HomeMy WebLinkAbout48-25 Checklist - Frederick WaterREVIEW CHECKLIST
FREDERICK WATER
Subdivision/Site Plan Name:
Design Professional Name:
Design Professional Phone:
Tax Map (PIN):
Submission Date:
Submission Number:
O.K.
O Incomplete
N Not Applicable
X Unacceptable
GENERAL
1 Owner's and Developer's contact information
2 Magisterial district, tax map; and address if applicable
3 Utility contact information
4 North arrow on all plan sheets
5 Scale references on all plan sheets
6 Current FW Standards and Specifications have been
reviewed for compliance at www.FW-water.com
7 Current FW construction notes are on plans
8 All existing easements are shown including deed book
& page or instrument number
9 Vicinity map
10 General layout sheet
11 Current existing water and sanitary sewer infrastructure
is shown and described
12 Required onsite FW easements are identified
13 Required off site FW easements are identified
14 Note has been added to landscape drawings that no
trees or shrubs shall be placed on FW easements
15 Project Acceptance Requirements per FW standards
(page 4) have been considered in project phasing
16 Existing site conditions are shown and labeled ie. ex.
structures, utilities etc.
17
Master development plan reviewed for compliance and
MDP #, date included. Any variiance from MDP water or
sewer requirements is explained Design ProfessionalNOTES
This checklist is to be completed by the Design Professional and
submitted with the Site Plan.
REQUIREMENTS
Review Key
1st ReviewRevised 1/4/18 Frederick Water Plan Review Checklist Page 1 of 4
18 Proffer statement reviewed for compliance and copy
included
19 Exceptions to FW requirements are described
20 Length of water and sewer lines on private property to
be owned by FW kept to minimum
21 Lot numbers, building numbers and street names are
shown on all sheets
22 All plan sheets have been reconciled to reflect the
same information
23 Existing FW infrastucture requiring field adjustment
where grade changes occur has been shown
24
Existing FW facilities to be removed or abandoned are
noted accordingly. Significant items, fire hydrants,
valves etc. are noted to be furnished to FW inspector
25 Ownership of existing and proposed, water and sanitary
sewer is labeled
26 Continutity of service to adjacent parcels has been
considered and easements provided
27 FW easements are exclusive. Crossings permitted only
as necessary
28 Street ownership (VDOT or private) is shown
29 Water and sanitary sewer usage form is completed
WATER
30 Project water system has been modeled
31 Air release has been evaluated and shown
32 FW's water infrastructure has been evaluated and can
meet project demands
33 Water meter size(s) are shown
34
Fire line(s) to building show gate valve 10'-20' off
building with ownership line, valve is the end of FW
ownership
35 Double detector size and location is shown
36 Water segments are labeled on plan and profile
37 Sanitary sewer crossings are shown under water lines
with min. 18" separation
38 Sanitary lateral crossings have lot number and
elevation shown on profile
39 All crossings are labeled including min. 18" separation
40 Connection to exsiting lines are labeled and include
party responsible for field connection
41 Special conditions; service disruption, by pass piping,
etc. is clearly detailed
42 Existing and proposed line diameters, pipe types etc.
are shown
43 Water lines shall be CL 52 DIP
44 Water lines under permeable pavers should be
minimized
45 Bollards around fire hydrants in truck and other
vulnerable areas are shown
46 Applicable FW detail drawings are included
47 Restrained joints in fill areas and 20' onto original
ground are reflected
Revised 1/4/18 Frederick Water Plan Review Checklist Page 2 of 4
48 Existing FW laterals, services, main stubs etc unutilized
are shown with details for disconnection and removal
49 Protectus 3 meter including size, is shown for private
underground fire lines
50 Fire lines are shown as CL 52 DIP and restrained
51 Pipe types are shown on plan and profile for all
segments
52 Valves are shown on all branches of tees, crosses,
wyes etc.
53 Minumum 25' pre blast is shown for main line stubs
54 Air release and vacuum breaker valves have been
evaluated and shown
55 Appropriate FW detail drawings are included
56
Virginia Department of Health's Project Summary
Report is completed and included, see
http://www.vdh.virginia.gov/content/uploads/sites/14/20
16/04/General-Permit-Project-Summary-Report.pdf
SANITARY SEWER
57 Project sanitary sewer system has been modeled
58 FW's sanitary sewer infrastructure has been evaluated
and can meet project demands
59 Manhole rim elevations are shown
60 Sewer segments are labeled on plan and profile
61 Water line crossings are shown above sewer min. 18"
separation
62 All crossings are labeled including min. 18" separation
63 Connection points are labeled and identify party
performing connection
64 Special conditions; service disruption, by pass piping,
etc. is clearly detailed
65 Line diameters, pipe types etc. are shown
66 Sewer lines under permeable pavers should be
minimized
67 Applicable FW detail drawings are included
68 Existing FW laterals, services, main stubs etc unutilized
are shown with details for disconnection and removal
69 Restrained joints in fill areas and 20' onto original
ground are reflected
70 Drop connections are noted on plans and profiles
71 Multiple inside drop connections into same manhole
have been evaluated and larger manhole is identified
72 Manholes larger than 4' in diameter are labeled
73 Deep sewer laterals are noted on plans and profiles
74 Pipe types are shown on plan and profile for all
segments
75 Minumum 25' pre blast is shown for main line stubs
Revised 1/4/18 Frederick Water Plan Review Checklist Page 3 of 4
76 Air release and vacuum breaker valves have been
evaluated and shown
77 Appropriate FW detail drawings are included
SANITARY SEWER PUMP STATIONS
78 Show all proposed site improvements.
79 Pump station wet well accessible by vactor truck
80 Personnel door accessible to full size pick up truck
(suction lift pumps only)
81 Show and label existing contours.
82 Show and label final contours.
83 Show proposed utilities, including electrical, telephone
services information
84 Show transformer and generator location and
dimensions
85 Provide 100-year floodplain elevation and note on PS
plan
86 Fence is shown on property line
87 Gently sloping minimum 3' gravel outside fence
perimeter
88 Surface water is directed away from pump station lot
89 Paving and stone areas are labeled
90 Gate size is shown and post is min. 1' off pavement
91 Access road provides heavy truck access and slopes
no greater than 10 %
92 Station information sheets are complete including
interim and buildout as applicable
93 Appropriate FW detail drawings are included
94
95
96
97
98
99
100
101
102
103
104
105
Revised 1/4/18 Frederick Water Plan Review Checklist Page 4 of 4