Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
48-25 - Firestone Complete Auto Care Frederick Water
This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.DATEAS SHOWNCHECKED BYSCALEDESIGNED BYDRAWN BYKHA PROJECT 2025 KIMLEY-HORN AND ASSOCIATES, INC.11400 COMMERCE PARK DR., SUITE 400, RESTON, VA 20191PHONE: 703-674-1300 FAX: 703-674-1350WWW.KIMLEY-HORN.COM10/31/2025111125000JMHPESHRTVIRGINIAFREDERICK COUNTYFIRESTONE COMPLETEAUTO CAREPREPARED FOR=AREMBA GROUP, LLCCOVER SHEETC00 SITE PLAN SP#XX-XX FIRESTONE COMPLETE AUTO CARE STONEWALL MAGISTERIAL DISTRICT TAX PARCEL 43-A-100F CORNER OF MARKET STREET AND MERCHANT STREET INTERSECTION WINCHESTER, FREDERICK COUNTY, VA 10/31/2025 KIMLEY-HORN AND ASSOCIATES, INC. 11400 COMMERCE PARK DRIVE, SUITE 400 RESTON, VA 20191 PHONE: 202-350-32 CONTACT: HEATHER TIMOTHY EMAIL: HEATHER.TIMOTHY#KIMLEY-HORN.COM APPLICANT =AREMBA GROUP, LLC 14600 DETROIT AVE, SUITE 1500, LAKEWOOD, OH 44107 PHONE: 216-221-2163 CONTACT: TODD HAMULA EMAIL: THAMULA#=AREMBAGROUP.COM LAND OWNER RUTHERFORD FARM, LLC 230 LEESBURG PIKE SUITE 620 VIENNA VA 2212 PHONE: 703-44-4312 CIVIL ENGINEER VICINITY MAP - PROJECT BOUNDARIES 1 500 SITE FREDERICK COUNTY SITE PLAN STATISTICS APPLICANT =AREMBA GROUP, LLC DEVELOPER =AREMBA GROUP, LLC TAX PARCEL ID 43-A-100F MAGISTERIAL DISTRICT STONEWALL EXISTING AND PROPOSED =ONING B3 EXISTING USE VACANT LOT PROPOSED USE AUTOMOBILE SERVICE SITE DATA: PROPERTY AREA 2.9553 AC PROJECT AREA 2.9553 AC DISTURBED AREA 1.1746 AC TOTAL IMPERVIOUS AREA 0.696 AC FRONT BUILDING SETBACK 35 FEET FRONT LANDSCAPE BUFFER 10 FEET PARKING RE4UIRED SERVICE BAYS: 2 SPACES PER BAY OFFICE 5,766 SF: 1 SPACE1/250SF 23 SPACES RETAIL 41 SF 1 SPACE1/200SF 5 SPACES ADA 2 SPACES PARKING PROVIDED 32 PARKING SPOTS PROVIDED 30 STANDARD, 2 ADA 1 LOADING SPACE PERCENTAGE OF PROPERTY LANDSCAPED 14.39 PERCENTAGE OF WOODLANDS DISTURBED 0 INTERIOR LANDSCAPING RE4UIRED 1130 SF INTERIOR LANDSCAPING PROVIDED 1134 SF MINIMUM PERIMETER TREES RE4UIRED 17 MINIMUM PERIMETER TREES PROVIDED 17 MINIMUM PERIMETER SHRUBS RE4UIRED 30 MINIMUM PERIMETER SHRUBS PROPOSED 30 PERMITS NAME PERMIT NUMBER DATE STATUS PERMIT APPROVAL BLOCK LAND DEVELOPMENT APPLICATION NUMBER BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB =ONING ADMINISTRATOR BBBBBBBBBBBBBBBBBBB DATE APPROVED BY THE FREDERICK COUNTY =ONING ADMINISTRATOR SITE PLAN VALID FOR FIVE 5 YEARS FROM APPROVAL DATE UTILITIES ELECTRIC: RAPPAHANNOCK ELECTRIC COOPERATIVE 137 KELLEY COURT FRONT ROYAL, VA 22630 CONTACT: 540-622-2001 GAS: WASHINGTON GAS P.O. BOX 2400 WINCHESTER, VA 22604 CONTACT: 540-69-1111 WATER/SEWER: FREDERICK WATER PO. BOX 177 WINCHESTER, VA 22604 540-6-1061 PHONE: VERI=ON 404 HILLSDALE LANE WINCHESTER, VA 22602 540-665-3156 DEVELOPER =AREMBA GROUP, LLC 14600 DETROIT AVE, SUITE 1500, LAKEWOOD, OH 44107 PHONE: 216-221-2163 CONTACT: TODD HAMULA EMAIL: THAMULA#=AREMBAGROUP.COM SITE PROJECT DESCRIPTION NARRATIVE THE PROPOSED PROJECT IS FOR A 6,607 SF AUTO CARE CENTER. THE SITE IS CURRENTLY VACANT AND IS =ONED B-3 - INDUSTRIAL TRANSITION DISTRICT. THE PROPOSED IMPROVEMENTS WILL CONSIST OF PAVING, UTILITIES, AND LANDSCAPING. PLEASE REFERENCE THE APPROVED RUTHERFORD CROSSING SITE PLAN 55-07 AND ORIGINAL SITE PLAN 13-07 , APPROVED MASTER SITE PLAN 14-06, AND RE=ONING 17-06 FOR FULL PROFFERS. BUILDING AREAS TYPE AREA (S.F.) SHOWROOM AREA RETAIL 41 SERVICE AREA OFFICE 3,517 INVENTORY AREA OFFICE 1,34 ACCESSORY USE AREAS OFFICE 415 TOTAL BUILDING 6,607 SHEET INDEX SHEET NUMBER SHEET TITLE C00 COVER SHEET C01 SITE PLAN C01.1 FIRE SAFETY PLAN C02 DEMOLITION PLAN C03 GRADING DRAINAGE PLAN C03.1 DRAINAGE AREA MAP C03.2 STORMWATER MANAGEMENT NARRATIVE C04 EROSION SEDIMENT CONTROL PLAN C04.1 EROSION SEDIMENT CONTROL NOTES DETAILS C05 UTILITY PLAN C05.1 DRAINAGE UTILITY PROFILES C07 LANDSCAPE PLAN C07.1 LANDSCAPE NOTES DETAILS C07.2 IRRIGATION PLAN C09 SITE DETAILS 1 OF 2 C10 SITE DETAILS 2 OF 2 C11 PROFFERS 1 OF 2 C12 PROFFERS 2 OF 2 ALTA 1 ALTA SURVEY PSL 1 LIGHTING PLAN FLOOR AREA RATIO: ALLOWED - 1.0 PROPOSED - 6,607 / 12,733 SF 0.05 RESPONSIBLE LAND DISTURBER CERTIFICATE RDL #: _______________________________ NAME: _______________________________ TELEPHONE NUMBER: _________________ FREDERICK WATER REVIEW NUMBER ______________ APPROVED APPROVED AS NOTED CORRECT & RESUBMIT __________ ITEMS TO CORRECT REVIEWER DATE__________________________________ 1 29 Earl Wiley 4 November 20, 2025 WWW W W W W W W W W W WWWWWWWWWWWW W W W W W STOP STOPSTOP 19 7 LODLODLODLODLODLODLODLOD LOD LOD LOD LOD LOD LODLODLODLODLODLODLODLODLODLOD4 FIRESTONE BUILDING ER PROTOTYPE HEIGHT 25.5 6,607 SF TRAS H ENCL OS U R E USE D TI R E ENCL O S U R E R10 R 1 0 20.0 TYP.9.0 TYP. .00 3.00 PROPOSED 24X24 STOP SIGN R1-1 24.0 PROPOSED ADA PARKING SIGN 24.0 LIMITS OF PROPOSED CONCRETE PAVING TIE TO EXISTING PAVEMENT, CURB, AND GUTTER LIMITS OF PROPOSED CONCRETE PAVING TIE TO EXISTING PAVEMENT, CURB, AND GUTTER LIMITS OF PROPOSED CONCRETE PAVING TIE TO EXISTING PAVEMENT, CURB, AND GUTTER LIMITS OF PROPOSED CONCRETE PAVING TIE TO EXISTING PAVEMENT, CURB, AND GUTTER 131.3 51.7 46.0 PROPOSED 3 CURB FLUME R12 .00 TYP.24.0 R5 R 5 R10 R 1 0 R 5 R10 R10 R 5 R5 PROPOSED MONUMENT SIGN - SEE ARCHITECTURE PLANS R5 R3 0 R25 5.00 R3 R 3 10.0 CONNECT TO EXISTING SIDEWALK CG-12 TYPE B RAMP15.0 PROPOSED 24X24 STOP SIGN R1-1 PROPOSED 24X24 STOP SIGN R1-1 PROPOSED 24X24 STOP SIGN R1-1 R 1 0 VAN LOADING SIGN CG-12 TYPE B RAMP CG-12 TYPE B RAMP CG-12 TYPE B RAMP 34.7 34. 30. CG-12 TYPE B RAMP 12 X45 LOADING SPACE24.0 PROPOSED STOP BAR - SEE NOTE 4 EXISTING BOLLARDS TO BE REPAINTEDSEE ARCHITECTURAL PLANS PROPOSED CROSSWALK PROPOSED CROSSWALK LEGEND LOD PROPERTY LINE PROPOSED LIMITS OF DISTURBANCE PROPOSED VDOT CG-6 PARKING COUNT 1.FOR ALL PAVEMENT MATERIAL SPECIFICATION SEE SHEET C09. 2.ALL DIMENSIONS TO THE FACE OF THE CURB, UNLESS NOTES AS OTHERWISE. 3.PARKING SPACE STRIPING TO BE 4 WIDE WITH 2 COATS OF WHITE REFLECTIVE TRAFFIC PAINT. 4.STOP BAR STRIPING TO BE 24 WIDE SPACES AT 5 OFF CENTER WITH 2 COATS OF WHITE REFLECTIVE TRAFFIC PAINT. 5.ANY EXISTING OR PROPOSED UTILITY STRUCTURE TOP THAT WILL BE IN THE PAVED SIDEWALK OR TRAIL SHALL BE ADA COMPLIANT. 6. ALL ACCESSIBLE PARKING STALLS SHALL HAVE SIGNAGE INSTALLED PER DETAIL ON SHEET C09. 7.ALL PAVING AND EARTHWORK OPERATIONS SHALL CONFORM TO THE RECOMMENDATION OF THE GEOTECHNICAL REPORT. .CONTRACTOR TO PERFORM REPAIRS ON EXISTING ASPHALT PAVEMENT AS NEEDED DURING CONSTRUCTION. XX PROPOSED FIRE LANE SIGN SEE SHEET C-210 GENERAL NOTES CONCRETE PAVEMENT SEE SHEET C09 HEAVY DUTY CONCRETE PAVEMENT SEE SHEET C09 CONCRETE SIDEWALK SITE BOLLARD SEE SHEET C09 PROPOSED SIGN LIGHT POLE WALL MOUNTED LIGHT PROPOSED VDOT STANDARD 6 CURB This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.DATEAS SHOWNCHECKED BYSCALEDESIGNED BYDRAWN BYKHA PROJECT 2025 KIMLEY-HORN AND ASSOCIATES, INC.CALL "MISS UTILITY" 811 11400 COMMERCE PARK DR., SUITE 400, RESTON, VA 20191PHONE: 703-674-1300 FAX: 703-674-1350WWW.KIMLEY-HORN.COM10/31/2025111125000JMHPESHRTVIRGINIAFREDERICK COUNTYFIRESTONE COMPLETEAUTO CAREPREPARED FOR=AREMBA GROUP, LLCNORTH SITE PLANC01 WWW W W W W W W W W W WWWWWT WWWWWWW W W W W W STOP STOPSTOPEETT T T T T T T T E E E E E E T T TEE TTTTTT TTTTTT PROPOSED FIRE LANE SIGN TYPE D PROPOSED FIRE LANE SIGN TYPE A PROPOSED FIRE LANE SIGN TYPE C MOUNT TO STOP SIGN POLE PROPOSED FIRE LANE SIGN TYPE C PROPOSED FIRE LANE SIGN TYPE A PROPOSED FIRE LANE SIGN TYPE C MOUNT TO STOP SIGN POLE PROPOSED FIRE LANE SIGN TYPE A PROPOSED FIRE LANE STRIPING PROPOSED FIRE LANE STRIPING PROPOSED FIRE LANE STRIPING FIRESTONE BUILDING 6,607 SF TRAS H ENCL OS U R E USE D TI R E ENCL O S U RE PROPOSED FIRE LANE SIGN TYPE A PROPOSED FIRE LANE STRIPING PROPOSED FIRE LANE SIGN TYPE C 227 LINEAR FEET OFFIRE HYDRANT COVER26 LIN E A R F E E T O F FIRE HY D R A N T C O V E R LEGEND LOD PROPERTY LINE PROPOSED LIMITS OF DISTURBANCE PROPOSED VDOT CG-6 PROPOSED FIRE LANE STRIPING PROPOSED FIRE LANE SIGN SEE SHEET C-210This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.DATEAS SHOWNCHECKED BYSCALEDESIGNED BYDRAWN BYKHA PROJECT 2025 KIMLEY-HORN AND ASSOCIATES, INC.CALL "MISS UTILITY" 811 11400 COMMERCE PARK DR., SUITE 400, RESTON, VA 20191PHONE: 703-674-1300 FAX: 703-674-1350WWW.KIMLEY-HORN.COM10/31/2025111125000JMHPESHRTVIRGINIAFREDERICK COUNTYFIRESTONE COMPLETEAUTO CAREPREPARED FOR=AREMBA GROUP, LLCNORTH FIRE SAFETY PLANC01.1 WWW W W W W W W W W W WWWWWT WWWWWWW W W W W W STOP STOPSTOPEETT T T T T T T T E E E E E E T T TEE TTTTTT TTTTTT LODLODLODLODLODLODLODLOD LOD LOD LOD LOD LOD LODLODLODLODLODLODLODLODLODLODEXISTING FIRE HYDRANT AND BOLLARDS TO BE REMOVED. REMOVE PIPE UP TO THE MAIN, THEN CUT AND CAP. EXISTING LIGHT POLE TO BE REMOVED. REMOVE/ CAP EXISTING WIRING REMOVE EXISTING CURB INLET TOP AND REPLACE WITH GRATE INLET. REFERENCE SHEET C-300. EXISTING LIGHT POLE TO BE REMOVED. REMOVE/ CAP EXISTING WIRING EXISTING SANITARY SEWER CLEAN OUT TO BE REMOVED TO ESTABLISH NEW SEWER SERVICE. REFERENCE SHEET C-500. EXISTING ELECTRICAL E4UIPMENT TO REMAIN AND BE PROTECTED CONTRACTOR TO TEST PIT EXISTING TELEPHONE AND ELECTRIC CONDUITS PRIOR TO INSTALLATION. NOTIFY ENGINEER IF CONDUIT DEPTH CONFLICTS WITH PROPOSED GRADING OPERATIONS EXISTING FIRE HYDRANT TO REMAIN AND BE PROTECTED DURING CONSTRUCTION EXISTING FLUSHING ASSEMBLY TO BE REMOVED. REMOVE PIPE UP TO THE MAIN THEN CUT AND CAP. EXISTING CURB TO BE DEMOLISHED EXISTING HEDGE TO BE REMOVED IN IMMEDIATE VICINITY OF NEW SIDEWALK EXISTING HEDGE TO BE REMOVED IN IMMEDIATE VICINITY OF NEW SIDEWALK EXISTING SHRUBS AND VEGETATION TO BE REMOVED LEGEND LOD PROPERTY LINE PROPOSED LIMITS OF DISTURBANCE EXISTING BOLLARD EXISTING LIGHT POLE EXISTING HYDRANT EXISTING SANITARY CLEANOUT 1.THE CONTRACTOR IS TO COORDINATE THE REMOVAL/ABANDONMENT OF ALL UTILITIES WITH THE RESPECTIVE UTILITY COMPANIES. 2.ALL DEBRIS FROM THE DEMOLISHED STRUCTURES THAT IS NOT REUSED AS FILL IS TO BE DISPOSED OF ACCORDING TO ALL APPLICABLE STANDARDS. DEMOLISHED MATERIALS REUSED AS FILL MATERIAL SHALL BE IN PER THE DIRECTION OF THE SOILS ENGINEER. 3.CONTRACTOR TO HIRE CONSULTANT TO INSPECT ALL EXISTING UTILITIES THAT ARE TO REMAIN. FINDINGS ARE TO BE SUBMITTED TO THE DESIGN ENGINEER PRIOR TO CONSTRUCTION OR ORDERING SO THAT A DETERMINATION CAN BE MADE AS TO THE CONDITION OF THE EXISTING LINES. ANY UTILITIES THAT ARE IN MARGINAL CONDITION WILL NEED TO BE REPLACED. 4.ALL TEST PITS LOCATING THE EXISTING UTILITIES ARE TO BE COMPLETED PRIOR TO CONSTRUCTION OR ORDERING. 5.CONTRACTOR TO HAVE ALL UTILITIES FIELD MARKED AND THEN LOCATED BY THE SURVEYOR. ALL LOCATIONS ARE TO BE REPORTED TO THE DESIGN ENGINEER PRIOR TO CONSTRUCTION OR ORDERING. 6.ALL DEMOLITION IS TO BE PERFORMED IN STRICT CONFORMANCE WITH ALL APPLICABLE COUNTY STATE AND/OR OTHER GOVERNING BODIES STANDARDS. 7.DURING DEMOLITION, ANY HA=ARDOUS MATERIAL, SUCH AS ASBESTOS, SHALL BE REMOVED AND REMEDIATED IN ACCORDANCE WITH THE VIRGINIA DEPARTMENT OF ENVIRONMENTAL 4UALITY VDE4 STANDARDS AND ALL OTHER APPLICABLE STANDARDS. .THE REMOVAL AND/OR ABANDONMENT OF ANY SUBSURFACE STRUCTURES, INCLUDING STORAGE TANKS, MANHOLES AND PIPES, SHALL BE DONE IN ACCORDANCE WITH ALL APPLICABLE STANDARDS. 9.CONTRACTOR TO LOCATE GAS LINE PRIOR TO WORKING IN THIS AREA AND SHALL NOTIFY KIMLEY-HORN AND WASHINGTON GAS CO TO COORDINATE REMOVAL. 10.WATER AND SEWER DEMOLITION, PATCHING, ADJUSTMENTS ETC. SHALL BE PER FREDERICK WATER FW INSPECTOR S RE4UIREMENTS. EXISTING FW MATERIALS REMOVED SHALL BE FURNISHED TO FW INSPECTOR AS RE4UIRED AND NOT REUSED. 11.ALL EXISTING WATER, SEWER, AND STORM EASEMENTS RECORDED IN INSTRUMENT XXXX. 12.CONTRACTOR TO REMOVE AND REPLACE HEDGES AS NEEDED TO CONSTRUCT INLET IMPROVEMENTS. DEMOLITION NOTES EXISTING FEATURE TO BE REMOVED This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.DATEAS SHOWNCHECKED BYSCALEDESIGNED BYDRAWN BYKHA PROJECT 2025 KIMLEY-HORN AND ASSOCIATES, INC.CALL "MISS UTILITY" 811 11400 COMMERCE PARK DR., SUITE 400, RESTON, VA 20191PHONE: 703-674-1300 FAX: 703-674-1350WWW.KIMLEY-HORN.COM10/31/2025111125000JMHPESHRTVIRGINIAFREDERICK COUNTYFIRESTONE COMPLETEAUTO CAREPREPARED FOR=AREMBA GROUP, LLCNORTH DEMOLITION PLANC02 REMOVE GATE VALVE AND INSTALL MJ PLUG IN TEE CONTRACTOR SHALL COORDINATE WATER MAIN SHUT DOWN WITH THE FREDERICK WATER INSPECTOR, SEE NOTES SHOW AND LABEL THE REMAINING WATER MAIN VERIFY THE EXISTING WATER AND SANITARY SEWER ARE SHOWN PER MISS UTILITY DESIGNER LOCATE AND SURVEY CAPTURE OF MARKS VERIFY THAT RECORDED EASEMENTS ARE GENERALLY PROVIDED FOR THE EXISTING WATER AND SANITARY SEWER PER STANDARD PRACTICE AND REFLECT PROPOSED FREDERICK WATER EASEMENTS IF NECESSARY 1 2 3 4 5 6 WATER MAIN CONNECTION/DISCONNECTION NOTES: CONTRACTOR SHALL, AS APPLICABLE: 1.TEST PIT EXISTING MAIN(S) PERFORM TEST PITTING OF THE EXISTING MAIN(S) IN ACCORDANCE WITH THE REQUIREMENTS OF THE FREDERICK WATER INSPECTOR. 2.INSTALL JOINT RESTRAINTS INSTALL JOINT RESTRAINTS ON EXISTING MAIN(S) IN ACCORDANCE WITH CURRENT FREDERICK WATER REQUIREMENTS PRIOR TO SYSTEM SHUTDOWN. 3.MINIMIZE SHUTDOWN TIME PREPARE ALL WORK AS FAR IN ADVANCE AS POSSIBLE TO MINIMIZE WATER SYSTEM SHUTDOWN DURATION. 4.PROVIDE ADEQUATE RESOURCES ENSURE SUFFICIENT LABOR, EQUIPMENT, AND MATERIALS ARE AVAILABLE ON-SITE TO COMPLETE THE CONNECTION WORK PER THE FREDERICK WATER INSPECTOR’S REQUIREMENTS. 5.DEVELOP A SHUTDOWN PLAN SUBMIT A DETAILED WATER SHUTDOWN PLAN FOR REVIEW AND APPROVAL BY THE FREDERICK WATER INSPECTOR. PLAN MUST ADDRESS FIRE WATCH, NIGHT WORK, AND ANY OTHER SPECIAL CONDITIONS THAT MAY BE REQUIRED. 6.COORDINATE IN ADVANCE SCHEDULE THE SHUTDOWN WITH THE FREDERICK WATER INSPECTOR, FREDERICK COUNTY FIRE MARSHAL, AND ALL AFFECTED CUSTOMERS A MINIMUM OF SEVEN (7) DAYS IN ADVANCE. MAKE ALL NECESSARY PREPARATIONS TO MEET THE REQUIREMENTS OF EACH INVOLVED PARTY. STOP STOPSTOPLODLOD LODLODLODLODLODLOD LOD LOD LOD LOD LOD LODLODLODLODLODLODLODLODLODLODFIRESTONE BUILDING FFE 692.50 690 691692692 692.20 FL 692.17 FL A2 A1 A5A3 691 692692 6 9 2 692 6926926 9 2 692 6 HDPE ROOF DRAIN CONNECTION, INV 69.75 20 TRANSITION FROM FLUSH CURB TO 6 CURB FLUSH CURB A1A1A1 CONNECT WITH INSERTA-TEE A7 692.01 FL 692.03 FL 690.96 FL 691.09 FL 691.21 FL 690.73 FL 690.30 FL 691.7 FL 691.6 FL 691.11 FL 691.43 FL 691.76 FL 692.25 BW 692.54 BW 692.55 BW 692.25 BW 692.04 FL 691.40 FL 690.0 FL 691.7 FL 691.59 SW 691.42 SW 691.65 SW 691.76 SW 692.16 SW 692.21 SW 692.01 TC 691.30 HP 690.71 FL 691.0 FL 692.30 SW 690.45 FL 691.13 FL 692.03 FL 692.21 FL 692.72 FL 691.23 FL 690.64 FL 691.20 FL 691.60 FL 691.52 FL 691.60 FL 691.75 FL 690.0 FL 691.67 FL 690.64 FL 690.59 FL 690.70 FL 691.91 FL 691.25 LP 692.19 HP 12 LF OF 15 HDPE # 0.1 54 LF OF 12 HDPE # 0.1 6 LF OF 12 HDPE # 0.79 57 LF OF 6 HDPE # 0.79 692.02 FL 691.4 FL 692.45 HP 692.10 691.60 HP 691.26 HP 692.2 HP 692.40 HP3.463.453.4 4 1. 4 7 1.492.01 3.43 1.971.292.00 1.02 691.53 SW 691.46 SW 692.91 SW 692.9 SW 690.04 692.02692.02 691.12 LP 691.3 FL 69.31 LP 692.25 BC/TC 692.2 BC/TC OVERLAND RELIEF PATH OVERLAND RELIEF PATH 692.39 SW 692.47 SW LEGEND LOD PROPERTY LINE PROPOSED LIMITS OF DISTURBANCE EXISTING CONTOURS PROPOSED CONTOURS PROPOSED SLOPE PROPOSED SPOT ELEVATION SPOT ELEVATION LEGEND RIM RIM ELEVATION FFE FINISHED FLOOR ELEVATION TW TOP OF WALL BW BOTTOM OF WALL ME MATCH EXISTING LP LOW POINT HP HIGH POINT SW SIDEWALK PV PAVEMENT TD TOP OF DITCH BD BOTTOM OF DITCH TC TOP OF CURB BC BOTTOM OF CURB UNLABELED SPOT ELEVATIONS ARE ASSUMED TO BE AT THE FLOWLINE OR TOP OF PAVEMENT PROPOSED STORM MANHOLE PROPOSED STORM PIPE RIDGE GENERAL NOTES 1.CONTRACTOR TO MATCH EXISTING GRADE AT LIMITS OF DISTURBANCE. 2.CONTRACTOR TO COMPLY WITH GEOTECHNICAL REPORT RECOMMENDATIONS FOR COMPACTION AND SUB-BASE PREPARATION UNDER BUILDING PADS. 95 COMPACTION UNDER ALL OTHER AREAS UNLESS OTHERWISE SPECIFIED ON THESE PLANS OR WITHIN THE GEOTECHNICAL REPORT. 3.BEFORE USING ANY SECTION OF EXISTING STORM DRAIN AS PART OF THE PROPOSED STORM DRAINAGE SYSTEM, THE EXISTING PIPE SECTIONS NEED TO BE FLUSHED, INSPECTED, EVALUATED AND DEEMED IN GOOD CONDITION. 4.TC/BC ELEVATION DIFFERENCE TO BE 0.5 UNLESS OTHERWISE NOTED. 5.SEE SHEET C05.1 FOR PROFILE OF STORM PIPES. STRUCTURE TABLE STRUCTURE NAME: A1 A2 A3 A5 A7 DETAILS: VDOT DI-1 RIM: 69.30 INV IN: 65.60 VDOT DI-3C L 6 RIM: 691.3 INV IN: 67.33 INV OUT: 67.0 NYLOPLAST 24 BASIN SOLID COVER RIM: 692.34 INV IN: 67.7 INV OUT: 67.77 VDOT DI-3C L 6 RIM: 691.7 INV IN: 6.90 INV OUT: 6.40 2 45 BEND 1 6 CO RIM: 692.61 INV OUT: 69.35 PIPES IN: FROM A2, 15 HDPE INV IN: 65.60 # 0.1 FROM A3, 12 HDPE INV IN: 67.33 # 0.1 FROM A5, 12 HDPE INV IN: 67.7 # 0.79 FROM A7, 6 HDPE INV IN: 6.90 # 0.79 PIPES OUT TO A1, 15 HDPE INV OUT: 67.0 # 0.1 TO A2, 12 HDPE INV OUT: 67.77 # 0.1 TO A3, 12 HDPE INV OUT: 6.40 # 0.79 TO A5, 6 HDPE INV OUT: 69.35 # 0.79This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.DATEAS SHOWNCHECKED BYSCALEDESIGNED BYDRAWN BYKHA PROJECT 2025 KIMLEY-HORN AND ASSOCIATES, INC.CALL "MISS UTILITY" 811 11400 COMMERCE PARK DR., SUITE 400, RESTON, VA 20191PHONE: 703-674-1300 FAX: 703-674-1350WWW.KIMLEY-HORN.COM10/31/2025111125000JMHPESHRTVIRGINIAFREDERICK COUNTYFIRESTONE COMPLETEAUTO CAREPREPARED FOR=AREMBA GROUP, LLCNORTH GRADING DRAINAGE PLANC03 WWWWWWWW W W W W STOP STOPSTOPT T T T T T T E E E E E T TE TTTTT TTTT LODLODLODLODLODLODLODLOD LOD LOD LOD LOD LOD LODLODLODLODLODLODLODLODLODLODDA E2 0.55 AC CW 0.30 DA E3 0.20 AC CW 0.30 DA E5 0.14 AC CW 0.30 DA E1 0.21 AC CW 0.30 DA E4 0.06 AC CW 0.30 PRE OVERALL 1.16 AC CW 0.30 LEGEND LOD PROPERTY LINE PROPOSED LIMITS OF DISTURBANCE EXISTING CONTOURS PROPOSED CONTOURS IMPERVIOUS AREA DRAINAGE AREA BOUNDARY GENERAL NOTES 1.DRAINAGE AREAS ARE BASED ON THOSE IN THE RUTHERFORD CROSSING APPROVED PLAN SET DATED 10/11/2007. 1.1.SEE STORMWATER NARRATIVE ON SHEET C03.2 WT WWWWWWW W W W W STOP STOPTT T T T T T E E E E E T TEE TTTTT TTTTT LODLODLODLODLODLODLODLOD LOD LOD LOD LOD LOD LODLODLODLODLODLODLODLODLODLOD690 690 691 6916 9 2 692692 692 691 691LODLOD LODLODLODLODLODLOD LOD LOD LOD LOD LOD LODLODLODLODLODLODLODLODLODLODDA P2 0. AC CW 0.76 DA P5 0.02 AC CN 0.43 DA P1 0.17 AC CW 0.51 DA P4 0.03 AC CW 0.57 DA P3 0.06 AC CW 0.52 POST OVERALL 1.16 AC CW 0.70 This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.DATEAS SHOWNCHECKED BYSCALEDESIGNED BYDRAWN BYKHA PROJECT 2025 KIMLEY-HORN AND ASSOCIATES, INC.CALL "MISS UTILITY" 811 11400 COMMERCE PARK DR., SUITE 400, RESTON, VA 20191PHONE: 703-674-1300 FAX: 703-674-1350WWW.KIMLEY-HORN.COM10/31/2025111125000JMHPESHRTVIRGINIAFREDERICK COUNTYFIRESTONE COMPLETEAUTO CAREPREPARED FOR=AREMBA GROUP, LLCDRAINAGE AREA MAPC03.1NORTH PRE-DEVELOPMENT POST-DEVELOPMENT This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.DATEAS SHOWNCHECKED BYSCALEDESIGNED BYDRAWN BYKHA PROJECT 2025 KIMLEY-HORN AND ASSOCIATES, INC.CALL "MISS UTILITY" 811 11400 COMMERCE PARK DR., SUITE 400, RESTON, VA 20191PHONE: 703-674-1300 FAX: 703-674-1350WWW.KIMLEY-HORN.COM10/31/2025111125000JMHPESHRTVIRGINIAFREDERICK COUNTYFIRESTONE COMPLETEAUTO CAREPREPARED FOR=AREMBA GROUP, LLCSTORMWATERMANAGEMENTNARRATIVEC03.2 STORMWATER MANAGEMENT NARRATIVE STORMWATER MANAGEMENT FOR THE RUTHERFORD CROSSING SHOPPING CENTER IS PROVIDED BY A WET SWALE NORTH OF THE PROPERTY. COUNTY STAFF HAS INDICATED THAT CHANNEL AND FLOOD PROTECTION FOR THIS PROJECT WILL BE MET AS LONG AS THE DISTURBED AREA INCLUDES LESS IMPERVIOUS COVER THAN ORIGINALLY DESIGNED IN THE RUTHERFORD CROSSING SITE PLAN DATED OCTOBER 11, 2007. THE ORIGINAL PLANS ASSUMED A RATIONAL COEFFICIENT OF 0. FOR THE DISTURBED AREA, WHILE THIS APPLICATION PROPOSES 0.70 SEE SHEET C03.1. GIVEN THAT THIS IS LESS THAN DESIGNED, CHANNEL AND FLOOD PROTECTION RE4UIREMENTS ARE CONSIDERED MET. WATER QUALITY NARRATIVE THE PROPOSED DEVELOPMENT FLOWS EXCLUSIVELY TO THE DRAINAGE SYSTEM THAT IS PART OF THE SITE PLAN FOR RUTHERFORD CROSSING, DATED 10/11/2007. THE PROJECT WILL RE4UIRE A PHOSPHOROUS LOAD REDUCTION OF 0.65 LB/YR CALCULATED USING THE NEW DEVELOPMENT VIRGINIA RUNOFF REDUCTION METHOD COMPLIANCE SPREADSHEET - VERSION 4.1. A PORTION OF THE SITE WILL BE TREATED USING AN EXISTING WET SWALE FROM THE SITE PLAN FOR RUTHERFORD CROSSING, 0.19 LB/YR OR 29. THE REMAINING 0.46 LB/YR OF RE4UIRED PHOSPHOROUS REDUCTION IS ACHIEVED THROUGH PURCHASE OF NUTRIENTS CREDITS. VIRGINIA RUNOFF REDUCTION CALCULATIONS WWW W W W W W W W W W WWWWWT WWWWWWW W W W W W STOP STOPSTOPEETT T T T T T T T E E E E E E T T TEE TTTTTT TTTTTT 690 690 691 6916 9 2 692692 692 691 691LODLOD LODLODLODLODLODLOD LOD LOD LOD LOD LOD LODLODLODLODLODLODLODLODLODLODSFSFSFSFSF SF SF SF SF SF IP PROPOSED SILT SOCK CONTRACTOR MAY REVISE CONSTRUCTION ENTRANCE LOCATION ELSEWHERE WITHIN THE PAD AT THE APPROVAL OF THE INSPECTOR SFSF SF SF SF CE CONTRACTOR TO INSTALL SILT FENCE ALONG PERIMETER OF PROPERTY AT CONSTRUCTION COMMENCEMENT. SILT FENCE TO BE REMOVED AS APPROPRIATE DURING FINE GRADING. IP IP IP SF FIRESTONE BUILDING ER PROTOTYPE 6,607 SF LEGEND LOD PROPERTY LINE PROPOSED LIMITS OF DISTURBANCE EXISTING CONTOURS SF PROPOSED SILT FENCE CONSTRUCTION ENTRANCE GENERAL NOTES 1.EROSION AND SEDIMENT CONTROL MEASURES TO REMAIN IN PLACE THROUGHOUT CONSTRUCTION. 2.EROSION CONTROL MEASURES ARE SHOWN OFFSET FROM THE LIMITS OF DISTURBANCE FOR CLARITY 3.REFER TO SHEET C04.1 FOR ESC NOTES AND SUGGESTED SE4UENCE OF CONSTRUCTION. SF CE PROPOSED INLET PROTECTIONIP This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.DATEAS SHOWNCHECKED BYSCALEDESIGNED BYDRAWN BYKHA PROJECT 2025 KIMLEY-HORN AND ASSOCIATES, INC.CALL "MISS UTILITY" 811 11400 COMMERCE PARK DR., SUITE 400, RESTON, VA 20191PHONE: 703-674-1300 FAX: 703-674-1350WWW.KIMLEY-HORN.COM10/31/2025111125000JMHPESHRTVIRGINIAFREDERICK COUNTYFIRESTONE COMPLETEAUTO CAREPREPARED FOR=AREMBA GROUP, LLCNORTH EROSION SEDIMENT CONTROLPLANC04 This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.DATEAS SHOWNCHECKED BYSCALEDESIGNED BYDRAWN BYKHA PROJECT 2025 KIMLEY-HORN AND ASSOCIATES, INC.CALL "MISS UTILITY" 811 11400 COMMERCE PARK DR., SUITE 400, RESTON, VA 20191PHONE: 703-674-1300 FAX: 703-674-1350WWW.KIMLEY-HORN.COM10/31/2025111125000JMHPESHRTVIRGINIAFREDERICK COUNTYFIRESTONE COMPLETEAUTO CAREPREPARED FOR=AREMBA GROUP, LLCEROSION SEDIMENT CONTROLNOTES DETAILSC04.1 SUGGESTED SE4UENCE OF CONSTRUCTION 1.CONTRACTOR TO OBTAIN ALL APPLICABLE PERMITS PRIOR TO COMMENCEMENT OF LAND DISTURBANCE ACTIVITIES. COPIES OF OBTAINED PERMITS ARE TO BE FILED WITH FREDERICK COUNTY. 2.CONTRACTOR TO STAKE OUT LIMITS OF DISTURBANCE. 3.UPON WRITTEN APPROVAL FROM INSPECTOR INSTALL SITE SEDIMENT CONTROLS AS SHOWN ON THE PLAN. NO CLEARING OR GRADING IS TO BE DONE EXCEPT WHERE NECESSARY FOR THE INSTALLATION OF PERIMETER SEDIMENT CONTROLS. MARK ALL PROTECTED AREAS PRIOR TO LAND DISTURBING ACTIVITY. 4.INSTALL SILT FENCE AS NOTED ON THE PLANS. 5.DEMOLISH AND REMOVE ALL FEATURES AS SHOWN ON THE DEMOLITION PLAN SHEET. HAUL DEBRIS TO AN APPROVED SITE. 4.BEGIN CLEARING AND ROUGH GRADING. 5.ANY DISTURBED AREAS THAT WILL REMAIN DORMANT FOR 7 DAYS SHALL BE TEMPORARY SEEDED. 6.INSPECT AND MAINTAIN/REPLACE SEDIMENT CONTROLS AS NECESSARY THROUGHOUT THE TIMELINE OF CONSTRUCTION. 7.BEGIN CONSTRUCTION OF PROPOSED STORM SYSTEM AND OTHER UTILITIES. PROVIDE INLET PROTECTION FOR ALL PROPOSED INLETS OF STORM SYSTEMS AS SHOWN ON PLANS. .BEGIN CONSTRUCTION OF PROPOSED AUTO CARE CENTER AND PARKING LOT. 9.UPON COMPLETION OF DEMOLITION, CONSTRUCTION AND LAND DISTURBING ACTIVITIES, PROVIDE PERMANENT STABILI=ATION ACCORDING TO APPROVED METHODS AND REMOVE ALL REMAINING EROSION AND SEDIMENT CONTROL MEASURES WITH APPROVAL OF INSPECTOR. PROJECT DESCRIPTION THE PROJECT CONSISTS OF IMPROVEMENTS ASSOCIATED WITH A NEW AUTO CARE CENTER TO BE LOCATED IN FREDERICK COUNTY, VIRGINIA, NEAREST TO THE INTERSECTION OF MERCHANT STREET AND MARKET STREET. THE SITE IS CURRENTLY VACANT AND IS =ONED AS B-3 INDUSTRIAL TRANSITION DISTRICT. PROPOSED IMPROVEMENTS INCLUDE A NEW /-6,607 SF BUILDING WITH A HEIGHT OF /-25 5, DRIVE AISLES, PARKING AREAS, CURBING, WATER SEWER CONNECTIONS, AND A STORM DRAINAGE NETWORK. SITE WORK INCLUDES GRADING, UTILITY INSTALLATIONS, PAVING, AND LANDSCAPING. THE PROPOSED LAND DISTURBANCE ENCOMPASSES /-1.16 ACRES. ACCESS TO THE SITE WILL BE PROVIDED VIA FOUR PROPOSED ENTRANCES OFF OF TWO EXISTING ACCESS DRIVES CONNECTED WITH MARKET STREET. EXISTING SITE CONDITIONS CURRENTLY, THE SITE IS A VACANT LOT. THE SITE IS LOCATED WITHIN AN EXISTING COMMERCIAL DEVELOPMENT KNOWN AS RUTHERFORD CROSSING. THE SITE IS RELATIVELY FLAT, WITH SLOPES DRAINING FROM THE MIDDLE OF THE SUBJECT AREA TO THE EXTENTS. THE SITE HAS AREAS OF EXISTING PAVEMENT AS WELL AS AREAS WITH VEGETATION. EROSION CONTROL MEASURES (C-ECM): C-ECM-15. OUTLET PROTECTION: OUTLET PROTECTION TAKES THE FORM OF STRUCTURALLY LINED APRONS OR OTHER FORMS OF ENERGY-DISSIPATING DEVICES PLACED AT THE OUTLETS OF PIPES, CURB OPENINGS, DITCH TURNOUTS, OR PAVED CHANNEL SECTIONS TO SLOW DISCHARGE VELOCITY FROM THE OUTLET TO PREVENT AN EROSIVE CONDITION. OUTLET PROTECTION PREVENTS SCOURING AT STORMWATER OUTLETS, PROTECTS THE OUTLET STRUCTURE, AND MINIMI=ES THE POTENTIAL FOR DOWNSTREAM EROSION BY REDUCING THE VELOCITY AND ENERGY OF CONCENTRATED STORMWATER FLOWS. OUTLET PROTECTION APPLIES TO THE OUTLETS OF ALL PIPES AND ENGINEERED CHANNEL SECTIONS. DISCHARGE VELOCITIES FROM PIPE OUTFALLS, OUTLET CHANNELS, OR SIMILAR STRUCTURES SHOULD NOT CAUSE EROSION IN DOWNSTREAM CHANNELS. SEDIMENT CONTROL MEASURES (C-SCM): C-SCM-03. TEMPORARY STONE CONSTRUCTION ENTRANCE: A TEMPORARY STONE CONSTRUCTION ENTRANCE IS A PAD WITH A FABRIC FILTER LINER UNDERNEATH THE STONE LOCATED AT POINTS OF VEHICULAR INGRESS AND EGRESS ON A CONSTRUCTION SITE. THERE ARE SEVERAL TYPES OF TRACK-OUT CONTROLS THAT MINIMI=E THE AMOUNT OF SEDIMENT, SUCH AS DIRT OR MUD, LEAVING OR BEING TRACKED OUT FROM THE CONSTRUCTION SITE ATTACHED TO VEHICLES. CONSTRUCTION ENTRANCES PROVIDE AN OPPORTUNITY FOR SIGNIFICANT REMOVAL OF MUD FROM CONSTRUCTION VEHICLE TIRES BEFORE THEY ENTER A PUBLIC ROAD, AND, JUST AS IMPORTANT, THE SOIL ADJACENT TO THE PAVED SURFACE CAN BE KEPT INTACT. TEMPORARY STONE CONSTRUCTION ENTRANCES REDUCE THE TRACKING OF MUD ONTO PAVED PUBLIC ROADS BY MOTOR VEHICLES OR RUNOFF AND PROVIDE A STABLE ENTRY TO OR EXIT FROM THE CONSTRUCTION SITE. THIS PRACTICE APPLIES WHERE TRAFFIC LEAVES A CONSTRUCTION SITE AND MOVES DIRECTLY ONTO A PUBLIC ROAD OR OTHER PAVED AREA. C-SCM-04. INLET PROTECTION: A SEDIMENT FILTER OR AN EXCAVATED IMPOUNDING AREA AROUND A STORM DRAIN DROP INLET OR CURB INLET WILL BE PROVIDED AT ALL INLET LOCATIONS WITHIN THE LIMITS OF DISTURBANCE. THE PURPOSE OF THIS PRACTICE IS TO PREVENT SEDIMENT FROM ENTERING STORM DRAINAGE SYSTEMS PRIOR TO PERMANENT STABILI=ATION OF THE DISTURBED AREA. THE STRUCTURE SHALL BE INSPECTED AFTER EACH RAIN AND REPAIRS MADE AS NEEDED. SEDIMENT SHALL BE REMOVED AND THE TRAP RESTORED TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE HALF THE DESIGN DEPTH OF THE TRAP. REMOVED SEDIMENT SHALL BE DEPOSITED IN A SUITABLE AREA AND IN SUCH A MANNER THAT IT WILL NOT ERODE. STRUCTURES SHALL BE REMOVED AND THE AREA STABILI=ED WHEN THE REMAINING DRAINAGE AREA HAS BEEN PROPERLY STABILI=ED. SURFACE STABILIZATION MEASURES (C-SSM): C-SSM-10. PERMANENT SEEDING: PERMANENT SEEDING IS THE ESTABLISHMENT OF PERENNIAL VEGETATIVE COVER ON DISTURBED AREAS BY PLANTING SEED. THE PURPOSES OF PERMANENT SEEDING ARE: 1.TO REDUCE EROSION AND DECREASE SEDIMENT YIELD FROM DISTURBED AREAS 2.TO PERMANENTLY STABILI=E DISTURBED AREAS IN A MANNER THAT IS ECONOMICAL, ADAPTABLE TO SITE CONDITIONS, AND ALLOWS SELECTION OF THE MOST APPROPRIATE PLANT MATERIALS 3.TO IMPROVE WILDLIFE HABITAT AND 4.TO ENHANCE NATURAL BEAUTY. PERMANENT SEEDING APPLIES IN: 1.DISTURBED AREAS WHERE PERMANENT, LONG-LIVED VEGETATIVE COVER IS NEEDED TO STABILI=E THE SOIL AND 2.ROUGH-GRADED AREAS THAT WILL NOT BE BROUGHT TO FINAL GRADE FOR 1 YEAR OR MORE. PERIMETER CONTROL MEASURES (C-PCM): C-PCM-04. SILT FENCE: A TEMPORARY SEDIMENT BARRIER CONSISTING OF A SYNTHETIC FILTER FABRIC STRETCHED ACROSS AND ATTACHED TO SUPPORTING POSTS AND ENTRENCHED WILL BE PROVIDED AROUND MUCH OF THE SITE PERIMETER AND PARALLEL TO SLOPED AREAS. THE PURPOSE OF THIS PRACTICE IS TO INTERCEPT AND DETAIN SMALL AMOUNTS OF SEDIMENT FROM DISTURBED AREAS DURING CONSTRUCTION OPERATIONS IN ORDER TO PREVENT SEDIMENT FROM LEAVING THE SITE. SILT FENCES SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY RE4UIRED REPAIRS SHALL BE MADE IMMEDIATELY. CLOSE ATTENTION SHALL BE PAID TO THE REPAIR OF DAMAGED SILT FENCE RESULTING FROM END RUNS AND UNDERCUTTING. SHOULD THE FABRIC ON A SILT FENCE DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL BE NECESSARY, THE FABRIC SHALL BE REPLACED PROMPTLY. SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH STORM EVENT. THEY MUST BE REMOVED WHEN DEPOSITS REACH APPROXIMATELY ONE-HALF THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE IS NO LONGER RE4UIRED SHALL BE DRESSED TO CONFORM WITH THE EXISTING GRADE, PREPARED AND SEEDED. MINIMUM STANDARDS VSMH 5.3.1 AN EROSION AND SEDIMENT CONTROL PROGRAM ADOPTED BY A DISTRICT OR LOCALITY MUST BE CONSISTENT WITH THE FOLLOWING CRITERIA, TECHNI4UES AND METHODS: MS-1. STABILI=ATION: PERMANENT OF TEMPORARY SOIL STABILI=ATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILI=ATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 14 DAYS. PERMANENT STABILI=ATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR. MS-2. STOCKPILES, WASTE, AND BORROW AREA: DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES AND BORROW AREAS SHALL BE STABILI=ED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILI=ATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE. MS-3. PERMANENT VEGETATION: A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILI=ED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT, IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION. MS-4. FIRST STEP MEASURES: SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND-DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. MS-5. EARTHEN STRUCTURE STABILI=ATION: STABILI=ATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSION IMMEDIATELY AFTER INSTALLATION. MS-6. TRAPS AND BASINS: SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN. A.THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THREE ACRES. B.SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM DRAINAGE AREAS GREATER THAN OR E4UAL TO THREE ACRES SHALL BE CONTROLLED BY A SEDIMENT BASIN. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA. THE OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE STRUCTURAL INTEGRITY OF THE BASIN DURING A TWENTY-FIVE YEAR STORM OF 24-HOUR DURATION. RUNOFF COEFFICIENTS USED IN RUNOFF CALCULATIONS SHALL CORRESPOND TO A BARE EARTH CONDITION OR THOSE CONDITIONS EXPECTED TO EXIST WHILE THE SEDIMENT BASIN IS UTILI=ED. MS-7. CUT AND FILL SLOPES: CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMI=E EROSION. SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILI=ATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILI=ING MEASURES UNTIL THE PROBLEM IS CORRECTED. MS-. CONCENTRATED RUNOFF: CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADE4UATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE. MS-9. WATER SEEPS: WHENEVER WATER SEEPS FROM A SLOPE FACE, ADE4UATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED. MS-10. INLET PROTECTION: ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT-LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. MS-11. OUTLET PROTECTION: BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE OPERATIONAL, ADE4UATE OUTLET PROTECTION AND ANY RE4UIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL. MS-12. WATERCOURSE CONSTRUCTION: WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMI=E ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILI=E THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION. NONERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE SUED FOR THESE STRUCTURES IF ARMORED BY NONERODIBLE COVER MATERIALS. MS-13. TEMPORARY VEHICULAR STREAM CROSSING: WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF NONERODIBLE MATERIAL SHALL BE PROVIDED. MS-14. OTHER WATERCOURSE REGULATIONS: ALL APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS PERTAINING TO WORK IN OR CROSSING LIVE WATERCOURSES SHALL BE MET. MS-15. BED AND BANK STABILI=ATION: THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILI=ED IMMEDIATELY AFTER WORK IN THE WATERCOURSE IS COMPLETED. MS-16. UTILITY CONSTRUCTION: UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: A.NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. B.EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. C.EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF-SITE PROPERTY. D.MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMI=E EROSION AND PROMOTE STABILI=ATION. E.RESTABILI=ATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THESE REGULATIONS. F.APPLICABLE SAFETY REGULATIONS SHALL BE COMPLIED WITH. MS-17. VEHICULAR TRACKING AND CONSTRUCTION ENTRANCES: WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMI=E THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION SHALL APPLY TO INDIVIDUAL DEVELOPMENT LOTS AS WELL AS TO LARGER LAND-DISTURBING ACTIVITIES. MS-1. TEMPORARY CONTROL REMOVAL: ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILI=ATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORI=ED BY THE LOCAL PROGRAM AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURE SHALL BE PERMANENTLY STABILI=ED TO PREVENT FURTHER EROSION AND SEDIMENTATION. MS-19. ADE4UATE STORMWATER CONVEYANCE TO ADE4UATE STORMWATER OUTFALL: PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASE IN VOLUME, VELOCITY AND PEAK FLOW RATE OF STORMWATER RUNOFF FOR THE STATED FRE4UENCY STORM OF 24-HOUR DURATION IN ACCORDANCE WITH THE FOLLOWING STANDARDS AND CRITERIA: A.CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE SHALL BE DISCHARGED DIRECTLY INTO AN ADE4UATE NATURAL OR MAN-MADE RECEIVING CHANNEL, PIPE OR STORM SEWER SYSTEM. FOR THOSE SITES WHERE RUNOFF IS DISCHARGED INTO A PIPE OR PIPE SYSTEM, DOWNSTREAM STABILITY ANALYSES AT THE OUTFALL OF THE PIPE OR PIPE SYSTEM SHALL BE PERFORMED. B.ADE4UACY OF ALL CHANNELS AND PIPES SHALL BE VERIFIED IN THE FOLLOWING MANNER: 1.THE APPLICANT SHALL DEMONSTRATE THAT THE TOTAL DRAINAGE AREA TO THE POINT OF ANALYSIS WITHIN THE CHANNEL IS ONE HUNDRED TIMES GREATER THAN THE CONTRIBUTING DRAINAGE AREA OF THE PROJECT IN 4UESTIONS 2.OR ·NATURAL CHANNELS SHALL BE ANALY=ED BY THE USE OF A TWO-YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP CHANNEL BANKS OR CAUSE EROSION OF CHANNEL BED OR BANKS AND ·ALL PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS SHALL BE ANALY=ED BY THE USE OF A TEN-YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP ITS BANKS AND BY THE USE OF A TWO-YEAR STORM TO DEMONSTRATE THAT STORMWATER WILL NOT CAUSE EROSION OF CHANNEL BED OR BANKS AND ·PIPES AND STORM SEWER SYSTEMS SHALL BE ANALY=ED BY THE USE OF A TEN-YEAR STORM TO VERIFY THAT STORMWATER WILL BE CONTAINED WITHIN THE PIPE OR SYSTEM. C.IF EXISTING NATURAL RECEIVING CHANNELS OR PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS OR PIPES ARE NOT ADE4UATE, THE APPLICANT SHALL: 1.IMPROVE THE CHANNEL TO A CONDITION WHERE A TEN-YEAR STORM WILL NOT OVERTOP THE BANKS AND A TWO-YEAR STORM WILL NOT CAUSE EROSION TO THE CHANNEL BED OR BANKS OR 2.IMPROVE THE PIPE OR PIPE SYSTEM TO A CONDITION WHERE THE TEN-YEAR STORM IS CONTAINED WITHIN THE APPURTENANCES OR 3.DEVELOP A SITE DESIGN THAT WILL NOT CAUSE THE PRE-DEVELOPMENT PEAK RUNOFF RATE FROM A TWO-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A NATURAL CHANNEL OR WILL NOT CAUSE THE PRE-DEVELOPMENT PEAK RUNOFF RATE FROM A TEN-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A MAN-MADE CHANNEL OR 4.PROVIDE A COMBINATION OF CHANNEL IMPROVEMENT, STORMWATER DETENTION OR OTHER MEASURES WHICH IS SATISFACTORY TO THE PLAN-APPROVING AUTHORITY TO PREVENT DOWNSTREAM EROSION. D.THE APPLICANT SHALL PROVIDE EVIDENCE OF PERMISSION TO MAKE THE IMPROVEMENTS. E.ALL HYDROLOGIC ANALYSES SHALL BE BASED ON THE EXISTING WATERSHED CHARACTERISTICS AND THE ULTIMATE DEVELOPMENT OF THE SUBJECT PROJECT. F.IF THE APPLICANT CHOOSES AN OPTION THAT INCLUDES STORMWATER DETENTION HE SHALL OBTAIN APPROVAL FROM THE LOCALITY OF A PLAN FOR MAINTENANCE OF THE DETENTION FACILITIES. THE PLAN SHALL SET FORTH THE MAINTENANCE RE4UIREMENTS OF THE FACILITY AND THE PERSON RESPONSIBLE FOR PERFORMING THE MAINTENANCE. G.OUTFALL FROM A DETENTION FACILITY SHALL BE DISCHARGED TO A RECEIVING CHANNEL, AND ENERGY DISSIPATERS SHALL BE PLACED AT THE OUTFALL OF ALL DETENTION FACILITIES AS NECESSARY TO PROVIDE A STABILI=ED TRANSITION FROM THE FACILITY TO THE RECEIVING CHANNEL. H.ALL ON-SITE CHANNELS MUST BE VERIFIED TO BE ADE4UATE. I. INCREASED VOLUMES OF SHEET FLOWS THAT MAY CAUSE EROSION OR SEDIMENTATION ON ADJACENT PROPERTY SHALL BE DIVERTED TO A STABLE OUTLET, ADE4UATE CHANNEL, PIPE OR PIPE SYSTEM, OR TO A DETENTION FACILITY. J.IN APPLYING THESE STORMWATER RUNOFF CRITERIA, INDIVIDUAL LOTS OR PARCELS IN A RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT SHALL NOT BE CONSIDERED TO BE SEPARATE DEVELOPMENT PROJECTS. INSTEAD, THE DEVELOPMENT, AS A WHOLE, SHALL BE CONSIDERED TO BE A SINGLE DEVELOPMENT PROJECT. HYDROLOGIC PARAMETERS THAT REFLECT THE ULTIMATE DEVELOPMENT CONDITION SHALL BE USED IN ALL ENGINEERING CALCULATIONS. K.ALL MEASURES USED TO PROTECT PROPERTIES AND WATERWAYS SHALL BE EMPLOYED IN A MANNER WHICH MINIMI=ES IMPACTS ON THE PHYSICAL, CHEMICAL AND BIOLOGICAL INTEGRITY OF RIVERS, STREAMS AND OTHER WATERS OF THE STATE. STORMWATER MANAGEMENT THE ENTIRETY OF THE SITE'S STORMWATER IS FLOWING TO VARIOUS EXISTING INLETS THAT TIE INTO AN EXISTING STORMWATER MANAGEMENT FACILITY PER THE APPROVED RUTHERFORD CROSSING SHOPPING CENTER PLANS. MAINTENANCE BETWEEN THE TIME THE EROSION CONTROL PLAN IS IMPLEMENTED AND FINAL SITE STABILI=ATION IS ACHIEVED, ALL DISTURBED AREAS AND EROSION CONTROLS MUST BE INSPECTED NOT LESS THAN ONCE EVERY SEVEN 7 CALENDAR DAYS AND WITHIN 4 HOURS OF A RUNOFF PRODUCING RAINFALL EVENT. EXAMPLES OF PARTICULAR ITEMS TO BE EVALUATED DURING SITE INSPECTIONS ARE LISTED BELOW. THIS LIST IS NOT INTENDED TO BE COMPREHENSIVE. DURING EACH INSPECTION, EACH INSPECTOR MUST EVALUATE OVERALL EROSION CONTROL SYSTEM PERFORMANCE, AS WELL AS THE EFFECTIVENESS OF SYSTEM COMPONENTS. ADDITIONAL FACTORS SHOULD BE CONSIDERED AS APPROPRIATE TO THE CIRCUMSTANCES. ·LOCATIONS WHERE VEHICLES ENTER AND EXIT THE SITE MUST BE INSPECTED FOR EVIDENCE OF OFF-SITE SEDIMENT TRACKING. A STABILI=ED CONSTRUCTION ENTRANCE WILL BE CONSTRUCTED WHERE VEHICLES ENTER AND EXIT. THIS ENTRANCE WILL BE MAINTAINED OR SUPPLEMENTED AS NECESSARY TO PREVENT SEDIMENT FROM LEAVING THE SITE ON VEHICLES. SEDIMENT TRACKED ONTO PUBLIC ROADWAYS MUST BE SHOVELED OR SWEPT FROM THE ROADWAY AND RE-DEPOSITED ON SITE IN A MANNER THAT MINIMI=ES ITS OFFSITE RELEASE POTENTIAL. ·SEDIMENT BARRIERS MUST BE INSPECTED AND, IF NECESSARY, THEY MUST BE ENLARGED OR CLEANED IN ORDER TO PROVIDE ADDITIONAL CAPACITY. ALL MATERIAL EXCAVATED FROM BEHIND SEDIMENT BARRIERS SHALL BE STOCKPILED ON THE UP SLOPE SIDE OF THE BARRIER. ADDITIONAL SEDIMENT BARRIERS MUST BE CONSTRUCTED AS NEEDED. ·INSPECTIONS WILL EVALUATE DISTURBED AREAS AND AREAS USED FOR STORING MATERIALS THAT ARE EXPOSED TO RAINFALL FOR EVIDENCE OF, OR THE POTENTIAL FOR, POLLUTANTS ENTERING THE DRAINAGE SYSTEM. IF NECESSARY, THE MATERIALS MUST BE COVERED OR ORIGINAL COVERS MUST BE REPAIRED OR SUPPLEMENTED. ALSO, PROTECTIVE BERMS MUST BE CONSTRUCTED, IF NEEDED, IN ORDER TO CONTAIN RUNOFF FROM MATERIAL STORAGE AREAS. ·GRASSED AREAS WILL BE INSPECTED TO CONFIRM THAT A HEALTHY STAND OF GRASS IS MAINTAINED. THE SITE HAS ACHIEVED FINAL STABILI=ATION WHEN TURF GRASS COVER PROVIDES PERMANENT STABILI=ATION OF THE SOIL SURFACE EXCLUSIVE OF AREAS THAT HAVE BEEN PAVED OR COVERED BY BUILDINGS. PERMANENT STABILI=ATION IS NOT CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION. ·ALL DISCHARGE POINTS MUST BE INSPECTED TO DETERMINE WHETHER EROSION CONTROL MEASURES ARE EFFECTIVE IN PREVENTING IMPACTS TO RECEIVING WATERS. BASED UPON THE RESULTS OF THE INSPECTIONS, EACH EROSION AND SEDIMENT CONTROL MEASURE SHALL BE REPAIRED AND/OR MAINTAINED IN ACCORDANCE WITH THE MAINTENANCE RE4UIREMENTS SPECIFIED IN THE CORRESPONDING SECTION OF VIRGINIA STORMWATER MANAGEMENT HANDBOOK VSMH MAINTAINED BY VIRGINIA S DEPARTMENT OF ENVIRONMENTAL 4UALITY DE4. THE CONTRACTOR SHALL MAINTAIN A COPY OF THIS HANDBOOK ON SITE AT ALL TIMES DURING CONSTRUCTION. PERMANENT STABILI=ATION PERMANENT STABILI=ATION WILL BE ACHIEVED WITH SEEDING AS SHOWN ON THE LANDSCAPING AND EROSION CONTROL PLAN SHEETS FOR ALL VEGETATED OR LANDSCAPING AREAS. CONCRETE, PAVEMENT AND OTHER IMPERVIOUS SURFACES WILL STABILI=E THE REMAINDER OF THE SITE. REF. SECTION 5.3.1.1 MS-1: STABILI=ATION. STOCKPILING TOPSOIL SHALL BE STOCKPILED IN SUCH A MANNER THAT NATURAL DRAINAGE IS NOT OBSTRUCTED AND NO OFF-SITE SEDIMENT DAMAGE SHALL RESULT. STABILI=E OR PROTECT STOCKPILES IN ACCORDANCE WITH MINIMUM STANDARD 2 MS-2. THE SIDE SLOPES OF THE STOCKPILE SHALL NOT EXCEED 2H:1V. PERIMETER CONTROLS MUST BE PLACED AROUND THE STOCKPILE IMMEDIATELY SEEDING OF STOCKPILES SHALL BE COMPLETED WITHIN 7 DAYS OF THE FORMATION OF THE STOCKPILE, IN ACCORDANCE WITH STD. AND 5.3.1.1 MS-1: STABILI=ATION TEMPORARY SEEDING. IF IT IS TO REMAIN DORMANT FOR LONGER THAN 30 DAYS. REFER TO MINIMUM STANDARD 1 MS-1 AND 2 MS-2 UNDER 5.3.1 EROSION AND SEDIMENT CONTROL MINIMUM STANDARDS VSMH. TEMPORARY STABILI=ATION TEMPORARY STABILI=ATION SHOULD BE USED WHERE SOIL SURFACES ARE NOT TO BE FINE GRADED FOR PERIODS LONGER THAN FOURTEEN 14 DAYS. SUCH AREAS INCLUDE DENUDED ARES, SOIL STOCKPILES, DIKES, DAMS, SIDES OF SEDIMENT BASINS, TEMPORARY ROADBANK, ETC. A PERMANENT VEGATIVE COVER SHALL BE APPLIED TO AREAS THAT WILL BE LEFT DORMANT FOR MORE THAN 1 YEAR. SPECIFICATIONS 3.31 OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK SHALL BE FOLLOWED FOR TEMPORARY STABILI=ATION. SE4UENCE OF CONSTRUCTION CLARIFICATION NOTE: THE SE4UENCE OF CONSTRUCTION SHOWN ABOVE IS A GENERAL OVERVIEW AND IS INTENDED TO CONVEY THE GENERAL CONCEPTS OF THE EROSION CONTROL DESIGN AND SHOULD NOT BE RELIED UPON FOR CONSTRUCTION PURPOSES. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR DETAILED PHASING AND CONSTRUCTION SE4UENCING NECESSARY TO CONSTRUCT THE PROPOSED IMPROVEMENTS INCLUDED IN THESE PLANS. THE CONTRACTOR SHALL NOTIFY ENGINEER IN WRITING IMMEDIATELY, PRIOR TO AND/OR DURING CONSTRUCTION IF ANY ADDITIONAL INFORMATION ON THE CONSTRUCTION SE4UENCE IS NECESSARY. CONTRACTOR IS SOLELY RESPONSIBLE FOR COMPLYING WITH THE RE4UIREMENTS OF THE AUTHORITY HAVING JURISDICTION AND ALL OTHER APPLICABLE LAWS. ADJACENT AREAS THE SITE IS BORDERED TO THE NORTH BY MARKET STREET, TO THE EAST BY A SPRINGHILL SUITES BY MARRIOTT, TO THE SOUTH BY MARTINSBURG PIKE, AND TO THE WEST BY AN URGENT CARE AND FAMILY PRACTICE CLINIC. THERE ARE NO STREAMS, LAKES, FLOODPLAIN AREAS, OR ENVIRONMENTAL 4UALITY CONCERNS ON THIS SITE. PERIMETER CONTROLS WILL PROTECT ADJACENT PROPERTIES. OFF-SITE AREAS NO OFF-SITE LAND DISTURBANCE IS PROPOSED WITH THIS PROJECT. SOILS THE SITE GENERALLY CONSISTS OF SOILS THAT ARE CLASSIFIED IN HYDROLOGIC SOIL GROUP C . SEE GEOTECHNICAL EVALUATION DATED 09/19/2025 FOR SOIL CHARACTERISTICS, BOUNDARIES, AND SITE GEOLOGY. WETLANDS THERE ARE NO EXISTING WETLANDS ON THE PROPOSED SITE. CONSTRUCTION ENTRANCE SITE ACCESS WILL BE PROVIDED VIA A PROPOSED CONSTRUCTION ENTRANCE LOCATED AT THE PROPOSED ENTRANCE ON THE NORTHEASTERN PORTION OF THE SITE. CONTROL MEASURES THE FOLLOWING CONTROL MEASURES, AS SHOWN ON THE EROSION CONTROL PLAN SHEETS: C04 OF THIS SITE PLAN, WILL BE USED FOR THIS PROJECT: CRITICAL AREAS CRITICAL AREAS TYPICALLY INCLUDE AREAS OF STEEP SLOPES, AREAS ADJACENT TO WETLANDS, AND OTHER AREAS WITH SERIOUS EROSION POTENTIAL. NO CRITICAL AREAS HAVE BEEN IDENTIFIED ON-SITE. CONTRACTOR SHALL OBTAIN A LAND DISTURBANCE/ VSMP PERMIT FROM FREDERICK COUNTY PUBLIC WORKS DEPARTMENT PRIOR TO COMMENCING ANY LAND DISTURBING ACTIVITIES. A COPY OF THE CONTRACTOR S STORMWATER POLLUTION PREVENTION PLAN SHALL BE INCLUDED WITH THE APPLICATION FOR THE PUBLIC WORKS PERMIT. LEGEND S W LOD PROPERTY LINE PROPOSED LIMITS OF DISTURBANCE PROPOSED SANITARY SEWER PROPOSED WATER LINE 10 UTILITY EASEMENT 1.FINAL BUILDING CONNECTIONS FOR ALL UTILITIES TO BE COORDINATED WITH MEP TEAM. 2.WATER AND SEWER LINES SHALL TERMINATE 5 FROM THE BUILDING FOR SERVICE CONNECTIONS UNLESS NOTED OTHERWISE. 3.ALL PVC SANITARY SEWER PIPES TO BE PVC DR25 CONFORMING TO AWWA C900 UNLESS OTHERWISE NOTED. 4.CONTRACTOR TO CONFIRM SI=E OF ALL EXISTING UTILITIES. 5.FREDERICK WATER¶S WATER AND SEWER STANDARDS AND SPECIFICATIONS ARE AVAILABLE AT WWW.FREDERICKWATER.COM 6.THE CONTRACTOR SHALL ADHERE TO FREDERICK WATER STANDARDS AND SPECIFICATIONS IN EFFECT AT THE TIME OF CONSTRUCTION. 7.THE CONTRACTOR SHALL SCHEDULE A PRE-CONSTRUCTION MEETING WITH THE FREDERICK WATER INSPECTOR PRIOR TO COMMENCING INSTALLATION OF ANY WATER OR SEWER FACILITIES. CONTRACTOR SHALL ALSO ARRANGE FOR INSPECTION OF SAID FACILITIES BY FREDERICK WATER. OIL WATER SEPARATORS AND/OR GREASE TRAPS MAY BE RE4UIRED BY FREDERICK COUNTY BUILDING INSPECTIONS. BOTH FREDERICK COUNTY BUILDING INSPECTIONS AND FREDERICK WATER WILL INSPECT THE INSTALLATION OF THOSE FACILITIES. BOTH INSPECTIONS SHALL BE SCHEDULED BY CONTRACTOR. .THE CONTRACTOR SHALL CONNECT A NEW SEWER LINE TO AN EXISTING MANHOLE BY CORE DRILLING THE MANHOLE. 9.A NEW WATER OR FORCED SEWER MAIN SHALL BE CONNECTED TO AN EXISTING MAIN BY A A CUT-IN TEE WITH ACCOMPANYING VALVES. 10.EXACT LOCATIONS OF WATER AND SEWER SERVICES ON NEW LINES ARE TO BE COORDINATED WITH FREDERICK WATER¶S INSPECTOR. 10.1.ADJUST FREDERICK WATER FACILITIES TO GRADE AS RE4UIRED BY THE FREDERICK WATER INSPECTOR. 11.FREDERICK WATER¶S MAINTENANCE DIVISION SHALL FURNISH AND INSTALL ALL WATER METERS THROUGH 2 INCH IN SI=E. IT IS THE CONTRACTOR¶S RESPONSIBILITY TO HAVE THE METER BOX ASSEMBLY INSTALLED CORRECTLY. BEFORE A PERMANENT METER IS INSTALLED: 11.1.THE METER BOX, WITH ITS FRAME AND COVER, MUST BE PROPERLY ALIGNED WITH THE YOKE BAR. 11.2.THE FRAME AND COVER SHALL BE SET TO FINAL GRADE. 11.3.THE DISTANCE BETWEEN THE TOP OF THE COVER AND THE YOKE BAR SHALL BE BETWEEN 20 AND 23 INCHES. 11.4.ALL COMPONENTS OF THE METER BOX ASSEMBLY SHALL BE IN PROPER WORKING ORDER. 12.FOR SERVICES THAT CONNECT TO EXISTING LINES: 12.1.FREDERICK WATER SHALL FURNISH AND INSTALL: 12.1.1.ALL ǫ´Xô´, ô´, 1´, 1ò´ AND 2´ WATER SERVICES 12.1.2.ALL SEWER SERVICES. 12.2.THE OWNER/DEVELOPER SHALL: 12.2.1.COORDINATE OR HAVE THE CONTRACTOR COORDINATE THE LOCATION OF THE SERVICE LATERAL WITH FREDERICK WATER¶S ENGINEERING ASSISTANT. 12.2.2.SUBMIT AN APPLICATION FOR SERVICE AND PAY THE RE4UIRED FEES. 13.ALL WATER SERVICE LINES MUST HAVE A BACKFLOW PREVENTION ASSEMBLY DOUBLE CHECK VALVE OR RP=, AS RE4UIRED. THE ASSEMBLY MUST MEET ASSE STANDARD NUMBER 1015 OR 1013. 14.ALL FIRE LINES MUST HAVE A BACKFLOW PREVENTION ASSEMBLY DETECTOR DOUBLE CHECK VALVE OR RP=, AS RE4UIRED. THE ASSEMBLY SHALL MEET ASSE STANDARD NUMBER 104 OR 1047. ANY PRIVATELY OWNED FIRE LINE, INTERIOR OR EXTERIOR, SHALL ALSO HAVE A FIRE SERVICE METER. THIS ASSEMBLY SHALL BE INSTALLED IMMEDIATELY BEFORE THE BACKFLOW PREVENTION UNIT. RADIO READ REMOTES ARE RE4UIRED. 15.FREDERICK WATER SHALL REVIEW THE MECHANICAL PLANS FOR DESIGN AND MATERIAL APPROVAL OF A BUILDING¶S: 15.1.DOMESTIC WATER METER AND ITS BACKFLOW PREVENTION DEVICE, AND/OR ITS 15.2.FIRE SERVICE LINE¶S WATER METER AND BACKFLOW PREVENTION DEVICE. 16.DE4 MUST ALSO APPROVE SEWER PUMP STATIONS. FREDERICK WATER RE4UIRES A COPY OF DE4¶S CERTIFICATE TO OPERATE AND A COPY OF THE STATION¶S DE4 APPROVED O M MANUAL. THESE DOCUMENTS MUST BE RECEIVED BEFORE SUBSTANTIAL COMPLETION IS ISSUED AND WATER METERS RELEASED. PROPOSED STORM STRUCTURE PROPOSED STORM PIPE GENERAL NOTES PROPOSED ELECTRIC LINE GAS GAS PROPOSED GAS LINE UGE PROPOSED UNDERGROUND ELECTRIC LINE WWW W W W W W W W W W WWWWWT WWWWWWW W W W W W STOP STOPSTOPEETT T T T T T T T E E E E E E T T TEE TTTTTT TTTTTT LODLODLODLODLODLODLODLOD LOD LOD LOD LOD LOD LODLODLODLODLODLODLODLODLODLODGAS BUILDING CONNECTION SANITARY BUILDING CONNECTION GASUGEUGEU G E UGE UGE UGE UGE UGE UGE UGE UGE UGE UGEUGEUGEUGEUGESWWWOIL/ WATER SEPARATOR. SEE PLUMBING AND ARCHITECTURAL DRAWINGS FOR DETAIL. S04 S03 S02 S01 2 LF OF 6 PVC # 2.59 27 LF OF 6 PVC # 2.59 LF OF 4 PVC # 2.0 4 LF OF 4 PVC # 2.0 12 LF OF 4 PVC # 2.0STA: 1000.92 6 COMBINED DOMESTIC/ FIRE SERVICE CONNECTION W/ DOMESTIC METER AND BACKFLOW PREVENTER STA: 1041.46 CORP. STOP STA: 1041.43 1 COPPER TUBING AND 3/4 IRRIGATION METER W/ IRRIGATION METER AND BACKFLOW PREVENTER STA: 1064.06 6 MJ GV STA: 106.63 X 6 CUT-IN TEE S05 FIRESTONE BUILDING ER PROTOTYPE 6,607 SF ELECTRIC AND TELECOM BUILDING CONNECTION PRIVATE IRRIGATION TO BE DESIGNED UNDER SEPARATE COVER 6 DI WATER LINESTA: 1011.92 6 MJ GV STRUCTURE TABLE STRUCTURE NAME: S01 S02 S03 S04 S04.1-IN S04.1-OUT S05 DETAILS: MH RIM: 692.16 INV IN: 63.35 6 SSCO RIM: 692.20 INV IN: 64.26 INV OUT: 64.06 MH RIM: 692.35 INV IN: 66.71 INV OUT: 64.99 6 SSCO RIM: 692.25 INV IN: 67.35 INV OUT: 67.15 OIL/WATER SEPARATOR IN RIM: 67.79 INV IN: 67.07 OIL/WATER SEPARATOR OUT RIM: 67.24 INV OUT: 66.7 BUILDING CONNECTION RIM: 6.33 INV OUT: 67.61 PIPES IN: FROM S02, 6 PVC INV IN: 63.35 # 2.59 FROM S03, 6 PVC INV IN: 64.26 # 2.59 FROM S04.1-OUT, 4 PVC INV IN: 66.71 # 2.0 FROM S05, 4 PVC INV IN: 67.35 # 2.0 FROM S04, 4 PVC INV IN: 67.07 # 2.0 PIPES OUT TO S01, 6 PVC INV OUT: 64.06 # 2.59 TO S02, 6 PVC INV OUT: 64.99 # 2.59 TO S04.1-IN, 4 PVC INV OUT: 67.15 # 2.0 TO S03, 4 PVC INV OUT: 66.7 # 2.0 TO S04, 4 PVC INV OUT: 67.61 # 2.0This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.DATEAS SHOWNCHECKED BYSCALEDESIGNED BYDRAWN BYKHA PROJECT 2025 KIMLEY-HORN AND ASSOCIATES, INC.CALL "MISS UTILITY" 811 11400 COMMERCE PARK DR., SUITE 400, RESTON, VA 20191PHONE: 703-674-1300 FAX: 703-674-1350WWW.KIMLEY-HORN.COM10/31/2025111125000JMHPESHRTVIRGINIAFREDERICK COUNTYFIRESTONE COMPLETEAUTO CAREPREPARED FOR=AREMBA GROUP, LLCUTILITY PLANC05NORTH ADD; BY CONTRACTOR ADD; (2) 8" GV'S AND (2) MJ LONG SOLID SLEEVES REPEAT OR REFER TO WATER MAIN CONNECTION/DISCONNECTION NOTES ELSWHERE ON PLANS REPLACE COPPER WITH 200 PSI CTS POLYETHELENE TUBING CONFIRM EXTENT OF THE RECORDED FREDERICK WATER EASEMENT AND SHOW/LABEL THE SANITARY SEWER LATERAL AS PRIVATE FROM EDGE OF EASEMENT TO BUILDING 1'9' BLDG EXTERIOR WALL FIRE AND/OR DOMESTIC RISER END OF FW 20' ESMT PRIVATE FREDERICK WATER GATE VALVE WITH ROADWAY BOX INCLUDE CLOUDED DETAIL BELOW ON PLANS, MODIFY AS REQUIRED FOR SPECIFIC APPLICATION SHOW PRIVATE TO FREDERICK WATER OWNERSHIP LIMITS ON PLAN AND PROFILE LABEL FIRE AND/OR DOMESTIC METER SIZE(S) 1' ADDITIONAL GATE VALVE REQUIRED AT MAIN FOR RISER NOTE: FIRE AND/OR DOMESTIC RISER METER, BACKFLOW DEVICES, ASSOCIATED VALVES AND PIPING SHALL BE PER THE FREDERICK WATER INSPECTOR, FREDERICK COUNTY FIRE MARSHAL AND FREDERICK COUNTY INSPECTION DEPARTMENT REQUIREMENTS ADD SUPPLEMENTAL FREDERICK WATER NOTES TO PLANS: 1)VALVES, MANHOLES, ARV’S AND OTHER FREDERICK WATER SURFACE FEATURES SHALL NOT BE PLACED IN CURB AND GUTTER, NOR SLOPED PORTION OF HANDICAPPED RAMPS. CONTRACTOR SHALL COORDINATE LOCATIONS WITH THE FREDERICK WATER INSPECTOR 2) IRRIGATION LINES AND DEVICES, LIGHT POLES, TRANSFORMERS, JUNCTION BOXES, PEDESTALS, OTHER OBSTACLES AND ALL DRY UTILITIES SHALL NOT BE PLACED ON FREDERICK WATER EASEMENTS. PERPENDICULAR IRRIGATION LINES AND DRY UTILITY CROSSINGS ARE PERMITTED WITH 18" MINIMUM VERTICAL SEPARATION AND PLACED IN CONDUIT OR SLEEVE WITHIN THE FREDERICK WATER EASEMENT; SHOWN AND LABELED ON PLANS AND PROFILES 3) RETAINING WALLS AND THEIR TIE BACKS SUCH AS GEO GRID OR OTHER SUPPORTS SHALL NOT BE PLACED IN FREDERICK WATER EASEMENTS 4) CONTRACTOR SHALL TEST PIT AS REQUIRED AND ADJUST ALL EXISTING FREDERICK WATER FACILITIES TO GRADE PER THE FREDERICK WATER INSPECTORS REQUIREMENTS 5) IF EXISTING FREDERICK WATER FACILITIES ARE REMOVED, THE REMOVED ITEMS AND RELATED MATERIALS SHALL BE REPLACED WITH NEW MATERIALS. REMOVED MATERIALS SHALL BE FURNISHED TO THE FREDERICK WATER INSPECTOR CONSIDER THE ABOVE NOTES AND REVIEW PLANS FOR COMPLIANCE AND PROVIDE SPECIFIC NOTES AT RELEVANT ITEMS AS APPLICABLE PROVIDE DOMESTIC WATER AND SANITARY SEWER, AND IRRIGATION DEMANDS VERIFY THAT ALL AGENCY FIRE FLOW REQUIREMENTS ARE ACHIEVED PROVIDE A CALCULATION ESTIMATING THE AVAILABLE FIRE FLOW AT THE FIRE HYDRANT(S) AND BUILDING. HAND CALCULATIONS OR A SIMPLE HYDRAULIC MODEL WILL BE ACCEPTABLE, ALONG WITH THE EXISTING HYDRANT(S) FLOW TEST RESULTS NEEDED TO EVALUATE THE EXISTING SYSTEM. CONTACTO SETH STUMP AT <SStump@frederickwater.com> FOR FIRE FLOW TESTS IF NEEDED SUBMIT UNDER SEPARATE EMAIL PRIOR TO RESUBMITTAL IF NECESSARY. ONCE ACCEPTED, INCLUDE WITHIN PLAN SET ADD; GREASE TRAP / OIL WATER SEPARATOR NOTES: 1)TANK SECTIONS SHALL BE BOLTED TOGETHER 2)WATERTIGHT BOLT DOWN FRAME AND COVERS ARE REQUIRED 3)PENETRATIONS SHALL HAVE BOOTS 4)TANK, COMPONENTS, AND INSTALLATION SHALL BE TRAFFIC RATED 5)CONTRACTOR SHALL COORDINATE INSTALLATION AND INSPECTIONS WITH BOTH FREDERICK COUNTY INSPECTIONS DEPARTMENT AND FREDERICK WATER LABEL STORM STRUCTURES PER PROFILE 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 SANITARY LATERAL SCALE: 1 40 H 1 4 V 67 60 64 6 692 696 700 704 70 712 716 720 67 60 64 6 692 696 700 704 70 712 716 720 27 LF OF 6 PVC # 2.59 LF OF 4 PVC # 2.0 4 LF OF 4 PVC # 2.0 12 LF OF 4 PVC # 2.0 EXISTING GRADE PROPOSED GRADE STA: 1034.426 SSCORIM: 692.20INV IN: 64.26 FROM S03INV OUT: 64.06 TO S01S02 STA: 1062.51MHRIM: 692.35INV IN: 66.71 FROM S04.1-OUTINV OUT: 64.99 TO S02S03 STA: 104.916 SSCORIM: 692.25INV IN: 67.35 FROM S05INV OUT: 67.15 TO S04.1-INS04 970 1000692.0692.011100693.2692.501127.91STA: 1007.05MHRIM: 692.16INV IN: 63.35 FROM S02S01 .03 OIL/ WATER SEPARATOR W/ CONCRETE COLLAR AND HEAVY DUTY LID STA: 1097.11BUILDING CONNECTIONRIM: 6.33INV OUT: 67.61 TO S04S05 2 LF OF 6 PVC # 2.59 6-INCH COMBINED DOMESTIC AND FIRE SERVICE SCALE: 1 40 H 1 4 V 62 64 6 692 696 62 64 6 692 696 EXISTING GRADE PROPOSED GRADE 920 1000693.3692.5011001115 STA: 106.63 X 6 CUT-IN TEE STA: 1064.06 6 MJ GVSTA: 1041.46 CORP. STOP STA: 1000.92 6 COMBINED DOMESTIC/ FIRE SERVICE CONNECTION W/ DOMESTIC METER AND BACKFLOW PREVENTER 5.96 1.50 12 HDPE STORM INV: 6.13 STA: 1007.39 STA: 1011.92 6 MJ GV 6 DI WATER LINE A1 TO A7 SCALE: 1 40 H 1 4 V 60 64 6 692 696 700 704 60 64 6 692 696 700 704 12 LF OF 15 HDPE # 0.1 EXISTING GRADE PROPOSED GRADE 2.54 STA: 1007.20VDOT DI-1RIM: 69.30INV IN: 65.60 15 SA1 STA: 11.95VDOT DI-3C L 6 RIM: 691.3INV IN: 67.33 12 NEINV OUT: 67.0 15 NA2 1000690.91100690.692.091200693.7691.351300693.3691.51372STA: 1242.69NYLOPLAST 24 BASINSOLID COVERRIM: 692.34INV IN: 67.7 12 NEINV OUT: 67.77 12 SWA3 STA: 1310.7VDOT DI-3C L 6 RIM: 691.7INV IN: 6.90 6 NEINV OUT: 6.40 12 SWA5 54 LF OF 12 HDPE # 0.1 6 LF OF 12 HDPE # 0.791.50 57 LF OF 6 HDPE # 0.79STA: 1367.762 45 BEND1 6 CORIM: 692.61INV OUT: 69.35 6 SWA7 6 DIP WATER INV: 66.09 STA: 1276.43 This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.DATEAS SHOWNCHECKED BYSCALEDESIGNED BYDRAWN BYKHA PROJECT 2025 KIMLEY-HORN AND ASSOCIATES, INC.CALL "MISS UTILITY" 811 11400 COMMERCE PARK DR., SUITE 400, RESTON, VA 20191PHONE: 703-674-1300 FAX: 703-674-1350WWW.KIMLEY-HORN.COM10/31/2025111125000JMHPESHRTVIRGINIAFREDERICK COUNTYFIRESTONE COMPLETEAUTO CAREPREPARED FOR=AREMBA GROUP, LLCWATER PROFILES SANITARY PROFILES STORM PROFILES DRAINAGE UTILITYPROFILESC05.1 REPEAT PRIVATE OWNERSHIP FROM PLAN COMMENT INSERT CL 52 UNLESS DEPTH OF THE EXSITING WATER MAIN IS KNOWN; CONSIDER THAT IT MAY BE APPROX . 4' BELOW GRADE. THE PROPSED WATER MAIN SHALL BE INSTALLED AS CLOSE TO 4' MIN. COVER AS POSSIBLE AND FIELD ADJUSTMENTS MAY BE NECESSARY. AFTER REVIEWING INCLUDE NOTES FOR CLARIFICATION SHOW FW TO PRIVATE OWNERSHIP LIMITS 23 24 25 26 WWW W W W W W W W W W WWWWWT WWWWWWW W W W W W STOP STOPSTOPEETT T T T T T T T E E E E E E T T TEE TTTTTT TTTTTT 19 7 LODLODLODLODLODLODLODLOD LOD LOD LOD LOD LOD LODLODLODLODLODLODLODLODLODLOD4 1 FG 1 FG 1 FG 3 PA 3 PA 5 PA 1 PA 5 PA 6 TCU 4 TCU 17 TCU 11 TCU FIRESTONE BUILDING ER PROTOTYPE ± 6,607 SF SYMBOL CODE QTY BOTANICAL NAME COMMON NAME CONT CAL / HT TREES FG 3 Fraxinus pennsylvanica Green Ash B & B 2"-2.5" Cal. PLANT SCHEDULE INTERIOR LANDSCAPING SYMBOL CODE QTY BOTANICAL NAME COMMON NAME CONT CAL / HT TREES PA 17 Platanus x acerifolia London Plane Tree B & B 2"-2.5" Cal. SYMBOL CODE QTY BOTANICAL NAME COMMON NAME CONT HEIGHT SHRUBS TCU 38 Taxus cuspidata Japanese Yew Cont.3` HT. PLANT SCHEDULE PERIMETER LANDSCAPING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.DATEAS SHOWNCHECKED BYSCALEDESIGNED BYDRAWN BYKHA PROJECT© 2025 KIMLEY-HORN AND ASSOCIATES, INC.CALL "MISS UTILITY" 811 11400 COMMERCE PARK DR., SUITE 400, RESTON, VA 20191PHONE: 703-674-1300 FAX: 703-674-1350WWW.KIMLEY-HORN.COM10/31/2025111125000JMHPESHRTVIRGINIAFREDERICK COUNTYFIRESTONE COMPLETEAUTO CAREPREPARED FORZAREMBA GROUP, LLCNORTH LANDSCAPE PLANC07 WWLWWLABENOTES: 1.NO TREES OR SHRUBS SHALL BE PLACED IN FW EASEMENTS. 2.EXISTING LANDSCAPE TO BE PRUNED ACCORDING TO SPECIES STANDARDS. OVERGROWTH AND WEEDS TO BE REMOVED AND AREA TO BE SODDED OR SEEDED PER NOTES AND SPECIFICATIONS. 3.EXISTING HEDGES TO REMAIN SHOULD BE PRUNED PER NOTES AND SPECIFICATIONS SOD 15,775 SQ FT MULCH 1,747 SQ FT GROUNDCOVER 10.31.25 UPON VERIFICATION OF THE RECORDED FREDERICK WATER EASEMENT, EVAULATE FOR 'NO TREES OR SHRUBS SHALL BE PLACED ON FW EASEMENTS' AND ADJUST AS APPLICABLE 27 This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.DATEAS SHOWNCHECKED BYSCALEDESIGNED BYDRAWN BYKHA PROJECT© 2025 KIMLEY-HORN AND ASSOCIATES, INC.11400 COMMERCE PARK DR., SUITE 400, RESTON, VA 20191PHONE: 703-674-1300 FAX: 703-674-1350WWW.KIMLEY-HORN.COM10/31/2025111125000JMHPESHRTVIRGINIAFREDERICK COUNTYFIRESTONE COMPLETEAUTO CAREPREPARED FORZAREMBA GROUP, LLCLANDSCAPE NOTES &DETAILSC07.1 GENERAL NOTES 1.Plants shall be healthy, vigorous material, free of pests and diseases and are subject to approval/rejection of the Landscape Architect prior to, during and after installation. Rejected plant material shall be removed from site. 2.Contractor shall identify all materials at growing location prior to purchase and submit digital photographs, and source list to the Landscape Architect for approval at a minimum of six (6) calendar weeks prior to installation. Plants not approved shall be re-sourced and resubmitted. 3.Planting beds and individual tree plantings shall be mulched continuously as specified. Planting and bed preparation are to be conducted under favorable weather conditions. Under no circumstance shall soil be worked, driven over, or walked upon while in a wet condition. 4.Prior to construction the contractor shall be responsible for locating underground utilities and execute work in a manner that avoids damage to utilities during the course of work. Contractor shall be responsible or remedy of any damage to utilities, structures, site appurtenances that occur as a result of landscape related work. When utility conflicts arise, please contact Landscape Architect. The Contractor is responsible for verifying depths and avoiding conflicts when trenching over or across areas where utilities exist. 5.Contractor is responsible for verifying quantities shown on documents. In the event of discrepancy, the Contractor shall notify the Landscape Architect prior to bid. Field adjustments shall be approved by Landscape Architect prior to installation. Quantities indicated on drawings are for reference; it is the Contractor's responsibility to ensure full coverage of plants at the indicated spacing. Any plant substitutions proposed require written approval by the Landscape Architect. 6.Contractor is responsible for warranty of all plant material, including seeding and sod, for a period of one (1) calendar year from date of substantial completion. Warranty includes maintenance of all plantings including, but not limited to watering, mowing, edging, spraying, mulching, fertilizing, adjusting stakes, weeding, seeding, and sodding of plantings and turf areas. Watering schedule is at the discretion of the Contractor, so long as plants are maintained in a wilt-free condition and maintain survival. Maintenance commences immediately upon arrival of plant material to the site. All plant material shall be watered immediately after planting. Warranty replacement planting shall meet or exceed the original specification identified on drawings. Replacement planting shall extend the same warranty as originally installed materials. Plantings and grass areas shall be flourishing and fully thriving at end of warranty period. 6.1.Plants identified for warranty replacement by Owner or Landscape Architect shall be replaced immediately by the Contractor unless otherwise agreed upon. Plantings (trees, shrubs, groundcover) subject to warranty replacement shall exhibit characteristics of 30% dead-per individual plant, non-contributing or disease compromised. Grass areas suitable for acceptance shall demonstrate 85% sustained/consistent and continuous, densely established coverage. Contractor shall perform a site review at end of warranty period and provide the Owner with written documentation of the site, including plant health, warranty replacement items, and conditions that may be influencing plant health. 7.Contractor shall remove all staking and guying material from plants and site at end of warranty period. 8.Contractor shall comply with all local, state and federal requirements, codes and regulations related to the work undertaken. PERFORMANCE SPECIFICATION A.PLANTS A.General 1.Meet or exceed measurements specified in the plant schedule. 2.Nursery grown, live, well-branched, and healthy plants free of dead branches and parts. 3.Free of disease, insect, injury and damage. 4.Unbroken, intact, dense and solid rootballs and containers, without cracks, flat sides or previously repaired damage. 5.Free of girdling roots or rootbound/circling container conditions. 6.Plants of consistent in growth habit and healthy character. 7.Free of compromising growth conditions such as weak crotch connections, crossed branches, snags and scars. 8.Graded, standards, caliper, sizes and stock consistent with ANSI Z60.1, American Standard for Nursery Stock most current edition. 9.Species identified consistent with Hortus Third: Concise Dictionary of Plants Cultivated in the United States and Canada, most current edition and Manual of Woody Plants: Their Identification, Ornamental Characteristics, Culture, Propagation and Uses, most current edition. 10.All disturbed areas shall be stabilized per the Erosion and Sediment Control Plans, unless otherwise identified on landscape plans. B.Trees: 1.Deciduous Single Trunk a.Full, straight and upright with consistent symmetrical natural branching pattern throughout. b.Type I specification consistent to ANSI standards. 2.Deciduous Multi-Trunk a.Full and upright with straight consistent symmetrical natural branching pattern throughout. b.Canes evenly spaced and of similar growth habit. c.Free of suckers and extraneous branching. 3.Evergreen Single-Trunk a.Full and upright with continuous symmetrical dense natural habit. b.Free of suckers and extraneous branching. c.Do not shear or otherwise prune to shape plantings. C.Evergreen and Deciduous Shrubs 1.Full, dense and naturally symmetrical. 2.Free of suckers and extraneous branching. 3.Do not shear or otherwise prune or shape plantings. D.Evergreen and Deciduous Groundcover 1.Full and dense in pots or flats E.Perennials and Seasonal Color 1.Full and dense in pots or flats F.Turf Grass 1.Subgrade a.Soil Mix-10% Compost, 90% topsoil by volume. b.Preparation: Loosen subgrade to a minimum depth of four (4) inches. Remove all non-natural materials including litter, stones, sticks and all items greater than ¾ inch in any dimension. c.Preparation: Spread soil mix at a depth of four (4) inches continuously to meet grade elevations shown on drawings. Allow for thickness of sod when applicable. 2.Grass Sod a.Sod as specified per plans or as approved by the Landscape Architect. b.Install not longer than twenty-four (24) hours from harvest. c.Grass bed not less than two (2) inches in continuous thickness. d.100% continuous live sod coverage after first growing season and at end of warranty period. e.Of uniform non-varying density and continuous texture quality capable of growth and development immediately upon installation. Weed and noxious plant free. f.Stagger installation rows and place aligned parallel to contours. g.Fill joints solidly with planting bed preparation soil. h.Provide anchor pins at twenty-four (24) inches on center for slopes greater than 4:1. i.All permanent sod shall be listed on the current Virginia turf grass variety recommendations and be blue bag certified. 3.Grass Seed a.Mix as specified per plans or as approved by the Landscape Architect. b.Provide first and new of year seed crops in mix free of weed seeds and deleterious matter. c.Provide seed mix not greater than 15% annual or perennial rye. d.Replacement or overseeding mixes consistent with original application/installation. e.Provide erosion blankets or other slope retention methods as noted on drawings. f.All permanent seed shall be listed on the current Virginia turf grass variety recommendations and be blue bag certified. g.Seed rate equals one (1) pound per 1000 SF, or as per manufacturer's specification, or jurisdictions requirement. II.Materials and Appurtenances A.Testing 1.Materials testing information/certificates/dated labels shall be current to the project and performed/certified not greater than 120 calendar previous days from current date of submittal for review. B.Top Soil 1.Neutral Ph balance 5.5 -7.5. Friable and containing 2.0-5.0% organic matter by dry weight. Continuously free of non-soil items such as stones, debris, sticks, trash, and deleterious matter greater than ¾ inch in any direction. Clay content shall not exceed 25%.Gravel content shall not exceed 10%. Silt shall not exceed 25%. C.Use of Existing Topsoil 1.Existing topsoil on-site may be repurposed with prior Owner or project officer approval. Contractor shall provide soil testing and additive program that demonstrates consistent performance with characteristics and composition as identified in section II.B.1. D.Shredded Hardwood Mulch 1.100% organic shredded first year hardwood free of deleterious matter, rock, gravel and weed seed. Neutral pH balance 5.5-7.5. 2.Mulch top of root ball and saucer within 48 hours to a minimum of 2 inches and to a depth not to exceed 3 inches, or as specified in planting details, whichever is greater. 3.Mulch to bed lines where shown. Hedges are to be mulched as continuous beds, not individually, of the width shown on the plans. Trees shall be mulched within a minimum three (3) foot radius of each trunk or as identified on the plans. No mulch is to be placed in the plant crowns or against tree trunks within 6 inches. E.Compost pH 1.Balanced 5.0-8.5 pH mature, stable and weed free produced by natural aerobic decomposition. Free of visible contaminants and toxic substances. Not greater than 5% sand, silt, clay or rock by dry weight. Consistent with US-EPA CFR Title 40 Part 503 Standards for Class A biosolids. 2.Compost Testing 2.1.Prior to delivery on-site, the following items are required for approval by Owner: Feedstock percentage in final compost product; statement that the products meets federal, state and local health safety requirements. 2.2.Provide copy of lab analysis less than 120 calendar days old verifying that the product meets described physical requirements; chemical contaminants; Ph; physical contaminants; biological contaminants (including a statement that fecal coliform and salmonella testing and results comply with requirements of the US Composting Council Seal of Testing approval programs. G. Planting Soil Mix 1. 75% topsoil and 25% Compost. H.Fertilizer 1.Turf - Granular 10% Nitrogen, 20% Phosphorous, 10% Potassium; Rate as recommended per manufacturer instructions. Product and Material Safety Data as approved by Owner. 2.Trees and Shrubs - Slow-release/tablet, 10% Nitrogen, 6% Phosphorous, 4% Potassium. Product and Material Safety Data as approved by Owner. I.Hardwood Stakes 1.2 x 2 x 48 inch square of sound hardwood. 2.All tree staking shall not conflict with pedestrian travel. J.Tree Ties 1. Villa Non-Abrasive Rubber Tree Ties or as specified per the detail, or approved equal. III.Execution A.Site Conditions 1.Inspect site and notify Owner in writing of acceptance with indication that project conditions are acceptable are suitable to proceed with work. Notify Owner of any existing damage and/or other conflicting conditions. 2.Do not proceed with work until unsatisfactory conditions have been satisfactorily remedied. Notify Owner of acceptance prior to commencement of work. 3.Notify Owner in writing of any conditions that may preclude successful completion of work including items such as coordination with other trades, incomplete work, drainage, soil temperature and/or composition, access to storage/work areas, damage to conditions, etc. 4.Notify Owner in writing immediately of any items that may influence work schedule, timing of tasks, materials delivery and/or installation and warranty responsibilities. 5.Coordinate and cooperate with other trades working in and adjacent to work areas. Examine drawings of other trades which show development of the entire project and become familiar with the scope of required work by others. B.Planting Seasons Recommended seasons are a general guide based on historical climatic data and typical performance of plantings, and which vary dependent on project-specific environmental conditions. Due to construction schedules, recommended planting seasons may or may not coincide with request(s) for certificate of occupancy for projects. Coordination of planting installation and seasons shall be reviewed with Owner on an individual project basis. 1.Recommended planting seasons are March 15 - June 15 (Spring) and September 15 - November 15 (Fall). 2.Do not install plantings or turf grass between June 15 and September 15, without approval by Owner. 2.1.Do not install/plant seed or sod turf grass areas when ambient air temperature is below forty (40) degrees Fahrenheit, or forecast for a twelve (12) hour period after completion of work. C.Positioning & Location of Plantings 1.Position plants to show the most-prominent and well-formed face to most-public view. 2.Field locate plants and location/spacing/dimension of planting beds on project site prior to beginning installation. D.Implementation 1.Pursue work continuously without delay or interruption until completion unless notified otherwise by Owner. 2.Provide project submittals ahead of commencement of work. Landscape Architect requires a minimum of ten (10) working days from date of receipt for review of submittals and response to Owner and Contractor, or per project specifications. 3.Continuously update implementation schedule and notify Owner of progress. Delays related to material availability are not cause for non-completion of scheduled delivery of work. 4.Report delays due to weather or site conditions immediately upon finding. Provide recommendation for remedy of schedule delays. 5.Report delays due to extraordinary natural or other conditions beyond control of Contractor. 6.Excavate planting beds and pockets to a depth required for planting consistent with planting details. 6.1.Remove the burlap, twine, and wire baskets from the top 1/2 of all B&B root balls. 6.2.Remove entirety of plastic pots from all plant material. 6.3.Remove any rock or other underground obstructions to depth necessary to permit planting consistent with planting details. 7.It shall be the responsibility to perform all work in a manner that protects completed work by others, such as curbs, utilities, storm drainage, fences, driveway aprons, drives, vegetation, etc. The Contractor shall be responsible for the cost of satisfactory repair of all damage in kind resulting from their failure to comply. 8.Contractor shall perform a site review at end of warranty period and provide the Owner with written documentation of the site, including plant health, warranty replacement items, and conditions that may be influencing plant health. E.Clean Up 1.The work area is to be kept reasonably neat and clean and all debris hauled away and disposed of legally, off-site, in a timely manner. 2.Remove trash, debris and work materials from site prior to request for substantial completion. Thoroughly clean surfaces impacted by work including building, parking areas, roadways, sidewalks, signs, lights, site furnishings, etc. 3.Repair any damage to existing conditions that occurred during execution of work. 4.All clean-up and demobilization procedures shall be performed to satisfaction of the Owner and Landscape Architect. 2X WIDTH OF ROOT BALL NOTE: SHRUBS INSTALLED IN CONTINUOUS SUCCESSION OR LARGE BED SHALL BE PLACED IN ONE CONTINUOUS DEPTH BED SCARIFY SIDES OF PLANTING PIT SET SHRUB FLUSH TO GRADE OR UP TO 1/8 DEPTH OF ROOT BALL 2-3" LAYER OF MULCH PLANTING SOIL MIX UNDISTURBED SOIL PEDESTAL. SET SHRUB PLUMB IN PLANTING PIT EXISTING SUBGRADE B NOT TO SCALE SHRUB PLANTING 3x WIDEST DIMENSION OF ROOT BALL6'-0"PLAN VIEW NON-ABRAISIVE RUBBER TREE TIES TREE STAKES PREVAILING WIND CENTRAL LEADER REMOVE NURSERY STAKE NON-ABRAISIVE RUBBER TIES. THREE (3) TWO INCH TREE STAKES. INSTALL 6" AWAY FROM EDGE OF THE ROOT BALL. STAKE LOCATION SHALL NOT INTERFERE WITH PERMANENT BRANCHES PRIOR TO MULCHING, LIGHTLY TAMP SOIL AROUND THE ROOT BALL IN 6" LIFTS TO BRACE TREE. DO NOT OVER-COMPACT WHEN THE PLANTING HOLE HAS BEEN BACKFILLED PLANTING SOIL MIX 2-3" LAYER OF MULCH. MULCH ON TOP OF ROOT BALL SHALL NOT EXCEED 1" FINISHED GRADE. EXISTING SUBGRADE. SCARIFY SIDES OF PLANTING PIT TOP OF ROOT BALL SHALL BE FLUSH OR UP TO 1/8 DEPTH OF ROOT BALL WITH FINISHED GRADE. CUT & REMOVE BURLAP & ROPES FROM TOP 1/2 OF ROOTBALL. -NON-BIODEGRADABLE MATERIAL (WIRE BASKET) SHALL BE TOTALLY REMOVED UNDISTURBED SOIL PEDESTAL. SET TREE PLUMB IN PLANTING PIT A NOT TO SCALE DECIDUOUS TREE PLANTING WWLWWL___10.31.25 WWW W W W W W W W W W WWWWWT WWWWWWW W W W W W STOP STOPSTOPEETT T T T T T T T E E E E E E T T TEE TTTTTT TTTTTT 19 7 LODLODLODLODLODLODLODLOD LOD LOD LOD LOD LOD LODLODLODLODLODLODLODLODLODLOD4 FIRESTONE BUILDING ER PROTOTYPE ± 6,607 SF This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.DATEAS SHOWNCHECKED BYSCALEDESIGNED BYDRAWN BYKHA PROJECT© 2025 KIMLEY-HORN AND ASSOCIATES, INC.CALL "MISS UTILITY" 811 11400 COMMERCE PARK DR., SUITE 400, RESTON, VA 20191PHONE: 703-674-1300 FAX: 703-674-1350WWW.KIMLEY-HORN.COM10/31/2025111125000JMHPESHRTVIRGINIAFREDERICK COUNTYFIRESTONE COMPLETEAUTO CAREPREPARED FORZAREMBA GROUP, LLCNORTH IRRIGATION PLANC07.2WWL WWLABEIRRIGATION COVERAGE LEGEND AREAS TO BE IRRIGATED, SEE LANDSCAPE IRRIGATION SPECIFICATION 32 84 00 FOR REQUIREMENTS NOTES: PROVIDE SEPARATE IRRIGATION ZONES FOR FOR ALL TURF, WOODY ORNAMENTALS, AND SHRUBS. ADDITIONAL ZONING MAY BE REQUIRED BASED ON PLANT MATERIAL WATER USAGE. 10.31.25 IRRIGATION LINES, CONTROL WIRES ETC. THAT CROSS FW EASEMENT SHALL HAVE MIN. 18" VERTICVAL SEPARATION AND BE PLACED WITHIN CONDUIT THROUGH ENTIRE FW ESMT. SHOW AND LABEL ON THIS SHEET, UTILITY PLAN AND PROFILES AS APPLICABLE 28 3/8" WIDE x 1 2 " DEEP MAX TOOLED JOINT NOTES: 1.EXPANSION JOINTS SHALL BE PROVIDED @ 15' INTERVALS MAX. AND AT MEETING OF ALL PAVEMENTS, WALLS, STEPS, VERTICAL SURFACES, BACKS OF CURB, SIGN POSTS, LIGHT POLES, ETC... 2.1/4" RADIUS ON ALL TOOLED EDGES. 3.EXPANSION JOINTS RECESSED 1/4" BELOW FINISH GRADE OF WALK. 4.CONTROL JOINTS SHALL BE PROVIDED @ 5' INTERVALS MAX. SELF-LEVELING SEALANT, COLOR TO MATCH COLOR OF ADJACENT PAVING / BACKER ROD, NO BOND TO SEALANT / 1 2" POLYSTYRENE FOAM EXPANSION JOINT SIDEWALK JOINT DETAIL Scale: N.T.S. 1/2" EXPANSION JOINT 3/8" CONTROL JOINT 95% COMPACTED SUBGRADE95% COMPACTED SUBGRADE 1/2" 5 36" 18" 48" 6" 6" 6" STEEL BOLLARD CONCRETE FILLED BLACK PLASTIC COVER TO BE INSTALLED OVER STEEL BOLLARD 4000 PSI CONCRETE GROUND SURFACE (VARIES) COLOR: BLACK POWDER COAT QTY: 2 STEEL PIPE ID = 6" STEEL PIPE OD = 6.625" SLEEVE ID = 6 7/8" 6 7/8"1/4 CROSS SECTION OF SLEEVE This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.DATEAS SHOWNCHECKED BYSCALEDESIGNED BYDRAWN BYKHA PROJECT 2025 KIMLEY-HORN AND ASSOCIATES, INC.CALL "MISS UTILITY" 811 11400 COMMERCE PARK DR., SUITE 400, RESTON, VA 20191PHONE: 703-674-1300 FAX: 703-674-1350WWW.KIMLEY-HORN.COM10/31/2025111125000JMHPESHRTVIRGINIAFREDERICK COUNTYFIRESTONE COMPLETEAUTO CAREPREPARED FOR=AREMBA GROUP, LLCSITE DETAILS 1 OF 2C09 PAVEMENT SECTIONS N.T.S. PAVEMENT SECTION DETAILS FOR SCHEMATIC PURPOSES ONLY. SECTIONS TO BE VERIFIED WITH FINAL GEOTECHNICAL REPORT PRIOR TO CONSTRUCTION PAVEMENT SECTIONS N.T.S.4 NOTES: 1.METHODS AND MATERIALS SHALL CONFORM TO VDOT STANDARDS. 2.GEOTECHNICAL ENGINEER TO PROVIDE PAVEMENT SECTION RECOMMENDATION USING THE FOLLOWING DESIGN CRITERIA: - 20-YEAR DESIGN LIFE - 50-PASSENGER VEHICLES PER BUILDING, PER DAY - 2 TRUCKS/DELIVERIES PER BUILDING, PER DAY - AASHTO HS-20 LOADING STANDARD 3.GEOTECHNICAL ENGINEER TO REVIEW AND PROVIDE PAVEMENT SECTION RECOMMENDATION APPLICABLE TO INDIVIDUAL SITE CONDITIONS. ALL VEHICLE-RATED SECTIONS SHALL BE DESIGNED TO AASHTO HS-20 LOADING CRITERIA. 4.ALL PUBLIC ROADS ARE SUBJECT TO FINAL PAVEMENT DESIGN APPROVAL BY APPLICABLE STATE AND LOCAL GOVERNMENT. 5.SEE 033000 CAST-IN-PLACE CONCRETE SPECIFICATION FOR CONCRETE INSTALLATION INFORMATION,SUSTAINABILITY RE4UIREMENTS, AND EMBODIED CARBON LIMITS. CONCRETE SHOWN IN CIVIL DRAWINGS IS TO BE CONSIDERED WHEN CALCULATING THE PROJECT-WIDE EMBODIED CARBON REDUCTION. 6.IN LIEU OF HMA, WARM MIX ASPHALT WMA IS PREFERRED AND SHALL BE PSECIFIED BY DESIGNER WHERE AHJ ALLOWABLE AND WHERE WMA IS READILY AVAILABLE AT LOCAL PRODUCTION PLANTS. STANDARD DUTY MINIMUM CONCRETE PAVEMENT SECTION NOT TO SCALE 6.0" BASE STONE MATERIAL VDOT SECTION 208 21A/B STONE 5" PORTLAND CEMENT CONCRETE VDOT SECTION 217 HEAVY DUTY MINIMUM CONCRETE PAVEMENT SECTION NOT TO SCALE ADA SYMBOL DETAIL Scale: N.T.S.7 ADA SIGN DETAIL Scale: N.T.S.6 STANDARD CURB & GUTTER DETAIL Scale: N.T.S.STANDARD CURB DETAIL Scale: N.T.S.9 ADA RAMP DETAIL Scale: N.T.S.3 BOLLARD DETAIL N.T.S.1 6.0" BASE STONE MATERIAL VDOT SECTION 208 21A/B STONE 7" PORTLAND CEMENT CONCRETE VDOT SECTION 217 This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.DATEAS SHOWNCHECKED BYSCALEDESIGNED BYDRAWN BYKHA PROJECT 2025 KIMLEY-HORN AND ASSOCIATES, INC.CALL "MISS UTILITY" 811 11400 COMMERCE PARK DR., SUITE 400, RESTON, VA 20191PHONE: 703-674-1300 FAX: 703-674-1350WWW.KIMLEY-HORN.COM10/31/2025111125000JMHPESHRTVIRGINIAFREDERICK COUNTYFIRESTONE COMPLETEAUTO CAREPREPARED FOR=AREMBA GROUP, LLCSITE DETAILS 2 OF 2C10 LABEL AS ; FOR REFERENCE OF KEY COMPONENTS RELATED TO INTERIOR COMBINE RISER 29 This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.DATEAS SHOWNCHECKED BYSCALEDESIGNED BYDRAWN BYKHA PROJECT 2025 KIMLEY-HORN AND ASSOCIATES, INC.11400 COMMERCE PARK DR., SUITE 400, RESTON, VA 20191PHONE: 703-674-1300 FAX: 703-674-1350WWW.KIMLEY-HORN.COM10/31/2025111125000JMHPESHRTVIRGINIAFREDERICK COUNTYFIRESTONE COMPLETEAUTO CAREPREPARED FOR=AREMBA GROUP, LLCPROFFERS 1 OF 2C11 This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.DATEAS SHOWNCHECKED BYSCALEDESIGNED BYDRAWN BYKHA PROJECT 2025 KIMLEY-HORN AND ASSOCIATES, INC.11400 COMMERCE PARK DR., SUITE 400, RESTON, VA 20191PHONE: 703-674-1300 FAX: 703-674-1350WWW.KIMLEY-HORN.COM10/31/2025111125000JMHPESHRTVIRGINIAFREDERICK COUNTYFIRESTONE COMPLETEAUTO CAREPREPARED FOR=AREMBA GROUP, LLCPROFFERS 2 OF 2C12 ALTA 1 This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.DATEAS SHOWNCHECKED BYSCALEDESIGNED BYDRAWN BYKHA PROJECT 2025 KIMLEY-HORN AND ASSOCIATES, INC.CALL "MISS UTILITY" 811 11400 COMMERCE PARK DR., SUITE 400, RESTON, VA 20191PHONE: 703-674-1300 FAX: 703-674-1350WWW.KIMLEY-HORN.COM10/31/2025111125000JMHPESHRTVIRGINIAFREDERICK COUNTYFIRESTONE COMPLETEAUTO CAREPREPARED FOR=AREMBA GROUP, LLCLIGHTING PLANPSL 1 73'-1/4"