HomeMy WebLinkAbout41-25 Pump Station Design Report4T" HIGH SCHOOL PUMP STATION DESIGN REPORT
FREDERICK COUNTY, VIRGINIA
September 26, 2025
Prepared for:
Foresight Design Services
1260 Radford Street
Christiansburg, VA 24073
$NTH 0
.ba
rAURRELL Gn
No. 3
t�n
ONAL B�
PEED & BORTZ, L.L.C.
CiviI/Environmental Engineers
20 Midway Plaza Drive -Suite 100 Christiansburg, Virginia 24073
Phone:540-394-3214 FAX:540-394-3215
engineer(c�peed-bortzxom
41' High School Pumn Station Design
TABLE OF CONTENTS
09/26/2025
I.# BACKGROUND..................................................................................................................2#
II.# PROPOSED STATION.......................................................................................................2#
APPENDICES
Appendix A — Station Design Calculations
Appendix B — Design Specifications
Peed & Bortz, LLC 24-38
4th High School Pump Station Design 09/26/2025
BACKGROUND
The purpose of this report is to provide details of the design needed for the
proposed 4th high school facility in regards to the sewer connection. Due to the
location of the facility and cost analysis, a pump station with forcemain design was
selected to provide sewer conveyance from the campus facility to a wastewater
facility located south of the site.
The proposed 4th High School will have an estimated 1600 students and 200
faculty/staff within the facility. In order to estimate the total flow from the facility,
values from 9VAC25-790-460 was used to generate gallons per day of flow for the
total number of people on the school campus.
A daily flow of 16 gpd was used for the 1600 students and 10 gpd was used for the
200 faculty/staff. Therefore, approximately 25,600 gpd was estimated for the
students and 2000 gpd was estimated for the faculty/staff. This produces a total of
27,600 gpd for the school facility. Based on the daily flow converted to gallons per
minute, 19.17 gpm was then used to estimate the peak flows for 2.5 and 4 times the
average flow. This estimated 48 gpm and 77 gpm respectively which were used in
the design of the pump station.
PROPOSED PUMP STATION
The proposed pump station will be located in the southwest corner of the property in
order to collect and convey all flow from the high school to the waste water
treatment facility located at 158 W Parkins Mill Road. The forcemain will be
installed along school property until reaching Front Royal Pike (Route 522). There
the forcemain will then be installed along the right of way until reaching Parkins Mill
Road (Route 644). The 4-inch forcemain will total approximately 6350 ft and convey
the flow from the station to a receiving manhole located near the intersection of W
Parkins Mill Road and Front Royal Pike. The initial calculations for a 4-inch
forcemain requires a minimum of 80 gpm to provide the required 2 fps of scour
velocity within the pipe. Though the peak flow was estimated at 77 gpm, a minimum
of 80 is required just to meet scour velocity. A submersible grinder pump was
selected to provide the required minimum scour velocity and convey the peak flow.
The design pump is based on the Keen KG(X)3, 3HP, 4.00" Impeller with a
minimum pump rate of 84 gpm at a 1-minute pump cycle. A 6ft diameter wetwell
volume was designed to allow for the pump to have a 10-minute pump cycle time of
210 gallons with a minimum active level of 1.0 ft between pump on and pump off.
Based on the pump curve and selected design pump, the pumps are set to 84 gpm
@ 37 TDH to provide the required flow within the forcemain.
The pump station components are designed with 3-inch internal piping throughout
the wetwell and valve vault which ties into the 4-inch forcemain that leaves the
school property and connects to a receiving manhole southwest of the school. The
station valve vault is equipped with check valves, plug valves, an air release and
2 Peed & Bortz, LLC 25-06
41' High School Pump Station Design 09/26/2025
meter within the vault. An emergency pump connection line is also included for
operational continuity in the case of a failure.
A control shed has been added to provide a central location for all panels,
disconnects and controls needed for the pump station. The station will be powered
from a connection at the school facility and during a power failure the station will
operated from the school's emergency backup generator. Therefore, no additional
generator unit was placed on site near the proposed pump station.
See design calculations and pump specifications in appendices for pump data.
Peed & Bortz, LLC 25-06
Appendix A
Pump Design Calculations
PUMP STATION WETWELL BUOYANCY ANALYSIS
4th HIGHSCHOOL
Wetwell Inside Diameter
6.00 feet
Wall Thickness
0.67 feet
Slab Thickness
1.00 feet
Footer Extension
1.00 feet
Interior Chamfer Height
0.00 feet
Interior Chamfer Width
0.00 feet
Chamber Exterior Diameter 7.33 feet
Slab Diameter 9.33 feet
Top Wetwell Elevation 714.00 feet
Top Base Slab Elevation 697.00 feet
Ground Elevation 713.20 feet
Ground Water Elevation 713.20 feet
Weight of Water 62.40 lb/ft3
Concrete Specific Gravity 2.30
Soil Specific Gravity 1.15
JN 25-06
Displaced Water Volume Buoyant Force
Slab 68.4 ft3 4,269 Ibf
Chamber 684.2 ft3 42,697 Ibf
Total 752.7 ft3 46,966 Ibf
Downward Load
Structure
Volume
Resistant Force
Slab
68.4 ft3
9,819 Ibf
Chamber
237.4 ft3
34,067 Ibf
Chamfer
0.0 ft3
0 Ibf
Soil above Footer
445.1 ft3
31,937 Ibf
Total
750.8 ft3
75,823 Ibf
Minimum Net Downward Force*
28,857 Ibf
* Equipment weights are not included.
9/26/2025
25-06 Wetwell_BuoyancyCalc_Design.xls
a
CD
CD
a
go
W
O
N
r
r
C)
c
O
3
(ND
cn
O C
O
o
CDN'CDo
CD
7
0
m _
7
m y
CD
CA
0 W no CD N' N 41 O W W M
D1 N N N S CO CO W CD CD O a. <<
CD
CD °( a a 7< <<
DCca °D
g C T CL CD
ND] (oo
fn N o
l O
CD
CD
v
V
V
W s
N
V
V
N
71
N
i A
CD
O
O
N
O
O
a
CD
W
T
CD
A
a
CD
Cl
O
O
T
o.-c1CiC��-i NA coca W vGi
N N CD CD N Ul O c C 67
3 O. N N CD CD C)o W W O CO CD
N y o W CD CD f0 a. < <
(O
CD :
Cn a o W (D a n n O N
CD CD = CD <
O n = C a s CD N O N
O �n _ _ < Co
O— O " O O O O O N O 0 0
O w m m m O N N O Am
O O O O O O m N 0 m O O W O
z
=0T
T T T m
TTTT -uTv
cnpcn cn-na
a
c
C y
j
C7 a Rl
W M A W N 1
n
N O _
CD
n
D] 7 CD
3(
� O
M 1
m
cr 0 3
O
67
o<i
o CD � o
CAD
am CA�.
a�T
o
c; E m 0 a
7
N m
N
CD ,-.
- N
p CD c N C O
y,
m
(D
7 N
O
� n
z W
O
CD
CD '
C1 �, O
C
W
CD
A W
CD N
CD CD co 3
v
s
o
CD
a
ID ID
o'
O
o_ r!
0 0
O O
1 W CD��
N
a
v �.
O
7
Q
O
N (o
O O CD
(D
CO
W CO
O
O O— A W E T
O O 6 N p�2 W a V O
00 W � O O O 0CDO CO
U1 0 N W W CD
O C
CT O O
O O A O � ( (�
W
W 00 V O 0 0 00 I CD
W
W I O N O V O �I A
m W O O O O O CD
OD O WVD O I O O C.fl CD O II CD
W OVIO�N O W OII Cn
co CD O O O O O CD
� W V O Cn A W N O
(DO O O a)O O O O O
Cz
90
r
rA W W N N 0 0
M W 00 N V N m (n O
N N 0 0 0
W C7 V N O V- N O
O A CD W W W N -,Iq)
N N — —— 0 0 0
O A CD W w N V- O O
N N — — O Cl O
O A co W ON V m O
N N s s 0 0 0
O A (D W OD N V M O
N
O
nCD
�G
CD
O
O (D
CD
O
C) CD
CD
O a
O CD
CD
O O
n CD
G Cn
CD
0 0 0 0 0 0 0 0 0 o �-0 o
(D
x TKtn-Ti�
(D a (D
0. ID
O CO 00 V (M (n A W N O W O O O O O CD CD 0
a
f0/1 3
0 0 0 0 0 0 0 0 0 0 0
n CD F n 0
d N O S
N C O
N rt
n: N O K
(O (D V O7 (>7 C17 A W W N N O O O O O
^ r
0 C (NI1
N 00 W M W O A V Cn O M V Ch N O 0
0
w N
V, A O -+ N O CD W A O N O A A WW W W
._. co
'8
tfi
.M
O
0 w w V T m m A A w N N co CJ7 w -� O
r
AM M V (O A V CD A (D W (D A
w N W W CT O) O) O w N O N O W� A A CO
CD O'm
CCD Cp CD
N N W V W N W CD CD w W co O (D V A N N V
..' N N
" CD V 00 � W N -+ O O
W COwCn N OD N CO O� N
O
A W V j V? A M (b W O v W 0
CD O
CD
m -Cl cn W (D W Cn m Cn N (wD CO7t CNO V
v N
W
O
O O
(D (o
0 0 0 0
�
o a
3 3
N M N O Co Co Co O N Cn CO Co CO 0 N O O
n
Or �
C'D to CD
CO W V 00
A m Co V W V (b V W V (O CD V Co OD W Ui V
v N A
WN ONi A N CD (A A N O O V 01 A W N 0 0 0
Or 'd
.(ND
O A CD M M Cn M CO A 1 O
v N 0 Ln IV W-4 Cn v N N V O O O Cn V O W
CD En CD
.... Cn
Cn
^ r T
O O O 0 0 0 O 0 O O CO O O 0 0 0 0 0 0 0 O
CD O
(v cn (D
(n
N
O.
.
V.
O.
A
W
W
N
N.
—
O
O
O
O
O
O
--�
CO
O1
CO
A
CO
O
CO
OD
OD
O
CD(D
A
W
V
A
8
O
Cn
N
O
O
Cn
A
A
V
(D
Cn
N
CD
W
O
W
O
OD
V
CD
Cn
Ut
A
W
W
W
N
N
1
0
O
(D
CO
(D
O
W
fn
OD
Un
(O
A
O
Cn
N
CO
C71
W
W
Cp =
W
v
W
Co
V
O)
A
Co
CD
O)
A
OD
00
m
N
00
V
0)
N
(D
O
V
O
O
W
CO
O
W
W
W
W
CD
-�
-�
O
CO
A
CS7
O
CD ..
"O
N
(n
W
N
CO
M
V
M
(11
A
A
W
N
N
V
(77
M^
O
Cn
1
V
A
s
CD
N
V
V
00
CO
A
W
N.
W
O
V
N
CDco x
V
N
O
v
W
00
O
V
A
W
A
W
NM
1
CT
V
CO
M
Ln
N
A
Cn
V
M
0
CD
W
N
O
CD
CO
W
V
CT
W
N
CD
O
A
(D
A
O
-N
A
N
N
A
�l
Cp =
N
A
A
A
N
coo
W
O
O
A
A
(O
co
CO
w
A
O
N
Clt
OD
w W
co
A
O 2
W
N
W
A
O
V
w
O—
w
m
co
0
co
0
CD '
CD
O
N
s
0
V
Cn
A
N
0
M
CO
O
A
V
N
V
W
CD =
N
00
00
A
O
V
m
O
w
-
m
O
O
(D
CCD
fwD
O)
lti
to
ci
O
CD
j
CO
00
V
O
W
A
A
W
W
Cal
V
CD
Cn
A
W
CO
N
A
cO
0o
V
V
00
(D
A
O
Cn
N
CO
Cn
W
W
Cp O
O
N
CDm(ND
V
W
0D
O
V
A
W
A
00
N
—
M
Cn
V
CD
V
O
O
W
W
O
W
W
W
W
(D
O
CO
A
O
.... 3 =
(O
O
CD
d
po
W
O
N
r
r
n
Ch -n p.
^.
C
CL
f0
O O O O O O O O O O O _
CO)ID
n n
IV C O
N .O. O
O �C M
f0 W W v v a1 O CJ7 O7 A A CNJI C
O M— V N W W (O A CO Ot 3
Co N -I N m O7 O W O A '6
01
ra
O
7
CA A A A A W W W W N N
i O O) W O Oo Ul W O CO Ul
CA O A co W �I N O) " O1
Ut A A A A W W W W N N
� w O W O w O7 W O OD O7
Cn O A W W —1 N O) 1 cn
U1 A A A A W W W W N N
OD O) W O 00 U) W O OD CT7
j Oi O A W W V N O) Ul
U7 A A A A W W W W N N
w O W CT W O m U1
M O A W W v N O— O1
O O O O O O O O O O O
CD
o
P
0
c :�
-Clrz
3
mn
CD
-
3CD
a = o
CD
I
-a
(D D
r
co<
can
-0 3
;
ao v
° 3
a C
o
O.
C
n_
O
(D
O
m
o
3
w
o
m
(D
w
m
3
O
m
y
C
A
3
0
,.
3
_
N
N Cb
O
1 N
O
V
FP
(O
_N
A O
(a cc co
C1 N A
66 @
N cch W
V
v
x
N'
O
0
W
0
M
0
V
0
W
00
M
A
o
W
O
1
N
o
00
-•
O
O
0
OD
o
V
0
m
0
Cn
0
A
00
W
N
0
0
O
in TI
O
O
CO
N
A
N
OD
W
W
W
CT
W
V
W
(O
A
A
N
A
W
A
G.W
A
A
A
A
A
CJ7
3
m
O
0
CT
W
A
co
co
(O
V
0
W
(D
A
Oo
0
CO
W
V
m
N
A
O
m
A
m
-�
m
V
(fl
cn
CD
c
3
a
3
N
�
3
W
W
W
W
W
W
W
W
A
A
A
A
A
A
A
A
A
A
A
A
A
A
W
A
CT
m
V
M
(O
O
—
—
N
N
W
W
W
A
A
T.
A
A
Un
3
M
W
m
M
CO
M
V
W
O
V
W
V—
M
M—
A
m
M
(O
O
-a
N
W
A
V
O
O—
m
m
0
A
m
m
CT
—
in
m
m
V
m
CO
C
01
O
O
Cl
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
C
3
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
-a
N
D
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
o
0
o
0
0
0
0
0
0
0
0
0
0
0
3
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
-a
1
W
c
N- M
CD C
3
3
3
.0 (D
m M _
�
N
3 to
X 0
m
a pr
Cl)
w �
3
N o
C O
o
C
e
a
3
O
a
3
N
(D
En
M.
O
7
Cl
to
(D
CA
O
W
CD
CD
O_
90
co
O
N
r
r
n
V1 N TI �
WO
m CD
m
to
> >
(O j W
T R7
O 0
F
rL O 3
n D
U N
N
i71
N
l�D
O
O
7 Q1
O
(n
CD
N
OD N O
CDO O
O O O
O
N
N
-4
T
m
C~1 O
O O O
CD CD O
CD
C.
Cn �
N
CD
O
m �
O
C -I
� N
CD (31
O
C�
O Cp
Xv
A x
K7 -4
Cb CD O
O N
O A
-3 N
9
CA
V
00 O � a �1
cD
D r r D o y 3o O.
M CD 3 CD
3 CD �. to
a =
3 -0f m co
O O N p0 3
:3 OHO !�C o
C
N � �
N C
CI
O
ti ti ti m 0) 3
O O O O (0
CO N (D V
O O O cn O
O O O O O
NCD
�
O O CT Ln O
O O CD O
v O
O
G] N 01 N 3
O
CA O O CCD
O O O
S(AN0
—I
O
N O C7 ) m C1
CO v m CO C
O
C
N N fl1 N 3
CD
CD
cl
go
ao
0
r
C�
m -i
cu 0
N w cn rn V co
0 0 0 0 0 0 0 0 0
0 I t - -
X X O
(D m
m m
X X
Gl Q N.)5 X O
w w
w w
2 2 w
O
A A
O O
O O
A
O
cn
o d o
c c
m v
o 3 O
m m
V
O
I ( o
Co
Co
m -n
;K o
= ci
ID
X O
0 fa O
w �
n w 3
c =
m v
A O
0
0
C)
o w
c O
m
c
/J
cn
I
V
O
o�
0
N J
0
0
� I �
S
to
3
N
n
S
O
O
T
a
3
_cn
rt
O�
7
Appendix B
Pump Specifications
Grinder Pumps `'; :: ' PINSO
e
KG
FM
,ten
3HP Hi h Flow Grinder Pump(X)4,3 (Class 1, Div.1, Groups C & D Hazardous Location)
V-
The KEEN PUMP KG(X)3 series centrifugal grinder pumps easily handle residential,
commercial or industrial sanitary waste, reducing it to a fine slurry. The KG(X)3
pump is designed for use in pressure sewer applications or any piping network.
The recessed vortex impeller design of the KG(X)3 grinder pump provides trouble -
free, non -overloading operation over the entire performance curve. The modular
design provides quick and easy serviceability. The hardened stainless steel grinder
assembly provides many years of dependable operation.
The KG(X)3 series pump features:
• Interchangeable with Competitor Installations
• Dual Silicon -Carbide Mechanical Shaft Seals w/Vitone Elastomers
• Pressed -In Motor with Internal Overload Protection
• 3-Bearing Shaft Support (Upper / Lower / Sleeve)
• Internal Moisture Detection
• Strong Motor, 1-Phase (208/230) Volt or 3-Phase (208/230/460) Volt
Performance Curve
70
60
50
LL
40
— -
v
30
O
20
10
0
40 80 120 160 200
Capacity (GPM)
REV 04/2018
Features and Benefits
1. Watertight Cable Entrance
Agency -approved, watertight strain relief cord grip with compres-
sion grommet protects outer cord jacket (FM Explosion -Proof) or
Heavy-duty molded compression grommet protects outer cord
jacket. Epoxy- filled iidti i nner cord cap proves an-wcking moistur�
protection to the motor even if power cable is cut or damaged.
2. Modular Pump Design
Commonality of parts across the Keen product line minimizes th
amount of parts required for servicing. Heavy-duty ASTM A48,
Class 35 cast iron components.
3. Strong Motor
Powerful high -torque motor for reliable pump operation. Pressec
stator securely holds motor and efficiently transfers heat. Class
insulation with overload protection in oil -filled chamber for cool
operation and long motor life.
4. 3-Bearing Support
Motor / Pump shaft securely held with upper and lower ball
bearing plus additional sleeve bearing in lower seal chamber.
Long 100,000 hour L-10 bearing life.
5. Double Mechanical Seal Protection
Dual silicon carbide mechanical shaft seals w/ Viton® elastomer
provide twice the moisture protection for the motor. Dual seals a
housed in a secondary oil -filled seal chamber. Tougher silicon
carbide seals better handle sand, grit and abrasive materials.
6. Moisture Detection
Dual Seal leak probe signals alarm in control panel for
scheduled maintenance.
7. Non -Overloading Hydraulic Design
The recessed centrifugal impeller allows 100% performance cure
operation from shut-off to maximum flow without damage to the
pump or system. The recessed vortex impeller is out of the
passageway of fluid flow, eliminating concerns of blockage or
wear.
8. Proven Grinder Assembly
Hardened (Rockwell 56-60) stainless steel grinder assembly has
30+ years proven field experience. The reversible grinder ring ar
grinder impeller effectively reduce solids into a fine slurry, easily
passable in a piping system without concerns of clogging. Highly
efficient 17,250 cuts/second.
9. Versatile Flange Connection
Combination 2-1/2" and 3" horizontal flange. Industry -standard
ANSI Class 125 dimensions.
10. Accessories
Stainless steel lifting handle included. Anti -vibration nylon
mounting feet OPTIONAL.
3HP Grinder Pump
High Flow
KG(X)3
V_jEEN PFAM
471 US Hwy 250 East - Ashland, Ohio 44805
419.207.9400 fax 419.207.8031
www.keenpump.com
SST LIFTING
HANDLE
36�
PUMP STANDARD HUR12nNTAL FLANGE
OR 3' ANSI) STANDARD BASIN
PACkAGL DISCHARGE t2' PIPING)
ACCEPTABLE WITH MACERATED
SEWAGE SLURRY
DISCHARGE FLANGE 'SLC]TS'
FC]R LIPTIdNAL 2,5' dR 3' ANSI
DISCHARGE, CLASS 1P5„ 4-BC]LT
86
lVKEE1Y KEmPUMPOO
�%M 471 US HM250 FAST PHONE: 418 2074WOO
�p�F� � ASHUWU, OHIO 44805 FAX 41&207-B0 l
ME
3-7,5HP NIGH FLC]W/HIGH HLAD OR. PUMP DIMLNSIC]NS
CALF DM # REV.
NTS
Ewa BY I a4TE K N- 2 8 I
A77KEEN PUMP
3HP SUBMERSIBLE GRINDER PUMP
GENERAL
KG(X)3
MOTOR DATA
Pump Model
HP / Power Supply
3HP / 3 ib, 60 Hz
PUMP DATA
Full Load Amps 208V
21 Amps
Date
03/06/2017
Start Amps 208V
105 Amps
Discharge Flange
2-1/2 & 3" ANSI Horizontal
Full Load Amps 230V
18 Amps
Grinder Ring
25 Slots
Start Amps 230V
90 Amps
Impeller Type / Std. Dia.
Recessed / 4.50"
Full Load Amps 460V
9 Amps
Three Phase
Start Amps 460V
45 Amps
Poles / Rated Speed
2 P / 3450 rpm
F Class
Insulation Class
PERFORMANCE CURVE
Head / [Ft]
70
60
4.50" DIA
_
50
4.25" DIA
40
4.00" DIA
30
20
10
0 40 80 120 160
Capacity [USGPM]
MODEL HP Phase Volts
*
200
KG(X)3-2083
3
3
208
KG(X)3-2303
3
3
230
KG(X)3-4603
3
3
460