HomeMy WebLinkAbout2_CR_P&Z_HITTC25002
December 16, 2025
Amy L. Feltner
Planner
Frederick County
Dept. of Planning & Zoning
Dear Ms. Feltner:
Re: Comment response for Site Plan #45-25 – Fisher Scientific Parking Expansion
Property Identification Number (PIN): 90-A-58B
We are in receipt of your comments dated November 3, 2025, and our specific responses are
as follows:
Review Comments
1. Boundary Line Adjustment. Parking is not a permitted use as a primary use for the
parcel. A boundary line adjustment with the primary use that the parking serves is
required. Update all calculations, green space requirements, and other ordinance
requirements based on the newly formed parcel.
RESPONSE: A consolidation of the properties will be prepared for review, approval
and recording prior to approval of the Site Plan. This site plan is not providing a site
development summary of TM #90-A-58A or the newly formed parcel, only the
summary of the effects of this plan upon TM #90-A-58B. The existing site is being
considered in compliance.
2. Power of Attorney. The original, signed and sealed, Power of Attorney is required.
RESPONSE: A signed, sealed power of attorney was provided to the Planning
Department on November 24, 2025.
3. Cover Sheet. The following items should be made:
· Site Plan Reference. Add the Site Plan Reference number #45-25.
· North Arrow. Ensure that a North arrow is on all relevant sheets.
· Zoning Administrator Signature Box. The Zoning Administrators signature
box is the correct term to apply to the county approval box.
RESPONSE: Site plan reference number 45-25 has been added, and the signature
box has been updated to reference “Zoning Administrator”. Please see sheet
CS0000. North arrow now visible on all pertinent plan sheets.
4. Site Plan.
· Obstructions. Utility poles shall not be permitted within any parking space.
Any structure located in a parking lot shall be surrounded on all sides abutting
spaces or aisles by a six-inch concrete curb. The structure shall be separated
from the curb by a distance of three feet. (§165-202.01(D)(11)).
· Adjacent Parcels. Identify the relevant zoning and current use for the adjacent
parcels on C2.00.
· Parking Surface Material. Identify the parking surface material. The legend
identifies some materials but there is no correlation to the parking lot material.
RESPONSE: Relevant zoning and use information for adjacent parcels has been
revised on Sheet CS2000, as well as on the existing conditions plan, sheet CS1000.
Additional labeling and clarification has been added to the proposed parking surface
and section. Please see sheets CS4000 and CS4500.
5. Landscaping and Boundary Lot Survey. Address landscaping and parking
requirements on the overall area of the new parcel and identify the boundaries of the
parcel.
· Interior and Perimeter Landscaping. Shade trees required based on 2000
square feet of parking area are rounded up, not down. Eleven (11) trees will
be required based on the proposed 33,077 square feet of parking area.
RESPONSE: Landscaping and parking requirements are not being addressed for the
overall new parcel, only for the improvements associated with TM #90-A-58B. The
existing site is being considered in compliance.
6. Lighting Plan.
· Height. Lighting fixtures, including mounting base, shall not be more than 25
feet above finished grade. (165-201-07(B)(3)). Light fixtures located in a
parking lot shall be surrounded on all sides, abutting spaces or aisles by a six-
inch curb. The structure shall be separated from the curb by a distance of three
feet. (165-202.01(D)(11)).
· Notes. Add a note specifying that all site lighting will be in conformance with
§165-201.07 and be full cutoff, fully downcast and shielded.
RESPONSE: The geometric layout has been revised to propose a raised 6in concrete
curb island around the internal light pole. Additionally, a note pertaining to
§165.201.07 has been added. Please see sheet CS8100.
7. Agency Approvals. Comment sheets (approvals) are required from the following
agencies: the Frederick County Inspections Department, the Frederick County Fire
Marshal, the Virginia Department of Transportation (VDOT), Frederick Water, the
Frederick County Engineer (Public Works), and Frederick County Geographic
Information Systems.
RESPONSE: NOTED. All agency approval letters will be provided upon receipt.
We have enclosed three (3) sets of the revised plan for your review. Please let us know
if you need any additional information.
Sincerely,
Michael Artz, LS 3B