November 21, 2025
Mr. Earl Wiley
Frederick Water
315 Tasker Road
Stephens City, VA 22655
RE: FCPS 4th High School
Job No. 3805.0
Dear Mr. Wiley:
Please find enclosed a resubmittal on the above referenced project for your review and
comment. Below is a list of the items included in this submittal:
• Revised Site Plan dated November 21, 2025
• Revised Erosion and Sediment Control & Stormwater Management Narrative dated
November 21, 2025
• Signed Water Model Summary Report dated September 26, 2025 with signed seal date of
November 10, 2025
We received your comments dated October 23, 2025 and have addressed them as follows:
Type of Comments:
1. Comment: (C0.01) Update Frederick Water Construction Notes.
Response: The Frederick Water Construction Notes shown on the plans were taken from
the Frederick Water Standards and Specifications on the Frederick Water website dated
April, 2022.
2. Comment: (C0.01) Add the note below to this and other applicable details; Note: sanitary
sewer and, as labeled, water facilities will be owned and maintained by Frederick County
Public Schools (FCPS), Frederick Water has not reviewed these facilities.
Response: These notes have been added to the plans as requested.
FCPS 4th High School Page 2 of 10
Job No. 3805.0
3. Comment: (C0.01) Add supplemental Frederick water notes to plans:
a. Valves, manholes, ARV’s and other Frederick Water surface features shall not be
placed in curb and gutter, nor sloped portion of handicapped ramps. contractor
shall coordinate locations with the Frederick Water inspector
b. Irrigation lines and devices, light poles, transformers, junction boxes, pedestals,
other obstacles and all dry utilities shall not be placed on Frederick Water
easements. Perpendicular irrigation lines and dry utility crossings are permitted
with 18" minimum vertical separation
c. Retaining walls and their tie backs such as geo grid or other supports shall not be
placed in Frederick Water easements
d. Contractor shall test pit as required and adjust all existing Frederick water facilities
to grade per the Frederick Water inspector’s requirements
e. If existing Frederick Water facilities are removed, the removed items and related
materials shall be replaced with new materials. removed materials shall be
furnished to the Frederick Water inspector
Response: These notes have been added to the plans as requested.
4. Comment: (C1.04) Show and label recorded FCSA/FW and other easements within plan
view.
Response: Existing FCSA/FW easements have been added and labeled accordingly.
5. Comment: (C1.09) Show and label all recorded FCSA/FW and other recorded easements
within plan view on topographic, grading and utility sheets as applicable (TYP).
Response: Existing FCSA/FW easements have been added and labeled accordingly on
topographic, grading and utility sheets.
6. Comment: (C1.09) Show and label all existing FCSA/FW facilities within plan view on
topographic, grading and utility sheets as applicable (TYP).
Response: Existing FCSA/FW facilities have been added and labeled accordingly on
topographic, grading and utility sheets.
7. Comment: (C3.10) Show ex. 12" water main – consider assumed elevation and need for
test pits.
Response: The existing 12” water main crossing is now illustrated in the profile.
8. Comment: (C3.10) 18" min. vertical separation from Frederick Water lines is typically
required. However, to avoid adjusting the existing 12" water main, if test pits reveal that
the existing water main can remain in place and maintain a minimum 6" vertical
separation from the proposed storm line, this condition would be acceptable with a
concrete cradle or arch is placed under/on the storm line. If circumstances require the
water main to be adjusted, 18" min. vertical separation is required.
Response: Understood. We have attempted to provide 18” minimum vertical separation
from FW lines in all locations. In locations where that is not feasible we have added a
note requiring the requested concrete cradle.
FCPS 4th High School Page 3 of 10
Job No. 3805.0
9. Comment: (C3.10) Add note: 18" minimum vertical separation is preferred, a minimum 6"
vertical separation to storm with a concrete cradle or arch for the storm line is acceptable
under the specific conditions at this location.
Response: Note has been added.
10. Comment: (C3.12) Confirm all Frederick Water crossings are shown and labeled on storm
profiles. Provide 18" minimum vertical separation and label as; 18" min vert sep, 18" min.
clear or similar (TYP).
Response: All Frederick Water crossings are shown and labeled. Vertical separation has
been dimensioned for all Frederick Water crossings, with a typical 18” minimum noted.
11. Comment: (C4.00) Frederick Water has identified the need to redirect sanitary sewer flows
from sources north of the area to the Parkins Mill wastewater treatment plant.
To support this future redirection, Frederick Water requests that a 20-foot Frederick water
easement be provided, extending from the FCPS pump station, along the existing FCPS
force main to the northern property line, and then along the northern property line to the
Justes drive right-of-way (R.O.W.).
The FCPS force main may remain within this easement until the redirection occurs and the
FCPS pump station and force main are taken offline.
Unless otherwise noted, the easement and any improvements included in this plan shall
comply with current Frederick Water easement requirements.
Response: FCPS would like further discussion with Frederick Water regarding the
requested easement.
12. Comment: (C4.00) Add the note below to this and other utility sheets; Note: Sanitary sewer
and, as labeled, water facilities will be owned and maintained by Frederick County public
schools (FCPS), Frederick Water has not reviewed these facilities.
Response: This note has been added to all utility plan and profile sheets.
13. Comment: (C4.01) Use labels, linetypes and color, if possible to clearly identify FCPS owned
and maintained water and sanitary sewer facilities on all sheets (TYP).
Response: Callouts, labels, and easements are now included in the plans to provide
clarity of utility ownership.
14. Comment: (C4.01) Explain the use for this connection; if connection is justified a min 20' of
dip and flushing assy and 3rd GV is required.
Response: This portion of the water line has been revised. The connection is no longer
provided.
15. Comment: (C4.01) Place FCPS water line in sleeve min. 18" under the FW water main within
FW easement (TYP)
Response: A sleeve is called out in the described location. Please see profile sheets for
more information regarding the crossing.
FCPS 4th High School Page 4 of 10
Job No. 3805.0
16. Comment: (C4.02) Include clouded detail below on plans, modify as required for specific
application.
Response: The detail provided has been added to Sheet C4.04.
17. Comment: (C4.02) Show private to Frederick Water ownership limits on plan and profile.
Response: The plans call out FCPS-owned water lines and Frederick Water easements.
Therefore, the limits of ownership are sufficiently depicted in the plans.
18. Comment: (C4.02) Label fire and/or domestic meter size(s) at riser in building.
Response: The proposed domestic meter size and fire line size are labeled accordingly.
Additional information regarding the riser inside the building is provided on the
architectural and plumbing plans.
19. Comment: (C4.02)Water model comments:
a. The model is approved with the following comments:
b. Model report shall be signed and sealed by a licensed VA PE on the cover sheet
c. Include the following pages in the plan set:
i. Cover page with PE seal
ii. PDF page 3 (overview map with hydrant information)
iii. PDF page 5 analysis graph
iv. PDF page 6
v. PDF page 7
vi. PDF page 8
Response: The listed items have been provided in the plans as requested.
20. Comment: (C4.02) Place FH connection to closer water main or provide justification.
Response: The fire hydrant is now connected to the closer water main as requested.
21. Comment: (C4.02) Show GV on FH tee and 2nd GV is line to FH is 20' or greater.
Response: One gate valve is provided for this line. The line length to the hydrant is less
than 20’ and a dimension has been provided to verify.
22. Comment: (C4.02) Confirm all metered water will be supplied through the 4" domestic
water meter.
Response: All metered water will be supplied through the 4” domestic water meter.
23. Comment: (C4.02) Place GV to building on tee if FH tee is shifted per other comment. If FH
tee is not shifted, place GV 10' form sanitary sewer laterals. Label to FCPS ownership
transition at this GV, see provided detail to left.
Response: A gate valve and easement are proposed in accordance with the provided
detail on Sheet C4.04.
FCPS 4th High School Page 5 of 10
Job No. 3805.0
24. Comment: (C4.02) Add to sheets with grease traps and other detail sheets as necessary;
grease trap / oil water separator notes:
a. Tank sections shall be bolted together
b. Watertight bolt down frame and covers are required
c. Penetrations shall have boots
d. Tank, components, and installation shall be traffic rated
e. Contractor shall coordinate installation and inspections with both Frederick County
inspections department and Frederick Water
Response: These notes have been added to the utility sheets as requested.
25. Comment: (C4.03) 2nd GV required for FH lines more than 20' in length. 2nd GV shall be
placed approx. 3-5' from FH and not within curb and gutter (TYP).
Response: Understood. The plans have been revised to comply with this typical
requirement.
26. Comment: (C4.03) Min. 10' horizontal separation is preferred, 7' min. is required with
justification (TYP).
Response: The light pole has been moved outside of the Frederick Water easement for
adequate separation.
27. Comment: (C4.03) Show water lines within plan view (TYP).
Response: Existing waterlines are now shown.
28. Comment: (C4.03) Connect proposed water main to ex. water main near Admiral Byrd
Middle School for redundancy.
Response: This connection has been provided as requested.
29. Comment: (C4.03) Shift other utilities min. 10' off FW lines and/ or off FW easement (TYP).
Response: The utility plans have been revised to provide 10’ minimum spacing between
FW water lines and other utilities.
30. Comment: (C4.03) Explain the use for this connection; if connection is justified a min 20' of
dip and flushing assy is required.
Response: This portion of the water line has been revised. The connection is no longer
provided.
31. Comment: (C4.03) Add note that all crossings of FW easement(s) shall be in conduit and
min 18" under FW lines (TYP).
Response: The note has been added as requested.
32. Comment: (C4.03) Show and label Frederick Water easements, including width if known
or variable as applicable (TYP).
Response: Proposed Frederick Water easements are now shown and labeled on the
plans.
FCPS 4th High School Page 6 of 10
Job No. 3805.0
33. Comment: (C4.03) Min. 10' horizontal separation is preferred, 7' min. is required with
justification (TYP).
Response: The plans have been revised to provide 10’ minimum horizontal separation.
34. Comment: (C4.03) Add 3rd GV (TYP).
Response: A third gate valve has been added at this location.
35. Comment: (C4.03) Min. 10' horizontal separation is preferred, 7' min. is required with
justification (TYP).
Response: The plans have been revised to provide 10’ minimum horizontal separation.
36. Comment: (C4.03) Provide, label plan sheet match lines (TYP).
Response: Match lines are now provided throughout the C4 plan sheet series.
37. Comment: (C4.03) Label water main stations on all utility sheets.
Response: Station labels have been added to all proposed water mains.
38. Comment: (C4.04) GV for FH is required at tee and 3'-5' from FH .
Response: Another gate valve has been added at this location.
39. Comment: (C4.04) Line shall be min. 8" to within 50' of FH, prefer that the 8x6 reducer is
place at second GV, 3-5' from FH.
Response: The proposed water line has been revised as requested. All fire hydrant lines
longer than 50’ have been revised to use this required configuration and noted
accordingly.
40. Comment: (C4.04) FH's placed in areas without curb and gutter shall have bollards shown
and labeled.
Response: This fire hydrant is located behind curb and sidewalk. Therefore, no bollards
are necessary for this fire hydrant. Bollards have been added for the hydrant near the
loading dock turnaround area.
41. Comment: (C4.04) 2nd GV for FH is required at tee and 3'-5' from FH.
Response: A second gate valve has been added as requested.
42. Comment: (C4.04) Line shall be min. 8" to within 50' of FH, prefer that the 8x6 reducer is
place at second GV, 3-5' from FH’s
Response: The water line has been revised as requested.
43. Comment: (C4.04) FH's placed in areas without curb and gutter shall have bollards shown
and labeled.
Response: Bollards are now provided for fire hydrants in areas without curb.
FCPS 4th High School Page 7 of 10
Job No. 3805.0
44. Comment: (C4.04) Post indicator valves (PIV) are not permitted on FW's portion, GV at tee
is sufficient.
Response: The post indicator valve is no longer proposed. A gate valve is provided at the
tee.
45. Comment: (C4.04) Label bends (TYP).
Response: All horizontal bends are now labeled.
46. Comment: (C4.04) Check all FW water lines to confirm valve spacing does not exceed 1000'
and adjust plans as applicable.
Response: Additional valves have been provided to ensure spacing does not exceed
1,000’.
47. Comment: (C4.07) Show and label all water facilities within plan view.
Response: All existing water facilities have been shown and labeled accordingly.
48. Comment: (C4.07) Insert 'Contractor' and delete crossed out text.
Response: The callout has been revised as requested.
49. Comment: (C4.08) Label water main diameter (TYP).
Response: The existing water main diameter is now labeled.
50. Comment: (C4.08) Clearly show and label recorded water easement on all parcels.
Response: All water easements are shown and labeled accordingly.
51. Comment: (C4.08) Label storm structures per storm plan.
Response: Proposed storm structure labels are now included on this sheet.
52. Comment: (C4.09) Verify existing sanitary sewer and modify plans accordingly.
Response: This existing sewer infrastructure was field surveyed by our survey team and
has been verified accordingly.
53. Comment: (C4.09) Request Frederick Water plans for this area and all other areas of this
project from Jacob Lewis jacob.lewis@frederickwater.com.
Response: FW plans for this area were requested and received from Jacob Lewis. Thank
you for the assistance. We have utilized the provided plans to show the location of
existing infrastructure on our plans as requested.
54. Comment: (C4.09) Show ownership lines.
Response: Ownership limits are now labeled as requested.
55. Comment: (C4.09) Eliminate drop connection.
Response: The drop connection has been removed.
FCPS 4th High School Page 8 of 10
Job No. 3805.0
56. Comment: (C4.09) Note; core drill at top of bench and reshape invert all related work shall
be performed by the contractor.
Response: The note has been added to this sheet.
57. Comment: (C4.09) Show ex. 12" water main – consider assumed elevation and need for
test pits.
Response: The existing 12” water main has been shown. Test pits will be considered with
the Owner for verification of depth.
58. Comment: (C4.09) FCPS force sewer shall be min. 18" under the ex. 12" water main.
Response: Understood. Force main profile has been updated to show existing 12” water
main and the proposed force main crossing a minimum of 18” below it.
59. Comment: (C4.11) Min. 18" vertical separation required, deflection is preferred in lieu of
bends.
Response: The profile has been modified as requested.
60. Comment: (C4.11) Insert 'Contractor' and delete crossed out text.
Response: The note has been revised as requested.
61. Comment: (C4.11) Add; cl 52 (TYP).
Response: Callout has been revised as requested.
62. Comment: (C4.11) Clarify what these elliptical symbols represent.
Response: The elliptical symbols were a plotting error. These have been removed.
63. Comment: (C4.11) Replace with 4' (TYP).
Response: Profiles and label have been modified as requested.
64. Comment: (C4.11) Clarify what these lines represent (TYP)
Response: These lines are bends. However, in the portion of the proposed water main
to be installed along the existing Justes Drive edge of pavement, it is expected that the
contractor will utilize deflections to maintain the horizontal offset from the Justes Drive
curve.
65. Comment: (C4.11) Label all horizontal and vertical bends including degree, size and
whether horizontal or vertical (TYP).
Response: Horizontal bends are labeled in plan views and vertical bends are labeled in
profile views.
66. Comment: (C4.11) Deflect water as much as practical (TYP).
Response: Understood. Portions of the 12” water main along the existing portion of
Justes Drive are labeled to be deflected. Contractor will have permission to utilize
deflections (compliant with specifications) in lieu of bends where applicable.
FCPS 4th High School Page 9 of 10
Job No. 3805.0
67. Comment: (C4.11) Label all instances; restrained joints required in fill, min. 20' onto
original ground (TYP).
Response: These instances have been labeled accordingly.
68. Comment: (C4.11) Evaluate for release of air and show/label ARV's as applicable.
Response: Air release valves are now provided and labeled in plans and profiles.
69. Comment: (C4.11) Show and label sleeve, conduits crossing FW easements (TYP).
Response: All sanitary, water, and dry utility crossings within FW easements now include
a sleeve or encasement as requested.
70. Comment: (C4.12) Remove meter installation if not applicable to this project.
Response: This detail has been removed.
71. Comment: (C4.12) Add flushing assy detail if applicable based on other comments.
Response: Flushing assy detail is no longer applicable as the stubouts have been
removed.
72. Comment: (C4.14) Delete.
Response: This detail has been removed.
73. Comment: (C4.15) Show and label ex. 12" water main.
Response: This has been added to the profile.
74. Comment: (C4.15) Sanitary sewer force main shall be placed min. 18" vertically below the
ex. 12" water main.
Response: The profile provides the requested separation.
75. Comment: (C4.15) Show and label ex. 12" water main.
Response: This has been added to the profile.
76. Comment: (C4.15) Sanitary sewer force main shall be placed min. 18" vertically below the
ex. 12" water main.
Response: The profile provides the requested separation.
77. Comment: (C4.16) Eliminate drop connection.
Response: The drop connection has been removed.
78. Comment: (C4.16) Core drill at top of bench and reshape invert all related work shall be
performed by the contractor.
Response: This is now called out on the profile.
79. Comment: (C4.16) Show and label ownership lines.
Response: Ownership limits are now depicted on the profile.
FCPS 4th High School Page 10 of 10
Job No. 3805.0
80. Comment: (C6.00) Add note to this sheet and others; no trees or shrubs shall be placed on
Frederick Water easements.
Response: This note has been added to the landscaping plan sheets.
Thank you for your time in reviewing this project. If you have any questions, please feel
free to contact me by phone or email (info@foresightdesignservices.com).
Sincerely,
Foresight Design Services
Trevor M. Kimzey, P.E.
Director of Engineering
Enclosures
cc: Kevin Kenney, FCPS (via email)
Matt Waguespack, VLK (via email)
TMK/lew