Loading...
HomeMy WebLinkAbout2026-01-21 CRL Frederick Water (1) Engineers Surveyors Planners Environmental Scientists Laboratory QC Inspection Services Telephone 540-662-4185 Fax 540.722.9528 www.greenwayeng.com Page 1 of 2 January 21, 2026 Frederick Water 315 Tasker Rd, Stephenson, VA 22655 Attn: Earl Wiley Re: Carroll Industrial Park Lot 9 Dear Mr. Wiley, We are in receipt of your comments dated January 12, 2026 and offer the following responses: Comment #1 (Sheet 2): Add usage in GPD. Response: Usage changed from GPM to GPD, see Sheet 2. Comment #2 (Sheet 2): Please include the following in your resubmitted plans; The requirement for a hydraulic model for the project was waived by the FW Engineer due to the projects proximity to a water main with ample pressure and flow as well as the internal looping of pipes provided. Furthermore, the Engineer of Record attests to the sufficiency of the proposed water mains. Response: Note stating the above has been added under Frederick Water Project Information, see Sheet 2. Comment #3 (Sheet 8): Include instrument number(s) for all easements within plan view and include on all sheets (typ) Response: Easements are now labeled with associated instrument numbers, Sheets 8 & 9. Comment #4 (Sheet 8): Contractor shall test pit the existing water main to confirm that 48” of cover is maintained. Coordinate task with Frederick Water Inspector. Response: Note added stating the above and water profiles call out test pit, see Sheets 8 & 10. Comment #5 (Sheet 9): Replace ‘1’ with ‘2’ as two bends are required. Response: Waterline now calls out 2-45 bends, see Sheet 9. Comment #6 (Sheet 9): Identify and label water meter size and adjust water service linetypes, fittings, etc. to represent standard practice for intended water service and meter size. Page 2 of 2 Response: Water meter and service line have been revised to conform to standard practice, see Sheet 9. Comment #7 (Sheet 9): Water service shall be installed ‘straight thru’ meter and tubing coiled on private portions is recommended in lieu of bends. Response: Waterline has been revised to be ‘straight thru’ meter and no longer has bends, see Sheet 9. Comment #8 (Sheet 9): Adjust computation tables to show remainder of existing water and sanitary sewer. Response: Comp tables have now been moved to show existing lines, see Sheet 9. Comment #9 (Sheet 9): Main with service connection per typical FW detail with saddle and corp or provided justification for tee Response: Private water service now connects to main typ. per the FW detail, see Sheet 9. Comment #10 (Sheet 10): Add typical reference to 4’ cover. Response: Water profile labeled with typical 4’ Cover, see Sheet 10. Comment #11 (Sheet 10): Private water service appears to be 8”, add label if this is the case or adjust line type and typica label. Response: Private water service now shown/labeled as 1”, see Sheets 9 & 10. Thank you for your assistance with this project. Please contact us with any questions or need for additional information. Sincerely, Daniel Murphy Project Manager Greenway Engineering, Inc. dmurphy@greenwayeng.com (540)662-4185