Loading...
HomeMy WebLinkAbout29-26 Site HP 2026 Pavilion GE Signed1COVER SHEET1" 1000 HP HOOD 2026 PAVILION MINOR SITE PLAN BACK CREEK MAGISTERIAL DISTRICT FREDERICK COUNTY, VA SP #29-26 VICINITY MAP SCALE: 1" 1000 OWNER / DEVELOPER HP HOOD INC. 160 HOOD WAY WINCHESTER, VA 22602 (540) 869-0045 HP HOOD 2026 PAVILIONBACK CREEK MAGISTERIAL DISTRICTFREDERICK COUNTY, VA07/08/2026 ZJ/ZS/CH 7 2247H Plan Revisions Rev. No Rev. Date Comment 1 08/21/2026 FC Planning Comments DATE APPROVAL ZONING ADMINISTRATOR SITE PLAN VALID FOR (5) FIVE YEARS FROM DATE OF APPROVAL 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF DESIGNED BY: FILE NO. SCALE: DATE: LIST OF SERVICES: CIVIL ENGINEERING I GIS I LAND SURVEYING I ENVIRONMENTAL PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA | MARTINSBURG, WV | ASHBURN, VAGas:Washington Gas P.O. Box 2400 Winchester, VA 22604 (540) 869-1111 Water/Sewer:Frederick Water P.O. Box 1877 Winchester, VA. 22604 (540) 868-1061 Power:Shenandoah Valley Electric Coop 3463 Valley Pike Winchester, VA 22602 (800) 234-7832 UTILITY NOTICE REQUIRED Contractors shall notify all public utility operators who maintain underground utility lines in the area of proposed excavating or blasting at least two (2) working days, but not more than ten (10) working days, prior to commencement of excavation or demolition. Names and telephone numbers of the operators of underground utility lines appear below. These numbers shall also be used to serve in an emergency condition. CALL "MISS UTILITY" VIRGINIA UTILITY PROTECTION SERVICE (VUPS) AT 811 OR 1-800-552-7001, 48 HOURS PRIOR TO THE START OF WORK. EXCAVATORS MUST NOTIFY ALL PUBLIC UTILITY OPERATORS WHO MAINTAIN UNDERGROUND UTILITY LINES IN THE AREA OF PROPOSED EXCAVATING OR BLASTING AND HAVE THOSE FACILITIES LOCATED BY THE UTILITY COMPANIES PRIOR TO COMMENCING EXCAVATION. THE EXCAVATOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL COUNTY REQUIREMENTS, VIRGINIA CODE AND REGULATIONS. Verizon P.O. Box 17398 Baltimore, MD 21297 (301) 954-6282 Communications:Comcast Comunications 195 Rainville Road Winchester, VA 22602 (540) 504-0942 Shentel 500 Shentel Way Edinburg, VA 22824 (800) 743-6835 AT&T 7777 Leesburg Pike, 100N Falls Church, VA 22043 (703) 251-9988 City of Winchester Public Utilities 15 North Cameron Street Winchester, VA. 22601 (540) 667-1815 Lumos Networks One Lumos Way Waynesboro, VA 22980 (866) 840-8781 Sheet List Table Sheet #Sheet Title Revsion No Revison Date 1 Cover Sheet 1 08/21/2026 2 General Notes and Legend 1 08/21/2026 3 Adjoiners and Setbacks 1 08/21/2026 4 Existing Conditions 1 08/21/2026 5 E&S Narrative & Plan 1 08/21/2026 6 Site Plan 1 08/21/2026 7 Site Details 1 08/21/2026 SP #29-26 26Aug2026 N/A 2GENERAL NOTES AND LEGENDRev. No.Date 1 0/21/2026HP HOOD 2026 PAVILIONBACK CREEK MAGISTERIAL DISTRICTFREDERICK COUNTY, VA0/0/2026 =J/=S/CH  224H11 Windy Hill LaneWinchester, Virginia 22602Telephone: (40) 662-41Fa[: (40) 22-92www.greenwayeng.comFND1971ENGINEERINGSHEET OF DESIGNED BY: FILE NO. SCALE: DATE:PROUDLY SERVING VIRGINIA WEST VIRGINIAOFFICES IN: WINCHESTER, VA MARTINSBURG, WVSP #29-26 LEGEND PROPOSED SAN. LAT. CLEANOUT PROPOSED CENTERLINE EXISTING SPOT ELEVATION STORM DRAIN STRUCTURE IDENTIFIER SANITARY MANHOLE IDENTIFIER PROPOSED SPOT ELEVATION EXISTING CURB AND GUTTER PROPOSED EDGE OF PAVEMENT EXISTING EDGE OF PAVEMENT PROPOSED STORM SEWER WITH INLET EXISTING STORM SEWER WITH INLET PROPOSED TELEPHONE LINE EXISTING TELEPHONE LINE TRANSITION TO REVERSE CURB PROPOSED CURB AND GUTTER PROPOSED ELECTRIC SERVICE EXISTING ELECTRIC SERVICE PROPOSED SANITARY SEWER WITH MANHOLE EXISTING SANITARY SEWER WITH MANHOLE PROPOSED GAS LINE EXISTING GAS LINE FENCELINE FLOW LINE PROPOSED WATERLINE W/ TEE PROPERTY LINE EXISTING TELEPHONE PEDESTAL EXISTING WATERLINE W/ TEE EXISTING UTILITY POLE/GUIDE WIRE SIGNS PROPOSED REDUCER EXISTING FIRE HYDRANT/VALVE/METER INDICATES THE NUMBER OF TYP. PARKING SPACES PARKING INDICATOR HANDICAP PARKING PROPOSED BUILDING ENTRANCE VEHICLES PER DAY COUNT PROPOSED FIRE HYDRANT/VALVE/METER LIGHT POLE EXISTING TREE LINE EXISTING EASEMENT PROPOSED EASEMENT EXISTING CENTERLINE EXISTING INDEX CONTOUR EXISTING INTERMEDIATE CONTOUR PROPOSED CONTOUR PROJECT INFORMATION Parcel Identification No:6-A-6A Street Address:160 HOOD WAY Parcel Site Area:4.09 Acres Disturbed Area:1,222 S4. FT Current =oning:M2 Current Use:Industrial/ Manufacturing Proposed Use:Industrial/ Manufacturing FIRE MARSHAL'S NOTE GENERAL PLAN AND CONSTRUCTION NOTES VDOT GENERAL NOTES Fire lane marNings and signage: Any No ParNing signs and yellow painted curb locations will be installed by field inspection at the direction of the Fire Marshal's Office. V1. All worN on this proMect shall conform to the current editions of and latest revisions to the Virginia Department of Transportation (VDOT) Road and Bridge Specifications and Standards, the Virginia Erosion and Sediment Control Regulations, and any other applicable state, federal or local regulations. In case of a discrepancy or conflict between the Standards or Specifications and Regulations, the most stringent shall govern. V2. All construction shall comply with the latest U.S. Department of Labor, Occupational Safety and Health Administration (OSHA), and Virginia Occupational Safety Health (VOSH) Rules and Regulations. V. When worNing within VDOT right-of-way, all traffic control, whether permanent or temporary, shall be in accordance with the current edition of VDOT¶s WorN Area Protection Manual. A transportation management plan needs to be submitted for approval and land use permit issued prior to any e[ecution of worN within the VDOT right of way. V4. The developer shall be responsible for relocating, at his e[pense, any and all utilities, including traffic signal poles, Munction bo[es, controllers, etc., owned by VDOT or private / public utility companies. It is the sole responsibility of the developer to locate and identify utility facilities or items that may be in conflict with the proposed construction activity. VDOT approval of these plans does not indemnify the developer from this responsibility. V. Design features relating to field construction, regulations, and control or safety of traffic may be subMect to change as deemed necessary by VDOT. Any additional e[pense incurred as a result of any field revision shall be the responsibility of the developer. V6. If reTuired by the local VDOT Land Development Office, a pre-construction conference shall be arranged and held by the engineer and/or developer with the attendance of the contractor (s), various County agencies, utility companies and VDOT prior to initiation of worN. V. The contractor shall notify the local VDOT Land Development Office when worN is to begin or cease for any undetermined length of time. VDOT reTuires and shall receive 4 hours advance notice prior to any reTuired or reTuested inspection. V. The contractor shall notify the Traffic Operations Center at (40) 2-900 for any traffic control plan that impacts a VDOT maintained Interstate or Primary roadway to provide notification of the installation and removal of the worN zone. V9. The contractor shall be responsible for maintaining a VDOT permitted temporary construction entrance(s) in accordance with Section .02 of the Virginia Erosion and Sediment Control HandbooN. Furthermore, access to other properties affected by this proMect shall be maintained through construction. V10. Contractor shall ensure adeTuate drainage is achieved and maintained on the site during and at the end of construction. V11. All water and sewer lines within e[isting or proposed VDOT right-of-way shall have a minimum thirty-si[ (6) inches cover and when possible shall be installed under roadway drainage facilities at conflict points. V12. Any unusual subsurface conditions (e.g., unsuitable soils, springs, sinNholes, voids, caves, etc.) encountered during the course of construction shall be immediately brought to the attention of the engineer and VDOT. WorN shall cease in that vicinity until an adeTuate design can be determined by the engineer and approved by VDOT. V1. All fill areas, borrow material and undercut areas shall be inspected and approved by a VDOT representative prior to placement of fill. A VDOT representative shall be present to insure the soil sample(s) obtained for CBR¶s is representative of the location. When soil samples are submitted to private laboratories for testing, the samples shall be clearly identified and labeled as belonging to a proMect to be accepted by VDOT and that testing shall be performed in accordance with all applicable VDOT standards and procedures. V14. All roadway fill, base, subgrade material, and bacNfill in utility/storm sewer trenches shall be compacted in accordance with the lift thicNnesses, density and moisture reTuirements as specified in the current VDOT Road and Bridge Specifications. Certified copies of test reports shall be submitted to VDOT daily, unless specified otherwise. V1. VDOT Standard CD and UD underdrains shall be installed where indicated on these plans and/or as specified by VDOT. V16. A post installation visual/video camera inspection shall be conducted by the Contractor on all pipes identified on the plans as storm sewer pipe and a select number of pipe culverts. For pipe culverts, a minimum of one pipe installation for each size of each material type will be inspected or ten percent of the total amount for each size and material type summarized. All pipe installations on the plans not identified as storm sewer pipe shall be considered as culvert pipe for inspection purposes. Additional testing may be reTuired as directed by the Area Land Use Engineer or their representative. V1. The installation of any entrances and mailbo[es within any dedicated street right-of-way shall meet VDOT minimum design standards and is the responsibility of the developer. V1. Prior to VDOT acceptance of any streets, all reTuired street signage and/or pavement marNings shall be installed by the developer in accordance with the Manual On Uniform Traffic Control Devices. V19. The developer shall provide the VDOT Land Development Office with a list of all material sources prior to the start of construction. Copies of all invoices for materials utilized within any dedicated street right-of-way must be provided to the local VDOT Land Development Office prior to acceptance of the worN. Unit and total prices may be obscured. V20. Aggregate base and subbase materials shall be placed on subgrade by means of a mechanical spreader. Density will be determined using the density control strip in accordance with Section 04 of the VDOT Road and Bridge Specifications and VTM-10. A certified compaction technician shall perform these tests. Certified copies of test reports shall be submitted to VDOT daily, unless specified otherwise. In addition to checNing stone depths, a VDOT representative shall be notified and given the opportunity to be present during the construction and testing of the density control strip. V21. Asphalt concrete pavements shall be placed in accordance with Section 1 of the VDOT Road and Bridge Specifications. Density shall be determined using the density control strip as specified in Section 1 and VTM-6. A certified compaction technician shall perform these tests. Certified copies of test reports shall be submitted to VDOT daily, unless specified otherwise. A VDOT representative shall be notified and given the opportunity to be present during the construction and testing of the control strip. V22. In accordance with Section 02.0, the foundations for pipe culverts thirty-si[ (6) inches and larger shall be e[plored below the bottom of the e[cavation to determine the type and condition of the foundation. The contractor shall report findings of foundation e[ploration to the engineer and VDOT for approval prior to placing pipe. Foundation designs shall comply with VDOT Road and Bridge Standard PB-1. Where soft, yielding, or otherwise unsuitable foundation is encountered, the foundation design and/or need for foundation stabilization shall be determined by the engineer and approved by VDOT. V2. VDOT Standard Guardrail shall be installed where warranted and/or as proposed on these plans in accordance with VDOT¶s installation criteria. Final approval of the guardrail layout to be given by VDOT after grading is mostly complete. V24. Approval of these plans shall e[pire five () years from the date of the approval letter. V2. VDOT Standard CG-12 Curb Ramps shall be installed where indicated on these plans and/or as specified by VDOT. V26. The foundations for all bo[ culverts shall be investigated by means of e[ploratory borings advanced below proposed foundation elevation to determine the type and condition of the foundation. The contractor shall submit copies of borehole logs and report findings of foundation e[ploration to the engineer and VDOT for approval prior to constructing bo[. Foundation designs shall comply with VDOT Road and Bridge Standard PB-1. Contrary to the Standard, where rocN is encountered and cast-in-place bo[ is proposed, the thicNness of bedding shall be si[ (6) inches. Where soft, yielding, or otherwise unsuitable foundation is encountered, the foundation design and/or need for foundation stabilization shall be determined by the engineer and approved by VDOT. V2.The contractor/developer and subcontractors will be reTuired to submit detailed Maintenance of Traffic plans for the worN to be pursued throughout the life of the proMect for review and consideration of approval by the VDOT Engineer. Additional MOT plans may be reTuired that combine or reTuire revisions to the e[isting TTC's in the latest edition of the Virginia WorN Area Protection Manual. The VDOT Engineer shall be afforded at least 14 days to review MOT submittals for consideration of approval. GENERAL 1.Greenway Engineering, Inc. (GE) has issued this plan set based on proMect criteria dictated by the client and municipal codes. This plan set is not considered complete or appropriate for construction until ALL necessary agencies have given approval AND this plan set is signed and sealed by a licensed professional. Any worN, planning, scheduling, material purchases and/or construction prior to approvals and licensed/professional sealing will be performed at the risN of the personnel authorizing worN. GE shall be held harmless from all costs, time delays and/or material changes incurred on any worN that is preformed prior to this plan set being approved and sealed. 2.The approval of these plans in no way relieves the Developer, Contractor, Subcontractor, or any of their agents of any legal responsibility which may be reTuired by the code of Virginia or any County enacted local ordinance, nor does it guarantee the issuance of any reTuired permits by the County, State, VDOT or any other governing Agency. .An approved set of plans as well as all applicable permits and reTuired documents must be available at the construction site at all times during construction. A representative of the Developer must be available at all times. 4.GE and/or the Engineer shall not not be responsible for or have control over or charge of construction means, methods, techniTues, seTuences or procedures, nor for safety precautions and programs in connection with any worN shown on these plans. GE and/or the Engineer is not responsible for any Contractor's schedules or failure to carry out the worN. GE and/or the Engineer is not responsible for acts of omissions by the Contractor, Subcontractor, or their agents, employees, or any other person performing portions of the worN. .Methods and materials used in the construction of the improvements herein shall conform to current County Construction Standards and Specifications and/or current VDOT Standards and Specifications. Should a conflict between design specifications and these plans occur the most stringent reTuirement shall apply. 6.The Developer and/or Contractor shall be responsible for constructing the site in accordance with the approved plans and construction documents and the scope of worN shall conform with grades, depths, dimensions, ect. shown hereon. .All Nnown cemetery and/or gravesite locations have been identified on these plans. Any cemetery or gravesite shown on these plans shall be marNed and protected in accordance with state law. The developer or contractor shall be responsible for marNing, installing protecting and maintaining protection of any Nnown sites during construction and in the event that any unNnown gravesites is discovered during construction, the Owner and Engineer must be notified immediately and adeTuate protection from construction shall be installed immediately. PERMITS AND INSPECTIONS 1.The Developer or his agent shall be responsible for obtaining all reTuired permits from the appropriate State and/or local agencies and to comply with their reTuirements and all applicable National, State and Local laws and shall be responsible for obtaining any reTuired permits from the Virginia Department of Environmental 4uality (DE4) or the United States Army Corp of Engineers for any plan wetland disturbance as may be shown on these plans. They shall also be responsible the identification and delineation of any wetlands that may be present on the construction site. 2.Prior to the initiation of any land disturbing activities the Responsible Land Disturber, Developer, or the Contractor shall obtain a Land Disturbance Permit from the FredericN County Public WorNs Department and shall be responsible for filing a Virginia Stormwater Management Program (VSMP) registration statement for the construction site as reTuired by law . They shall also be responsible for obtaining and maintaining on site a Stormwater Pollution Prevention Plan (SWPPP). The approval of these plans in no way relieves the developer or his agent of the responsibilities contained in the Virginia Erosion and Sediment Control HandbooN. .Upon completion of all construction activities and permanent site stabilization, the Developer shall submit to FredericN County Public WorNs Department a DE4 Notice of Termination form, a copy of the sites construction inspection log booN, an engineer certified red-lined as-built of the approved plans with computations for all permanent stormwater management facilities, water Tuality, and stormwater conveyance systems, a recorded copy of the reTuired BMP Maintenance Agreement (if needed) , any VSMP Permit maintenance fees (if reTuired), and a written reTuest to FredericN County Planning for bond release. The Developer shall also schedule a Final on site inspection with FredericN County Public WorNs Department. 4.The Contractor, Owner or Developer must obtain a VDOT Land Use Permit (Entrance) from the Office of the Resident Engineer, Virginia Department of Transportation (VDOT) and provide to FredericN County prior to any construction activities within e[isting State right-of-way. .The Contractor, Owner or Developer shall be responsible for scheduling all reTuired State and local inspections and for the securing of any third party inspection/testing service to insure construction compliance with these plans and specifications and shall Neep and maintain a site inspection log booN. It is Greenway Engineering's recommendation that a third party inspection/testing service be employed to ensure that proMect is compliant and that materials installed meet the details and specifications in these plans. 6.Any retaining wall 2 ft. or greater in height shall designed by a Structural Engineer reTuire the issuance of a separate building permit. .Individual sign permits will be reTuired from the =oning Office for all free standing and/or facade signs prior to erecting the sign and may reTuire a separate building permit. UTILITIES 1.The location of e[isting utilities shown in these plans are taNen from e[isting available records and may not be representative of e[act locations. It shall be the contractors responsibility to verify the e[act horizontal and vertical location of all e[isting utilities as needed prior to construction. The contractor shall be responsible for the digging of all test holes that may be reTuired, whether recommended or not by these plans, to determine the e[act location and elevation of e[isting utilities. If any conflicts arising from this e[isting utility verification or if during the course of construction, any obMect of an unusual nature is encountered, the contractor shall cease worN in that area and immediately notify Greenway Engineering at (40) 662-41 and/or the proper authority. Greenway Engineering or any engineer associated with these plans shall not be responsible or liable for any construction cost that may be associated with the installation or reinstallation any utility or other improvements if not notified of any discrepancies between actual field conditions and the approved plan. 2.The developer will be responsible for the relocation of any e[isting utilities which may be reTuired as a result of his proMect. Any reTuired relocation of e[isting utilities should be completed prior to construction. .The Developer and/or Contractor shall be responsible to supply all utility companies with copies of the approved plans and advise them that all grading shall conform to the approved plans, and further that the utility companies shall be responsible for honoring these plans and the finished grades in the installation of their utility lines. 4.All proposed utilities to be located underground. .The Developer and/or Contractor shall notify operators who maintain underground utility lines in the area of proposed e[cavating or blasting at least two (2) worNing days, but not more than ten (10) worNing days, prior to commencement of e[cavation or demolition. 6.The developer shall be responsible for notifying FredericN Water and all other appropriate utility companies prior to construction of water and/or sanitary sewer lines. Information should also be obtained from the appropriate authority concerning permits, cut sheets, and connections to e[isting lines. .All sanitary sewers, water mains and appurtenances shall be constructed in accordance with the current standards and specifications of FredericN Water. .When grading is proposed within easements of utilities, letters of permission from all involved companies must be provided to the FredericN County Public WorNs Department prior to issuance of grading and/or site development permits. 9.The developer shall be responsible for any damage to the e[isting streets and/or utilities which may occur as a result of construction within or contiguous to an e[isting right-of-way or utility. 10.All stormwater piping and structures shown on these plans are only accurate to the inlet or manhole locations as shown hereon. Detail design of stormwater structures were not provided to Greenway Engineering. Actual pipe alignments will be based upon developed structural shop drawings as provided by the manufacturer. Contractor shall maNe adMustments to pipe alignments base on provided shop drawings. Greenway Engineering will not be held responsible or liable for any discrepancies or changes caused by the structural design. Contractor may submit shop drawings to Greenway Engineering for review and approval at contractor's e[pense. Shop drawings will be reviewed for compliance with design plans. The Owner or Developer will be responsible for any redesign as a result of structural shop drawing design. 11.All parNing lot/street light and dry utility design shall be performed and provided separately by others. All dry utility, structural base design, electrical design, photometrics and or other lighting information shown hereon is as specified by others and is included for informational purposes only, as directed by the Owner, Developer and/or public agency reTuirements. Greenway Engineering has not performed any lighting and/or dry utility design and does not warrant and is not responsible for the degree and/or adeTuacy of illumination on this proMect or the adeTuacy of the dry utility to service the site. Any changes to the lighting design, once the plan is approved, shall be approved by the County prior to installation. SITEWORK 1.Refer to the Geotechnical Engineer Report for methods, materials and details for construction of all earthworN activities. 2.All vegetation, root material, topsoil, and any other unsuitable material shall be removed from the construction limits of the site before removal or placing of fill material. EarthworN clearing shall e[tend a minimum of 10' beyond all building and pavement limits with an additional 1 foot of clearance for each foot of fill reTuired. .Controlled (Structural) fills shall be compacted to 9 of ma[imum dry density as determined by method A per standard proctor AASHTO-T99, ASTM-D69, or VTM-1 as applicable (Non-structural fills  to 90). Structural fills shall e[tend a minimum of ' beyond the limits of all foundation elements at bearing elevation. Density shall be certified by a registered professional engineer and results submitted to FredericN County prior to pavement construction. If a geotechnical report has been prepared, it should supersede the reTuirements in this note. No visual pumping, no rocNs larger than 6-inches. Materials classified as OL, OH, MH or PT are not suitable for use as structural fill. All fill should be placed on stable subgrades. Fill should not be placed on surfaces that are muddy or frozen, or have not been approved by testing and/or proof-rolling. All fill material compacted by heavy compaction eTuipment should be placed in ma[imum 10-inch loose lifts. All fill material compacted by hand-operated tampers or light compaction eTuipment should be placed in ma[imum 4-inch loose lifts. Fill placed on sloping ground should be properly benched into residual soils such that a smooth interface will not be present. Fill material placed below and e[tending 10 feet beyond the foundations for the structure should be compacted to at least 9 of ma[imum dry density as determined by the Standard Proctor Test Method (ASTM-D69). 4.All fills greater than 2 feet shall reTuire compaction testing. .All fills with slopes steeper than :1 or more than 10 feet in height shall reTuire a Slope Stability Analysis. 6.All fill embanNments being constructed against slopes of e[isting embanNments or hillsides or across e[isting embanNments, hillsides, and depressions at a sNew angle of 0 degrees or more or slopes are steeper than 4:1 shall be benched in a series of horizontal cuts beginning at the intersection with original ground and continuing at each vertical intersection with the previous cut. Material removed during benching shall be placed and compacted as embanNment material. For e[isting slopes steeper than 4:1 but less than 1 12:1, the bench shall be a minimum of 6 feet wide. For e[isting slopes steeper than 1 12:1 but less than 12:1, the bench shall be a minimum of 4 feet wide. .All pavement sections shown on these approved plans are based on a minimum CBR value of 6 and are for preliminary design only. Final pavement design shall be based upon actual CBR values. The Contractor or Developer shall be responsible for field tests per VDOT standards to obtain actual CBR values for final design. Final pavement designs will be approved by VDOT and/or the Owner/Developer, which ever applicable, prior to installation. GE shall be held harmless from all costs, time delays and/or material changes incurred on any worN that is preformed prior to final pavement design approval. .Concrete for pads and/or sidewalNs shall be a minimum Class A or 000 psi (with air) and shall be placed in accordance to ACI practices or as otherwise specified per structural design. All concrete areas reTuiring a separate permit shall be designed by a registered professional structural engineer. 9.The contractor shall provide adeTuate means of cleaning mud from trucNs and/or other eTuipment prior to entering public streets, and it is the contractors responsibility to clean streets, allay dust, and to taNe whatever measures are necessary to insure that public streets are maintained in a clean, mud and dust free condition at all times. 10.Warning signs, marNers, barricades or flagmen should be in accordance with the State and Federal Manual on Uniform Traffic Control Devices (MUTCD). 11.The e[act location of all guard rails and paved ditches will be determined by VDOT personnel. A Moint inspection will be held with the Developer, County Representatives, and Representatives of the Virginia Department of Transportation (VDOT) to determine if and where guard rail and/or paved ditches will be needed. The developer will be responsible for providing guardrail and paved ditches as determined by this Moint inspection. Refer to Virginia Department of Transportation (VDOT) Guard Rail and Paved Ditch Specifications. 12.Any changes to the approved Landscape Plan shall be approved approved by the County prior to installation. 1.All springs shall be capped and piped to the nearest storm sewer manholes or curb inlet. The pipe shall be minimum 6 diameter and conform to VDOT standard SB-1. 14.Construction debris shall be containerized in accordance with the Virginia Litter Control Act no less than one litter receptacle shall be provided at the construction site. 1.All e[cavations shall be benched according to OSHA regulations to permit safe entry. PERMANENT STORMWATER MANAGEMENT EMBANKMENTS 1.Satisfactory fill materials for use in constructing permanent stormwater management facility embanNments shall include materials classified in ASTM D-24 as GC, GM, SC, SM, CL, or MI groups. Soils must contain a minimum of 20 plus No. 200 sieve and be Well Graded material, with no stones greater than 6 inches, mi[ed with the clay. A minimum of three samples shall be classified. 2.All fill areas shall be Keyed In and compacted in horizontal layers not to e[ceed a ma[imum loose lift of  inches thicN. All fill shall be compacted with a sheepsfoot, rubber-tired or vibratory roller to a density of 100 of ma[imum dry density with a moisture content within /- 2 of optimum per Standard Procter Test (ASTM D69) or the Modified Proctor Test (ASTM D1) as director by the geotechnical engineer. Compaction test shall be performed at one test per ,000 sTuare feet on each layer. .Principal spillway must be installed concurrently with fill placement and not e[cavated into the embanNment. All fills beside pipes or structures shall be placed in horizontal layers not to e[ceed 4 inches in depth and shall be compacted by hand tampers. Fill material shall completely fill all spaces under and beside pipes. ETuipment should not be driven within 4 feet of any structure part during bacNfilling operation and shall never be driven over until compacted fill has been placed to a depth specified by the structural live load capacity of the structure or pipe. 4.EmbanNments shall be constructed with a relatively impervious core and cutoff trench. Core material shall be classified as GC, SC, or CL. The cutoff trench shall be e[cavated in impervious material a minimum of depth and width of 4 feet with side slopes no steeper than 1:1 and located at or upstream of the embanNment centerline. The impervious core shall e[tend up to the 10-year water surface elevation (see engineering design). The surface of the embanNment shall be covered with a minimum 6 inches of clean topsoil and stabilized with grass. .Stormwater management facility earthen embanNments shall not be greater than 2' in height measured from the downstream toe of slope to the top of the embanNment with embanNment slopes no steeper than 2:1and a combined minimum upstream and downstream slope of :1. The minimum top width of the embanNment shall be ' for embanNments 14' or less in height and shall be level. 6.Any groundwater seepage encountered during cutoff trench construction shall be drained by means of a foundation drain to the outside/ downstream toe of the embanNment slope. Foundation drains shall be downstream and outside of the limits of the cutoff trench. The constructed foundation drain section shall be an e[cavated 2' [ 2' trench bacNfilled with hand compacted # stone wrapped in geote[tile fabric. .A geotechnical or construction inspector should be on site during embanNment construction. .All embanNment construction, compaction testing, and construction inspections shall be the responsibility of the site contractor. CONSTRUCTION STAKE-OUT/ ASBUILTS 1.All staNe-out to be performed by GE. If the contractor does not utilize GE for staNe-out then the contractor assumes all liability for accuracy of construction. 2.All cutsheet and grades are to be reviewed by Engineer of Record prior to issuance for construction. .Asbuilts of the SWM system is reTuired to verify conformance with the approved plans. Please contact GE when installation is complete. 4.All stormwater collection, stormwater management and water Tuality features must be inspected by Engineer of Record during construction. As-built certification, reTuired to terminate VSMP permit and bond release with the County upon the completion of the proMect, must be completed by GE. TOPOGRAPHY 1.Topography shown on this plan has been conducted per the VA Administrative code 1VAC10-20-2 and the minimum standards and procedures set forth in chapter 4 († 4.1-400 et seT.) of Title 4.1 of the Code of Virginia. This plan shows the design assumptions utilizing these accuracy standards. Inverts and other elevations shown hereon must be field verified by the contractor prior to construction. If a discrepancy is found, the contractor shall cease worN in that area and immediately notify Greenway Engineering. Greenway Engineering shall be held harmless for any discrepancies or conflicts if not notified immediately. 2.Contractor shall confirm all e[isting tie-in points of this proMect prior to the start of construction. GE shall be notified of any discrepancies between actual field conditions and the approved plan prior to the start of construction. 2. Aerial, horizontal and vertical control surveys were 1. Boundary survey was performed by: performed by: (Year) Dated: Greenway Engineering Inc SURVEY AND TOPOGRAPHIC INFORMATION 10/24/2014Greenway Engineering Inc FREDERICK WATER PROJECT INFORMATION NO ADDITIONAL DEMAND ANTICIPATED WITH THIS PROJECT. Ma[imum Height Allowed:60' ReTuired SetbacNs: Front Yard (Primary/Arterial):' Front Yard (Collector/Minor):' Side Yard:2' Rear Yard:2' Provided SetbacNs: Front Yard:.' East Side Yard:29.' West Side Yard:202.1' Rear Yard:0.0' ProMect Description: This proMect consists of the installation of a pavilion. Previous Approvals (FredericN County SP Numbers): #6-01, #14-02, #6-0, #1-04, #2-1, #-1, #0-14, #2-14, #2-14, #12-16, #2-16, #12-1, #6-1, #2-1, #44-20, #16-22, #2-2, #29-2, #02-24, #6-2 General Note: No changes are proposed to e[isting site landscaping, lighting, parNing, or signage. No additional landscaping is required per previous approvals fulfilling requirements. FredericN County Inspections Notes: 1) Installation of pavillion/foundation shall comply with the 2021 Virginia Uniform Statewide Building Code (VBC) 2) A building permit is reTuired for pad and pavilion. All structural plans submitted for permit application may be reTuested to be sealed by a Virginia Design Professional. Flood Hazard Area Note: The proMect area lies within =one 'X', areas of minimal flood hazard, as shown on FIRM Map 1069C0214E, effective 01/29/2021. Lighting Notes: Outdoor lighting to be designed, shielded, aimed, located , and maintained to shield adMacent properties and shall be full-cutoff fi[tures. No additional lighting is proposed with this plan. 10/24/2014, 11/06/2020, 02/14/2022, 0/1/202, 0/0/2026 26Aug2026 PROPOSED PAVILION357.5'279.8'850.0'205 2 . 1 ' PROPOSED 32' X 16' PAVILION AREA = 512 SQ. FT. 70.2' DISTANCE FROM PROP. FOOTPRINT TO EX. BLDG ADJOINERS AND SETBACKSHP HOOD 2026 PAVILIONBACK CREEK MAGISTERIAL DISTRICTFREDERICK COUNTY, VA151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF DESIGNED BY: FILE NO. SCALE: DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WVSP 29-26 Rev. No.Date 1 08/21/2026 3 07/08/2026 ZJ/ZS/CH 7 2247H 1" = 100' 26Aug2026 52 1 GND 52 5 FFE 52 5 FFE 52 4 GND 52 0 GND 52 0 GND 52 0 GND 52 0 GND 51 4 GND 51 9 GND 46 6 GND 52 0 GND 51 4 GND 51 9 GND 51 4 GND519 GND 45 6 GND 39 2 ex gnd 38 75 GND 38 0 ex gnd EX. BLDG EX. FIR E L A N E EX FH EX FH 4"@1.95%4"@1.95% 8"@1.0% NEW CLEAN OUT PLUG IN YARD NEW (REROUTED) 8" PVC SCHD. 40 PIPING NEW (REROUTED) 8" PVC SCHD. 40 PIPING 8" TEE. PIPE HEADING BACK TOWARDS BUILDING ? LEFT INTACT EXISTING 8" PIPE LEFT INTACT 8"@1.0% PROJECT AREA EXISTING CONDITIONSHP HOOD 2026 PAVILIONBACK CREEK MAGISTERIAL DISTRICTFREDERICK COUNTY, VA151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF DESIGNED BY: FILE NO. SCALE: DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WVSP 29-26 Rev. No.Date 1 08/21/2026 4 07/08/2026 ZJ/ZS/CH 7 2247H 1" = 40' 26Aug2026 SF LCG LCG PS PS PS  WLQG\ HLOO LDQHWLQFKHVWHU 9LUJLQLD 2262THOHSKRQH:  662-FD[:  22-92ZZZ.JUHHQZD\HQJ.FRPFND1971ENGINEERINGSHEET OF DESIGNED BY: FILE NO. SCALE: DATE:PRO8DLY SER9ING 9IRGINIA WEST 9IRGINIAOFFICES IN: WINCHESTER 9A MARTINSB8RG W9SP #29-26 MINIM8M CONSTR8CTION STANDARDS AQ HURVLRQ DQG VHGLPHQW FRQWURO SURJUDP DGRSWHG ZLWK WKLV SODQ PXVW EH FRQVLVWHQW ZLWK WKH 9SECH IRU 99AC2-- PLQLPXP VWDQGDUGV: .PHUPDQHQW RU WHPSRUDU\ VRLO VWDELOL]DWLRQ VKDOO EH DSSOLHG WR GHQXGHG DUHDV ZLWKLQ VHYHQ GD\V DIWHU ILQDO JUDGH LV UHDFKHG RQ DQ\ SRUWLRQ RI WKH VLWH. THPSRUDU\ VRLO VWDELOL]DWLRQ VKDOO EH DSSOLHG ZLWKLQ VHYHQ GD\V WR GHQXGHG DUHDV WKDW PD\ QRW EH DW ILQDO JUDGH EXW ZLOO UHPDLQ GRUPDQW IRU ORQJHU WKDQ  GD\V. PHUPDQHQW VWDELOL]DWLRQ VKDOO EH DSSOLHG WR DUHDV WKDW DUH WR EH OHIW GRUPDQW IRU PRUH WKDQ RQH \HDU. 2.DXULQJ FRQVWUXFWLRQ RI WKH SURMHFW VRLO VWRFN SLOHV DQG ERUURZ DUHDV VKDOO EH VWDELOL]HG RU SURWHFWHG ZLWK VHGLPHQW WUDSSLQJ PHDVXUHV. TKH DSSOLFDQW LV UHVSRQVLEOH IRU WKH WHPSRUDU\ SURWHFWLRQ DQG SHUPDQHQW VWDELOL]DWLRQ RI DOO VRLO VWRFNSLOHV RQ VLWH DV ZHOO DV ERUURZ DUHDV DQG VRLO LQWHQWLRQDOO\ WUDQVSRUWHG IURP WKH SURMHFW VLWH. .A SHUPDQHQW YHJHWDWLYH FRYHU VKDOO EH HVWDEOLVKHG RQ GHQXGHG DUHDV QRW RWKHUZLVH SHUPDQHQWO\ VWDELOL]HG. PHUPDQHQW YHJHWDWLRQ VKDOO QRW EH FRQVLGHUHG HVWDEOLVKHG XQWLO D JURXQG FRYHU LV DFKLHYHG WKDW LV XQLIRUP PDWXUH HQRXJK WR VXUYLYH DQG ZLOO LQKLELW HURVLRQ. .SHGLPHQW EDVLQV DQG WUDSV SHULPHWHU GLNHV VHGLPHQW EDUULHUV DQG RWKHU PHDVXUHV LQWHQGHG WR WUDS VHGLPHQW VKDOO EH FRQVWUXFWHG DV D ILUVW VWHS LQ DQ\ ODQG-GLVWXUELQJ DFWLYLW\ DQG VKDOO EH PDGH IXQFWLRQDO EHIRUH XSVORSH ODQG GLVWXUEDQFH WDNHV SODFH. .SWDELOL]DWLRQ PHDVXUHV VKDOO EH DSSOLHG WR HDUWKHQ VWUXFWXUHV VXFK DV GDPV GLNHV DQG GLYHUVLRQV LPPHGLDWHO\ DIWHU LQVWDOODWLRQ. 6.SHGLPHQW WUDSV DQG VHGLPHQW EDVLQV VKDOO EH GHVLJQHG DQG FRQVWUXFWHG EDVHG XSRQ WKH WRWDO GUDLQDJH DUHD WR EH VHUYHG E\ WKH WUDS RU EDVLQ. D.TKH PLQLPXP VWRUDJH FDSDFLW\ RI D VHGLPHQW WUDS VKDOO EH  FXELF \DUGV SHU DFUH RI GUDLQDJH DUHD DQG WKH WUDS VKDOO RQO\ FRQWURO GUDLQDJH DUHDV OHVV WKDQ WKUHH DFUHV. E.SXUIDFH UXQRII IURP GLVWXUEHG DUHDV WKDW LV FRPSULVHG RI IORZ IURP GUDLQDJH DUHDV JUHDWHU WKDQ RU HTXDO WR WKUHH DFUHV VKDOO EH FRQWUROOHG E\ D VHGLPHQW EDVLQ. TKH PLQLPXP VWRUDJH FDSDFLW\ RI D VHGLPHQW EDVLQ VKDOO EH  FXELF \DUGV SHU DFUH RI GUDLQDJH DUHD. TKH RXWIDOO V\VWHP VKDOO DW D PLQLPXP PDLQWDLQ WKH VWUXFWXUDO LQWHJULW\ RI WKH EDVLQ GXULQJ D -\HDU VWRUP RI 2-KRXU GXUDWLRQ. RXQRII FRHIILFLHQWV XVHG LQ UXQRII FDOFXODWLRQV VKDOO FRUUHVSRQG WR D EDUH HDUWK FRQGLWLRQ RU WKRVH FRQGLWLRQV H[SHFWHG WR H[LVW ZKLOH WKH VHGLPHQW EDVLQ LV XWLOL]HG. .CXW DQG ILOO VORSHV VKDOO EH GHVLJQHG DQG FRQVWUXFWHG LQ D PDQQHU WKDW ZLOO PLQLPL]H HURVLRQ. SORSHV WKDW DUH IRXQG WR EH HURGLQJ H[FHVVLYHO\ ZLWKLQ RQH \HDU RI SHUPDQHQW VWDELOL]DWLRQ VKDOO EH SURYLGHG ZLWK DGGLWLRQDO VORSH VWDELOL]LQJ PHDVXUHV XQWLO WKH SUREOHP LV FRUUHFWHG. .CRQFHQWUDWHG UXQRII VKDOO QRW IORZ GRZQ FXW RU ILOO VORSHV XQOHVV FRQWDLQHG ZLWKLQ DQ DGHTXDWH WHPSRUDU\ RU SHUPDQHQW FKDQQHO IOXPH RU VORSH GUDLQ VWUXFWXUH. 9.WKHQHYHU ZDWHU VHHSV IURP D VORSH IDFH DGHTXDWH GUDLQDJH RU RWKHU SURWHFWLRQ VKDOO EH SURYLGHG. .AOO VWRUP VHZHU LQOHWV WKDW DUH PDGH RSHUDEOH GXULQJ FRQVWUXFWLRQ VKDOO EH SURWHFWHG VR WKDW VHGLPHQW-ODGHQ ZDWHU FDQQRW HQWHU WKH FRQYH\DQFH V\VWHP ZLWKRXW ILUVW EHLQJ ILOWHUHG RU RWKHUZLVH WUHDWHG WR UHPRYH VHGLPHQW. .BHIRUH QHZO\ FRQVWUXFWHG VWRUPZDWHU FRQYH\DQFH FKDQQHOV RU SLSHV DUH PDGH RSHUDWLRQDO DGHTXDWH RXWOHW SURWHFWLRQ DQG DQ\ UHTXLUHG WHPSRUDU\ RU SHUPDQHQW FKDQQHO OLQLQJ VKDOO EH LQVWDOOHG LQ ERWK WKH FRQYH\DQFH FKDQQHO DQG UHFHLYLQJ FKDQQHO. 2.WKHQ ZRUN LQ D OLYH ZDWHUFRXUVH LV SHUIRUPHG SUHFDXWLRQV VKDOO EH WDNHQ WR PLQLPL]H HQFURDFKPHQW FRQWURO VHGLPHQW WUDQVSRUW DQG VWDELOL]H WKH ZRUN DUHD WR WKH JUHDWHVW H[WHQW SRVVLEOH GXULQJ FRQVWUXFWLRQ. NRQHURGLEOH PDWHULDO VKDOO EH XVHG IRU WKH FRQVWUXFWLRQ RI FDXVHZD\V DQG FRIIHUGDPV. EDUWKHQ ILOO PD\ EH XVHG IRU WKHVH VWUXFWXUHV LI DUPRUHG E\ QRQHURGLEOH FRYHU PDWHULDOV. .WKHQ D OLYH ZDWHUFRXUVH PXVW EH FURVVHG E\ FRQVWUXFWLRQ YHKLFOHV PRUH WKDQ WZLFH LQ DQ\ VL[-PRQWK SHULRG D WHPSRUDU\ YHKLFXODU VWUHDP FURVVLQJ FRQVWUXFWHG RI QRQHURGLEOH PDWHULDO VKDOO EH SURYLGHG. .AOO DSSOLFDEOH IHGHUDO VWDWH DQG ORFDO UHTXLUHPHQWV SHUWDLQLQJ WR ZRUNLQJ LQ RU FURVVLQJ OLYH ZDWHUFRXUVHV VKDOO EH PHW. .TKH EHG DQG EDQNV RI D ZDWHUFRXUVH VKDOO EH VWDELOL]HG LPPHGLDWHO\ DIWHU ZRUN LQ WKH ZDWHUFRXUVH LV FRPSOHWHG. 6.8QGHUJURXQG XWLOLW\ OLQHV VKDOO EH LQVWDOOHG LQ DFFRUGDQFH ZLWK WKH IROORZLQJ VWDQGDUGV LQ DGGLWLRQ WR RWKHU DSSOLFDEOH FULWHULD: D.NR PRUH WKDQ  OLQHDU IHHW RI WUHQFK PD\ EH RSHQHG DW RQH WLPH. E.E[FDYDWHG PDWHULDO VKDOO EH SODFHG RQ WKH XSKLOO VLGH RI WUHQFKHV. F.EIIOXHQW IURP GHZDWHULQJ RSHUDWLRQV VKDOO EH ILOWHUHG RU SDVVHG WKURXJK DQ DSSURYHG VHGLPHQW WUDSSLQJ GHYLFH RU ERWK DQG GLVFKDUJHG LQ D PDQQHU WKDW GRHV QRW DGYHUVHO\ DIIHFW IORZLQJ VWUHDPV RU RII-VLWH SURSHUW\. G.MDWHULDO XVHG IRU EDFNILOOLQJ WUHQFKHV VKDOO EH SURSHUO\ FRPSDFWHG LQ RUGHU WR PLQLPL]H HURVLRQ DQG SURPRWH VWDELOL]DWLRQ. H.RHVWDELOL]DWLRQ VKDOO EH DFFRPSOLVKHG LQ DFFRUGDQFH ZLWK WKLV FKDSWHU. I.ASSOLFDEOH VDIHW\ UHTXLUHPHQWV VKDOO EH FRPSOLHG ZLWK. .WKHUH FRQVWUXFWLRQ YHKLFOH DFFHVV URXWHV LQWHUVHFW SDYHG RU SXEOLF URDGV SURYLVLRQV VKDOO EH PDGH WR PLQLPL]H WKH WUDQVSRUW RI VHGLPHQW E\ YHKLFXODU WUDFNLQJ RQWR WKH SDYHG VXUIDFH. WKHUH VHGLPHQW LV WUDQVSRUWHG RQWR D SDYHG RU SXEOLF URDG VXUIDFH WKH URDG VXUIDFH VKDOO EH FOHDQHG WKRURXJKO\ DW WKH HQG RI HDFK GD\. SHGLPHQW VKDOO EH UHPRYHG IURP WKH URDGV E\ VKRYHOLQJ RU VZHHSLQJ DQG WUDQVSRUWHG WR D VHGLPHQW FRQWURO GLVSRVDO DUHD. SWUHHW ZDVKLQJ VKDOO EH DOORZHG RQO\ DIWHU VHGLPHQW LV UHPRYHG LQ WKLV PDQQHU. TKLV SURYLVLRQ VKDOO DSSO\ WR LQGLYLGXDO GHYHORSPHQW ORWV DV ZHOO DV WR ODUJHU ODQG-GLVWXUELQJ DFWLYLWLHV. .AOO WHPSRUDU\ HURVLRQ DQG VHGLPHQW FRQWURO PHDVXUHV VKDOO EH UHPRYHG ZLWKLQ  GD\V DIWHU ILQDO VLWH VWDELOL]DWLRQ RU DIWHU WKH WHPSRUDU\ PHDVXUHV DUH QR ORQJHU QHHGHG XQOHVV RWKHUZLVH DXWKRUL]HG E\ WKH 9ESCP DXWKRULW\. TUDSSHG VHGLPHQW DQG WKH GLVWXUEHG VRLO DUHDV UHVXOWLQJ IURP WKH GLVSRVLWLRQ RI WHPSRUDU\ PHDVXUHV VKDOO EH SHUPDQHQWO\ VWDELOL]HG WR SUHYHQW IXUWKHU HURVLRQ DQG VHGLPHQWDWLRQ. 9.PURSHUWLHV DQG ZDWHUZD\V GRZQVWUHDP IURP GHYHORSPHQW VLWHV VKDOO EH SURWHFWHG IURP VHGLPHQW GHSRVLWLRQ HURVLRQ DQG GDPDJH GXH WR LQFUHDVHV LQ YROXPH YHORFLW\ DQG SHDN IORZ UDWH RI VWRUPZDWHU UXQRII IRU WKH VWDWHG IUHTXHQF\ VWRUP RI 2-KRXU GXUDWLRQ LQ DFFRUGDQFH ZLWK WKH IROORZLQJ VWDQGDUGV DQG FULWHULD. SWUHDP UHVWRUDWLRQ DQG UHORFDWLRQ SURMHFWV WKDW LQFRUSRUDWH QDWXUDO FKDQQHO GHVLJQ FRQFHSWV DUH QRW PDQ-PDGH FKDQQHOV DQG VKDOO EH H[HPSW IURP DQ\ IORZ UDWH FDSDFLW\ DQG YHORFLW\ UHTXLUHPHQWV IRU QDWXUDO RU PDQ-PDGH FKDQQHOV: D.CRQFHQWUDWHG VWRUPZDWHU UXQRII OHDYLQJ D GHYHORSPHQW VLWH VKDOO EH GLVFKDUJHG GLUHFWO\ LQWR DQ DGHTXDWH QDWXUDO RU PDQ-PDGH UHFHLYLQJ FKDQQHO SLSH RU VWRUP VHZHU V\VWHP. FRU WKRVH VLWHV ZKHUH UXQRII LV GLVFKDUJHG LQWR D SLSH RU SLSH V\VWHP GRZQVWUHDP VWDELOLW\ DQDO\VHV DW WKH RXWIDOO RI WKH SLSH RU SLSH V\VWHP VKDOO EH SHUIRUPHG. E.AGHTXDF\ RI DOO FKDQQHOV DQG SLSHV VKDOO EH YHULILHG LQ WKH IROORZLQJ PDQQHU:  TKH DSSOLFDQW VKDOO GHPRQVWUDWH WKDW WKH WRWDO GUDLQDJH DUHD WR WKH SRLQW RI DQDO\VLV ZLWKLQ WKH FKDQQHO LV RQH KXQGUHG WLPHV JUHDWHU WKDQ WKH FRQWULEXWLQJ GUDLQDJH DUHD RI WKH SURMHFW LQ TXHVWLRQ RU 2 D NDWXUDO FKDQQHOV VKDOO EH DQDO\]HG E\ WKH XVH RI D WZR-\HDU VWRUP WR YHULI\ WKDW VWRUPZDWHU ZLOO QRW RYHUWRS FKDQQHO EDQNV QRU FDXVH HURVLRQ RI FKDQQHO EHG RU EDQNV. E AOO SUHYLRXVO\ FRQVWUXFWHG PDQ-PDGH FKDQQHOV VKDOO EH DQDO\]HG E\ WKH XVH RI D -\HDU VWRUP WR YHULI\ WKDW VWRUPZDWHU ZLOO QRW RYHUWRS LWV EDQNV DQG E\ WKH XVH RI D WZR-\HDU VWRUP WR GHPRQVWUDWH WKDW VWRUPZDWHU ZLOO QRW FDXVH HURVLRQ RI FKDQQHO EHG RU EDQNV DQG F PLSHV DQG VWRUP VHZHU V\VWHPV VKDOO EH DQDO\]HG E\ WKH XVH RI D -\HDU VWRUP WR YHULI\ WKDW VWRUPZDWHU ZLOO EH FRQWDLQHG ZLWKLQ WKH SLSH RU V\VWHP. F.II H[LVWLQJ QDWXUDO UHFHLYLQJ FKDQQHOV RU SUHYLRXVO\ FRQVWUXFWHG PDQ-PDGH FKDQQHOV RU SLSHV DUH QRW DGHTXDWH WKH DSSOLFDQW VKDOO:  IPSURYH WKH FKDQQHOV WR D FRQGLWLRQ ZKHUH D -\HDU VWRUP ZLOO QRW RYHUWRS WKH EDQNV DQG D WZR-\HDU VWRUP ZLOO QRW FDXVH HURVLRQ WR WKH FKDQQHO WKH EHG RU WKH EDQNV RU 2 IPSURYH WKH SLSH RU SLSH V\VWHP WR D FRQGLWLRQ ZKHUH WKH -\HDU VWRUP LV FRQWDLQHG ZLWKLQ WKH DSSXUWHQDQFHV  DHYHORS D VLWH GHVLJQ WKDW ZLOO QRW FDXVH WKH SUH-GHYHORSPHQW SHDN UXQRII UDWH IURP D WZR-\HDU VWRUP WR LQFUHDVH ZKHQ UXQRII RXWIDOOV LQWR D QDWXUDO FKDQQHO RU ZLOO QRW FDXVH WKH SUH-GHYHORSPHQW SHDN UXQRII UDWH IURP D -\HDU VWRUP WR LQFUHDVH ZKHQ UXQRII RXWIDOOV LQWR D PDQ-PDGH FKDQQHO RU  PURYLGH D FRPELQDWLRQ RI FKDQQHO LPSURYHPHQW VWRUPZDWHU GHWHQWLRQ RU RWKHU PHDVXUHV ZKLFK LV VDWLVIDFWRU\ WR WKH 9ESCP DXWKRULW\ WR SUHYHQW GRZQVWUHDP HURVLRQ. G.TKH DSSOLFDQW VKDOO SURYLGH HYLGHQFH RI SHUPLVVLRQ WR PDNH WKH LPSURYHPHQWV. H.AOO K\GURORJLF DQDO\VHV VKDOO EH EDVHG RQ WKH H[LVWLQJ ZDWHUVKHG FKDUDFWHULVWLFV DQG WKH XOWLPDWH GHYHORSPHQW FRQGLWLRQ RI WKH VXEMHFW SURMHFW. I.II WKH DSSOLFDQW FKRRVHV DQ RSWLRQ WKDW LQFOXGHV VWRUPZDWHU GHWHQWLRQ KH VKDOO REWDLQ DSSURYDO IURP WKH 9ESCP RI D SODQ IRU PDLQWHQDQFH RI WKH GHWHQWLRQ IDFLOLWLHV. TKH SODQ VKDOO VHW IRUWK WKH PDLQWHQDQFH UHTXLUHPHQWV RI WKH IDFLOLW\ DQG WKH SHUVRQ UHVSRQVLEOH IRU SHUIRUPLQJ WKH PDLQWHQDQFH. J.OXWIDOO IURP D GHWHQWLRQ IDFLOLW\ VKDOO EH GLVFKDUJHG WR D UHFHLYLQJ FKDQQHO DQG HQHUJ\ GLVVLSDWRUV VKDOO EH SODFHG DW WKH RXWIDOO RI DOO GHWHQWLRQ IDFLOLWLHV DV QHFHVVDU\ WR SURYLGH D VWDELOL]HG WUDQVLWLRQ IURP WKH IDFLOLW\ WR WKH UHFHLYLQJ FKDQQHO. K.AOO RQ-VLWH FKDQQHOV PXVW EH YHULILHG WR EH DGHTXDWH. L.IQFUHDVHG YROXPHV RI VKHHW IORZV WKDW PD\ FDXVH HURVLRQ RU VHGLPHQWDWLRQ RQ DGMDFHQW SURSHUW\ VKDOO EH GLYHUWHG WR D VWDEOH RXWOHW DGHTXDWH FKDQQHO SLSH RU SLSH V\VWHP RU WR D GHWHQWLRQ IDFLOLW\. M.IQ DSSO\LQJ WKHVH VWRUPZDWHU PDQDJHPHQW FULWHULD LQGLYLGXDO ORWV RU SDUFHOV LQ D UHVLGHQWLDO FRPPHUFLDO RU LQGXVWULDO GHYHORSPHQW VKDOO QRW EH FRQVLGHUHG WR EH VHSDUDWH GHYHORSPHQW SURMHFWV. IQVWHDG WKH GHYHORSPHQW DV D ZKROH VKDOO EH FRQVLGHUHG WR EH D VLQJOH GHYHORSPHQW SURMHFW. H\GURORJLF SDUDPHWHUV WKDW UHIOHFW WKH XOWLPDWH GHYHORSPHQW FRQGLWLRQ VKDOO EH XVHG LQ DOO HQJLQHHULQJ FDOFXODWLRQV. N.AOO PHDVXUHV XVHG WR SURWHFW SURSHUWLHV DQG ZDWHUZD\V VKDOO EH HPSOR\HG LQ D PDQQHU ZKLFK PLQLPL]HV LPSDFWV RQ WKH SK\VLFDO FKHPLFDO DQG ELRORJLFDO LQWHJULW\ RI ULYHUV VWUHDPV DQG RWKHU ZDWHUV RI WKH VWDWH. O.AQ\ SODQ DSSURYHG SULRU WR -XO\  2 WKDW SURYLGHV IRU VWRUPZDWHU PDQDJHPHQW WKDW DGGUHVVHV DQ\ IORZ UDWH FDSDFLW\ DQG YHORFLW\ UHTXLUHPHQWV IRU QDWXUDO RU PDQ-PDGH FKDQQHOV VKDOO VDWLVI\ WKH IORZ UDWH FDSDFLW\ DQG YHORFLW\ UHTXLUHPHQWV IRU QDWXUDO RU PDQ-PDGH FKDQQHOV LI WKH SUDFWLFHV DUH GHVLJQHG WR L GHWDLQ WKH ZDWHU TXDOLW\ YROXPH DQG WR UHOHDVH LW RYHU  KRXUV LL GHWDLQ DQG UHOHDVH RYHU D 2-KRXU SHULRG WKH H[SHFWHG UDLQIDOO UHVXOWLQJ IURP WKH RQH \HDU 2-KRXU VWRUP DQG LLL UHGXFH WKH DOORZDEOH SHDN IORZ UDWH UHVXOWLQJ IURP WKH . 2 DQG -\HDU 2-KRXU VWRUPV WR D OHYHO WKDW LV OHVV WKDQ RU HTXDO WR WKH SHDN IORZ UDWH IURP WKH VLWH DVVXPLQJ LW ZDV LQ D JRRG IRUHVWHG FRQGLWLRQ DFKLHYHG WKURXJK PXOWLSOLFDWLRQ RI WKH IRUHVWHG SHDN IORZ UDWH E\ D UHGXFWLRQ IDFWRU WKDW LV HTXDO WR WKH UXQRII YROXPH IURP WKH VLWH ZKHQ LW ZDV LQ D JRRG IRUHVWHG FRQGLWLRQ GLYLGHG E\ WKH UXQRII YROXPH IURP WKH VLWH LQ LWV SURSRVHG FRQGLWLRQ DQG VKDOO EH H[HPSW IURP DQ\ IORZ UDWH FDSDFLW\ DQG YHORFLW\ UHTXLUHPHQWV IRU QDWXUDO RU PDQ-PDGH FKDQQHOV DV GHILQHG LQ DQ\ UHJXODWLRQV SURPXOJDWHG SXUVXDQW WR † 62.-.: RU 62.-.:6 RI WKH AFW. P.FRU SODQV DSSURYHG RQ DQG DIWHU -XO\  2 WKH IORZ UDWH FDSDFLW\ DQG YHORFLW\ UHTXLUHPHQWV RI † 62.-.:2 A RI WKH AFW DQG WKLV VXEVHFWLRQ VKDOO EH VDWLVILHG E\ FRPSOLDQFH ZLWK ZDWHU TXDQWLW\ UHTXLUHPHQWV LQ WKH SWRUPZDWHU MDQDJHPHQW AFW † 62.-.:2 HW VHT. RI WKH CRGH RI 9LUJLQLD DQG DWWHQGDQW UHJXODWLRQV XQOHVV VXFK ODQG-GLVWXUELQJ DFWLYLWLHV DUH LQ DFFRUGDQFH ZLWK 99AC2-- RI WKH 9LUJLQLD SWRUPZDWHU MDQDJHPHQW PURJUDP 9SMP RHJXODWLRQ RU DUH H[HPSW SXUVXDQW WR VXEGLYLVLRQ C  RI † 62.-.: RI WKH AFW. Q.CRPSOLDQFH ZLWK WKH ZDWHU TXDQWLW\ PLQLPXP VWDQGDUGV VHW RXW LQ 99AC2--66 RI WKH 9LUJLQLD SWRUPZDWHU MDQDJHPHQW PURJUDP 9SMP RHJXODWLRQ VKDOO EH GHHPHG WR VDWLVI\ WKH UHTXLUHPHQWV RI WKLV VXEGLYLVLRQ 9. EROSION AND SEDIMENT CONTROL NARRATI9E HP HOOD 226 PA9ILION DHVFULSWLRQ: TKH SURMHFW ZLOO FRQVLVW RI WKH FRQVWUXFWLRQ RI D SDYLOLRQ IRU WKH HP HRRG IDFWRU\ ORFDWHG LQ WLQFKHVWHU 9A. TKLV ZLOO UHTXLUH LQVWDOODWLRQ RI D FRQFUHWH SDG ZLWK IRXQGDWLRQ. A WRWDO RI 222 S4. FT VTXDUH IHHW ZLOO EH GLVWXUEHG IRU FRQVWUXFWLRQ. DDWH RI FRQVWUXFWLRQ: CRQVWUXFWLRQ ZLOO EHJLQ IROORZLQJ SODQ DSSURYDO DQG ZLOO WDNH DSSUR[LPDWHO\ RQH  PRQWK WR FRPSOHWH. E[LVWLQJ VLWH FRQGLWLRQV: TKH VLWH LV FXUUHQWO\ XWLOL]HG DV DQ LQGXVWULDO IDFLOLW\. TKH VLWH LV GLYLGHG LQWR WZR SULPDU\ GUDLQDJH DUHDV GUDLQLQJ QRUWK DQG VRXWK. AOO DUHDV GUDLQ WR HRJXH RXQ ZKLFK LV D WULEXWDU\ WR OSHTXRQ CUHHN. T\SLFDO VORSHV UDQJH EHWZHHQ 2 DQG 2. AGMDFHQW DUHDV: TKH VLWH LV ERXQGHG E\ IQWHUVWDWH  RQ WKH HDVW DQG ZRRGV/LQGXVWULDO SURSHUW\ WR WKH QRUWK. TR WKH WHVW LW LV ERXQGHG E\ WKUHH LQGXVWULDO/FRPPHUFLDO SURSHUWLHV. TR WKH SRXWK LW LV ERXQGHG E\  FRPPHUFLDO DQG UHWDLO SURSHUWLHV. AGMDFHQW SURSHUWLHV DUH ]RQHG B2 B M2 DQG RA. OIIVLWH DUHDV: NR RIIVLWH DUHDV ZLOO EH LPSDFWHG E\ WKLV SURMHFW. SRLOV: TKH H[LVWLQJ VRLO FRQGLWLRQV ZHUH REWDLQHG IURP WKH NRCS SRLOV SXUYH\. RHIHU WR WKH VRLOV PDS WKLV VKHHW. CULWLFDO DUHDV: NR FULWLFDO DUHDV DUH LGHQWLILHG ZLWK WKLV SURMHFW. EURVLRQ AQG SHGLPHQW CRQWURO MHDVXUHV: 8QOHVV RWKHUZLVH LQGLFDWHG DOO YHJHWDWLYH DQG VWUXFWXUDO HURVLRQ DQG VHGLPHQW FRQWURO PHDVXUHV VKDOO EH FRQVWUXFWHG DQG PDLQWDLQHG DFFRUGLQJ WR WKH PLQLPXP VWDQGDUGV DQG VSHFLILFDWLRQV RI WKH 9LUJLQLD EURVLRQ DQG SHGLPHQW CRQWURO HDQGERRN. SWUXFWXUDO MHDVXUHV: NR FRQVWUXFWLRQ HQWUDQFH LV SURSRVHG DV WKH GLVWXUEDQFH DUHD LV PLQLPDO DQG VKRXOG QRW UHTXLUH YHKLFXODU DFFHVV. SLWH LV DFFHVVHG WKURXJK D SULYDWH SDUNLQJ ORW. CRQWUDFWRU WR HQVXUH PXG LV QRW FDUULHG EH\RQG WKH SULYDWH SDUNLQJ ORW DQG LV WR FOHDQ XS DQ\ PXG FDUULHG RXWVLGH WKH GLVWXUEDQFH DUHD GDLO\. IQVWDOO VLOW IHQFH C-PCM- DQG VXSHU VLOW IHQFH DV VKRZQ RQ WKH SODQV WR LQWHUFHSW DQG GHWDLQ VPDOO DPRXQWV RI VHGLPHQW IURP GLVWXUEHG DUHDV GXULQJ FRQVWUXFWLRQ LQ RUGHU WR SUHYHQW VHGLPHQW IURP OHDYLQJ WKH VLWH. THPSRUDU\ VHHGLQJ C-SSM-9 DQG/RU SHUPDQHQW VHHGLQJ C-SSM- VKDOO EH SODFHG RQ DOO FULWLFDO VORSHV : RU JUHDWHU DQG DV QHHGHG WR VWDELOL]H GLVWXUEHG DUHDV. 9HJHWDWLYH MHDVXUHV: PHUPDQHQW RU WHPSRUDU\ VRLO VWDELOL]DWLRQ VKDOO EH DSSOLHG WR GHQXGHG DUHDV ZLWKLQ VHYHQ  GD\V DIWHU ILQDO JUDGH LV UHDFKHG RQ DQ\ SRUWLRQ RI WKH VLWH. THPSRUDU\ VRLO VWDELOL]DWLRQ VKDOO EH DSSOLHG ZLWKLQ VHYHQ  GD\V WR GHQXGHG DUHDV WKDW PD\ QRW EH DW ILQDO JUDGH EXW ZLOO UHPDLQ GRUPDQW IRU ORQJHU WKDQ IRXUWHHQ  GD\V. PHUPDQHQW VRLO VWDELOL]DWLRQ VKDOO EH DSSOLHG WR DOO DUHDV WKDW DUH WR EH OHIW GRUPDQW IRU PRUH WKDQ RQH \HDU. TRSVRLO WKDW KDV EHHQ VWRFNSLOHG VKDOO EH VXUURXQGHG ZLWK VLOW IHQFH DQG SURWHFWHG E\ PXOFK DQG/RU WHPSRUDU\ YHJHWDWLRQ LPPHGLDWHO\ DIWHU JUDGLQJ. AOO HDUWK EHUPV GLYHUVLRQV DQG VHGLPHQW WUDS HPEDQNPHQWV DUH WR EH PDFKLQH-FRPSDFWHG VHHGHG DQG PXOFKHG KD\ PXOFK RU VWUDZ IRU WHPSRUDU\ DQG/RU SHUPDQHQW YHJHWDWLYH FRYHU LPPHGLDWHO\ DIWHU FRQVWUXFWLRQ EURVLRQ FRQWURO PDWV VKDOO EH LQVWDOOHG RYHU VWHHS : FXW DQG ILOOV VORSH ZKLFK KDYH EHHQ EURXJKW WR ILQDO JUDGH DQG VHHGHG WR SURWHFW IURP ULOO DQG JXOO\ HURVLRQ. MDQDJHPHQW SWUDWHJLHV: CRQVWUXFWLRQ VKDOO EH VHTXHQFHG VXFK WKDW JUDGLQJ RSHUDWLRQV ZLOO EHJLQ DQG HQG DV TXLFNO\ DV SRVVLEOH. TKH VLWH VXSHULQWHQGHQW VKDOO EH UHVSRQVLEOH IRU WKH LQVWDOODWLRQ DQG PDLQWHQDQFH RI DOO HURVLRQ DQG VHGLPHQW FRQWURO PHDVXUHV. MDLQWHQDQFH RI WKHVH PHDVXUHV WKURXJKRXW WKH SURMHFW LV FULWLFDO WR WKH HIIHFWLYHQHVV RI WKH SURJUDP. AIWHU DUHDV DERYH FRQWUROV KDYH EHHQ VWDELOL]HG WKH FRQWUROV VKDOO EH FOHDQHG XS DQG UHPRYHG. EOHFWULF SRZHU WHOHSKRQH VWRUP VDQLWDU\ ZDWHU JDV VXSSO\ WUHQFKHV DUH WR EH FRPSDFWHG VHHGHG DQG PXOFKHG ZLWKLQ ILYH  GD\V DIWHU EDFNILOOLQJ. NR PRUH WKDQ  IHHW DUH WR EH RSHQ DW DQ\ RQH WLPH. AOO FXW DQG ILOO VORSHV DUH WR EH VHHGHG DQG PXOFKHG ZLWKLQ ILYH  GD\V RI FRPSOHWLRQ RI JUDGLQJ. DUDLQDJH VZDOHV VKDOO EH VWDELOL]HG ZLWK FKHFN GDPV XQWLO YHJHWDWLRQ KDV EHHQ ZHOO HVWDEOLVKHG DW ZKLFK WLPH WKH FKHFN GDPV VKDOO EH UHPRYHG. DHYLFHV OLVWHG DERYH DUH FRQVLGHUHG PLQLPXP HURVLRQ DQG VHGLPHQW FRQWUROV. AGGLWLRQDO FRQWURO PHDVXUHV PD\ EH QHFHVVDU\ GXH WR FRQWUDFWRU SKDVLQJ RU RWKHU XQIRUHVHHQ FRQGLWLRQV. IW LV WKH FRQWUDFWRU V UHVSRQVLELOLW\ WR SURYLGH DGGLWLRQDO PHDVXUHV WR WKRVH VKRZQ DV QHHGHG LQ RUGHU WR FRQWURO HURVLRQ DQG FRQWDLQ VHGLPHQW RQ VLWH. AOO PHDVXUHV VKDOO EH LQVWDOOHG DFFRUGLQJ WR WKH VWDQGDUGV DQG VSHFLILFDWLRQV LQ WKH 9LUJLQLD EURVLRQ DQG SHGLPHQW CRQWURO HDQGERRN. SWRUPZDWHU MDQDJHPHQW: NR LQFUHDVH LQ UXQQRII H[SHFWHG. NR FKDQJH LQ JURXQG FRYHUV. MDLQWHQDQFH PURJUDP: IQVSHFWLRQV VKDOO EH FRQGXFWHG DW D IUHTXHQF\ RI DW OHDVW RQH HYHU\  EXVLQHVV GD\V RU DW OHDVW RQFH HYHU\  EXVLQHVV GD\V DQG QR ODWHU WKDQ 2 KRXUV IROORZLQJ D PHDVXUDEOH VWRUP HYHQW. IQ WKH HYHQW WKDW D PHDVXUDEOH VWRUP HYHQW RFFXUV ZKHQ WKHUH DUH PRUH WKDQ 2 KRXUV EHWZHHQ EXVLQHVV GD\V WKH LQVSHFWLRQ VKDOO EH FRQGXFWHG RQ WKH QH[W EXVLQHVV GD\. A PHDVXUDEOH VWRUP HYHQW LV GHILQHG DV .2 LQFKHV RI UDLQIDOO RYHU D 2-KRXU SHULRG LQ DFFRUGDQFH ZLWK 99AC2--. AQ\ GDPDJHG VWUXFWXUDO PHDVXUHV DUH WR EH UHSDLUHG E\ WKH HQG RI WKH GD\ SHHGHG DUHDV VKDOO EH FKHFNHG UHJXODUO\ WR HQVXUH WKDW D JRRG VWDQG RI JUDVV LV PDLQWDLQHG. AOO DUHDV VKDOO EH IHUWLOL]HG DQG UHVHHGHG DV QHHGHG XQWLO JUDVV LV HVWDEOLVKHG. TUDSSHG VHGLPHQW LV WR EH UHPRYHG DV UHTXLUHG WR PDLQWDLQ  WUDS HIILFLHQF\ DQG GLVSRVHG RI E\ VSUHDGLQJ RQ VLWH. IQOHW SURWHFWLRQ VKDOO EH FKHFNHG UHJXODUO\ IRU VHGLPHQW EXLOG-XS. II WKH JUDYHO RXWOHW LV FORJJHG E\ VHGLPHQW LW VKDOO EH UHPRYHG DQG FOHDQHG RU UHSODFHG LPPHGLDWHO\. TKH FRQWUDFWRU LV UHVSRQVLEOH IRU NHHSLQJ H[LVWLQJ SXEOLF URDGV LQ D FOHDQ GXVW DQG PXG IUHH FRQGLWLRQ DW DOO WLPHV. EURVLRQ DQG VHGLPHQW FRQWURO SURJUDP: .HROG SUH-FRQVWUXFWLRQ PHHWLQJ RQ VLWH ZLWK LQVSHFWRU. 2.IQVWDOO FRQVWUXFWLRQ HQWUDQFH. .COHDULQJ DQG JUXEELQJ IRU VHGLPHQW FRQWURO GHYLFHV RQO\ .PODFHPHQW RI VHGLPHQW FRQWURO GHYLFHV. .OEWDLQ LQVSHFWRU V DSSURYDO SULRU WR EHJLQQLQJ JUDGLQJ RSHUDWLRQV. 6.COHDU DQG JUXE PDLQ DUHD RI VLWH SURWHFWHG E\ LQVWDOOHG E S FRQWUROV. .RRXJK JUDGH UHPDLQGHU RI VLWH. .IQVWDOO GUDLQDJH GHYLFHV ZLWK VHGLPHQW FRQWURO. 9.FLQDO JUDGLQJ. .RHVWRUDWLRQ DQG VWDELOL]DWLRQ RI GLVWXUEHG DUHDV. .RHPRYH HURVLRQ DQG VHGLPHQW FRQWURO PHDVXUHV ZLWK WKH DSSURYDO RI WKH LQVSHFWRU. ALL DUHDV WR EH VWDELOL]HG  SULRU WR LQVWDOODWLRQ RI ELRUHWHQWLRQ EDVLQV. NRWH: TKH FUHGHULFN CRXQW\ PXEOLF WRUNV DQG EQJLQHHULQJ DHSDUWPHQW UHWDLQ WKH ULJKW WR DGG DQG/RU PRGLI\ WKHVH HURVLRQ DQG VHGLPHQW FRQWURO PHDVXUHV GXULQJ WKH FRQVWUXFWLRQ SURFHVV ZLWKLQ UHDVRQ WR HQVXUH DGHTXDWH SURWHFWLRQ WR WKH SXEOLF DQG WKH HQYLURQPHQW. SHHGLQJ VFKHGXOH VRLO VWDELOL]DWLRQ : .AOO SHUPDQHQW VHHGLQJ VKDOO EH LQ DFFRUGDQFH ZLWK VHFWLRQ . .2 RI WKH 9ESCH. 2.SSUHDG WRSVRLO DW D PLQLPXP GHSWK RI IRXU  LQFKHV. .IQFRUSRUDWH SXOYHUL]HG DJULFXOWXUDO OLPHVWRQH LQWR WKH WRSVRLO DW D UDWH RI 92 OEV. SHU  VTXDUH IHHW 2 WRQV SHU DFUH . .FHUWLOL]H ZLWK -- IHUWLOL]HU DW D UDWH RI 2 OEV SHU  VTXDUH IHHW  OEV SHU DFUH . .SHHG DOO DUHDV ZLWK D VHHG PL[ FRQVLVWLQJ RI 6 .HQWXFN\  TDOO FHVFXH DQG  RHG TRS CORYHU. 6.MXOFK DOO VHHGHG DUHDV ZLWK VWUDZ PXOFK DSSOLHG DW D UDWH RI  OEV SHU DFUH DQFKRUHG ZLWK FXWEDFN RU HPXOVLILHG DVSKDOW DSSOLHG DW D UDWH RI 2 JDOORQV SHU DFUH. DXVW FRQWURO: .THPSRUDU\ VHHGLQJ VKDOO EH DSSOLHG WR DOO GLVWXUEHG DUHDV VXEMHFW WR OLWWOH RU QR FRQVWUXFWLRQ WUDIILF. 2.AOO KDXO URDGV DQG RWKHU KHDY\ WUDIILF URXWHV VKDOO EH VSULQNOHG ZLWK ZDWHU XQWLO WKH VXUIDFH LV ZHW DQG UHSHDWHG DV QHHGHG WR FRQWURO GXVW.E S NARRATI9E PLANRHY. NR.DDWH /2/226HP HOOD 226 PA9ILIONBAC. CREE. MAGISTERIAL DISTRICTFREDERIC. CO8NTY 9AAS SHOWN  //226 =-/=S/CH  22H E S PLAN 9IEW LDQG DLVWXUEDQFH/ 9SMP NRWHV SIWH GLVWXUEDQFH DUHD LV 222 S4. FT. TKH ODQG GLVWXUEDQFH LV H[HPSW IURP ODQG GLVWXUEDQFH SHUPLWWLQJ SHU FUHGHULFN CRXQW\ CRGH †-: 9IRGINIA EROSION AND SEDIMENT CONTROL PROGRAM 9ESCP LAND DIST8RBANCE RU 9ESCP LAND-DIST8RBING ACTI9ITY: AQ\ PDQ-PDGH FKDQJH WR WKH ODQG VXUIDFH WKDW PD\ UHVXOW LQ VRLO HURVLRQ IURP ZDWHU RU ZLQG DQG WKH PRYHPHQW RI VHGLPHQWV LQWR VWDWH ZDWHUV RU RQWR ODQGV LQ WKH CRPPRQZHDOWK LQFOXGLQJ EXW QRW OLPLWHG WR FOHDULQJ JUDGLQJ H[FDYDWLQJ WUDQVSRUWLQJ DQG ILOOLQJ RI ODQG H[FHSW WKDW WKH WHUP VKDOO QRW LQFOXGH: I. DLVWXUEHG ODQG DUHDV RI OHVV WKDQ  VTXDUH IHHW LQ VL]H KRZHYHU WKH JRYHUQLQJ ERG\ RI WKH SURJUDP DXWKRULW\ PD\ UHGXFH WKLV H[FHSWLRQ WR D VPDOOHU DUHD RI GLVWXUEHG ODQG RU TXDOLI\ WKH FRQGLWLRQV XQGHU ZKLFK WKLV H[FHSWLRQ VKDOO DSSO\ TKH VLWH LV H[HPSW IURP 9SMP SHUPLWWLQJ SHU FUHGHULFN CRXQW\ CRGH †-: 9IRGINIA STORMWATER MANAGEMENT PROGRAM 9SMP LAND DIST8RBANCE RU 9SMP LAND-DIST8RBING ACTI9ITY: A PDQ-PDGH FKDQJH WR WKH ODQG VXUIDFH WKDW SRWHQWLDOO\ FKDQJHV LWV UXQRII FKDUDFWHULVWLFV LQFOXGLQJ FOHDULQJ JUDGLQJ RU H[FDYDWLRQ H[FHSW WKDW WKH WHUP VKDOO QRW LQFOXGH: D. LDQG-GLVWXUELQJ DFWLYLWLHV WKDW GLVWXUE OHVV WKDQ RQH DFUH RI ODQG DUHD H[FHSW IRU DFWLYLWLHV WKDW DUH SDUW RI D ODUJHU FRPPRQ SODQ RI GHYHORSPHQW RU VDOH WKDW LV RQH DFUH RU JUHDWHU RI GLVWXUEDQFH KRZHYHU WKH JRYHUQLQJ ERG\ RI DQ\ ORFDOLW\ WKDW DGPLQLVWHUV D 9SMP PD\ UHGXFH WKLV H[FHSWLRQ WR D VPDOOHU DUHD RI GLVWXUEHG ODQG RU TXDOLI\ WKH FRQGLWLRQV XQGHU ZKLFK WKLV H[FHSWLRQ VKDOO DSSO\ SILT FENCE LIMITS OF CLEARING GRADING NO. .EY SYMBOL DESCRIPTION C-PCM- LCG SF EROSION/SEDIMENT CONTROL LEGEND C-SSM-PS PERMANENT SEEDING C-SCM-IP STORM DRAIN INLET PROTECTION 26Aug2026 2.0%2.0% 5:1 50 96 SW/EX 50 99 SW/EX 750 751 751 2.0%2.0%5:15:15:131.75' PAD 15.75' PAD PROP. PAVILION PAD = 751.02 (512 SF.) 70.27' TO EX WALLPROP. PAVILION FOOTPRINT PROP. 5' SIDEWALK 32' BLDG FOOTPRINT LCG LCGSWALE B/T PAD AND SW, 2% MIN FALL 16' BLDG FOOTPRINT TP TP TPTP TP TP 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF DESIGNED BY: FILE NO. SCALE: DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WVSP 29-26 Rev. No.Date 1 08/21/2026 PS SITE PLANHP HOOD 2026 PAVILIONBACK CREEK MAGISTERIAL DISTRICTFREDERICK COUNTY, VA1" = 10' 6 07/08/2026 ZJ/ZS/CH 7 2247H SITE PLAN SCALE 1" = 10' GRADING NOTE: 1.GRADING TO ENSURE POSITIVE DRAINAGE AWAY FROM BUILDINGS. PITCHED METAL ROOF TO BE USED FOR DRAINAGE OF THE PAVILION AWAY FROM BUILDINGS. LANDSCAPE NOTES: 1.ALL EXISTING LANDSCAPING AND VEGETATION OUTSIDE THE PROPOSED PAD TO BE RESTORED TO EXISTING CONDITIONS. 2.NO ADDITIONAL LANDSCAPING PROPOSED WITH THIS PLAN = PERMANENT SEEDING, SEE DETAILS SHEET 7 LIGHTING NOTES: 1.NO ADDITIONAL EXTERIOR LIGHTING PROPOSED WITH THIS PLAN. 2.OUTDOOR LIGHTING TO BE DESIGNED , SHIELDED, AIMED, LOCATED, AND MAINTAINED TO SHIELD ADJACENT PROPERTIES AND SHALL BE FULL-CUTOFF FIXTURES. UTILITY NOTES: 1.ALL EXISTING UTILITY LOCATIONS ARE SHOWN APPROXIMATED BASED ON AVAILABLE INFORMATION. CONTRACTOR TO FIELD VERIFY/TEST PIT AND NOTIFY ENGINEER OF ANY CONFLICTS. 2.EXISTING STORM SHOWN IS INTERPRETED FROM AVAILABLE SURVEY DATA AND HP HOOD PLANT DATA. 3.EXISTING PROCESS PIPE SHOW PER AVAILABLE SURVEY DATA AND HP HOOD PLANT DATA. CONCRETE SIDEWALK N.T.S. 11/11/15 VER 1 -2% 4" 4000 PSI VDOT A4 CONCRETE 4" SUBBASE (21-A STONE) WIDTH VARIES SEE SITE PLAN COMPACTED SUBGRADE (COMPACTED TO 95% DENSITY AT OPTIMUM MOISTURE CONTENT VDOT VTM-1 METHOD) 6x6 WWMW2.9/2.9 TEST PITS SCALE 1" = 10' 26Aug2026 SITE DETAILSHP HOOD 2026 PAVILIONBACK CREEK MAGISTERIAL DISTRICTFREDERICK COUNTY, VA151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF DESIGNED BY: FILE NO. SCALE: DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WVSP 29-26 Rev. No.Date 1 08/21/2026 N/A 7 07/08/2026 ZJ/ZS/CH 7 2247H 26Aug2026