Loading...
HomeMy WebLinkAbout48-25 Checklist - Frederick WaterREVIEW CHECKLIST FREDERICK WATER Subdivision/Site Plan Name: Design Professional Name: Design Professional Phone: Tax Map (PIN): Submission Date: Submission Number: O.K. O Incomplete N Not Applicable X Unacceptable GENERAL 1 Owner's and Developer's contact information 2 Magisterial district, tax map; and address if applicable 3 Utility contact information 4 North arrow on all plan sheets 5 Scale references on all plan sheets 6 Current FW Standards and Specifications have been reviewed for compliance at www.FW-water.com 7 Current FW construction notes are on plans 8 All existing easements are shown including deed book & page or instrument number 9 Vicinity map 10 General layout sheet 11 Current existing water and sanitary sewer infrastructure is shown and described 12 Required onsite FW easements are identified 13 Required off site FW easements are identified 14 Note has been added to landscape drawings that no trees or shrubs shall be placed on FW easements 15 Project Acceptance Requirements per FW standards (page 4) have been considered in project phasing 16 Existing site conditions are shown and labeled ie. ex. structures, utilities etc. 17 Master development plan reviewed for compliance and MDP #, date included. Any variiance from MDP water or sewer requirements is explained Design ProfessionalNOTES This checklist is to be completed by the Design Professional and submitted with the Site Plan. REQUIREMENTS Review Key 1st ReviewRevised 1/4/18 Frederick Water Plan Review Checklist Page 1 of 4 18 Proffer statement reviewed for compliance and copy included 19 Exceptions to FW requirements are described 20 Length of water and sewer lines on private property to be owned by FW kept to minimum 21 Lot numbers, building numbers and street names are shown on all sheets 22 All plan sheets have been reconciled to reflect the same information 23 Existing FW infrastucture requiring field adjustment where grade changes occur has been shown 24 Existing FW facilities to be removed or abandoned are noted accordingly. Significant items, fire hydrants, valves etc. are noted to be furnished to FW inspector 25 Ownership of existing and proposed, water and sanitary sewer is labeled 26 Continutity of service to adjacent parcels has been considered and easements provided 27 FW easements are exclusive. Crossings permitted only as necessary 28 Street ownership (VDOT or private) is shown 29 Water and sanitary sewer usage form is completed WATER 30 Project water system has been modeled 31 Air release has been evaluated and shown 32 FW's water infrastructure has been evaluated and can meet project demands 33 Water meter size(s) are shown 34 Fire line(s) to building show gate valve 10'-20' off building with ownership line, valve is the end of FW ownership 35 Double detector size and location is shown 36 Water segments are labeled on plan and profile 37 Sanitary sewer crossings are shown under water lines with min. 18" separation 38 Sanitary lateral crossings have lot number and elevation shown on profile 39 All crossings are labeled including min. 18" separation 40 Connection to exsiting lines are labeled and include party responsible for field connection 41 Special conditions; service disruption, by pass piping, etc. is clearly detailed 42 Existing and proposed line diameters, pipe types etc. are shown 43 Water lines shall be CL 52 DIP 44 Water lines under permeable pavers should be minimized 45 Bollards around fire hydrants in truck and other vulnerable areas are shown 46 Applicable FW detail drawings are included 47 Restrained joints in fill areas and 20' onto original ground are reflected Revised 1/4/18 Frederick Water Plan Review Checklist Page 2 of 4 48 Existing FW laterals, services, main stubs etc unutilized are shown with details for disconnection and removal 49 Protectus 3 meter including size, is shown for private underground fire lines 50 Fire lines are shown as CL 52 DIP and restrained 51 Pipe types are shown on plan and profile for all segments 52 Valves are shown on all branches of tees, crosses, wyes etc. 53 Minumum 25' pre blast is shown for main line stubs 54 Air release and vacuum breaker valves have been evaluated and shown 55 Appropriate FW detail drawings are included 56 Virginia Department of Health's Project Summary Report is completed and included, see http://www.vdh.virginia.gov/content/uploads/sites/14/20 16/04/General-Permit-Project-Summary-Report.pdf SANITARY SEWER 57 Project sanitary sewer system has been modeled 58 FW's sanitary sewer infrastructure has been evaluated and can meet project demands 59 Manhole rim elevations are shown 60 Sewer segments are labeled on plan and profile 61 Water line crossings are shown above sewer min. 18" separation 62 All crossings are labeled including min. 18" separation 63 Connection points are labeled and identify party performing connection 64 Special conditions; service disruption, by pass piping, etc. is clearly detailed 65 Line diameters, pipe types etc. are shown 66 Sewer lines under permeable pavers should be minimized 67 Applicable FW detail drawings are included 68 Existing FW laterals, services, main stubs etc unutilized are shown with details for disconnection and removal 69 Restrained joints in fill areas and 20' onto original ground are reflected 70 Drop connections are noted on plans and profiles 71 Multiple inside drop connections into same manhole have been evaluated and larger manhole is identified 72 Manholes larger than 4' in diameter are labeled 73 Deep sewer laterals are noted on plans and profiles 74 Pipe types are shown on plan and profile for all segments 75 Minumum 25' pre blast is shown for main line stubs Revised 1/4/18 Frederick Water Plan Review Checklist Page 3 of 4 76 Air release and vacuum breaker valves have been evaluated and shown 77 Appropriate FW detail drawings are included SANITARY SEWER PUMP STATIONS 78 Show all proposed site improvements. 79 Pump station wet well accessible by vactor truck 80 Personnel door accessible to full size pick up truck (suction lift pumps only) 81 Show and label existing contours. 82 Show and label final contours. 83 Show proposed utilities, including electrical, telephone services information 84 Show transformer and generator location and dimensions 85 Provide 100-year floodplain elevation and note on PS plan 86 Fence is shown on property line 87 Gently sloping minimum 3' gravel outside fence perimeter 88 Surface water is directed away from pump station lot 89 Paving and stone areas are labeled 90 Gate size is shown and post is min. 1' off pavement 91 Access road provides heavy truck access and slopes no greater than 10 % 92 Station information sheets are complete including interim and buildout as applicable 93 Appropriate FW detail drawings are included 94 95 96 97 98 99 100 101 102 103 104 105 Revised 1/4/18 Frederick Water Plan Review Checklist Page 4 of 4