Loading...
HomeMy WebLinkAbout#44-25 Site Plan Page 1 signature pageVillage at Orchard Ridge Cottages 4WO I :&TJ I I WAIMCIMM FREDERICK COUNTY, VIRGINIA YOTO! rel \ 1 ►L G' PRn.IFCT CONTACTS: OWNER: THE VILLAGE AT ORCHARD RIDGE, INC. ADDRESS- 400 CLOCKTOWER RIDGE DRIVE WINCHESTER, VA 22603 PHONE NUMBER- 540A31.2800 FAX NUMBER- E-MAIL- CONTACT- CONTRACTOR: HOWARD SHOCKEY & SONS, INC. ADDRESS- 1057 MARTINSBURG PIKE WINCHESTER, VA 22601 PHONE NUMBER- 540.723.4185 FAX NUMBER- E-MAIL- RWAGONER@HOWARDSHOCKEY.COM CONTACT- ROB WAGONER ENGINEER (CIVIL): DICE ENGINEERING, PLC ADDRESS- 101 SHELBY CT. WINCHESTER, VA 22602 PHONE NUMBER- 540.974.5157 FAX NUMBER- 540.723.4868 E-MAIL- DDUNLAP@DICE-ENG.COM CONTACT- DENNIE DUNLAP SCALE: 1" = 1000' ELECTRIC COMPANY: SHEN. VALLEY ELECTRIC COOPERATIVE, INC. ADDRESS- 3463 VALLEY PIKE WINCHESTER, VA 22602 PHONE NUMBER- 540.450.0111 CONTACT - WATER PROVIDER: FREDERICK WATER ADDRESS- P.O. BOX 1877 WINCHESTER, VA 22604 PHONE NUMBER- 540.868.1061 CONTACT - SEWER PROVIDER: FREDERICK WATER ADDRESS- P.O. BOX 1877 WINCHESTER, VA 22604 PHONE NUMBER- 540.868.1061 CONTACT - GAS COMPANY: SHENANDOAH GAS ADDRESS- 350 HILLANDALE LANE WINCHESTER, VA 22602 PHONE NUMBER- 540.869.1111 CONTACT - PHONE COMPANY: VERIZON ADDRESS- 404 HILLANDALE LANE WINCHESTER, VA 22602 PHONE NUMBER- 540.665.3153 CONTACT - LOT TABULATION BY UNIT TYPE CCRC PROPOSED PREVIOUSLY APPROVED PROPOSED UNITS PER MDP RESIDENTIAL PHASES 1, 1B, 1C & 2 TO DATE UNITS UNIT NUMBER % OF TOTAL TYPE OF UNITS (1048) ILU 4 340 344 820 78.2% ACU 0 18 18 126 12.0% SNU 1 0 20 20 102 9.7% DENSITY - TOTAL AREA PER USE UNIT TYPE PROPOSED PREVIOUSLY APPROVED PHASES 1, 1 B, 1 C & 2 AVG. LOT AREA (S.F.) TOTAL S.F. 1 BR APT 0 81 X 1000 = 81,000 2 BR APT 0 126 X 2000 = 252,000 1 BR ASSISTED 0 18 X 1000 = 18,000 1 BR SKILLED CARE 0 20 X 1000 = 20,000 COTTAGES 4 82 X 3000 = 258,000 1 BR RENTAL APT 0 50 X 1000 = 50,000 TOTAL = 679,000 S.F. or 15.59 Acres PROJECT INFORMATION: CURRENT OWNER: THE VILLAGE AT ORCHARD RIDGE, INC. REFERENCE: TM 52-A-50 GAINESBORO MAGISTERIAL DISTRICT EXISTING USE DESCRIPTION: CONTINUING CARE RETIREMENT (CCRC) - ADDITIONS TO EXISTING FACILITY PROPOSED USE DESCRIPTION: NO PROPOSED CHANGE IN USE PROPERTY ACREAGE: 131.06 ACRES DISTURBED AREA: 1.66 ACRES ZONING: MS PHYSICAL ADDRESS: 400 CLOCKTOWER RIDGE DRIVE, WINCHESTER, VA 22603 FLOODPLAIN: PROPOSED AREA OF DISTURBANCE LOCATED OUTSIDE THE ZONE A FLOODPLAIN BASED ON FIRM MAP PANEL NO. 51069CO204E, DATED 01/29/2021 PREVIOUSLY APPROVED PLANS: SP#02-13, SP#07-14, SP#45-20, MDP#01-09 PROJECT NOTES: 1. Parcel area: 131.06 ac. 2. Zoning: MS 3. Existing Use: Continuing Care Retirement Community 4. Proposed Use: Continuing Care Retirement Community 5. Property Identification: TM 52-A-50 6. Owner Information: The Village at orchard Ridge, Inc. 400 Clocktower Ridge Drive Winchester, VA 22603 7. Land Disturbance: 1.66 acres 8. Building Setback Requirements: Front: - Required: 20' (private urban local road) - Provided: 27.8' Side: - Required: 50' perimeter, 100'/200' buffers, 10' spacing between cottages - Provided: 1243.0' (East), 880.7' (West), 21.2' between cottages Rear: - Required: 50' perimeter, 100'/200' buffers - Provided: 101.0' 9. Parking Setback Requirements: - Required: 50' perimeter, 100'/200' buffers - Provided: N/A (no new parking) 10. Building Height: - Maximum allowed building height (cottages) = 35' - Proposed building height = 24'f 11. Parking Calcs: - All cottage units shown with 2-car garages, therefore the parking requirements (2 spaces per unit) are accommodated within the individual unit garage/driveway. 12. Loading Spaces: - No additional loading spaces proposed per this plan 13. Floor Area CaICS: - Existing floor area = 592,662 sq. ft. (all phases) - Proposed floor area = 12,349 sq. ft. (4 cottages) - Total floor area = 605,011 sq. ft. 14. F.A.R. - Maximum allowed = 1.0 - Existing = 0.104 - Proposed = 0.106 15. Minimum landscaped area: - Required: 20% - 0.20 * 131.06 acres = 26.21 acres - Existing: 96.8f acres (73.9%) - Provided: 96.45t acres (73.6%) 16. Trip Generation Data: - Refer to traffic analysis titled "Round Hill Center" prepared by Patton, Harris, Rust & Associates. - Information obtained from ITE Trip Generation, 10th edition: - Detached dwelling units: 4.27 trips/unit = 4.27 * 4 = 17 ADT per this plan 17. Water Usage Calcs: - See water usage calculations, this sheet. 18. Boundary and topographic information shown hereon was obtained from existing site plan information and supplemented by a field -run survey by Triad Engineering, Inc., dated 05/23/2025. 19. A 50' woodland buffer along the perimeter boundary lines exist and will not be encroached or modified per this plan. 20. There are no additional refuse containers proposed per this plan. 21. There is no additional signage proposed per this plan. 22. All new utilities must be underground. WATER USAGE CALCULATION: PHASE 1 (EXISTING): - IL UNITS: 1.4 PERSONS/UNIT * 100 GPD/PERSON * 205 UNITS = 28,700 GPD - AL UNITS: 1.0 PERSONS/UNIT * 200 GPD/PERSON * 28 UNITS = 5,600 GPD - EMPLOYEES: 90 EMPLOYEES * 35 GPD/EMPLOYEE = 3,150 GPD - TOTAL PHASE 1: 37,450 GPD PHASE 1B (EXISTING): - IL UNITS: 1.4 PERSONS/UNIT * 100 GPD/PERSON * 18 UNITS = 2,520 GPD PHASE 1 C (EXISTING): - IL UNITS: 1.4 PERSONS/UNIT * 100 GPD/PERSON * 13 UNITS = 1,820 GPD PHASE 2 (EXISTING): - IL UNITS: 1.4 PERSONS/UNIT * 100 GPD/PERSON * 104 UNITS = 14,560 GPD - SKILLED NURSING UNITS: 1.0 PERSONS/UNIT * 200 GPD/PERSON * 11 UNITS = 2,200 GPD - EMPLOYEES: 30 EMPLOYEES * 35 GPD/EMPLOYEE = 1,050 GPD - TOTAL PHASE 2: 17,810 GPD TOTAL EXISTING (PHASES 1, 1B, 1C, & 2): - 37,450 GPD + 2,520 GPD + 1,820 GPD + 17,810 GPD = 59,600 GPD PROPOSED (4 NEW COTTAGES): - IL UNITS: 1.4 PERSONS/UNIT * 100 GPD/PERSON *4 UNITS = 560 GPD TOTAL (EXISTING & PROPOSED): - 59,600 GPD + 560 GPD = 60,160 GPD SHFFT INDEX: SHEET DESCRIPTION SHEET NUMBER COVERSHEET................................................................................ GENERALNOTES........................................................................... OVERALLPLAN.............................................................................. INITIALE&SC PLAN........................................................................ DEMOLITIONPLAN......................................................................... SITEPLAN....................................................................................... GRADING AND FINAL E&SC PLAN ................................................ LANDSCAPEPLAN......................................................................... LIGHTINGPLAN.............................................................................. UTILITY PLAN AND PROFILES...................................................... PRE -DEVELOPED SWM PLAN ...................................................... POST -DEVELOPED SWM PLAN .................................................... POST -DEVELOPED SWM PLAN AND CALCULATIONS ............... UTILITYDETAILS............................................................................ E&SC NOTES.................................................................................. E&SC DETAILS............................................................................... VRRMSUMMARY........................................................................... CONSTRUCTION DETAILS............................................................ EXISTING SITE PROFFERS.......................................................... EXISTING SITE PROFFERS.......................................................... EXISTING SITE PROFFERS.......................................................... EXISTING SITE PROFFERS.......................................................... BUILDING DEPT. NOTE: All structures shall comply to the current USBC. C-01 C-02 ... C-03 ... C-04 .. C-05 ...C-06 ....C-07 ... C-08 ...C-09 ...C-10 ... C-11 ... C-12 ...C-13 ...C-14 ... C-15 ....C-16 ...C-17 ... C-18 .... C-19 ....C-20 ....C-21 ....C-22 ABBREVIATIONS ARCH. ARCHITECT MIN. MINIMUM C/L OR CL CENTERLINE NE NORTH EAST CL. CLASS NW NORTH WEST C/OUT OR C/O CLEAN OUT P.C. POINT OF CURVE CONC. CONCRETE P.I. POINT OF INTERSECTION CG CURB & GUTTER P.T. POINT OF TANGENT D.I.P. DUCTILE IRON PIPE PVC POLYVINYL CHLORIDE DIA. DIAMETER PVI POINT OF VERTICAL INTERSECTION E.P. EDGE OF PAVEMENT PVT POINT OF VERTICAL TANGENT EL. or ELEV. ELEVATION R RADIUS ESMT. EASEMENT R.D. ROOF DRAIN EW EXISTING WATER RT. RIGHT EX. EXISTING SAN. SEW. or S SANITARY SEWER F.E. FOUNDATION ELEVATION SEW. SEWER F.E.S. FLARED END SECTION STD. STANDARD F.F.E. FINISHED FLOOR ELEVATION STM. SEW. STORM SEWER F.H. FIRE HYDRANT SE SOUTH EAST F/L FIRE LINE SW SOUTH WEST F.W. TOP OF FOUNDATION WALL S/W SIDEWALK GM GAS LINE MARKER S.F. SQUARE FEET G.V. GATE VALVE STR. STRUCTURE HORIZ, HORIZONTAL T.B. TOP OF BANK INV. INVERT T/C TOP OF CURB IRS IRON ROD SET TPD TRIPS PER DAY LAT. LATERAL U/G UNDERGROUND LF LINEAL FEET VERT. VERTICAL L.O.D. LIMITS OF DISTURBANCE W/L WATERLINE LT. LEFT X-ING CROSSING MH MANHOLE RESPONSIBLE LAND DISTURBER CERTIFICATION #: EXP. DATE: THE RESPONSIBLE LAND DISTURBER IS THE PARTY RESPONSIBLE FOR CARRYING OUT THE LAND DISTURBING ACTIVITY AS SET FORTH IN THE PLANS. MAP FREDERICK COUNTY ZONING ADMINISTRATOR DATE SITE PLAN VALID FOR FIVE (5) YEARS FROM DATE OF PLANNING DEPT. APPROVAL U J 0- t� z_/ 0L W z M z W U 2 O N U O ti (j N w m�o�o ww�ro@� =f-Lw U) CO WLU � c=j 0 U- Z a u_ Q w I U) z w 0 U U z W Q z 0 U X U W a W LL W W a Cn z 0 L W W ro N O N L0 0 N 0 m U w 0 Uj U Z U m 0 Q N O Lo o < o um LU Q p.. Z I- O� I- O� Z W -n Q O O ry Q OW I- W LL I° L1J LL] U) olf O C) FREDERICK COUNTY SP #44-25 SHEET NUMBER: C-0 1