Loading...
HomeMy WebLinkAbout40-25 Laurel Ridge Lineman TrainingCOUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 October 7, 2025 Osvaldo Ramos (via email: Osvaldo.Ramos@timmons.com) Timmons Group 20110 Ashbrook Place, Suite 100 Ashburn, VA 20147 Re: Review Comments for Site Plan #40-25 – LRCC Lineman Training Facility Property Identification Number (PIN): 91-A-99B Dear Osvaldo: Planning Staff has reviewed the above-referenced site plan to determine if administrative approval can be granted. At this time, administrative approval cannot be granted. This site plan cannot be approved until the issues in this letter, as well as all issues of the other review agencies, have been adequately addressed. Please review Staff’s comments listed below and then prepare a revised site plan which adequately addresses each concern. Review Comments: (1) Master Development Plan. A Master Development Plan is required or a waiver from the Director of Planning and Development shall be provided. (165-801.03(C)). (2) Cover Sheet. a) Reference Number. Add the site plan reference number #40-25 . b) Previous Plan Approvals. Add reference to any other plan or master development plan approved by the County for the site (§165- 802.03(A)(7)). Specify Rezoning (REZ) applications #04-25 and Site Plans (SP) #32-12. c) Utilities. Remove Shenandoah Electric from the Electrical Service Provider. d) FEMA Flood Plain. Indicate whether the parcel is or is not within a FEMA Flood Plain. (3) Project Summary. a) FAR. Provide the overall site Floor-Area-Ratio (FAR). b) Landscaped Area. Provide the required landscaping calculations and the actual landscaping provided. (4) Geometry/Site Layout. a) Easement. Label and identify all easements on the site plan. b) Trash Enclosure. All commercial and industrial developments shall be provided with outdoor trash containers (§165-204.11(D)(2). Such trash container shall not be located in the front yard areas of such uses. (§165- 204.11(D)(3)). c) Curb & Gutters. Concrete curbing and gutters shall be installed around the perimeter of all parking lots. All curbing shall be a minimum of six inches in height. All parking lots shall be included within an approved stormwater management plan. (§165-202.01(D)(3)). (5) Landscaping. a) Zoning Buffer Note. A Category C Buffer is required between HE and RA uses. Identify the active and inactive portions of the buffer on the landscaping plan. (§165.203.02(D)(b)). See also proffer statement 2.1 on the required buffer. b) Minimum Landscaped Area. A minimum of 25% of the site shall be green space. (§165-609 .01(D)(13)(b)). Provide the necessary calculations of total site area, impervious area, and remaining greenspace area. c) Landscaping; Parking lots. The impervious area of the parking lots shall be provided with interior and perimeter landscaping. i. Legend. Provide a legend that identifies the species, caliper, scientific name, and common name. (§165-802.03(C); §165.202.01(D)(13)). ii. Perimeter Landscaping. The perimeter of all impervious areas shall be landscaped with one shade tree for every 2000 square foot of impervious area for the first 100,000 square feet of the entire site. Provide the necessary calculation and indicate the required amount of shade trees. (§165.202.01(D)(13)(a)). Please also refer to the species of shade trees permitted in §165-203.01(B)(1). iii. Interior Landscaping. A minimum of 5% of the interior portion of the parking lot shall be landscaped for the purpose of providing shade trees. Such interior landscaping shall be provided on raised islands and in continuous raised strips extending the length of the parking bay. (165.202.01(D)(13)(b)). iv. Headlight Screening. Headlight screening shall be provided to prevent headlights from shining into right-of-way or adjacent properties. (§165-202.01(13)(a)). (6) Signage. The location, dimensions, and height of all signs shall be shown on the plan (§165-802.03(C)(17)). Signs shall be in conformance with §165-201.06. (7) Photometric Plan. Provide the proposed height of the parking lot lighting fixtures. Additionally, a note that includes all statements within Proffer Item #3.1 shall be added to the photometric plan. (8) Agency Approvals. Comment sheets (approvals) are required from the following agencies: the Frederick County Inspections Department, the Frederick County Fire Marshal, the Virginia a Department of Transportation (VDOT), Frederick County G.I.S., Frederick Water, Winchester City Engineering (Julie Carter), Town of Middletown Planning, and the Frederick County Engineer (Public Works). Additional comments may be provided on subsequent submission. After you have revised the site plan, please resubmit one (1) hard copy so that Staff may verify the information contained on the plan addresses the above comments. Staff will also need all approved review agency comment sheets, recordation of the plat (as applicable), at least five (5) copies of the final plan set and a digital (PDF) copy for approval. Do not hesitate to contact me if you have any questions or concerns regarding this letter. Thank you for your consideration. Sincerely, Amy Feltner Planner ALF/pd cc: Laurel Ridge Community College Educational Foundation, 173 Skirmisher Lane, Middletown, VA 22645