107 North Kent Street, Second Floor, Suite 200 • Winchester, Virginia 22601-5000
October 31, 2025
Mr. Trevor Kimzey, PE
Foresight Design Services
1260 Radford Street
Christiansburg, Virginia 24073
RE: Site Plan Comments – Frederick County Public Schools 4th High School
Frederick County, Virginia
Dear Mr. Kimzey:
Upon review of the site plan dated September 26, 2025, Frederick County Public Works
offers the following comments:
1. All sediment basins must be designed for the 100-year 24-hour design storm per
Frederick County Code §143-160-G(1) “Erosion and sediment control (ESC) program
and plan requirements”. 25-year design storm is used in basin calculations.
2. Provide details for material of all proposed storm pipes.
3. Show proposed spot grades at building corners to provide the required 6” of fall within
10’ of building foundation.
4. Provide details (Materials, cross-sections, underdrains, etc.) for all proposed permeable
pavement, including artificial turf used as permeable pavement. Clearly label individual
permeable pavement sections on site grading plan.
5. Plans and details should specify proposed bioretention BMPs as “Level 1 Bioretention”
to help ensure consistency with Virginia Stormwater Management Handbook
specifications.
6. Provide sediment forebays at all bioretention inflow locations receiving flow from more
than 0.25 acre of impervious surface or 1.5 acres of pervious surface.
7. Detention Pond 1A has a proposed 2” orifice that will be prone to clogging. For orifices
3” or smaller, a non-clogging low-flow orifice such as a perforated riser is preferred per
Virginia Stormwater Management Handbook guidance.
Page 2
Frederick County Public Schools 4th High School
October 30, 2025
8. Ensure consistency of contributing drainage areas, BMP treatment areas, and BMP sizing
between site grading plan, SWM report tables/calculations, post-development drainage
area maps, and VRRM spreadsheet calculations.
9. Ensure accuracy of Time of Concentration figures provided. Numerous calculations have
assumed a five minute Time of Concentration.
10. Data for Grass Channel 4.2 is not included in the Channel Report.
11. Grass Channel 4.3 is listed on the VRRM spreadsheet and SWM Report BMP Table but
is not included in SWM Report design calculations, Post-Development Inlet and Ditches
DA Map, or site grading plan.
Once these comments are addressed, submit a copy of the revised plan for further review.
Sincerely,
Benjamin H. Whitlock Joe C. Wilder
Environmental Program Administrator Director of Public Works