checklist https://checklist.frederickwater.com/
10 of 12 11/19/2025, 9:15 AM
82. Pipe types are shown on plan
and profile for all segments
N
83. Minimum 25' pre-blast is shown
for main-line stubs
N
84. Air release and vacuum breaker
valves have been evaluated and
shown
N
85. Appropriate FW detail drawings
are included
Sanitary Sewer Pump Stations
Description Design
Professional Notes
86. Show all proposed site
improvements
N
87. Pump station wet well accessible
by vactor truck
N
88. Personnel door accessible to full-
size pickup truck (suction lift pumps
only)
N
89. Show and label existing contours N
90. Show and label final contours N
Review Checklist https://checklist.frederickwater.com/
11 of 12 11/19/2025, 9:15 AM
91. Show proposed utilities, including
electrical and telephone services
information
N
92. Show transformer and generator
location and dimensions
N
93. Provide 100-year floodplain
elevation and note on PS plan
N
94. Fence is shown on property line N
95. Gently sloping minimum 3' gravel
outside fence perimeter
N
96. Surface water is directed away
from pump station lot
N
97. Paving and stone areas are
labeled
N
98. Gate size is shown and post is
min. 1' off pavement
N
99. Access road provides heavy
truck access and slopes no greater
than 10%
N
100. Station information sheets are
complete including interim and
buildout as applicable
N
101. Appropriate FW detail drawings
are included
N
NOV 24
Review Checklist https://checklist.frederickwater.com/