Loading...
HomeMy WebLinkAbout2025-11-21.Wiley_Frederick Water November 21, 2025 Mr. Earl Wiley Frederick Water 315 Tasker Road Stephens City, VA 22655 RE: FCPS 4th High School Job No. 3805.0 Dear Mr. Wiley: Please find enclosed a resubmittal on the above referenced project for your review and comment. Below is a list of the items included in this submittal: • Revised Site Plan dated November 21, 2025 • Revised Erosion and Sediment Control & Stormwater Management Narrative dated November 21, 2025 • Signed Water Model Summary Report dated September 26, 2025 with signed seal date of November 10, 2025 We received your comments dated October 23, 2025 and have addressed them as follows: Type of Comments: 1. Comment: (C0.01) Update Frederick Water Construction Notes. Response: The Frederick Water Construction Notes shown on the plans were taken from the Frederick Water Standards and Specifications on the Frederick Water website dated April, 2022. 2. Comment: (C0.01) Add the note below to this and other applicable details; Note: sanitary sewer and, as labeled, water facilities will be owned and maintained by Frederick County Public Schools (FCPS), Frederick Water has not reviewed these facilities. Response: These notes have been added to the plans as requested. FCPS 4th High School Page 2 of 10 Job No. 3805.0 3. Comment: (C0.01) Add supplemental Frederick water notes to plans: a. Valves, manholes, ARV’s and other Frederick Water surface features shall not be placed in curb and gutter, nor sloped portion of handicapped ramps. contractor shall coordinate locations with the Frederick Water inspector b. Irrigation lines and devices, light poles, transformers, junction boxes, pedestals, other obstacles and all dry utilities shall not be placed on Frederick Water easements. Perpendicular irrigation lines and dry utility crossings are permitted with 18" minimum vertical separation c. Retaining walls and their tie backs such as geo grid or other supports shall not be placed in Frederick Water easements d. Contractor shall test pit as required and adjust all existing Frederick water facilities to grade per the Frederick Water inspector’s requirements e. If existing Frederick Water facilities are removed, the removed items and related materials shall be replaced with new materials. removed materials shall be furnished to the Frederick Water inspector Response: These notes have been added to the plans as requested. 4. Comment: (C1.04) Show and label recorded FCSA/FW and other easements within plan view. Response: Existing FCSA/FW easements have been added and labeled accordingly. 5. Comment: (C1.09) Show and label all recorded FCSA/FW and other recorded easements within plan view on topographic, grading and utility sheets as applicable (TYP). Response: Existing FCSA/FW easements have been added and labeled accordingly on topographic, grading and utility sheets. 6. Comment: (C1.09) Show and label all existing FCSA/FW facilities within plan view on topographic, grading and utility sheets as applicable (TYP). Response: Existing FCSA/FW facilities have been added and labeled accordingly on topographic, grading and utility sheets. 7. Comment: (C3.10) Show ex. 12" water main – consider assumed elevation and need for test pits. Response: The existing 12” water main crossing is now illustrated in the profile. 8. Comment: (C3.10) 18" min. vertical separation from Frederick Water lines is typically required. However, to avoid adjusting the existing 12" water main, if test pits reveal that the existing water main can remain in place and maintain a minimum 6" vertical separation from the proposed storm line, this condition would be acceptable with a concrete cradle or arch is placed under/on the storm line. If circumstances require the water main to be adjusted, 18" min. vertical separation is required. Response: Understood. We have attempted to provide 18” minimum vertical separation from FW lines in all locations. In locations where that is not feasible we have added a note requiring the requested concrete cradle. FCPS 4th High School Page 3 of 10 Job No. 3805.0 9. Comment: (C3.10) Add note: 18" minimum vertical separation is preferred, a minimum 6" vertical separation to storm with a concrete cradle or arch for the storm line is acceptable under the specific conditions at this location. Response: Note has been added. 10. Comment: (C3.12) Confirm all Frederick Water crossings are shown and labeled on storm profiles. Provide 18" minimum vertical separation and label as; 18" min vert sep, 18" min. clear or similar (TYP). Response: All Frederick Water crossings are shown and labeled. Vertical separation has been dimensioned for all Frederick Water crossings, with a typical 18” minimum noted. 11. Comment: (C4.00) Frederick Water has identified the need to redirect sanitary sewer flows from sources north of the area to the Parkins Mill wastewater treatment plant. To support this future redirection, Frederick Water requests that a 20-foot Frederick water easement be provided, extending from the FCPS pump station, along the existing FCPS force main to the northern property line, and then along the northern property line to the Justes drive right-of-way (R.O.W.). The FCPS force main may remain within this easement until the redirection occurs and the FCPS pump station and force main are taken offline. Unless otherwise noted, the easement and any improvements included in this plan shall comply with current Frederick Water easement requirements. Response: FCPS would like further discussion with Frederick Water regarding the requested easement. 12. Comment: (C4.00) Add the note below to this and other utility sheets; Note: Sanitary sewer and, as labeled, water facilities will be owned and maintained by Frederick County public schools (FCPS), Frederick Water has not reviewed these facilities. Response: This note has been added to all utility plan and profile sheets. 13. Comment: (C4.01) Use labels, linetypes and color, if possible to clearly identify FCPS owned and maintained water and sanitary sewer facilities on all sheets (TYP). Response: Callouts, labels, and easements are now included in the plans to provide clarity of utility ownership. 14. Comment: (C4.01) Explain the use for this connection; if connection is justified a min 20' of dip and flushing assy and 3rd GV is required. Response: This portion of the water line has been revised. The connection is no longer provided. 15. Comment: (C4.01) Place FCPS water line in sleeve min. 18" under the FW water main within FW easement (TYP) Response: A sleeve is called out in the described location. Please see profile sheets for more information regarding the crossing. FCPS 4th High School Page 4 of 10 Job No. 3805.0 16. Comment: (C4.02) Include clouded detail below on plans, modify as required for specific application. Response: The detail provided has been added to Sheet C4.04. 17. Comment: (C4.02) Show private to Frederick Water ownership limits on plan and profile. Response: The plans call out FCPS-owned water lines and Frederick Water easements. Therefore, the limits of ownership are sufficiently depicted in the plans. 18. Comment: (C4.02) Label fire and/or domestic meter size(s) at riser in building. Response: The proposed domestic meter size and fire line size are labeled accordingly. Additional information regarding the riser inside the building is provided on the architectural and plumbing plans. 19. Comment: (C4.02)Water model comments: a. The model is approved with the following comments: b. Model report shall be signed and sealed by a licensed VA PE on the cover sheet c. Include the following pages in the plan set: i. Cover page with PE seal ii. PDF page 3 (overview map with hydrant information) iii. PDF page 5 analysis graph iv. PDF page 6 v. PDF page 7 vi. PDF page 8 Response: The listed items have been provided in the plans as requested. 20. Comment: (C4.02) Place FH connection to closer water main or provide justification. Response: The fire hydrant is now connected to the closer water main as requested. 21. Comment: (C4.02) Show GV on FH tee and 2nd GV is line to FH is 20' or greater. Response: One gate valve is provided for this line. The line length to the hydrant is less than 20’ and a dimension has been provided to verify. 22. Comment: (C4.02) Confirm all metered water will be supplied through the 4" domestic water meter. Response: All metered water will be supplied through the 4” domestic water meter. 23. Comment: (C4.02) Place GV to building on tee if FH tee is shifted per other comment. If FH tee is not shifted, place GV 10' form sanitary sewer laterals. Label to FCPS ownership transition at this GV, see provided detail to left. Response: A gate valve and easement are proposed in accordance with the provided detail on Sheet C4.04. FCPS 4th High School Page 5 of 10 Job No. 3805.0 24. Comment: (C4.02) Add to sheets with grease traps and other detail sheets as necessary; grease trap / oil water separator notes: a. Tank sections shall be bolted together b. Watertight bolt down frame and covers are required c. Penetrations shall have boots d. Tank, components, and installation shall be traffic rated e. Contractor shall coordinate installation and inspections with both Frederick County inspections department and Frederick Water Response: These notes have been added to the utility sheets as requested. 25. Comment: (C4.03) 2nd GV required for FH lines more than 20' in length. 2nd GV shall be placed approx. 3-5' from FH and not within curb and gutter (TYP). Response: Understood. The plans have been revised to comply with this typical requirement. 26. Comment: (C4.03) Min. 10' horizontal separation is preferred, 7' min. is required with justification (TYP). Response: The light pole has been moved outside of the Frederick Water easement for adequate separation. 27. Comment: (C4.03) Show water lines within plan view (TYP). Response: Existing waterlines are now shown. 28. Comment: (C4.03) Connect proposed water main to ex. water main near Admiral Byrd Middle School for redundancy. Response: This connection has been provided as requested. 29. Comment: (C4.03) Shift other utilities min. 10' off FW lines and/ or off FW easement (TYP). Response: The utility plans have been revised to provide 10’ minimum spacing between FW water lines and other utilities. 30. Comment: (C4.03) Explain the use for this connection; if connection is justified a min 20' of dip and flushing assy is required. Response: This portion of the water line has been revised. The connection is no longer provided. 31. Comment: (C4.03) Add note that all crossings of FW easement(s) shall be in conduit and min 18" under FW lines (TYP). Response: The note has been added as requested. 32. Comment: (C4.03) Show and label Frederick Water easements, including width if known or variable as applicable (TYP). Response: Proposed Frederick Water easements are now shown and labeled on the plans. FCPS 4th High School Page 6 of 10 Job No. 3805.0 33. Comment: (C4.03) Min. 10' horizontal separation is preferred, 7' min. is required with justification (TYP). Response: The plans have been revised to provide 10’ minimum horizontal separation. 34. Comment: (C4.03) Add 3rd GV (TYP). Response: A third gate valve has been added at this location. 35. Comment: (C4.03) Min. 10' horizontal separation is preferred, 7' min. is required with justification (TYP). Response: The plans have been revised to provide 10’ minimum horizontal separation. 36. Comment: (C4.03) Provide, label plan sheet match lines (TYP). Response: Match lines are now provided throughout the C4 plan sheet series. 37. Comment: (C4.03) Label water main stations on all utility sheets. Response: Station labels have been added to all proposed water mains. 38. Comment: (C4.04) GV for FH is required at tee and 3'-5' from FH . Response: Another gate valve has been added at this location. 39. Comment: (C4.04) Line shall be min. 8" to within 50' of FH, prefer that the 8x6 reducer is place at second GV, 3-5' from FH. Response: The proposed water line has been revised as requested. All fire hydrant lines longer than 50’ have been revised to use this required configuration and noted accordingly. 40. Comment: (C4.04) FH's placed in areas without curb and gutter shall have bollards shown and labeled. Response: This fire hydrant is located behind curb and sidewalk. Therefore, no bollards are necessary for this fire hydrant. Bollards have been added for the hydrant near the loading dock turnaround area. 41. Comment: (C4.04) 2nd GV for FH is required at tee and 3'-5' from FH. Response: A second gate valve has been added as requested. 42. Comment: (C4.04) Line shall be min. 8" to within 50' of FH, prefer that the 8x6 reducer is place at second GV, 3-5' from FH’s Response: The water line has been revised as requested. 43. Comment: (C4.04) FH's placed in areas without curb and gutter shall have bollards shown and labeled. Response: Bollards are now provided for fire hydrants in areas without curb. FCPS 4th High School Page 7 of 10 Job No. 3805.0 44. Comment: (C4.04) Post indicator valves (PIV) are not permitted on FW's portion, GV at tee is sufficient. Response: The post indicator valve is no longer proposed. A gate valve is provided at the tee. 45. Comment: (C4.04) Label bends (TYP). Response: All horizontal bends are now labeled. 46. Comment: (C4.04) Check all FW water lines to confirm valve spacing does not exceed 1000' and adjust plans as applicable. Response: Additional valves have been provided to ensure spacing does not exceed 1,000’. 47. Comment: (C4.07) Show and label all water facilities within plan view. Response: All existing water facilities have been shown and labeled accordingly. 48. Comment: (C4.07) Insert 'Contractor' and delete crossed out text. Response: The callout has been revised as requested. 49. Comment: (C4.08) Label water main diameter (TYP). Response: The existing water main diameter is now labeled. 50. Comment: (C4.08) Clearly show and label recorded water easement on all parcels. Response: All water easements are shown and labeled accordingly. 51. Comment: (C4.08) Label storm structures per storm plan. Response: Proposed storm structure labels are now included on this sheet. 52. Comment: (C4.09) Verify existing sanitary sewer and modify plans accordingly. Response: This existing sewer infrastructure was field surveyed by our survey team and has been verified accordingly. 53. Comment: (C4.09) Request Frederick Water plans for this area and all other areas of this project from Jacob Lewis jacob.lewis@frederickwater.com. Response: FW plans for this area were requested and received from Jacob Lewis. Thank you for the assistance. We have utilized the provided plans to show the location of existing infrastructure on our plans as requested. 54. Comment: (C4.09) Show ownership lines. Response: Ownership limits are now labeled as requested. 55. Comment: (C4.09) Eliminate drop connection. Response: The drop connection has been removed. FCPS 4th High School Page 8 of 10 Job No. 3805.0 56. Comment: (C4.09) Note; core drill at top of bench and reshape invert all related work shall be performed by the contractor. Response: The note has been added to this sheet. 57. Comment: (C4.09) Show ex. 12" water main – consider assumed elevation and need for test pits. Response: The existing 12” water main has been shown. Test pits will be considered with the Owner for verification of depth. 58. Comment: (C4.09) FCPS force sewer shall be min. 18" under the ex. 12" water main. Response: Understood. Force main profile has been updated to show existing 12” water main and the proposed force main crossing a minimum of 18” below it. 59. Comment: (C4.11) Min. 18" vertical separation required, deflection is preferred in lieu of bends. Response: The profile has been modified as requested. 60. Comment: (C4.11) Insert 'Contractor' and delete crossed out text. Response: The note has been revised as requested. 61. Comment: (C4.11) Add; cl 52 (TYP). Response: Callout has been revised as requested. 62. Comment: (C4.11) Clarify what these elliptical symbols represent. Response: The elliptical symbols were a plotting error. These have been removed. 63. Comment: (C4.11) Replace with 4' (TYP). Response: Profiles and label have been modified as requested. 64. Comment: (C4.11) Clarify what these lines represent (TYP) Response: These lines are bends. However, in the portion of the proposed water main to be installed along the existing Justes Drive edge of pavement, it is expected that the contractor will utilize deflections to maintain the horizontal offset from the Justes Drive curve. 65. Comment: (C4.11) Label all horizontal and vertical bends including degree, size and whether horizontal or vertical (TYP). Response: Horizontal bends are labeled in plan views and vertical bends are labeled in profile views. 66. Comment: (C4.11) Deflect water as much as practical (TYP). Response: Understood. Portions of the 12” water main along the existing portion of Justes Drive are labeled to be deflected. Contractor will have permission to utilize deflections (compliant with specifications) in lieu of bends where applicable. FCPS 4th High School Page 9 of 10 Job No. 3805.0 67. Comment: (C4.11) Label all instances; restrained joints required in fill, min. 20' onto original ground (TYP). Response: These instances have been labeled accordingly. 68. Comment: (C4.11) Evaluate for release of air and show/label ARV's as applicable. Response: Air release valves are now provided and labeled in plans and profiles. 69. Comment: (C4.11) Show and label sleeve, conduits crossing FW easements (TYP). Response: All sanitary, water, and dry utility crossings within FW easements now include a sleeve or encasement as requested. 70. Comment: (C4.12) Remove meter installation if not applicable to this project. Response: This detail has been removed. 71. Comment: (C4.12) Add flushing assy detail if applicable based on other comments. Response: Flushing assy detail is no longer applicable as the stubouts have been removed. 72. Comment: (C4.14) Delete. Response: This detail has been removed. 73. Comment: (C4.15) Show and label ex. 12" water main. Response: This has been added to the profile. 74. Comment: (C4.15) Sanitary sewer force main shall be placed min. 18" vertically below the ex. 12" water main. Response: The profile provides the requested separation. 75. Comment: (C4.15) Show and label ex. 12" water main. Response: This has been added to the profile. 76. Comment: (C4.15) Sanitary sewer force main shall be placed min. 18" vertically below the ex. 12" water main. Response: The profile provides the requested separation. 77. Comment: (C4.16) Eliminate drop connection. Response: The drop connection has been removed. 78. Comment: (C4.16) Core drill at top of bench and reshape invert all related work shall be performed by the contractor. Response: This is now called out on the profile. 79. Comment: (C4.16) Show and label ownership lines. Response: Ownership limits are now depicted on the profile. FCPS 4th High School Page 10 of 10 Job No. 3805.0 80. Comment: (C6.00) Add note to this sheet and others; no trees or shrubs shall be placed on Frederick Water easements. Response: This note has been added to the landscaping plan sheets. Thank you for your time in reviewing this project. If you have any questions, please feel free to contact me by phone or email (info@foresightdesignservices.com). Sincerely, Foresight Design Services Trevor M. Kimzey, P.E. Director of Engineering Enclosures cc: Kevin Kenney, FCPS (via email) Matt Waguespack, VLK (via email) TMK/lew