HomeMy WebLinkAboutComments PWProject Name:________________________________________________
Acreage (Disturbed Area Acreage): _______________________________
PIN(s): __________________
Address (or general location):
Existing Zoning: ___________________________________________________
Proposed Use: ____________________________________________________
Staff Name (Email Address): _________________________________________
Agency Name Completing Comments (select one):
____ Frederick Water
____ Virginia Department of Transportation
____ Winchester Regional Airport
____ Virginia Department of Health
____ Historic Resources Advisory Board
____ Frederick County (FC) Public Schools
____ FC Public Works
____ FC Inspections
____ FC Fire Marshal
____ FC Parks & Recreation
____ FC County Attorney
____ Other (Specify): ________________________
Reviewer Name (Email Address): _____________________________________________________
Review Agency Comments:
*Comments that may not fit in the box should be attached to the cover sheet on agency or department letterhead.
Resubmission to address comments requested? Y _____ or N _____
REQUEST FOR SITE PLAN COMMENTS
15
107 North Kent Street, Second Floor, Suite 200 • Winchester, Virginia 22601-5000
October 29, 2025
Mr. Mike Artz, LS
Pennoni Associates, Inc.
117 E. Piccadilly Street, Suite 200
Winchester, Virginia 22601
RE: Site Plan Comments – Thermo Fisher Parking Expansion
Frederick County, Virginia
Dear Mr. Artz:
Upon review of the site plan dated September 8, 2025, Frederick County Public Works offers the
following comments:
1. All energy balance calculations must use an improvement factor of 0.8 since the total disturbance
of the site exceeds one acre.
2. Demonstrate how this site plan satisfies water quality requirements of the Virginia Erosion and
Stormwater Management Regulation (9VAC25-875-580 & 9VAC25-875-590). The VRRM
spreadsheet (plan sheet CS9100) states that a 0.93 lb./yr. phosphorous load reduction is required.
Provide details of proposed permanent water quality BMPs and/or describe offsite compliance
options that will be used.
3. Provide details for material of all proposed storm pipes.
4. Provide a North arrow on all plan sheets.
Once these comments are addressed, submit a copy of the revised plan for further review.