February 10, 2026
Mr. Eric Bittner
Dept. of Planning & Development
107 N. Kent St., Suite 202
Winchester, VA 22601
RE: TVOR Cottages Site Plan (#44-25)
Planning Review Comments
Dear Mr. Bittner:
The following represents Dice Engineering, PLC responses to Planning comments provided via
letter, dated November 10, 2025, concerning the TVOR Cottages site plan review. Review
comments are shown in bold italics. I am responding on a point-by-point basis to correlate with
your comments.
1. Cover Sheet - The following items should be made:
o Site Plan reference – Add the Site Plan reference number #44-25. The site plan
reference #44-25 is now provided in the project title (see sheet C-01), and in the
lower right corner of each sheet border (see all sheets).
o Magisterial District – List the Magisterial District (Gainesboro) where the
property is located. The Gainesboro Magisterial District is now provided (see
Project Information, sheet C-01).
o Previous Approvals – List Site Plan (SP) #02-13, #07-14, #45-20, and Master
Development Plan (MDP) #01-09 as previously approved plans. The referenced
previous plan approvals are now provided (see Project Information, sheet C-01).
o FEMA Floodplain – Provide the FEMA Flood Insurance Rate Map number, date,
and designed flood zone in which the property is located. The FEMA floodplain
info is now provided (see Project Information, sheet C-01).
o Rezoning and Proffers – Add the rezoning proffers to the site plan. The
proffer limits the amount and type of housing units. Provide the overall floor
area and overall limits. Verify that this concludes all the housing permitting
under the rezoning. The additional rezoning proffers are now provided (see sheets
C-21 & C-22). T he floor area and floor area ratio are provided (see Project Note
#13 & #14, sheet C-01). The lot tabulation by unit type, which compares the
existing/proposed units to the overall allowable units per the MDP/proffers, is
provided in a table (see lower left corner of sheet C-01).
Dept. of Planning and Development February 10, 2026
RE: TVOR Cottages Site Plan Page 2
Please find attached the revised Site Plan, including comment response letters to both Planning
and Public Works. It’s my understanding that Frederick Water will not need to review/approve
since the utilities at TVOR are private, but I’ve also included their review checklist if the plan
needs to be forwarded to Frederick Water for review. Please note there are two hard copies of
the site plan provided (Planning & Public Works), a copy was not provided for the Fire Marshal
since they’ve previously approved the plan.
If you have any questions or need any additional information, please don’t hesitate to contact
me. Thank you for your time and consideration regarding this matter.
Sincerely,
Dice Engineering, PLC
__________________________
Dennie D. Dunlap III, P.E.
Principal