Re: Review Comments for the Site Plan #41-24 – Carroll Industrial Park Lot 9
Property Identification Numbers (PINs): 43-21-9 & 43-21-7 (portion)
Dear Mr. Bittner,
We are in receipt of your comments dated December 19, 2025 and offer the following responses:
Comment #1 (Cover Sheet):
Reference Number: Add new site plan reference #49-25 to Sheet 1.
Engineer’s Seal: A signed seal of the certified Virginia Land Surveyor, architect,
or engineer, surveyor or architect must be on each sheet of the site plan.
Response:
Site Plan reference number has been updated to #49-25, See all sheets.
Plan has been sealed and signed by licensed Engineer, See all sheets.
Comment #2 (Sheet 2):
Previously Approved Plans: Add reference to previously approved site plan #41-
24.
Uses: Add the proposed use of concrete mixing.
Response:
Approved plans have been updated to include #41-24, see Sheet 2.
Proposed Uses have been updated to include Concrete Mixing, see Sheet 2.
Comment #3 (Sheet 3):
Parcel Acreage: Add the acreage of the parcel in addition to the PIN/owner
information/zoning.
Parcels: If no work or disturbance is proposed to parcel 43-21-7, remove parcel
from plan.
Page 2 of 3
Response:
Acreage of parcels are shown on the parcel labels, see Sheet 3.
Current proposed design does disturb Parcel 43-21-7, labels and linework
have been adjusted to better reflect this, see Sheet 3.
Comment #4 (Sheet 9):
Freestanding Monument Sign: Include the maximum size of the monument sign
in accordance with 165-201.06.
Multiple monument signs: Only one monument sign is permitted (165-
201.06(3)(b)[1]). Remove one of the proposed monument signs.
No water or sewer note: The note saying no proposed water or sewer note
conflicts with the proposed water line. Correct or clarify.
Parking: Identify parking spaces for the proposed use. Include tabulation for the
minimum parking spaces (1.5 per employee plus any office or similar use, and 1
per company vehicle.) If more than 10 spaces are required, parking lot
landscaping will be required.
Height: Include the maximum height of the batch plant and the QC lab height.
Setbacks: Include the actual setbacks for the QC lab and the batch plant from the
property line.
Response:
The sign height has been added to the site plan. See Sheet 9.
The landowner is aware of the comment and will be addressing this with a
subsequent submission.
Note stating no proposed water or sewer has been removed, see Sheet 9.
Minimum parking spaces have been calculated and provided, see Sheet 2 and
9.
Max height for batch plant and QC lab has been added, see Sheet 9.
Setback dimensions have been added to the QC lab and batch plant, see Sheet
9.
Comment #5 (Sheet 13):
Existing Vegetation: Ensure there is sufficient existing vegetation along the
property boundary adjoining the railroad to meet the intent of the ordinance to
substitute for the single row of evergreen trees. If there are gaps in the vegetation,
supplemental plantings must be added.
Legend: Identify the green curved bubbles located by the southeast entrance.
Sign location: The proposed monument sign by the northwest entrance overlaps
with a proposed tree planting. This may also be addressed through addressing the
multiple monuments signs comment.
Response:
Existing vegetation buffer shown had previous site plan approval dated
04/22/25, site plan number 41-24. Buffer can be seen on Sheet 13.
Page 3 of 3
Green curved bubbles near southeast entrance are individual trees that are
now called out to be removed, see Sheets 9 & 13.
Planting has been revised to clear signage, see Sheet 13.
Comment #6 Agency Approvals: Comment sheets (approvals) are required from the following
agencies: Fire Marshall, and Frederick Water.
Response: Agency Approvals will be provided once completed.
Thank you for your assistance with this project. Please contact us with any questions or need for