Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
48-25 Geotechnical Report
ECS Mid-Atlantic, LLC Subsurface Exploration and Geotechnical Evaluation Bridgestone Tire - Rutherford Crossing 151 Market Street Winchester, Virginia 22603 ECS Project Number 01:34293 September 19, 2025 Bridgestone Tire – Rutherford Crossing September 19, 2025 ECS Project No. 01:34293 Page i TABLE OF CONTENTS EXECUTIVE SUMMARY ............................................................................................................. 1 1.0 INTRODUCTION .................................................................................................................. 2 2.0 PROJECT INFORMATION ..................................................................................................... 2 2.1 Project Location...................................................................................................................... 3 2.2 Previous Exploration .............................................................................................................. 4 2.3 Proposed Construction ........................................................................................................... 4 2.4 Regional/Site Geology ............................................................................................................ 5 2.4.1 Karst Terrane Considerations ....................................................................................... 7 3.0 FIELD EXPLORATION AND LABORATORY TESTING .............................................................. 10 3.1 Subsurface Characterization ................................................................................................ 10 3.2 Groundwater Observations .................................................................................................. 11 3.3 Laboratory Testing ............................................................................................................... 11 4.0 DESIGN RECOMMENDATIONS ........................................................................................... 13 4.1 Foundations .......................................................................................................................... 13 4.1.1 Shallow Foundations ................................................................................................... 13 4.2 Slabs On Grade ..................................................................................................................... 14 4.3 Seismic Design Considerations ............................................................................................. 15 4.4 Pavements ............................................................................................................................ 16 5.0 SITE CONSTRUCTION RECOMMENDATIONS ....................................................................... 19 5.1 Subgrade Preparation .......................................................................................................... 19 5.1.1 Stripping and Grubbing ............................................................................................... 19 5.1.2 Proofrolling ................................................................................................................. 19 5.1.3 Site Temporary Dewatering ........................................................................................ 19 5.1.4 High Plasticity Soils ..................................................................................................... 21 5.2 Earthwork Operations .......................................................................................................... 21 5.2.1 Existing Man-Placed Fill .............................................................................................. 21 5.2.2 New Structural Fill ...................................................................................................... 22 5.2.3 Rock Excavation .......................................................................................................... 23 5.3 Foundation and Slab Observations ...................................................................................... 24 5.4 Utility Installations ............................................................................................................... 24 5.6 Karst Related Risk and Construction Issues ......................................................................... 24 5.5.1 Karst Earthwork Recommendations ........................................................................... 25 6.0 CLOSING ........................................................................................................................... 27 Bridgestone Tire – Rutherford Crossing September 19, 2025 ECS Project No. 01:34293 Page ii APPENDICES Appendix A – Drawings & Reports • Site Location Diagram • Boring Location Diagram Appendix B – Field Operations • Subsurface Exploration Procedures • Reference Notes for Boring Logs • Boring Logs B-01 through B-09 Appendix C – Laboratory Testing • Laboratory Test Results Summary • Plasticity Chart • Grain Size Analysis • Standard Proctor (in conjunction with CBR) • California Bearing Ratio (CBR) Testing • California Bearing Ratio (CBR) Testing (ECS Project No. 01:34157) • California Bearing Ratio (CBR) Testing (ECS Project No. 01:29100) Appendix D – Previous Exploration and Supplemental Report Documents • Typical Foundation Detail • Bedrock Pinnacle Undercut Detail • Glossary of Geologic and Karst Terms • Karst Auger Refusal Diagram • Standard and Heavy-Duty Pavement Section Diagrams Bridgestone Tire – Rutherford Crossing September 19, 2025 ECS Project No. 01:34293 Page 1 EXECUTIVE SUMMARY The following summarizes the results of the recent exploration, particularly those that may have a cost impact on the planned development, and the principal foundation and pavement recommendations are summarized. Information gleaned from the executive summary should not be utilized in lieu of reading the entire geotechnical report. Based on the Lot 1-B Frederick County ALTA Survey plan, provided to ECS via email correspondence on July 22, 2025, we understand the project includes the construction of a single-story Bridgestone Tire service center building with access drives, parking areas, dumpster pads, and associated subsurface infrastructure. The site is a previously graded, undeveloped grass and asphalt covered parcel. The site appears to have been graded during the initial site development of the shopping center beginning around 2007. Site retaining walls were not noted on the provided site plan. Existing fill soils were encountered in all borings (B-01 through B-09) performed during this geotechnical investigation. ECS is very familiar with the site from a geotechnical and construction materials testing (CMT) perspective since development of the North Rutherford site began in 2007. ECS has provided both geotechnical engineering and construction materials testing services for numerous parcels at the Rutherford Crossing development. Based on our extensive experience within the North Rutherford Crossing Development, the existing fill soils are generally suitable for support of foundations, pavement, and grade supported slabs; however, consistency and depth of the existing fill soil is variable and limited removal and replacement may be necessary depending on field performance of these soils during construction. The proposed subgrades should be proofrolled during construction to evaluate the suitability of these materials. Where areas of soft or highly plastic soils are encountered in the foundation areas or pavement and slab areas, the material will need to be removed and replaced or suitably reinforced with the use of geotextiles. A budget should be established for additional undercut and replacement of soils within the construction limits. The planned structures can be supported by conventional shallow foundations consisting of column or strip footings bearing on a combination of approved existing fill, new structural fill, natural soils, and/or weathered rock and bedrock. In general, the site appears to be suitable for construction of the planned development from a geotechnical perspective, although there are subsurface conditions that could affect development activities. The primary factors that could affect the proposed development are the presence of existing fill soils, natural high plasticity clay soils, shallow rock surface, the potential for perched and seasonal groundwater, and the potential for karst conditions. Bridgestone Tire – Rutherford Crossing September 19, 2025 ECS Project No. 01:34293 Page 2 1.0 INTRODUCTION The purpose of this study was to provide geotechnical information for the design of a single-story Bridgestone Tire service center building and associated access drives, parking areas, dumpster pads, and subsurface infrastructure. The project site is located northeast of the intersection of Merchant Street and Market Street, in Winchester, Frederick County, Virginia. The recommendations developed for this report are based on the Request for Proposal (RFP) email dated June 30, 2025, our recent discussions with the design team, and the updated site plan exhibits provided by the Zaremba Group, LLC via email correspondence, on July 22, 2025. Our services were provided in accordance with our Proposal No. 72517-GP, dated July 10, 2025, and authorized on July 15, 2025. This report contains the procedures and results of our subsurface exploration and laboratory testing programs, review of existing site conditions, engineering analyses, and recommendations for the design and construction of the project. The report includes the following items. • A brief review and description of our field and laboratory test procedures and the results of testing conducted. • A review of surface topographic features and site conditions. • A review of area and site geologic conditions. • A review of subsurface soil/rock stratigraphy with pertinent physical properties. • Final soil exploration test boring logs. • Recommendations for site preparation and construction of compacted fills, including an evaluation of on-site soils for use as structural fills, and identification of potentially unsuitable soils and/or soils exhibiting excessive moisture at the time of sampling. • Recommended foundation type and pertinent design recommendations. • Concrete pavement design, including a recommended design CBR value. • An evaluation of soil and rock excavation issues. • Recommendations for seismic site classification in accordance with the International Building Code (IBC 2021). This analysis will be based on the Standard Penetration Test (SPT) method described in ASCE 7 Chapter 22. Liquefaction analysis is not included. • Evaluation and recommendations relative to groundwater control. • Discussion of potential karst geology conditions and construction recommendations for karst risk mitigation. 2.0 PROJECT INFORMATION Bridgestone Tire – Rutherford Crossing September 19, 2025 ECS Project No. 01:34293 Page 3 2.1 PROJECT LOCATION The project site is located in a vacant lot to the northeast of the intersection of Merchant Street and Market Street in the Rutherford Crossing development in Winchester, Frederick County, Virginia. The project site is bounded by an existing Valley Health Urgent Care Facility to the southwest, Market Street to the northwest, an undeveloped lot and access road to the southeast, and an access road and hotel property to the northeast. Below is a Site Location figure depicting the general location of the project based on the description above for reference. Figure 2.1.1 Site Location (Aerial image obtained from Google Earth) Site grading plans were not provided at the time of this report. The project site is relatively flat, with site elevations ranging from a topographic low of approximately EL. 698± feet on the southern portion of the site to a topographic high of EL. 700± feet on the eastern portion of the site. The current site conditions include a grassy, undeveloped lot with occasional landscape shrubs. If any of the information is inaccurate, either due to misunderstanding or due to design changes that may occur, ECS should be contacted in order to provide additional or alternate recommendations as warranted. Site Location Not To Scale Bridgestone Tire – Rutherford Crossing September 19, 2025 ECS Project No. 01:34293 Page 4 2.2 PREVIOUS EXPLORATION ECS is familiar with this site having been involved with various phases of the project since the initial site development for the overall Rutherford Crossing Retail Center. Shallow limestone bedrock was prevalent across the area and significant portions of the site were graded with shot rock and clay fill derived from on-site excavations during mass grading for the site development. Karst conditions were documented in the retail center as well Previous exploration was conducted immediately west on Lot 1-A in accordance with ECS project Nos. 01:24917-A and 01:34157. ECS has also performed previous geotechnical explorations on other lots within the North Rutherford Crossing Development in accordance with ECS project No. 01:28822 and ECS project No. 01:29100. ECS has performed construction materials testing (CMT) for the construction the Starbucks restaurant at Rutherford Crossing from March to September 2020, and for the Chick-Fil-A restaurant adjacent to the project site from March-June 2022. CMT tasks for these projects included asphalt/soil compaction testing, foundation installation, bearing capacity testing, concrete testing, and structural steel inspection. ECS has not been involved on any geotechnical investigation or construction materials testing projects on the parcel included in this investigation. Based on our history on the North Rutherford Crossing Parcel, the existing fill soils are considered suitable for the proposed construction. 2.3 PROPOSED CONSTRUCTION Based on the site plan provided to ECS by the Zaremba Group, the proposed project will include the construction of a single-story Bridgestone Tire service building with associated drive lanes, parking areas, and underground utilities on the approximate 1.2± acre lot. Finished floor elevations and site grading plans were not provided from review during the preparation of this report. Additionally, site retaining walls were not noted on the provided site plan. Based on information provided by the Zaremba Group, LLC, we understand column loads will be on the order of 25± kips and wall loads will be in the range of 1± kips per foot (kpf) or less. . Table 2.2.1 – Planned Construction Summary SUBJECT DESIGN INFORMATION / ASSUMPTIONS Building Footprint Approximately 6,607± square feet in plan view # of Stories One story above grade Usage Bridgestone Tire Facility Framing Combination of masonry, cold formed metal, and structural steel (assumed) Max Column Loads 25 kips Wall Loads 1 kips per linear foot (klf) maximum Slab Load 125 psf Lowest Finish Floor Elevation Approximately El. 694± ft (assumed) Bridgestone Tire – Rutherford Crossing September 19, 2025 ECS Project No. 01:34293 Page 5 Based on communication with the Zaremba Group, LLC, all of the parking areas and drive lanes will be paved using rigid concrete pavement. We have assumed there will be no asphalt pavement and have not provided recommendations for an asphalt pavement section. 2.4 REGIONAL/SITE GEOLOGY The site is located within the Valley and Ridge Physiographic Province of the Appalachian Highlands. According to the Geologic Map of the Winchester Quadrangle (Orndorff, et. al. USGS OFR-03-461, 2003) the project site is underlain by the Ordovician Age Pinesburg Station Dolomite and Rockdale Run Formation. A portion of the referenced geologic map is presented below. The Pinesburg Station Dolomite is generally described as a predominately light gray, fine grained dolostone which weathers to a yellowish to drab-gray color. The Rockdale Run Formation is generally described as an interbedded bluish-gray limestone and gray dolostone with several distinctive chert zones and algal structures associated with clastic limestone. These units are stratigraphically bounded by the underlying Stonehenge Formation, and the overlying Lincolnshire Limestone, both primarily consisting of a lithological package of carbonate units generally described as a dark to light gray, fine to medium grained limestones with minor chert lenses. Structurally, the area is characterized by moderately to high angle bedding with varying dip directions. Reported bedding dips in the vicinity of the site are approximately 30± degrees to the southeast with a northeast strike. Several anticlinal-synclinal fold pairs area mapped in the general vicinity of the project area. The site is situated along the eastern limb of a southwest plunging anticline. A small left lateral strike-slip fault is mapped within a few thousand feet to the south of the project site. Numerous faults have created repeated lithologies and disrupted stratigraphic columns across the geographic area. Bridgestone Tire – Rutherford Crossing September 19, 2025 ECS Project No. 01:34293 Page 6 Figure 2.4.1 Geologic Map Excerpt (Winchester Quadrangle, Orndorff, et. al., 2003) All of the carbonate lithologies present on-site are susceptible to karst development due to the dissolution of the soluble bedrock. Depth to bedrock can be extremely variable due to the pinnacled nature and karst development that occurs within these geologic formations. Depth to Site Location Not To Scale Bridgestone Tire – Rutherford Crossing September 19, 2025 ECS Project No. 01:34293 Page 7 bedrock may vary from surface outcrop exposure to greater than 20± feet below existing grades. Vertical pinnacles of resistant bedrock may be encountered at or near the surface with deeper soil zones, or cutters, of residual soil located between the rock pinnacles. A characteristic “saw-tooth” top-of-rock profile is common in areas with karst development. 2.4.1 Karst Terrane Considerations Karst features such as sinkholes and collapsed solution cavities are problematic in this geologic terrane. Karst development is directly linked to rock structure and lithology, overburden thickness and to surface and subsurface hydrologic influences. Sinkholes are not always apparent at the ground surface and are frequently collapsed and filled with soft sediment. The area of the site is well documented to have karst features associated with the dissolution of the underlying carbonate bedrock lithologies. Karst terrane is characterized by caves, caverns, voids, soil domes, internal drainages, losing streams, and topographical features such as sinkholes and closed depressions. A highly variable top of rock profile is commonly encountered. These features are the result of the dissolution of soluble bedrock such as limestone, dolostone and evaporites by groundwater and/or the infiltration of surface water. As water enters fractures, bedding planes and other bedrock discontinuities within soluble bedrock, it slowly dissolves the rock and enlarges the discontinuities. Over geologic time, this results in the formation of solution channels or underground passages and ravines which may develop into surficial manifestations such as sinkholes and closed depressions. The dissolution of bedrock is generally a very slow process. However, soil may be eroded, or raveled, into the enlarged bedrock fractures creating soil domes and eventually surface depressions and potential sudden ground subsidence. Grading and excavations often hastens the formation of karst manifestations as new surface and subsurface drainage pathways are formed where water is allowed to flow and/or pond. The zone, or area where most active dissolution and ground water fluctuations occur, is generally referred to as the “epikarst” zone in karst literature. Epikarst is defined as the interface zone between soil and rock in karst landscapes and is characterized by small fractures and solution pockets that may or may not be filled with water and/or soil. This zone typically has fractured bedrock with soil infilling, and “float” blocks and “detached” pinnacles of limestone. This zone of material generally overlies competent, less fractured bedrock at depth. The epikarst zone is usually the area of most active solutioning and soil raveling, if present. The bedrock within the general geographic region is characterized by folded and faulted soluble carbonate lithologies interbedded with non-carbonate lithologies. These carbonate formations are generally highly calcareous, moderately to highly solution prone, and typically weather differentially to produce a pinnacled top of rock profile. A pinnacled top of rock is characterized by areas of shallow bedrock, termed pinnacles, with intervening areas of deeper soils, termed cutters. The degree of weathering or solutioning is often controlled by lithological variations and structural orientations. Where structural discontinuities, such as thrust faults, intersect or in areas which are highly fractured, such as related to folding, solutioning is intensified creating low areas and seams that are typically filled with residual clay soils. Conversely, more competent, high areas represent slightly too non-fractured lithologies that are often coarser grained and only slightly solution prone. The underlying carbonate formations of the geographic area are highly susceptible to karst Bridgestone Tire – Rutherford Crossing September 19, 2025 ECS Project No. 01:34293 Page 8 development. Contributing characteristics and factors controlling the karst development includes the synclinal/anticlinal fold pairs, joint sets and high angle bedding within the area. Based on the structural orientations and the prevailing anticlinal/synclinal fold pair structural style in the project area, the underlying bedrock is likely highly fractured. Fracture sets typically develop in association with folding and faulting due to the regional stresses induced in the rock during the tectonic events. Three fracture sets typically develop in folded rocks. The fracture sets developed are generally parallel the fold axis, or axial planar fractures, perpendicular to the fold axis and perpendicular to the bedding plane. Karst development is enhanced along these fracture sets due to the increased permeability and surface water infiltration. Within areas of intersecting fractures and other bedrock discontinuities and formation contacts, an increased risk for karst development is anticipated. Residual soils derived from the chemical weathering of the underlying carbonate bedrock are typically clayey silts and silty clays with varying amounts of limestone fragments, cobbles and boulders. It should be noted that large detached boulders and cobbles may be present as “float” blocks within the soil mantle overlying the carbonate bedrock. These “float” blocks are potentially large, commonly exceeding three (3) feet in one dimension, and will induce auger refusal with standard geotechnical rotary auger drill rigs. The limestone “float” blocks are soil supported and do not represent the actual bedrock surface when encountered within a boring. Therefore, it should be understood that a boring terminated at “auger refusal” does not necessarily indicate the actual top of rock elevation except in locations with either rock coring or supplemental air-track rock probes. As such, the soils underlying limestone “float” blocks have not been tested for in-situ strength. Due to the natural weathering and residual soil development processes in karst terrane, the surficial soils occasionally exhibit higher densities/consistencies than the underlying soils closer to the bedrock interface. Deeper soils tend to exhibit lower in-situ density and strength and generally have higher silt content with corresponding lower clay content. Therefore, the residual soils encountered near the soil/bedrock interface tend to be of lower bearing capacity. In addition, the soils near this interface may be in a saturated condition due to the development of perched groundwater on top of the bedrock. The Virginia Energy (formerly the Virginia Department of Mines, Minerals, and Energy) on-line Interactive Geologic Map does not depict any mapped karst features within the boundaries of the property; however, the nearest mapped karst feature to the site is approximately 1300± feet south of the site, as depicted on Figure 2.5.1. ECS is familiar with this site since the initial site development for Rutherford Crossing Retail Center and documented several sinkholes and karst features during site explorations and mass grading and earthwork operations for the development. Considering the presence of carbonate rock on the site and the documented geological conditions in the geographic area, there is an inherent risk of karst development that could impact the proposed structures, pavements, and subsurface infrastructure in the project site. It should be noted that sinkhole development is generally unpredictable and subsurface explorations cannot completely eliminate the possibility of sinkhole development at a project site. Therefore, some risk of sinkhole development does exist for the site given this geologic setting. Bridgestone Tire – Rutherford Crossing September 19, 2025 ECS Project No. 01:34293 Page 9 Figure 2.4.1 Excerpt from the Virginia Energy Online Interactive Geologic Map with Mapped Sinkhole Locations Site Location Sinkhole Locations NOT TO SCALE Bridgestone Tire – Rutherford Crossing September 19, 2025 ECS Project No. 01:34293 Page 10 3.0 FIELD EXPLORATION AND LABORATORY TESTING The scope of services included the drilling of nine (9) soil test borings, referenced as Borings B-01 through B-09. Borings B-01 through B-05 were drilled in the proposed building footprint. Borings B- 06 through B-09 were drilled in representative areas around the project site. The borings were field located and staked by ECS using Global Navigation Satellite System (GNSS). The boring locations depicted on the Boring Location Diagram included in the Appendix of this report are considered approximate. Ground surface elevations noted on the boring logs were obtained from the provided site plans. 3.1 SUBSURFACE CHARACTERIZATION The subsurface conditions encountered during the site exploration were consistent with published geological mapping and our experience on other projects within the site vicinity. The following sections provide generalized characterization of the soil and weathered rock strata. Please refer to the boring logs in Appendix B for details at specific boring locations. Approximate Depth (ft) Stratum Description Ranges of SPT(1) N-values (bpf) 0 feet–0.3± feet N/A Surficial Material consisting of 1± to 3± inches of topsoil. N/A 0.2± feet to 8.5± feet I Existing FILL soils consisting of very stiff to very hard Lean CLAY (CL) and Fat CLAY (CH) with varying amounts of sand and gravel and medium dense to very dense Poorly Graded GRAVEL (GP) and Clayey GRAVEL (GC) 13 to 50+ 5.0± feet to 20.0± feet II Residual soils consisting of firm to stiff FAT CLAY (CH) with varying amounts of sand and gravel. 8 to 15 (1) Standard Penetration Testing Standard Penetration Testing (SPT) sampler and auger refusal was encountered in each of the test borings advanced for this exploration (with the exception of Boring B-03 and B-06) at depths varying from approximately 2± to 8± feet below existing grades. Borings B-03 and B-08 were advanced to the planned termination depths of 20± feet and 10± feet below existing site grades, respectively. ECS been involved in projects in the vicinity of the project site since initial site development of the overall Rutherford Crossing Retail Center began. Shallow limestone bedrock is prevalent across the area and significant portions of the development were graded with shot rock and clay fill derived from on-site excavations during mass grading; therefore, it is possible that the shallow auger refusals encountered may be on boulders within the shot rock/clay fill materials or potentially on intact limestone bedrock. The character of the refusal material was not verified with rock coring methods. The Karst Auger Refusal Diagram found in Appendix D of this report provides a depiction of the variation to refusal on potential boulders or limestone bedrock present in the carbonate lithology at the site. Bridgestone Tire – Rutherford Crossing September 19, 2025 ECS Project No. 01:34293 Page 11 3.2 GROUNDWATER OBSERVATIONS Groundwater was not encountered in the borings performed as part of this exploration to the depths observed; however, the site is conducive to the presence of perched water tables. During drilling operations, water is not introduced into the boreholes, and the groundwater position can often be determined by observing water flowing into or out of the boreholes. Visual observation of the soil samples retrieved during auger drilling explorations can often be used in evaluating the groundwater levels. Shallower perched water conditions typically occur where water becomes trapped within isolated gravel layers or pockets within the fill. These zones, if present, are not expected to produce a significant quantity of water. Perched groundwater can develop in areas with shallow rock or where low permeability soils underlie higher permeability soils, especially after frequent precipitation events. Specifically, precipitation that enters the site, either directly or from overland flow, begins to percolate through the low to moderately permeable surficial soils. Once the water percolation reaches the bedrock or low permeability strata, it perches and begins to flow at the interface of the rock and the soil and within the fractured surface of the bedrock. This groundwater flow continues down gradient, with the perched water table occasionally surfacing to form as springs and intermittent streams. The groundwater is related to precipitation, although springs may exist in the lower lying areas for extended periods of time without recharge from precipitation. Therefore, the groundwater conditions at this site are expected to be significantly influenced by surface water runoff, especially during high precipitation seasons. In this geologic setting, perched water typically develops at, and immediately above the soil and bedrock interface. Groundwater tends to flow laterally along the soil/rock interface. Usually, a persistent water level occurs only in low-lying areas and adjacent to creeks; otherwise, it is related to precipitation and thus only transient in occurrence. Impervious layers, highly permeable fracture zones and utility beds can distort the seepage pattern. The highest groundwater observations are normally encountered in the late winter and early spring. Variations in the location of the long-term water table may occur as a result of changes in precipitation, evaporation, surface water runoff, and other factors not immediately apparent at the time of this exploration. Free or perched water may also be encountered at the interface of fill materials and natural soils. The site may also be subject to severe desiccation during extended dry periods. Therefore, earthwork operations, especially in the winter and spring months, are more likely to encounter difficulties with perched conditions than those operations undertaken in the summer or fall. 3.3 LABORATORY TESTING Selected soil samples were tested in our laboratory to check the field classification and to determine pertinent engineering properties. The laboratory testing program included visual classifications, natural moisture content tests, gradation analysis, Atterberg Limit testing, Standard Proctor moisture/density relationship testing, and California Bearing Ratio (CBR) testing. The data obtained from the laboratory testing program are included on respective soil boring logs and/or on separate laboratory sheets included in Appendix C of this report. Each soil sample was classified on the basis of texture and plasticity in accordance with the Unified Soil Classification System (USCS). The group symbols for each soil type are indicated in parentheses Bridgestone Tire – Rutherford Crossing September 19, 2025 ECS Project No. 01:34293 Page 12 following the soil descriptions on the test pit logs. A brief explanation of the USCS is included with this report. The samples were grouped by various soil types into the major zones noted on the soil boring logs. The stratification lines designating the interfaces between earth materials on boring logs and profiles are approximate; in situ, the transitions may be gradual, rather than distinct. The soil samples will be retained in our laboratory for a period of 60 days, after which, they will be discarded unless other instructions are received as to their disposition. Bridgestone Tire – Rutherford Crossing September 19, 2025 ECS Project No. 01:34293 Page 13 4.0 DESIGN RECOMMENDATIONS 4.1 FOUNDATIONS The following sections provide recommendations for the design of foundations, soil supported slabs, seismic design considerations, and pavements. Existing fill material was encountered in each of the borings for this exploration at depths varying from approximately 0.2± to 8.5± feet below existing grades. Existing fill materials will most likely be encountered in other unexplored areas of the site between boring locations. The existing fill material was placed in a controlled manner based upon our site experience and is generally considered suitable for support of building foundations, soil supported slabs on grade, and pavements dependent on performance during construction of the project. Limited areas of over-excavation and replacement may be required if conditions at the time of construction warrant. Given the anticipated bearing elevations for the planned foundations, existing fill, when encountered, should be thoroughly probed to identify soft zones that may have developed since the fill was placed which may require removal and replacement with new engineered fill. 4.1.1 Shallow Foundations We anticipate that the proposed structure can be supported by a conventional shallow foundation system consisting of individual column footings and continuous wall footings. Finished floor elevations of the proposed building has not been provided at the time of this report writing but are anticipated to be within a few feet of existing grades. It is anticipated that foundations will bear on existing fill materials, newly placed engineered fills, natural residual soils, or weathered and intact bedrock. Based on our experience on the North Rutherford Crossing Development, we anticipate the existing fill materials to be satisfactory for support of the proposed building, provided necessary measures are taken. If highly plastic clays are encountered at the bearing elevation, footings should be over excavated per the recommendations in the Highly Plastic Clays section of this report. The design of foundations should utilize the following parameters: Table 4.1.1. Foundation Design Design Parameter Column Footing Wall Footing Net Allowable Bearing Pressure(1) 3,000 psf 3,000 psf Acceptable Bearing Soil Material Approved Existing Fill, New Fill, Stratum II or III Approved Existing Fill, New Fill, Stratum II or III Minimum Width 24 inches 18 inches Minimum Exterior Footing Depth (below final exterior grade)(2) 24 inches 24 inches Estimated Total Settlement (3) Less than ½ - inch Less than ½ - inch Estimated Differential Settlement (4) Less than ½ inches between columns Less than ½ inches Notes: (1) Net allowable bearing pressure is the applied pressure in excess of the surrounding overburden soils above the base of the foundation. (2) For bearing considerations, frost penetration requirements, and expansive soil concerns (3) Based on the structural loads provided and a maximum footing size of 8 feet. (4) Between the existing structure and proposal additional based on maximum loads. Bridgestone Tire – Rutherford Crossing September 19, 2025 ECS Project No. 01:34293 Page 14 General Shallow Foundation Recommendations The allowable soil bearing pressures noted above refer to the pressure which may be transmitted to the foundation bearing soils in excess of the final minimum surrounding overburden pressure. During construction, any fill soils placed within undercut areas of foundations for the building pad should be tested for compaction in accordance with the Fill Placement section of this report. For the shallow foundation system consisting of conventional spread and/or continuous footings bearing on approved materials, we recommend that continuous footings have a minimum width of 18-inches and that isolated column footings have a minimum lateral dimension of 24-inches. The minimum dimensions recommended above help reduce the possibility of foundation bearing failure and excessive settlement due to local shear or "punching" action. In addition, footings should be placed at a depth to provide adequate frost cover protection. We recommend shallow foundations be located at a minimum depth of 24-inches below finished grade for frost considerations. A typical foundation detail is included in Appendix of this report. Potential Undercuts: If soft or unsuitable soils are observed at the foundation bearing elevations, the unsuitable soils should be undercut and removed at least two feet below the foundation bearing elevation. Any undercut should be backfilled with cementitious flowable fill (f’c ≥ 1,000 psi at 28 days) or structural fill up to the original design bottom of footing elevation; the original footing shall be constructed at the designed footing elevations. Additional undercutting of foundations may be required if highly plastic soils are present below the foundation. Please see the High Plasticity Soils section of this report. 4.2 SLABS ON GRADE While design Finished Floor Elevations of the new structure was not provided, we anticipate the buildings floor elevations will be within a few feet of existing grades (assumed as EL. 694± feet); therefore, grade supported slabs will bear on existing fill soils, residual soils, or new engineered fill. The existing fill soils are generally considered suitable for support of grade supported slabs; however, consistency and depth of the existing fill soil is variable and limited removal and replacement may be necessary depending on field performance of these soils during construction. Use of existing fill soil as slab support will be dependent on field performance, based on proof roll testing, during active construction. If new engineered fill placement is required to achieve design grades, new engineered fills, placed as recommended herein, will be suitable for floor slab support. If zones of unsuitable soils are encountered in areas between boing locations, partial removal and replacement as described in the other sections of this report should be implemented. The newly exposed subgrade should be thoroughly proofrolled as described in this report. Areas of soft or yielding soils resulting from the proofrolling should be removed and replaced with compacted structural fill in accordance with the recommendations included in this report. Following any undercut and subgrade stabilization, the slab area should be re-established with suitable structural fill. The following graphic depicts our soil-supported slab recommendations: Bridgestone Tire – Rutherford Crossing September 19, 2025 ECS Project No. 01:34293 Page 15 Figure 4.2.1 1. Drainage Layer Thickness: 4 inches minimum 2. Drainage Layer Material: Granular material including GRAVEL (GP, GW) and SAND (SP, SW) Subgrade Modulus: Provided the slab on grade subgrades are constructed in accordance with our recommendations, the slab may be designed assuming a modulus of subgrade reaction, k1 of 100 pci (lbs./cu. inch). The modulus of subgrade reaction value is based on a 1 ft by 1 ft plate load test basis. Vapor Barrier: Before the placement of concrete, a vapor barrier may be placed on top of the granular drainage layer to provide additional protection against moisture penetration through the floor slab. When a vapor barrier is used, special attention should be given to surface curing of the slab to reduce the potential for uneven drying, curling and/or cracking of the slab. Depending on proposed flooring material types, the structural engineer and/or the architect may choose to eliminate the vapor barrier. Slab Isolation: Soil-supported slabs should be isolated from the foundations and foundation- supported elements of the structure so that differential movement between the foundations and slab will not induce excessive shear and bending stresses in the floor slab. Where the structural configuration prevents the use of a free-floating slab such as in a drop down footing/monolithic slab configuration, the slab should be designed with suitable reinforcement and load transfer devices to preclude overstressing of the slab. 4.3 SEISMIC DESIGN CONSIDERATIONS Seismic Site Classification: The International Building Code (IBC) 2021 requires site classification for seismic design based on the upper 100 feet of a soil profile. At least two methods are utilized in classifying sites, namely the shear wave velocity (vs) method and the Standard Penetration Resistance (N-value) method. Where site specific data are not available to a depth of 100 feet, appropriate soil properties are permitted to be estimated by the registered design professional preparing the soils report based on known geologic conditions. The seismic site class definitions for the weighted average of either the SPT N-values or the shear wave velocities in the upper 100 feet of the soil profile are presented in Chapter 20 of ASCE 7 and in the table below. Concrete Slab Vapor Barrier Granular Capillary Break/Drainage Layer Compacted Subgrade Bridgestone Tire – Rutherford Crossing September 19, 2025 ECS Project No. 01:34293 Page 16 Site Class Soil Profile Name Shear Wave Velocity, Vs, (ft./s) A Hard Rock Vs > 5,000 fps B Medium Hard Rock 3,000 < Vs ≤ 5,000 fps BC Soft Rock 2,100 ≤ Vs ≤ 3,000 fps C Very Dense Sand or Hard Clay 1,450 < Vs ≤ 2,100 fps CD Dense Sand or Very Stiff Clay 1,000 ≤ Vs ≤ 1,450 fps D Medium Dense Sand or Stiff Clay 700 ≤ Vs ≤ 1,000 fps DE Loose Sand or Medium Stiff Clay 500 ≤ Vs ≤ 700 fps E Very Loose Sand or Soft Clay Vs ≤ 500 fps F Soils Requiring Site Response Analysis in accordance with ASCE Section 21.1 See ASCE Section 20.2.1 In the absence of actual shear wave (Vs) data, we utilized the Standard Penetration Test (SPT) N- values recorded from the borings. Based upon our interpretation of the subsurface conditions, the appropriate Seismic Site Classification is “CD” as shown in the preceding table. Ground Motion Parameters: In addition to the seismic site classification, ECS has determined the design spectral response acceleration parameters following the IBC methodology. The Mapped Reponses were estimated from the free U.S. Seismic Design Maps available from the American Society of Civil Engineers (ASCE) ASCE 7 Hazard Tool website (https://asce7hazardtool.online/). The design responses for the short (0.2 sec, SDS) and 1-second period (SD1) are noted in bold at the far right end of the following table and are based on a seismic risk category II. Period (sec) Mapped Spectral Response Accelerations (g) Maximum Spectral Response Acceleration Adjusted for Site Class (g) Design Spectral Response Acceleration (g) Reference Figures 1613.3.1 (1) & (2) Eqs. 16-37 & 16-38 Eqs. 16-39 & 16-40 0.2 SS 0.14 SMS=FaSs 0.17 SDS=2/3 SMS 0.11 1.0 S1 0.046 SM1=FvS1 0.082 SD1=2/3 SM1 0.054 The Site Class definition should not be confused with the Seismic Design Category designation which the Structural Engineer typically assesses. If a higher site classification is beneficial to the project, we can provide additional testing methods that may yield more favorable results. 4.4 PAVEMENTS Subgrade Characteristics: Based on the results of the soil test borings, pavement subgrades will likely consist of existing fill materials, Clayey and Poorly-Graded GRAVEL (GC, GC), Lean and Fat CLAY (CL, CH) with varying amounts of sand, gravel, and rock fragments, or new engineered fill Bridgestone Tire – Rutherford Crossing September 19, 2025 ECS Project No. 01:34293 Page 17 material. California Bearing Ratio (CBR) testing was performed in our laboratory on a representative bulk sample obtained from Boring B-06. The soil tested demonstrated a CBR value of 1.5, and a maximum swell of 2.51%. In addition to the CBR testing performed for this project, ECS utilized CBR testing from previous projects in the site vicinity. The average CBR values from previous nearby explorations tested to be 9.0 and 11.7, respectively. It is our opinion that these higher CBR values are more indicative of the site characteristics. For pavement design purposes, a CBR value equal to 2/3 of the tested values should be used; therefore, we recommend a design CBR value of 4.7 be utilized based on the results of the CBR testing at the Rutherford Crossing development. It is important CBR testing of the actual pavement subgrade soils (both natural and fill soils) should be performed to determine the soil engineering properties for final pavement design prior to subbase placement and paving. Pavement Design: We assume concrete pavement sections will be considered for pavement design in the parking lot and drive lanes and there will be no asphalt used. In areas of high traffic (i.e. the drive-thru lane, dumpster enclosure, and delivery areas) concrete pavement is anticipated. For pavement design purposes, a laboratory CBR value of 4.7 and a Resilience Factor of 2.0 was used. Traffic loading information was provided to us from the Zaremba Group. Initial serviceability, reliability, and standard deviation of the design inputs have all been assumed. A summary of the pavement design information used in our analysis is presented in the following table. Parameter ESAL Calculation Two-way ADT 900 Direction Distance Factor 0.50 Car Percentage 95% Heavy Truck Percentage 1% Light Truck Percentage 4% Buses Percentage Not provided Design Years 30 (assumed) Growth Rate 1 (assumed) Based on the results of the soil borings, traffic loading information, and laboratory testing, we recommend the following pavement sections for the proposed parking areas and drive lines for the Bridgestone Tire development: LAYER TYPE LAYER THICKNESS (IN) Standard Duty Heavy Duty Portland Cement Concrete 5 7 Base stone (VDOT 21B) 6 6 Total 11 13 The proposed base stone thickness (VDOT 21B) is intended to approximately match the bottom of existing aggregate depths to promote lateral subbase drainage. Bridgestone Tire – Rutherford Crossing September 19, 2025 ECS Project No. 01:34293 Page 18 Pavement Subgrade Preparation: Prior to fill placement or other construction on subgrades, the subgrades should be evaluated by an ECS field technician. The exposed subgrade should be thoroughly proofrolled with construction equipment having a minimum axle load of 10 tons [e.g. fully loaded tandem-axle dump truck]. Proofrolling should be traversed in two perpendicular directions with overlapping passes of the vehicle under the observation of an ECS technician. This procedure is intended to assist in identifying any localized yielding materials. Where proofrolling identifies areas that are unstable or “pumping” subgrade those areas should be repaired prior to the placement of any subsequent Engineered Fill or other construction materials. Methods of stabilization include undercutting, moisture conditioning, or chemical stabilization. The situation should be discussed with ECS to determine the appropriate procedure. Test pits may be excavated to explore the shallow subsurface materials to help in determining the cause of the observed unstable materials, and to assist in the evaluation of appropriate remedial actions to stabilize the subgrade. Pavement Drainage/Subdrainage: The pavement sections should be designed to mitigate the potential for “bathtub” effects from differential pavement thicknesses. Drainage mechanisms consisting of edge drains should be incorporated into the design to facilitate positive subbase drainage. The onsite CH materials are sensitive to moisture fluctuations and have poor drainage characteristics that can degrade subgrade support over time. Once parking areas and drive lanes have been established to subgrade elevations, it is important to proceed with the placement of all roadway design elements in a timely manner. Where standing water develops, either on the pavement surface or within the base course layer, softening of the subgrades and other problems related to the deterioration of the pavement can be expected. Curbs should be backfilled as soon as possible to reduce the infiltration of water the pavement subbase and soil subgrade. In these areas, drains should be considered across the parking lot and drive lanes to direct surface and subsurface infiltrating water to storm drain inlets. If drains are not installed or the subgrades not chemically treated with lime, surface runoff that seeps and perches into base materials and swells in the subgrades could create localized deterioration of the soil's support value. Mitigating water ponding within the base course layer may be reduced by installing underdrains and cross drains with positive drainage to drainage structures. If the subgrade soils are chemically stabilized, the need for underdrains may be reduced, provided positive drainage of subgrades can be maintained. Bridgestone Tire – Rutherford Crossing September 19, 2025 ECS Project No. 01:34293 Page 19 5.0 SITE CONSTRUCTION RECOMMENDATIONS 5.1 SUBGRADE PREPARATION 5.1.1 Stripping and Grubbing The subgrade preparation should consist of stripping all vegetation, any rootmat, any topsoil, existing undocumented fill, and any soft or unsuitable materials from the 10-foot expanded building limits and 5 feet beyond the toe of Structural Fills. Excavation and removal of exiting fills should be based on field performance of proof roll testing and in-situ bearing capacity testing at the time of construction. Where removal of existing fill soils is necessary, removal of unsuitable materials should extend 5-feet beyond the expanded pavement limit and 10-feet beyond the expanded building limits. ECS should be retained to verify that topsoil and unsuitable surficial materials have been removed prior to the placement of structural fill or construction of structures. 5.1.2 Proofrolling Extensive proofrolling is recommended at this site, especially in areas that have previously been disturbed and in areas containing existing fill within pavement and grade supported slab areas. Prior to placement of new fill, or other construction on subgrades, the subgrades should be evaluated by an ECS Engineering Field Technician. The exposed subgrade should be thoroughly proofrolled with construction equipment having a minimum axle load of 10 tons [e.g. fully loaded tandem-axle dump truck]. Proofrolling should be traversed in two perpendicular directions with overlapping passes of the vehicle under the observation of an ECS technician. This procedure is intended to assist in identifying any localized soft, yielding, or otherwise unsuitable materials. Where proofrolling identifies areas that are unstable or “pumping” subgrade those areas should be repaired prior to the placement of any subsequent Structural Fill or other construction materials. Methods of stabilization include undercutting, moisture conditioning, or chemical stabilization. The situation should be discussed with ECS to determine the appropriate procedure. Test pits may be excavated to explore the shallow subsurface materials to help in determining the cause of the observed unstable materials, and to assist in the evaluation of appropriate remedial actions to stabilize the subgrade. 5.1.3 Site Temporary Dewatering The long term continuous groundwater table at the site is expected to be well below the depth of auger/sampler refusal. However, groundwater conditions encountered at the site are strongly influenced by surface water flow and infiltration. Specifically, water that enters the site migrates downward to the interface of the fill soils, natural soil, and rock. Once the water reaches the less permeable natural soil or rock, the water travels laterally, often over large distances. Such perched groundwater conditions may be encountered during construction operations. The perched groundwater conditions are seasonal in nature. While perched groundwater conditions may not be encountered during the summer months, such conditions can occur in the winter and late spring months. Bridgestone Tire – Rutherford Crossing September 19, 2025 ECS Project No. 01:34293 Page 20 The contractor shall make their own assessment of temporary dewatering needs based upon the limited subsurface groundwater information presented in this report. Soil sampling is not continuous, and thus soil and groundwater conditions may vary between sampling intervals (typically 5 feet). If the contractor believes additional subsurface information is needed to assess dewatering needs, they should obtain such information at their own expense. ECS makes no warranties or guarantees regarding the adequacy of the provided information to determine dewatering requirements; such recommendations are beyond our scope of services. Dewatering systems are a critical component of many construction projects. Dewatering systems must be selected, designed, and maintained by a qualified and experienced (specialty or other) contractor familiar with the succinct geotechnical information and other aspects of the project. The failure to properly design and maintain a dewatering system for a given project can result in delayed construction, unnecessary foundation subgrade undercuts, detrimental phenomena such as ‘running sand’ conditions, internal erosion (i.e., ‘piping’), the migration of ‘fines’ down-gradient towards the dewatering system, localized settlement of nearby infrastructure, foundations, slabs- on-grade and pavements, etc. Water discharged from any site dewatering system shall be discharged in accordance with all local, state, and federal requirements. Strategies for Addressing Perched Groundwater: The typical primary strategy for addressing perched groundwater seeping into excavations is pumping from trench (or French) and sump pits with sump pumps. A typical sump pump drain (found in a sump pit or along a French drain) is depicted below. The inlet of the sump pump is placed at the bottom of the corrugated pipe and the discharge end of the sump is directed to an appropriate stormwater drain. Figure 5.1.3.1 - Sump Pit/Pump Diagram Details of a typical French drainage installation are included in Appendix D. A typical French drain consists of an 18 to 24-inch wide by 18 to 24-inch deep bed of AASHTO #57 or similar open graded aggregate wrapped in a medium duty, non-woven geotextile and (sometimes) containing a 6-inch diameter, Schedule 40 PVC perforated or slotted pipe. Actual dimensions should be as determined necessary by ECS during construction. After the installation has been completed, the geotextile should be wrapped over the top of the aggregate and pipe followed by placement of backfill. The Bridgestone Tire – Rutherford Crossing September 19, 2025 ECS Project No. 01:34293 Page 21 top of the drain should be positioned at least 18 inches below the design subgrade elevations. Drains should not be routed within the expanded building limits. 5.1.4 High Plasticity Soils High plasticity soils are those soil materials classified as CH and MH materials. High plasticity soils were encountered in many of the borings at variable depths. Where high plasticity soils are encountered at design subgrade elevations in slab areas, the subgrade should be undercut 2 feet. Grades should be restored with approved Structural Fill. Where high plasticity soils are encountered at foundation bearing elevations, the footings may be undercut to a depth of 4 feet below final exterior grade or until no longer present, whichever is less, and backfilled to the original bearing elevation with suitable fill or lean concrete. Undercutting of the footings and backfilling with granular backfill or gravel is not recommended, as this would create a reservoir condition that could saturate and soften the plastic soils. In addition, pavements constructed in areas of high plasticity soils should be underlain by at least 2 feet of compacted, non-expansive suitable fill. We do understand that removing and replacing these materials, or modifying them, may not be economical for the subject site. If you choose to leave these materials, it should be recognized that you take on risks by doing so. High plasticity soils are moisture sensitive, can be problematic during construction activities especially when they become wet, and can cause early pavement failures should they become wet. Care should be taken to provide adequate drainage and maintenance of exposed subgrades. 5.2 EARTHWORK OPERATIONS 5.2.1 Existing Man-Placed Fill Fill Content: Existing fill soils encountered during this exploration extended to depths of up to approximately 8.5± feet below existing grades and included Clayey and Poorly-Graded GRAVEL (GC, GP) and Lean and Fat CLAY (CL, CH) with varying amounts of sand and gravel. Existing fill soils will likely be encountered in other areas of the site that may have been previously utilized for development purposes, notably near the existing building access drives, and parking areas. Based on our extensive experience at the Rutherford Crossing site it is our professional opinion that the existing fill material is generally suitable for support of foundations and pavements, depending on field performance of these soils at the time of construction. The geotechnical engineer of record should be retained to serve as a continued source of geotechnical consultation. After stripping and before any new fill placement, the soil subgrade should be thoroughly proof rolled in the presence of the geotechnical engineer or his/her representative to assess the stability of the existing fill soils and to identify any areas requiring remediation. Existing fill materials may require removal from building footprints in their entirety, if documented to be of low bearing capacity, and replaced with new engineered fill as discussed herein. Existing fill material may be suitable for support of pavements and slabs without complete removal and reworking; however, the proposed subgrades should be proofrolled during construction. If areas of soft or unsuitable or highly plastic soils are encountered in the pavement and slab areas, the unsuitable material will need to be removed and replaced. Bridgestone Tire – Rutherford Crossing September 19, 2025 ECS Project No. 01:34293 Page 22 5.2.2 New Structural Fill Prior to placement of Structural Fill, representative bulk samples (about 50 pounds) of on-site and/or off-site borrow should be submitted to ECS for laboratory testing, which will typically include Atterberg limits, natural moisture content, grain-size distribution, and moisture-density relationships (i.e., Proctors) for compaction. Import materials should be tested prior to being hauled to the site to determine if they meet project specifications. Alternatively, Proctor data from other accredited laboratories can be submitted if the test results are within the last 90 days. Satisfactory Structural Fill Materials: Materials satisfactory for use as Structural Fill should consist of inorganic soils with the following engineering properties and compaction requirements. The materials specified below are locally available. Table 5.2.2.1 Structural Fill Requirements STRUCTURAL FILL INDEX PROPERTIES Subject Property Building and Pavement Areas LL < 45, PI<20 Max. Particle Size 4 inches STRUCTURAL FILL COMPACTION REQUIREMENTS Subject Requirement Compaction Standard Standard Proctor, ASTM D698 Required Compaction 98% of Max. Dry Density Moisture Content +/-2% points of the soil’s optimum value Loose Thickness 8 inches prior to compaction On-Site Borrow Suitability: Near surface soils encountered on site generally consisted of existing fill composed of Clayey GRAVEL and LEAN and FAT CLAY (CL, CH) with varying amounts of sand and gravel. Based on the anticipated design grades, significant cuts are not expected and will not generate appreciable quantities of borrow materials. High plasticity soils are not considered suitable for re-use as structural fill. If re-used, the on-site soils will likely require moisture conditioning, either wetting or drying, to meet compaction requirements. The owner should anticipate that off-site borrow sources will be required for any significant quaintly of fill material needed to achieve design grades. Fill Placement: Fill materials should not be placed on frozen soils, on frost-heaved soils, and/or on excessively wet soils. Borrow fill materials should not contain frozen materials at the time of placement, and all frozen or frost-heaved soils should be removed prior to placement of Structural Fill or other fill soils and aggregates. Excessively wet soils or aggregates should be scarified, aerated, and moisture conditioned. Aggregates/Blast Rock: The gradation of the material removed by ripping or blasting is typically quite varied. Excavated rock and weathered rock are generally only suitable for use in the deeper parts of embankment fills, or outside the zone of Structural Fill unless particle size is properly reduced to meet the structural fill gradation requirements. Bridgestone Tire – Rutherford Crossing September 19, 2025 ECS Project No. 01:34293 Page 23 When rock or intact weathered rock fragments are placed in non-structural areas, we recommend that the rock fragments be spread out evenly in layers. Many times the rock needs to be “choked” with rock fines, and/or soil, so that voids between the rock fragments are filled. Installation of a geotextile fabric may be required to be placed over the rock fill prior to placement of additional materials to inhibit the migration of soils into underlying voids within the fill mass. Within 4 feet of the subgrade elevation, no rock fragment should exceed 4 inches in maximum dimension. 5.2.3 Rock Excavation Based upon the potential for shallow rock, we anticipate controlled blasting or hoe-ramming may be necessary, particularly in deep utility excavations. Depending on the final grading details and the variability of the underlying rock surface, deeper excavations for foundations or other site improvements may encounter rock that requires removal. Excavations beyond the refusal depths in the carbonate bedrock will likely require extensive hoe ramming as blasting operations may not be feasible given the proximity of the nearby structures. Within local excavations for utility lines, we anticipate that hoe-ramming will be feasible if excavation is to extend below these levels. When reviewing these data for planning purposes, consideration of the excavation capabilities of different equipment will be necessary. For example, a backhoe will likely not be able to excavate weathered rock materials as easily as a trackhoe or ripper. At the same time, ripping may not be an appropriate excavation method for the desired activities. The values derived herein have been provided for informational purposes and are not intended to suggest or recommend excavation methods. In confined excavations, such as utility trenches, excavation of dense residual soils typically requires the use of large track-mounted backhoes. Excavation of harder phases of weathered rock typically requires the use of large track-mounted backhoes, pneumatic spades, or light blasting. Refusal materials (apparent rock) normally require blasting in trench excavations. Blasting in utility trenches should be done carefully to avoid damage to the surrounding materials. When the material to be excavated requires blasting, the contractor should comply with the requirements of the Fire Marshal. Blasting: Irregularities in the base of the footing foundation are acceptable, if rock materials are encountered. For the purposes of bid documentation, any irregularity of up to one foot vertically for ten feet of horizontal distance is acceptable. Proper control of blasting operations is critical at the site, along with timing of blasting operations. In general, all blasting on the site should be completed, to the extent practical, prior to the placement of concrete. In the event it is necessary to blast additional locations, then the use of vibration monitoring equipment to monitor the performance of placed concrete will be necessary. The potential for overblasting should be recognized during both the design and construction phases. We strongly recommend that the geotechnical consultant meet with the grading contractor and any blasting specialists to review shot patterns and blasting procedures at the time of construction to reduce difficulties associated with overblasting. If overshooting occurs, the loose or disturbed materials should be removed and replaced with controlled, compacted fill placed in accordance with the recommendations included in this report. Blasting should be performed as directed by the Frederick County Fire Marshall. Bridgestone Tire – Rutherford Crossing September 19, 2025 ECS Project No. 01:34293 Page 24 5.3 FOUNDATION AND SLAB OBSERVATIONS Protection of Foundation Excavations: Exposure to the environment may weaken the soils at the footing bearing level if the foundation excavations remain open for too long a time. Therefore, foundation concrete should be placed the same day that excavations are made. If the bearing soils are softened by surface water intrusion or exposure, the softened soils must be removed from the foundation excavation bottom immediately prior to placement of concrete. If the excavation must remain open overnight, or if rainfall becomes imminent while the bearing soils are exposed, a 1 to 3-inch thick “mud mat” of “lean” concrete should be placed on the bearing soils before the placement of reinforcing steel. Footing Subgrade Observations: Most of the soils at the foundation bearing elevation are anticipated to be suitable for support of the proposed structure. It is important to have ECS observe the foundation subgrade prior to placing foundation concrete, to confirm the bearing soils are what was anticipated. Slab Subgrade Verification: Prior to placement of a drainage layer, the subgrade should be prepared in accordance with the recommendations found in Section 5.1.2 Proofrolling. 5.4 UTILITY INSTALLATIONS Utility Subgrades: The soils encountered in our exploration are expected to be generally suitable for support of utility pipes. The pipe subgrades should be observed and probed for stability by ECS. Any loose or unsuitable materials encountered should be removed and replaced with suitable compacted Structural Fill, or pipe stone bedding material. Utility Backfilling: The granular bedding material (AASHTO #57 stone) should be at least 4 inches thick, but not less than that specified by the civil engineer’s project drawings and specifications. We recommend that the bedding materials be placed up to the springline of the pipe. Fill placed for support of the utilities, as well as backfill over the utilities, should satisfy the requirements for Structural Fill and Fill Placement. Excavation Safety: All excavations and slopes should be constructed and maintained in accordance with OSHA excavation safety standards. The contractor is solely responsible for designing, constructing, and maintaining stable temporary excavations and slopes. The contractor’s responsible person, as defined in 29 CFR Part 1926, should evaluate the soil exposed in the excavations as part of the contractor’s safety procedures. In no case should slope height, slope inclination, or excavation depth, including utility trench excavation depth, exceed those specified in local, state, and federal safety regulations. ECS is providing this information solely as a service to our client. ECS is not assuming responsibility for construction site safety or the contractor’s activities; such responsibility is not being implied and should not be inferred. 5.6 KARST RELATED RISK AND CONSTRUCTION ISSUES Karst is the term used to describe a terrane, of both topographic and subsurface characteristics, generally underlain by limestone rock in this region, in which the terrane is primarily formed through the dissolution of rock and which may consist of highly variable rock surfaces, sinkholes, Bridgestone Tire – Rutherford Crossing September 19, 2025 ECS Project No. 01:34293 Page 25 caves, sinking streams, closed depressions, and subterranean drainage. All of these features are related to the infiltration of surface waters and solutioning by groundwater over extended geologic time frames. Karst geology presents the developer with unique hazards and these hazards significantly increase the risk associated with developing a site. Risks associated with developing in Karst can include the formation of sinkholes that may form beneath buildings, roadways, utility lines, stormwater management ponds, dams, and other manmade structures. These features can occur as a gradual erosion of soils into the subsurface causing settlement damage to structures over an extended period of time, or rapidly in the case of a sudden cover collapse sinkhole as has been witnessed in the recent past in other areas of the country. In addition to sinkhole hazards, the sudden collapse of cave roofs due to overloading by structures can also occur. Karst hazards may sometimes lead to personal injury but rarely do they result in loss of life. Property damage due to Karst hazards can range from simple inconvenience to catastrophic property loss. When developing in karst prone geology, there is always a risk that karst hazards may impact the project, either during construction, or years and decades after the completion of construction. Creating new drainage channels and impoundments for stormwater management activities during land development, collection of groundwater in utility pipelines, leaking utilities, and pumping of groundwater for mining or water supply purposes are some human influences that have led to the development of unsuspected karst problems. 5.5.1 Karst Earthwork Recommendations To reduce the potential for sinkhole development which could impact foundation and subsurface infrastructure performance, positive surface drainage should be maintained both during and after construction. We recommend that the following preventative measures be followed (where practical) to reduce the potential inducement of sinkhole formation in proposed development areas. 1. All earthwork operations should be graded to drain away from the buildings and structural areas at all times. Upon completion of daily earthwork operations, the ground surface should be sealed by thorough rolling to reduce infiltration of precipitation and facilitate runoff. 2. All sediment control management facilities should be located outside of planned construction areas. Inlets associated with storm drain systems should not be utilized as temporary sediment control devices during construction. 3. During construction, care should be taken to reduce the ponding of surface water. Excavations should be excavated and backfilled the same day, if possible, or the founding soils must be provided with a mud mat to protect from water infiltration. 4. Excavations should be protected from surface water by diversion dikes or other means to direct surface water around the excavation. 5. Visual observations during all earthwork operations should be carried out in order to detect any previous unexposed or recently created collapse features. Any such feature should be called to the GER’s attention for remedial improvement. 6. Final site grading should include sloping grades and piping of downspouts away from the limits of the excavation (building envelope) made for building construction to prevent Bridgestone Tire – Rutherford Crossing September 19, 2025 ECS Project No. 01:34293 Page 26 introducing unwanted water to building foundation areas. Irrigation within the building envelope should be avoided. The piping of downspouts should be anticipated. If irrigation is to be used or piping of downspouts is undesirable, we recommend that the uppermost 2 feet of building backfill consist of low permeability engineered fill that can be demonstrated to provide a remolded permeability of 1x10-6 centimeters per second or less. On-site clayey soils are expected to be suitable for this purpose, however soils proposed for this use should be tested in the laboratory or in the field after placement to confirm their permeability. 7. All storm piping should be designed such that joints and structure tie-ins remain watertight with allowance for some settlement. Leaking storm pipes promote subsurface seepage and can instigate sinkhole development in the form of surficial dropouts with little or no warning. We recommend that all available geotechnical data be made available to the GER and/or their onsite representative during earthwork operations. It should be clearly understood that the total elimination of hazards associated with Karst is not practical. Even after implementing the recommendations contained within this report, Karst hazards are still possible. Bridgestone Tire – Rutherford Crossing September 19, 2025 ECS Project No. 01:34293 Page 27 6.0 CLOSING ECS has prepared this report to guide the geotechnical-related design and construction aspects of the project. We performed these services in accordance with the standard of care expected of professionals in the industry performing similar services on projects of like size and complexity at this time in the region. No other representation, expressed or implied, and no warranty or guarantee is included or intended in this report. The description of the proposed project is based on information provided to ECS. If any of this information is inaccurate or changes, either because of our interpretation of the documents provided or site or design changes that may occur later, ECS should be contacted so we can review our recommendations and provide additional or alternate recommendations that reflect the proposed construction. We recommend that ECS review the project plans and specifications so we can confirm that those plans/specifications are in accordance with the recommendations of this geotechnical report. Field observations, and quality assurance testing during earthwork and foundation installation are an extension of, and integral to, the geotechnical design. We recommend that ECS be retained to apply our expertise throughout the geotechnical phases of construction, and to provide consultation and recommendation should issues arise. ECS is not responsible for the conclusions, opinions, or recommendations of others based on the data in this report. APPENDIX A – Drawings & Reports Site Vicinity Location Diagram Boring Location Diagram SITE LOCATION DIAGRAM BRIDGESTONE TIRE - RUTHERFORD CROSSING ECS PROJECT NO.34293 SHEET 1 N S EW SCALE: 1"=2000' NOTE: BASE MAP TAKEN FROM USGS TOPO, WINCHESTER & STEPHENSON, VA-WV QUADRANGLE (2019) SITE STOP STOPS T O P P R O P O S E D B L D G . 6, 6 0 7 S F GROUNDSIGN Interstate Semitrailer (WB-65 and WB-67) (AASHTO2004_IMPERIAL)B-01B-02B-03B-04B-05B-06B-07B-08B-09SCALEPROJECT NO.SHEETDATEENGINEERDRAFTINGECS REVISIONSBORING LOCATION DIAGRAM ZAREMBA GROUP LLC BRIDGESTONE TIRE - RUTHERFORD CROSSING WINCHESTER, VA34293ETBRAC1"=40'108/18/20250SCALE (IN FEET)204040LEGEND APPROX. BORING LOCATIONC:\Users\rcowart\OneDrive - ECS Corporate Services\Geo eProj 34000-34999\34200-34299\34293-GP Bridgestone Tire - Rutherford Crossing Exploration\b-Drafting\34293_BLD.dwg, 9/16/2025 8:11:39 AM APPENDIX B – Field Operations Subsurface Exploration Procedures Reference Notes for Boring Logs Boring Logs B-01 through B-09 - -- • - - - • - - • • • - — - REFERENCE NOTES FOR BORING LOGS MATERIAL1,2 1Classifications and symbols per ASTM D 2488-17 (Visual-Manual Procedure) unless noted otherwise. 2To be consistent with general practice, “POORLY GRADED” has been removed from GP, GP-GM, GP-GC, SP, SP-SM, SP-SC soil types on the boring logs. 3Non-ASTM designations are included in soil descriptions and symbols along with ASTM symbol [Ex: (SM-FILL)]. 4Typically estimated via pocket penetrometer or Torvane shear test and expressed in tons per square foot (tsf). 5Standard Penetration Test (SPT) refers to the number of hammer blows (blow count) of a 140 lb. hammer falling 30 inches on a 2 inch OD split spoon sampler required to drive the sampler 12 inches (ASTM D 1586). “N-value” is another term for “blow count” and is expressed in blows per foot (bpf). SPT correlations per 7.4.2 Method B and need to be corrected if using an auto hammer. 6The water levels are those levels actually measured in the borehole at the times indicated by the symbol. The measurements are relatively reliable when augering, without adding fluids, in granular soils. In clay and cohesive silts, the determination of water levels may require several days for the water level to stabilize.In such cases, additional methods of measurement are generally employed. 7Minor deviation from ASTM D 2488-17 Note 14. 8Percentages are estimated to the nearest 5% per ASTM D 2488-17. Reference Notes for Boring Logs (09-02-2021).doc © 2021 ECS Corporate Services, LLC. All Rights Reserved COHESIVE SILTS & CLAYS UNCONFINED COMPRESSIVE STRENGTH, QP4 <0.25 0.25 - <0.50 0.50 - <1.00 1.00 - <2.00 2.00 - <4.00 4.00 - 8.00 >8.00 SPT5 (BPF) CONSISTENCY7 (COHESIVE) GRAVELS, SANDS & NON-COHESIVE SILTS SPT5 DENSITY <5 5 - 10 11 - 30 31 - 50 >50 Very Loose Loose Medium Dense Dense Very Dense WATER LEVELS6 RELATIVE AMOUNT7 Trace With Adjective (ex: “Silty”) COARSE GRAINED (%)8 <5 FINE GRAINED (%)8 <5 DRILLING SAMPLING SYMBOLS & ABBREVIATIONS PARTICLE SIZE IDENTIFICATION DESIGNATION PARTICLE SIZES Hollow Stem Auger Power Auger (no sample) Bulk Sample of Cuttings Wash Sample Shelby Tube Sampler Split Spoon Sampler Rock Quality Designation % Rock Sample Recovery % Rock Core, NX, BX, AX Rock Bit Drilling Pressuremeter TestSS ST WS BS PA HSA RQD PM RD RC REC Boulders Cobbles Gravel: Sand: Silt & Clay (“Fines”) Fine Medium Coarse Fine Coarse 0.074 mm to 0.425 mm (No. 200 to No. 40 sieve) <0.074 mm (smaller than a No. 200 sieve) 0.425 mm to 2.00 mm (No. 40 to No. 10 sieve) 2.00 mm to 4.75 mm (No. 10 to No. 4 sieve) 4.75 mm to 19 mm (No. 4 sieve to ¾ inch) ¾ inch to 3 inches (19 mm to 75 mm) 3 inches to 12 inches (75 mm to 300 mm) 12 inches (300 mm) or larger >50 31 - 50 16 - 30 9 - 15 5 - 8 2 - 4 <2 Very Hard Hard Very Stiff Stiff Firm Soft Very Soft ASPHALT CONCRETE GRAVEL TOPSOIL VOID BRICK AGGREGATE BASE COURSE GW GP GM GC SW SP SM SC ML MH CL CH OL OH PT WELL-GRADED GRAVEL gravel-sand mixtures, little or no fines POORLY-GRADED GRAVEL gravel-sand mixtures, little or no fines SILTY GRAVEL gravel-sand-silt mixtures CLAYEY GRAVEL gravel-sand-clay mixtures WELL-GRADED SAND gravelly sand, little or no fines POORLY-GRADED SAND gravelly sand, little or no fines SILTY SAND sand-silt mixtures CLAYEY SAND sand-clay mixtures SILT non-plastic to medium plasticity ELASTIC SILT high plasticity LEAN CLAY low to medium plasticity FAT CLAY high plasticity ORGANIC SILT or CLAY non-plastic to low plasticity ORGANIC SILT or CLAY high plasticity PEAT highly organic soils WL (First Encountered) WL (Completion) WL (Seasonal High Water) WL (Stabilized) FILL POSSIBLE FILL PROBABLE FILL ROCK FILL AND ROCK 25 - 45 10 - 20 30 - 45 10 - 25 CLIENT: Zaremba Group LLC PROJECT NO.: 01:34293 BORING NO.: B-01 SHEET: 1 OF 1 PROJECT NAME: Bridgestone Tire - Rutherford Crossing DRILLER/CONTRACTOR: All American Geotech, Inc. SITE LOCATION: 151 Market Street, Winchester, Virginia, 22603 LOSS OF CIRCULATION LATITUDE: 39.221932 LONGITUDE: -78.132637 STRUCTURE:SURFACE ELEVATION: 691 BOTTOM OF CASING DEPTH (FT)SAMPLE NUMBERSAMPLE TYPESAMPLEDISTANCE (IN)SAMPLERECOVERY (IN)DESCRIPTION OF MATERIAL STRATIGRAPHYWATER LEVELSELEVATION (FT)BLOWS/6"(TCP/MC/SPT-NVALUE)*0 20 40 60 80 100 Recovery %RQD % 0 10 20 30 40 50 TCP ModCal SPT 0 20 40 60 80 100 Fines%MC% PL MC LL 0 20 40 60 80 100 0 1 2 3 4 5 QP 5 1 2 3 4 SS SS SS SS 18 18 18 0 2 1 3 0 AUGER REFUSAL AT 8 Ft Topsoil [Thickness=3"]. FILL - (GP) POORLY GRADED GRAVEL - gray, dry, medium dense. FILL - (CL) LEAN CLAY WITH SAND - yellowish brown, moist, hard. (CH) FAT CLAY - reddish brown, moist, firm. 690 685 19-17-12 (29) 9-14-22 (36) 4-5-3 (8) 50/0'' (N>50) 29 36 8 N>50 18 49 82.122.7 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL WL (First Encountered):DRY BORING STARTED:07/31/2025 CAVE IN DEPTH:5FT WL (Comple on):DRY BORING COMPLETED:07/31/2025 HAMMER TYPE:Automa c WL (Seasonal High Water):Not Evaluated EQUIPMENT:LOGGED BY:DRILLING METHOD: WL (Stabilized):Not Evaluated Diedrich D-50 JWH Hollow Stem Auger (0'-8') GEOTECHNICAL BOREHOLE LOG CLIENT: Zaremba Group LLC PROJECT NO.: 01:34293 BORING NO.: B-02 SHEET: 1 OF 1 PROJECT NAME: Bridgestone Tire - Rutherford Crossing DRILLER/CONTRACTOR: All American Geotech, Inc. SITE LOCATION: 151 Market Street, Winchester, Virginia, 22603 LOSS OF CIRCULATION LATITUDE: 39.221838 LONGITUDE: -78.132505 STRUCTURE:SURFACE ELEVATION: 694 BOTTOM OF CASING DEPTH (FT)SAMPLE NUMBERSAMPLE TYPESAMPLEDISTANCE (IN)SAMPLERECOVERY (IN)DESCRIPTION OF MATERIAL STRATIGRAPHYWATER LEVELSELEVATION (FT)BLOWS/6"(TCP/MC/SPT-NVALUE)*0 20 40 60 80 100 Recovery %RQD % 0 10 20 30 40 50 TCP ModCal SPT 0 20 40 60 80 100 Fines%MC% PL MC LL 0 20 40 60 80 100 0 1 2 3 4 5 QP 5 1 2 3 4 SS SS SS SS 18 4 18 0 8 2 18 0 AUGER REFUSAL AT 7 Ft Topsoil [Thickness=2"]. FILL - (CH) GRAVELLY FAT CLAY - tan gray, moist, very hard. FILL - (GC) CLAYEY GRAVEL WITH SAND - yellowish brown, moist, medium dense. 690 8-21-31 (52) 50/4'' (N>50) 4-6-7 (13) 50/0'' (N>50) 52 N>50 13 N>50 14 36 39.211.1 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL WL (First Encountered):DRY BORING STARTED:07/31/2025 CAVE IN DEPTH:3.5FT WL (Comple on):DRY BORING COMPLETED:07/31/2025 HAMMER TYPE:Automa c WL (Seasonal High Water):Not Evaluated EQUIPMENT:LOGGED BY:DRILLING METHOD: WL (Stabilized):Not Evaluated Diedrich D-50 JWH Hollow Stem Auger (0'-7') GEOTECHNICAL BOREHOLE LOG CLIENT: Zaremba Group LLC PROJECT NO.: 01:34293 BORING NO.: B-03 SHEET: 1 OF 1 PROJECT NAME: Bridgestone Tire - Rutherford Crossing DRILLER/CONTRACTOR: All American Geotech, Inc. SITE LOCATION: 151 Market Street, Winchester, Virginia, 22603 LOSS OF CIRCULATION LATITUDE: 39.221777 LONGITUDE: -78.132727 STRUCTURE:SURFACE ELEVATION: 692 BOTTOM OF CASING DEPTH (FT)SAMPLE NUMBERSAMPLE TYPESAMPLEDISTANCE (IN)SAMPLERECOVERY (IN)DESCRIPTION OF MATERIAL STRATIGRAPHYWATER LEVELSELEVATION (FT)BLOWS/6"(TCP/MC/SPT-NVALUE)*0 20 40 60 80 100 Recovery %RQD % 0 10 20 30 40 50 TCP ModCal SPT 0 20 40 60 80 100 Fines%MC% PL MC LL 0 20 40 60 80 100 0 1 2 3 4 5 QP 5 10 15 1 2 3 4 5 6 SS SS SS SS SS SS 18 5 18 18 18 18 6 3 1 18 18 18 END OF BORING AT 20 Ft Topsoil [Thickness=2"]. FILL - (GC) CLAYEY GRAVEL - gray brown, moist, dense. FILL - (GP) POORLY GRADED GRAVEL - gray, dry, very dense. FILL - (CH) FAT CLAY - yellowish brown, moist, very stiff. (CH) FAT CLAY - yellowish brown and tan, moist, firm to stiff. 690 685 680 675 12-17-24 (41) 50/5'' (N>50) 13-9-7 (16) 3-4-4 (8) 4-5-6 (11) 5-5-7 (12) 41 N>50 16 8 11 12 19 20 53 61 91.6 99.0 24.6 26.8 28.4 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL WL (First Encountered):DRY BORING STARTED:07/31/2025 CAVE IN DEPTH:11.5FT WL (Comple on):DRY BORING COMPLETED:07/31/2025 HAMMER TYPE:Automa c WL (Seasonal High Water):Not Evaluated EQUIPMENT:LOGGED BY:DRILLING METHOD: WL (Stabilized):Not Evaluated Diedrich D-50 JWH Hollow Stem Auger (0'-20') GEOTECHNICAL BOREHOLE LOG CLIENT: Zaremba Group LLC PROJECT NO.: 01:34293 BORING NO.: B-04 SHEET: 1 OF 1 PROJECT NAME: Bridgestone Tire - Rutherford Crossing DRILLER/CONTRACTOR: All American Geotech, Inc. SITE LOCATION: 151 Market Street, Winchester, Virginia, 22603 LOSS OF CIRCULATION LATITUDE: 39.221676 LONGITUDE: -78.13294 STRUCTURE:SURFACE ELEVATION: 691 BOTTOM OF CASING DEPTH (FT)SAMPLE NUMBERSAMPLE TYPESAMPLEDISTANCE (IN)SAMPLERECOVERY (IN)DESCRIPTION OF MATERIAL STRATIGRAPHYWATER LEVELSELEVATION (FT)BLOWS/6"(TCP/MC/SPT-NVALUE)*0 20 40 60 80 100 Recovery %RQD % 0 10 20 30 40 50 TCP ModCal SPT 0 20 40 60 80 100 Fines%MC% PL MC LL 0 20 40 60 80 100 0 1 2 3 4 5 QP 1 2 3 SS SS SS 12 3 0 8 2 0 AUGER REFUSAL AT 4 Ft (Several offset borings were a empted and encountered auger refusal at 4 or less) Topsoil [Thickness=1"]. FILL - (GP) POORLY GRADED GRAVEL - gray, dry, very dense. 690 21-50/6'' (N>50) 50/3'' (N>50) 50/0'' (N>50) N>50 N>50 N>50 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL WL (First Encountered):DRY BORING STARTED:07/31/2025 CAVE IN DEPTH:2.5FT WL (Comple on):DRY BORING COMPLETED:07/31/2025 HAMMER TYPE:Automa c WL (Seasonal High Water):Not Evaluated EQUIPMENT:LOGGED BY:DRILLING METHOD: WL (Stabilized):Not Evaluated Diedrich D-50 JWH Hollow Stem Auger (0'-4') GEOTECHNICAL BOREHOLE LOG CLIENT: Zaremba Group LLC PROJECT NO.: 01:34293 BORING NO.: B-05 SHEET: 1 OF 1 PROJECT NAME: Bridgestone Tire - Rutherford Crossing DRILLER/CONTRACTOR: All American Geotech, Inc. SITE LOCATION: 151 Market Street, Winchester, Virginia, 22603 LOSS OF CIRCULATION LATITUDE: 39.221594 LONGITUDE: -78.132815 STRUCTURE:SURFACE ELEVATION: 693 BOTTOM OF CASING DEPTH (FT)SAMPLE NUMBERSAMPLE TYPESAMPLEDISTANCE (IN)SAMPLERECOVERY (IN)DESCRIPTION OF MATERIAL STRATIGRAPHYWATER LEVELSELEVATION (FT)BLOWS/6"(TCP/MC/SPT-NVALUE)*0 20 40 60 80 100 Recovery %RQD % 0 10 20 30 40 50 TCP ModCal SPT 0 20 40 60 80 100 Fines%MC% PL MC LL 0 20 40 60 80 100 0 1 2 3 4 5 QP 5 1 2 3 SS SS SS 18 18 18 6 4 12 AUGER REFUSAL AT 7 Ft Topsoil [Thickness=2"]. FILL - (GC) CLAYEY GRAVEL WITH SAND - gray, moist, medium dense. FILL - (CL) GRAVELLY LEAN CLAY - gray, moist, hard. 690 5-7-9 (16) 8-13-16 (29) 9-14-34 (48) 16 29 48 16 34 13.4 3.3 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL WL (First Encountered):DRY BORING STARTED:07/31/2025 CAVE IN DEPTH:4FT WL (Comple on):DRY BORING COMPLETED:07/31/2025 HAMMER TYPE:Automa c WL (Seasonal High Water):Not Evaluated EQUIPMENT:LOGGED BY:DRILLING METHOD: WL (Stabilized):Not Evaluated Diedrich D-50 JWH Hollow Stem Auger (0'-7') GEOTECHNICAL BOREHOLE LOG CLIENT: Zaremba Group LLC PROJECT NO.: 01:34293 BORING NO.: B-06 SHEET: 1 OF 1 PROJECT NAME: Bridgestone Tire - Rutherford Crossing DRILLER/CONTRACTOR: All American Geotech, Inc. SITE LOCATION: 151 Market Street, Winchester, Virginia, 22603 LOSS OF CIRCULATION LATITUDE: 39.221591 LONGITUDE: -78.132591 STRUCTURE:SURFACE ELEVATION: 694 BOTTOM OF CASING DEPTH (FT)SAMPLE NUMBERSAMPLE TYPESAMPLEDISTANCE (IN)SAMPLERECOVERY (IN)DESCRIPTION OF MATERIAL STRATIGRAPHYWATER LEVELSELEVATION (FT)BLOWS/6"(TCP/MC/SPT-NVALUE)*0 20 40 60 80 100 Recovery %RQD % 0 10 20 30 40 50 TCP ModCal SPT 0 20 40 60 80 100 Fines%MC% PL MC LL 0 20 40 60 80 100 0 1 2 3 4 5 QP 5 1 2 3 4 SS SS SS SS 18 18 18 18 8 2 18 18 END OF BORING AT 10 Ft Topsoil [Thickness=1"]. FILL - (CH) GRAVELLY FAT CLAY - gray to brown, dry, hard. FILL - (CL) SANDY LEAN CLAY WITH GRAVEL - yellowish brown, moist, very stiff. (CH) FAT CLAY WITH SAND - trace gravel, brown, moist, stiff. 690 685 32-25-16 (41) 20-17-11 (28) 7-6-8 (14) 5-7-8 (15) 41 28 14 15 15 41 54.14.2 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL WL (First Encountered):DRY BORING STARTED:07/31/2025 CAVE IN DEPTH:6FT WL (Comple on):DRY BORING COMPLETED:07/31/2025 HAMMER TYPE:Automa c WL (Seasonal High Water):Not Evaluated EQUIPMENT:LOGGED BY:DRILLING METHOD: WL (Stabilized):Not Evaluated Diedrich D-50 JWH Hollow Stem Auger (0'-10') GEOTECHNICAL BOREHOLE LOG CLIENT: Zaremba Group LLC PROJECT NO.: 01:34293 BORING NO.: B-07 SHEET: 1 OF 1 PROJECT NAME: Bridgestone Tire - Rutherford Crossing DRILLER/CONTRACTOR: All American Geotech, Inc. SITE LOCATION: 151 Market Street, Winchester, Virginia, 22603 LOSS OF CIRCULATION LATITUDE: 39.221649 LONGITUDE: -78.133164 STRUCTURE:SURFACE ELEVATION: 690 BOTTOM OF CASING DEPTH (FT)SAMPLE NUMBERSAMPLE TYPESAMPLEDISTANCE (IN)SAMPLERECOVERY (IN)DESCRIPTION OF MATERIAL STRATIGRAPHYWATER LEVELSELEVATION (FT)BLOWS/6"(TCP/MC/SPT-NVALUE)*0 20 40 60 80 100 Recovery %RQD % 0 10 20 30 40 50 TCP ModCal SPT 0 20 40 60 80 100 Fines%MC% PL MC LL 0 20 40 60 80 100 0 1 2 3 4 5 QP 1 SS SS 18 0 12 0 AUGER REFUSAL AT 2 Ft (Several offset borings were a empted and encountered auger refusal at 2 or less) Topsoil [Thickness=2"]. FILL - (GC) CLAYEY GRAVEL - gray to brown, moist, medium dense. 18-13-9 (22) 50/0'' (N>50) 22 N>50 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL WL (First Encountered):DRY BORING STARTED:07/31/2025 CAVE IN DEPTH:1FT WL (Comple on):DRY BORING COMPLETED:07/31/2025 HAMMER TYPE:Automa c WL (Seasonal High Water):Not Evaluated EQUIPMENT:LOGGED BY:DRILLING METHOD: WL (Stabilized):Not Evaluated Diedrich D-50 JWH Hollow Stem Auger (0'-2') GEOTECHNICAL BOREHOLE LOG CLIENT: Zaremba Group LLC PROJECT NO.: 01:34293 BORING NO.: B-08 SHEET: 1 OF 1 PROJECT NAME: Bridgestone Tire - Rutherford Crossing DRILLER/CONTRACTOR: All American Geotech, Inc. SITE LOCATION: 151 Market Street, Winchester, Virginia, 22603 LOSS OF CIRCULATION LATITUDE: 39.221893 LONGITUDE: -78.132968 STRUCTURE:SURFACE ELEVATION: 689 BOTTOM OF CASING DEPTH (FT)SAMPLE NUMBERSAMPLE TYPESAMPLEDISTANCE (IN)SAMPLERECOVERY (IN)DESCRIPTION OF MATERIAL STRATIGRAPHYWATER LEVELSELEVATION (FT)BLOWS/6"(TCP/MC/SPT-NVALUE)*0 20 40 60 80 100 Recovery %RQD % 0 10 20 30 40 50 TCP ModCal SPT 0 20 40 60 80 100 Fines%MC% PL MC LL 0 20 40 60 80 100 0 1 2 3 4 5 QP 1 2 3 SS SS SS 18 6 0 6 1 0 AUGER REFUSAL AT 3 Ft (Several offset borings were a empted and encountered auger refusal at 3 or less) Topsoil [Thickness=2"]. FILL - (CH) GRAVELLY FAT CLAY - tannish brown, moist, hard. 10-15-29 (44) 50/6'' (N>50) 50/0'' (N>50) 44 N>50 N>50 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL WL (First Encountered):DRY BORING STARTED:07/31/2025 CAVE IN DEPTH:2FT WL (Comple on):DRY BORING COMPLETED:07/31/2025 HAMMER TYPE:Automa c WL (Seasonal High Water):Not Evaluated EQUIPMENT:LOGGED BY:DRILLING METHOD: WL (Stabilized):Not Evaluated Diedrich D-50 JWH Hollow Stem Auger (0'-3') GEOTECHNICAL BOREHOLE LOG CLIENT: Zaremba Group LLC PROJECT NO.: 01:34293 BORING NO.: B-09 SHEET: 1 OF 1 PROJECT NAME: Bridgestone Tire - Rutherford Crossing DRILLER/CONTRACTOR: All American Geotech, Inc. SITE LOCATION: 151 Market Street, Winchester, Virginia, 22603 LOSS OF CIRCULATION LATITUDE: 39.222029 LONGITUDE: -78.132738 STRUCTURE:SURFACE ELEVATION: 690 BOTTOM OF CASING DEPTH (FT)SAMPLE NUMBERSAMPLE TYPESAMPLEDISTANCE (IN)SAMPLERECOVERY (IN)DESCRIPTION OF MATERIAL STRATIGRAPHYWATER LEVELSELEVATION (FT)BLOWS/6"(TCP/MC/SPT-NVALUE)*0 20 40 60 80 100 Recovery %RQD % 0 10 20 30 40 50 TCP ModCal SPT 0 20 40 60 80 100 Fines%MC% PL MC LL 0 20 40 60 80 100 0 1 2 3 4 5 QP 5 1 2 3 4 SS SS SS SS 18 18 18 0 18 6 12 0 AUGER REFUSAL AT 7 Ft Topsoil [Thickness=1"]. FILL - (CH) FAT CLAY - trace gravel, brown, very stiff. FILL - (GC) CLAYEY GRAVEL WITH SAND - yellowish brown, moist, medium dense. (CH) FAT CLAY - trace gravel, reddish brown, moist, stiff. 685 8-11-12 (23) 7-7-8 (15) 4-4-5 (9) 50/0'' (N>50) 23 15 9 N>50 15 37 35.19.2 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL WL (First Encountered):DRY BORING STARTED:07/31/2025 CAVE IN DEPTH:4.5FT WL (Comple on):DRY BORING COMPLETED:07/31/2025 HAMMER TYPE:Automa c WL (Seasonal High Water):Not Evaluated EQUIPMENT:LOGGED BY:DRILLING METHOD: WL (Stabilized):Not Evaluated Diedrich D-50 JWH Hollow Stem Auger (0'-7') GEOTECHNICAL BOREHOLE LOG APPENDIX C – Laboratory Testing Laboratory Test Results Summary Plasticity Chart Grain Size Analysis Standard Proctor (in conjunction with CBR) California Bearing Ratio (CBR) Testing California Bearing Ratio (CBR) Testing (ECS Project No. 01:34157) California Bearing Ratio (CBR) Testing (ECS Project No. 01:29100) 2 22.7 CL 49 18 31 82.1 3 11.1 GC 36 14 22 39.2 3 24.6 CH 53 19 34 91.6 4 26.8 5 28.4 CH 61 20 41 99.0 2 3.3 GC 34 16 18 13.4 2 4.2 CL 41 15 26 54.1 106.1 16.0 1.5 1.7 2 9.2 GC 37 15 22 35.1 Project: Client: Laboratory Testing Summary Sample Location Sample Number Depth (ft)^MC (%) Soil Type Atterberg Limits **Percent Passing No. 200 Sieve Moisture - Density CBR (%) #Organic Content (%)LL PL PI <Maximum Density (pcf) <Optimum Moisture (%)0.1 in.0.2 in. B-01 2.5-3.6 B-02 5.0-6.5 B-03 5.0-6.5 B-03 8.5-10.0 B-03 13.5-15.0 B-05 2.5-4.0 B-06 2.5-4.0 B-09 2.5-4.0 Notes:See test reports for test method, ^ASTM D2216-19, *ASTM D2488, **ASTM D1140-17, #ASTM D2974-20e1 < See test report for D4718 corrected values Definitions:MC: Moisture Content, Soil Type: USCS (Unified Soil Classification System), LL: Liquid Limit, PL: Plastic Limit, PI: Plasticity Index, CBR: California Bearing Ratio, OC: Organic Content Bridgestone Tire - Rutherford Crossing Project No.:01:34293 Approved by Date Received Zaremba Group, LLC Date Reported:8/22/2025 Office / Lab Address Office Number / Fax jvong Htran MUzun 8/8/2025 ECS Mid-Atlantic LLC - Chantilly 14026 Thunderbolt Place Suite 100 Chantilly, VA 20151-3232 (703)471-8400 (703)834-5527 Tested by Checked by LL PL PI %<#200 49 18 31 82.1 36 14 22 39.2 p 53 19 34 91.6 61 20 41 99.0 34 16 18 13.4 V 41 15 26 54.1 37 15 22 35.1 LIQUID AND PLASTIC LIMITS TEST REPORT TEST RESULTS (ASTM D4318-10 (MULTIPOINT TEST)) Sample Location Sample Number Sample Depth (ft)%<#40 AASHTO USCS Material Description B-01 2 2.50-3.58 85.5 A-7-6 CL Lean Clay with Sand Yellowish Brown B-02 3 5.00-6.50 42.2 A-6 GC Clayey Gravel with Sand Yellowish Brown B-03 3 5.00-6.50 95.3 A-7-6 CH Fat Clay Yellowish Brown B-03 5 13.50-15.00 99.5 A-7-6 CH Fat Clay Yellowish Brown B-05 2 2.50-4.00 16.6 A-2-6 GC Clayey Gravel with Sand Yellow Brown B-06 2 2.50-4.00 60.3 A-7-6 CL Sandy Lean Clay with Gravel Yellowish Brown B-09 2 2.50-4.00 40.6 A-6 GC Clayey Gravel with Sand Yellowish Brown Project:Bridgestone Tire - Rutherford Crossing Project No.:01:34293 Client:Zaremba Group, LLC Date Reported:8/22/2025 Office / Lab Address Office Number / Fax ECS Mid-Atlantic LLC - Chantilly 14026 Thunderbolt Place Suite 100 Chantilly, VA 20151-3232 (703)471-8400 (703)834-5527 Tested by Checked by Approved by Date Received jvong Htran MUzun 8/8/2025 0 10 20 30 40 50 60 0 10 20 30 40 50 60 70 80 90 100 110 LIQUID LIMIT ML or OLCL-ML MH or OH P L A S T I C I T Y I N D E X Dashed line indicates the approximate upper limit boundary for natural soils D90 D50 D10 D85 D30 Cu D60 D15 Cc PARTICLE SIZE DISTRIBUTION TEST RESULTS (ASTM D422-63(2007)) Sieving Hydrometer Sedimentation Dry Mass of sample, g 89.8 Particle Size % Passing Particle Size mm % Passing Very coarse, >3" sieve 0.0 3"100.0 Sample Proportions % dry mass #4 97.7 3/8"100.0 #10 90.8 Gravel, 3" to # 4 sieve 2.0#20 87.6 #40 85.5 Coarse Sand, #4 to #10 sieve 7.0#60 84.2 #100 83.2 Medium Sand, #10 to #40 5.0#200 82.1 Fine Sand, #40 to #200 4.0 Fines <#200 82.1 USCS CL Liquid Limit 49 1.615 AASHTO A-7-6 Plastic Limit 18 0.347 USCS Group Name Lean clay with sand Plasticity Index 31 Project:Bridgestone Tire - Rutherford Crossing Project No.:01:34293 Client:Zaremba Group, LLC Depth (ft):2.5 - 3.6 Sample Description:Lean Clay with Sand Yellowish Brown Sample No.:2 Sample Source:B-01 Date Reported:8/22/2025 Office Number / Fax ECS Mid-Atlantic LLC - Chantilly 14026 Thunderbolt Place Suite 100 Chantilly, VA 20151-3232 (703)471-8400 (703)834-5527 Tested by Checked by Approved by Date Received Remarks Office / Lab Address jvong Htran MUzun 8/8/2025 ÷÷ ø ö çç è æ 1m m SILTSAND FineMediumCoarseGRAVEL CLAYVery Coarse 3"2"1.5"1"3/4"1/2"3/8"#4 #10 #20 #40 #60 #100 #140 #200 0 10 20 30 40 50 60 70 80 90 100 0.0010.010.11101001000Percentage Passing %Particle Size mm D90 D50 D10 D85 D30 Cu D60 D15 Cc PARTICLE SIZE DISTRIBUTION TEST RESULTS (ASTM D422-63(2007)) Sieving Hydrometer Sedimentation Dry Mass of sample, g 188.6 Particle Size % Passing Particle Size mm % Passing Very coarse, >3" sieve 0.0 3"100.0 Sample Proportions % dry mass 3/4"82.7 1"100.0 3/8"73.8 Gravel, 3" to # 4 sieve 37.0#4 63.1 #10 48.9 Coarse Sand, #4 to #10 sieve 14.0#20 44.5 #40 42.2 Medium Sand, #10 to #40 7.0#60 41.2 #100 40.4 Fine Sand, #40 to #200 3.0#200 39.2 Fines <#200 39.2 USCS GC Liquid Limit 36 21.330 2.139 AASHTO A-6 Plastic Limit 14 19.710 USCS Group Name Clayey gravel with sand Plasticity Index 22 3.933 Project:Bridgestone Tire - Rutherford Crossing Project No.:01:34293 Client:Zaremba Group, LLC Depth (ft):5.0 - 6.5 Sample Description:Clayey Gravel with Sand Yellowish Brown Sample No.:3 Sample Source:B-02 Date Reported:8/22/2025 Office Number / Fax ECS Mid-Atlantic LLC - Chantilly 14026 Thunderbolt Place Suite 100 Chantilly, VA 20151-3232 (703)471-8400 (703)834-5527 Tested by Checked by Approved by Date Received Remarks Office / Lab Address jvong Htran MUzun 8/8/2025 ÷÷ ø ö çç è æ 1m m SILTSAND FineMediumCoarseGRAVEL CLAYVery Coarse 3"2"1.5"1"3/4"1/2"3/8"#4 #10 #20 #40 #60 #100 #140 #200 0 10 20 30 40 50 60 70 80 90 100 0.0010.010.11101001000Percentage Passing %Particle Size mm D90 D50 D10 D85 D30 Cu D60 D15 Cc PARTICLE SIZE DISTRIBUTION TEST RESULTS (ASTM D422-63(2007)) Sieving Hydrometer Sedimentation Dry Mass of sample, g 40.5 Particle Size % Passing Particle Size mm % Passing Very coarse, >3" sieve 0.0 3"100.0 Sample Proportions % dry mass #10 98.4 #4 100.0 #20 96.7 Gravel, 3" to # 4 sieve 0.0#40 95.3 #60 94.5 Coarse Sand, #4 to #10 sieve 2.0#100 93.6 #200 91.6 Medium Sand, #10 to #40 3.0 Fine Sand, #40 to #200 3.0 Fines <#200 91.6 USCS CH Liquid Limit 53 AASHTO A-7-6 Plastic Limit 19 USCS Group Name Fat clay Plasticity Index 34 Project:Bridgestone Tire - Rutherford Crossing Project No.:01:34293 Client:Zaremba Group, LLC Depth (ft):5.0 - 6.5 Sample Description:Fat Clay Yellowish Brown Sample No.:3 Sample Source:B-03 Date Reported:8/22/2025 Office Number / Fax ECS Mid-Atlantic LLC - Chantilly 14026 Thunderbolt Place Suite 100 Chantilly, VA 20151-3232 (703)471-8400 (703)834-5527 Tested by Checked by Approved by Date Received Remarks Office / Lab Address jvong Htran MUzun 8/8/2025 ÷÷ ø ö çç è æ 1m m SILTSAND FineMediumCoarseGRAVEL CLAYVery Coarse 3"2"1.5"1"3/4"1/2"3/8"#4 #10 #20 #40 #60 #100 #140 #200 0 10 20 30 40 50 60 70 80 90 100 0.0010.010.11101001000Percentage Passing %Particle Size mm D90 D50 D10 D85 D30 Cu D60 D15 Cc PARTICLE SIZE DISTRIBUTION TEST RESULTS (ASTM D422-63(2007)) Sieving Hydrometer Sedimentation Dry Mass of sample, g 41.4 Particle Size % Passing Particle Size mm % Passing Very coarse, >3" sieve 0.0 3"100.0 Sample Proportions % dry mass #10 99.8 #4 100.0 #20 99.6 Gravel, 3" to # 4 sieve 0.0#40 99.5 #60 99.4 Coarse Sand, #4 to #10 sieve 0.0#100 99.3 #200 99.0 Medium Sand, #10 to #40 0.0 Fine Sand, #40 to #200 1.0 Fines <#200 99.0 USCS CH Liquid Limit 61 AASHTO A-7-6 Plastic Limit 20 USCS Group Name Fat clay Plasticity Index 41 Project:Bridgestone Tire - Rutherford Crossing Project No.:01:34293 Client:Zaremba Group, LLC Depth (ft):13.5 - 15.0 Sample Description:Fat Clay Yellowish Brown Sample No.:5 Sample Source:B-03 Date Reported:8/22/2025 Office Number / Fax ECS Mid-Atlantic LLC - Chantilly 14026 Thunderbolt Place Suite 100 Chantilly, VA 20151-3232 (703)471-8400 (703)834-5527 Tested by Checked by Approved by Date Received Remarks Office / Lab Address jvong Htran MUzun 8/8/2025 ÷÷ ø ö çç è æ 1m m SILTSAND FineMediumCoarseGRAVEL CLAYVery Coarse 3"2"1.5"1"3/4"1/2"3/8"#4 #10 #20 #40 #60 #100 #140 #200 0 10 20 30 40 50 60 70 80 90 100 0.0010.010.11101001000Percentage Passing %Particle Size mm D90 D50 D10 D85 D30 Cu D60 D15 Cc PARTICLE SIZE DISTRIBUTION TEST RESULTS (ASTM D422-63(2007)) Sieving Hydrometer Sedimentation Dry Mass of sample, g 156.9 Particle Size % Passing Particle Size mm % Passing Very coarse, >3" sieve 0.0 3"100.0 Sample Proportions % dry mass 3/4"72.7 1"100.0 3/8"49.8 Gravel, 3" to # 4 sieve 63.0#4 36.7 #10 23.1 Coarse Sand, #4 to #10 sieve 14.0#20 18.3 #40 16.6 Medium Sand, #10 to #40 6.0#60 15.6 #100 14.5 Fine Sand, #40 to #200 4.0#200 13.4 Fines <#200 13.4 USCS GC Liquid Limit 34 22.610 9.558 AASHTO A-2-6 Plastic Limit 16 21.500 3.102 USCS Group Name Clayey gravel with sand Plasticity Index 18 12.940 0.189 Project:Bridgestone Tire - Rutherford Crossing Project No.:01:34293 Client:Zaremba Group, LLC Depth (ft):2.5 - 4.0 Sample Description:Clayey Gravel with Sand Yellow Brown Sample No.:2 Sample Source:B-05 Date Reported:8/22/2025 Office Number / Fax ECS Mid-Atlantic LLC - Chantilly 14026 Thunderbolt Place Suite 100 Chantilly, VA 20151-3232 (703)471-8400 (703)834-5527 Tested by Checked by Approved by Date Received Remarks Office / Lab Address jvong Htran MUzun 8/8/2025 ÷÷ ø ö çç è æ 1m m SILTSAND FineMediumCoarseGRAVEL CLAYVery Coarse 3"2"1.5"1"3/4"1/2"3/8"#4 #10 #20 #40 #60 #100 #140 #200 0 10 20 30 40 50 60 70 80 90 100 0.0010.010.11101001000Percentage Passing %Particle Size mm D90 D50 D10 D85 D30 Cu D60 D15 Cc PARTICLE SIZE DISTRIBUTION TEST RESULTS (ASTM D422-63(2007)) Sieving Hydrometer Sedimentation Dry Mass of sample, g 8395.0 Particle Size % Passing Particle Size mm % Passing Very coarse, >3" sieve 0.0 3"100.0 Sample Proportions % dry mass 1"99.7 1 1/2"100.0 3/4"98.8 Gravel, 3" to # 4 sieve 21.03/8"89.8 #4 79.4 Coarse Sand, #4 to #10 sieve 8.0#10 71.4 #20 64.6 Medium Sand, #10 to #40 11.0#40 60.3 #60 58.1 Fine Sand, #40 to #200 6.0#100 56.1 #200 54.1 Fines <#200 54.1 USCS CL Liquid Limit 41 9.647 AASHTO A-7-6 Plastic Limit 15 6.899 USCS Group Name Sandy lean clay with gravel Plasticity Index 26 0.395 Project:Bridgestone Tire - Rutherford Crossing Project No.:01:34293 Client:Zaremba Group, LLC Depth (ft):2.5 - 4.0 Sample Description:Sandy Lean Clay with Gravel Yellowish Brown Sample No.:2 Sample Source:B-06 Date Reported:8/22/2025 Office Number / Fax ECS Mid-Atlantic LLC - Chantilly 14026 Thunderbolt Place Suite 100 Chantilly, VA 20151-3232 (703)471-8400 (703)834-5527 Tested by Checked by Approved by Date Received Remarks Office / Lab Address jvong Htran MUzun 8/8/2025 ÷÷ ø ö çç è æ 1m m SILTSAND FineMediumCoarseGRAVEL CLAYVery Coarse 3"2"1.5"1"3/4"1/2"3/8"#4 #10 #20 #40 #60 #100 #140 #200 0 10 20 30 40 50 60 70 80 90 100 0.0010.010.11101001000Percentage Passing %Particle Size mm D90 D50 D10 D85 D30 Cu D60 D15 Cc PARTICLE SIZE DISTRIBUTION TEST RESULTS (ASTM D422-63(2007)) Sieving Hydrometer Sedimentation Dry Mass of sample, g 183.4 Particle Size % Passing Particle Size mm % Passing Very coarse, >3" sieve 0.0 3"100.0 Sample Proportions % dry mass 3/4"94.1 1"100.0 3/8"81.5 Gravel, 3" to # 4 sieve 33.0#4 67.0 #10 50.6 Coarse Sand, #4 to #10 sieve 16.0#20 44.2 #40 40.6 Medium Sand, #10 to #40 10.0#60 38.8 #100 37.1 Fine Sand, #40 to #200 6.0#200 35.1 Fines <#200 35.1 USCS GC Liquid Limit 37 15.160 1.846 AASHTO A-6 Plastic Limit 15 11.520 USCS Group Name Clayey gravel with sand Plasticity Index 22 3.284 Project:Bridgestone Tire - Rutherford Crossing Project No.:01:34293 Client:Zaremba Group, LLC Depth (ft):2.5 - 4.0 Sample Description:Clayey Gravel with Sand Yellowish Brown Sample No.:2 Sample Source:B-09 Date Reported:8/22/2025 Office Number / Fax ECS Mid-Atlantic LLC - Chantilly 14026 Thunderbolt Place Suite 100 Chantilly, VA 20151-3232 (703)471-8400 (703)834-5527 Tested by Checked by Approved by Date Received Remarks Office / Lab Address jvong Htran MUzun 8/8/2025 ÷÷ ø ö çç è æ 1m m SILTSAND FineMediumCoarseGRAVEL CLAYVery Coarse 3"2"1.5"1"3/4"1/2"3/8"#4 #10 #20 #40 #60 #100 #140 #200 0 10 20 30 40 50 60 70 80 90 100 0.0010.010.11101001000Percentage Passing %Particle Size mm %Preparation pcf Type of rammer Corrected Opt. Moisture Content %Test Specfication / Method Corrected Max. Dry Density pcf material retained on:3/4 in. sieve % 3/8 in. sieve % #4 sieve % 20.6 % retained on #4 sieve. Laboratory Compaction Characteristics of Soil Using Standard Effort Optimum Moisture Content 16.0 ASTM moist preparation Maximum Dry Unit Weight 106.1 Manual - 5.5lbf (24.5N) 12.8 ASTM D698-12e2-method A 114.5 Specific gravity - D854 water pycnometer 2.60 Historical Cumulative 1.2 Coarse Aggregate Specific Gravity - C127 coarse aggregate 2.60 Historical10.2 20.6 Soil Description Nat. Moist. %Liquid Limit Plasticity Index %< #200 USCS AASHTO Sandy Lean Clay with Gravel Yellowish Brown 4.2 41 26 54.1 CL A-7-6 Project:Bridgestone Tire - Rutherford Crossing Project No.:01:34293 Client:Zaremba Group, LLC Depth (ft.):2.5 - 4 Sample / Source:B-06 Sample No.:2 Test Reference/No.:Date Reported:8/22/2025 Office / Lab Address Office Number / Fax ECS Mid-Atlantic LLC - Chantilly 14026 Thunderbolt Place Suite 100 Chantilly, VA 20151-3232 (703)471-8400 (703)834-5527 Tested by Checked by Approved by Date Received Remarks jvong Htran MUzun 8/8/2025 D4718 corrected 80.0 90.0 100.0 110.0 120.0 130.0 140.0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32Dry Unit Weight, pcfWater Content, % ----Zero Air Voids SG =2.60 Density (pcf) Percent of Max. Dens.Moisture (%)Density (pcf) Percent of Max. Dens.Moisture (%)0.1 in.0.2 in. 98.9 86.4 12.5 87.1 76.1 24.6 1.5 1.7 0.00 Project No.: Depth (ft.): Sample No.: Date Reported: California Bearing Ratios (CBR) of Laboratory-Compacted Soils TEST RESULTS (ASTM D1883-16) Molded Soaked CBR (%) Linearty Correction (in.) Surcharge (lbs.) Swell (%) 10 2.51 Material Description AASHTO USCS MAX. Dens. (pcf) Optimum Moisture (%)LL PI % Fines % Gravel Sandy Lean Clay with Gravel Yellowish Brown A-7-6 CL 114.47 12.8 41 26 54.1 21.0 Project:Bridgestone Tire - Rutherford Crossing 01:34293 Client:Zaremba Group, LLC 2.5 - 4 Sample / Source B-06 2 Test Reference/No.:1 8/22/2025 8/8/2025 Office / Lab Address Office Number / Fax ECS Mid-Atlantic LLC - Chantilly 14026 Thunderbolt Place Suite 100 Chantilly, VA 20151-3232 (703)471-8400 (703)834-5527 Tested by Checked by Approved by Date Received Remarks jvong Htran MUzun 0 5 10 15 20 25 30 35 40 45 50 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5Penetration Resistance (psi)Penetration Depth (in.) data 0.1in 0.2in correction Density (pcf) Percent of Max. Dens.Moisture (%)Density (pcf) Percent of Max. Dens.Moisture (%) 0.1 in. 0.2 in. 134.3 99.0 6.5 126.9 93.5 12.2 11.7 11.2 0.00 Project No.: Depth (ft.): Sample No.: Date Reported: California Bearing Ratios (CBR) of Laboratory-Compacted Soils TEST RESULTS (AASHTO T 193-13) Molded Soaked CBR (%) Linearty Correction (in.) Surcharge (lbs.) Swell (%) 10 0.44 Material Description AASHTO USCS MAX. Dens. (pcf) Optimum Moisture (%)LL PI % Fines % Gravel Clayey Gravel Yellowish Brown A-7-6 GC 135.69 6.9 50 33 41.2 50.0 Project:North Rutherford Crossing Parcel Exploration 01:34157 Client:CFT NV Developments, LLC 0 - 0.1 Sample / Source P-05 D3S-1 Test Reference/No.:1 7/8/2025 6/30/2025 Office / Lab Address Office Number / Fax ECS Mid-Atlantic LLC - Chantilly 14026 Thunderbolt Place Suite 100 Chantilly, VA 20151-3232 (703)471-8400 (703)834-5527 Tested by Checked by Approved by Date Received Remarks jvong Htran MUzun 0 50 100 150 200 250 300 350 400 450 500 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5Penetration Resistance (psi)Penetration Depth (in.) data 0.1in 0.2in correction TransmittalPage4/6 BEARING RATIO TEST REPORT ASTM D1883-16 Project No: 29100 Project: Rutherford Crossing Retail Development Source of Sample: B-5 Depth: 0.00-5.00 Sample Number: Bulk Date: Gravelly Lean Clay Light Brown (21.2% +4) Test Description/Remarks: Figure 117.2 14.4 36 20CL Material Description USCS Max. Dens. (pcf) Optimum Moisture (%) LL PI Molded Density (pcf) Percent of Max. Dens. Moisture (%) Soaked Density (pcf) Percent of Max. Dens. Moisture (%) CBR (%) 0.10 in.0.20 in. Linearity Correction (in.) Surcharge (lbs.) Max. Swell (%) 1 116.9 99.7 14.9 115.2 98.3 18.1 9.0 8.3 0.000 10 1.5 2 3 Penetration Resistance (psi)0 40 80 120 160 200 Penetration Depth (in.) 0 0.1 0.2 0.3 0.4 0.5 Dashed line is curve linearity correction APPENDIX D – Previous Exploration and Supplemental Report Documents Typical Foundation Detail Bedrock Pinnacle Undercut Detail Glossary of Geologic and Karst Terms Karst Auger Refusal Diagram Standard and Heavy-Duty Pavement Section Diagrams NOT TO SCALE TYPICAL FOUNDATION DETAIL Q (WALL LOAD) FINISH GRADE Df = 24 IN MIN. q = ALLOWABLE BEARING PRESSURE B (FOOTING WIDTH) = 18 INCH MINIMUM WALL LENGTH CONTINUOUS FOOTING Q (COLUMN LOAD) FINISH GRADE Df = 24 IN MIN. q = ALLOWABLE BEARING PRESSURE B (FOOTING WIDTH) = 2 FEET MINIMUM B COLUMN FOOTING Glossary of Geologic and Karst Terms (Source: A Lexicon of Cave and Karst Terminology with Special Reference to Environmental Karst Hydrology, United States Environmental ProtecƟon Agency, EPA/600/R-02/003, February 2002) aquifer, karst. An aquifer in which the flow of water is or can be appreciable through one or more of the following: joints, faults, bedding-plane parƟngs, and caviƟes — any or all of which have been enlarged by dissoluƟon. anƟcline. Upfolded stratum bedding. Applies to rocks resulƟng from consolidaƟon of sediments and exhibiƟng surfaces of separaƟon (bedding planes) between layers of the same or different materials (e.g., shale, sandstone, limestone, etc.). bedding plane. 1. A primary deposiƟonal laminaƟon in sedimentary rocks that may be preserved, though possibly with different properƟes, in metamorphic rocks. These laminaƟons may be clearly visible where lithologies change or where deposiƟonal cycles were completed/iniƟated, or they may be effecƟvely invisible to the naked eye, marking subtle changes in deposiƟonal condiƟons. Most bedding planes were originally horizontal or very slightly inclined, but more steeply inclined bedding planes developed in rocks deposited in deltaic or sand dune environments or in marine reefs. When rocks are folded the bedding planes provide an indicaƟon of the degree of deformaƟon. Bedding planes play a crucial role in the incepƟon and ongoing development of most caves and many surface karst features. 2. A plane that separates two strata of differing characterisƟcs. bedrock. Solid rock underlying unconsolidated material calcite. The commoner, more stable, mineral form of calcium carbonate, CaCO3. It is the dominant component of all limestones and, due to its dissoluƟon and reprecipitaƟon by natural waters at normal temperatures, it is also the dominant mineral of chemical cave deposits carbonate rock. A rock that consists of one or more carbonate minerals. Carbonate rock successions (or sequences) are those in which carbonate rock is dominant, but which also contain rocks of other lithology cave. A natural opening formed in the rocks below the surface of the ground large enough for a man to enter. It may consist of a single connected opening or a series of small or large chambers connected by galleries. cavern. Underground opening in soluble rock similar to a cave. When used as a noun, it refers to large openings. collapse sink; collapse sinkhole. 1. A variety of closed depression that forms by collapse of the rock above an exisƟng cave passage or chamber. 2. A closed depression formed by the collapse of the roof of a cave conduit; karst conduit. RelaƟvely large dissoluƟonal voids, including enlarged fissures and tubular tunnels; in some usage the term is restricted to voids that are water-filled. conduit flow; karst conduit flow. Underground water flow within conduits. Conduit flow is generally turbulent, but can also be laminar cuƩer. A karren-like groove formed beneath the soil, more commonly referred to as subsoil karren disconƟnuity. An unconformity in which the bedding planes above and below the break are basically parallel, indicaƟng a significant hiatus in the orderly sequence of sedimentary rocks. doline; sinkhole. A basin- or funnel-shaped hollow in limestone, ranging in diameter from a few meters up to a kilometer and in depth from a few to several hundred meters. dolomite. 1. The pure mineral dolomite has the composiƟon CaMg (CO3)2 and has properƟes very similar to those of calcite. The rock dolomite consists mainly of the mineral dolomite, with subordinate calcite, and has properƟes very similar to those of limestone. epikarst; epikarst zone. A relaƟvely thick (the thickness may vary significantly, but 15 to 30 meters thick is a good generalizaƟon) porƟon of bedrock that extends from the base of the soil zone and is characterized by extreme fracturing and enhanced soluƟon. It is separated from the phreaƟc zone by an inacƟve, relaƟvely waterless interval of bedrock that is locally breached by vadose percolaƟon. Glossary of Geologic and Karst Terms Page 2 of 3 exposed karst. A general term for bare karsƟc rocks outcropping at the surface of the ground. It embraces karst areas without any iniƟal cover (naked karst) or exposed by erosion of the residuum and soil (denuded karst) or of the allochthonous cover (exhumed karst). Karst topography in which cover is absent fault. 1. A fracture in the earth’s crust, across which relaƟve rock movement has taken place, or conƟnues to take place. Fault planes commonly guide verƟcal or sub-verƟcal shaŌs in caves, as well as guiding sub-horizontal or oblique passages within the confines of the fault plane. 2. A fracture or fracture zone along which there has been displacement of the two sides relaƟve to one another parallel to the fracture. This displacement may be of a few cenƟmeters or many kilometers. fissure. Any disconƟnuity within the rock mass that is either iniƟally open or capable of being opened by dissoluƟon to provide a route for water movement. Fissures in this sense, applied generally in karst, therefore include the primary sedimentary bedding planes as well as tectonic faults and joints. fracture. 1. A break or secondary disconƟnuity in the rock mass, whether or not there has been relaƟve movement across it. Faults, thrusts, and joints are all fractures, but bedding planes, which are primary features, are not. 2. Breakage of rock strata. 3. The general term for any mechanical disconƟnuity in the rock; it is, therefore, the collecƟve term for joints, faults, cracks, etc. gaining stream. A stream or reach of a stream whose flow is being increased by inflow of ground water geological map. A map on which is recorded geologic informaƟon, such as the distribuƟon, nature, and age relaƟonships of rock units (surficial deposits may or may not be mapped separately), and the occurrence of structural features (folds, faults, joints), mineral deposits, and fossil localiƟes geologic hazard. A naturally occurring or man-made geologic condiƟon or phenomenon that presents a risk or is a potenƟal danger to life and property. Examples include landsliding, flooding, earthquakes, ground subsidence, coastal and beach erosion, faulƟng, dam leakage and failure, mining disasters, polluƟon and waste disposal, and seawater intrusion infiltraƟon. The downward entry of water into the soil or rock intermiƩent stream, intermiƩent river. 1. A stream or river which flows only in direct response to precipitaƟon or to intermiƩent discharge of a spring; not confined to karst areas, but not uncommon in them. 2. A stream or river that flows at irregular intervals interrupted river, interrupted stream. 1. A river which flows for part of its course on the surface, and part underground in caves. 2. A stream interrupted over space. 3. A disconƟnuous stream joint. A break of geological origin in the conƟnuity of a body of rock occurring either singly, or more frequently in a set or system, but not aƩended by a visible movement parallel to the surface of the disconƟnuity. Karren. (German.) Channels or furrows, caused by soluƟon on massive bare limestone surfaces; they vary in depth from a few millimeters to more than a meter and are separated by ridges. karst. (InternaƟonally used term, originally the German form of the Slavic word kras or krš, meaning a bleak waterless place; it is the German name for a district east of Trieste having such terrane.) A terrane, generally underlain by limestone or dolomite, in which the topography is chiefly formed by the dissolving of rock, and which may be characterized by sinkholes, sinking streams, closed depressions, subterranean drainage, and caves. The term karst unites specific morphological and hydrological features in soluble (mostly carbonate) rocks. Morphological features include karren, dolinas (sinkholes), jamas, ponors, uvalas, poljes, caves, caverns, etc. Hydrological features include basins of closed drainage, lost rivers, estavelles, vauclusian springs, submarine springs, more or less individualized underground streams and incongruity of surface and underground divides. Karst is understood to be the result of natural processes in and on the earth’s crust cause by soluƟon and leaching of limestones, dolomites, gypsum, halite, and other soluble rocks. karst topography. Topography dominated by features of soluƟonal origin. Geomorphically, the dominant features usually but not always obviously present, are sinkholes and caves. karst valley. 1. Valleys in karst are normally disƟncƟve due to the lack of integrated surface drainage. Most are either blind (due to being closed where the drainage sinks underground), headless or pocket (where a river emerges from a spring) or dry (where surface flow has been lost due to underground capture). 2. Elongated soluƟon valley in limestone. 3. Valley produced by collapse of a cavern roof. lithology. 1. The physical characterisƟc of a rock, including composiƟon, grain size, texture, degree of cementaƟon (or lithificaƟon) and structure, that determine the rock type[ 2. The physical properƟes and aspect of a rock. losing stream. A stream or reach of a stream in which water flows from the stream bed into the ground. In karst terranes, losing streams may slowly sink into fractures or completely disappear. outcrop. An open exposure of bedrock or otherwise buried material Glossary of Geologic and Karst Terms Page 3 of 3 overburden. 1. The loose soil, sand, silt, or clay that overlies bedrock. In some usages it refers to all material overlying the point of interest. 2. The total cover of soil and rock overlying an underground excavaƟon. perched ground water. Ground water separated from an underlying body of ground water by an unsaturated zone perched water table. Unconfined ground water separated from an underlying body of ground water by unsaturated soil or rock. It may be either temporary or permanent. pinnacles. These are a parƟcularly mature form of karren. The side walls are grikes with karren cuƫng across one another to form sharp edges and peaks that can reach several meters in height. Generally, pinnacles need a long period Ɵme to form. They are common in the tropics and can aƩain great sizes. OŌen, they are covered. recharge. 1. The process of addiƟon of water to the saturated zone 2. The replenishment of a depleted aquifer by injecƟon or infiltraƟon of water from the surface. residual clay. Clay or sandy clay remaining on a rock surface aŌer removal of calcium carbonate by soluƟon. sink; sinkhole. 1. A point where a stream or river disappears underground. The sinking water may filter through a choke that excludes cavers, or may flow into an open horizontal cave or verƟcal shaŌ, and while acƟve all of these may be termed sinkholes. The flow of water may be very small, but in full flood many sinkholes swallow flows of tens of cubic meters per second. 2. General terms for closed depressions. They may be basin, funnel, or cylindrical shaped. spring. Point where underground water emerges on to the surface, not exclusive to limestone, but generally larger in cavernous rocks. structure. One of the larger features of a rock mass (e.g., bedding, foliaƟon, joinƟng, cleavage, brecciaƟon, etc.). Also the sum total of such features as contrasted with texture. In a broader sense, it refers to the structural features of an area such as anƟclines or synclines. syncline. Downfolded stratum tectonic. Pertaining to structural features due to the deformaƟon of the Earth’s crust terrain. An area with some specific characterisƟcs. Reserved for surficial features only. Contrast with terrane. terrane. An area with some specific characterisƟcs. Includes both surface and subsurface features. Contrast with terrain. thrust; thrust fault. A generally gently dipping or subhorizontal fault plane where the relaƟve movement has been essenƟally horizontal, with one rock sequence being pushed across and above another. AUGER REFUSAL AT RELATIVELY SHALLOW DEPTH ON A BEDROCK PINNACLE AUGER REFUSAL IN A DEEP SOIL CUTTER AUGER REFUSAL ON A FLOAT BOULDER GIVING A FALSE INDICATION OF SHALLOW BEDROCK AUGER REFUSAL DUE TO DEFLECTING AUGERS - CONTINUED DOWNWARD FORCE CAN CAUSE THE FAILURE OF AUGER CONNECTIONS AND LOSS OF DRILL STRING IN THE BOREHOLE KARST AUGER REFUSAL SCENARIO DIAGRAM NOT TO SCALE NOTE: AUGER REFUSAL IN ALL SCENARIO'S MAY MASK THE PRESENCE OF KARST VOIDS 1 2 3 4 1 2 3 4 GROUND SURFACE CARBONATE BEDROCK HEAVY DUTY MINIMUM CONCRETE PAVEMENT CROSS-SECTION Notes: 1. Portland Cement Concrete materials should meet VDOT Section 217 Standard Specifications. 2. Dense Graded Crushed Stone Base materials should meet VDOT Section 208 Standard Specification for 21A/B Stone 7" PortlandCementConcrete VDOT Section 217 6" Base StoneMaterial VDOT Section 20821A/BStone Notes: 1. Portland Cement Concrete materials should meet VDOT Section 217 Standard Specifications. 2. Dense Graded Crushed Stone Base materials should meet VDOT Section 208 Standard Specification for 21A/B Stone STANDARD DUTY MINIMUM CONCRETE PAVEMENT CROSS-SECTION 5" PortlandCementConcrete VDOT Section 217 6" Base StoneMaterial VDOT Section 20821A/BStone