HomeMy WebLinkAboutFW review checklistREVIEW CHECKLIST This checklist is to be completed by the Design Professional and
submitted with the Site Plan,
FREDERICK WATER
Subdivision/Site Plan Name: The Village at Orchard Ridge Cottage Prototype Site Plan
---------------------------------------------------------------------------------------------
Design Professional Name: Dice Engineering, PLC
----- ---------------------------------------------- -
Design Professional Phone: (540) 974-5157
Tax Map (PIN): TM 52-A-50
---------------------------------------------------------------------------------------------
Submission Date: 10/16/2025
--- ------------------------------------------------------------------------------------------
Submission Number: 1
---------------------------------------------------------------------------------------------
5
Review Key
o
a
l
✓
O.K.
O
Incomplete
REQUIREMENTS
o
N
Not Applicable
°'
a)
X
Unacceptable
P
3. r,:`is ery% *�
}..' ?.' 3 i
S
r�
"F, v V.�.5 3L'" $. vk`tfiay .*s�-r: 2'te..:
'4 NX
��.
��',
t...� t�-,uyn�'.u� ::. �i, ..-s�i,i.
i` �'�.. .'e .. +r�.k� $...,.� 43 � .�s ` :��E'�'"f',� M�..i.
,o-£" . ,S•n,.
1 Owner's and Developer's contact information
2
Magisterial district, tax map; and address if applicable
f
3
Utility contact information
4
North arrow on all plan sheets
5
Scale references on all plan sheets
6
Current FW Standards and Specifications have been
reviewed for compliance at www.FW-water.com
✓
7
Current FW construction notes are on plans
6
All existing easements are shown including deed book
& page or instrument number
9
Vicinity map
10
General layout sheet
jV
Current existing water and sanitary sewer infrastructure
11
is shown and described
✓
12
Required onsite FW easements are identified
N
13
Required off site FW easements are identified
iV
Note has been added to landscape drawings that no
14
trees or shrubs shall be placed on FW easements
Project Acceptance Requirements per FW standards
15
(page 4) have been considered in project phasing
16
Existing site conditions are shown and labeled ie, ex.
structures, utilities etc.
Master development plan reviewed for compliance and
17
MDP #, date included. Any variiance from MDP water or
iU
sewer require ents is explained
Revised 1/4/18 Frederick Water Plan Review Checklist Page 1 of
18
Proffer statement reviewed for compliance and copy
included
19
Exceptions to FW requirements are described
N
Length of water and sewer lines on private property to
20
be owned b FW kept to minimum
✓
21
Lot numbers, building numbers and street names are
shown on all sheets
22
All plan sheets have been reconciled to reflect the
✓
same information
23
Existing FW infrastucture requiring field adjustment
where grade changes occur has been shown
Existing FW facilities to be removed or abandoned are
24
noted accordingly. Significant items, fire hydrants,
valves etc. are noted to be furnished to FW ins ector
Ownership of existing and proposed, water and sanitary
25
✓
sewer is labeled
Continutity of service to adjacent parcels has been
26
considered and easements provided
N
27
FW easements are exclusive. Crossings permitted only
iN
as necessary
28
Street ownership (VDOT or private) is shown
29
Water aynd sanitary sewer usage form is completed
f
GfSr t N'sj vay:„:v `i.4v'Y' a<..h�«c
4
S'�v'k:i'c"f`y
'�a
30
Project water system has been modeled
31
Air release has been evaluated and shown
N
32
FW's water infrastructure has been evaluated and can
✓
meet ro"ect demands
33
Water meter size(s) are shown
Fire line(s) to building show gate valve 10'-20' off
34
building with ownership line, valve is the end of FW
ownership
35
Double detector size and location is shown
N
36
Water segments are labeled on plan and profile
37
Sanitary sewer crossings are shown under water lines
with min. 18" separation
38
Sanitary lateral crossings have lot number and
elevation shown on profile
39
All crossings are labeled including min. 18" separation
40
Connection to exciting lines are labeled and include
✓
party responsible for field connection
41
Special conditions; service disruption, by pass piping,
N
etc. is clearly detailed
42
Existing and proposed line diameters, pipe types etc.
✓
are shown
43
Water lines shall be CL 52 DIP
jV
44
Water lines under permeable pavers should be
N
minimized
45
Bollards around fire hydrants in truck and other
N
vulnerable areas are shown
46
Applicable FW detail drawings are included
47
Restrained joints in fill areas and 20' onto original
round are reflected
Revised 1/4/18 Frederick Water Plan Review Checklist ' Page 2 of 4
Existing FW laterals, services, main stubs etc unutilized
48
are shown with details for disconnection and removal
Iq
49
Protectus 3 meter including size, is shown for private
N
under round fire lines
50
Fire lines are shown as CL 52 DIP and restrained
Pipe types are shown on plan and profile for all
51
segments
52
Valves are shown on all branches of tees, crosses,
✓
es etc.
53
Minumum 25' pre blast is shown for main line stubs
N
Air release and vacuum breaker valves have been
54
N
evaluated and shown
55
Appropriate FW detail drawings are included
Virginia Department of Health's Project Summary
Report is completed and included, see
56
hftp://www.vdh.virginia.gov/content/uploads/sites/14/20
16/04/Genera l-Permit-Project-Summary-Report. pdf
�3 ,� �h4
:+t�, S 4
it 1`a-a*,:5 -.NO
G+�"L- "Sd i� i ;..L." 3'.i,`r �'. i i'
�.., ' 3 yn 3 1„�`
�s'�`i
.-
ey,,i`
s,
S*4..L`
yr - #
"*� ` '. av'vv £?.S 2',�"
` '�' ph ^€�Sr*c+''" f�vih fi �: l n sk' .Ca}-{'£? `�'r�''F +'z"^'. ? i.R.y°s, '` '"•� •I+2``.
e�`Y-3-�a.4:'•+""�'u
i
imS
}'e g;sTizY;'
57
Project sanitary sewer system has been modeled
f
FW's sanitary sewer infrastructure has been evaluated
58
and can meet project demands
59
Manhole rim elevations are shown
60
Sewer segments are labeled on plan and profile
61
Water line crossings are shown above sewer min. 18"
✓
separation
62
All crossings are labeled including min. 18" separation
Connection points are labeled and identify party
63
erformin connection
Y
64
Special conditions; service disruption, by pass piping,
etc. is clearly detailed
1V
65
Line diameters, pipe types etc. are shown
66
Sewer lines under permeable pavers should be
N
minimized
67
Applicable FW detail drawings are included
Existing FW laterals, services, main stubs etc unutilized
68
are shown with details for disconnection and removal
N
Restrained joints in fill areas and 20' onto original
69
round are reflected
N
70
Drop connections are noted on plans and profiles
N
71
Multiple inside drop connections into same manhole
N
have been evaluated and larger manhole is identified
72
Manholes larger than 4' in diameter are labeled
N
73
Deep sewer laterals are noted on plans and profiles
jy
74
Pipe types are shown on plan and profile for all
segments
75
Minumum 25' pre blast is shown for main line stubs
N
Revised 1 /4/18 Frederick Water Plan Review Checklist Page 3 of 4
76
Air release and vacuum breaker valves have been
evaluated and shown
77
Appropriate FW detail drawings are included
x
78
�-
i.�a
Show all proposed site improvements.
�
79
Pump station wet well accessible by vactor truck
N
80
Personnel door accessible to full size pick up truck
suction lift pumps only)
'v
81
Show and label existing contours.
82
Show and label final contours.
N
83
Show proposed utilities, including electrical, telephone
services information
84
Show transformer and generator location and
dimensions
85
Provide 100-year floodplain elevation and note on PS
plan
86
Fence is shown on property line
87
Gently sloping minimum T gravel outside fence
perimeter
88
Surface water is directed away from pump station lot
N
89
Paving and stone areas are labeled
�V
90
Gate size is shown and post is min. I'off pavement
N
91
Access road provides heavy truck access and slopes
no qreater than 10
92
Station information sheets are complete including
interim and buildout as applicable
NI
93
Appropriate FW detail drawings are included
94
95
96
97
98
99
100
101
102
103
104
105