HomeMy WebLinkAbout2025-11-21.Spielman_VDOT
November 21, 2025
Mr. Joseph Spielman
VDOT – Edinburg Residency
14031 Old Valley Pike
Edinburg, VA 22824
RE: FCPS 4th High School
Job No. 3805.0
Dear Mr. Spielman:
Please find enclosed a resubmittal on the above referenced project for your review and
comment. Below is a list of the items included in this submittal:
• Revised Site Plan dated November 21, 2025
• Revised Erosion and Sediment Control & Stormwater Management Narrative dated
November 21, 2025
We received your comments dated November 17, 2025 and have addressed them as
follows:
General Comments:
1. Comment: Site plan is missing the most updated copy of the VDOT notes. I am attaching
for your convenience.
Response: Thank you for providing. These notes have been added to Sheet C0.01.
2. Comment: Provide a typical section for the extension of Justes Drive to the FCPS property
line.
Response: Typical sections are now provided for the Justes Drive extension into the site.
3. Comment: Provide a typical section for the bus loop to be maintained by VDOT.
Response: Typical sections are now provided for the Justes Drive extension into the site.
The actual bus loop adjacent to the school building does not have a typical section as it
has varying design elements along its length, but generally it consists of the proposed
heavy duty pavement section, with 6” curbing on both sides (either CG-6 or CG-2).
4. Comment: Show proposed striping and signage to Justes drive. If a left turn land warranted
onto Rosa? If so, provide the proposed striping.
Response: Additional striping, including left-turn striping for the turn onto Rosa Lane,
has been added to the plans.
FCPS 4th High School Page 2 of 2
Job No. 3805.0
5. Comment: Provide a proper drainage system for both sides of the Justice bus loop to
include a shoulder a ditch section to ensure the life of the proposed bus loop and not allow
premature pavement failures.
Response: A proper shoulder and ditch section has been provided for the Justes Drive
extension to ensure proper drainage.
6. Provide a 1:30 scale for the force main drawings along 522. We need more clarity on the
plan sheets for us to properly review those.
Response: The force main along Route 522 is now shown at 1:30 scale.
Thank you for your time in reviewing this project. If you have any questions, please feel
free to contact me by phone or email (info@foresightdesignservices.com).
Sincerely,
Foresight Design Services
Trevor M. Kimzey, P.E.
Director of Engineering
Enclosures
cc: Kevin Kenney, FCPS (via email)
Matt Waguespack, VLK (via email)
TMK/lew