HomeMy WebLinkAbout05. Firestone Water Supply Report 2026-02-25 (002)
LOS ANGELES • ST. LOUIS • CHICAGO • NEW YORK
2043 Woodland Parkway, Suite 300, St. Louis, Missouri 63146 (314) 991-2633
codeconsultants.com
February 25, 2026
Todd Hamula
Zaremba Group
14600 Detroit Avenue, Suite 1500
Lakewood, OH 44107
RE: FIRESTONE – WINCHESTER, VA
FIREFLOW DEMAND
PROJECT NO. 250809.06.000
Dear Todd:
The following water supply analysis is documented by the letter and attached report.
Hydrant Flow Test Results
The Hydrant Flow Test was conducted by Patriot Fire & Security for the proposed Firestone site. The
pertinent data is as follows:
Date of Test August 12, 2025
Static Pressure 72 psi
Residual Pressure 38 psi
Flow 1,959 gpm
Elevation of Test Hydrant 691 ft. AMSL
Location of Test The Test Hydrant was located at intersection of Market
Street and the access road 500 ft northeast of Merchant
Street. The Flow Hydrant was located approximately
275 ft South of the test hydrant location.
Pursuant to the receipt of this information we have been able to define the safety factor to be applied to this
raw data to be as follows:
FIRE DEPARTMENT: None required or recommended
CCI will apply a safety factor of at least 10% (8 psi) to the static pressure indicated above and will adjust
the pressure relative to the effective point of the test. The resultant water supply curve to be used as the
basis of design is defined by the following coordinates:
Static Pressure 64 psi
Residual Pressure 30 psi
Flow 1,959 gpm
Todd Hamula
February 25, 2026
Page 2
Location/Elevation of Effective Point At the Test Hydrant located at the intersection of Market
Street and the access road 500 ft northeast of Merchant
Street.
Elevation of Water Source 691 ft AMSL or 1.5 ft below the assumed finished floor.
Fire Flow Analysis
Pursuant to the receipt of this information we have been able to define the required fire flow for a sprinklered
facility as follows:
Virginia Statewide Fire Prevention Code Appendix B
Building Construction Type V-B (Virginia Construction Code)
Building Fire Flow Area 6,578 sq ft
Minimum Required Fire Flow Duration 2 hours
Minimum Required Fire Flow 1,500 gpm
Maximum Daily Domestic Flow 26 gpm
Calculated Available Flow @ 20 psi 2,464 gpm
Conclusion
Based on the current configuration, the system DOES APPEAR to have SUFFICIENT fire flow for a
sprinklered facility. These results are based on preliminary configurations. The actual utility layout at the
site may increase or decrease the available pressure. The final design layout shall be used as a basis for
the actual water supply to provide the fire flow required.
Sincerely,
Jim Kinslohr, PE
Principal
Attachment
JLK/ka
\250809.06.000 BSRO-Winchetser, VA Water Supply Report 2026-02-25.docx
CODE CONSULTANTS, INC.
2043 WOODLAND PKWY, SUITE 300
ST. LOUIS, MO 63146-4235
PHONE: 314-991-2633
CORPORATE CERTIFICATE OF AUTHORITY
NO. 0407004245
JAMES L. KINSLOHR, PE
LICENSE NO. 0402063201
ENGINEER OF RECORD:
Sprinkler System/Flow Test VerificationLocation:Winchester, VAReport Date:2/24/2026Safety Factor 8.0 psiReviewer:KASAdj High Static:psiExisting Sprinkler Placards Water Supply Water SupplyStatic:72.0 psiSystem Area Description Residual (PSI)Safety (PSI)Req. Pres. (PSI)System Flow (GPM)Inside Hose (GPM)Outside Hose (GPM)Required Flow (GPM)Pres. (PSI)Flow (GPM)Pres. (PSI)Flow (GPM)Residual:38.0 psi- - - 72.00 64.0 0 HYD 1 HYD 2- - - 51.31500 43.3 1500Pitot:15.0 psi 15.0 psi- - - 38.01959 30.0 1959Orifice Size:2.5in.2.5in.- - - 28.12250 20.1 2250Num. Of Butts:2 2- - - 20.02464 12.0 2464Coefficient:0.9 0.9-2.93000 -10.9 3000Calculated Flow: 653gpm1306gpmHydraulic Log Graph N1.85202464202252 Total Flow: 1959gpm4000Flow (gpm)10 800 1200 1600 2000 2400 2800 3200 3600-----0.010.020.030.040.050.060.070.080.090.0100.0110.0120.0130.0140.0150.0160.0170.0180.0190.0200.0Pressure (psi)Required Fire Flow:Static: 72.0 psiResidual: 51.3 psiFlow: 1,500 gpmTest PointStatic: 72.0 psiResidual: 38.0 psiFlow: 1,959 gpmAdjusted curve forsafety factorAvailable Fire Flow:Static: 72 psiResidual: 20 psiFlow: 2,464 gpm
FIRE FLOW DEMAND CALCULATIONLocation:Winchester, VAReport Date:2/24/2026Static Residual Residual0 1959 15001 psi: 72.0 38.0 51.32 -8.0-10.0-8.03 1.5 -0.6-0.6-0.64 Underground Loss 0.0 -3.35 63.427.439.42Note: System DOES appear to have sufficient pressure at the required FIRE FLOW to support the site. Available at Base of FIRE FLOW hydrant with Underground Site LossElevation Adjustment (0.433 x ft.) To Base of RiserFire Sprinkler Water Supply Available for Design Available per TestSafety Factorgpm:12" DI @ 275 L.F. 8" DI @ 793 L.F. + (3) Tee +(2) 45 Elbows8" DI @ 75 L.F. + (1) Tee + (1) 90 Elbow
LEGEND
S
W
LOD
PROPERTY LINE
PROPOSED LIMITS
OF DISTURBANCE
PROPOSED
SANITARY SEWER
PROPOSED
WATER LINE
10
UTILITY
EASEMENT
1.FINAL BUILDING CONNECTIONS FOR ALL UTILITIES TO BE
COORDINATED WITH MEP TEAM.
2.WATER AND SEWER LINES SHALL TERMINATE 5
FROM THE BUILDING
FOR SERVICE CONNECTIONS UNLESS NOTED OTHERWISE.
3.ALL PVC SANITARY SEWER PIPES TO BE PVC DR25 CONFORMING TO
AWWA C900 UNLESS OTHERWISE NOTED.
4.CONTRACTOR TO CONFIRM SI=E OF ALL EXISTING UTILITIES.
5.FREDERICK WATER¶S WATER AND SEWER STANDARDS AND
SPECIFICATIONS ARE AVAILABLE AT WWW.FREDERICKWATER.COM
6.THE CONTRACTOR SHALL ADHERE TO FREDERICK WATER
STANDARDS AND SPECIFICATIONS IN EFFECT AT THE TIME OF
CONSTRUCTION.
7.THE CONTRACTOR SHALL SCHEDULE A PRE-CONSTRUCTION
MEETING WITH THE FREDERICK WATER INSPECTOR PRIOR TO
COMMENCING INSTALLATION OF ANY WATER OR SEWER FACILITIES.
CONTRACTOR SHALL ALSO ARRANGE FOR INSPECTION OF SAID
FACILITIES BY FREDERICK WATER. OIL WATER SEPARATORS AND/OR
GREASE TRAPS MAY BE RE4UIRED BY FREDERICK COUNTY BUILDING
INSPECTIONS. BOTH FREDERICK COUNTY BUILDING INSPECTIONS
AND FREDERICK WATER WILL INSPECT THE INSTALLATION OF THOSE
FACILITIES. BOTH INSPECTIONS SHALL BE SCHEDULED BY
CONTRACTOR.
.THE CONTRACTOR SHALL CONNECT A NEW SEWER LINE TO AN
EXISTING MANHOLE BY CORE DRILLING THE MANHOLE.
9.A NEW WATER OR FORCED SEWER MAIN SHALL BE CONNECTED TO
AN EXISTING MAIN BY A A CUT-IN TEE WITH ACCOMPANYING VALVES.
10.EXACT LOCATIONS OF WATER AND SEWER SERVICES ON NEW LINES
ARE TO BE COORDINATED WITH FREDERICK WATER¶S INSPECTOR.
10.1.ADJUST FREDERICK WATER FACILITIES TO GRADE AS RE4UIRED
BY THE FREDERICK WATER INSPECTOR.
11.FREDERICK WATER¶S MAINTENANCE DIVISION SHALL FURNISH AND
INSTALL ALL WATER METERS THROUGH 2 INCH IN SI=E. IT IS THE
CONTRACTOR¶S RESPONSIBILITY TO HAVE THE METER BOX
ASSEMBLY INSTALLED CORRECTLY. BEFORE A PERMANENT METER
IS INSTALLED:
11.1.THE METER BOX, WITH ITS FRAME AND COVER, MUST BE
PROPERLY ALIGNED WITH THE YOKE BAR.
11.2.THE FRAME AND COVER SHALL BE SET TO FINAL GRADE.
11.3.THE DISTANCE BETWEEN THE TOP OF THE COVER AND THE
YOKE BAR SHALL BE BETWEEN 20 AND 23 INCHES.
11.4.ALL COMPONENTS OF THE METER BOX ASSEMBLY SHALL BE IN
PROPER WORKING ORDER.
12.FOR SERVICES THAT CONNECT TO EXISTING LINES:
12.1.FREDERICK WATER SHALL FURNISH AND INSTALL:
12.1.1.ALL ǫ´Xô´, ô´, 1´, 1ò´ AND 2´ WATER SERVICES
12.1.2.ALL SEWER SERVICES.
12.2.THE OWNER/DEVELOPER SHALL:
12.2.1.COORDINATE OR HAVE THE CONTRACTOR COORDINATE
THE LOCATION OF THE SERVICE LATERAL WITH FREDERICK
WATER¶S ENGINEERING ASSISTANT.
12.2.2.SUBMIT AN APPLICATION FOR SERVICE AND PAY THE
RE4UIRED FEES.
13.ALL WATER SERVICE LINES MUST HAVE A BACKFLOW PREVENTION
ASSEMBLY DOUBLE CHECK VALVE OR RP=, AS RE4UIRED. THE
ASSEMBLY MUST MEET ASSE STANDARD NUMBER 1015 OR 1013.
14.ALL FIRE LINES MUST HAVE A BACKFLOW PREVENTION ASSEMBLY
DETECTOR DOUBLE CHECK VALVE OR RP=, AS RE4UIRED. THE
ASSEMBLY SHALL MEET ASSE STANDARD NUMBER 104 OR 1047.
ANY PRIVATELY OWNED FIRE LINE, INTERIOR OR EXTERIOR, SHALL
ALSO HAVE A FIRE SERVICE METER. THIS ASSEMBLY SHALL BE
INSTALLED IMMEDIATELY BEFORE THE BACKFLOW PREVENTION
UNIT. RADIO READ REMOTES ARE RE4UIRED.
15.FREDERICK WATER SHALL REVIEW THE MECHANICAL PLANS FOR
DESIGN AND MATERIAL APPROVAL OF A BUILDING¶S:
15.1.DOMESTIC WATER METER AND ITS BACKFLOW PREVENTION
DEVICE, AND/OR ITS
15.2.FIRE SERVICE LINE¶S WATER METER AND BACKFLOW
PREVENTION DEVICE.
16.DE4 MUST ALSO APPROVE SEWER PUMP STATIONS. FREDERICK
WATER RE4UIRES A COPY OF DE4¶S CERTIFICATE TO OPERATE AND
A COPY OF THE STATION¶S DE4 APPROVED O M MANUAL. THESE
DOCUMENTS MUST BE RECEIVED BEFORE SUBSTANTIAL
COMPLETION IS ISSUED AND WATER METERS RELEASED.
17.VALVES, MANHOLES, ARV
S AND OTHER FREDERICK WATER
SURFACE FEATURES SHALL NOT BE PLACED IN CURB AND GUTTER,
NOR SLOPED PORTION OF HANDICAPPED RAMPS. CONTRACTOR
SHALL COORDINATE LOCATIONS WITH THE FREDERICK WATER
INSPECTOR.
1.IRRIGATION LINES AND DEVICES, LIGHT POLES, TRANSFORMERS,
JUNCTION BOXES, PEDESTALS, OTHER OBSTACLES AND ALL DRY
UTILITIES SHALL NOT BE PLACED ON FREDERICK WATER
EASEMENTS. PERPENDICULAR IRRIGATION LINES AND DRY UTILITY
CROSSINGS ARE PERMITTED WITH 1 MINIMUM VERTICAL
SEPARATION AND PLACED IN CONDUIT OR SLEEVE WITHIN THE
FREDERICK WATER EASEMENT SHOWN AND LABELED ON PLANS AND
PROFILES.
19.RETAINING WALLS AND THEIR TIE BACKS SUCH AS GEO GRID OR
OTHER SUPPORTS SHALL NOT BE PLACED IN FREDERICK WATER
EASEMENTS.
20.CONTRACTOR SHALL TEST PIT AS RE4UIRED AND ADJUST ALL
EXISTING FREDERICK WATER FACILITIES TO GRADE PER THE
FREDERICK WATER INSPECTORS RE4UIREMENTS.
21.IF EXISTING FREDERICK WATER FACILITIES ARE REMOVED, THE
REMOVED ITEMS AND RELATED MATERIALS SHALL BE REPLACED
WITH NEW MATERIALS. REMOVED MATERIALS SHALL BE FURNISHED
TO THE FREDERICK WATER INSPECTOR.
22.FIRE AND/OR DOMESTIC RISER METER, BACKFLOW DEVICES,
ASSOCIATED VALVES AND PIPING SHALL BE PER THE FREDERICK
WATER INSPECTOR, FREDERICK COUNTY FIRE MARSHAL AND
FREDERICK COUNTY INSPECTION DEPARTMENT RE4UIREMENTS
PROPOSED STORM
STRUCTURE
PROPOSED
STORM PIPE
GENERAL NOTES
PROPOSED
ELECTRIC LINE
GAS GAS PROPOSED
GAS LINE
UGE PROPOSED UNDERGROUND
ELECTRIC LINE
WWW
W
W W W W W W W W
WWWWWT WWWWWWW W W W W
W
STOP
STOPSTOPEETT
T
T
T
T
T
T
T
E
E
E
E
E
E
T T TEE
TTTTTT
TTTTTT
10
P.R.L.
35
B.R.L.35
B.R.L.10
P.R.L.WLODLODLODLODLODLODLODLOD LOD LOD LOD LOD LOD LODLODLODLODLODLODLODLODLODLODGAS BUILDING
CONNECTION
SANITARY
BUILDING
CONNECTION
GASUGEUGEU
G
E
UGE UGE UGE UGE UGE UGE UGE UGE
UGE
UGEUGEUGEUGEUGEWSWWWW
OIL/ WATER SEPARATOR. SEE
PLUMBING AND ARCHITECTURAL
DRAWINGS FOR DETAIL.
S04
S03
S02
S01
2 LF OF 6 PVC # 2.50
27 LF OF 6 PVC # 2.50
LF OF 4 PVC # 2.0
4 LF OF 4 PVC # 2.0
12 LF OF 4 PVC # 2.0STA: 1000.92
COMBINED DOMESTIC/FIRE SERVICE
CONNECTION W/ 1 DOMESTIC METER
AND BACKFLOW PREVENTER
STA: 1041.46
CORP. STOP
STA: 1041.44
200 PSI CTS POLYETHELENE TUBING
AND 3/4 IRRIGATION METER
W/ BACKFLOW PREVENTER
STA: 1064.06
MJ 45 BEND
STA: 106.63
X CUT-IN TEE
2 MJ GV
2 MJ LONG SOLID SLEEVES
CONTRACTOR TO COMPLETE
S05
FIRESTONE BUILDING
ER PROTOTYPE
6,607 SF
ELECTRIC AND
TELECOM
BUILDING
CONNECTION
PRIVATE IRRIGATION TO BE
DESIGNED UNDER SEPARATE COVER
DI CL 52 WATER LINESTA: 1011.92
MJ GV
W/ ROADWAY BOX
SEE WATER MAIN
CONNECTION/DISCONNECTION
NOTES ON SHEET C02
FDC
1.00
9.00
1.00
END OF FREDERICK
WATER 20
EASEMENT
PRIVATEOWNERSHIPFREDERICK WATERADDITIONAL GATE VALVE
RE4UIRED AT MAIN FOR RISER PRIVATE OWNERSHIPFREDERICKWATERPROPOSED FIRE HYDRANT
IRRIGATION LINES, CONTROL WIRES, ETC.
THAT CROSS FW EASEMENTS SHALL
HAVE MIN. 1 VERTICAL SEPARATION
AND BE PLACED WITHIN CONDUIT
THROUGH ENTIRE FW EASEMENT
STA: 103.64
6 X TEE
6 MJ GV
STRUCTURE TABLE
STRUCTURE NAME:
EX MH1
S01
S02
S03
S04
S04.1-IN
S04.1-OUT
S05
DETAILS:
MH
RIM: 692.24
INV IN: 62.95
MH
RIM: 692.16
INV IN: 63.55
INV OUT: 63.35
6 SSCO
RIM: 692.20
INV IN: 64.44
INV OUT: 64.24
MH
RIM: 692.35
INV IN: 67.60
INV OUT: 65.14
6 SSCO
RIM: 692.1
INV IN: 6.25
INV OUT: 6.05
OIL/WATER
SEPARATOR IN
RIM: 6.33
INV IN: 67.96
OIL/WATER
SEPARATOR OUT
RIM: 6.13
INV OUT: 67.76
BUILDING CONNECTION
RIM: 6.7
INV OUT: 6.50
PIPES IN:
FROM S01, 6 PVC INV IN: 62.95 # 0.95
FROM S02, 6 PVC INV IN: 63.55 # 2.50
FROM S03, 6 PVC INV IN: 64.44 # 2.50
FROM S04.1-OUT, 4 PVC INV IN: 67.60 # 2.0
FROM S05, 4 PVC INV IN: 6.25 # 2.0
FROM S04, 4 PVC INV IN: 67.96 # 2.0
PIPES OUT
TO EX MH1, 6 PVC INV OUT: 63.35 # 0.95
TO S01, 6 PVC INV OUT: 64.24 # 2.50
TO S02, 6 PVC INV OUT: 65.14 # 2.50
TO S04.1-IN, 4 PVC INV OUT: 6.05 # 2.0
TO S03, 4 PVC INV OUT: 67.76 # 2.0
TO S04, 4 PVC INV OUT: 6.50 # 2.0
1.TANK SECTIONS SHALL BE BOLTED TOGETHER
2.WATERTIGHT BOLT DOWN FRAME AND COVERS ARE RE4UIRED
3.PENETRATIONS SHALL HAVE BOOTS
4.TANK, COMPONENTS, AND INSTALLATION SHALL BE TRAFFIC RATED
5.CONTRACTOR SHALL COORDINATE INSTALLATION AND INSPECTIONS
WITH BOTH FREDERICK COUNTY INSPECTIONS DEPARTMENT AND
FREDERICK WATER.
OIL WATER SEPARATOR NOTES
This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.DATEAS SHOWNCHECKED BYSCALEDESIGNED BYDRAWN BYKHA PROJECT 2025 KIMLEY-HORN AND ASSOCIATES, INC.CALL "MISS UTILITY" 811 11400 COMMERCE PARK DR., SUITE 400, RESTON, VA 20191PHONE: 703-674-1300 FAX: 703-674-1350WWW.KIMLEY-HORN.COM1/16/2026111125000JMHJMHCMHVIRGINIAFREDERICK COUNTYFIRESTONE COMPLETEAUTO CAREPREPARED FOR=AREMBA GROUP, LLCUTILITY PLANC05NORTH
CALCULATIONS FOR AVAILABLE FLOW AT 20 PSI
4R 4F
HRA0.54 / HFA0.54
4R 1210
65A0.54 / 33A0.54
4R 1,745 GPM
4F 1210 GPM
HR 5 - 20 65
HF 5 - 52 33
S
U2
20'-0"
20'-0"
U1
BOR
H1
U3
SITEStatic ResidualStatic: 72.0 psiResidual: 38.0 psiFlow: 1959 gpm(653 gpm at 3 outlets)
Code Consultants Inc.
2043 Woodland Parkway
Suite 300
St. Louis, MO 63146
314-991-2633
Job Name : 250809.06.000 BSRO Winchester, VA - Area 1
Building :
Location :
System :
Contract :
Data File : 250809.06.000 BSRO Winchester, VA - UG loss.WXF
Computer Programs by Hydratec Inc. Revision: 50.5520.727
Code Consultants Inc. Page 1 250809.06.000 BSRO Winchester, VA - Area 1 Date 10203040E50R60U70S80S90E100R110P120130140150200 400 600 800 1000 1200 1400 1600 1800FLOW ( N ^ 1.85 )City Water Supply: Demand:C1C2C1 - Static Pressure : 72 C2 - Residual Pressure: 38 C2 - Residual Flow : 1959 D1 - Elevation : _______D2 - System Flow : _______D2 - System Pressure : 1.645 Hose ( Demand ) : 1526 D3 - System Demand : 1526 Safety Margin : 48.937 D1D2D3Water Supply CurveComputer Programs by Hydratec Inc. Revision: 50.5520.727
Code Consultants Inc. Page 2 250809.06.000 BSRO Winchester, VA - Area 1 Date Fitting Legend Abbrev. Name ½ ¾ 1 1¼ 1½ 2 2½ 3 3½ 4 5 6 8 10 12 14 16 18 20 24 E NFPA 13 90' Standard Elbow 1 2 2 3 4 5 6 7 8 10 12 14 18 22 27 35 40 45 50 61 F NFPA 13 45' Elbow 1 1 1 1 2 2 3 3 3 4 5 7 9 11 13 17 19 21 24 28 G NFPA 13 Gate Valve 0 0 0 0 0 1 1 1 1 2 2 3 4 5 6 7 8 10 11 13 T NFPA 13 90' Flow thru Tee 3 4 5 6 8 10 12 15 17 20 25 30 35 50 6071 81 91 101 121 Units Summary Diameter Units Inches Length Units Feet Flow Units US Gallons per Minute Pressure Units Pounds per Square Inch Note: Fitting Legend provides equivalent pipe lengths for fittings types of various diameters. Equivalent lengths shown are standard for actual diameters of Sched 40 pipe and CFactors of 120 except as noted with *. The fittings marked with a * show equivalent lengths values supplied by manufacturers based on specific pipe diameters and CFactors and they require no adjustment. All values for fittings not marked with a * will be adjusted in the calculation for CFactors of other than 120 and diameters other than Sched 40 per NFPA. Fittings Used SummaryComputer Programs by Hydratec Inc. Revision: 50.5520.727
Code Consultants Inc. Page 3
250809.06.000 BSRO Winchester, VA - Area 1 Date
SUPPLY ANALYSIS
Node at Static Residual Available
Source Pressure Pressure Flow Pressure Total Demand Required Pressure
S 72.0 38 1959.0 50.581 1526.0 1.645
NODE ANALYSIS
Pressure Discharge
Node Tag Elevation Node Type at Node at Node Notes
BOR 0.0 0.0 26.0
U1 0.0 0.0 1500.0
U2 0.0 1.16
U3 0.0 1.26
S 0.0 1.64
H1 0.0 0.53
Flow Summary - NFPA
Computer Programs by Hydratec Inc. Revision: 50.5520.727
Code Consultants Inc. Page 4
250809.06.000 BSRO Winchester, VA - Area 1 Date
Node1 Elev1 K Qa Nom Fitting Pipe CFact Pt
to or Ftngs Pe ******* Notes ******
Node2 Elev2 Fact Qt Act Eqiv Len Total Pf/Ft Pf
BOR 0 H26 26.00 8 E 28.468 75.000 140 0.0
to T 55.354 90.148 0.0
U1 0 26.0 8.27 G 6.326 165.148 0 0.001 Vel = 0.16
U1 0 609.23 8 E 28.468 375.000 140 0.001
to T 55.354 83.822 0.0
U2 0 635.23 8.27 458.822 0.0025 1.158 Vel = 3.79
U2 0 0.0 12 275.000 140 1.159
to 0.0
U3 0 635.23 12.34 275.000 0.0004 0.099 Vel = 1.70
U3 0 0.0 8 T 55.354 98.000 140 1.258
to 55.354 0.0
S 0 635.23 8.27 153.354 0.0025 0.387 Vel = 3.79
0.0
S 635.23 1.645 K Factor = 495.28
U1 0 H1500 890.77 8 112.000 140 0.001
to 0.0
H1 0 890.77 8.27 112.000 0.0047 0.528 Vel = 5.32
H1 0 0.0 8 2F 28.468 208.000 140 0.529
to 28.468 0.0
S 0 890.77 8.27 236.468 0.0047 1.116 Vel = 5.32
0.0
S 890.77 1.645 K Factor = 694.52
Final Calculations : Hazen-Williams
Computer Programs by Hydratec Inc. Revision: 50.5520.727