HomeMy WebLinkAboutSP 49-25 Approved Site PlanN/A
2GENERAL NOTES151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF
DESIGNED BY:
FILE NO.
SCALE:
DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WV0074CCCARROLL INDUSTRIAL PARK LOT 9SITE DEVELOPMENT PLANSTONEWALL MAGISTERIAL DISTRICTFREDERICK COUNTY, VIRGINIA14
CC/DM
11/21/2024
#49-25
LEGEND
PROPOSED SAN. LAT. CLEANOUT
PROPOSED CENTERLINE
EXISTING SPOT ELEVATION
STORM DRAIN STRUCTURE IDENTIFIER
SANITARY MANHOLE IDENTIFIER
PROPOSED SPOT ELEVATION
EXISTING CURB AND GUTTER
PROPOSED EDGE OF PAVEMENT
EXISTING EDGE OF PAVEMENT
PROPOSED STORM SEWER WITH INLET
EXISTING STORM SEWER WITH INLET
PROPOSED TELEPHONE LINE
EXISTING TELEPHONE LINE
TRANSITION TO REVERSE CURB
PROPOSED CURB AND GUTTER
PROPOSED ELECTRIC SERVICE
EXISTING ELECTRIC SERVICE
PROPOSED SANITARY SEWER WITH MANHOLE
EXISTING SANITARY SEWER WITH MANHOLE
PROPOSED GAS LINE
EXISTING GAS LINE
FENCELINE
FLOW LINE
PROPOSED WATERLINE W/ TEE
PROPERTY LINE
EXISTING TELEPHONE PEDESTAL
EXISTING WATERLINE W/ TEE
EXISTING UTILITY POLE/GUIDE WIRE
SIGNS
PROPOSED REDUCER
EXISTING FIRE HYDRANT/VALVE/METER
INDICATES THE NUMBER OF TYP. PARKING SPACES
PARKING INDICATOR
HANDICAP PARKING
PROPOSED BUILDING ENTRANCE
VEHICLES PER DAY COUNT
PROPOSED FIRE HYDRANT/VALVE/METER
LIGHT POLE
EXISTING TREE LINE
EXISTING EASEMENT
PROPOSED EASEMENT
EXISTING CENTERLINE
EXISTING INDEX CONTOUR
EXISTING INTERMEDIATE CONTOUR
PROPOSED CONTOUR
PROJECT INFORMATION
FIRE MARSHAL'S NOTE
GENERAL PLAN AND CONSTRUCTION NOTES VDOT GENERAL NOTES
Fire lane markings and signage:
Any "No Parking" signs and yellow painted curb locations will be installed
by field inspection at the direction of the Fire Marshal's Office.
V1. All work on this project shall conform to the current editions of and latest revisions to the Virginia Department of
Transportation (VDOT) Road and Bridge Specifications and Standards, the Virginia Erosion and Sediment Control
Regulations, and any other applicable state, federal or local regulations. In case of a discrepancy or conflict between the
Standards or Specifications and Regulations, the most stringent shall govern.
V2. All construction shall comply with the latest U.S. Department of Labor, Occupational Safety and Health Administration
(OSHA), and Virginia Occupational Safety & Health (VOSH) Rules and Regulations.
V3. When working within VDOT right-of-way, all traffic control, whether permanent or temporary, shall be in accordance with the
current edition of VDOT’s Work Area Protection Manual. A transportation management plan needs to be submitted for
approval and land use permit issued prior to any execution of work within the VDOT right of way.
V4. The developer shall be responsible for relocating, at his expense, any and all utilities, including traffic signal poles, junction
boxes, controllers, etc., owned by VDOT or private / public utility companies. It is the sole responsibility of the developer to
locate and identify utility facilities or items that may be in conflict with the proposed construction activity. VDOT approval of
these plans does not indemnify the developer from this responsibility.
V5. Design features relating to field construction, regulations, and control or safety of traffic may be subject to change as deemed
necessary by VDOT. Any additional expense incurred as a result of any field revision shall be the responsibility of the
developer.
V6. If required by the local VDOT Land Development Office, a pre-construction conference shall be arranged and held by the
engineer and/or developer with the attendance of the contractor (s), various County agencies, utility companies and VDOT
prior to initiation of work.
V7. The contractor shall notify the local VDOT Land Development Office when work is to begin or cease for any undetermined
length of time. VDOT requires and shall receive 48 hours advance notice prior to any required or requested inspection.
V8. The contractor shall notify the Traffic Operations Center at (540) 332-9500 for any traffic control plan that impacts a VDOT
maintained Interstate or Primary roadway to provide notification of the installation and removal of the work zone.
V9. The contractor shall be responsible for maintaining a VDOT permitted temporary construction entrance(s) in accordance with
Section 3.02 of the Virginia Erosion and Sediment Control Handbook. Furthermore, access to other properties affected by
this project shall be maintained through construction.
V10. Contractor shall ensure adequate drainage is achieved and maintained on the site during and at the end of construction.
V11. All water and sewer lines within existing or proposed VDOT right-of-way shall have a minimum thirty-six (36) inches cover
and when possible shall be installed under roadway drainage facilities at conflict points.
V12. Any unusual subsurface conditions (e.g., unsuitable soils, springs, sinkholes, voids, caves, etc.) encountered during the
course of construction shall be immediately brought to the attention of the engineer and VDOT. Work shall cease in that
vicinity until an adequate design can be determined by the engineer and approved by VDOT.
V13. All fill areas, borrow material and undercut areas shall be inspected and approved by a VDOT representative prior to
placement of fill. A VDOT representative shall be present to insure the soil sample(s) obtained for CBR’s is representative
of the location. When soil samples are submitted to private laboratories for testing, the samples shall be clearly identified and
labeled as belonging to a project to be accepted by VDOT and that testing shall be performed in accordance with all
applicable VDOT standards and procedures.
V14. All roadway fill, base, subgrade material, and backfill in utility/storm sewer trenches shall be compacted in accordance with
the lift thicknesses, density and moisture requirements as specified in the current VDOT Road and Bridge Specifications.
Certified copies of test reports shall be submitted to VDOT daily, unless specified otherwise.
V15. VDOT Standard CD and UD underdrains shall be installed where indicated on these plans and/or as specified by VDOT.
V16. A post installation visual/video camera inspection shall be conducted by the Contractor on all pipes identified on the plans as
storm sewer pipe and a select number of pipe culverts. For pipe culverts, a minimum of one pipe installation for each size of
each material type will be inspected or ten percent of the total amount for each size and material type summarized. All pipe
installations on the plans not identified as storm sewer pipe shall be considered as culvert pipe for inspection purposes.
Additional testing may be required as directed by the Area Land Use Engineer or their representative.
V17. The installation of any entrances and mailboxes within any dedicated street right-of-way shall meet VDOT minimum design
standards and is the responsibility of the developer.
V18. Prior to VDOT acceptance of any streets, all required street signage and/or pavement markings shall be installed by the
developer in accordance with the Manual On Uniform Traffic Control Devices.
V19. The developer shall provide the VDOT Land Development Office with a list of all material sources prior to the start of
construction. Copies of all invoices for materials utilized within any dedicated street right-of-way must be provided to the local
VDOT Land Development Office prior to acceptance of the work. Unit and total prices may be obscured.
V20. Aggregate base and subbase materials shall be placed on subgrade by means of a mechanical spreader. Density will be
determined using the density control strip in accordance with Section 304 of the VDOT Road and Bridge Specifications and
VTM-10. A certified compaction technician shall perform these tests. Certified copies of test reports shall be submitted to
VDOT daily, unless specified otherwise. In addition to checking stone depths, a VDOT representative shall be notified and
given the opportunity to be present during the construction and testing of the density control strip.
V21. Asphalt concrete pavements shall be placed in accordance with Section 315 of the VDOT Road and Bridge Specifications.
Density shall be determined using the density control strip as specified in Section 315 and VTM-76. A certified compaction
technician shall perform these tests. Certified copies of test reports shall be submitted to VDOT daily, unless specified
otherwise. A VDOT representative shall be notified and given the opportunity to be present during the construction and
testing of the control strip.
V22. In accordance with Section 302.03, the foundations for pipe culverts thirty-six (36) inches and larger shall be explored below
the bottom of the excavation to determine the type and condition of the foundation. The contractor shall report findings of
foundation exploration to the engineer and VDOT for approval prior to placing pipe. Foundation designs shall comply with
VDOT Road and Bridge Standard PB-1. Where soft, yielding, or otherwise unsuitable foundation is encountered, the
foundation design and/or need for foundation stabilization shall be determined by the engineer and approved by VDOT.
V23. VDOT Standard Guardrail shall be installed where warranted and/or as proposed on these plans in accordance with VDOT’s
installation criteria. Final approval of the guardrail layout to be given by VDOT after grading is mostly complete.
V24. Approval of these plans shall expire five (5) years from the date of the approval letter.
V25. VDOT Standard CG-12 Curb Ramps shall be installed where indicated on these plans and/or as specified by VDOT.
V26. The foundations for all box culverts shall be investigated by means of exploratory borings advanced below proposed
foundation elevation to determine the type and condition of the foundation. The contractor shall submit copies of borehole
logs and report findings of foundation exploration to the engineer and VDOT for approval prior to constructing box.
Foundation designs shall comply with VDOT Road and Bridge Standard PB-1. Contrary to the Standard, where rock is
encountered and cast-in-place box is proposed, the thickness of bedding shall be six (6) inches. Where soft, yielding, or
otherwise unsuitable foundation is encountered, the foundation design and/or need for foundation stabilization shall be
determined by the engineer and approved by VDOT.
V27.The contractor/developer and subcontractors will be required to submit detailed Maintenance of Traffic plans for the work to
be pursued throughout the life of the project for review and consideration of approval by the VDOT Engineer. Additional MOT
plans may be required that combine or require revisions to the existing TTC's in the latest edition of the Virginia Work Area
Protection Manual. The VDOT Engineer shall be afforded at least 14 days to review MOT submittals for consideration of
approval.
GENERAL
1.Greenway Engineering, Inc. (GE) has issued this plan set based on project criteria dictated by the client and municipal codes.
This plan set is not considered complete or appropriate for construction until ALL necessary agencies have given approval AND
this plan set is signed and sealed by a licensed professional. Any work, planning, scheduling, material purchases and/or
construction prior to approvals and licensed/professional sealing will be performed at the risk of the personnel authorizing work.
GE shall be held harmless from all costs, time delays and/or material changes incurred on any work that is preformed prior to
this plan set being approved and sealed.
2.The approval of these plans in no way relieves the Developer, Contractor, Subcontractor, or any of their agents of any legal
responsibility which may be required by the code of Virginia or any County enacted local ordinance, nor does it guarantee the
issuance of any required permits by the County, State, VDOT or any other governing Agency.
3.An approved set of plans as well as all applicable permits and required documents must be available at the construction site at
all times during construction. A representative of the Developer must be available at all times.
4.GE and/or the Engineer shall not not be responsible for or have control over or charge of construction means, methods,
techniques, sequences or procedures, nor for safety precautions and programs in connection with any work shown on these
plans. GE and/or the Engineer is not responsible for any Contractor's schedules or failure to carry out the work. GE and/or the
Engineer is not responsible for acts of omissions by the Contractor, Subcontractor, or their agents, employees, or any other
person performing portions of the work.
5.Methods and materials used in the construction of the improvements herein shall conform to current County Construction
Standards and Specifications and/or current VDOT Standards and Specifications. Should a conflict between design
specifications and these plans occur the most stringent requirement shall apply.
6.The Developer and/or Contractor shall be responsible for constructing the site in accordance with the approved plans and
construction documents and the scope of work shall conform with grades, depths, dimensions, ect. shown hereon.
7.All known cemetery and/or gravesite locations have been identified on these plans. Any cemetery or gravesite shown on these
plans shall be marked and protected in accordance with state law. The developer or contractor shall be responsible for
marking, installing protecting and maintaining protection of any known sites during construction and in the event that any
unknown gravesites is discovered during construction, the Owner and Engineer must be notified immediately and adequate
protection from construction shall be installed immediately.
PERMITS AND INSPECTIONS
1.The Developer or his agent shall be responsible for obtaining all required permits from the appropriate State and/or local
agencies and to comply with their requirements and all applicable National, State and Local laws and shall be responsible for
obtaining any required permits from the Virginia Department of Environmental Quality (DEQ) or the United States Army Corp of
Engineers for any plan wetland disturbance as may be shown on these plans. They shall also be responsible the identification
and delineation of any wetlands that may be present on the construction site.
2.Prior to the initiation of any land disturbing activities the Responsible Land Disturber, Developer, or the Contractor shall obtain
a Land Disturbance Permit from the Frederick County Public Works Department and shall be responsible for filing a Virginia
Stormwater Management Program (VSMP) registration statement for the construction site as required by law . They shall also
be responsible for obtaining and maintaining on site a Stormwater Pollution Prevention Plan (SWPPP). The approval of these
plans in no way relieves the developer or his agent of the responsibilities contained in the Virginia Erosion and Sediment Control
Handbook.
3.Upon completion of all construction activities and permanent site stabilization, the Developer shall submit to Frederick County
Public Works Department a DEQ Notice of Termination form, a copy of the sites construction inspection log book, an engineer
certified red-lined as-built of the approved plans with computations for all permanent stormwater management facilities, water
quality, and stormwater conveyance systems, a recorded copy of the required BMP Maintenance Agreement (if needed) , any
VSMP Permit maintenance fees (if required), and a written request to Frederick County Planning for bond release. The
Developer shall also schedule a Final on site inspection with Frederick County Public Works Department.
4.The Contractor, Owner or Developer must obtain a VDOT Land Use Permit (Entrance) from the Office of the Resident Engineer,
Virginia Department of Transportation (VDOT) and provide to Frederick County prior to any construction activities within existing
State right-of-way.
5.The Contractor, Owner or Developer shall be responsible for scheduling all required State and local inspections and for the
securing of any third party inspection/testing service to insure construction compliance with these plans and specifications and
shall keep and maintain a site inspection log book. It is Greenway Engineering's recommendation that a third party
inspection/testing service be employed to ensure that project is compliant and that materials installed meet the details and
specifications in these plans.
6.Any retaining wall 2 ft. or greater in height shall designed by a Structural Engineer require the issuance of a separate building
permit.
7.Individual sign permits will be required from the Zoning Office for all free standing and/or facade signs prior to erecting the sign
and may require a separate building permit.
UTILITIES
1.The location of existing utilities shown in these plans are taken from existing available records and may not be representative of
exact locations. It shall be the contractors responsibility to verify the exact horizontal and vertical location of all existing utilities
as needed prior to construction. The contractor shall be responsible for the digging of all test holes that may be required,
whether recommended or not by these plans, to determine the exact location and elevation of existing utilities. If any conflicts
arising from this existing utility verification or if during the course of construction, any object of an unusual nature is
encountered, the contractor shall cease work in that area and immediately notify Greenway Engineering at (540) 662-4185
and/or the proper authority. Greenway Engineering or any engineer associated with these plans shall not be responsible or
liable for any construction cost that may be associated with the installation or reinstallation any utility or other improvements if
not notified of any discrepancies between actual field conditions and the approved plan.
2.The developer will be responsible for the relocation of any existing utilities which may be required as a result of his project. Any
required relocation of existing utilities should be completed prior to construction.
3.The Developer and/or Contractor shall be responsible to supply all utility companies with copies of the approved plans and
advise them that all grading shall conform to the approved plans, and further that the utility companies shall be responsible for
honoring these plans and the finished grades in the installation of their utility lines.
4.All proposed utilities to be located underground.
5.The Developer and/or Contractor shall notify operators who maintain underground utility lines in the area of proposed
excavating or blasting at least two (2) working days, but not more than ten (10) working days, prior to commencement of
excavation or demolition.
6.The developer shall be responsible for notifying Frederick Water and all other appropriate utility companies prior to construction
of water and/or sanitary sewer lines. Information should also be obtained from the appropriate authority concerning permits, cut
sheets, and connections to existing lines.
7.All sanitary sewers, water mains and appurtenances shall be constructed in accordance with the current standards and
specifications of Frederick Water.
8.When grading is proposed within easements of utilities, letters of permission from all involved companies must be provided to
the Frederick County Public Works Department prior to issuance of grading and/or site development permits.
9.The developer shall be responsible for any damage to the existing streets and/or utilities which may occur as a result of
construction within or contiguous to an existing right-of-way or utility.
10.All stormwater piping and structures shown on these plans are only accurate to the inlet or manhole locations as shown hereon.
Detail design of stormwater structures were not provided to Greenway Engineering. Actual pipe alignments will be based upon
developed structural shop drawings as provided by the manufacturer. Contractor shall make adjustments to pipe alignments
base on provided shop drawings. Greenway Engineering will not be held responsible or liable for any discrepancies or changes
caused by the structural design. Contractor may submit shop drawings to Greenway Engineering for review and approval at
contractor's expense. Shop drawings will be reviewed for compliance with design plans. The Owner or Developer will be
responsible for any redesign as a result of structural shop drawing design.
11.All parking lot/street light and dry utility design shall be performed and provided separately by others. All dry utility, structural
base design, electrical design, photometrics and or other lighting information shown hereon is as specified by others and is
included for informational purposes only, as directed by the Owner, Developer and/or public agency requirements. Greenway
Engineering has not performed any lighting and/or dry utility design and does not warrant and is not responsible for the degree
and/or adequacy of illumination on this project or the adequacy of the dry utility to service the site. Any changes to the lighting
design, once the plan is approved, shall be approved by the County prior to installation.
SITEWORK
1.Refer to the Geotechnical Engineer Report for methods, materials and details for construction of all earthwork activities.
2.All vegetation, root material, topsoil, and any other unsuitable material shall be removed from the construction limits of the site
before removal or placing of fill material. Earthwork clearing shall extend a minimum of 10' beyond all building and pavement
limits with an additional 1 foot of clearance for each foot of fill required.
3.Controlled (Structural) fills shall be compacted to 95% of maximum dry density as determined by method "A" per standard
proctor AASHTO-T99, ASTM-D698, or VTM-1 as applicable (Non-structural fills 85% to 90%). Structural fills shall extend a
minimum of 5' beyond the limits of all foundation elements at bearing elevation. Density shall be certified by a registered
professional engineer and results submitted to Frederick County prior to pavement construction. If a geotechnical report has
been prepared, it should supersede the requirements in this note. No visual pumping, no rocks larger than 6-inches. Materials
classified as OL, OH, MH or PT are not suitable for use as structural fill. All fill should be placed on stable subgrades. Fill should
not be placed on surfaces that are muddy or frozen, or have not been approved by testing and/or proof-rolling. All fill material
compacted by heavy compaction equipment should be placed in maximum 10-inch loose lifts. All fill material compacted by
hand-operated tampers or light compaction equipment should be placed in maximum 4-inch loose lifts. Fill placed on sloping
ground should be properly benched into residual soils such that a smooth interface will not be present. Fill material placed
below and extending 10 feet beyond the foundations for the structure should be compacted to at least 98% of maximum dry
density as determined by the Standard Proctor Test Method (ASTM-D698).
4.All fills greater than 2 feet shall require compaction testing.
5.All fills with slopes steeper than 3:1 or more than 10 feet in height shall require a Slope Stability Analysis.
6.All fill embankments being constructed against slopes of existing embankments or hillsides; or across existing embankments,
hillsides, and depressions at a skew angle of 30 degrees or more or slopes are steeper than 4:1 shall be benched in a series of
horizontal cuts beginning at the intersection with original ground and continuing at each vertical intersection with the previous
cut. Material removed during benching shall be placed and compacted as embankment material. For existing slopes steeper
than 4:1 but less than 1 12:1, the bench shall be a minimum of 6 feet wide. For existing slopes steeper than 1 12:1 but less than
12:1, the bench shall be a minimum of 4 feet wide.
7.All pavement sections shown on these approved plans are based on a minimum CBR value of 6 and are for preliminary design
only. Final pavement design shall be based upon actual CBR values. The Contractor or Developer shall be responsible for field
tests per VDOT standards to obtain actual CBR values for final design. Final pavement designs will be approved by VDOT
and/or the Owner/Developer, which ever applicable, prior to installation. GE shall be held harmless from all costs, time delays
and/or material changes incurred on any work that is preformed prior to final pavement design approval.
8.Concrete for pads and/or sidewalks shall be a minimum Class A3 or 3000 psi (with air) and shall be placed in accordance to
ACI practices or as otherwise specified per structural design. All concrete areas requiring a separate permit shall be designed
by a registered professional structural engineer.
9.The contractor shall provide adequate means of cleaning mud from trucks and/or other equipment prior to entering public
streets, and it is the contractors responsibility to clean streets, allay dust, and to take whatever measures are necessary to
insure that public streets are maintained in a clean, mud and dust free condition at all times.
10.Warning signs, markers, barricades or flagmen should be in accordance with the State and Federal Manual on Uniform Traffic
Control Devices (MUTCD).
11.The exact location of all guard rails and paved ditches will be determined by VDOT personnel. "A joint inspection will be held
with the Developer, County Representatives, and Representatives of the Virginia Department of Transportation (VDOT) to
determine if and where guard rail and/or paved ditches will be needed. The developer will be responsible for providing guardrail
and paved ditches as determined by this joint inspection." Refer to Virginia Department of Transportation (VDOT) Guard Rail
and Paved Ditch Specifications.
12.Any changes to the approved Landscape Plan shall be approved approved by the County prior to installation.
13.All springs shall be capped and piped to the nearest storm sewer manholes or curb inlet. The pipe shall be minimum 6"
diameter and conform to VDOT standard SB-1.
14.Construction debris shall be containerized in accordance with the Virginia Litter Control Act; no less than one litter receptacle
shall be provided at the construction site.
15.All excavations shall be benched according to OSHA regulations to permit safe entry.
PERMANENT STORMWATER MANAGEMENT EMBANKMENTS
1.Satisfactory fill materials for use in constructing permanent stormwater management facility embankments shall include
materials classified in ASTM D-2487 as GC, GM, SC, SM, CL, or MI groups. Soils must contain a minimum of 20% plus No. 200
sieve and be "Well Graded" material, with no stones greater than 6 inches, mixed with the clay. A minimum of three samples
shall be classified.
2.All fill areas shall be "Keyed In" and compacted in horizontal layers not to exceed a maximum loose lift of 8 inches thick. All fill
shall be compacted with a sheepsfoot, rubber-tired or vibratory roller to a density of 100% of maximum dry density with a
moisture content within +/- 2% of optimum per Standard Procter Test (ASTM D698) or the Modified Proctor Test (ASTM D1557)
as director by the geotechnical engineer. Compaction test shall be performed at one test per 5,000 square feet on each layer.
3.Principal spillway must be installed concurrently with fill placement and not excavated into the embankment. All fills beside
pipes or structures shall be placed in horizontal layers not to exceed 4 inches in depth and shall be compacted by hand
tampers. Fill material shall completely fill all spaces under and beside pipes. Equipment should not be driven within 4 feet of any
structure part during backfilling operation and shall never be driven over until compacted fill has been placed to a depth
specified by the structural live load capacity of the structure or pipe.
4.Embankments shall be constructed with a relatively impervious core and cutoff trench. Core material shall be classified as GC,
SC, or CL. The cutoff trench shall be excavated in impervious material a minimum of depth and width of 4 feet with side slopes
no steeper than 1:1 and located at or upstream of the embankment centerline. The impervious core shall extend up to the
10-year water surface elevation (see engineering design). The surface of the embankment shall be covered with a minimum 6
inches of clean topsoil and stabilized with grass.
5.Stormwater management facility earthen embankments shall not be greater than 25' in height measured from the downstream
toe of slope to the top of the embankment with embankment slopes no steeper than 2:1and a combined minimum upstream and
downstream slope of 5:1. The minimum top width of the embankment shall be 8' for embankments 14' or less in height and shall
be level.
6.Any groundwater seepage encountered during cutoff trench construction shall be drained by means of a foundation drain to the
outside/ downstream toe of the embankment slope. Foundation drains shall be downstream and outside of the limits of the
cutoff trench. The constructed foundation drain section shall be an excavated 2' x 2' trench backfilled with hand compacted #57
stone wrapped in geotextile fabric.
7.A geotechnical or construction inspector should be on site during embankment construction.
8.All embankment construction, compaction testing, and construction inspections shall be the responsibility of the site contractor.
CONSTRUCTION STAKE-OUT/ ASBUILTS
1.All stake-out to be performed by GE. If the contractor does not utilize GE for stake-out then the contractor assumes all liability
for accuracy of construction.
2.All cutsheet and grades are to be reviewed by Engineer of Record prior to issuance for construction.
3.Asbuilts of the SWM system is required to verify conformance with the approved plans. Please contact GE when installation is
complete.
4.All stormwater collection, stormwater management and water quality features must be inspected by Engineer of Record during
construction. As-built certification, required to terminate VSMP permit and bond release with the County upon the completion of
the project, must be completed by GE.
TOPOGRAPHY
1.Topography shown on this plan has been conducted per the VA Administrative code 18VAC10-20-382 and the minimum
standards and procedures set forth in chapter 4 (§ 54.1-400 et seq.) of Title 54.1 of the Code of Virginia. This plan shows the
design assumptions utilizing these accuracy standards. Inverts and other elevations shown hereon must be field verified by the
contractor prior to construction. If a discrepancy is found, the contractor shall cease work in that area and immediately notify
Greenway Engineering. Greenway Engineering shall be held harmless for any discrepancies or conflicts if not notified
immediately.
2.Contractor shall confirm all existing tie-in points of this project prior to the start of construction. GE shall be notified of any
discrepancies between actual field conditions and the approved plan prior to the start of construction.
USECLASS * TRIP RATE
TRIP GENERATION DATA
UNITS VPD
* TAKEN FROM ITE TRIP GENERATION 9TH EDITION
PHASE
PARCEL NOTES
1. BOTH PARCELS CONTAIN A TOTAL AREA OF 30.00 AC. THIS
PLAN IS FOR ONLY A PORTION OF PIN # 43-21-7. FOR A
TOTAL PROJECT SITE OF 11.12 AC.
2. PREVIOUSLY APPROVED SITE PLAN FOR 43-21-7 IS #31-21
AND MDP #04-18 FOR CARROLL INDUSTRIAL PARK.
Rev. No.Date
1 02/21/2025
FREDERICK WATER PROJECT INFORMATION
WATER AND SANITARY SEWER USAGE
WATER DEMAND 21,600 GPD
SANITARY SEWER DISCHARGE 21,600 GPD
*NO HYDRAULIC MODELING REQUIRED PER EMAIL
FROM MICHAEL NEWLIN DATED 12/31/2025.
Calculation of demand/discharge
WATER DEMAND
Provided by Client
SEWER DISCHARGE
Sewer discharge equals water demand
7
NOTES:
1. The requirement for a hydraulic model for the project was waived by the FW Engineer due to the project's proximity to a
water main with ample pressure and flow as well as the interal looping of pipes provided.
2. The Engineer of Record attests to the sufficiency of the proposed water mains.
8
8
8 10
5
6
43-21-2
FREDERICK COUNTY SANITATION AUTHORITY
ZONED: M2
19.13 AC.
MILTON RAY DRIVE
80' ROW
25 MPH SPEED LIMIT
EBERT ROAD80' ROW25 MPH SPEED LIMIT43-21-9
C CLANN, LLC
ZONED: M2
10.00 AC.
43-21-7
C CLAN, LLC
ZONED: M2
20.00 AC.
43-21-7
C CLAN, LLC
ZONED: M2
20.00 AC.
EX. W/L ESMT
INSTRUMENT
#070002103
EX. W/L ESMT
INSTRUMENT
#070002103
EX. W/L ESMT
INSTRUMENT #070002103
EX. FENCE
EX. FENCE
EX. FENCE 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF
DESIGNED BY:
FILE NO.
SCALE:
DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WV0074CCCARROLL INDUSTRIAL PARK LOT 9SITE DEVELOPMENT PLANSTONEWALL MAGISTERIAL DISTRICTFREDERICK COUNTY, VIRGINIA14
CC/DM
11/21/2024
#49-25EXISTING CONDITIONSRev. No.Date
1 02/21/2025
1'=40"
3
8
5
6
43-21-2
FREDERICK COUNTY SANITATION AUTHORITY
ZONED: M2
19.13 AC.
MILTON RAY DRIVE
80' ROW
25 MPH SPEED LIMIT
EBERT ROAD80' ROW25 MPH SPEED LIMIT43-21-9
C CLANN, LLC
ZONED: M2
10.00 AC.
EX RAILROAD
43-21-7
C CLAN, LLC
ZONED: M2
20.00 AC.
43-21-7
C CLAN, LLC
ZONED: M2
20.00 AC.
EX. W/L ESMT
INSTRUMENT
#070002103
EX. W/L ESMT
INSTRUMENT
#070002103
EX. W/L ESMT
INSTRUMENT #070002103
EX. FENCE
EX. FENCE
EX. FENCE
CE
AREA TO ST 1
A=2.93 AC.
AREA TO ST 2
A=2.42 AC.
AREA TO ST 3
A=1.36 AC.
AREA TO ST 4
A=2.94 AC.
AREA TO SSF
A=0.82 AC.
ST#1
WET STORAGE (A1)
DRY STORAGE (A2)
ST#2
ST#3
ST#4
WET STORAGE (A1)
DRY STORAGE (A2)
WET STORAGE (A1)
DRY STORAGE (A2)
WET STORAGE (A1)
DRY STORAGE (A2)
^^^^^^^^^^^^^
^
^
^
^
^^^^^^^^^^^^^^
^
^^^^^^^^^^^^^^^^^^^^INITIAL
LOD
INITIAL
LOD
INITIAL
LOD
82 00
82 00
80 00
80 00
80 00
80 00
82 00 82 00
SSF
DD
SSF
SSF
SSF
SSF
LOD
LOD
LOD
LOD
LOD
DD
CE
AREA TO ST 1
A=0.30 AC.151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF
DESIGNED BY:
FILE NO.
SCALE:
DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WV0074CCCARROLL INDUSTRIAL PARK LOT 9SITE DEVELOPMENT PLANSTONEWALL MAGISTERIAL DISTRICTFREDERICK COUNTY, VIRGINIA14
CC/DM
11/21/2024
#49-25E&S PHASE IRev. No.Date
1'=40"
4
EROSION/SEDIMENT CONTROL LEGEND
KEY SYMBOL DESCRIPTION
LIMITS OF DISTURBANCE
CONSTRUCTION ENTRANCE
LOD
CE
SUPER SILT FENCESSF
^INITIAL LIMITS OF DISTURBANCE
DRAINAGE DIVIDES
DV
INITIAL
LOD
TEMPORARY DIVERSION
CARRYING OUT THE LAND DISTURBING
ACTIVITY AS SET FORTH IN THE PLANS.
IS THE PARTY RESPONSIBLE FOR
THE RESPONSIBLE LAND DISTURBER
DATE:
CERTIFICATION #:
NAME:
RESPONSIBLE LAND DISTURBER
FOR PHASE I EROSION AND
SEDIMENT CONTROL ONLY!!
5
6
43-21-2
FREDERICK COUNTY SANITATION AUTHORITY
ZONED: M2
19.13 AC.
MILTON RAY DRIVE
80' ROW
25 MPH SPEED LIMIT
EBERT ROAD80' ROW25 MPH SPEED LIMIT43-21-9
C CLANN, LLC
ZONED: M2
10.00 AC.
EX RAILROAD
43-21-7
C CLAN, LLC
ZONED: M2
20.00 AC.
43-21-7
C CLAN, LLC
ZONED: M2
20.00 AC.
EX. W/L ESMT
INSTRUMENT
#070002103
EX. W/L ESMT
INSTRUMENT
#070002103
EX. W/L ESMT
INSTRUMENT #070002103
EX. FENCE
EX. FENCE
EX. FENCE
LOD
LOD
LOD
LOD
675 75
INV
" STM 15678 00
INV
684 43
INV
683 60
INV
" STM
2x15
83 6
83 22
82 88
83 27
%2.08
83 53 83 19
12'GRAVEL TRAILER
PARKING LOT
OLD DOMINION
CONCRETE
SUPPLY YARD
EG
(TO BE REMOVED)
(TO BE REMOVED)
(TO BE REMOVED)
(TO BE REMOVED)
(TO BE REMOVED)
(TO BE REMOVED)
(TO BE REMOVED)
OVERHEAD UTILITY
(TO REMAIN)
55'
60'
60'
55'
55'
55'
55'
40'
BUILDING HEIGHT = 18'
(TO BE REMOVED)60'EGEG EG(TO BE REMOVED)
60'
GUY WIRES
(TO REMAIN)
GUY WIRES
(TO REMAIN)
fdPP
(TO REMAIN)
PP
(TO BE
REMOVED)
PP
(TO BE REMOVED)
PP
(TO BE REMOVED)
(TO BE REMOVED)
PP
(TO REMAIN)
PHASE 1
PHASE 2
EGEGPP
(TO REMAIN)
PP
(TO REMAIN)
PP
(TO
REMAIN)
GUY WIRES
(TO REMAIN)
60'
PP
(TO REMAIN)
PR. 15" HDPE12'12'12'11'12'12'1827 SF
1827 SF44'6'x1'x6'
MONUMENT
SIGN
40'BUILDING HEIGHT = 18'
(TO REMAIN)50'R
6
0
'
R80'R4
0
'
R
10+0011+0011+35.1410+0011+0011+13.5819.9'
PR. 2x15" HDPE
(TO BE REMOVED)18'10'30'CG-6 CG-6CG-6CG-6204'40'
231
.
1
'
91'
44'25'27'40'37'30' WIDE GATE
30' WIDE
GATE
AGGREGATE BIN
PAVED WASH
DOWN AREA
11'11'PIT #1
QC LAB
(MAX HEIGHT 10')
BATCH PLANT
(SILOS HAVE MAX
HEIGHT OF 39')
8" WATERLINE "A"
20' W/L ESMT
2-45° BENDS
5/8" W/M (TYP.)
1-F.H.
ASSEMBLY W/
BOLLARDS
1-8" G.V.
1- 8"x1" TAPPED PLUG
1- CORP STOP & 1" PE
200 PSI CTS TUBING
6" SAN
LAT (TYP.)
BATCH TRAILER
OVERHEAD UTILITY
(TO RE RELOCATED)
UNDERGROUND
UTILITY RELOCATION
UNDERGROUND
UTILITY RELOCATION
144'PHASE 2
SUPPLY YARD
CONNECT TO EX W/L
6" SAN
LAT (TYP.)
CONNECT TO EX
SAN. SEWER
(BY CONTRACTOR)
(TO BE REMOVED)
10+
0
0
11+
0
012+0012+70.00
1-11.25° BEND
1" PRIVATE
WATER SERVICE
686
688686686
688
690
692694692692688684686682682680PIT #4PIT #2
PIT #3
8'18'
EMPLOYEE
PARKING
AREA
EXISTING TREE
(TO BE REMOVED)
EXISTING
(TREES
TO BE
REMOVED)191.5'69.5'52'
231.4'
1-8" TEE
1-6" G.V.8'8'98' OF
OPAQUE
FENCE
CURB-CUT
W/ RIPRAP CG-6CG-6R
%0.5CONCRETE
TRUCK
PARKING
AREA
IP
IP
OP
OP
AREA TO CLV #2
A=1.48 AC.
AREA TO CLV #1
A=0.65 AC.
#1
DL
#1
CLV
#2
CLV
82 00
82 00
80 00
80 00
80 00
80 00
82 00 82 00 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF
DESIGNED BY:
FILE NO.
SCALE:
DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WV0074CCCARROLL INDUSTRIAL PARK LOT 9SITE DEVELOPMENT PLANSTONEWALL MAGISTERIAL DISTRICTFREDERICK COUNTY, VIRGINIA14
CC/DM
11/21/2024
#49-25E&S PHASE IIRev. No.Date
1 01/31/2025
1'=50"
5
EROSION/SEDIMENT CONTROL LEGEND
KEY SYMBOL DESCRIPTION
LIMITS OF DISTURBANCE
CONSTRUCTION ENTRANCE
LOD
CE
SUPER SILT FENCESSF
^INITIAL LIMITS OF DISTURBANCE
DRAINAGE DIVIDES
DV
INITIAL
LOD
TEMPORARY DIVERSION
CARRYING OUT THE LAND DISTURBING
ACTIVITY AS SET FORTH IN THE PLANS.
IS THE PARTY RESPONSIBLE FOR
THE RESPONSIBLE LAND DISTURBER
DATE:
CERTIFICATION #:
NAME:
RESPONSIBLE LAND DISTURBER
FOR PHASE II EROSION AND
SEDIMENT CONTROL ONLY !!
5
5
5
151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF
DESIGNED BY:
FILE NO.
SCALE:
DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WV0074CCCARROLL INDUSTRIAL PARK LOT 9SITE DEVELOPMENT PLANSTONEWALL MAGISTERIAL DISTRICTFREDERICK COUNTY, VIRGINIA14
CC/DM
11/21/2024
#49-25E&S NARRATIVERev. No.Date
1 01/31/2025
AS SHOWN
6
MINIMUM CONSTRUCTION STANDARDS
An erosion and sediment control program adopted with this plan must be consistent with
the VSECH for 9VAC25-840-40 minimum standards:
1.Permanent or temporary soil stabilization shall be applied to denuded areas within
seven days after final grade is reached on any portion of the site. Temporary soil
stabilization shall be applied within seven days to denuded areas that may not be at
final grade but will remain dormant for longer than 14 days. Permanent stabilization
shall be applied to areas that are to be left dormant for more than one year.
2.During construction of the project, soil stock piles and borrow areas shall be stabilized
or protected with sediment trapping measures. The applicant is responsible for the
temporary protection and permanent stabilization of all soil stockpiles on site as well
as borrow areas and soil intentionally transported from the project site.
3.A permanent vegetative cover shall be established on denuded areas not otherwise
permanently stabilized. Permanent vegetation shall not be considered established
until a ground cover is achieved that is uniform, mature enough to survive and will
inhibit erosion.
4.Sediment basins and traps, perimeter dikes, sediment barriers and other measures
intended to trap sediment shall be constructed as a first step in any land-disturbing
activity and shall be made functional before upslope land disturbance takes place.
5.Stabilization measures shall be applied to earthen structures such as dams, dikes
and diversions immediately after installation.
6.Sediment traps and sediment basins shall be designed and constructed based upon
the total drainage area to be served by the trap or basin.
a.The minimum storage capacity of a sediment trap shall be 134 cubic yards per acre
of drainage area and the trap shall only control drainage areas less than three acres.
b.Surface runoff from disturbed areas that is comprised of flow from drainage areas
greater than or equal to three acres shall be controlled by a sediment basin. The
minimum storage capacity of a sediment basin shall be 134 cubic yards per acre of
drainage area. The outfall system shall, at a minimum, maintain the structural integrity
of the basin during a 100-year storm of 24-hour duration. Runoff coefficients used in
runoff calculations shall correspond to a bare earth condition or those conditions
expected to exist while the sediment basin is utilized.
7.Cut and fill slopes shall be designed and constructed in a manner that will minimize
erosion. Slopes that are found to be eroding excessively within one year of
permanent stabilization shall be provided with additional slope stabilizing measures
until the problem is corrected.
8.Concentrated runoff shall not flow down cut or fill slopes unless contained within an
adequate temporary or permanent channel, flume or slope drain structure.
9.Whenever water seeps from a slope face, adequate drainage or other protection shall
be provided.
10.All storm sewer inlets that are made operable during construction shall be protected
so that sediment-laden water cannot enter the conveyance system without first being
filtered or otherwise treated to remove sediment.
11.Before newly constructed stormwater conveyance channels or pipes are made
operational, adequate outlet protection and any required temporary or permanent
channel lining shall be installed in both the conveyance channel and receiving
channel.
12.When work in a live watercourse is performed, precautions shall be taken to minimize
encroachment, control sediment transport and stabilize the work area to the greatest
extent possible during construction. Nonerodible material shall be used for the
construction of causeways and cofferdams. Earthen fill may be used for these
structures if armored by nonerodible cover materials.
13.When a live watercourse must be crossed by construction vehicles more than twice in
any six-month period, a temporary vehicular stream crossing constructed of
nonerodible material shall be provided.
14.All applicable federal, state and local requirements pertaining to working in or
crossing live watercourses shall be met.
15.The bed and banks of a watercourse shall be stabilized immediately after work in the
watercourse is completed.
16.Underground utility lines shall be installed in accordance with the following standards
in addition to other applicable criteria:
a.No more than 500 linear feet of trench may be opened at one time.
b.Excavated material shall be placed on the uphill side of trenches.
c.Effluent from dewatering operations shall be filtered or passed through an approved
sediment trapping device, or both, and discharged in a manner that does not
adversely affect flowing streams or off-site property.
d.Material used for backfilling trenches shall be properly compacted in order to
minimize erosion and promote stabilization.
e.Restabilization shall be accomplished in accordance with this chapter.
f.Applicable safety requirements shall be complied with.
17.Where construction vehicle access routes intersect paved or public roads, provisions
shall be made to minimize the transport of sediment by vehicular tracking onto the
paved surface. Where sediment is transported onto a paved or public road surface,
the road surface shall be cleaned thoroughly at the end of each day. Sediment shall
be removed from the roads by shoveling or sweeping and transported to a sediment
control disposal area. Street washing shall be allowed only after sediment is removed
in this manner. This provision shall apply to individual development lots as well as to
larger land-disturbing activities.
18.All temporary erosion and sediment control measures shall be removed within 30
days after final site stabilization or after the temporary measures are no longer
needed, unless otherwise authorized by the VESCP authority. Trapped sediment and
the disturbed soil areas resulting from the disposition of temporary measures shall be
permanently stabilized to prevent further erosion and sedimentation.
19.Properties and waterways downstream from development sites shall be protected
from sediment deposition, erosion and damage due to increases in volume, velocity
and peak flow rate of stormwater runoff for the stated frequency storm of 24-hour
duration in accordance with the following standards and criteria. Stream restoration
and relocation projects that incorporate natural channel design concepts are not
man-made channels and shall be exempt from any flow rate capacity and velocity
requirements for natural or man-made channels:
a.Concentrated stormwater runoff leaving a development site shall be discharged
directly into an adequate natural or man-made receiving channel, pipe or storm sewer
system. For those sites where runoff is discharged into a pipe or pipe system,
downstream stability analyses at the outfall of the pipe or pipe system shall be
performed.
b.Adequacy of all channels and pipes shall be verified in the following manner:
(1)The applicant shall demonstrate that the total drainage area to the point of analysis
within the channel is one hundred times greater than the contributing drainage
area of the project in question; or
(2)(a) Natural channels shall be analyzed by the use of a two-year storm to verify that
stormwater will not overtop channel banks nor cause erosion of channel bed or
banks.
(b)All previously constructed man-made channels shall be analyzed by the use of
a 10-year storm to verify that stormwater will not overtop its banks and by the
use of a two-year storm to demonstrate that stormwater will not cause erosion
of channel bed or banks; and
(c)Pipes and storm sewer systems shall be analyzed by the use of a 10-year
storm to verify that stormwater will be contained within the pipe or system.
c.If existing natural receiving channels or previously constructed man-made channels
or pipes are not adequate, the applicant shall:
(1)Improve the channels to a condition where a 10-year storm will not overtop the
banks and a two-year storm will not cause erosion to the channel, the bed, or the
banks; or
(2)Improve the pipe or pipe system to a condition where the 10-year storm is
contained within the appurtenances;
(3)Develop a site design that will not cause the pre-development peak runoff rate
from a two-year storm to increase when runoff outfalls into a natural channel or will
not cause the pre-development peak runoff rate from a 10-year storm to increase
when runoff outfalls into a man-made channel; or
(4)Provide a combination of channel improvement, stormwater detention or other
measures which is satisfactory to the VESCP authority to prevent downstream
erosion.
d.The applicant shall provide evidence of permission to make the improvements.
e.All hydrologic analyses shall be based on the existing watershed characteristics and
the ultimate development condition of the subject project.
f.If the applicant chooses an option that includes stormwater detention, he shall obtain
approval from the VESCP of a plan for maintenance of the detention facilities. The
plan shall set forth the maintenance requirements of the facility and the person
responsible for performing the maintenance.
g.Outfall from a detention facility shall be discharged to a receiving channel, and
energy dissipators shall be placed at the outfall of all detention facilities as necessary to
provide a stabilized transition from the facility to the receiving channel.
h.All on-site channels must be verified to be adequate.
i.Increased volumes of sheet flows that may cause erosion or sedimentation on
adjacent property shall be diverted to a stable outlet, adequate channel, pipe or pipe
system, or to a detention facility.
j.In applying these stormwater management criteria, individual lots or parcels in a
residential, commercial or industrial development shall not be considered to be separate
development projects. Instead, the development, as a whole, shall be considered to be a
single development project. Hydrologic parameters that reflect the ultimate development
condition shall be used in all engineering calculations.
k.All measures used to protect properties and waterways shall be employed in a
manner which minimizes impacts on the physical, chemical and biological integrity of
rivers, streams and other waters of the state.
l.Any plan approved prior to July 1, 2014, that provides for stormwater management
that addresses any flow rate capacity and velocity requirements for natural or man-made
channels shall satisfy the flow rate capacity and velocity requirements for natural or
man-made channels if the practices are designed to (i) detain the water quality volume
and to release it over 48 hours; (ii) detain and release over a 24-hour period the expected
rainfall resulting from the one year, 24-hour storm; and (iii) reduce the allowable peak flow
rate resulting from the 1.5, 2, and 10-year, 24-hour storms to a level that is less than or
equal to the peak flow rate from the site assuming it was in a good forested condition,
achieved through multiplication of the forested peak flow rate by a reduction factor that is
equal to the runoff volume from the site when it was in a good forested condition divided
by the runoff volume from the site in its proposed condition, and shall be exempt from any
flow rate capacity and velocity requirements for natural or man-made channels as defined
in any regulations promulgated pursuant to § 62.1-44.15:54 or 62.1-44.15:65 of the Act.
m.For plans approved on and after July 1, 2014, the flow rate capacity and velocity
requirements of § 62.1-44.15:52 A of the Act and this subsection shall be satisfied by
compliance with water quantity requirements in the Stormwater Management Act (§
62.1-44.15:24 et seq. of the Code of Virginia) and attendant regulations, unless such
land-disturbing activities are in accordance with 9VAC25-870-48 of the Virginia
Stormwater Management Program (VSMP) Regulation or are exempt pursuant to
subdivision C 7 of § 62.1-44.15:34 of the Act.
n.Compliance with the water quantity minimum standards set out in 9VAC25-870-66
of the Virginia Stormwater Management Program (VSMP) Regulation shall be deemed to
satisfy the requirements of this subdivision 19.
EROSION AND SEDIMENT
CONTROL NARRATIVE
Description: The project will consist of the construction of a gravel parking lot. The property is zoned M2 and is
located off Ebert Road in Frederick County, Virginia. A total of 11.12 acres will be disturbed for construction.
Date of construction: Construction will begin following plan approval and will take approximately six (6) months
to complete.
Existing site conditions: The site is warehouse space and open fields.
Adjacent areas: The site is bounded by warehouse properties to the east, Interstate 81 to the north. West is
commercial properties. South is commercial properties and open fields. Adjacent properties are zonedM1& M2.
Offsite areas: No offsite areas will be impacted by this project.
Soils: The existing soil conditions were obtained from the NRCS Soils Survey. Refer to the soils map this sheet.
Critical areas: No critical areas are identified with this project.
Erosion And Sediment Control Measures: Unless otherwise indicated, all vegetative and structural erosion and
sediment control measures shall be constructed and maintained according to the minimum standards and
specifications of the Virginia Erosion and Sediment Control Handbook.
Structural Measures:
Phase I:
Install Temporary Construction Entrance with Wash Rack (3.02) as shown on the plans to minimize sediment
carried onto roadway.
Install super silt fence (3.05) and super silt fence as shown on the plans to intercept and detain small amounts
of sediment from disturbed areas during construction in order to prevent sediment from leaving the site.
Install temporary diversion dikes (3.09) as shown on the plans to divert sediment-laden runoff to the sediment
trapping structures.
Install Temporary Sediment Traps (3.13) as shown on plans to detain sediment-laden runoff from small
disturbed areas long enough to allow the majority of the sediment to settle out.
Temporary seeding (3.31) and/or permanent seeding (3.32) shall be placed on all critical slopes (3:1 or greater)
and as needed to stabilize disturbed areas.
Soil stabilization blankets & matting (3.36) shall be installed over steep 3:1 or greater cut and fills slope which
have been brought to final grade and seeded to protect from rill and gully erosion.
Phase II:
Phase I controls shall remain into Phase II for the duration of the project or until drainage area is stabilized.
Fill slope surface shall be left in a roughened condition to reduce erosion, see Plate 3.29-4. Contractor shall
redirect the concentrated flow away from the fill slope by installing diversion dike and divert the runoff to
sediment traps or sediment basins.
Temporary seeding (3.31) and/or permanent seeding (3.32) shall be placed on all critical slopes (3:1 or greater)
and as needed to stabilize disturbed areas.
Vegetative Measures:
Permanent or temporary soil stabilization shall be applied to denuded areas within seven (7) days after final
grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven (7) days
to denuded areas that may not be at final grade but will remain dormant for longer than fourteen (14) days.
Permanent soil stabilization shall be applied to all areas that are to be left dormant for more than one year.
Topsoil that has been stockpiled shall be surrounded with silt fence and protected by mulch and/or temporary
vegetation immediately after grading.
All earth berms, diversions and sediment trap embankments are to be machine-compacted, seeded and
mulched (hay mulch or straw) for temporary and/or permanent vegetative cover immediately after construction
Erosion control mats shall be installed over steep (3:1) cut and fills slope which have been brought to final
grade and seeded to protect from rill and gully erosion.
Management Strategies:
Construction shall be sequenced such that grading operations will begin and end as quickly as possible.
The site superintendent shall be responsible for the installation and maintenance of all erosion and
sediment control measures. Maintenance of these measures throughout the project is critical to the
effectiveness of the program.
After areas above controls have been stabilized, the controls shall be cleaned up and removed.
Electric power, telephone, storm, sanitary, water & gas supply trenches are to be compacted, seeded
and mulched within five (5) days after backfilling. No more than 500 feet are to be open at any one time.
All cut and fill slopes are to be seeded and mulched within five (5) days of completion of grading.
Drainage swales shall be stabilized with check dams until vegetation has been well established, at which
time the check dams shall be removed.
Devices listed above are considered minimum erosion and sediment controls. Additional control
measures may be necessary due to contractor phasing or other unforeseen conditions. It is the
contractor's responsibility to provide additional measures to those shown, as needed, in order to control
erosion and contain sediment on site. All measures shall be installed according to the standards and
specifications in the Virginia Erosion and Sediment Control Handbook.
Stormwater Management:
Increased runoff from this development will be controlled by the Project's stormwater management
facilities.
Maintenance Program:
All control measures shall be inspected daily by the site superintendent or his representative and within
24 hours after any storm event greater than 0.5 inches of rain per 24-hour period. Any damaged
structural measures are to be repaired by the end of the day. Seeded areas shall be checked regularly
to ensure that a good stand of grass is maintained. All areas shall be fertilized and reseeded as needed
until grass is established.
Trapped sediment is to be removed as required to maintain 50% trap efficiency and disposed of by
spreading on site.
Inlet protection shall be checked regularly for sediment build-up. If the gravel outlet is clogged by
sediment, it shall be removed and cleaned or replaced immediately.
The contractor is responsible for keeping existing public roads in a clean, dust and mud free, condition at
all times.
Erosion and sediment control program:
Phase I
1.Hold pre-construction meeting on site with inspector.
2.Install construction entrance.
3.Clearing and grubbing for sediment control devices only
4.Placement of sediment control devices.
5.Obtain inspector's approval prior to beginning grading operations.
6.Clear and grub main area of site protected by installed E&S controls.
Phase II
7.Rough grade remainder of site.
8.Final grading.
9.Restoration and stabilization of disturbed areas.
10.Remove erosion and sediment control measures with the approval of the inspector.
Note: The Frederick County Public Works and Engineering Department retain the right to add and/or
modify these erosion and sediment control measures during the construction process, within
reason, to ensure adequate protection to the public and the environment.
Seeding schedule (soil stabilization):
1.All permanent seeding shall be in accordance with section 3.31 & 3.32 of the VESCH.
2.Spread topsoil at a minimum depth of four (4) inches.
3.Incorporate pulverized agricultural limestone into the topsoil at a rate of 92 lbs. per 1,000 square
feet (2 tons per acre).
4.Fertilize with 10-10-10 fertilizer at a rate of 23 lbs per 1,000 square feet (1,000 lbs per acre).
5.Seed all areas with a seed mix consisting of 67% Kentucky 31 Tall Fescue and 33% Red Top
Clover.
6.Mulch all seeded areas with straw mulch applied at a rate of 3,500 lbs per acre anchored with
cutback or emulsified asphalt applied at a rate of 200 gallons per acre.
Dust control:
1.Temporary seeding shall be applied to all disturbed areas subject to little or no construction traffic.
2.All haul roads and other heavy traffic routes shall be sprinkled with water until the surface is wet and
repeated as needed to control dust.
SOIL MAP
1'=100"
151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF
DESIGNED BY:
FILE NO.
SCALE:
DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WV0074CCCARROLL INDUSTRIAL PARK LOT 9SITE DEVELOPMENT PLANSTONEWALL MAGISTERIAL DISTRICTFREDERICK COUNTY, VIRGINIA14
CC/DM
11/21/2024
#49-25E&S DETAILSRev. No.Date
1 01/31/2025
N/A
7
TEMPORARY DIVERSION CHANNEL
N.T.S.
118" TYP.
DITCH DEPTH
3'VARIABLEROADWAY
2 MAX
1
GRASS LINED DITCH
CUT SL
O
P
E
/
EX. GRA
D
E
2 MAX
*NO FILL TO BE PLACED WITH DITCH CONSTRUCTION
543-21-2FREDERICK COUNTY SANITATION AUTHORITYZONED: M219.13 AC.43-21-4PIERCE HARDY LIMITED PARTNERSHIPZONED: M210.00 AC.MILTON RAY DRIVE 80' ROW25 MPH SPEED LIMITEBER
T
R
O
A
D
80' R
O
W
25 MP
H
S
P
E
E
D
L
I
M
I
T 43-21-9C CLANN, LLCZONED: M210.00 AC.43-21-7C CLAN, LLCZONED: M220.00 AC.43-21-7C CLAN, LLCZONED: M220.00 AC.EX. W/L ESMTINSTRUMENT#070002103EX. W/L ESMTINSTRUMENT#070002103EX. W/L ESMTINSTRUMENT #070002103EX. FENCEEX. FENCEEX. FENCELODLODLODLOD#1DL#1CLV#2CLV67575INV" STM
1567800INV 68443INV68360INV" STM 2x15%0.5086958704868786968655866412'GRAVEL TRAILERPARKING LOTOLD DOMINIONCONCRETESUPPLY YARDEG(TO BE REMOVED)(TO BE REMOVED)(TO BE REMOVED)(TO BE REMOVED)(TO BE REMOVED)(TO BE REMOVED)(TO BE REMOVED)OVERHEAD UTILITY(TO REMAIN)55'60'60'55'55'55'55'40'BUILDING HEIGHT = 18'(TO BE REMOVED)60'EG
EGEG(TO BE REMOVED)60'GUY WIRES(TO REMAIN)GUY WIRES(TO REMAIN)fdPP(TO REMAIN)PP(TO BE REMOVED)PP(TO BE REMOVED)PP(TO BE REMOVED)(TO BE REMOVED)PP(TO REMAIN)PHASE 1PHASE 2EGEG
PP(TO REMAIN)PP(TO REMAIN)PP(TOREMAIN)GUY WIRES(TO REMAIN)60'PP(TO REMAIN)PR. 15" HDPE12'12'12'11'12'12'1827 SF1827 SF44'6'x1'x6'MONUMENTSIGN40'BUILDING HEIGHT = 18'(TO REMAIN)5
0
'R60'R80'
R40'R10+0011+0011+35.1410+0011+0011+13.5819.9'PR. 2x15" HDPE(TO BE REMOVED)18'10'30'CG-6C
G
-
6
CG-
6CG-6204'231.1'91'44'25'27'40'37'20' WIDE GATE30' WIDEGATEAGGREGATE BINPAVED WASHDOWN AREA11'11'PIT #1BATCH PLANT(SILOS HAVE MAXHEIGHT OF 39')8" WATERLINE "A"20' W/L ESMT2-45° BENDS5/8" W/M (TYP.)1-F.H.ASSEMBLY W/BOLLARDS1-8" G.V.1- 8"x1" TAPPED PLUG1- CORP STOP & 1" PE200 PSI CTS TUBING6" SANLAT (TYP.)BATCH TRAILEROVERHEAD UTILITY(TO RE RELOCATED)UNDERGROUNDUTILITY RELOCATIONUNDERGROUNDUTILITY RELOCATION144'PHASE 2SUPPLY YARDCONNECT TO EX W/L6" SANLAT (TYP.)CONNECT TO EXSAN. SEWER(BY CONTRACTOR)(TO BE REMOVED)10+0011+0012+0012+70.001-11.25° BEND1" PRIVATEWATER SERVICE686688686686688690692694692
6
9
2
68
8
68
4
6
8
6
68
2
682
680
PIT #4
PIT #2PIT #3EXISTING TREE(TO BE REMOVED)EXISTING(TREESTO BEREMOVED)130.4'
69.5'52'231.4'1-8" TEE1-6" G.V.CONCRETETRUCKPARKINGAREA18'8'8'8'%0.5EMPLOYEEPARKINGAREACG-2
8128TC8033TC7987TC7939EP6
8
0
6808223TC
8061TC8113TC8169TC8844EP8423EP8448EP8578TC8664TC8913TC8923TC8904TC8852TC151 Windy Hill Lane
Winchester, Virginia 22602
Telephone: (540) 662-4185
Fax: (540) 722-9528
www.greenwayeng.com
FND 1971
E N G I N E E R I N GSHEET OFDESIGNED BY:FILE NO.SCALE:DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIA
OFFICES IN: WINCHESTER, VA & MARTINSBURG, WV0074CCCARROLL INDUSTRIAL PARK LOT 9
SITE DEVELOPMENT PLAN
STONEWALL MAGISTERIAL DISTRICT
FREDERICK COUNTY, VIRGINIA14CC/DM11/21/2024#49-25GRADING PLANRev. No.Date203/03/20251'=40"8PAVEMENT SECTIONN.T.S.11/05/14VER 18" SUBBASE VDOT STD. GR-21BCOMPACTED SUBGRADE(COMPACTED TO 95% DENSITY ATOPTIMUM MOISTURE CONTENTVDOT VTM-1 METHOD)PRIVATE GRAVEL AREANOTE:THIS PAVEMENT SECTION IS NOT DESIGNED BASED ON AN ANTICIPATED TRAFFICLOADING OR CBR VALUE AND IS INTENDED FOR PRIVATE USE AND MAINTENANCEONLY.555NOTE:1.IRRIGATION LINES AND DEVICES, LIGHT POLES, TRANSFORMERS,JUNCTION BOXES, PEDESTALS, OTHER OBSTACLES AND ALL DRYUTILITIES SHALL NOT BE PLACED ON FREDERICK WATER EASEMENTS;PERPENDICULAR IRRIGATION LINES AND DRY UTILITY CROSSINGS AREPERMITTED WITH 18" MINIMUM VERTICAL SEPARATION.2.VALVES, MANHOLES, ARVS AND OTHER FREDERICK WATER SURFACEFEATURES SHALL NOT BE PLACED IN CURB AND GUTTER, NOR SLOPEDPORTION OF HANDICAPPED RAMPS; CONTRACTOR SHALL COORDINATELOCATIONS WITH THE FREDERICK WATER INSPECTOR.3.CONTRACTOR SHALL COORDINATE WITH FREDERICK WATERINSPECTOR AND TEST PIT THE EXISTING WATER MAIN TO CONFIRMTHAT 48" OF COVER IS MAINTAINED.77777771011
543-21-2FREDERICK COUNTY SANITATION AUTHORITYZONED: M219.13 AC.43-21-4PIERCE HARDY LIMITED PARTNERSHIPZONED: M210.00 AC.MILTON RAY DRIVE 80' ROW25 MPH SPEED LIMITEBER
T
R
O
A
D
80' R
O
W
25 MP
H
S
P
E
E
D
L
I
M
I
T 43-21-9C CLANN, LLCZONED: M210.00 AC.43-21-7C CLAN, LLCZONED: M220.00 AC.43-21-7C CLAN, LLCZONED: M220.00 AC.EX. W/L ESMTINSTRUMENT#070002103EX. W/L ESMTINSTRUMENT#070002103EX. W/L ESMTINSTRUMENT #070002103EX. FENCEEX. FENCEEX. FENCELODLODLODLOD#1DL#1CLV#2CLV67575INV" STM 1567800INV 68443INV68360INV" STM 2x15%0.5086958704868786968655866412'GRAVEL TRAILERPARKING LOTOLD DOMINIONCONCRETESUPPLY YARDEG(TO BE REMOVED)(TO BE REMOVED)(TO BE REMOVED)(TO BE REMOVED)(TO BE REMOVED)(TO BE REMOVED)(TO BE REMOVED)OVERHEAD UTILITY(TO REMAIN)55'60'60'55'55'55'55'40'BUILDING HEIGHT = 18'(TO BE REMOVED)60'EG
EGEG(TO BE REMOVED)60'GUY WIRES(TO REMAIN)GUY WIRES(TO REMAIN)fdPP(TO REMAIN)PP(TO BE REMOVED)PP(TO BE REMOVED)PP(TO BE REMOVED)(TO BE REMOVED)PP(TO REMAIN)PHASE 1PHASE 2EGEG
PP(TO REMAIN)PP(TO REMAIN)PP(TOREMAIN)GUY WIRES(TO REMAIN)60'PP(TO REMAIN)PR. 15" HDPE12'12'12'11'12'12'1827 SF1827 SF44'6'x1'x6'MONUMENTSIGN40'BUILDING HEIGHT = 18'(TO REMAIN)5
0
'R60'R80'
R40'R10+0011+0011+35.1410+0011+0011+13.5819.9'PR. 2x15" HDPE(TO BE REMOVED
)18'10'30'CG-6C
G
-
6
CG-
6CG-6204'231.1'91'44'25'27'40'37'20' WIDE GATE30' WIDEGATEAGGREGATE BINPAVED WASHDOWN AREA11'11'PIT #1BATCH PLANT(SILOS HAVE MAXHEIGHT OF 39')8" WATERLINE "A"20' W/L ESMT2-45° BENDS5/8" W/M (TYP.)1-F.H.ASSEMBLY W/BOLLARDS1-8" G.V.1- 8"x1" TAPPED PLUG1- CORP STOP & 1" PE200 PSI CTS TUBING6" SANLAT (TYP.)BATCH TRAILEROVERHEAD UTILITY(TO RE RELOCATED)UNDERGROUNDUTILITY RELOCATIONUNDERGROUNDUTILITY RELOCATION144'PHASE 2SUPPLY YARDCONNECT TO EX W/L6" SANLAT (TYP.)CONNECT TO EXSAN. SEWER(BY CONTRACTOR)(TO BE REMOVED)10+0011+0012+0012+70.001-11.25° BEND1" PRIVATEWATER SERVICEPIT #4
PIT #2PIT #3EXISTING TREE(TO BE REMOVED)EXISTING(TREESTO BEREMOVED)130.4'
69.5'52'231.4'1-8" TEE1-6" G.V.CONCRETETRUCKPARKINGAREA18'8'8'8'%0.5EMPLOYEEPARKINGAREACG-2
8128TC8033TC7987TC7939EP8223TC8061TC8113TC8169TC8844EP8423EP8448EP8578TC8664TC8913TC8923TC8904TC8852TCLAYOUT & UTILITY PLAN
151 Windy Hill Lane
Winchester, Virginia 22602
Telephone: (540) 662-4185
Fax: (540) 722-9528
www.greenwayeng.com
FND 1971
E N G I N E E R I N GSHEET OFDESIGNED BY:FILE NO.SCALE:DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIA
OFFICES IN: WINCHESTER, VA & MARTINSBURG, WV0074CCCARROLL INDUSTRIAL PARK LOT 9
SITE DEVELOPMENT PLAN
STONEWALL MAGISTERIAL DISTRICT
FREDERICK COUNTY, VIRGINIA14CC/DM11/21/2024#49-25Rev. No.Date203/03/20251"=40'9557NOTES1.VALVES, MANHOLES, ARV'S AND OTHER FREDERICK WATERSURFACE FEATURES SHALL NOT BE PLACED IN CURB AND GUTTER,NOR SLOPED PORTION OF HANDICAPPED RAMPS. CONTRACTORSHALL COORDINATE LOCATIONS WITH THE FREDERICK WATERINSPECTOR.2.IRRIGATION LINES AND DEVICES, LIGHT POLES, TRANSFORMERS,JUNCTION BOXES, PEDESTALS, OTHER OBSTACLES AND ALL DRYUTILITIES SHALL NOT BE PLACED ON FREDERICK WATEREASEMENTS; PERPENDICULAR IRRIGATION LINES AND DRY UTILITYCROSSINGS ARE PERMITTED WITH 18" MINIMUM VERTICALSEPARATION.3.VALVES, MANHOLES, ARVS AND OTHER FREDERICK WATERSURFACE FEATURES SHALL NOT BE PLACED IN CURB AND GUTTER,NOR SLOPED PORTION OF HANDICAPPED RAMPS; CONTRACTORSHALL COORDINATE LOCATIONS WITH THE FREDERICK WATERINSPECTOR.4.EXISTING BUILDINGS TO REMAIN AND BE USED FOR: STORAGEFACILITIES FOR CONSTRUCTION CONTRACTORS, HEAVYCONSTRUCTION CONTRACTORS, AND SPECIAL TRADECONTRACTORS.5.PARKING SPACES ARE NOT REQUIRED FOR THE PROPOSED USES,BUT HAVE BEEN PROVIDED.6.CONTRACTOR SHALL TEST PIT AS REQUIRED AND ADJUST ALLEXISTING FREDERICK WATER FACILITIES TO GRADE PER THEFREDERICK INSPECTORS REQUIREMENTS7.THE WASHDOWN WATER WILL BE RECYCLED IN A CLOSED LOOPSYSTEM AND WILL NOT BE GOING INTO THE SANITARY SEWERLATERAL.8.QC LAB & BATCH TRAILER WILL REQUIRE BUILDING PERMITS.NOTE:THE WATER AND SANITARY SEWER ARE NOT IN SERVICE AND CONTRACTOR WILL PERFORM ALL REQUIREDWORK TO ACHIEVE PLACING THE RELEVANT PORTIONS OF WATER AND SANITARY SEWER FACILITIES IN SERVICE.6710888889101011
EBERT ROAD ENTRANCE CULVERT-0+500+000+501+001+502+00665670675680685665670675680685113.96' - 15" HDPE @ 1.97%00+00.00
INV OUT = 678.00
1+13.96
INV OUT = 675.75 PROPOSEDGRADEEXISTINGGRADE9' CL-IRIP-RAPMILTON RAY DRIVE ENTRANCE CULVERT-0+500+000+501+001+502+00675680685690675680685690127.81 - 2x15" HDPE @ 0.6%00+00.00
1+27.81
INV OUT = 684.43
INV OUT= 683.60 PROPOSEDGRADEEXISTINGGRADE7' CL-IRIP-RAP9+5010+0010+5011+0011+5012+00665670675680685690695EBERT ROAD ENTRANCE10+00.00
PROPOSEDGRADEEXISTINGGRADE-0.95%-2.00%2.30%PVI STA.10+15.50
PVI ELEV.680.03
PVC STA.10+20.50
PVC ELEV.679.93
PVI STA.10+25.50
PVI ELEV.679.83
PVT STA.10+30.50
PVT ELEV.679.95
VC = 10.00SD = 87'K-Val = 2.3SAG = 10+25.15ELEV. = 679.889+5010+0010+5011+0011+5012+00670675680685690695700MILTON ROAD ENTRANCE10+00.00 PROPOSEDGRADEEXISTINGGRADE-2.52%-2.00%5.00%PVI STA.10+14.00PVI ELEV.686.90 PVC STA.10+19.00PVC ELEV.686.80PVI STA.10+24.00PVI ELEV.686.70PVT STA.10+29.00PVT ELEV.686.95VC = 10.00SD = 45'K-Val = 1.4SAG = 10+21.86ELEV. = 686.779+5010+0010+5011+0011+5012+0012+5013+0013+50660665670675680685690660665670675680685690SANITARY LATERAL PROFILE6" PVC SAN LAT @ 2.0%10+00 = CONN. TO EX. SANITARY SEWER
INV OUT = 675.75
12+74.94 = SAN. CLEANOUT
INV OUT = 682.53
11+02.18 = SAN. CLEANOUT PROPOSEDGRADEEXISTINGGRADETP-0+500+000+501+001+502+002+506756806856906957000+78.33 = 11.25° BEND
1+71.64 = 1-8" G.V.
1-TAPPED PLUG
1-CORP STOP 8" WATERLINE "A"CL 52 DIP8" WATERLINE "A"PROPOSEDGRADEEXISTINGGRADETPWATERLINE "A" PROFILE4.0'COVER(TYP.)0+00 = CONN. TO EXISTING W/L
INV OUT = 685.59
0+1.25 = 45° BEND
0+3.75 = 45° BEND
1+82.43 =
5/8" WATER METER
675680685690695700PE 200 PSI CTS TUBING1" PRIVATE WATER SERVER2+52.97 =
END PRIVATE
SERVICE LINE
3+00VDOT PROFILES & DETAILS
151 Windy Hill Lane
Winchester, Virginia 22602
Telephone: (540) 662-4185
Fax: (540) 722-9528
www.greenwayeng.com
FND 1971
E N G I N E E R I N GSHEET OFDESIGNED BY:FILE NO.SCALE:DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIA
OFFICES IN: WINCHESTER, VA & MARTINSBURG, WV0074CCCARROLL INDUSTRIAL PARK LOT 9
SITE DEVELOPMENT PLAN
STONEWALL MAGISTERIAL DISTRICT
FREDERICK COUNTY, VIRGINIA14CC/DM11/21/2024#49-25Rev. No.Date102/21/202510H:1"=50V:1"=5"SCALE: 1" = 5'
5 2.5 0 5 10
75
5
6
FREDERICK COUNTY SANITATION AUTHORITY
ZONED: M2
19.13 AC.
43-21-4
PIERCE HARDY LIMITED PARTNERSHIP
ZONED: M2
10.00 AC.
MILTON RAY DRIVE
80' ROW
25 MPH SPEED LIMIT
EBERT ROAD80' ROW25 MPH SPEED LIMITEX RAILROAD
43-21-7
C CLAN, LLC
ZONED: M2
20.00 AC.
43-21-7
C CLAN, LLC
ZONED: M2
20.00 AC.
EX. W/L ESMT
INSTRUMENT
#070002103
EX. W/L ESMT
INSTRUMENT
#070002103
EX. W/L ESMT
INSTRUMENT #070002103
EX. FENCE
EX. FENCE
EX. FENCE
LOD
LOD
LOD
LOD
#1
DL
#1
CLV
#2
CLV
675 75
INV
" STM 15678 00
INV
684 43INV
683 60INV
" STM 2x15
83 6
83 22
8288
83 27
%2.08
83 53 83 19
(TO BE REMOVED)
(TO BE REMOVED)
(TO BE REMOVED)
(TO BE REMOVED)
(TO BE REMOVED)
(TO BE REMOVED)
(TO BE REMOVED)
OVERHEAD UTILITY
(TO REMAIN)
BUILDING HEIGHT = 18'
(TO BE REMOVED)
(TO BE REMOVED)
GUY WIRES
(TO REMAIN)
GUY WIRES
(TO REMAIN)
fdPP
(TO REMAIN)
PP
(TO BE
REMOVED)
PP
(TO BE REMOVED)
PP
(TO BE REMOVED)
(TO BE REMOVED)
PP
(TO REMAIN)
PHASE 1
PHASE 2
PP
(TO REMAIN)
PP
(TO REMAIN)
PP
(TO
REMAIN)
GUY WIRES
(TO REMAIN)
PP
(TO REMAIN)
PR. 15" HDPE
1827 SF
1827 SF
6'x1'x6'
MONUMENT
SIGN
BUILDING HEIGHT = 18'
(TO REMAIN)
10+0011+0011+35.1410+0011+0011+13.58PR. 2x15" HDPE
(TO BE REMOVED)30' WIDE GATE
30' WIDE
GATE
20' W/L ESMT
OVERHEAD UTILITY
(TO RE RELOCATED)
UNDERGROUND
UTILITY RELOCATION
UNDERGROUND
UTILITY RELOCATION
(TO BE REMOVED)
10+0
0
11+
0
012+0012+70.00
686
688686686
688
690
692694692692688684686682682680EXISTING TREE
(TO BE REMOVED)
EXISTING
(TREES
TO BE
REMOVED)
CURB-CUT
W/ RIPRAP
CG-6R
%0.5POI #2
POI #1
DRAINAGE AREA A
TO POI #1
A=9.28 AC.
C=0.78
DRAINAGE AREA B
TO POI #2
A=6.41 AC.
C=0.81
5
6
FREDERICK COUNTY SANITATION AUTHORITY
43-21-4
PIERCE HARDY LIMITED PARTNERSHIP
ZONED: M2
10.00 AC.
MILTON RAY DRIVE
80' ROW
25 MPH SPEED LIMIT
EBERT ROAD80' ROW25 MPH SPEED LIMITEX RAILROAD
43-21-7
C CLAN, LLC
ZONED: M2
20.00 AC.
43-21-7
C CLAN, LLC
ZONED: M2
20.00 AC.
EX. W/L ESMT
INSTRUMENT
#070002103
EX. W/L ESMT
INSTRUMENT
#070002103
EX. W/L ESMT
INSTRUMENT #070002103
EX. FENCE
EX. FENCE
EX. FENCE
LOD
LOD
LOD
LOD
83 6
83 22
82 88
83 27
%2.08
83 53 83 19
10+0011+0011+35.1410+0011+0011+13.5810+
0
0
11+
0
012+0012+70.00
%0.5DRAINAGE AREA TO
POI #1
A=8.97 AC.
CN=73
DRAINAGE AREA TO
POI #2
A=6.55 AC.
CN=81
POI #2
POI #1
SWM PLAN151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF
DESIGNED BY:
FILE NO.
SCALE:
DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WV0074CCCARROLL INDUSTRIAL PARK LOT 9SITE DEVELOPMENT PLANSTONEWALL MAGISTERIAL DISTRICTFREDERICK COUNTY, VIRGINIA14
CC/DM
11/21/2024
#49-25
Rev. No.Date
1"=80'
11
SWM NARRATIVE
STORMWATER MANAGEMENT NARRATIVE:
THIS PROJECT PROPOSES A NEW DEVELOPMENT PROPOSED TRUCK TRAILER PARKING LOT. THE 11.12 ACRE
SITE WAS EVALUATED FOR STORMWATER QUALITY AND QUANTITY CONTROL.
STORMWATER QUALITY (BMP):
THE VIRGINIA RUNOFF REDUCTION METHOD FOR RE-DEVELOPMENT WORKSHEET V3.0-2011 STANDARDS AND
SPECIFICATIONS WAS USED TO VERIFY COMPLIANCE OF THE WATER QUALITY CONTROL REQUIREMENTS. THE
REQUIRED PHOSPHORUS REDUCTION FOR THE SITE IS 7.24 LB/YR. WATER QUALITY CREDITS WILL BE
PURCHASED FOR THE ENTIRE 7.24 LB/YR REQUIRED TO COMPLY WITH WATER QUALITY (BMP) REQUIREMENTS.
STORMWATER QUANTITY (SWM):
FOR POI #1, THE AREA DRAINS TO AN EXISTING CULVERT UNDER EBERT ROAD THAT THEN DRAINS INTO AN
EXISTING SWM POND. THE SWM POND WAS APPROVED WITH LOT 1 OF THE CARROLL INDUSTRIAL PARK SITE
PLAN #13-20 BY PAINTER-LEWIS, PLC, WHICH WAS APPROVED IN 2020 AND AS-BUILT IN 2024 BY GREENWAY
ENGINEERING.
THE LOT 1 SITE PLAN PROVIDED STORMWATER MANAGEMENT FOR THE DRAINAGE AREA SHOWN WITHIN THIS
PLAN. PER THE APPROVED SWM REPORT, THE PROPOSED DITCH LINES AND STORM SEWER SYSTEMS HAVE
BEEN DESIGNED FOR THE FULLY DEVELOPED CONDITION OF THIS PARK UNDER THE TEN YEAR STORM AND 70%
IMPERVIOUS COVERAGE AREA. ALL THESE SYSTEMS WERE DESIGNED TO DRAINAGE INTO THE SWM POND TO
CONTROL RUNOFF PRIOR TO DRAINING TO OFFSITE CHANNELS.
FOR POI #2, THE AREA DRAINS TO AN EXISTING CULVERT UNDER EBERT ROAD WITHIN THE RAILROAD
RIGHT-OF-WAY. THE TOTAL DRAINAGE AREA AND FLOW OF THE AREA WAS REDUCED. THE PRE-DEVELOPED
DRAINAGE AREA IS 6.55 ACRES WITH A CN OF 81. THE POST-DEVELOPED DRAINAGE AREA IS 6.41 ACRES WITH A
CN OF 81.
NOTES:
HYDROCAD SOFTWARE VERSION 10 BUILD 15 WAS USED TO ROUTE THE STORMWATER MANGEMENT FACILITY
AND ALL DRAINAGE AREAS TO VERIFY THE SWM REQUIREMENTS WERE MET.
SITE BOUNDARY
DRAINAGE DIVIDES
IMPERVIOUS AREAS
SWM LEGEND
GRASS AREAS
LIMITS OF DISTURBANCE
HYDROLOGIC SOIL GROUPA, B, C, D
TC PATH
PRE-DEVELOPMENT DRAINAGE MAP POST-DEVELOPMENT DRAINAGE MAP
5
6
FREDERICK COUNTY SANITATION AUTHORITY
43-21-4
PIERCE HARDY LIMITED PARTNERSHIP
ZONED: M2
10.00 AC.
MILTON RAY DRIVE
80' ROW
25 MPH SPEED LIMIT
EBERT ROAD80' ROW25 MPH SPEED LIMITEX RAILROAD
43-21-7
C CLAN, LLC
ZONED: M2
20.00 AC.
43-21-7
C CLAN, LLC
ZONED: M2
20.00 AC.
EX. W/L ESMT
INSTRUMENT
#070002103
EX. W/L ESMT
INSTRUMENT
#070002103
EX. W/L ESMT
INSTRUMENT #070002103
EX. FENCE
EX. FENCE
EX. FENCE
LOD
LOD
LOD
LOD
#1
DL
#1
CLV
#2
CLV
675 75
INV
" STM 15678 00
INV
684 43
INV
683 60
INV
" STM 2x15
83 6
83 22
82 88
83 27
%2.08
83 53 83 19
(TO BE REMOVED)
(TO BE REMOVED)
(TO BE REMOVED)
(TO BE REMOVED)
(TO BE REMOVED)
(TO BE REMOVED)
(TO BE REMOVED)
OVERHEAD UTILITY
(TO REMAIN)
BUILDING HEIGHT = 18'
(TO BE REMOVED)
(TO BE REMOVED)
GUY WIRES
(TO REMAIN)
GUY WIRES
(TO REMAIN)
fdPP
(TO REMAIN)
PP
(TO BE
REMOVED)
PP
(TO BE REMOVED)
PP
(TO BE REMOVED)
(TO BE REMOVED)
PP
(TO REMAIN)
PHASE 1
PHASE 2
PP
(TO REMAIN)
PP
(TO REMAIN)
PP
(TO
REMAIN)
GUY WIRES
(TO REMAIN)
PP
(TO REMAIN)
PR. 15" HDPE
1827 SF
1827 SF
6'x1'x6'
MONUMENT
SIGN
BUILDING HEIGHT = 18'
(TO REMAIN)
10+0011+0011+35.1410+0011+0011+13.58PR. 2x15" HDPE
(TO BE REMOVED)30' WIDE GATE
30' WIDE
GATE
8" WATERLINE "A"
20' W/L ESMT
2-45° BENDS
5/8" W/M (TYP.)
1-F.H.
ASSEMBLY W/
BOLLARDS
1-8" G.V.
1- 8"x1" TAPPED PLUG
1- CORP STOP & 1" PE
200 PSI CTS TUBING
6" SAN
LAT (TYP.)
OVERHEAD UTILITY
(TO RE RELOCATED)
UNDERGROUND
UTILITY RELOCATION
UNDERGROUND
UTILITY RELOCATION
CONNECT TO EX W/L
6" SAN
LAT (TYP.)
CONNECT TO EX
SAN. SEWER
(BY CONTRACTOR)
(TO BE REMOVED)
10+
0
0
11+
0
012+0012+70.00
1-11.25° BEND
1" PRIVATE
WATER SERVICE
686
688686686
688
690
692694692692688684686682682680EMPLOYEE
PARKING
AREA
EXISTING TREE
(TO BE REMOVED)
EXISTING
(TREES
TO BE
REMOVED)
1-8" TEE
1-6" G.V.
CURB-CUT
W/ RIPRAP
CG-6R
%0.5BMP PLAN151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF
DESIGNED BY:
FILE NO.
SCALE:
DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WV0074CCCARROLL INDUSTRIAL PARK LOT 9SITE DEVELOPMENT PLANSTONEWALL MAGISTERIAL DISTRICTFREDERICK COUNTY, VIRGINIA14
CC/DM
11/21/2024
#49-25
Rev. No.Date
1"=60'
12
BMP LEGEND
LIMITS OF DISTURBANCE
HYDROLOGIC SOIL GROUPA, B, C, D
IMPERVIOUS COVER
FOREST/OPEN SPACE
(NONE)
(NO HATCHING)
MANAGED TURF
**NUTRIENT CREDITS TO BE PURCHASED
5643-21-2FREDERICK COUNTY SANITATION AUTHORITYZONED: M219.13 AC.MILTON RAY DRIVE 80' ROW25 MPH SPEED LIMITEBER
T
R
O
A
D
80' R
O
W
25 M
P
H
S
P
E
E
D
L
I
M
I
T 43-21-9C CLANN, LLCZONED: M210.00 AC.EX RAILROAD43-21-7C CLAN, LLCZONED: M220.00 AC.43-21-7C CLAN, LLCZONED: M220.00 AC.EX. W/L ESMTINSTRUMENT#070002103EX. W/L ESMTINSTRUMENT#070002103EX. W/L ESMTINSTRUMENT #070002103EX. FENCEEX. FENCEEX. FENCELODLODLODLOD#1DL#1CLV#2CLV67575INV" STM 1567800INV 68443INV68360INV" STM 2x15836832282888327%2.088353831912'GRAVEL TRAILERPARKING LOTOLD DOMINIONCONCRETESUPPLY YARDEG(TO BE REMOVED)(TO BE REMOVED)(TO BE REMOVED)(TO BE REMOVED)(TO BE REMOVED)(TO BE REMOVED)(TO BE REMOVED)OVERHEAD UTILITY(TO REMAIN)55'60'60'55'55'55'55'40'BUILDING HEIGHT = 18'(TO BE REMOVED)60'EG
EGEG(TO BE REMOVED)60'GUY WIRES(TO REMAIN)GUY WIRES(TO REMAIN)fdPP(TO REMAIN)PP(TO BE REMOVED)PP(TO BE REMOVED)PP(TO BE REMOVED)(TO BE REMOVED)PP(TO REMAIN)PHASE 1PHASE 2EGEG
PP(TO REMAIN)PP(TO REMAIN)PP(TOREMAIN)GUY WIRES(TO REMAIN)60'PP(TO REMAIN)PR. 15" HDPE12'12'12'11'12'12'1827 SF1827 SF44'6'x1'x6'MONUMENTSIGN40'BUILDING HEIGHT = 18'(TO REMAIN)5
0
'R60'R80'
R40'R19.9'PR. 2x15" HDPE(TO BE REMOVED)18'10'30'CG-6C
G
-
6
CG-
6CG-6204'40'231.1'91'44'25'27'40'37'30' WIDE GATE30' WIDEGATEAGGREGATE BINPAVED WASHDOWN AREA11'11'PIT #1QC LAB(MAX HEIGHT 10')BATCH PLANT(SILOS HAVE MAXHEIGHT OF 39')8" WATERLINE "A"20' W/L ESMT2-45° BENDS5/8" W/M (TYP.)1-F.H.ASSEMBLY W/BOLLARDS1-8" G.V.1- 8"x1" TAPPED PLUG1- CORP STOP & 1" PE200 PSI CTS TUBING6" SANLAT (TYP.)BATCH TRAILEROVERHEAD UTILITY(TO RE RELOCATED)UNDERGROUNDUTILITY RELOCATIONUNDERGROUNDUTILITY RELOCATION144'PHASE 2SUPPLY YARDCONNECT TO EX W/L6" SANLAT (TYP.)CONNECT TO EXSAN. SEWER(BY CONTRACTOR)(TO BE REMOVED)1-11.25° BEND1" PRIVATEWATER SERVICE686688686686688690692694692692
6
8
8
68
4
68
6
68
2
682
68
0
PIT #4
PIT #2PIT #38'18'EMPLOYEEPARKINGAREAEXISTING TREE(TO BE REMOVED)EXISTING(TREESTO BEREMOVED)191.5'
69.5'52'231.4'1-8" TEE1-6" G.V.8'8'98' OFOPAQUEFENCECURB-CUTW/ RIPRAPCG-6 CG-6R%0.5CONCRETETRUCKPARKINGAREAGG9BS10GG6BS4GG5BS4GG13BS13GG17BS17151 Windy Hill Lane
Winchester, Virginia 22602
Telephone: (540) 662-4185
Fax: (540) 722-9528
www.greenwayeng.com
FND 1971
E N G I N E E R I N GSHEET OFDESIGNED BY:FILE NO.SCALE:DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIA
OFFICES IN: WINCHESTER, VA & MARTINSBURG, WV0074CCCARROLL INDUSTRIAL PARK LOT 9
SITE DEVELOPMENT PLAN
STONEWALL MAGISTERIAL DISTRICT
FREDERICK COUNTY, VIRGINIA14CC/DM11/21/2024#49-25LANDSCAPE & LIGHTING PLANRev. No.Date304/09/20251'=40"13NOTES:1.NO LIGHTING IS PROPOSED ON THE SITE,THEREFORE NO PHOTOMETRIC PLAN ISREQUIRED.2.REAR SETBACK ON SOUTHEAST PROPERTY LINETO USE EXISTING TREE LINE BUFFER.3.NO TREES OR SHRUBS SHALL BE PLACES ONFREDERICK WATER EASEMENTS.EXISTING TRUCK TRAILER STORAGENO BUFFER REQUIREDEXISTING BUFFER TO REMAINEXISTING BUFFER TO REMAIN55688
NOTES:
1. ALL SEEDED AND SODDED AREAS OF PROJECT WILL BE OF A DROUGHT TOLERANT MIX PER PENNINGTON SEED
COMPANY.
2. ALL STREET, INTERIOR AND PERIMETER TREES WILL HAVE A MULCH BED CUT UNDER THE TREE EQUAL TO 6' RADIUS
TREE TRUNK.
3. NO SLOPE IN EXCESS OF 25% WILL BE SEEDED OR SODDED.
4. MULCHED FOUNDATION LANDSCAPE BEDS, AS SHOWN WITH 3" LAYER OF MULCH, COVER 19,606 SF X .25=
4,754 CF / 27 = 181 CY. THIS DOES NOT INCLUDE THE STREET, INTERIOR AND PARKING LOT TREE MULCH BEDS
5. BEFORE SODDING, SEEDING AND LANDSCAPING THE CONTRACTOR WILL TILL ALL COMPACTED AREAS AT LEAST 6" IN
DEPTH TO LOOSEN THE COMPACTED SOILS AND ADD AMENDMENTS
6. SEE SHEET L102 OF ARCHITECTURALS FOR DETAILED SMALL HOUSE COURTYARD LANDSCAPE PLANTINGS
GENERAL CONDITIONS
SCOPE OF WORK
THE LANDSCAPE CONTRACTOR SHALL PROVIDE ALL MATERIALS, LABOR AND EQUIPMENT TO
COMPLETE ALL LANDSCAPE WORK AS SHOWN ON THE PLANS AND SPECIFICATIONS.
NOTE: IF CONTRACTOR BIDS ACCORDING TO THE PLANT LIST, HE/SHE SHOULD THOROUGHLY
CHECK THE PLANT LIST QUANTITIES WITH THE SYMBOLS DRAWN ON THE PLAN, TO BE SURE
THERE ARE NO DISCREPANCIES. IF THERE IS A DISCREPANCY BETWEEN THE DRAWING AND
THE LIST ON THE PLANS, THE DRAWING TAKES PRECEDENCE.
STANDARDS
ALL PLANT MATERIAL WILL CONFORM TO THE CURRENT ISSUE OF THE AMERICAN STANDARD
FOR NURSERY STOCK PUBLISHED BY THE AMERICAN NURSERY & LANDSCAPE ASSOCIATION
(ANLA).PLANT MATERIAL MUST BE SELECTED FROM NURSERIES THAT HAVE BEEN INSPECTED
AND CERTIFIED BY STATE PLANT INSPECTORS.COLLECTED MATERIAL MAY BE USED ONLY
WHEN APPROVED BY OWNER'S REPRESENTATIVE.NOMENCLATURE WILL BE IN ACCORDANCE
WITH HORTUS III BY L.H. BAILEY.
SUBSTITUTIONS: PRE-BID
IT IS THE LANDSCAPE CONTRACTOR'S RESPONSIBILITY TO MAKE EVERY REASONABLE EFFORT
TO FIND THE PLANTS SPECIFIED BY THE LANDSCAPE ARCHITECT. THE LANDSCAPE
CONTRACTOR MAY OFFER SUBSTITUTIONS TO THE LANDSCAPE ARCHITECT FOR HIS/HER
CONSIDERATION. THE LANDSCAPE CONTRACTOR WILL NOTIFY THE LANDSCAPE ARCHITECT IF
THERE ARE KNOWN
DISEASES OR INSECT RESISTANT SPECIES THAT CAN BE SUBSTITUTED FOR A SELECTED
PEST-PRONE PLANT. THE CONTRACTOR SHALL SUBMIT A BASE BID AS PER PLAN PLUS PRICE
CLARIFICATIONS FOR ALL RECOMMENDED SUBSTITUTIONS.
SUBSTITUTIONS: POST-BID
IT IS THE INTENT TO ELIMINATE POST-BID SUBSTITUTIONS. HOWEVER, IN THE EVENT THAT THE
CONTRACT MATERIAL HAS BECOME UNAVAILABLE, AN APPROPRIATE SUBSTITUTION MUST BE
APPROVED BY THE OWNER'S REPRESENTATIVE.
UTILITIES AND UNDERGROUND FEATURES
THE LANDSCAPE CONTRACTOR SHALL NOTIFY UTILITY COMPANIES AND/OR THE GENERAL
CONTRACTOR IN ADVANCE OF CONSTRUCTION TO LOCATE UTILITIES.
IF THERE IS A CONFLICT WITH UTILITIES AND THE PLANTING, THE LANDSCAPE ARCHITECT
SHALL BE RESPONSIBLE FOR RELOCATING PLANTS PRIOR TO THE PLANTING PROCESS. ANY
COST DUE TO RELOCATING AFTER PLANTING SHALL BE BORNE BY THE OWNER. IF PLANTS ARE
TO BE INSTALLED IN AREAS THAT SHOW OBVIOUS POOR DRAINAGE, AND THE PLANTS ARE
INAPPROPRIATE FOR THAT CONDITION, THE LANDSCAPE CONTRACTOR SHALL NOTIFY THE
LANDSCAPE ARCHITECT AND OWNER. IF THEY DEEM NECESSARY, THE PLANTS SHALL BE
RELOCATED, THE CONTRACT SHALL BE ADJUSTED TO ALLOW FOR DRAINAGE CORRECTION AT
A NEGOTIATED COST, OR THE PLANT SELECTION MODIFIED BY THE LANDSCAPE ARCHITECT TO
ACCOMMODATE THE POOR DRAINAGE.
WARRANTY
THE STANDARD WARRANTY IS FOR ONE (1) YEAR PERIOD, EXCLUDING BULBS, SOD AND
ANNUALS, COMMENCING ON THE DATE OF INITIAL ACCEPTANCE. ALL PLANTS SHALL BE ALIVE
AND IN SATISFACTORY GROWTH AT THE END OF THE GUARANTEE PERIOD. ANY MATERIAL
THAT IS 25% DEAD OR MORE SHALL BE CONSIDERED DEAD AND MUST BE REPLACED AT NO
CHARGE. A TREE SHALL BE CONSIDERED DEAD WHEN THE MAIN LEADER HAS DIED BACK, OR
25% OF THE CROWN IS DEAD. REPLACEMENTS SHALL BE MADE DURING THE NEXT PLANTING
PERIOD. REPLACEMENTS SHALL BE OF THE SAME TYPE, SIZE AND QUALITY AS ORIGINAL
SPECIES UNLESS OTHERWISE NEGOTIATED.
STANDARDS
A. PLANTS WILL BE IN ACCORDANCE WITH THE CURRENT ANLA'S STANDARDS AND CONFORM IN
GENERAL TO REPRESENTATIVE SPECIES.
B. BALLED AND BURLAPPED (B&B)
1. BALLED AND BURLAPPED PLANTS SHALL BE DUG WITH FIRM ROOT BALLS FREE OF
NOXIOUS WEEDS. THERE SHOULD BE NO EXCESS SOIL ON TOP OF THE ROOTBALL OR
AROUND THE TRUNK
2. BALL SIZES SHALL BE IN ACCORDANCE WITH ANLA STANDARDS.
3. CALIPER AND HEIGHT MEASUREMENT: IN SIZE GRADING B&B SINGLE TRUNK TREES,
CALIPER SHALL TAKE PRECEDENCE OVER HEIGHT. CALIPER OF THE TRUNK SHALL BE
TAKEN 6" ABOVE GROUND LEVEL (UP TO AND INCLUDING 4" CALIPER SIZE) AND 12" ABOVE
THE GROUND LEVEL FOR LARGER TREES. FOR MULTIPLE-TRUNK TREES, HEIGHT
MEASUREMENT SHALL TAKE PRECEDENCE OVER CALIPER.
C. CONTAINER - GROWN STOCK
1. THE SIZE OF CONTAINER-GROWN SHRUBS IS MEASURED BY HEIGHT AND WIDTH OF THE
PLANT. CONTAINER-GROWN TREES ARE MEASURED BY THE SAME STANDARDS LISTED IN
B.3. ABOVE. THE ROOT SYSTEM OF CONTAINER-GROWN PLANTS SHALL BE WELL
DEVELOPED AND WELL DISTRIBUTED THROUGH OUT THE CONTAINER.
2. ALL CONTAINER-GROWN TREES AND SHRUBS THAT HAVE CIRCLING (GIRDLING) AND
MATTED ROOTS SHALL BE TREATED IN THE FOLLOWING MANNER PRIOR TO PLANTING:
SEPARATE THE ROOTS BY HAND, UNTANGLING SO CIRCLING ROOTS WILL NOT DAMAGE
FUTURE OF THE PLANT. SEE PLANTING PROCEDURES FOR ALL CONTAINER-GROWN TREES &
SHRUBS IN THIS SECTION.
3. ALL CONTAINER-GROWN PLANTS SHOULD BE GROUPED AND WATERED DAILY UNTIL
THEY ARE PLANTED IN THE LANDSCAPE, THE SOIL SHALL BE KEPT MOIST WITH THE
EQUIVALENT OF ONE-INCH OF RAINFALL PER WEEK.
D. PRUNING SHALL BE DONE BEFORE PLANTING OR DURING THE PLANTING OPERATION. PRUNING
DETAIL FOR TREES IN THIS SECTION.
E. ALL PLANT MATERIAL IN TRANSIT SHALL BE COVERED TO KEEP MATERIAL FROM DRYING OUT.
THE COVERING SHALL COMPLY WITH THE STATE AND LOCAL LAWS PERTAINING TO THE
TRANSPORT OF MATERIALS.
F. TREES SHALL BE PLACED IN AN UPRIGHT POSITION WITH THE ROOTBALL COVERED BY MULCH
AND KEPT MOIST. TREES AND SHRUBS SHOULD NOT BE LEFT ON SITE UNPLANTED FOR MORE
THAN 24-HOURS WITHOUT ADEQUATE WATER TO INSURE ROOT SURVIVAL.
INSPECTION
A. PLANTS MAY BE SUBJECT TO INSPECTION AND APPROVAL BY THE OWNER OR OWNER'S
REPRESENTATIVE AT THE PLACE OF GROWTH OR HOLDING YARD FOR CONFORMITY TO
SPECIFICATION REQUIREMENTS AS TO QUALITY, SIZE AND VARIETY.
B. PLANTS DAMAGED IN HANDLING OR TRANSPORTATION CAN BE REJECTED BY THE OWNER OR
OWNER'S REPRESENTATIVE.
C. STATE NURSERY INSPECTION CERTIFICATES SHALL BE FURNISHED TO THE LANDSCAPE
ARCHITECT UPON REQUEST.
PLANTING PROCEDURES FOR ALL CONTAINER-GROWN TREES & SHRUBS
A. REMOVE THE PLANT EITHER BY CUTTING OR INVERTING THE CONTAINER.
B. FOR UNTREATED PLASTIC CONTAINER-GROWN PLANTS WITH CIRCLING ROOTS, SEPARATE
ROOTS BY HAND AND UNTANGLE ROOTS THE LENGTH OF THE ROOTBALL.
C. PLANT SHRUB OR TREE A MINIMUM OF 18 OF THE HEIGHT OF THE ROOTBALL ABOVE EXISTING
GRADE.
D. APPLY A 2 TO 3" THICK LAYER OF APPROVED HARDWOOD MULCH. KEEP MULCH 6" AWAY FROM
THE TRUNK OF ALL TREES AND SHRUBS.
E. PLANTS GROWN IN ROOT CONTAINMENT BAGS MUST HAVE BAGS REMOVED DURING THE
PLANTING OPERATION. NO ADDITIONAL SLASHING OF THE ROOTBALL IS NECESSARY.151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF
DESIGNED BY:
FILE NO.
SCALE:
DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WV0074CCCARROLL INDUSTRIAL PARK LOT 9SITE DEVELOPMENT PLANSTONEWALL MAGISTERIAL DISTRICTFREDERICK COUNTY, VIRGINIA14
CC/DM
11/21/2024
#49-25LANDSCAPE & SITE DETAILSRev. No.Date
3 04/09/2025
N/A
14
SHRUBS AND TREES
48
50Green Giant ArborvitaeThuja Standishii x Plicata
ABB BOTANICAL NAME COMMON NAME QUANTITY SIZE
BS
GG
Piciea Pungens Colorado Blue Spruce 4 FT
4 FT
NOTE: LANDSCAPE BUFFER REQUIREMENTS MET PER § 165-204.24
"F.Facilities shall be required to landscape the yard area within the front setback to
provide for a double row of evergreen trees that are staggered and planted a
maximum of 12 feet on center. The side and rear yards shall be planted with a
single row of evergreen trees that are planted a maximum of 40 feet on center. All
trees shall be a minimum of four feet in height at the time of planting. The Board
of Supervisors may allow for alternative landscaping based on topography and/or
adjacent land uses."
NOTES:
1.NO LIGHTING IS PROPOSED ON
THE SITE, THEREFORE NO
PHOTOMETRIC PLAN IS
REQUIRED.
2.REAR SETBACK ON SOUTHEAST
PROPERTY LINE TO USE
EXISTING TREE LINE BUFFER.
3.NO TREES OR SHRUBS SHALL BE
PLACES ON FREDERICK WATER
EASEMENTS.
8' MIN.18' OR 20'STRIPED AREA
HANDICAPPED
SYMBOLS
FC
EP
4.0' MIN.
7.0' MAX.
4" STEEL PIPE FILLED WITH CONCRETE
DISPLAY CONDITIONS
24"
6"6"
9"
RESERVED
PARKING
12"
2'WHEEL STOP
WITH EP
SIGN (SEE DETAIL)
HANDICAPPED PARKING
N.T.S.
03/17
VER 1
NOTE:
RAMP FOR HANDICAPPED MUST
BE LOCATED AT SAME POINT
ADJACENT TO THE STRIPED
AISLE.
LIGHT COLORED
REFLECTIVE
BACKGROUND
MAT'L.
DARK COLORED
2" LETTERS &
3/8" BORDER
INTERNATIONAL SYMBOL
OF ACCESSIBILITY
PENALTY,
$100-500 Fine,
TOW-AWAY-ZONE
LIGHT COLORED 1" LETTERS
DARK COLORED REFLECTIVE
BACKGROUND MATERIAL
SIGN SHALL BE LOCATED
SUCH THAT IT WILL NOT
BE OBSCURED BY
VEHICLE PARKED IN
SPACE.
8' VAN ACCESSIBLE SPACE
5' FOR REGULAR SPACE
CONCRETE SECTION
N.T.S
11