HomeMy WebLinkAbout2025-11-21.Spielman_VDOT November 21, 2025 Mr. Joseph Spielman VDOT – Edinburg Residency 14031 Old Valley Pike Edinburg, VA 22824 RE: FCPS 4th High School Job No. 3805.0 Dear Mr. Spielman: Please find enclosed a resubmittal on the above referenced project for your review and comment. Below is a list of the items included in this submittal: • Revised Site Plan dated November 21, 2025 • Revised Erosion and Sediment Control & Stormwater Management Narrative dated November 21, 2025 We received your comments dated November 17, 2025 and have addressed them as follows: General Comments: 1. Comment: Site plan is missing the most updated copy of the VDOT notes. I am attaching for your convenience. Response: Thank you for providing. These notes have been added to Sheet C0.01. 2. Comment: Provide a typical section for the extension of Justes Drive to the FCPS property line. Response: Typical sections are now provided for the Justes Drive extension into the site. 3. Comment: Provide a typical section for the bus loop to be maintained by VDOT. Response: Typical sections are now provided for the Justes Drive extension into the site. The actual bus loop adjacent to the school building does not have a typical section as it has varying design elements along its length, but generally it consists of the proposed heavy duty pavement section, with 6” curbing on both sides (either CG-6 or CG-2). 4. Comment: Show proposed striping and signage to Justes drive. If a left turn land warranted onto Rosa? If so, provide the proposed striping. Response: Additional striping, including left-turn striping for the turn onto Rosa Lane, has been added to the plans. FCPS 4th High School Page 2 of 2 Job No. 3805.0 5. Comment: Provide a proper drainage system for both sides of the Justice bus loop to include a shoulder a ditch section to ensure the life of the proposed bus loop and not allow premature pavement failures. Response: A proper shoulder and ditch section has been provided for the Justes Drive extension to ensure proper drainage. 6. Provide a 1:30 scale for the force main drawings along 522. We need more clarity on the plan sheets for us to properly review those. Response: The force main along Route 522 is now shown at 1:30 scale. Thank you for your time in reviewing this project. If you have any questions, please feel free to contact me by phone or email (info@foresightdesignservices.com). Sincerely, Foresight Design Services Trevor M. Kimzey, P.E. Director of Engineering Enclosures cc: Kevin Kenney, FCPS (via email) Matt Waguespack, VLK (via email) TMK/lew