November 21, 2025
Mr. Joe Wilder
Frederick County Public Works
107 North Kent Street, Suite 200
Winchester, VA 22601
RE: FCPS 4th High School
Job No. 3805.0
Dear Mr. Wilder:
Please find enclosed a resubmittal on the above referenced project for your review and
comment. Below is a list of the items included in this submittal:
• Revised Site Plan dated November 21, 2025
• Revised Erosion and Sediment Control & Stormwater Management Narrative dated
November 21, 2025
• Draft CGP Registration Statement dated November 21, 2025
We received your comments dated October 31, 2025 and have addressed them as follows:
General Comments:
1. All sediment basins must be designed for the 100-year 24-hour design storm per Frederick
County Code §143-160-G(1) “Erosion and sediment control (ESC) program and plan
requirements”. 25-year design storm is used in basin calculations.
Response: All sediment basins have been designed to manage the 100 year storm.
2. Provide details for material of all proposed storm pipes.
Response: All storm drain pipes have been specified to be HDPE.
3. Show proposed spot grades at building corners to provide the required 6” of fall within
10’ of building foundation.
Response: Spot elevations have been added to show the required fall away from the
building foundation.
4. Provide details (Materials, cross-sections, underdrains, etc.) for all proposed permeable
pavement, including artificial turf used as permeable pavement. Clearly label individual
permeable pavement sections on site grading plan.
Response: Permeable pavement details have been included on site detail sheet C2.10.
5. Plans and details should specify proposed bioretention BMPs as “Level 1 Bioretention” to
help ensure consistency with Virginia Stormwater Management Handbook specifications.
Response: “Level 1” has been added to the callouts of the bioretentions and their
associated detail and tables.
FCPS 4th High School Page 2 of 2
Job No. 3805.0
6. Provide sediment forebays at all bioretention inflow locations receiving flow from more
than 0.25 acre of impervious surface or 1.5 acres of pervious surface.
Response: Forebays have been added to all bioretentions where concentrated flow
enters per discussions with the review staff.
7. Detention Pond 1A has a proposed 2” orifice that will be prone to clogging. For orifices 3”
or smaller, a non-clogging low-flow orifice such as a perforated riser is preferred per
Virginia Stormwater Management Handbook guidance.
Response: An orifice protection sediment filter detail has been provided for Pond 1A.
8. Ensure consistency of contributing drainage areas, BMP treatment areas, and BMP sizing
between site grading plan, SWM report tables/calculations, post-development drainage
area maps, and VRRM spreadsheet calculations.
Response: All storm water management design and calculations have been reviewed
and revised as needed to ensure consistency of contributing drainage areas, BMP
treatment areas, and BMP sizing between the site grading plan and supporting SWM
calculations.
9. Ensure accuracy of Time of Concentration figures provided. Numerous calculations have
assumed a five minute Time of Concentration.
Response: Any Time of Concentrations that could be extended have been looked into
and adjusted accordingly, particularly the Tc for the sediment basin designs.
10. Data for Grass Channel 4.2 is not included in the Channel Report.
Response: All grass channels have been added to the ditch sizing calculations.
11. Grass Channel 4.3 is listed on the VRRM spreadsheet and SWM Report BMP Table but is
not included in SWM Report design calculations, Post-Development Inlet and Ditches DA
Map, or site grading plan.
Response: All grass channels have been added to the ditch sizing calculations.
Thank you for your time in reviewing this project. If you have any questions, please feel
free to contact me by phone or email (info@foresightdesignservices.com).
Sincerely,
Foresight Design Services
Trevor M. Kimzey, P.E.
Director of Engineering