Re: Review Comments for Site Plan #41-24 – Carroll Industrial Park Lot 9
Property Identification Numbers (PINs): 43-21-9 & 43-21-7 (portion)
Dear Mr. Murphy:
Planning Staff has reviewed the above-referenced site plan to determine if administrative
approval can be granted. At this time, administrative approval cannot be granted. This site
plan cannot be approved until the issues in this letter, as well as all issues of the other
review agencies, have been adequately addressed. Please review Staff’s comments listed
below and then prepare a revised site plan which adequately addresses each concern.
Review Comments:
1) Cover Sheet: The following revisions should be made to the cover sheet:
• Reference Number: Add new site plan reference #49-25 to sheet 1.
Addressed.
• Engineer’s Seal: A signed seal of the certified Virginia Land Surveyor,
architect, or engineer, surveyor or architect must be on each sheet of the
site plan. Not addressed. The signed seal was not present as indicated, will
be required for signature sets, but not review sets.
2) Sheet 2: The following revisions should be made to sheet 2:
• Previously Approved Plans: Add reference to previously approved site plan
#41-24. Addressed.
Uses: Add the proposed use of concrete mixing. Addressed.
3) Sheet 3: The following revisions should be made to sheet 3:
• Parcel Acreage: Add the acreage of the parcel in addition to the PIN/owner
information/zoning. Addressed.
• Parcels: if no work or disturbance is proposed to parcel 43-21-7, remove
parcel from plan. Addressed.
Re: SP #49-25 – Carroll Industrial Park Lot 9
Page 2 of 3
4) Sheet 9: The following revisions should be made to sheet 9:
• Freestanding Monument Sign: Include the maximum size of the
monument sign in accordance with §165-201.06. Addressed.
• Multiple monument signs: Only one monument sign is permitted (§165-
201.06(3)(b)[1]). Remove one of the proposed monument signs.
Addressed through revised copy received 2/12/2026.
•
• No water or sewer note: The note saying no proposed water or sewer
note conflicts with the proposed water line. Correct or clarify.
Addressed.
• Parking: Identify parking spaces for the proposed use. Include
tabulations for the minimum parking spaces (1.5 per employee plus any
office or similar use, and 1 per company vehicle). If more than 10 spaces
are required, parking lot landscaping will be required. Partially
Addressed. Include truck parking or statement that trucks associated
with the use are not parked on the property.
• Curb & Gutter: Concrete curb and guttering is required around the
perimeter of the parking lot.
• Headlight Screening: the fence may act as the headlight screen, but must
be opaque
• Batch Trailer: Temporary trailers are not permitted, include detail that
the proposed batch trailer is a truck trailer and not a structure.
• Height: Include the maximum height of the batch plant and the QC lab
height. Addressed.
• Setbacks: Include the actual setbacks of the QC lab and the batch plant
from the property line. Addressed.
5) Sheet 12: The following revisions should be made to sheet 12:
• Existing Vegetation: Ensure there is sufficient existing vegetation along the
property boundary adjoining the railroad to meet the intent of the ordinance
to substitute for the single row of evergreen trees. If there are gaps in the
vegetation, supplemental plantings must be added. Addressed.
• Legend: Identify the green curved bubbles located by the southeast
entrance. Addressed.
• Sign location: the proposed monument sign by the northwest entrance
overlaps with a proposed tree planting. This may also be addressed through
addressing the multiple monument signs comment. Addressed.
6) Agency Approvals: Comment sheets (approvals) are required from the following
agencies: Fire Marshall, and Frederick Water
7) Re-Review fee: Submit the $500 re-review fee.
Re: SP #49-25 – Carroll Industrial Park Lot 9
Page 3 of 3
Additional comments may be provided on subsequent submissions.
After you have revised the site plan, please resubmit one (1) hard copy so that staff may
verify the information contained on the plan addressing the above comments. Once all
comments are addressed and you have confirmation, staff will need all approved review
agency comment sheets, at least five (5) copies of the final plan set and a digital (PDF)
copy for final approval. Do not hesitate to contact me if you have any questions or concerns
regarding this letter. Thank you for your consideration.
Sincerely,
Eric Bittner
Planner II
cc: