Loading...
HomeMy WebLinkAboutComments PWProject Name:________________________________________________ Acreage (Disturbed Area Acreage): _______________________________ PIN(s): __________________ Address (or general location): Existing Zoning: ___________________________________________________ Proposed Use: ____________________________________________________ Staff Name (Email Address): _________________________________________ Agency Name Completing Comments (select one): ____ Frederick Water ____ Virginia Department of Transportation ____ Winchester Regional Airport ____ Virginia Department of Health ____ Historic Resources Advisory Board ____ Frederick County (FC) Public Schools ____ FC Public Works ____ FC Inspections ____ FC Fire Marshal ____ FC Parks & Recreation ____ FC County Attorney ____ Other (Specify): ________________________ Reviewer Name (Email Address): _____________________________________________________ Review Agency Comments: *Comments that may not fit in the box should be attached to the cover sheet on agency or department letterhead. Resubmission to address comments requested? Y _____ or N _____ REQUEST FOR SITE PLAN COMMENTS 15 107 North Kent Street, Second Floor, Suite 200 • Winchester, Virginia 22601-5000 October 29, 2025 Mr. Mike Artz, LS Pennoni Associates, Inc. 117 E. Piccadilly Street, Suite 200 Winchester, Virginia 22601 RE: Site Plan Comments – Thermo Fisher Parking Expansion Frederick County, Virginia Dear Mr. Artz: Upon review of the site plan dated September 8, 2025, Frederick County Public Works offers the following comments: 1. All energy balance calculations must use an improvement factor of 0.8 since the total disturbance of the site exceeds one acre. 2. Demonstrate how this site plan satisfies water quality requirements of the Virginia Erosion and Stormwater Management Regulation (9VAC25-875-580 & 9VAC25-875-590). The VRRM spreadsheet (plan sheet CS9100) states that a 0.93 lb./yr. phosphorous load reduction is required. Provide details of proposed permanent water quality BMPs and/or describe offsite compliance options that will be used. 3. Provide details for material of all proposed storm pipes. 4. Provide a North arrow on all plan sheets. Once these comments are addressed, submit a copy of the revised plan for further review. Sincerely, Benjamin H. Whitlock Joe C. Wilder Environmental Program Administrator Director of Public Works JCW/ cc: Planning and Development file