Loading...
HomeMy WebLinkAbout44-25 Site plan applicationSITE PLAN APPLICATION 1. Project Title: The Villaqe at Orchard Ridge Cottage Prototype Site Plan 2. Project Description: Project includes four new independent-livinq cottages to be constructed on Advowson Place & extended Prominence Circle. 3. Location of Property: 100 0 G I �k i-d w,e. ffZ; Jg-- O', (Street Address): W H z e es+c f, VA 2 z 6 0 3 19 9 n. Applicant/Designer: Name: Dice Engineering, PLC Telephone: (540) 974-5157 Primary Point of Contact: Dennie Dunlap Email: ddunlapq@_dice-enq.p Address: 101 Shelby Ct., Winchester, VA 22602 Property Owner (if different than above): Name: The Villaqe at Orchard Ridge, In Telephone: (540) 431-2800 Address: 400 Clocktower Ridge Drive, Winchester, VA 22603 Property Information: a. Property Identification Number(s): b. Total acreage of the parcel to be developed c. Total disturbed area of the parcel: d. Present Use(s): e. Proposed Use(s): f. Magisterial District(s) TM 52-A-50 131.06 acres 1.64 acres Continuing Care Retirement Community Continuing Care Retirement Community Gainesboro 7. Site Plan Type: a. Is this an original or new site plan? Yes: a No: II b. Is this a revised site plan? Yes: II No: Q✓ If yes provide all previous site plan numbers: SP #04-11, SP #29-12, SP #09-14, SP #39a c. Is this a minor site plan? Yes: II No: II If yes, provide all previous site plan numbers: 8. Zoning Information: a. Current Zoning: MS b. Was this property Rezoned? Yes: [Z No: II c. If yes provide the rezoning number for this property: RZ #01-09 d. Are there any proffers for this property? Yes: II No: II e. Has an MDP been approved for this property? Yes: II No: f. If yes provide the MDP number for this property: 9. Adjoining property zoning and use: Zoning: Use: North: Agricultural, Residential RA South: Agricultural / Undeveloped B2 East: lAgricultural / Undeveloped RA West: lAgricuiturai / Undeveloped B2, RA l have read the material included in this package and understand what is required by the Frederick County Planning Department. I also understand that all required material will be complete prior to the submission of my site plan. Signature: Name (Printed): Date: 10/15/25 Dennie Dunlap *A signed Power of Attorney form is required if someone is signing on the owner(s) behalf. 9