Loading...
HomeMy WebLinkAbout49-25 Comment Letter, 2.13.2026COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 107 North Kent Street, Suite 202 • Winchester, Virginia 22601 February 13, 2026 Daniel Murphy (dmurphy@greenwayeng.com) Greenway Engineering 151 Windy Hill Lane Winchester, VA 22602 Re: Review Comments for Site Plan #41-24 – Carroll Industrial Park Lot 9 Property Identification Numbers (PINs): 43-21-9 & 43-21-7 (portion) Dear Mr. Murphy: Planning Staff has reviewed the above-referenced site plan to determine if administrative approval can be granted. At this time, administrative approval cannot be granted. This site plan cannot be approved until the issues in this letter, as well as all issues of the other review agencies, have been adequately addressed. Please review Staff’s comments listed below and then prepare a revised site plan which adequately addresses each concern. Review Comments: 1) Cover Sheet: The following revisions should be made to the cover sheet: • Reference Number: Add new site plan reference #49-25 to sheet 1. Addressed. • Engineer’s Seal: A signed seal of the certified Virginia Land Surveyor, architect, or engineer, surveyor or architect must be on each sheet of the site plan. Not addressed. The signed seal was not present as indicated, will be required for signature sets, but not review sets. 2) Sheet 2: The following revisions should be made to sheet 2: • Previously Approved Plans: Add reference to previously approved site plan #41-24. Addressed. Uses: Add the proposed use of concrete mixing. Addressed. 3) Sheet 3: The following revisions should be made to sheet 3: • Parcel Acreage: Add the acreage of the parcel in addition to the PIN/owner information/zoning. Addressed. • Parcels: if no work or disturbance is proposed to parcel 43-21-7, remove parcel from plan. Addressed. Re: SP #49-25 – Carroll Industrial Park Lot 9 Page 2 of 3 4) Sheet 9: The following revisions should be made to sheet 9: • Freestanding Monument Sign: Include the maximum size of the monument sign in accordance with §165-201.06. Addressed. • Multiple monument signs: Only one monument sign is permitted (§165- 201.06(3)(b)[1]). Remove one of the proposed monument signs. Addressed through revised copy received 2/12/2026. • • No water or sewer note: The note saying no proposed water or sewer note conflicts with the proposed water line. Correct or clarify. Addressed. • Parking: Identify parking spaces for the proposed use. Include tabulations for the minimum parking spaces (1.5 per employee plus any office or similar use, and 1 per company vehicle). If more than 10 spaces are required, parking lot landscaping will be required. Partially Addressed. Include truck parking or statement that trucks associated with the use are not parked on the property. • Curb & Gutter: Concrete curb and guttering is required around the perimeter of the parking lot. • Headlight Screening: the fence may act as the headlight screen, but must be opaque • Batch Trailer: Temporary trailers are not permitted, include detail that the proposed batch trailer is a truck trailer and not a structure. • Height: Include the maximum height of the batch plant and the QC lab height. Addressed. • Setbacks: Include the actual setbacks of the QC lab and the batch plant from the property line. Addressed. 5) Sheet 12: The following revisions should be made to sheet 12: • Existing Vegetation: Ensure there is sufficient existing vegetation along the property boundary adjoining the railroad to meet the intent of the ordinance to substitute for the single row of evergreen trees. If there are gaps in the vegetation, supplemental plantings must be added. Addressed. • Legend: Identify the green curved bubbles located by the southeast entrance. Addressed. • Sign location: the proposed monument sign by the northwest entrance overlaps with a proposed tree planting. This may also be addressed through addressing the multiple monument signs comment. Addressed. 6) Agency Approvals: Comment sheets (approvals) are required from the following agencies: Fire Marshall, and Frederick Water 7) Re-Review fee: Submit the $500 re-review fee. Re: SP #49-25 – Carroll Industrial Park Lot 9 Page 3 of 3 Additional comments may be provided on subsequent submissions. After you have revised the site plan, please resubmit one (1) hard copy so that staff may verify the information contained on the plan addressing the above comments. Once all comments are addressed and you have confirmation, staff will need all approved review agency comment sheets, at least five (5) copies of the final plan set and a digital (PDF) copy for final approval. Do not hesitate to contact me if you have any questions or concerns regarding this letter. Thank you for your consideration. Sincerely, Eric Bittner Planner II cc: