Loading...
HomeMy WebLinkAbout05. Firestone Water Supply Report 2026-02-25 (002) LOS ANGELES • ST. LOUIS • CHICAGO • NEW YORK 2043 Woodland Parkway, Suite 300, St. Louis, Missouri 63146 (314) 991-2633 codeconsultants.com February 25, 2026 Todd Hamula Zaremba Group 14600 Detroit Avenue, Suite 1500 Lakewood, OH 44107 RE: FIRESTONE – WINCHESTER, VA FIREFLOW DEMAND PROJECT NO. 250809.06.000 Dear Todd: The following water supply analysis is documented by the letter and attached report. Hydrant Flow Test Results The Hydrant Flow Test was conducted by Patriot Fire & Security for the proposed Firestone site. The pertinent data is as follows: Date of Test August 12, 2025 Static Pressure 72 psi Residual Pressure 38 psi Flow 1,959 gpm Elevation of Test Hydrant 691 ft. AMSL Location of Test The Test Hydrant was located at intersection of Market Street and the access road 500 ft northeast of Merchant Street. The Flow Hydrant was located approximately 275 ft South of the test hydrant location. Pursuant to the receipt of this information we have been able to define the safety factor to be applied to this raw data to be as follows: FIRE DEPARTMENT: None required or recommended CCI will apply a safety factor of at least 10% (8 psi) to the static pressure indicated above and will adjust the pressure relative to the effective point of the test. The resultant water supply curve to be used as the basis of design is defined by the following coordinates: Static Pressure 64 psi Residual Pressure 30 psi Flow 1,959 gpm Todd Hamula February 25, 2026 Page 2 Location/Elevation of Effective Point At the Test Hydrant located at the intersection of Market Street and the access road 500 ft northeast of Merchant Street. Elevation of Water Source 691 ft AMSL or 1.5 ft below the assumed finished floor. Fire Flow Analysis Pursuant to the receipt of this information we have been able to define the required fire flow for a sprinklered facility as follows: Virginia Statewide Fire Prevention Code Appendix B Building Construction Type V-B (Virginia Construction Code) Building Fire Flow Area 6,578 sq ft Minimum Required Fire Flow Duration 2 hours Minimum Required Fire Flow 1,500 gpm Maximum Daily Domestic Flow 26 gpm Calculated Available Flow @ 20 psi 2,464 gpm Conclusion Based on the current configuration, the system DOES APPEAR to have SUFFICIENT fire flow for a sprinklered facility. These results are based on preliminary configurations. The actual utility layout at the site may increase or decrease the available pressure. The final design layout shall be used as a basis for the actual water supply to provide the fire flow required. Sincerely, Jim Kinslohr, PE Principal Attachment JLK/ka \250809.06.000 BSRO-Winchetser, VA Water Supply Report 2026-02-25.docx CODE CONSULTANTS, INC. 2043 WOODLAND PKWY, SUITE 300 ST. LOUIS, MO 63146-4235 PHONE: 314-991-2633 CORPORATE CERTIFICATE OF AUTHORITY NO. 0407004245 JAMES L. KINSLOHR, PE LICENSE NO. 0402063201 ENGINEER OF RECORD: Sprinkler System/Flow Test VerificationLocation:Winchester, VAReport Date:2/24/2026Safety Factor 8.0 psiReviewer:KASAdj High Static:psiExisting Sprinkler Placards Water Supply Water SupplyStatic:72.0 psiSystem Area Description Residual (PSI)Safety (PSI)Req. Pres. (PSI)System Flow (GPM)Inside Hose (GPM)Outside Hose (GPM)Required Flow (GPM)Pres. (PSI)Flow (GPM)Pres. (PSI)Flow (GPM)Residual:38.0 psi- - - 72.00 64.0 0 HYD 1 HYD 2- - - 51.31500 43.3 1500Pitot:15.0 psi 15.0 psi- - - 38.01959 30.0 1959Orifice Size:2.5in.2.5in.- - - 28.12250 20.1 2250Num. Of Butts:2 2- - - 20.02464 12.0 2464Coefficient:0.9 0.9-2.93000 -10.9 3000Calculated Flow: 653gpm1306gpmHydraulic Log Graph N1.85202464202252 Total Flow: 1959gpm4000Flow (gpm)10 800 1200 1600 2000 2400 2800 3200 3600-----0.010.020.030.040.050.060.070.080.090.0100.0110.0120.0130.0140.0150.0160.0170.0180.0190.0200.0Pressure (psi)Required Fire Flow:Static: 72.0 psiResidual: 51.3 psiFlow: 1,500 gpmTest PointStatic: 72.0 psiResidual: 38.0 psiFlow: 1,959 gpmAdjusted curve forsafety factorAvailable Fire Flow:Static: 72 psiResidual: 20 psiFlow: 2,464 gpm FIRE FLOW DEMAND CALCULATIONLocation:Winchester, VAReport Date:2/24/2026Static Residual Residual0 1959 15001 psi: 72.0 38.0 51.32 -8.0-10.0-8.03 1.5 -0.6-0.6-0.64 Underground Loss 0.0 -3.35 63.427.439.42Note: System DOES appear to have sufficient pressure at the required FIRE FLOW to support the site. Available at Base of FIRE FLOW hydrant with Underground Site LossElevation Adjustment (0.433 x ft.) To Base of RiserFire Sprinkler Water Supply Available for Design Available per TestSafety Factorgpm:12" DI @ 275 L.F. 8" DI @ 793 L.F. + (3) Tee +(2) 45 Elbows8" DI @ 75 L.F. + (1) Tee + (1) 90 Elbow LEGEND S W LOD PROPERTY LINE PROPOSED LIMITS OF DISTURBANCE PROPOSED SANITARY SEWER PROPOSED WATER LINE 10 UTILITY EASEMENT 1.FINAL BUILDING CONNECTIONS FOR ALL UTILITIES TO BE COORDINATED WITH MEP TEAM. 2.WATER AND SEWER LINES SHALL TERMINATE 5 FROM THE BUILDING FOR SERVICE CONNECTIONS UNLESS NOTED OTHERWISE. 3.ALL PVC SANITARY SEWER PIPES TO BE PVC DR25 CONFORMING TO AWWA C900 UNLESS OTHERWISE NOTED. 4.CONTRACTOR TO CONFIRM SI=E OF ALL EXISTING UTILITIES. 5.FREDERICK WATER¶S WATER AND SEWER STANDARDS AND SPECIFICATIONS ARE AVAILABLE AT WWW.FREDERICKWATER.COM 6.THE CONTRACTOR SHALL ADHERE TO FREDERICK WATER STANDARDS AND SPECIFICATIONS IN EFFECT AT THE TIME OF CONSTRUCTION. 7.THE CONTRACTOR SHALL SCHEDULE A PRE-CONSTRUCTION MEETING WITH THE FREDERICK WATER INSPECTOR PRIOR TO COMMENCING INSTALLATION OF ANY WATER OR SEWER FACILITIES. CONTRACTOR SHALL ALSO ARRANGE FOR INSPECTION OF SAID FACILITIES BY FREDERICK WATER. OIL WATER SEPARATORS AND/OR GREASE TRAPS MAY BE RE4UIRED BY FREDERICK COUNTY BUILDING INSPECTIONS. BOTH FREDERICK COUNTY BUILDING INSPECTIONS AND FREDERICK WATER WILL INSPECT THE INSTALLATION OF THOSE FACILITIES. BOTH INSPECTIONS SHALL BE SCHEDULED BY CONTRACTOR. .THE CONTRACTOR SHALL CONNECT A NEW SEWER LINE TO AN EXISTING MANHOLE BY CORE DRILLING THE MANHOLE. 9.A NEW WATER OR FORCED SEWER MAIN SHALL BE CONNECTED TO AN EXISTING MAIN BY A A CUT-IN TEE WITH ACCOMPANYING VALVES. 10.EXACT LOCATIONS OF WATER AND SEWER SERVICES ON NEW LINES ARE TO BE COORDINATED WITH FREDERICK WATER¶S INSPECTOR. 10.1.ADJUST FREDERICK WATER FACILITIES TO GRADE AS RE4UIRED BY THE FREDERICK WATER INSPECTOR. 11.FREDERICK WATER¶S MAINTENANCE DIVISION SHALL FURNISH AND INSTALL ALL WATER METERS THROUGH 2 INCH IN SI=E. IT IS THE CONTRACTOR¶S RESPONSIBILITY TO HAVE THE METER BOX ASSEMBLY INSTALLED CORRECTLY. BEFORE A PERMANENT METER IS INSTALLED: 11.1.THE METER BOX, WITH ITS FRAME AND COVER, MUST BE PROPERLY ALIGNED WITH THE YOKE BAR. 11.2.THE FRAME AND COVER SHALL BE SET TO FINAL GRADE. 11.3.THE DISTANCE BETWEEN THE TOP OF THE COVER AND THE YOKE BAR SHALL BE BETWEEN 20 AND 23 INCHES. 11.4.ALL COMPONENTS OF THE METER BOX ASSEMBLY SHALL BE IN PROPER WORKING ORDER. 12.FOR SERVICES THAT CONNECT TO EXISTING LINES: 12.1.FREDERICK WATER SHALL FURNISH AND INSTALL: 12.1.1.ALL ǫ´Xô´, ô´, 1´, 1ò´ AND 2´ WATER SERVICES 12.1.2.ALL SEWER SERVICES. 12.2.THE OWNER/DEVELOPER SHALL: 12.2.1.COORDINATE OR HAVE THE CONTRACTOR COORDINATE THE LOCATION OF THE SERVICE LATERAL WITH FREDERICK WATER¶S ENGINEERING ASSISTANT. 12.2.2.SUBMIT AN APPLICATION FOR SERVICE AND PAY THE RE4UIRED FEES. 13.ALL WATER SERVICE LINES MUST HAVE A BACKFLOW PREVENTION ASSEMBLY DOUBLE CHECK VALVE OR RP=, AS RE4UIRED . THE ASSEMBLY MUST MEET ASSE STANDARD NUMBER 1015 OR 1013. 14.ALL FIRE LINES MUST HAVE A BACKFLOW PREVENTION ASSEMBLY DETECTOR DOUBLE CHECK VALVE OR RP=, AS RE4UIRED . THE ASSEMBLY SHALL MEET ASSE STANDARD NUMBER 104 OR 1047. ANY PRIVATELY OWNED FIRE LINE, INTERIOR OR EXTERIOR, SHALL ALSO HAVE A FIRE SERVICE METER. THIS ASSEMBLY SHALL BE INSTALLED IMMEDIATELY BEFORE THE BACKFLOW PREVENTION UNIT. RADIO READ REMOTES ARE RE4UIRED. 15.FREDERICK WATER SHALL REVIEW THE MECHANICAL PLAN S FOR DESIGN AND MATERIAL APPROVAL OF A BUILDING¶S: 15.1.DOMESTIC WATER METER AND ITS BACKFLOW PREVENTION DEVICE, AND/OR ITS 15.2.FIRE SERVICE LINE¶S WATER METER AND BACKFLOW PREVENTION DEVICE. 16.DE4 MUST ALSO APPROVE SEWER PUMP STATIONS. FREDERICK WATER RE4UIRES A COPY OF DE4¶S CERTIFICATE TO OPERATE AND A COPY OF THE STATION¶S DE4 APPROVED O M MANUAL. THESE DOCUMENTS MUST BE RECEIVED BEFORE SUBSTANTIAL COMPLETION IS ISSUED AND WATER METERS RELEASED. 17.VALVES, MANHOLES, ARV S AND OTHER FREDERICK WATER SURFACE FEATURES SHALL NOT BE PLACED IN CURB AND GUTTER, NOR SLOPED PORTION OF HANDICAPPED RAMPS. CONTRACTOR SHALL COORDINATE LOCATIONS WITH THE FREDERICK WATER INSPECTOR. 1.IRRIGATION LINES AND DEVICES, LIGHT POLES, TRANSFORMERS, JUNCTION BOXES, PEDESTALS, OTHER OBSTACLES AND ALL DRY UTILITIES SHALL NOT BE PLACED ON FREDERICK WATER EASEMENTS. PERPENDICULAR IRRIGATION LINES AND DRY UTILITY CROSSINGS ARE PERMITTED WITH 1 MINIMUM VERTICAL SEPARATION AND PLACED IN CONDUIT OR SLEEVE WITHIN THE FREDERICK WATER EASEMENT SHOWN AND LABELED ON PLANS AND PROFILES. 19.RETAINING WALLS AND THEIR TIE BACKS SUCH AS GEO GRID OR OTHER SUPPORTS SHALL NOT BE PLACED IN FREDERICK WATER EASEMENTS. 20.CONTRACTOR SHALL TEST PIT AS RE4UIRED AND ADJUST ALL EXISTING FREDERICK WATER FACILITIES TO GRADE PER THE FREDERICK WATER INSPECTORS RE4UIREMENTS. 21.IF EXISTING FREDERICK WATER FACILITIES ARE REMOVED, THE REMOVED ITEMS AND RELATED MATERIALS SHALL BE REPLACED WITH NEW MATERIALS. REMOVED MATERIALS SHALL BE FURNISHED TO THE FREDERICK WATER INSPECTOR. 22.FIRE AND/OR DOMESTIC RISER METER, BACKFLOW DEVICES, ASSOCIATED VALVES AND PIPING SHALL BE PER THE FREDERICK WATER INSPECTOR, FREDERICK COUNTY FIRE MARSHAL AND FREDERICK COUNTY INSPECTION DEPARTMENT RE4UIREMENTS PROPOSED STORM STRUCTURE PROPOSED STORM PIPE GENERAL NOTES PROPOSED ELECTRIC LINE GAS GAS PROPOSED GAS LINE UGE PROPOSED UNDERGROUND ELECTRIC LINE WWW W W W W W W W W W WWWWWT WWWWWWW W W W W W STOP STOPSTOPEETT T T T T T T T E E E E E E T T TEE TTTTTT TTTTTT 10 P.R.L. 35 B.R.L.35 B.R.L.10 P.R.L.WLODLODLODLODLODLODLODLOD LOD LOD LOD LOD LOD LODLODLODLODLODLODLODLODLODLODGAS BUILDING CONNECTION SANITARY BUILDING CONNECTION GASUGEUGEU G E UGE UGE UGE UGE UGE UGE UGE UGE UGE UGEUGEUGEUGEUGEWSWWWW OIL/ WATER SEPARATOR. SEE PLUMBING AND ARCHITECTURAL DRAWINGS FOR DETAIL. S04 S03 S02 S01 2 LF OF 6 PVC # 2.50 27 LF OF 6 PVC # 2.50  LF OF 4 PVC # 2.0 4 LF OF 4 PVC # 2.0 12 LF OF 4 PVC # 2.0STA: 1000.92  COMBINED DOMESTIC/FIRE SERVICE CONNECTION W/ 1 DOMESTIC METER AND BACKFLOW PREVENTER STA: 1041.46 CORP. STOP STA: 1041.44 200 PSI CTS POLYETHELENE TUBING AND 3/4 IRRIGATION METER W/ BACKFLOW PREVENTER STA: 1064.06  MJ 45ƒ BEND STA: 106.63  X  CUT-IN TEE 2  MJ GV 2 MJ LONG SOLID SLEEVES CONTRACTOR TO COMPLETE S05 FIRESTONE BUILDING ER PROTOTYPE “ 6,607 SF ELECTRIC AND TELECOM BUILDING CONNECTION PRIVATE IRRIGATION TO BE DESIGNED UNDER SEPARATE COVER  DI CL 52 WATER LINESTA: 1011.92  MJ GV W/ ROADWAY BOX SEE WATER MAIN CONNECTION/DISCONNECTION NOTES ON SHEET C02 FDC 1.00 9.00 1.00 END OF FREDERICK WATER 20 EASEMENT PRIVATEOWNERSHIPFREDERICK WATERADDITIONAL GATE VALVE RE4UIRED AT MAIN FOR RISER PRIVATE OWNERSHIPFREDERICKWATERPROPOSED FIRE HYDRANT IRRIGATION LINES, CONTROL WIRES, ETC. THAT CROSS FW EASEMENTS SHALL HAVE MIN. 1 VERTICAL SEPARATION AND BE PLACED WITHIN CONDUIT THROUGH ENTIRE FW EASEMENT STA: 103.64 6 X  TEE 6 MJ GV STRUCTURE TABLE STRUCTURE NAME: EX MH1 S01 S02 S03 S04 S04.1-IN S04.1-OUT S05 DETAILS: MH RIM: 692.24 INV IN: 62.95 MH RIM: 692.16 INV IN: 63.55 INV OUT: 63.35 6 SSCO RIM: 692.20 INV IN: 64.44 INV OUT: 64.24 MH RIM: 692.35 INV IN: 67.60 INV OUT: 65.14 6 SSCO RIM: 692.1 INV IN: 6.25 INV OUT: 6.05 OIL/WATER SEPARATOR IN RIM: 6.33 INV IN: 67.96 OIL/WATER SEPARATOR OUT RIM: 6.13 INV OUT: 67.76 BUILDING CONNECTION RIM: 6.7 INV OUT: 6.50 PIPES IN: FROM S01, 6 PVC INV IN: 62.95 # 0.95 FROM S02, 6 PVC INV IN: 63.55 # 2.50 FROM S03, 6 PVC INV IN: 64.44 # 2.50 FROM S04.1-OUT, 4 PVC INV IN: 67.60 # 2.0 FROM S05, 4 PVC INV IN: 6.25 # 2.0 FROM S04, 4 PVC INV IN: 67.96 # 2.0 PIPES OUT TO EX MH1, 6 PVC INV OUT: 63.35 # 0.95 TO S01, 6 PVC INV OUT: 64.24 # 2.50 TO S02, 6 PVC INV OUT: 65.14 # 2.50 TO S04.1-IN, 4 PVC INV OUT: 6.05 # 2.0 TO S03, 4 PVC INV OUT: 67.76 # 2.0 TO S04, 4 PVC INV OUT: 6.50 # 2.0 1.TANK SECTIONS SHALL BE BOLTED TOGETHER 2.WATERTIGHT BOLT DOWN FRAME AND COVERS ARE RE4UIRED 3.PENETRATIONS SHALL HAVE BOOTS 4.TANK, COMPONENTS, AND INSTALLATION SHALL BE TRAFFIC RATED 5.CONTRACTOR SHALL COORDINATE INSTALLATION AND INSPECTIONS WITH BOTH FREDERICK COUNTY INSPECTIONS DEPARTMENT AND FREDERICK WATER. OIL WATER SEPARATOR NOTES This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.DATEAS SHOWNCHECKED BYSCALEDESIGNED BYDRAWN BYKHA PROJECT‹ 2025 KIMLEY-HORN AND ASSOCIATES, INC.CALL "MISS UTILITY" 811 11400 COMMERCE PARK DR., SUITE 400, RESTON, VA 20191PHONE: 703-674-1300 FAX: 703-674-1350WWW.KIMLEY-HORN.COM1/16/2026111125000JMHJMHCMHVIRGINIAFREDERICK COUNTYFIRESTONE COMPLETEAUTO CAREPREPARED FOR=AREMBA GROUP, LLCUTILITY PLANC05NORTH CALCULATIONS FOR AVAILABLE FLOW AT 20 PSI 4R 4F HRA0.54 / HFA0.54 4R 1210 65A0.54 / 33A0.54 4R 1,745 GPM 4F 1210 GPM HR 5 - 20 65 HF 5 - 52 33 S U2 20'-0" 20'-0" U1 BOR H1 U3 SITEStatic ResidualStatic: 72.0 psiResidual: 38.0 psiFlow: 1959 gpm(653 gpm at 3 outlets) Code Consultants Inc. 2043 Woodland Parkway Suite 300 St. Louis, MO 63146 314-991-2633 Job Name : 250809.06.000 BSRO Winchester, VA - Area 1 Building : Location : System : Contract : Data File : 250809.06.000 BSRO Winchester, VA - UG loss.WXF Computer Programs by Hydratec Inc. Revision: 50.5520.727 Code Consultants Inc. Page 1 250809.06.000 BSRO Winchester, VA - Area 1 Date 10203040E50R60U70S80S90E100R110P120130140150200 400 600 800 1000 1200 1400 1600 1800FLOW ( N ^ 1.85 )City Water Supply: Demand:C1C2C1 - Static Pressure : 72 C2 - Residual Pressure: 38 C2 - Residual Flow : 1959 D1 - Elevation : _______D2 - System Flow : _______D2 - System Pressure : 1.645 Hose ( Demand ) : 1526 D3 - System Demand : 1526 Safety Margin : 48.937 D1D2D3Water Supply CurveComputer Programs by Hydratec Inc. Revision: 50.5520.727 Code Consultants Inc. Page 2 250809.06.000 BSRO Winchester, VA - Area 1 Date Fitting Legend Abbrev. Name ½ ¾ 1 1¼ 1½ 2 2½ 3 3½ 4 5 6 8 10 12 14 16 18 20 24 E NFPA 13 90' Standard Elbow 1 2 2 3 4 5 6 7 8 10 12 14 18 22 27 35 40 45 50 61 F NFPA 13 45' Elbow 1 1 1 1 2 2 3 3 3 4 5 7 9 11 13 17 19 21 24 28 G NFPA 13 Gate Valve 0 0 0 0 0 1 1 1 1 2 2 3 4 5 6 7 8 10 11 13 T NFPA 13 90' Flow thru Tee 3 4 5 6 8 10 12 15 17 20 25 30 35 50 6071 81 91 101 121 Units Summary Diameter Units Inches Length Units Feet Flow Units US Gallons per Minute Pressure Units Pounds per Square Inch Note: Fitting Legend provides equivalent pipe lengths for fittings types of various diameters. Equivalent lengths shown are standard for actual diameters of Sched 40 pipe and CFactors of 120 except as noted with *. The fittings marked with a * show equivalent lengths values supplied by manufacturers based on specific pipe diameters and CFactors and they require no adjustment. All values for fittings not marked with a * will be adjusted in the calculation for CFactors of other than 120 and diameters other than Sched 40 per NFPA. Fittings Used SummaryComputer Programs by Hydratec Inc. Revision: 50.5520.727 Code Consultants Inc. Page 3 250809.06.000 BSRO Winchester, VA - Area 1 Date SUPPLY ANALYSIS Node at Static Residual Available Source Pressure Pressure Flow Pressure Total Demand Required Pressure S 72.0 38 1959.0 50.581 1526.0 1.645 NODE ANALYSIS Pressure Discharge Node Tag Elevation Node Type at Node at Node Notes BOR 0.0 0.0 26.0 U1 0.0 0.0 1500.0 U2 0.0 1.16 U3 0.0 1.26 S 0.0 1.64 H1 0.0 0.53 Flow Summary - NFPA Computer Programs by Hydratec Inc. Revision: 50.5520.727 Code Consultants Inc. Page 4 250809.06.000 BSRO Winchester, VA - Area 1 Date Node1 Elev1 K Qa Nom Fitting Pipe CFact Pt to or Ftngs Pe ******* Notes ****** Node2 Elev2 Fact Qt Act Eqiv Len Total Pf/Ft Pf BOR 0 H26 26.00 8 E 28.468 75.000 140 0.0 to T 55.354 90.148 0.0 U1 0 26.0 8.27 G 6.326 165.148 0 0.001 Vel = 0.16 U1 0 609.23 8 E 28.468 375.000 140 0.001 to T 55.354 83.822 0.0 U2 0 635.23 8.27 458.822 0.0025 1.158 Vel = 3.79 U2 0 0.0 12 275.000 140 1.159 to 0.0 U3 0 635.23 12.34 275.000 0.0004 0.099 Vel = 1.70 U3 0 0.0 8 T 55.354 98.000 140 1.258 to 55.354 0.0 S 0 635.23 8.27 153.354 0.0025 0.387 Vel = 3.79 0.0 S 635.23 1.645 K Factor = 495.28 U1 0 H1500 890.77 8 112.000 140 0.001 to 0.0 H1 0 890.77 8.27 112.000 0.0047 0.528 Vel = 5.32 H1 0 0.0 8 2F 28.468 208.000 140 0.529 to 28.468 0.0 S 0 890.77 8.27 236.468 0.0047 1.116 Vel = 5.32 0.0 S 890.77 1.645 K Factor = 694.52 Final Calculations : Hazen-Williams Computer Programs by Hydratec Inc. Revision: 50.5520.727